WHEREAS, the City previously retained CH2M-HILL, Inc. for the implementation of a
Poplar Tree Water Reuse System for the application of Woodburn wastewater treatment, and
executed an Agreement for Professional Services; and
WHEREAS, Task Order No. 1 - Predesign of a Poplar Tree Water Reuse System, and
Permitting Assistance including Temperature and Mixing Zone issues - was incorporated into the
Agreement and is almost completed; and
WHEREAS, the City and CH2M-Hill, Inc. now want to begin Task Order No. -2 - Final
Design of Poplar Tree Reuse System, Bidding and Construction Services, and Operational
Management Program; and
WHEREAS, it is necessary to enter into an Addendum to Agreement so that said Task
Order can begin; NOW, THEREFORE,
THE CITY OF WOODBURN RESOLVES AS FOLLOWS:
Section 1. That the city enter into an Addendum to Agreement with CH2M-Hill, Inc.
Section 2. That the Mayor is authorized to sign, on behalf of the City, said addendum, a
copy of which is affixed hereto as Attachment "N' and by this reference is. corp rated herein.
APprOVedastoformV;VVO-~ 5 6 4<3
City Attorney Date,
APPROVED: ~~ ~,
Nancy A' , Mayor /
May 11, 1998
Passed by the Council
Submitted to the Mayor
Approved by the Mayor
Filed in the Office of the Recorder
ATTEST: mCUM~
M~t, City Recorder
City of Woodburn, Oregon
May 12, 1998
May 12, 1998
May 12, 1998
Page 1 - COUNCIL BILL NO. 1886
RESOLUTION NO. 1481
r- ----"--.-.---r-- """'-- .~~ -- ..." ---,-.-----------" ,..--... ..--.",..--.-.
,TTACHMENT A
Page -'- of 61 q
DUPLICATE ORIGINAL
ADDENDUM TO AGREEMENT
THIS ADDENDUM TO AGREEMENT is entered into between the City of Woodburn
("OWNER"), an Oregon municipal corporation, and CH2M-Hll..L, INC., ("CONSULTANT').
WITNESSETH
WHEREAS, OWNER retained CONSULTANT for the implementation of a Poplar Tree
Water Reuse System for the application of Woodburn wastewater treatment, and
WHEREAS, OWNER and CONSULT ANT executed an Agreement for Professional
Services ("the Agreement"), which was approved by the Council on February 10, 1997, and
WHEREAS, Task Order No.1 - Predesign ofa Poplar Tree Water Reuse System, and
Permitting Assistance including Temperature and Mixing Zone Issues - was incorporated into the
Agreement and is almost completed; and
WHEREAS, OWNER and CONSULT ANT now want to begin Task Order NO.2 - Final
Design of Poplar Tree Reuse System, Bidding and Construction Services, and Operational
Management Program; and
NOW, THEREFORE, in consideration of the terms conditions and covenants contained
herein, the parties agree as follows:
L NOTICES
Article 6 M of the Agreement is modified to read as follows:
M. Notices
All notices required under this Agreement shall be delivered by facsimile, personal
delivery, or mail and shall be addressed to the following persons:
Mark Madison
CH2M-Hll..L, Inc.
825 S.B. Multnomah, Suite 1300
Portland, OR 97232
(503) 235-5000
FAX (503) 9\235-2445
Mr. Frank Tiwari
Public Works Director
City ofW oodburn
Woodburn, Oregon 97071
(503) 982-5240
FAX (503) 982-5244
Page 1 - Addendum to Agreement
r
'I' -~_._~.-- -~"-~-"----"--~-'--
ATTACHMENT A
Page..i!;;;... of 01 '/
DUPLICATE ORIGINAL
IT. INCORPORATION OF TASK ORDER NO.2
Article 7 of the Agreement is modified to specifically incorporate Task Order No.2 - Final
Design of Poplar Tree Reuse System. Bidding and Construction Services, and Operational
Management Program, a copy of which is attached hereto as Exhibit "N' and is
incorporated herein by reference.
III. AGREEMENT IN FULL FORCE AND EFFECT
In all other respects, the Agreement shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have caused this Addendum to Agreement
to be executed in duplicate by their respective authorized officers or representatives.
CH2M-lllLL, INC.
CITY OF WOODBURN
Date:
By: 'ZL~ A 1r"7
Nancy A. Kirksey, Mayor
Date: May 12, 1998
By:
William Blosser, Vice President
Attest:~:r=-~~
Mary Te ant, City Recorder
Date: III ~ ~) 1 9 7Z
Approved as to form:
City of Woodburn
Legal Counsel
N. Robert Shields
Page 2 - Addendum to Agreement
r- ---~"-~-'"'T'-- '----..---...-+~ ...,---..--"...----- - .-~,-,---,---
T
ATTACHMENl'd
Page -3- of .~ C}
EXHIBIT A
Page -1..- of ~ 7
Task Order No.2
Final Design of Poplar Tree
Reuse System, Bidding and Construction Services, and
Operational Management Program
Subject: ORIGINAL CONTRACT to furnish professional services to the City of
Woodburn, Oregon, for the Poplar Tree Water Reuse System and Permitting Assistance
Including Temperature and Mixing Zone Issues dated February 12, 1997.
Upon execution of Task Order No.2 by the City of Woodburn (OWNER) and the CH2M
HILL Poplar Team (CONSULTANT) in the space provided below, this Task Order will
serve as authorization for the CONSULTANT to carry out and complete the services as set
forth below in accordance with the referenced Contract between the OWNER and the
CONSULTANT.
1. Understanding, Approach, and Purpose
The OWNER has requested the CONSULTANT to provide the services associated with the
implementation of the Poplar Tree Water Reuse System (Reuse Sys!em). The Reuse System
shall be an integral part of the new upgraded Woodburn Wastewater Treatment Plant
(WWTP) facilities by others. The key project objectives are:
· Establish a plantation of 3-year old poplar trees by the required time of
compliance
· Establish the reclaimed water irrigation system
· Include pumping capability for in-plant water use at irrigation pump station.
. Design for application of liquid biosolids as a fertilizer source
. Provide suitability assessment for property acquisition assistance
. Provide field soils investigations for up to 2 potential property acquisition sites
. Coordinate with DEQ and address requirements
· Deliver project on time and on budget
. Continue the education outreach and involvement program to maintain
community awareness, involvement during construction, and long term support
for the project
· Provide an interpretive Center and landscape design
. Implement a sound operations, maintenance, and management strategy for the
water and biosolids reuse system to ensure long term compliance
. Prepare an Operations and Maintenance Manual
. Continue operations and maintenance activities for existing poplar
demonstration fields and potentially the new fields
. Continue to investigate funding sources - develop one funding request package
by City - 40 hours
\\ROSE\PROJ\WOOOBURN\ 140040\TASK6\T02\T02scPH,OQC
5/4198
r
.__ _'"_ '_-Y--'.'_ ....,.. ~.- ___H _ .-.-.- _ --> _ ---..-_.' ,-
~.
.
. iTACHMENT.-.d..-
Page....:i.- of d 9
CllY OF WOODBURN- POPlAR TREE WATER REUSE TASK ORDER NO. 2 CONTRACT
EXHIBIT A
Page...2:..- of 011
The CONSULTANT has designed the approach to achieve these stated goals and objectives
in three distinct phases:
. Task Order 1: Predesign of Poplar Tree Reuse System and Permitting Assistance
Including Temperature and Mixing Zone Issues
. Task Order 2: Final Design of Poplar Reuse System and Field Drains, Conceptual
Design of Wetlands, Bidding, Construction Services, and Public Involvement Program
Future Task Orders may include but are not limited to:
. Operations, Maintenance, and Management Assistance
. Design of Phase II Poplar Tree Reuse System
The objective of Task Order No.1 was to develop a 30 percent design of the full-scale poplar
tree water reuse system and provide public involvement and permitting assistance.
The objective of Task Order 2 is to complete final design and construct the reclaimed water
Reuse System. The final design tasks will produce the contract documents for bidding. The
scope for the final design includes components of the reuse system, including the pump
station wet well, the trees, irrigation system, associated electrical wiring, and yard piping
and a groundwater underdrain system for low-lying agricultural fields. Coordination with
the treatment plant design and construction will continue. The design of the liquid
biosolids application system to the poplar plantation is included. In addition a conceptual
design of stormwater wetlands system is also included. The details of the work scope for
this phase are included in this Task Order.
The scope of work and level of effort is based on delivering the following design packages:
. Irrigation Distribution Piping, Irrigation Application System, and Biosolids Application
System
. Irrigation and W3 Pump Station
. Biosolids Pump Station
. Tree Plantation
. 1998 Interim Sodium Hypochlorite System
The scope of work and level of effort for the design packages are based on the sheet counts
listed in Attachment A.
\\ROSE\PROJ\WOODBURN\ 140040\T ASK6\T02\T02SCPH.OOC
5/4198
2
~'
.._........._,... .,.0.< ._.....,."......~._,
..,.
'TACHMENT -L1
,;tge~ of ...:J C}
CITY OF WOOOBUAN- POPlAR TREE WATER REUSE TASK ORDER NO. 2 CONTRACT
2.
Scope of Services
EXHIBIT ...L1
Page ~ of .;) 7
The specific services to be provided in Task Order No.2 are broken into the following tasks:
Task 1. Ongoing Coordination with Treatment Plant Design
Task 2. Surveying and Utility Locate
Task 3. Final Design for Trees, Pump Station and Irrigation System
Task 4. Management Plan
Task 5. Funding Assistance
Task 6. Design of Biosolids Application System
Task 7. Bidding Services for Contracts
Task 8. Construction Management Services
Task 9. Operations and Maintenance (O&M) Manual
Task 10. Start-up and Training
Task 11. Public Involvement
Task 12. DEQ Coordination
Task 13. Interim Chlorination and 1998, 1999, and 2000 Site Operation and Maintenance
Assistance
Task 14. Project Management
The following summarizes the activities associated with each of these tasks.
Task 1 Coordination with Treatment Plant Design
The objective of this task is to ensure proper communications regarding the incorporation of
the reuse project into the treatment plant final design and construction. Four meetings (3
hours per meeting) are assumed with Treatment Plant Consultant and OWNER staff for
design and construction coordination. One meeting is assumed between the design staff
(i.e. I&C and electrical) of the Treatment Plant Consultant and CH2M HILL.
Activities
1.1 Planning Meetings with Treatment Plant Consultant and OWNER
1.2 Review of Final Design and Construction Schedule for WWTP
1.3 Ongoing Coordination with BCC
Deliverables
. Updates of final design and construction schedules for WWTP.
. Documentation for decisions made at meetings
Scope of OWNER Services
. Attend two meetings (and other coordination meetings as needed up to 4)
. Timely review of draft memorandum
\\ROSE\PROJ\WOODBURN\ 140040\T ASK6\T02\ T02SCPH,DOC
5/4198
3
l'
'~-r'.'
1'-""-'''''~''.'--"''-~-' ".1_.,_................."...4...~"..,' ..,-~.~ ,-.,,~..~.-~..._."^'~~-'""_......,... ,
"I'
AC~MENT-L-
. ...ge -, of,~ 1
CITY Of WOOOBUAN- POPlAR mEE WATER REUSE TASK ORDER NO.2 CONTRACT
Task 2 Surveying and Utility Locate
EXHIB1T/- A '
Page -z- of 62 '1
The objective of this task is to coordinate with the surveying done by others to ensure the
required data is gathered to develop the base information for the design project and provide
control during conStruction. It is assumed the OWNER will be responsible for surveying.
Surveying activities by others to be coordinated include research, control surveying, and
topographic/location surveying. The boundaries of the site need to be researched to
provide an exterior boundary of the overall site. The Marion County Surveyor's office will
have current survey and deed records to accurately define the exterior boundary of the land
owned and leased by the OWNER. Control surveying will provide control monuments in
the field in strategic locations to be used during the topographic survey and to locate
property monuments. The topographic survey will provide information needed to check the
aerial survey, locate utilities, and verify the position of existing features such as headworks,
pumps, outfall structures, etc. Site plan mapping will center on the OWNER providing a
base map for use in the design of various elements of the project. A geometric control plan
will provide an overall control map to show a contractor the control points that will be in
place to build the project.
The CONSULTANT will coordinate the surveying activities required to develop the base
information for the design project and provide control during construction. Data
Management will include manipulation of data for the base mapping as well as correlating
the ground survey with previous aerial mapping.
Activities
2.1 Survey Coordination
2.2 Data Management
Deliverables
. None identified
Scope of OWNER Services
. Locate existing utilities and conduct survey
. AutoCAD version 12 reference file showing field collected data
. Site Plan
Task 3 Final Design for Trees, Pump Station and Irrigation
System
The objective of this task is to continue the final design the poplar plantation tree spacing
and planting to provide irrigation of Woodburn WWTP effluent (reclaimed water) and
biosolids application to the poplar tree plantation. The final design was begun under Task
Order No. 1 for the trees and field application systems. It is assumed that the irrigation
system will be installed in summer/fall of 1998 and the trees will be planted in March 1999.
Table 1 represents the preliminary design criteria to be used during the predesign and final
design phase and identifies the major components to be designed for Phase I only.
\\ROSE\PROJ\WOODBURN\ 140040\TASK6\T02\T02sCPH.OOC
5/4198
4
,.
T-'
_.,_ '.._._....--' "..."" _ "H. ,._,___"_,,,..., "'_"""_"
..
\TTACHMENT.J (:'
28ge..:::L- of c') 7
CllY OF WOOOBURN- POPLAR mEE WATER REUSE TASK ORDER ~T A
. Page --5- of '-" I
Table 1. Assumed Design Criteria for Contracting Purposes.
COMPONENT CRITERIA
Pump station wet well structure - Capacity to allow acceptable pump cycle times as regulated by the
need to reuse all water from plant in excess of permitted river discharge
in July and August
Housing for switch gear and
motors
Pump equipment
Filter equipment
Existing Plantation head works
controller
Biosolids application
Effluent mainlines
Field distribution manifolds
Infield application system
Tree selection
Monitoring equipment
- Interim sodium hypochlorite addition
- Effluent switchgear in existing control building. Motors and biosolids
switchgear outdoors
- Relocate existing reuse pump
- For present treatment plant volume (3.33 MGD)
- Irrigation Pumps (Le. Phase 1- 2 at 1 MGD, 2 at 0.5 MGD; 2 at 2.5 MGD
(one redundant 1.0 mgd and 2.5 mgd)
- W3 Pumps: 1 @ 375 gpm-share header and irrigation redundant
pumps.
- One variable speed drive
- Phased for present treatment plant volume
- 2 units of equal capacity. One is redundant
- Sized to match pump capacity
- Relocate
- Expand to track pump operations and cycle fields
- Liquid biosolids application with hard hose real, pump, filters,
pipeline, risers, tractor and tank trailer.
- One mainline, 3.33 MGD Phase I
- Up to 5 fields per manifold and 0.5 MGD per field during normal use.
- Phase I would have 3 manifolds to allow rest time for fields and
maintenance and operation issues
- Total area is assumed to be 80 acres
- Micro-spray irrigation system
- Submains will be minimized
- All pipe and tube will be sized for greater than 1 ft/ see velocity
- Tree selection and layout will be based on results from the prototype
and additional ongoing studies at various localities within the state
- Monitoring equipment will be based on criteria developed in the
effluent and biosolids management plan
The objective of this task is to prepare design documents for internal and OWNER review.
Comments from Task Order No.1 will be incorporated into the 75 percent design. The
CONSULTANT will submit five sets of 75 percent drawings and 75 percent and 95 percent
specifications to the OWNER for their review. An internal quality assurance/ quality control
review (QA/QC) of the documents will be conducted simultaneously with a design review
by the OWNER. Major review comments will be addressed in the design. It is assumed that
the irrigated areas will be approximately 80 acres. Two copies of the 75 percent documents
will be sent to DEQ for their information. Preparation of final contract documents will focus
on the final bid forms, front-end legal sections, technical specifications, and drawings by
addressing major review comments received in prior tasks. Three sets of final construction
documents will be sent to DEQ. Thirty five (35) copies of Bid Ready documents will be
delivered to the OWNER.
The list of bid document sheets that are expected to be included in the contract documents
are shown in Attachment A.
\\ROSe\PROJ\WOOOBURN\ 140040\T ASK6\T02\T02SCPH,OQC
5/4198
5
TO- '-"'-"'---'--"--y--"'-"'-~""---'-'-' --.--....---,
I
. ATTACHMENT--LL-
Page M gf::) <J
Task 3.1 Develop Base Design Sheets and Specifications
The objective of this task is to develop the base design sheets and specifications that will be
used in the development of the final contract documents. This task was partially completed
in Task Order No.1. This task completes the remaining activities. CONSULTANT staff will
work with the OWNER in developing the CAD files required for the design sheets. The
OWNER will provide to the CONSULTANT existing CAD files that are pertinent to the
design of the Poplar Tree Reuse System. It is assumed that between the surveyed
information gathered in Task 2 and other existing CAD files provided by the City enough
information will be available to develop the base design sheets for approximately 80 acres
adjacent to the WWTP. Since actual areas requiring the development of CAD files are not
known at this time, there may need to be an additional work scope to survey and develop
the areas greater than 80 acres. The CONSULTANT and OWNER will work together in
identifying the appropriate specifications (both general and technical) for the project. It is
assumed that the CONSULTANT's standard specifications system will be used.
CITY OF woooeUAN- POPLAR TREE WATER REUSE TASK ORDER NO. 2 CONTRACT
EXHIBIT A
Page~ of d1
Activities
Task 3.1.1 Design Sheet and Specification List (legals and technical)
Task 3.1.2 Review Existing CAD files
Task 3.1.3 Develop Base Drawings
Task 3.1.4 Develop Base General and Technical Specifications
Oeliverables
. List of design sheets and specifications for contract documents
Scope of OWNER Services
. Provide Existing CAD files pertinent to the design
. Timely review of list of design sheets and specifications
Task 3.2 Final Design Documents for Pump Station, Filters and Yard Piping
The objective of this task is to prepare 75 percent design drawings, 75 and 95 percent
specifications and final contract bid documents for the irrigation W3 Pump Station and
ductile iron Yard Piping.
Activities
Task 3.2.1. Develop Specifications
Task 3.2.2. Prepare Pump Station and Filter Drawings
Task 3.2.3. Prepare Yard Piping Drawings
Task 3.2.4. Draft Engineer's Cost Estimate
Task 3.2.5. Internal QA/QC
Task 3.2.6. OWNER Review Session
Task 3.2.7. Document Appropriate Changes to Incorporate from 75 and 95 percent reviews
Task 3.2.8. Final Engineer's Cost Estimate
Oeliverables
. 5 sets of 75 percent design drawings and specifications for Pump Station and Yard
Piping
\\AOSEIPROJ\WOODBURN\ 140040\T ASK6\T02\T02scPH,OQC
5/4198
6
..,.,
---.....-._,.- .~-- ,- --~,-_._----, .- -~ .. - ------.-----
"
.
ATTAC
Pa
CITY OF woooeURN- POPLAR mEE. WATER REUSE TASK ORDER NO. 2 CONTRACT
.
5 sets of 95 percent specifications
Engineer's cost estimates for 75 percent and final design
2 sets of 75 percent documents to DEQ for review
Memorandum on changes to incorporate from 75 percent reviews into final design
35 sets of bound Biddable (final plans and specifications) documents and one unbound
set
3 sets of final construction documents to DEQ for review and approval
Revised construction cost estimate
EXHIBIT A
Page -L.. of
.
~7
.
.
.
.
.
Scope of OWNER Services
· Timely review of drawings and specifications and written comments
. Approval of front end and legal specifications
Task 3.3 Final Design Documents for Trees
The objective of this task is to prepare final design documents and final contract documents
for the tree plantation. A letter specification for planting material will be completed under
Task Order No. 1. The final design documents will include requirements for installation,
site preparation, first year maintenance, and ground cover.
Activities
Task 3.3.1. Develop Specifications
Task 3.3.2. Prepare Poplar Tree Plantation Area Drawings
Task 3.3.3. Prepare Buffer Tree Area Drawings
Task 3.3.4. Internal QA/QC
Task 3.3.5. OWNER Review Sessions
Task 3.3.6. Document Appropriate Changes to Incorporate into Design
Task 3.3.7. Engineer's Cost Estimate
Deliverables
. Five sets of 75 percent design drawings and specifications to OWNER
· Two copies of 75 percent design documents to DEQ for review
. 5 sets of 95 percent specifications
· Engineer's cost estimate for 75 percent and final design
· Memorandum on changes to incorporate from 75 percent reviews into final design
· 35 sets of bound Biddable (final plans and specifications) documents and one unbound
set
.
. Three sets of final construction documents to DEQ for review and approval
Scope of OWNER Services
. Timely review of drawings and specifications and written comments
. Approval of front end and legal specifications
Task 3.4 Instrumentation and Control Software Development
The objective of this task is to develop the Instrumentation and Control (I&C) software that
will operate the irrigation system. .
\IROSE\PROJ\WOODBURN\ 140040\ T ASK6\T02\T02SCPH,DQC
5/4198
7
...-'
_~.._.~____....._~_..c-"-".--.....",.,.....,,.+_.".,.,~ """_",,,,_.,~',,"_H'__""'~_".~_">^""_"~'~"_""'."'--"^.....>..__,_,"~"~_......
ATTACHMENT A
Page..1J..L of d ?
CITY OF WOODBURN- POPlAR TREE WATER REUSE TASK ORDER NO. 2 CONTRACT
Activities
Task 3.4.1.
Task 3.4.2.
Task 3.4.3.
Task 3.4.4.
EXHIBIT A
Page -t:L of d- .,
Workshop
Prepare Draft Narrative Operating Strategies
Review Comment Workshop
Prepare I&C Software (Design Monitoring and Control System Software) and
Finalize Narratives
Deliverables
. Operation Narratives Memorandum
. Monitoring and Control Software
Scope of OWNER Services
. Participation in Workshops
Task 3.5 Final Design Documents for Distribution Piping and Application System
The objective of this task is to prepare 75 percent design drawings, 75 percent and 95
percent specifications and final contract bid documents for PVC plantation piping. Fifty-
percent design was completed under Task Order No.1.
Activities
Task 3.5.1. Develop Specifications
Task 3.5.2. Prepare Distribution Piping and Application System Drawings
Task 3.5.3. Engineer's Cost Estimate
Task 3.5.4. Internal QA/QC
Task 3.5.5. OWNER Review Session
Task 3.5.6. Document Appropriate Changes to Incorporate into Design
Deliverables
. Five sets of 75 percent design drawings and specifications for PVC plantation piping
. Draft engineer's cost estimate for 75 percent design
. Two sets of 75 percent design documents to DEQ for review
. Five sets of 95 percent specifications
. Memorandum on changes to incorporate from 75 percent reviews into final design
. 35 sets of bound Biddable (final plans and specifications) documents and one unbound
set
. Three sets of final construction documents to DEQ for review and approval
. Revised construction cost estimate
Scope of OWNER Services
. Timely review of drawings and specifications and written comments
. Approval of front end and legal specifications
Task 3.6 Property Suitability Assessment for Land Acquisition Assistance
The objective of this task is to provide assistance to the OWNER to assess potential property
purchases for future poplar plantation development. CONSULTANT will provide site
visits, review of SCS soil survey, and letter reports for up to 8 properties and issue a brief
letter report on land suitability. In addition, field soils investigations for up to 2 properties
will be conducted. Brief letter reports will be written to document the soils investigations.
\IROSE\PROJ\WOODBURN\ 140040\T ASK6\T02\ T02sCPH ,DOC
5/4198
8
1.
I
'ATTACHMENT-4-
Page -LL of OJ ,
CITY OF WOOOBURN- POPlAR TREE WATER REUSE TASK ORDER NO.2 CONTRACT
Activities
Task 3.6.1 Site Visits and SCS Soil Survey (literature review only)
Task 3.6.2 Suitability Assessment Letter reports (Up to 8)
Task 3.6.3 Soils Investigations and Brief Letter Reports (Up to 2)
Deliverables
. Letter report on suitability assessment (up to 8 properties)
. Letter report on soils investigations (up to 2 properties)
Scope of OWNER Services
. Participation in site visits
EXHIBIT --.d .
Page ~ of ,). 7
Task 4 Management Plan
The objective of this task is to develop the Irrigation and Biosolids Management Plan. The
work on this task was taken out of Task Order No.1 and moved to Task Order No.2. An
outline of the management plan will be prepared and submitted to the OWNER for review.
Specific information anticipated to be required for the plan are soils and hydrogeologic
findings at the site, hydraulic and nutrient loading rates analysis, operations and
monitoring plans, and general design information of key facility components. A draft of the
plan will be prepared for review by OWNER and DEQ staff. Only one review process is
anticipated, before a final management plan can be submitted. After the CONSULTANT
has received the review comments, the appropriate comments will be incorporated into a
final Effluent and Biosolids Management Plan.
Activities
Task 4.1 Prepare Draft Plan
Task 4.2 Internal Review
Task 4.3 Client and DEQ Reviews
Task 4.4 Prepare Final Plan
Deliverables
. Outline of Effluent and Biosolids Management Plan
. Draft Effluent and Biosolids Management Plan
. Final Effluent and Biosolids Management Plan
Scope of OWNER Services
. Timely review of effluent and biosolids management plan outline
. Timely review of draft effluent and biosolids management plan
Task 5-Funding Assistance
The objective of this task is to assistance the OWNER (up to 40 hours) in the preparation of
a standard package that could be used in submitting applications for secure funding
assistance. The OWNER will be responsible of contacting the key sources of funding and
preparing the applications.
\\ROSE\PROJ\WOOOBURN\ 140040\T ASK6\T02\T02sCPH.DOC
5/4198
9
~'_.,..,... ".-".._.._"..~_",~."_~",__.,...... ..,",",k,..._..._..-4...._.,.~...._.,_k~.'.....~"'" """'"~~~"=_
". T
'TTACHMENT~
,1age~ of ~
CITY OF WOOOBURN- POPlAR TREE WATER REUSE TASK ORDER NO, 2 CONTRACT
Activities
Task 5.1 Develop standard package to be used with applications
EXHIBIT A
Page....1.JL of ~ 7
Deliverables
. standard package to be used with applications
Scope of OWNER Services
. List of Top Funding Sources to Pursue
. Contact List of Top Funding Sources
Task 6 Design of Biosolids Application System
The objective of this task is to design the biosolids application system. The final design will
include 75 percent design drawing submittals, 75 percent and 95 percent specifications and
final contract documents. The biosolids, filter and supernatant piping will be bid in the
same package as the irrigation piping and the biosolids pump station will be bid in a future
package not yet defined. The biosolids equipment will be packaged to bid each piece of
equipment separately (tractor, winch and hose reel). The biosolids equipment includes
tractor, hose-reel, tank trailer, nozzle cart, winch, and brown bear. It is assumed that the
Biosolids Pump Station Design Package will be bid with the Owner's Treatment Plant Phase
3 Contract by the Treatment Plant Consultant.
Activities
Task 6.1 Develop 75 percent and 95 percent Specifications and final for piping, and
equipment
Task 6.2 Prepare Biosolids Application System 75 percent and final Drawings
Task 6.3 Prepare individual bid packages for equipment
Task 6.4 Engineer's Cost Estimate
Task 6.5 Internal QA/QC
Task 6.6 Client Review Sessions
Task 6.7 Document Appropriate Changes to Incorporate into Design
Deliverables
. Five sets of 75 percent design drawings and 75 percent and 95 percent specifications for
biosolids application system
. Five sets of 75 percent design drawings and 75 and 95 percent specifications for
biosolids pump station
. Draft engineer's cost estimate for 75 percent design and final construction documents
. Two copies of 75 percent documents to DEQ for review
.
. Five sets of 95 percent equipment specifications
. Memorandum on changes to incorporate from reviews into final design
. 35 sets of bound Biddable (final plans and specifications) documents and one unbound
set
.
\\AOSE\PAOJ\WOODSURN\ 140040\TASK6\T02\T02sCPH.OOC
5/4/98
10
T"
-.--y-..-............ ...........,......-.... -.. ,..-," - _...._.._~~_.._.-
"
ATTACHMENT A
page...t.l of d- !
CITY OF WOOOBUAN- POPLAR mEE WATER REUSE TASK ORDER NO, 2 CONTRACT
. Three sets of final construction documents to DEQ for review
Scope of OWNER Services
. Timely review of drawings and specifications and written comments
. Approval o,f front end and legal specifications
EXHIBIT -A
Page -1L of d"7
Task 7 Bidding Services for Contracts
The objective of this task is to provide bidding services for the Woodburn Contracts to
secure competitive and responsive contractors. The scope of work for Bidding Services is
common to the construction packages that are currently anticipated for construction at the
Woodburn WWTP. The packages include:
Task 10.2.1.1. Irrigation Distribution Piping, Irrigation Application System, and Biosolids
Application System Bidding .
Task 10.2.1.2. Irrigation and W3 Pump Station Bidding Services
Task 10.2.1.3. Tree Plantation Bidding Services
Task 10.2.1.4. Biosolids Equipment Bidding
Task 10.2.1.5. Biosolids Pump Station
The CONSULTANT will attend one prebid meeting for each bid package with the bidders
to discuss key elements of the project. It is assumed that one addendum will be prepared for
each bid package in order to address questions resulting from bidders review of the
contract documents. The CONSULT ANT will attend the bid opening and assist the
OWNER in reviewing the bids for conformance to the documents and provide a
recommendation of the contractor to award the contract to.
Activities for Each Contract
Task 7 X.I. Assist in Preparation of Bid Announcement
Task 7 X.2. Prebid meeting
Task 7 X.3. Preparation of One Addendum
Task 7 X.4. Bid Opening and Evaluation
Deliverables for Each Contract
. Up to one Addendum
. Bid Announcement Comments
. Two complete sets of bid documents including addenda to DEQ
. Recommendation of Selection
Scope of OWNER Services
. Conduct two meetings for each contract
\\ROSE\PROJ\WOODBURN\ 140040\TASK6\T02\T02SCPH,DQC
5/4198
11
1
'--,..."--r.,._~_.~......~'-_.~-~_.__.,-'_.
ATTACH!fENT A
Page I of a-- /
CITY OF WOODBURN- POPLAR lREE WATER REUSE TASK ORDER NO. 2 CONlRACT
Task 8 Construction Management Services
EXHIBIT -.-!1
Page ~ of .,.} 7
The objective of this task is to provide the services to monitor and verify construction
conformance to the contract documents. The scope of work for Construction Management
Services is common to the construction packages that are currently anticipated for
construction at the Woodburn WWTP. The packages include:
Task 8.1. Irrigation Distribution Piping, Irrigation Application System, and Biosolids
Application System
Task 8.2. Irrigation and W3 Pump Station
Task 8.3. Tree Plantation
Task 804. Biosolids Pump Station (Office Services and Periodic Site Support Only)
For each contract, the CONSULTANT will attend one preconstruction meeting to go over
the construction schedule, and address contractors questions. The CONSULTANT will
provide a one-quarter time inspector during the course of the construction. It is assumed
that the tree planting construction will last 1.5 months. It is assumed the plantation piping
construction will last 4 months. It is assumed the irrigation and W3 pump station and
biosolids pump station construction will each last 5 months. Monthly progress reports will
be prepared to inform the OWNER of the construction status. The contractor will provide
the CONSULTANT with as-built information in order for the Consultant to prepare final
as-built drawings.
Task 8.X.1 Site Visits and Meetings
The objective of this task is to attend meetings and visit the site during construction to
provide continuity from the design through construction. (The X in the Task number refers
to the bid package number).
Activities
Task 8.x.l.l. Attend preconstruction meeting
Task 8.x.1.2. Provide periodic site visits and support, as requested by the City
Task 8.X.I.3. Provide an inspector to inspect
Task 8.x.IA. Attend job site meetings
Task 8.x.l.5. Conduct Pre-final and Final Inspections
Task 8.x.l.6. Prepare Punchlist
Deliverables
. Progress Reports
. Punchlists
Scope of OWNER Services
. Provide job site office space or trailer
. Attend meetings .
Task 8.X.2 Submittal Review
The objective of this task is to review and respond to schedules, and samples, results of tests
and inspections, and other data which the Contractor is required to submit for conformance
\\ROSE\PROJ\WOODBURN\ 140040\TASK6\T02\T02SCPH,OQC
5/4198
12
r
. ... "-'-~-r-~- ,.--.-,-.... ~"""'--"-' ..,_.'~'''-'''''''---''~~--'-'''--'' ,
'1~
....
ATTACHMENT A
page....L::L of .;; q
CITY OF WOODBURN- POPLAR TREE WATER REUSE TASK ORDER NO. 2 CONTRACT
with the design concept of the project and compliance with the information given in the
contract documents.
Activities
Task 8.x.2.1. Review and respond to contractor submittals
EXHIBIT A
Page...L2.. of :J 7
Deliverables
. Written responses summarizing submittal review results and actions needed by
Contractor.
Scope of OWNER Services
. Assist in responses if required
Task 8.X.3 Clarifications (Requests For Information [RFI]s)
The objective of this task is to receive, review and respond to requests for clarifications and
interpretations (RFIs) of the drawings, specifications, and contract requirements not
affecting the cost or time of completion of the contract.
Activities
Task 8.X.3.1 Review and respond to requests for clarifications and interpretations (RFIs)
Deliverables
. Written responses to requests for clarification or interpretation.
SCOpe of OWNER Services
. Assist in responses if required
Task 8.X.4 Change Orders and Change Proposals
The object of this task is to review, prepare, and recommend change orders for work arising
from unforeseen conditions or for changes requested affecting the cost or time of
completion of the project. Assist the City in negotiating the scope and cost of any necessary
contract change orders with the Contractor. Document scope, cost and justification.
Activities
Task S.x.4.1. Review, prepare, and recommend change orders
Task 8.x.4.2. Assist City in negotiating the scope/cost of any necessary contract change
orders
Task 8.xA.3. Document scope, cost and justification
Task 8.X.4.4. Deliverables
. Written recommendations and documentation of scope, cost and schedule changes.
Scope of OWNER Services
. Negotiate and approve Change Orders
Task 8.X.S Record Drawings
The object of this task is to transfer the Contractor's mark-up as-built drawings to the
electronic file (Autocad Version 12)
\IROSE\PROJ\WOQDBURN\ 140040\TASK6\T02\T02SCPH,OQC
5/4I9B
13
...M
-'-~T"
lIJI''''
ATTACHMENT A
page..!.ie- of ~
CITY Of WOOOBURN- POPlAR TREE WATER REUSE TASK ORDER NO.2 CONTRACT
Activities
Task 8.X.5.1 Obtain as-built drawings
Task 8.X.5.2 Transfer the Contractor's mark-up as-built drawings to the electronic file
(Autocad Version 12)
EXHI~
Page of ;:;2.:
Deliverables
. Electronic version of as-built drawing files ,two sets of 11 by'17 as-built drawings and
one unbound copy
Scope of OWNER Services
. Not applicable
Task S.X.6 Claims Analysis
The object of this task is to provide claims analysis assistance for extra compensation and
time extensions. Provide a summary report outlining the reasons, justifications, causes, and
recommendations to the City.
Activities
Task 8.X.6.1 Evaluate Contractors claims for extra compensation and time extensions
Deliverables
. Summary report outlining the reasons, justifications, causes, and recommendations
Scope of OWNER Services
. Approve or reject claims
Task S.X.7 Dispute Resolution
The object of this task is to provide disputes resolution support. Assist in negotiations,
analysis, discussions, and documentation, to resolve disputes in a timely fashion.
Activities
Task 8.X.7.1 Participate in dispute resolution in the manner outlined by the City.
Deliverables
. Dispute resolution documentation ~s established by the City
Scope of OWNER Services
· Disputes resolution format
Task 9 Operations and Maintenance Manual
The objective of this task is to provide the OWNER with an operations and maintenance
(O&M) manual for the reuse system and biosolids application system. The CONSULTANT
will develop the operations and maintenance manual based on the final design documents,
equipment manufacturers' information about the various components in the system,
engineering and operational experience, and an understanding of the long-term benefits of
the system.
\\ROSE\PROJ\WOODBURNl140040\TASK6\T02\T02SCPH.OOC
5/4/98
14
~'
"--y-
T"
\CHMENT~
.Ja..LJ.... of ~
EXHIBIT-----LL-- .
Pace I~ of ~7 ClTYOFWOOllllUAN-POPlAATREEWATEAAEUSETASKOADERNO. 2 CONTRACT
The scope of work for the O&M mahual corresponds with the systems that are currently
anticipated for the Woodburn WWTP, which include the irrigation and W3 pump station,
irrigation distribution piping, irrigation application system, biosolids application system,
biosolids pump station, and the tree plantation.
The safety, maintenance management, spare parts, and sampling/laboratory sections of the
manual will be limited in scope to overviews. These sections will reference the equipment
manufacturer O&M manuals and other authorities as pertinent. Overall, it is expected that
not more than 10 figures will be developed for the manual.
Another subtask will be to collect and organize the equipment manufactur.er O&M manuals
required by the construction contracts for use by the plant staff. CONSULT ANT will
provide up to 8 hours of assistance to OWNER's staff during this effort.
The subtasks are as follows:
Task 9.1. Prepare the Poplar Tree Reuse System O&M Manual
Task 9.2. Equipment Maintenance Manuals
Task 9.1 Prepare the Poplar Tree Reuse System O&M Manual
Activities
Task 9.1.1. Develop outline for manual
Task 9.1.2. Prepare draft for O&M manual
Task 9.1.3. Review workshop
Task 9.1.4. Prepare final O&M manual
Oeliverables
. Draft O&M manual (5 copies for the OWNER and 3 copies for DEQ)
. Final O&M manual (10 copies for the OWNER and 3 copies for DEQ)
Scope of OWNER Services
Timely reviews
Task 9.2 Equipment Maintenance Manuals
Activities
Task 9.2.1. Collect equipment manufacturer O&M manuals
Task 9.2.2. Organize in 3-ring binders and prepare list of manuals
Oeliverables
. Hard Copies and CD ROM copies (if available) of equipment manufacturer O&M
manuals from the Contractor
. Word document files of 0 & M manual
Scope of OWNER Services
. Assemble the Equipment Manufacturer's O&M Manuals
\IAOSE\PAOJ\woooaURN\ 140040\T ASK6\ T02\ T02SCPH.DOC
5/4198
15
- .~-.-.....-"_...".
---r
\TTAC11M ENT ...Ll..-
?age..l1L. of c~ C)
CITY OF WOOOBlJRtI- POPlAR mEE WA~R REUSE TASK ORDER NO. 2 CONTRACT
EXHIBIT ----t1
Page -1Je.. of ~ 7
Task 10 Start Up and Training
At the end of construction, the CONSULTANT will participate with the contractor in a start
up phase intended to test the system operations and train the OWNER's staff in the
operations and management of the system. It is assumed thiS start up phase will last one
week. Training will include computerized operation of the poplar irrigation system and
maintenance activities. Training on the irrigation system is expected to include 1 day of on-
site training for the irrigation system. Since the biosolids system will not be fully
constructed, one-day training is assumed to review the operations of the future biosolids
system
Task 10.1. Effluent Reuse System
Task 10.2. Biosolids Reuse System
Task 10.1.1 Startup
Activities
Task 10.1.1.1 Coordinate start-up schedule with plant staff
Task 10.1.1.2 Assist with Start-up
Deliverables
· None identified
Scope of OWNER Services
· Participation in Startup
Task 10.1. 2 Training
Activities
Task 10.1.2.1 Coordination and production of training materials
Task 10.1.2.2 Participation in training provided by suppliers
Task 10.1.2.3 Provide training for Instrumentation and Control System
Deliverables
· Training Materials
Scope of OWNER Services
· Participation in Training
· Video taping of training sessions if desired
Task 10.2 Biosolids Reuse System
Activities
Task 10.2.1 Training of future biosolids system
\\AOSE\PROJ\WOODBURN\ 140040\r ASK6\ ro2\ro2SCPH,DQC
5/4/98
16
,...~,........",-
i
fTACHMENT A
, 'age.Ll. of ~ C;
CITY OF WOOOBURN- POPI.AR TREE WATER REUSE TASK ORDER NO. 2 CONTRACT
Deliverables
· None identified
Scope of OWNER services
. Participation in Training
EXHIBIT A
page..cL. of c;;l 7
Task 11 - Public Involvement
The objective of the public involvement program during the final design and construction
phase is to continue to build on the work performed in Task Order 1 by informing the
public of the progress of the final development of the poplar plantation. This process will
enable the OWNER to educate the public, develop and maintain an excitement about the
project, provide a graphical demonstration of the benefits of this innovative technol~gy, as
well as respond to questions and issues raised by the public with particular emphasis on the
WWTP and plantation neighbors. We have based the level of effort on an allowance
The key tasks associated with the Public Involvement Process during this phase are:
. Coordinate Outreach Approach
. Development of Education Outreach Material
. Coordinate Signage and Interpretive Center
. Conceptual Design of Interpretive Center and landscaping
Task 11.1 Coordinate with OWNER/Communications Volunteer
The CONSULTANT can best assist the OWNER in promoting the environmental benefit of
this project by continuing to coordinate closely with technical and public issues. We
recommend that the Public Involvement Task Lead meet with the OWNER and the Team to
continue to examine issues and opportunities as the project matures.
The reuse regulations require that signs be posted around the perimeter and other locations
indicating that reclaimed water is used and is not side for drinking or body contact. The
design of these signs will be coordinated with the interpretive signs designed in Task Order
No.I. The signs may include warnings in several local languages.
Work will continue from Task Order 1.
Activities
11.1.
11.2.
11.3.
Continued Strategy Meeting(s) to Examine Issues & Opportunities
Develop interpretive and required signs
Other outreach as requested
Deliverables
. Interpretive Sign design and production
. Required Sign Design and production
Scope of OWNER Services
. Review of material
. Final distribution of material
\IROSE\PROJ\WOODBURNl140040\T ASK6\T02\T02SCPH,OQC
5/4198
17
.....x_
..-.,...-
~.
"\CHMENT~
;de of~
EXHIBI~
Page I
A
of :J..-1
CITY OF WOOllBUAN- POPLAR TREE WATER REUSE TASK ORDER NO, 2 CONTRACT
· Provide Spanish and Russian translations. If desired, this task could be a consultant
responsibility, but would constitute a scope/ fee enhancement.
11.2 Interpretive Center SitelAccessibilitylLandscape Conceptual Design
The objective of this subtask is to develop a site and landscape conceptual design for the
Interpretive Center that integrates the Center with both the new WWTP and the poplar
plantation and is ADA accessible. No detailed design of the Interpretive Center will be
performed.
Activities
Task 11.4.1. Brainstorming Workshop and Concept Diagrams
Task 11.4.2. Development of Concept Plan
Task 11.4.3. Cost Estimate and Final Presentation
Deliverables
. Concept Diagrams
· Concept Site Plan (No bid documents will be prepared).
. Cost Estimate
Scope of OWNER Services
· Review of material
. Construction of landscaping plans
Task 12 DEQ Coordination
The objective of this task is to coordinate with DEQ on submittal reviews to ensure
compliance with the DEQ requirements. Assume 7 meetings will be attended with DEQ for
the duration of the project. In addition, stormwater permit application information will be
prepared. It is assumed the OWNER will be responsible for the preparation and submittal
of the stormwater permit application. A drawing will also be prepared for erosion control
during construction.
Activities
Task 10.2.1.1. Attend 7 DEQ Review And Coordination Meetings
Task 10.2.1.2. Provide Submittals To DEQ (Final Design And Intermediate Documents)
Task 10.2.1.3. Incorporate DEQ Comments Into The Final Submittals
Task 10.2.1.4. Develop Stormwater Permit Application Information
Task 10.2.1.5. Develop An Erosion Control Drawing
Deliverables
· Transmittals To DEQ (Final Design And Intermediate Documents)
· Stormwater Permit Application Information
· Erosion Control Drawing Design
Scope of OWNER Services
· Stormwater Permit
. Erosion Control Plan
\\ROSE\PROJ\WOODBURN\ 140040\T ASKS\ To2\T02sCPH,OQC
5/4/9B
1B
...'"
"T
.ACHMENT A
.~e g.L of <:3-- ')
CITY OF WOODBURN-- POPlAR TREE WATER REUSE TASK ORDER NO. 2 CONTRACT
Task 13. Interim Chlorination and Site Operations and
Maintenance
EXHIBIT A
Page -J.!i of d. 7
The objective of this task is to assist in the site operations and maintenance in 1998, 1999,
and 2000. As part of this task, interim chlorination requirements for the operations prior to
the completion of the treatment plant expansion will be identified and implemented. Since
portion of the demonstration site will be removed for construction of the Facultative Sludge
Lagoons (FSLs), some of the irrigation system mainline and distribution piping will be
removed. The FSL Contractor will be responsible for replacing the mainline; capping the
distribution system and testing the system to ensure it is operational for the 1998 irrigation
season.
In 1998, the trees in the remaining demonstration site will be 4 years old. Since most of the
research aspects of the demonstration site have been completed over the last three years, the
future operations of the system will be designed to reflect operations planned in the future.
Therefore, the irrigation system will be operated only from July through August. The key
activities involved in the operations will be:
. Irrigation application monitoring, operations management, and reporting
. Tree system monitoring, tree management and reporting
. General coordination
. Preparation of annual reports
Task 13.1 Add Interim Chlorination Capabilities to Irrigation. Pump Discharge
The objective of this subtask is to provide interim disinfection of the effluent reuse to meet
Level IT disinfection requirements. As soon as the new permit is adopted, the landscape
irrigation clause is superseded by the Level II effluent requirements. Additional
disinfectant will need to be added downstream of the irrigation pumps to provide more
chlorine for total coliform reductions until the new plant is on-line. An interim system will
need to be added to the irrigation pump discharge for the 1998 summer irrigation season
and additional modifications will need to be made during the irrigation pump station
construction for the 1999/2000 irrigation seasons. It is assumed the City's 6SOD-gallon tank
can be used for the interim system. A letter stating the design specifications and one
drawing will be provided.
Activities
Task 13.1.1. Develop Design, Drawings and catalog sheets and letter proposal
Task 13.1.2. Develop operation plan for interim system
Task 13.1.3. Interim Chlorination System Start-up Assistance
Deliverables
. One drawing and catalog cuts for tank connections and pump
Scope of OWNER Services
. Timely reviews
. Incorporation into Cities WWTP O&M manual
\\RoSE\PROJ\WOODBURM 140040\ T ASK6\ T02\T02SCPH.DOC
514198 _
19
1'-
"-y---- .-
~TTACHMENT A
Page 2.2 of .7 i
CI1Y OF WOOOBURN- POPLAR TREE WATER REUSE TASK ORDER NO.2 CONTRACT
EXHIBIT --A
Pi:ll:jC::...dQ. of ~ 7
Task 13.2 1998 O&M
The objective of this subtask is to provide operational assistance of the demonstration site
during the 1998 irrigation season in accordance with the permit. A portion of the
demonstration site was removed with the current construction of the FSL's. Since FSL
contractor will be responsible for replacing the mainline, capping the distribution system
and testing the system to ensure it is operational for the 1998 irrigation season,
CONSULTANT has assumed up to 8 hours to provide assistance during the reconfiguration
of the demonstration irrigation system. In addition, CONSULTANT will provide up to 8
hours in the assistance and guidance of re-installing the automated TDR that was removed
during the construction of the FSL's.
During the month of June, CONSULTANT (assumes one staff member) will perform a site
visit to assist in the system check before start up. The intent of this visit is to identify any
repairs required before start up. After the repairs have been made and the system is ready
to start up, CONSULTANT (assumes same staff member) will spend one day with the
OWNER's staff to start up the system. The start up will involve establishing the initial
irrigation schedule for the season and programming the schedule into the irrigation control
system. In addition, the planned operations and procedures for the system will be
reviewed with the OWNER's staff. .
During the July and August operations, CONSULTANT will spend one day every two
weeks in the OWNER's office to assist the OWNER's staff with the verification of the
system operations, TDR data collection and evaluation, water applied estimates, and
determination of required modifications to the existing irrigation schedule. During the
other weeks of the each month, it is assumed the OWNER's staff will perform the activities
and provide information to CONSULTANT staff for review and evaluation. It is assumed
this office time will involve up to 4 hours every other week during July and August. As the
TDR and water applied data is collected during this time by OWNER's staff,
CONSULT ANT will spend an additional 4 hours per week to evaluate and provide
summarizes during the irrigation operation~ At the end of the irrigation operation, TOR
information will continued to be gathered by OWNER's staff through the end of December.
During this time, CONSULTANT provided up to 32 hours (8 hours during Sept., Oct., Nov.,
and Dec.) to provide evaluation of the information.
Soil sampling events will be planned in June and November. CONSULTANT will spend
one day during each event to gather composite samples for laboratory testing. In addition
to the soil sampling, the trees will be evaluated for growth and health at the end of October.
General information on tree growth and health will consist of average height and diameter
breast height (dbh) for the stand. No leaf tissue analysis is planned. However, if the trees
appear to be deficient of nutrients, an analysis will be performed to determine the potential
deficiencies in nutrients. During the course of the growing season, on~ site visit and
meeting will be performed to review the health and growth of the tree system.
At the end of the irrigation season, it is assumed the OWNER's staff will be responsible for
the winterization of the irrigation system. Once the final TDR data is gather in December, a
draft annual report will be prepared summarizing the information on water applied,
effluent quality applied, loading rates, soil moisture trends, and tree health and growth. A
meeting with the OWNER to review the draft report will be held and comments to
\\AOSE\PROJ\WOODBURN\ 140040\T ASK6\T02\T02scPH,DOC
5/4198
20
?'
"To
. '-'",
. I
:'TACHMENT .A
.Je ~ of ..:.l!
EX....~ .--
PI:. ~,
~-
,A
of rl." CITYOFWOOOBUAN- POPLAAmEEWATER REUSE TASK OAOER NO. 2 CONTRACT
incorporate into final annual report documented. A final annual report will be prepared
and submitted to the OWNER and DEQ.
Activities
13.2.1 Coordination with FSL Contractor
13.2.2 One Site Visit for System Check Before Start Up
13.2.3 Irrigation Start Up Assistance
13.2.4 Irrigation Operations in July and August
13.2.5 Guidance in Re-installing TDR
13.2.6 Automated TDR and Irrigation Application Data Collection and Evaluation
13.2.7 Soils and Tree Sampling and Analysis
13.2.8 One Tree Related site visit and meeting
13.2.9 Prepare Draft Annual Report
13.2.10 Review Meeting With OWNER
13.2.11 Prepare Final Annual Report
13.2.12 General Management
Oeliverables
· Summary of irrigation operations and maintenance in annual reports for 1998
. 5 Copies of draft report
· 10 Copies of final report
· 2 Copies sent to DEQ
Scope of OWNER Services
. FSL Contractor work
· Weekly operations of the irrigation system
· Weekly collection of TDR readings
. Delivery of information to CONSULTANT
. Mowing
· Herbicide applications
. Vole control
· Repair of damaged sprinkler heads
· Re-establish micro-spray system and mainline disruptions due to Facultative Sludge
Lagoon construction
· Timely review of draft report
· Meet with CONSULTANT during site visits
· Be available for weekly conference calls
Task 13.3 1999 O&M
The objective of this subtask is to provide operational assistance to the OWNER's for the 80-
acre site including the public access/education site (existing demonstration site) during the
1999 irrigation season. Since the OWNER is not clear on staff availability for the 1999
season, CONSULTANT has assumed a similar scope of effort provided during 1998. Since
the site will have additional soil moisture probes, additional effort will be planned to assist
in the evaluation of the soil moisture information. The site needs to be operated to
maximize tree root growth and to establish guidelines for long~term operation. The
CONSULT ANT has assumed an allowance of up to 474 total hours and budget of $47,100 to
provide the assistance required during the 1999 operations. The OWNER may desire to
\\RosE\PROJIWOODBURN\ 140040IT ASK6\T02IT02SCPH,DQC
5/4198
21
,..
,or
~
, .'
,TTAC~~NT~
,.)age of C).
EXHIBIT A
~age~ 01 ~"7
r.rry OF WOOOBUF*- POPlAR mEE WATER REUSE TASK ORDER NO. 2 CONTRACT
increase or decrease the allowance as the operations assistance requirements for 1999 are
better defined.
Activities
13.3.1 One Site Visit for System Check Before Start Up (2 days)
13.3.2 Irrigation System Start Up
13.3.3 Irrigation operations during July and August
13.3.4 Data Collection Assistance and Evaluation (soil moisture, solIs, and trees)
13.4.5 Reporting
13.4.6 General Operations Management
Deliverables
· Summary of irrigation operations and maintenance in annual reports for 1999 .
. 5 Copies of draft report
· 10 Copies of final report
· 2 Copies sent to DEQ
Scope of OWNER Services
· Irrigation operations
· \^(eekly collection of manual TDR readings
· Delivery of information to CONSULTANT
. Mowing
· Herbicide applications
. Vole control
· Repair of damaged sprinkler heads
· Timely review of draft report
· Meet with CONSULTANT during six site visits
· Be available for weekly conference calls
Task 13.4 2000 O&M
The objective of this subtask is to provide operational assistance to the OWNER's for the 80-
acre site including the public access/education site (existing demonstration site) during the
2000 irrigation season. CONSULTANT has assumed a similar activities for 2000 as
provided in 1999, however effort has been reduced to reflect transition to OWNER staff. An
allowance of up to 284 hours and/ or $28,700 has been provided. The OWNER may desire
to increase or decrease the allowance for operations in 2000 as the requirements for
assistance are better defined.
Activities
13.4.1 One Site Visit for System Check Before Start Up (2 days)
13.4.2 Irrigation System Start Up
13.4.3 Irrigation operations during July and August
13.4.4 Data Collection Assistance and Evaluation (soil moisture, soils, and trees)
13.4.5 Reporting
13.4.6 General Operations Management
\\ROSE\PROJ\WOODBURN\ 140040\T ASK6\ T02\T02SCPH.DOC
5/4198
22
.~.,............
TACH~ENT~
.4ge ~ - Ofd
CITY OF WOOOBURN- POPLAR TREE WATER REUSE TASK ORDER NO, 2 CONTRACT
Deliverables
. Summary of irrigation operations and maintenance in annual reports for 1999
. 5 Copies of draft report
. 10 Copies of final report
. 2 Copies sent to DEQ
Scope of OWNER Services
. Irrigation operations
. Weekly collection of manual TDR readings
. Delivery of information to CONSULTANT
. Mowing
. Herbicide applications
. Vole control
. Repair of damaged sprinkler heads
. Timely review of draft report
. Meet with CONSULTANT during six site visits
. Be available for weekly conference calls
Task 14 Project Management
This task includes project management activities to guide the execution of the work and to
monitor performance against accepted budget and schedule. Project management will also
include general coordination and communication with the consult(!nt team, the OWNER,
and other interested parties, and administration of the CONTRACT. The invoices will show
for each task the staff names, hours, and cost per person, expenses, fee remaining, and
summary of budget. Format will be similar to that used for Task Order No.1. Change will be
managed within the contractual budget. Scope modifications and resource re-allocations
will be documented using the project Change Notice Forms.
Activities
Task 14.1.1. Prepare Project Management Plan
Task 14.1.2. Hold project kickoff meeting
Task 14.1.3. Prepare Monthly Status Reports with Percent Complete and Progress to Date
Task 14.1.4. Perform General Project Management Activities (Le., Team Supervision,
Coordination, Meetings, Track Progress and Monitor Budget and Schedule, Manage
Quality Control, Manage Change)
Task 14.1.5. Administer the CONSULTANT and OWNER CONTRACT
Task 14.1.6. Maintain project library and archive
Deliverables
. Project management plan .
. Written documentation of changes in scope or budget by Change Notice Form with
preparation of scope modifications and resource re-allocations within the contractual
budget
. Monthly status reports
\IROSE\PROJ\WOODBURN\ 140040\T ASK6\T02\T02SCPH ,DOC
5/4/98
23
1'" ..
'~'T
~TTACHMENT~
P.ge~ of a- +
· Invoices by staff hours and dollars by task (format to be defined by OWNER and
CONSULTANT
OF WOOOIlUfW- POPlAR TREE WATER REUSE TASK ORDER NO. 2 CONTRACT
· Scope of OWNER ServicesTimely approval of invoices
· Review of management plan and progress reports
· Timely review and notification of Change Notice Forms and approval or rejection
· Timely communication of concerns about progress report
Task 15 Unforeseen Activities
This Task includes "unforeseen activities" with the design project. This task will be for
project work that will need to be accomplished but is not readily apparent at this time. This
task will be included an allowance. Our experience for design and construction serVices is
that unforeseen site conditions, federal and state agency requirements, and owner
suggested project changes could increase the total work by 10 percent or more.
3. Additional Scope of OWNER Services
The OWNER will provide the following services in addition to the general services defined
in the original contract:
.
· Give thorough consideration to all reports, schedules, budgets, and other documents
presented by the CONSULTANT, and inform the CONSULTANT of all decisions.
· Advise the CONSULT ANT of changes or additions to the scope of services required to
satisfy the program objectives.
· Coordinate communications with other OWNER departments, consultants, and other
involved parties.
· Provide access to any relevant aerial photography, existing CAD files, and other
pertinent information.
4. Time of Performance
The CONSULTANT and OWNER have discussed the Task Order No.2 scope and services.
Figure 1 provides target completion dates for specific key milestones.
\\ROSE\PROJ\WOODBURN\ 140040\TASK6\T02\T02sCPH.OOC
5/4/98
24
~"
'--r
"""'
-\TTACHMENT --d.-
Page~ of .d-1
CITY OF WOODBURN- POPlAR TREE WATER REUSE TASK ORDER NO.2 CONTRACT
EXHIBIT A
Page o:l6 of .dJ7
5. Project Team
Below is the key project team members with their roles and responsibilities:
Mark Madison
Daria Wightman/HDR
Jeff Nuss
Dick Haapala
John Jacobson
Jeff Schwisow
Jerry Hildenbrand
John Turner
Bill Peterschmidt
Henriette Emond
Larry Powell
Kelly Irving/Jon Jacobson
Dave Collins
Jim Jordahl
Mark Madison
Bill Peterschmidt
Larry Powell
Jerry Hildenbrand
Sue Fry
Henriette Emond
Jeff Nuss
Jeff Nuss
Linda Macpherson
Project Manager
Senior Advisor
Project Administrator/Assistant Project Manager
Senior Reviewer
Senior Reviewer
Senior Reviewer
Senior Designer
Senior Reviewer
Senior Designer
Design Manager
Pipeline Design Leader
Pump Station Design Leader
Irrigation Application Design Leader
Biosolids System Design Leader
Tree System Design Leader
Monitoring and Control Design Leader
Mechanica1!Yard Piping Engineer
Electrica1!I&C Engineer
Structural Engineer
Specifications Coordination
Site operations, maintenance, and management leader
Construction Manager /Onsite Inspector
Public Involvement Task Leader
\\ROSE\PROJ\WOOOBURN\ 140040\TASK6\T02\To2SCPH,OQC
5/4/98
25
T--'
. ,_ ,-y- _,.M _ . p. . .
WIIJ
1
. '
ATTACHMENT ---L1-
Page~ of ~.1 .
CITY OF WOOOBUR\l-- POPlAR TREE WATER REUSE TASK ORDER NO. 2 CONTRACT
6. Compensation
EXHIBIT A
Page~ of 027
The compensation for services set forth in Task Order No.2 shall be based on actual labor
and expenses in accordance with the Agreement for Professional Services, Article 2.
Compensation. A budget of $efqSoO is hereby established for this task order. The budget
breakdown is shown in Table 2. The task level budgets may be re-allocated amongst tasks at
the discretion of the project manager and with authorization from the Public Works
Director as a representative of the Owner. Conditions for payment are as described in the
original contract.
Table 2
Estimated Budget for Task Order No.2
Description
Total
Task l-Ongoing Coordination with Treatment Plant Design Consultant
Task 2-Surveying Coordination
Task 3- Final Design for Trees, Pump Station and Irrigation System
Task 4-Management Plan
Task S-Funding Source Assistance
Task 6- Design of Biosolids Application System
Task 7- Bidding Services
Task 8- Construction Management Services
Task 9- Operations and Maintenance (O&M) Manual
Task 10- Start-up and Training
Task 11- Public Involvement Program
Task 12- DEQ Coordination
Task 13-1998/1999/2000 Site Operation and Maintenance
Task 14- Project Management
Total-Task Order No.2
$11/600
$5/000
$224,400
$29,000
$3,800
$37,700
$17,000
$116,100
$57,400
$17/400
$38/500
$32,900
$120,900
$93,300
$80,500
$885,500
Task IS-Unforeseen Activities
\\ROSE\PROJ\WOODBURN\ 140040\TASK6\To2\T02SCPH.DOC
. 5/4198
26
~.
---'T-.
. .
tTTACHMENT --Ll..-
Page ~ of c}...q
CITY OFWOOOBUR'/- POPlAR TREE WA~R REUSE TASK ORDER NO.2 CONTRACT
EXHIBIT A
Page.d:L of d 7
Other Conditions and Requirements
7.
1. Payment method and rates: Cost reimbursable-Multiplier
Salary Cost multiplied by 2.25, plus direct expenses plus 5 percent of direct expenses
2. Signature of Authorization
City of Woodburn, Oregon
CH2M HILL, Inc.
By:
By:
Title:
Title:
Date:
Date:
\\ROSE\PROJ\WOOOBURN\ 14OO4O\TASK6\T02\T02SCPH.OOC
5/4198
27
.,..-
".. "T"'"""" ._~.."" .--..