Loading...
Res 1510- Agrt Crane St Wtr Mas COUNCIL BILL NO. 1927 RESOLUTION NO. 1510 A RESOLUTION ENTERING INTO AN AGREEMENT WITH SUZANNE CRANE ENGINEERING, INC. DOING BUSINESS AS CRANE & MERSETH ENGINEERING/SURVEYING FOR PROFESSIONAL ENGINEERING CONSULTANT SERVICES RELATED TO ENGINEERING SERVICES FOR COMPLETION OF A STORMWATER MASTER PLAN AND AUTHORIZING THE MAYOR TO SIGN SAID AGREEMENT. WHEREAS, The City of Woodburn Stormwater Master plan was completed in 1978 and requires updating to comply with current requirements and consider changes caused by growth in the community, and WHEREAS, Consultant professional engineering services are needed now to accomplish tasks required to complete work on an updated Stormwater Master Plan, and WHEREAS, Crane & Merseth Engineering/Surveying, a profeSSional engineering consultant, has provided engineering constultant services to the city on preliminary Stormwater Master Plan engineering and other storm water studies that were satisfactory to the city and is recommended to perform engineering services required for completion of a Stormwater Master Plan, and WHEREAS, a proposed agreement for profeSSional services has been prepared and agreeded to by Crane & Merseth Engineering/Surveying and reviewed by the City Attorney (body) and Public Works staff (technical aspects and exhibits); NOW THEREFORE THE CITY OF WOODBURN RESOLVES AS FOLLOWS: Section 1. That the City of Woodburn enter into an agreement with Suzanne Crane Engineering, Inc. doing business as Crane & Merseth Engineering/Surveying for professional engineering consulting services relating to completion of a Stormwater Master Plan which is affixed as Attachment II A" and by this reference incorporated herein. Section 2. That the mayor is authorized to sign said agreement on behalf of the city. Page 1 - COUNCIL BILL NO. 1927 RESOLUTION NO. 1510 ~. .' ~",-,~_,~'_',;,_."~".-"-- . 'I" Approved as to form~ .~ City Attorney .-....., 1-l0-CJ~ Date APPROVED. Nancy A. Passed by the Council Submitted to the Mayor Approved by the Mayor Filed in the Office of the Recorder ATTEST: !!l~ ~"-'r-.Jl-yst Mary T&hnant, Recorder City of Woodburn, Oregon Page 2 - COUNCil BIll NO. RESOLUTION NO. ~".._.._"-_._._-~.....,_.~". . --.,.............-~"'"---. '" September 14. 1qqR September 15, 1998 September 15, 1998 September 15, 1998 ATTACHMENT ---L1- Page -L- of . } '1 DUPLICATE ORIGINAL AGREEMENT FOR PROFESSIONAL SERVICES This AGREEMENT for services is made this _ day of September, 1998, between the City of Woodburn, Oregon ("OWNER"), and Suzanne Crane Engineering, Inc. doing business as Crane & Merseth Engineering/Surveying (ENGINEER). ARTICLE 1. SCOPE OF SERVICES A. OWNER intends to complete work on the Storm Drainage Master Plan by conducting a Public Information Program (PIP) which is Task 1 in Attachment A; and to supplement the current files for the storm sewer system by creating an electronic data base inventory which is Task 2 in Attachment A, which together are the PROJECTS. ENGINEER agrees to provide OWNER with those services described in Attachment A to this AGREEMENT for those PROJECTS. ENGINEER may provide OWNER with extra services (services not specified in Attachment A) if ENGINEER and OWNER have agreed in writing to the scope of and fee for such extra services. B. ENGINEER will begin providing services after receipt by ENGINEER of an executed original of this AGREEMENT and a written Notice to Proceed from OWNER. OWNER will issue separate Notices to Proceed for each TASK. ENGINEER will perform its services in a diligent manner to completion. ENGINEER will not be responsible for delays caused by factors beyond its reasonable control, including but not limited to delays because of strikes, lockouts, work slowdowns or stoppages, accidents, acts of God, failure of any governmental or regulatory authority to act in a timely manner, failure of OWNER to furnish timely information or approve or disapprove of ENGINEER's services or work product promptly, or delays caused by faulty performance by OWNER or by contractors of any level. When such delays beyond ENGINEER's reasonable control occur, OWNER agrees ENGINEER will not be responsible for damages or be deemed to be in default of this AGREEMENT. ARTICLE 2. COMPENSATION A. OWNER agrees to pay ENGINEER for services performed underthisAGREEMENT. OWNER will pay ENGINEER on an hourly basis, plus expenses, according to the rate schedule set out in Attachment 2 to this AGREEMENT. However, the total compensation to ENGINEER for services provided under this AGREEMENT shall not exceed $82,563. The rate schedule set out in Attachment 2 will be revised by ENGINEER at the beginning of each calendar year to cover cost-of-business changes. Page 1 - Agreement for Professional Services - Storm Drainage Master Plan ........ ~_.~"'._".....^_.~_~."...t_"'--""......_'~.__..__..............._....,..4~.,..-....._^"._-~----..,"_._. .. .. , Uf ,- ATTACHMENT-L. Page~ of J'7 DUPLICATE ORIGINAL B. ENGINEER will submit invoices for progress payments to OWNER not more than once each month by the 20th day of each month. The invoices will represent the value of the completed services to date and will be prepared in the form that and supported by such documentation as OWNER may require. C. OWNER will pay ENGINEER's invoices within 30 days of receipt of each invoice. Interest at the rate of 1.5% per month will be charged by ENGINEER beginning 60 days after the date ENGINEER submits its invoice to OWNER. In the event of a contested invoice, only payment for the portion of the invoice that is contested will be withheld. OWNER will exercise reasonableness in contesting any invoice or portion of any invoice. ENGINEER has the right to suspend services under this AGREEMENT, after giving the OWNER seven days written notice, if OWNER fails to pay in full any invoice within 60 days of the date ENGI N EER submitted that invoice to OWNER. ENGINEER will have no liability to OWNER for suspending services in this circumstance. D. Upon completion of these services, ENGINEER will notify OWNER in writing that its services are complete and that final payment is due. If the services have been completed to the satisfaction of OWNER, and if all other provisions of this AGREEMENT have been fulfilled, then OWNER will make final payment to ENGINEER within 15 working days of receipt of that notice. ARTICLE 3. OBLIGATIONS OF ENGINEER A. Standard of Care The standard of care applicable to ENGINEER'S services will be the degree of skill and diligence normally employed by professional consultants or consultants performing the same or similar services. ENGINEER will reperform any services not meeting this standard without additional compensation. B. Subsurface Investigations In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, explorations, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect total PROJECT cost and/or execution. These conditions and cosUexecution effects are not the responsibility of ENGINEER. Page 2 - Agreement for Professional Services - Storm Drainage Master Plan '9',,,.. "~,,,",.,__>.^,_.. .._...--.....-"" ._."...."v..--....__"., .,__.""",.,..._______....~'~...."..._..._..O~".._~_., 1'" ATTAC~MENT---LL- PlgI Of I '7 DUPLICATE ORIGINAL C. ENGINEER'S Personnel at Construction Site The presence or duties of ENGINEER's personnel at a construction site, whether as on-site representatives or otherwise, do not make ENGINEER or its personnel in any way responsible for those duties that belong to OWNER and/or the construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions and have no duty for inspecting, noting, observing, correcting, or operating on health or safety deficiencies of the construction contractor or other entity or any other persons at the site except ENGINEER's own personnel. D. ENGINEER's Approval of Documents All written documents, drawings, and plans submitted by ENGINEER and intended to be relied upon for the PROJECT shall bear the signature, stamp or initials of ENGINEER. Any documents submitted by ENGINEER which do not bear ENGINEER's signature, stamp or initials or those of the ENGINEER'S authorized architect shall not be relied upon by OWNER. Interpretation of plans and answers to questions covering plans given by ENGINEER or ENGINEER's architect need not be put in writing and may be relied upon by OWNER and others. E. Opinions of Cost, Financial Considerations, and Schedules In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operation personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, ENGINEER makes no warranty that OWNER's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from ENGINEER's opinions, analyses, projections, or estimates. Page 3 - Agreement for Professional Services - Storm Drainage Master Plan .,..,'--- ..-..... ...,...... .._-"-"-............---..,..._j...,.......~~- ,....1-.--.,...,'..,..,-.,..._.->-_._........,__-'_....0+'........___..,_~,"''''."_.. ATTAC'fENT--L1- Page of 1 '7 DUPLICATE ORIGINAL F. Duty to Inform If at any time during the performance of this AGREEMENT, or any future phase of this AGREEMENT for which ENGINEER has been retained, ENGINEER becomes aware of actual or potential problems, faults or defects in the Project or any portion thereof, any nonconformance with the federal, state or local law, rule, or regulation, or has any objection to any decision or order made by OWNER with respect to such laws, rules or regulations, ENGINEER shall give prompt written notice thereof to OWNER's project manager. Any delay or failure on the part of OWNER to provide a written response to ENGINEER shall neither constitute agreement with nor acquiescence to ENGINEER's statement or claim, nor constitute a waiver of any of OWNER's rights. G. Record Drawings Record drawings, as required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. ENGINEER is not responsible for any errors or omissions in the information from others that are incorporated into the record drawings. H. Minority-and Women-Owned Businesses; OWNER-Specified Subcontractors ENGINEER will comply with OWNER's directives in utilizing the services of OWNER- specified subcontractors and/or minority and women-owned businesses on the PROJECT. Firms selected by ENGINEER to meet said directives will be subject to approval of OWNER. I. Workers Compensation 1. ENGINEER, ENGINEER's subcontractors, if any, and all employers working under this contract are subject employers under the Oregon Workers Compensation Law and shall comply with ORS 656.017, which requires them to provide workers' compensation coverage for all of their workers. 2. ENGINEER shall pay all contributions required to be made by ENGINEER to the Industrial Accident Fund. J. Health Care Payments ENGINEER shall pay when due all sums, including sums withheld from ENGINEER's employees pay, which ENGINEER has agreed to pay to health care providers for treatment rendered to ENGINEER's employees. Page 4 - Agreement for Professional Services - Storm Drainage Master Plan ....,-- '-_.~"'.._.." '"..,..... -.._.~",..... . ,,"-'''~'''''''- ..__...._...~...~,--_. ..'" " ATTACHj-1ENT A Page~ of /7 DUPLICATE ORIGINAL K. Hours of Labor No person employed pursuant to this contract shall be employed for more than eight hours in anyone day, or 40 hours in anyone week, except in cases of necessity, emergency, or where the public policy, as determined by OWNER, absolutely requires it. Employees shall be compensated at the rate of time and a half for all overtime worked in excess of 40 hours in one week, except for individuals who are excluded from receiving overtime under ORS 653.010 to 653.261 or under 29 U.S.C. Sec. 201-209. L. Payment for Labor, Material or Services 1. ENGINEER shall make payment when due to all persons supplying labor or material ENGINEER for the prosecution of work performed under this AGREEMENT. 2. ENGINEER shall not permit any lien or claim to be filed or prosecuted against OWNER on account of labor or material furnished pursuant to this AGREEMENT. 3. If ENGINEER fails, neglects or refuses to make payment when due of any claim for labor or services furnished to ENGINEER or a subconsultant for work performed pursuant to this AGREEMENT, OWNER may pay such claim and charge the amount of the payment against funds owned by OWNER to ENGINEER. M. State Income Tax Withholding ENGINEER shall pay to the Oregon Department of Revenue all sums withheld from employees pursuant to ORS 316.617. N. Recycled Paper Required To the maximum extent economically feasible, ENGINEER shall use recycled paper in performing this agreement. Page 5 - Agreement for Professional Services - Storm Drainage Master Plan .,..,--. -'-'~'r' .-,,'.-,... ,-'''_.... .--....,..." ,~-,-_...._.....,,---,-,'.. ATTACHMENT .....LL- Page~ of 11 DUPLICATE ORIGINAL O. Discrimination Prohibited No person shall be denied or subjected to discrimination in receipt of the benefits of any services or activities made possible by or resulting from this AGREEMENT on the grounds of sex, race, color, creed, marital status, age, disability or national origin. Any violation of this provision shall be grounds for cancellation, termination or suspension of the AGREEMENT in whole or in part, by OWNER. P. Access to ENGINEER's Accounting Records OWNER shall have access upon request to such books, documents, receipts, papers and records of ENGINEER as are directly pertinent to this AGREEMENT for the purpose of making audit, examination, excerpts, and transcripts for a period of three (3) years unless within that time OWNER specifically requests an extension. This clause shall survive the expiration, completion or termination of this AGREEMENT. Q. ENGINEER's Insurance The ENGINEER will maintain throughout this AGREEMENT the following insurance: 1. Workers' compensation and employer's liability insurance as required by the state or province where the work is performed. 2. Commercial (comprehensive) automobile and vehicle liability insurance covering claims for injuries to members of the public and/or damages to property of others arising from use of motor vehicles, including on-site and off- site operations, and owned, nonowned, or hired vehicles, with $1,000,000 combined single limits. 3. Commercial general liability insurance covering claims for injuries to members of the public or damage to property of others arising out of any covered negligent act or omission of ENGINEER or of any of its employees, agents, or subcontractors, with $1,000,000 per occurrence and in the aggregate. 4. Professional liability insurance of $2,000,000. 5. OWNER will be named as an additional insured with respect to ENGINEER's liabilities hereunder in insurance coverages identified in items (2) and (3), and ENGINEER waives subrogation against OWNER as to said policies. Page 6 - Agreement for Professional Services - Storm Drainage Master Plan ...~.-- 4_.____...._..__....m=-...........-_........."" ..._....-.-.~,. ...+"".' _.__ ",j .......u'""""'."',_... I" ATTACHMENT --LL- page.-::L- of /7 DUPLICATE ORIGINAL 6. ENGINEER shall furnish OWNER a certificate evidencing the date, amount and type of insurance that has been procured pursuant to this AGREEMENT. The policies referenced in Q2 and Q3 above shall be written on an "occurrence basis." All policies shall provide for not less that 30 days' written notice to OWNER before they may be revised, nonrenewed, canceled, or coverage reduced. Excepting worker's compensation coverage, all policies shall provide an endorsement naming OWNER, its officers, employees and agents as additional insureds. In the event the policy lapses during performance, OWNER may treat said lapse as a breach, terminate this AGREEMENT and seek damages, or use any other remedy provided by this AGREEMENT or by law. ARTICLE 4. OBLIGATIONS OF OWNER A. OWNER-Furnished Data OWNER will provide to ENGINEER all technical data in the OWNER's possession relating to ENGINEER's services on the PROJECT. ENGINEER will reasonably rely upon the accuracy, timeliness, and completeness of the information provided by OWNER. B. Access to Facilities and Property OWNER will make its facilities accessible to ENGINEER as required for ENGINEER's performance of its services. OWNER will perform at no cost to ENGINEER such tests of equipment, machinery, pipelines, and other components of OWNER's facilities as may be required in connection with ENGINEER's service, unless otherwise agreed to. OWNER will be responsible for all acts of OWNER's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the scope of Services, OWNER will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, province, or federal authorities; and land, easements, rights-of-way, and access necessary for ENGINEER's services or PROJECT construction. D. Timely Review OWNER will examine ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents and render in writing decisions requested by ENGINEER in a timely manner. Page 7 - Agreement for Professional Services - Storm Drainage Master Plan ..._ .. ~........~___._."____._.._...+--,~_,,~,......_...........~.,..~,,,"-,,_ +--,",_""=;"_"_,_~_,~,_"",,,,,~,,,_,,,~,,,,,,''''''_''",,"'~'~''"_'"'__.,o-~"_" .. ATTAC~MENT A Page of I 7 DUPLICATE ORIGINAL E. Prompt Notice OWNER will give prompt written notice to ENGINEER whenever OWNER observes or becomes aware of any development that affects the scope or timing of ENGINEER's services or of any defect in the work of ENGINEER or construction contractors. F. Asbestos or Hazardous Substances and Indemnification If asbestos or hazardous substances in any form are encountered or suspected, ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. If asbestos is suspected, ENGINEER will, if requested, assist OWNER in contacting regulatory agencies and in identifying asbestos testing laboratories and demolition/removal contractors or consultants. If asbestos is confirmed, OWNER will engage a specialty consultant or contractor to study the affected portions of the work and perform all remedial measures. If hazardous substances other than asbestos are suspected, ENGINEER will conduct tests to determine the extent of the problem and will perform the necessary studies and recommend the necessary remedial measures at an additional fee and contract terms to be negotiated. G. Changes OWNER, through Public Works Director as its representative, may make or approve changes within the general Scope of Services in this AGREEMENT, including cost allocations to the various tasks as defined in the Scope of Services. If such changes affect ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT. OWNER is not obligated to pay for services performed without OWNER's authorization. ARTICLE 5. GENERAL LEGAL PROVISIONS A. Project Documents Property of OWNER. All work in its original form, including but not limited to documents, drawings, tracings, surveying records, mylars, papers, computer programs, diaries and photographs, performed or produced by ENGINEER under this AGREEMENT shall be the exclusive property of OWNER and shall be delivered to OWNER prior to final payment. Any statutory or common law rights to such property held by ENGINEER as creator of such work shall be conveyed to OWNER upon request without additional compensation. Upon OWNER's approval and provided OWNER is identified in connection therewith, ENGINEER may include ENGINEER's work in its promotional materials. Drawings may bear a disclaimer releasing the ENGINEER Page 8 - Agreement for Professional Services - Storm Drainage Master Plan ..;'~; -"T" , ",.........,,~..,' .-t-.......- ,..,... .,', - .-'..'^__"..._._,....~"".,.'.. ._.<4...,.._~."~.,,~"~W~,~.-...,<,"-'"""..... ATTACt.ENT~ Page of~ DUPLICATE ORIGINAL from any liability for changes made on the original drawings and for reuse of the drawings subsequent to the date they are turned over to OWNER. B. Force Majeure ENGINEER is not responsible for damages or delay in performance caused by acts of God, strikes, lockouts, accidents, or other events beyond the control of ENGINEER. C. Termination This AGREEMENT may be terminated for convenience by either party with 30 days' written notice, or for cause if either party fails substantially to perform through no fault of the other and does not commence correction of such nonperformance within 5 days of written notice and diligently complete the correction thereafter. In the event of termination, ENGINEER shall perform such additional work as is necessary for the orderly filing of documents and closing of the PROJECT. The time spent on such work shall not exceed ten percent (10%) of the time spent on the PROJECT prior to the effective date of termination. OWNER shall pay ENGINEER and for all work performed in accordance with this AGREEMENT and all work necessary for filing and closing as described in this section. D. Suspension of Work OWNER may suspend, delay or interrupt all or any part of the work for such time as OWNER deems appropriate for its own convenience by giving written notice thereof to ENGINEER. An adjustment in the time of performance or method of compensation shall be allowed as a result of such delay or suspension unless the reason for the delay is within ENGINEER's control. OWNER shall not be responsible for work performed by any subcontractors after notice of suspension is given by OWNER to ENGINEER. Should OWNER suspend, delay or interrupt the work and the suspension is not within CONTRACTOR's control, then OWNER shall extend the time of completion by the length of the delay and the method of compensation shall be adjusted to reflect ENGINEER's reasonable increase or decrease in its standard hourly rates. E. No Third-Party Beneficiaries This AGREEMENT gives no rights or benefits to anyone other than OWNER and ENGINEER and has no third-party beneficiaries. Page 9 - Agreement for Professional Services - Storm Drainage Master Plan ..."~- ~"'"'''''''''''_~'''''''''''_''+-"''''-~''._n'''.~~~__~.~'''_''_~_"' ATTACHMENT -4-- page...l!2.- of I DUPLICATE ORIGINAL F. Indemnification ENGINEER agrees to indemnify OWNER from any losses, damages, or judgments arising out of claims by third parties for property damage or bodily injury caused solely by the negligent or intentional acts or omissions of the ENGINEER, its officers, employees, or agents in connections with the projects. OWNER agrees to indemnify ENGINEER from any losses, damages, or judgments arising out of claims by third parties for property damage or bodily injury caused solely by the negligent or intentional acts or omissions of OWNER, its officers, employees, or agents in connection with the projects. If the negligence or intentional conduct of both ENGINEER and OWNER (or such person identified above for whom each is liable) is a cause of such losses, damages, or judgments, then the losses, damages, or judgments will be shared between ENGINEER and OWNER in proportion to their relative degrees of fault. The review, approval or acceptance by OWNER, or City of Woodburn employees, of documents or other work prepared or submitted by ENGINEER shall not relieve ENGINEER of its responsibility to provide such materials in full conformity with OWNER's requirements as set forth in this AGREEMENT and to indemnify OWNER from any and all costs and damages resulting from ENGINEER's failure to adhere to the standard of performance described herein. G. Assignment Neither party will assign all or any part of this AGREEMENT without the prior written consent of the other party. OWNER shall have the right to let other agreements be coordinated with this AGREEMENT. ENGINEER shall cooperate with other firms, engineers or subconsultants on the project and OWNER so that all portions of the project may be completed in the least possible time within normal working hours. ENGINEER shall furnish other engineers and subconsultants and affected public utilities, whose designs are fitted into ENGINEER's design, detail drawings giving full information so that conflicts can be avoided. H. Jurisdiction The law of the state of Oregon shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. Page 10 - Agreement for Professional Services - Storm Drainage Master Plan '''Yq~, ..-~~,^...;-.,.~.._"~."...,.~-..,.t....__.~.~-,.--...,.~._.'.......~...".-..._.._,._--_..~-'",-- ,. ATTACHMENT --L1- Page -L..L of J 7 DUPLICATE ORIGINAL I. Adherence to Law ENGINEER shall adhere to all applicable federal and state laws, including but not limited to laws, rules, regulations, and policies concerning employer and employee relationships, workers' compensation, and minimum and prevailing wage requirements. Any certificates, licenses or permits which ENGINEER is required by law to obtain or maintain in order to perform work described on the Attachment 1 shall be obtained and maintained throughout the term of this AGREEMENT. J. ENGINEER's Warranty; No Waiver of Legal Rights Notwithstanding any acceptance or payments, OWNER shall not be precluded or estopped from recovering from ENGINEER, or its insurer or surety, such damages as may be sustained by reason of ENGINEER's failure to comply with the terms of this AGREEMENT. A waiver by OWNER of any breach by ENGINEER shall not be deemed to be a waiver of any subsequent breach by ENGINEER. K. Attorneys Fees In the event a suit or action is instituted to enforce any right guaranteed pursuant to this AGREEMENT, the prevailing party shall be entitled to, in addition to the statutory costs and disbursements, a reasonable attorneys fee to be fixed by trial and appellate courts respectively. L. Notices All notices required under this AGREEMENT shall be delivered by facsimile, personal delivery, or mail and shall be addressed to the following persons: Mr. Gordon Merseth Mr. Frank Tiwari Vice President Public Works Director 6566 SE Lake Road City of Woodburn Suite D 270 Montgomery Street Milwaukie, OR 97222-2138 Woodburn, OR 97071 M. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Page 11 - Agreement for Professional Services - Storm Drainage Master Plan "'.-.... - . J.--><-'_.......".~~""..~..........._~.-+-~~.....-......-....--~-,.'"'.~ "I ... A ATTACHMENT J 1 P8ge~ of __ DUPLICATE ORIGINAL N. Integration This AGREEMENT, including its attachments, constitutes the entire agreement between the OWNER and ENGINEER and supersedes all prior or contemporaneous oral or written representations or agreements. This AGREEMENT shall not be modified except with written documents signed by both parties. The following documents which are attached to this AGREEMENT are incorporated herein and by this reference made a part hereof. Attachment 1: Scope of Services Attachment 2: Schedule of Fees and Reimbursable Expenses Articles 3, 4, and 5 shall survive termination of this AGREEMENT for any cause. ARTICLE 6. ATTACHMENTS, SCHEDULES, AND SIGNATURES This AGREEMENT, including Attachments 1 and 2, constitutes the entire AGREEMENT, supersedes all prior written or oral understandings, and may be changed only by a written amendment executed by both parties. IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be executed in duplicate by their respective authorized officers or representative as of the day and year above written. CITY OF WOODBURN By: By: Nancy A. Kirksey, Mayor Attest: City Recorder Approved as to Form: City of Woodburn Legal Counsel N. Robert Shields Page 12 - Agreement for Professional Services - Storm Drainage Master Plan "1"'" "'-""'.'y+"""'" _" ..,.......,._.'>>0.....;." j._.'U~..h..<'_'_.,"';.<~=',_.,..".._....__.... .,'.._.,..."~""_e."ol'>____~_._..... -" ATTAC~J;1ENT --L1- Page of 1'/ ATTACHMENT A T21Sk 1. PUBLIC INVOLVEMENT PROGRAM Storm Drainage Master Plan SCOplil of Services Ohjective: Provide materials for citizen information meetings, Planning Commission information and City Council information and action. Drscription: Plan and prepare graphic display materials for use at citizen informational meetings, meet with city staff to review materials and plan presentations. Attend public meetings and meetings with the Planning Commission and City'Council. Discuss the Master Plan and the Detention Policy and answer questions regarding the documents. Products: Graphics for public meetings, final Storm Drainage Master Plan, Detention Policy Scope of Services: 1. Plan and prepare draft figures and graphic materials for use at public meetings and meetings with :the Planning Commission and the City Council. Incorporate information from the Storm Drain.age Master Plan and other materials suitable for public information and education. 2. Coordinate public information materials with findings and recommendations of city parks and planning staff pertaining to wetlands designations along Mill Creek, Senecal Creek and other arleas designated in the city. 3. Prepare for and attend 4 public informational meetings. 4. Prepare for and attend a city Planning Commissions meeting/workshop. Present elements of the draft master plan and the detention policy. Discuss each and answer questions as necessary. 5. Prepare for and attend a public hearing with the City Council. Present recommendations of the study and answer questions as needed. 6. P!repare responses to questions and issues raised during the public hearing. 7. Prepare a draft of the plan for Staff Review. 8. Incorporate final changes and send final draft version for approval. ",c," .. -,-,~~~._...."~.._".~~.~~"",,....--..,_.t---...<--<._---~,.-..._~.~,-- T\" ATTAC~fNT A Page of / 7 AttacJunent A Page 2 9. Pmpare and print 20 copies of the final Storm Drainage Master Plan Documents and 100 COpiell of the Detention Policy. 10. Prepare for and conduct a training session on use of the Santa Barbara urban hydrograph modeL Tad~ 2. PHASE II - STORMW A TER INVENTORY Storm Drainage Master Plan Scop.te of Services Objectives: Create an information database for a portion of the city's storm water system including: horizontal and vertical locations of all storm water facilities, type of facility, age, material and connectivity of each facility. The database will be linked with AutoCAD in such a way to create a map of all storm water facilities in the city. The initial area to be mapped is generally bounded by Cleveland Street on the north, Highway 99E on the east, Wilson Street on the south and Front Street on the west, an area of about 150 acres. DescHption: Develop a master numbering/identification system to allow each facility in the city's storm sewer system to be included in the data base. Using the city's existing files for storm sewers supplemented with data obtained using a portable GPS system, select and enter specific information about the storm sewer system (such as horizontal and vertical locations, size, material, age, etc) into an electronic data base. Create the appropriate electronic ties to enable the data base to be converted to a mapped format. Products: A data base of information for storm sewer facilities within the area as described above. pJ.oducts: A data base of information regarding all storm sewer facilities in the city. LeVCfl of Detail: The amount of work needed to complete preparation of the data base and mapjling of the city's storm sewer is a direct function of the level of detail needed to satisfy the goal$, of the city and staffwho will be using the data base/map for day-to-day work. The following tasks and estimate of cost are presented with the following assumptions regarding the level of detail to be provided. Horizontal Location: all facilities will be horizontally located using a portable GPS system and referenced to: (in order of preference) 1. the city's horizontal grid coordinate system, j"~""""______ .___~_._._h~.<""-"""'__"__'_~___"'-''"''''__"''';'~_+'''' ..'<-" "'_""_'._..~''"'__"'''''''''^'_~'''''_ ATTACHMENT A Page..L:i.. of I ? Attachment A Page 3 2. property lines, 3. street curbs or, 4. other utility locations No new topographic survey measurements (instrument quality) will be taken to establish the horizontal locations of these facilities as a part of tbis contract.. Vertical Location: invert elevations of all manholes, inlets, catch basins or other similar storm water system facilities will be determined from a measurement taken from the ground level elevations of the facility using the portable GPS unit. Other elevations for the ground level reference points will be made using survey instruments when necessary. Inventory data: physical data for the system will include: 1. Pipe diameters and general direction from the manhole, inlet or catch basin. 2. Pipe material as best determined without entering the structure 3. Other information about the system which can be gathered without entering the facility or structure. This <<:stimate presumes that the consultant will rent the GIS hardware and software for a one month period and it will be used by consultant staff to gather field data. The scope of work outliL\ed below will be the same regardless of the method of data collection. Scope of Services: 1. Select and document the numbering reference system for the storm sewer data base and mapping inventory system 2. Gather and record existing information on each facility in the city's storm sewer system (such as m2LI1holes, pipelines, catch basins, inlets, etc). Information will include but not be limited to such parameters as: horizontal location, elevation, material, age, connectivity, etc. 3. Rlecord information about the existing system on the city's grid mapping system maps and in a data base. 4. Gather field data similar to the parameters listed in No.1 above where such data does not currently exist within the city's records. It is estimated that approximately 18.5 miles of storm sewe:r system facilities may require data gathering in the field. 5. Log data from the field work on either grid maps or in an electronic data base. 6. With city staff, create the linkages that will allow data transfer to the city's AutoCAD system. PFlAS!o:Z.SCP n1'T'n 1'...,..,..... "'I',.... ,.. .. ATTACHMENT A page..ik... of 17 ATTACHMENT B Task 1. Public Information Program Staff Hours TASKS/SUBT ASKS PM SE TIV Cl EXP Hours Cost Hourly Rates 95 60 52 27 1. Plan and prepare graphics 16 4 12 8 1500 40 $4,100 2. Coordinate wetlands issues 8 4 12 $968 3. Public meetings (4) 24 16 2 240 40 $3,406 4. Planning Commission Mtg 4 4 40 8 $628 5. Council Hearing Meeting 6 4 40 10 $818 6. Hearing responses 4 4 4 12 $828 7. Prepare plan draft for staff 4 4 4 12 $728 8. Incorporate flnal changes 4 6 4 16 $848 9. Prepare final documents 16 20 16 8 800 44 $4,568 to. Staff hydrograph training 2 6 26 8 $576 TOTALS 88 44 60 26 $2,646 202 $17,468 PM = Project Manager SE = Staff Engineer TN = Engineering Tech IV CI = Clerical Assistant Note: Hourly rates are 1997 T~' ...,"-.... -- ATTACHMENTi4- Page --L2- of ATTACHMENT B Task 2. Storm Sewer Inventory TASKS/SOOT ASKS PM SE TIV CI EXP Hours Cost Hourly Rates 95 60 52 27 PHASE U - INVENTORY 1. Select numbering system 8 16 4 28 $ 1,928 2. Gather existing data 8 40 180 $ 280 228 $ 12,800 3. Transpose existing data 2 40 16 58 $ 3,422 4. Gather field data (8) 8 280 160 $2,500 448 $ 28,380 5. Log field data 4 180 80 $ 401 264 $ 13,741 6. Create AutoCAD links 8 40 32 80 $ 4,824 Phase II - Subtotals 30 572 360 80 $ 1,585 1106 $ 65,095 (a) Assumes Task 2 field work is conducted with use of a GPS data gathering system. (b) Hourly rates are 1997 PM = Project Manager SE = Staff Engineer TIV = Engineering Tech IV C1 = Clerical Assistant ~'"- ,,"~-'"- ---y--..-...-....-....'-'-.-.-.-