Ord 2392 - LDS Church
COUNCIL BILL NO. 2602
ORDINANCE NO. 2392
AN ORDINANCE ANNEXING 9.62 ACRES OF PROPERTY INTO THE CITY OF
WOODBURN LOCATED ON THE SOUTH SIDE OF MOLALLA ROAD AND NORTH
OF JUNE WAY AT 2045 MOLALLA ROAD; GRANTING A ZONE CHANGE FROM
MARION COUNTY UTF (URBAN TRANSITION FARM) ZONE TO CITY OF
WOODBURN CG (COMMERCIAL GENERAL) ZONE; APPROVING DESIGN
REVIEW APPLICATION CASE FILE NO. 04-18; AND ATTACHING CERTAIN
CONDITIONS THERETO.
WHEREAS, the applicant, LDS Church, submitted the following applications:
Annexation 04-02, Zone Change 04-02, and Design Review 04-18; and
WHEREAS, the Woodburn Comprehensive Plan and Zoning Map have established
certain land uses within the City of Woodburn' s Urban Growth Boundary; and
WHEREAS, the Woodburn City Council has reviewed the record pertaining to said
applications and heard all public testimony presented on said applications; NOW,
THEREFORE,
THE CITY OF WOODBURN ORDAINS AS FOLLOWS:
Section 1. That the subject property is owned by Elroy A. Olson and Jeanne M.
Fredrickson and is legally described in Exhibit "A" which is affixed hereto and by this reference
incorporated herein.
Section 2. That the subject property is depicted on the Exhibit Map for Annexation
which is affixed hereto as Exhibit "B" and is by this reference incorporated herein.
Section 3. That based upon the Findings in Support, which is affixed hereto as Exhibit
"C" and is by this reference incorporated herein, the subject property is hereby annexed to the
City of Wood bum.
Section 4. That the Woodburn Zoning Map is hereby amended as to the property
described in Exhibit "A" to this Ordinance from Marion County UTF (Urban Transition Farm)
Zone to City of Woodburn CG (Commercial General) Zone based upon the Findings in Support
which is affixed hereto as Exhibit "C".
Section 5. Development permit application Design Review 04-18 is hereby approved;
based upon the Findings in Support that are affixed hereto as Exhibit "C".
Section 6. That Annexation 04-02, Zone Change 04-02 and Design Review 04-18
approvals are subject to the conditions contained in Exhibit "D", which is affixed hereto and
incorporated herein, which the Council finds reasonable.
Page 1-COUNCILBILLNO. 2602
ORDINANCE NO. 2392
r
Passed by the Council
Submitted to the Mayor
Approved by the Mayor
::::eOff&~
City of Woodburn, Oregon
January
January
January
Approved as to form~ 1"fj- /&6
City Attorney
Page 2 - COUNCIL BILL NO. 2602
ORDINANCE NO. 2392
r
WARRAN1V DUO UNO'''IDUALI
'OL
u.
Exhibit" A"
C'Q tt
, ...,,""\. cal'" .,In_, COfW-V'" \.
P'.
... \tI1\ ,Iel proptl\V si\ua\. In the Coun'"
,
\
I
t
0(,1 \) L\ lOO'
, St." 01 O,"*"" detcribllllt:
,
P'llfJl r ',4~M$, .HAlf"'''' (!.()fJ~-r'l, t:J~tMI \
. .
:tD, ~e.t:(J,cO tJ /fJ ?SIAlIII !tA"-$ Foil
""~\"" \ \\" .. . "I
'l'jOOIJ'3~~\"\ ,,'.."......,... \
~ "'l.'"~~''' ."\'U-'){
Cc.'.:. \"';1 . :1'_,. .,.
t. Dr ~ WCObfJ cJA.N
(Sl.e 11"1. IJ"". ..t, rll~.
S,fIP CDtJ/lJr.)' ~ ~Q~,
.
..
..
i,
,
\
I:
t
t
and cowen""'" lNl.,antor 111M owner 01 \he ...,. dltcribed proper'" fr.. of lit encumbr-- eac_ -
Iftd w'" w..,ant ... defend tN ...,. -"'II ai, per.... wbo !MY I-'ulIy d..... the..... exC8llt ..1hOWn IbcM.
1he t,ue and actUII consideration lor \till venti. I" - B ·
..
. t:t. .
D..... "i~ I.~- ..... ~ ~
~ ~
. ':/...;/ u: --
\
-r~ I :a.tt"
tL^~. A -rit...........
inlt.unwnt \0" --,4 ........ volunUIV act ... deed.
oJ ...~.....
4.~ 'J> \ B,tore me: ~
' . p'.\:.ll~' ~ . ~~
"~ .~;~:;,;!;) ~":.a. "'_ _ ~" -
" ,.' .
. >.~ . tt10ulcl Include ca. plus .11 encumbrances ..1"lntlPlnll \he property to wblch 1M
.. , ~
':( RWf!,,,,.IM lIUbi- 01 which the pU,ch_ ..... \0 P-v or IllUme.
.. ,,~atlon includlll oth. property 01 value, MId the lollowlnt: "However, \tie ICtUaI conlld.atlon
conti... of Ol' Include. oth. proper", 01 value gill'" 01 promi" which I. per' of \tie/1M whole /
contlderation:' (Indicate whlchl
I.
o ,.~ton..tv IPI*'IlI the move nemed
.... ICknow\edglll 1M for....
.
.
.
\
I
S1A~E OF OREGON, CountV aI ~,""""
I
,
"
~
I
I
WARRAN1Y DUD UNDIVIDUAL)
I
STAll OF OREGON.
TO
n\~- F'^-,-...l".iLIo&.~.""
STAll Of ORIGON
ccuntY ell MIllon
I I\tl'ebf CIftit'I
"'It 1M wI\Nft w"
received II" ~
record. by me In
Marlon County
rlCOldt: _
F... ,,-
Hand Re""ned JA
REEL PAGI
'0& Jat
DCLJ....
Alter Recordin, Return to:
(...\ .. ~ 0J.c.., CUc..:'"
;;104~ rY"O\(\.L~ ~.
LVCXIc:lUA....", I Ov. q,O"
JUl.I! 1111 H4 'O~
AUM II. ",.VI04iON
HARION (:1\\11( ~ ~ Cl ERIl.
In J'01UD 1'~o,,1Y
~T." _
UtpulV
'1'1'. Me ....
r
....,......... '. ........<...:..:...J.... ........,.. ','}
,,-" Exhibit "B" .-- ~
...:" ". .... .'. ....... ...... . ". ..'.'.;l;"!8-.;'i~ y
..... .. ........... ............':.. .'.'.....,...:.< :.... .:.' '," ..'t7.'. ..... 1'-' <...i :..,.... .
" .,:, .............'.:., ,>,........ [> OJ.... :".",.... :"".: ,'::::"
'.' ". .......<><,....:>:. i" '. ~i
.. ................ - - - - - _ '-_ .....'- ,........ .,....... _>'~~,i/ ....~
...........'.. ...i......:......... ..lI6OMr!l(l~~33$>' .....<.1.;....... r.o~.~.". /'"R, t..< ...... .
'.......:.... ......... :': ...... ,'.' :.... .......,..-,t Ii ......'.......
- - - .... ..,.,..;....2.'-... . ......::.....: '. ....' '::." ".: "" ....:...:..... ...... ,.~.;.
. .....'......_ _ _ ~..__~., ..:' .... . ,....,.' :';::>o"'~r;,t.: 1\':1>'.
.. ":::'. ~ .o~.., ....1 ;.: ~:':
.:.. ... .......... . ...:.' .....,:. ...... "0"'>" .....:.. :..'~
.. .,... ..... .;.., .. ...... .'. .,:-,,' · . l'
. :...........:...:......... \......;...... ....:...........,.........' '~:/~..("~="': y .~<.;~.:.H};i~. ''e ~,,"1'
>i' ! ~ \--.......,.....,. II! ...:",'.': ....::..,.:....
."t<, ......... ......- OX r~ ~ \ I · - "' ~ ~ ",r ;,:-.:"
.. '. . .'. . L L- iJJ _____. c::>}. 7' ! ~ -<f
., ! \ E-I '. \. J ) X 0';''' ::.....
, 0 C.) --....... ~ "\ c::> \. ~ Ill'" ~ .....:...
..... 0 ~ - \ ~ -- c::> -'--' ... p)~ :'..' ",'
< ~~ ""_J) ~ --.--) \ "\ a/s" I .''j
..."., ...........<.:....... 0,," ~ I""') I ~.. ... )"
....:. '.' ....... ("I') \...C\ iJJ -....1._... c:::> '> \ l.(),."?'"~ ....:1 ....'..
:....: ..... I.... _ \ ~ \.........,) a; : . .:...)
..> .', ..' .. s'llll~" ""LI, .- $:.... "".' <<~
.. ..... ~~. 1lll.L"\ ~L: \:,+000 !}.': .' .' '.
..........~ ~ 6', '\ /' L2, NtJ.>..\<'~
.:................ .......... ..... ..... i~ .J =....... 'i ....,........
Il,.' l"'" L-., +J, /,.:",:".>" .
~;.: ilg I ~-:, " ~ \. 5t~i". "'.." ,",'
tfi~.. '" II ..::>, 8 .>+;:-.. ......
':~~~J ;~ ~ - ~ - - - ~ - ,~- - - ~..~ -'~~~ ~ tli!;jl\i.\\~:\;!!!;i!!t
t "'" ' , ,1-""'-!l>. ,," , ;. ·
... qjJ'"J ! I ~~ cV' C.)..... ; >( > ............< ..... ....
__\ <1.t i -" ~ 8 ~ ..... ,.., .... ....... ........
"'il,; -' ~ .' , ~ ~ ' , · "<.i.. W'
--\ ~' I '~~ .&;? ~ ..... '", .. ........... .............. ......... .... ....
~ -......, 'bik' I! ~'.n <(..... ..:. <.
. l'"' ~\ ~'~: ~,1- !il g L.... f .. ...... i ·
'V' "'J. I ii', ~ '<t l LO J[~;,;; ............. .'.
_0 ~ \ -'" r;~ l.\?1 I r "-&I.. I") ~ ...............i......: ....
~_ ~: > 0. I""'V\ '-) III "ii,! !.~ 8 c::r.o ,!t; I..... ........ ...:......
.... \.j) L,- to: t:,) '<t~. i ~ I")J ......... ..... ........
"1 --.:;:-. 0 8 ~ 1 I T"" c::>.. : :.
'\ ..--:'I ,,"u N " en I I ... '<t .. ~:: ..... .... ...:....:..
CI -=l '-.\ """""' <S:I \Q co ":-l; I 0 1")" .<. .., ....
1~~ ~ 0 r:.:: Lt'J <;:; ~ q;~! I oJ' q,~ $2 ....~<. ..... I .... ~..
'"..... ~,.-.~ ,... "- 0 ~ L" 09'9Sl "e ~~I It! I '-'1~~'li'b '" .....\.. . ..... · .'. ::..-
~:, ..~., ......... .... ,-- -,' .$)I: I , I I ..... L. ...:,.,:.......... .... . ""'"
it <%-,....... '< .~ 0 W l...... ./ . ...... · .....
l,:" ~ ~~ ~ .i> -::c, ~ <1, ~ ~.:.: J .,~;i"".. ............. ....
:; ~~\ ~ .;" ii" ~ \\ '-r.,' .. .... ".
., ~ ~ :f .-\f;. /:C]'or i' ....... .....,,: .........
\ ! -\ \~;..J.'.<""."
t\. ~ ill ~ A '0..., ! %-:"<'~~,' .......<)~"""
. . ....
..
.' ..
:. ..' . . .... ' .
.... . u.'. '..
[ '. ..
. r
'- -
,
. . ..... .
:..::."-"
.' ..
j
.
#
'"
EXHIBIT "C"
FINDINGS IN SUPPORT
ANNEXATION 04-02
ZONE CHANGE 04-02
DESIGN REVIEW 04-18
I. APPLICATION INFORMATION:
Applicant:
LOS Church
A TTN: Mark Cottle
395 N. Sherwood
Sherwood, OR 97140
Property Owner:
Elroy Olson and Jeanne M. Fredrickson
10730 Portland Road NE
Brooks, OR 97305
II. NATURE OF APPLICATION:
The applicant proposes to annex 9.62 acres of land into the City of Woodburn
and change the zoning of the property from Marion County "Urban Transition
Farm" (UTF) to City of Woodburn "Commercial General" (CG) located at 2045
Molalla Road. The applicant also requests design review approval for a 25,000
square foot church facility, 300 square foot storage building and 1,800 square
foot pavilion (covered picnic shelter).
III. RELEVANT FACTS:
The subject property is 9.62 acres in size and is located at 2045 Molalla Road. It
is identified specifically on Marion County Assessor Maps as Township 5 South,
Range 1 West, Section 8A, Tax Lot #5200, Lot #3 of the Woodburn Fruit Tracts.
The subject property is zoned Marion County "Urban Transition Farm" (UTF),
designated "Commercial" on the Woodburn Comprehensive Plan Map, and is the
location of an existing single family dwelling and shed. The properties located to
the west of the subject site are zoned City of Woodburn CG and Marion County
UTF, designated "Commercial" on the Woodburn Comprehensive Plan Map, and
are location of commercial uses. The properties located to the east of the
subject site are zoned Marion County UTF, designated "Commercial" on the
Woodburn Comprehensive Plan Map, and are location of a single family dwelling
and vacant land. The properties to the south of the subject site (across Highway
211/Molalla Road) are zoned City of Woodburn Medium Density Residential
(RM), designated Residential> 12 Units Per Acre and are the location of single
family dwellings and a church under construction. The property located to the
ANNX 04-02, ZC 04-02 & DR 04-18
Page 1
r
north of the subject site is zoned Marion County "Exclusive Farm Use" (EFU), is
located outside of the Urban Growth Boundary and is the location of the
Maclaren Youth Correctional Facility.
No wetlands are located on the subject property and it is located outside of the
500 year floodplain.
IV. RELEVANT APPROVAL CRITERIA:
Annexation 04-02:
A. WOODBURN DEVELOPMENT ORDINANCE
Section 5.104.01 Annexation
B. WOODBURN COMPREHENSIVE PLAN
Zone Chanae 04-02:
A. WOODBURN DEVELOPMENT ORDINANCE
Section 5.104.04 Zoning Map Change; Owner Initiated
B. WOODBURN COMPREHENSIVE PLAN
Desian Review 04-18:
WOODBURN DEVELOPMENT ORDINANCE
Section 2.106 Commercial General (CG)
Section 3.101 Street Standards
Section 3.102 Utilities and Easements
Section 3.104 Access
Section 3.105 Off Streets Parking and Loading
Section 3.106 Landscaping Standards
Section 3.107 Architectural Design Guidelines and Standards
Section 5.103.02 Design Review for All Structures 1000 Sq. Ft. OR
MORE
V. FINDINGS:
Annexation 04-02:
A. Woodburn Development Ordinance
Section 5.104.01 Annexation:
Section 5.104.01.0 Application Criteria
1. Annexation
a. Findings showing compliance with applicable
Woodburn Comprehensive Plan goals and policies
ANNX 04-02, ZC 04-02 & DR 04-18
Page 2
regarding annexation, with the applicant bearing
responsibility for the burden of proof.
FINDING: Findings showing compliance with applicable Woodburn
Comprehensive Plan goals and policies are provided later in this report.
This approval criterion is satisfied.
b. Territory to be annexed
1) Shall be contiguous to the City of Woodburn; and
2) Shall either:
a) Link to master plan public facilities with
adequate capacity to serve development of
the uses and densities indicated by the
Woodburn Comprehensive Plan; or
b) Guarantee the facility linkages with
adequate capacity, financed by the
applicant.
FINDING: The west property line and south property line of the subject
site are contiguous to the City of Woodburn city limits. Water,
wastewater and storm sewer service can be provided to the subject site.
The site is currently being served by a storm sewer system regulated by
ODOT. The existing sanitary sewer main in Highway 211 can be utilized
to provide wastewater service to the development. This is an abandoned
force main being converted to a gravity sewer system by the city. The
city has done some rehabilitation work on the system, however, further
rehabilitation may be required to meet current standards prior to being
put into service. The applicant is proposing to connect to the existing
12" diameter water main on the south side of Highway 211. The main is
adjacent to the Woodburn Crest Estates Subdivision only and is a dead
end system being served by an 8" diameter main from June Way. To
ensure proper fire flows and fire protection, the 12" diameter main in
Highway 211 will be looped to the existing 12" diameter water main near
the northeast corner of the Safeway site as shown on the applicant's site
plan. The applicant states that "the applicant will pay for all linkage and
capacity issues." This approval criterion is satisfied.
c. Annexations shall show a demonstrated community need
for additional territory and development based on the
following considerations:
ANNX 04-02, ZC 04-02 & DR 04-18
Page 3
r
FINDING: The applicant's annexation request should be
approved because the following considerations discussed below
are met.
1) Lands designated for residential and community
uses should demonstrate substantial
conformance to: a), b), and e) and at least one of
c) (i), c (ii) or d), as stated below;
a) Infill. The territory to be annexed should be
contiguous to the City on two or more
sides;
FINDING: The west property line and south property
line of the subject site are contiguous to the City of
Woodburn city limits.
b) Residential Buildable Land Inventory. The
territory to be annexed should not increase
the inventory of buildable land designated
on the Comprehensive Plan as Low or High
Density Residential within the City to more
than a 5-year supply;
FINDING: The property to be annexed will not
increase the inventory of buildable land on the
Comprehensive Plan as Low or High Density
Residential within the City to more than a 5-year
supply because a church is proposed on the subject
site instead of a residential development.
c) Street Connectivity. It is feasible for
development of the site to either:
(i) Complete or extend the
arterial/collector street pattern as
depicted on the Woodburn
Transportation System Plan; or
FINDING: Highway 211, classified as a major arterial
in the Woodburn Transportation System Plan, abuts
the south side of the subject site and is under the
jurisdiction of the Oregon Department of
Transportation (ODOT). ODOT commented
". .. Generally, the applicant will have to apply for and
obtain an approach road permit from ODOT for
ANNX 04-02, ZC 04-02 & DR 04-18
Page 4
T
access to the state highway. ODOT will require
improvements to the property frontage (curb, gutter,
sidewalk) consistent with the City's Transportation
System Plan, which designates OR 211 in this area
as a major arterial. The standard section for a major
arterial is five lanes, however, the TSP indicates that
OR 211 is envisioned as either 3 or 5 lanes east of
OR 99E. Since the existing highway is 3 lanes and
recent improvements farther to the west have been
for a 3-lane section, our expectation is that a 3-lane
section will be sufficient in this area. The approach
road permit will specify the requirements for the
location and design of the access to the property and
frontage improvements..."
e) Reinforcement of Public Investment. The
territory proposed for annexation should
reflect the City's goals for directing growth
by using public facility capacity that has
been funded by the City's capital
improvement program;
FINDING: The Public Works Department stated that
the City's water and wastewater facilities, funded
through the City's capital improvement program, have
adequate capacity to provide services to the proposed
development. Any site specific capacity issues will be
upgraded by the developer.
B. Woodburn Comprehensive Plan
IX. Goals and Policies
O. Annexation Goals and Policies
D-1. The goal is to guide the shape and geographic area of the City
within the urban growth boundary so the City limits:
A. Define a compact service area for the City;
B. Reflect a cohesive land area that is all contained within the
City; and
C. Provide the opportunity for growth in keeping with the
City's goals and capacity to serve urban development.
0-2. The goal is to clearly establish the intent of each proposed
expansion of the City; to assess the proposal's conformance
ANNX 04-02, ZC 04-02 & DR 04-18
Page 5
r
with the City's plans and facility capacity and to assess its
impact on the community prior to deeming an annexation
application complete.
FINDING: Annexation of the subject property is consistent with the
above goals because water, wastewater and storm sewer service can be
provided to the subject site. The applicant states that "the applicant will
pay for all linkage and capacity issues.. .The Church is committed to
paying all costs associated with the development of the site so the City is
not burdened with its impact."
0-3. The goal is to achieve greater utilization of land within the City
by:
a. Incorporating all of the territory within the City limits that
will be of benefit to the City into the City.
b. Providing the opportunity for the urban in-fill of vacant and
under utilized property that is currently unincorporated and
surrounded by the City.
c. Fostering an efficient pattern of urban development in the
City, maximizing the use of existing City facilities and
services, and balancing the costs of City services among
all benefited residents and development by incorporating
all territory into the City limits that will be of benefit.
FINDING: Annexation of the subject property is consistent with the
above goals because the applicant's proposed church use will provide a
service to the community. Water, wastewater and storm sewer service
can be provided to the subject site. The applicant states that "the
applicant will pay for all linkage and capacity issues." The proposed
development will provide a needed church service to the community.
Zone Chanae 04-02:
Woodburn Development Ordinance
Section 5.104.04 Zoning Map Change; Owner Initiated
Section 5.104.04.C Criteria.
1. Evidence proving a need for the proposed use and the
other permitted uses within the proposed zoning
designation.
ANNX 04-02, ZC 04-02 & DR 04-18
Page 6
r
FINDING: The applicant is proposing a church use on the subject
property which is a permitted use in the CG zone. The CG zone is
consistent with the Commercial land use designation for the subject
property as shown on the Woodburn Comprehensive Plan Map.
2. Evidence that the subject property best meets the need
relative to other properties in the existing developable land
inventory already designated with the same zone
considering size, location, configuration, visibility and
other significant attributes of the subject property.
FINDING: The applicant is not proposing to change the zoning on
the subject site from one city zoning designation to another.
Rather, the applicant is proposing to change the zoning
designation on the subject property from a Marion County zoning of
"Urban Transition Farm" (UTF) to a City of Woodburn zoning of
"Commercial General" (CG) as required by the annexation process.
The proposed CG zoning on the subject property is consistent with
the Commercial land use designation of the Woodburn
Comprehensive Plan. This approval criterion is met.
B. Woodburn Comprehensive Plan
FINDING: Applicable goals and policies have been satisfied through the
implementation of the Woodburn Development Ordinance and other
applicable ordinances in affect at the time of approval. The designated
land use for the property is Commercial on the Comprehensive Plan Map
which is consistent with the proposed Commercial General zone
designation.
Desian Review 04-18:
WOODBURN DEVELOPMENT ORDINANCE
Section 2.106 Commercial General (CG)
Section 2.106.01 Permitted Uses
The following uses, when developed under the applicable
development standards of the WDO, are permitted in the CG zone.
P. Other Services
11. Religious, civic and social organizations. (813)
FINDING: The applicant is proposing a church which is an outright
ANNX 04-02, ZC 04-02 & DR 04-18
Page 7
~
permitted use in the CG zone. This approval criterion is met.
Section 2.106.05 Dimensional Standards
FINDING: A proposed 300 square foot storage building on the east side
of the subject site and 1,800 square foot pavilion (picnic shelter) are
proposed on the north side of the subject site. These accessory
structures are reviewed below in conjunction with the main church building
because accessory buildings that are used for a non residential use have
the same setback and height requirements as the primary building/use per
Section 2.202.02.
The following dimensional standards shall be the minimum
requirements for all development in the CG zone.
A. Lot Standards.
Lots in a CG zone shall comply with the applicable standards of
Table 2.1.10.
TABLE 2.1.10 Lot Standards for Uses in a CG Zone
In a CG zone the lot area for a non-residential use shall be adequate to
contain all structures within the required setbacks. There shall be no
minimum width or depth.
FINDING: The proposed buildings and parking lot meet the required front
and interior yard setbacks as discussed later in this report. This approval
criterion is met.
B. Building Height.
The maximum height of buildings shall not exceed 70 feet, EXCEPT
chimneys, spires, domes, flag poles and other features not used for
human habitation (EXCEPT telecommunication facilities), shall not
exceed 100 feet.
FINDING: The highest height of the buildings will be 32 feet which meets
the 70 foot maximum height allowed in the CG zone. The maximum
height of the steeple is 70 feet which also meets the 70 foot maximum
height allowed in the CG zone. This approval criterion is met.
C. Setback and Buffer Improvement Standards.
1. Front Yard Setback and Setback Abutting a Street:
ANNX 04-02, ZC 04-02 & DR 04-18
Page 8
v
a. Dimensions:
1) The minimum setback abutting a street shall be 15
feet plus any Special Setback, Section 3.103.05.
FINDING: Highway 211 is classified as a major arterial in the
Woodburn Transportation System Plan (TSP). A major arterial is
required to have a 65 foot special setback (50 foot special setback
plus the required 15 foot front yard setback) from the centerline of
the street. The applicant's proposed buildings are located over 140
feet from the front property line which far exceeds the required 65
foot special setback requirement from the centerline of Highway
211.
b. Off Street Parking and Maneuvering:
1) Off street parking and storage shall be prohibited
within a required setback.
FINDING: No parking or storage is proposed to be located in the
65 foot special setback from the centerline of Highway 211. This
approval criterion is met.
c. Clear Vision Area: Fences, walls, landscaping and signs
shall be subject to clear vision area standards, Section
3.103.10.
FINDING: The applicant is not proposing to place the above listed
items in the required 10 foot vision clearance triangle at the access
driveway on Highway 211.
2. Interior Side and Rear Yard Setbacks.
a. Development in a CG zone shall be subject to the
setback and buffer requirements of Table 2.1.11.
(See Table on the next page.)
ANNX 04-02, ZC 04-02 & DR 04-18
Page 9
r
TABLE 2.1.11
Interior Yard and Buffer Standards for CG Zones
Abutting Property
Setback
Landscaping
Wall Interior
RS, RIS, or RM zone
There is no buffer yard
landscaping requirement for
an interior yard abutting a
buffer wall.
Solid brick or architectural 10 ft.
wall with anti-graffiti surface,
no less than 6 feet or
greater than 7 feet in
height.
CO, CG, DOC, P/SP or
IL zone
There is no buffer yard
landscaping requirement for
an interior yard abutting a
buffer wall.
Alternative A: Alternative A:
Wall requirement shall be 5 ft.
determined in conjunction
with the applicable Design
Review Process.
-------..-----------------..----- -..-----..--------
Alternative B: Alternative B:
No wall required. Zero setback
abutting a
building wall.
FINDING: The abutting property to the north is located in Marion County
and is zoned "Exclusive Farm Use" (EFU). A 5 foot interior yard setback
is required on the north side of the subject site. The proposed
development is located over 130 feet from the north property line which
meets the 5 foot interior yard setback requirement. The property located to
the west of the subject site is zoned "Commercial General" which requires
a 5 foot interior yard setback. The applicant's proposed parking facilities
and buildings are located over 80 feet from the west property line which
meets the 5 foot required interior yard setback requirement. The abutting
properties located to the east of the subject site are zoned Marion County
"Urban Transition Farm." The applicant's proposed parking facilities and
buildings are located over 39 feet from the east property line which meets
the 5 foot required interior yard setback requirement.
A wall is not required on the west property line because the applicant is
proposing an access road along the west side of the subject site that can
be shared with the properties located to the west of the applicant's
property. The properties located to the west of the subject site are the
location of commercial uses that are compatible with the applicant's
proposed church use. The property located to the north of the subject
site is located outside of the city limits and urban growth boundary, is
zoned Marion County EFU, and is the location of a correctional facility.
Fencing is already located on the north property line of the subject site.
The properties located to the east of the subject site are zoned Marion
County UTF, designated "Commercial" on the Woodburn Comprehensive
Plan Map, and are location of a single family dwelling and vacant land.
ANNX 04-02, ZC 04-02 & DR 04-18
Page 10
r
The applicant is proposing a 6 foot chain link fence along the east property
line of the subject site where the building and parking facilities are located.
A condition of approval is that a 6 foot chain link fence, subject to the
vision clearance standards in Section 2.202.03, shall be constructed on
the east property line of the subject site prior to final occupancy. The
applicant is proposing a significant amount of landscaping on the east side
of the subject site and on the front portion of the subject site adjacent to
the residential dwelling. The proposed building setbacks, landscaping and
chain link fence will be sufficient to buffer the surrounding properties from
the proposed development. This approval criterion is met.
b. The building setback from a private access easement
shall be a minimum of 5 feet.
FINDING: No private access easements are proposed. This
approval criterion is met.
c. Off street parking, Maneuvering and Storage:
Off street parking and storage shall be prohibited within
a required setback.
FINDING: No parking, maneuvering or storage is proposed in a required
setback. This approval criterion is met.
Section 2.106.06 Development Standards
All development in the CG zone shall comply with the applicable
provisions of the WDO. The following standards specifically apply to
uses in the CG zone.
D. Signs.
Signs shall be subject to Section 3.110.
FINDING: The applicant shows a 13.92 square foot stone wall sign on the
north side of the proposed church building which meets the maximum
allowable wall sign area of 133 square feet. Any other signs that are
proposed in the future will be subject to Section 3.110.
E. Landscaping and Sidewalks.
1. The street frontage of a subject property shall be improved
with either property line sidewalks and street trees or curb line
sidewalks. The improvement shall be determined at the time
of subdivision, PUD or design review as applicable. Sidewalks
ANNX 04-02, ZC 04-02 & DR 04-18
Page 11
r
and trees shall be installed by the property owner to the
standards of Section 3.101 and 3.106.
FINDING: Highway 211 and the required street improvement, including
sidewalks, are under the jurisdiction of the Oregon Department of
Transportation (ODOT). The subject site possesses approximately 440
feet of frontage abutting Highway 211. The submitted landscaping plan
shows 36 "Red Alder" trees (Alnus rubra), classified as a large tree
according to Section 6.103. Eight large trees are required for 440 feet of
frontage. The applicant is proposing to far exceed the 8 large street tree
requirement. This approval criterion is met.
3. Common refuse collection facilities shall be screened on all
sides by an architectural block wall and solid gate, both with
an anti-graffiti surface, a minimum of six feet and a maximum
of seven feet in height.
FINDING: The applicant is proposing a brick wall 6 feet in height, sealed
with brick sealer to resist graffiti, around the refuse collection facility. The
trash enclosure will have a solid metal gate. This approval criterion is met.
Section 3.101 Street Standards
Section 3.101.02 General Provisions
B. No access permit shall be issued unless the internal street(s),
boundary street(s) and abutting street(s) are constructed pursuant to
Section 3.101.02.C, UNLESS or until the applicant has obtained an
exception as provided in this section.
C. Design and Construction Standards.
1. All public streets under the jurisdiction of the City of
Woodburn shall comply with the applicable cross section
design standards noted in Section 3.101.03 and construction
specifications of the Public Works Department.
D. Street Right of Way and Improvement Standards for Development
Any development subject to an access permit, Section 3.104, shall be
responsible for adequate street rights of way and improvements.
The standards of Section 3.101.02.D may only be modified subject to
the approval of an exception, Section 5.103.12. In no instance may
standards be reduced below specified minimum, non-variable
standards.. .
ANNX 04-02, ZC 04-02 & DR 04-18
Page 12
T
2. Boundary Street Standard. (Figure 6.12)
a. Right of Way Standard. The full right of way for the
subject street classification, Section 3.101.03, shall be
required for a boundary street without an approved
exception or variance.
The minimum standard for a boundary street right of
way shall be no less than the width necessary to
accommodate the boundary street improvement
standard.
b. Street Improvement Standard. The full street
improvement for the subject street classification,
Section 3.101.03, shall be provided for a boundary street
without an approved exception or variance.
The minimum boundary street improvement standard
shall be equivalent to:
(1) One, 12 foot wide travel lane in each direction,
including curbs in each direction where the
classification specifies a maximum standard of
two travel lanes;
(2) Required drainage facilities; and
(3) In addition to the improvements cited in 1) above,
the full improvement of the street from the center
line to the boundary of the subject property plus
any center turn lane as described for the street
classification.
J. Sidewalks. All sidewalks shall be a minimum of 5 feet wide,
excluding the curb, and located one foot from the right of way line
EXCEPT in the DOC Zone or as otherwise approved by variance.
Section 3.101.03 Right of Way and Improvement Standards (Figure 6.9)
A. The street right of way and improvement cross-sectional standards
required for development are depicted in the Woodburn
Transportation System Plan Figure 30, EXCLUDING: Local
Residential WI Parking Both Sides "Skinny" Street; Local Residential
WI Parking One Side -"Skinny" Street; and Local Residential Street
WI No Parking. (See Figure 6.6)
ANNX 04-02, ZC 04-02 & DR 04-18
Page 13
FINDING: An access permit from the City of Woodburn is not required for the
proposed driveway access to the church because Highway 211 , the boundary
and connecting street, is under the jurisdiction of the Oregon Department of
Transportation and will be subject to the requirements of OAR 734-051. ODOT
commented "...Generally, the applicant will have to apply for and obtain an
approach road permit from ODOT for access to the state highway. ODOT will
require improvements to the property frontage (curb, gutter, sidewalk) consistent
with the City's Transportation System Plan, which designates OR 211 in this area
as a major arterial. The standard section for a major arterial is five lanes,
however, the TSP indicates that OR 211 is envisioned as either 3 or 5 lanes east
of OR 99E. Since the existing highway is 3 lanes and recent improvements
farther to the west have been for a 3-lane section, our expectation is that a 3-lane
section will be sufficient in this area. The approach road permit will specify the
requirements for the location and design of the access to the property and
frontage improvements..." This criterion will be met.
Section 3.102 Utilities and Easements
Section 3.102.01 Water, Sanitary Sewer and Storm Drainage Facilities
Municipal water, sanitary sewer and storm drainage facilities shall be
installed to applicable Public Works Department and state standards.
FINDING: Water, wastewater and storm sewer service can be provided to the
subject site. The site is currently being served by a storm sewer system
regulated by ODOT. The existing sanitary sewer main in Highway 211 can be
utilized to provide wastewater service to the development. This is an abandoned
force main being converted to a gravity sewer system by the city. The city has
done some rehabilitation work on the system, however, further rehabilitation may
be required to meet current standards prior to being put into service. The
applicant is proposing to connect to the existing 12" diameter water main on the
south side of Highway 211. The main is adjacent to the Woodburn Crest
Subdivision only and is a dead end system being served by an 8" diameter main
from June Way. To ensure proper fire flows and fire protection, the 12" diameter
in Highway 211 will be looped to the existing 12" diameter water main near the
northeast corner of the Safeway site as shown on the applicant's site plan. A
minimum 16 foot wide easement shall be conveyed to the City of Woodburn for
the on-site city maintained water system. The applicant states that "the applicant
will pay for all linkage and capacity issues." This approval criterion is satisfied.
A. Public Utility Easements (PUE).
Five foot wide public utility easements (i.e., easements for natural
gas lines and for electric and telecommunications wire or cable
service) shall be dedicated along each lot line abutting a public
street. At the time of tentative approval, utilities may request
ANNX 04-02, ZC 04-02 & DR 04-18
Page 14
r
dedication of a public utility easement within a reciprocal access
easement or centered along specified rear lot line in those zones
where zero setback is not permitted.
FINDING: Any public municipal water, sanitary sewer and storm drainage utility
easement dedications required by the proposed development will be subject to
the requirements of the Public Works Department and the WDO.
B. Creeks and Watercourse Maintenance Easements.
FINDING: There are no creeks or watercourses on the subject property for which
maintenance easements will be required. This approval criterion is met.
Section 3.104. Access
Section 3.104.01 Applicability
A. Street Access Required.
1. Every lot shall have direct access to an abutting public street
or to a public street by an irrevocable access easement.
FINDING: The applicant is proposing a driveway access to the subject
site from Highway 211. This approval criterion is met.
B. Access to City Streets, Permit Required.
2. A Traffic Impact Analysis (TIA) may be required by the Public
Works Director prior to the approval of a City access or street
construction permit when the Director estimates a
development proposal may generate either 100 or more
additional, peak hour trips, or 1,000 or more additional daily
trips, within ten years of a development application. A TIA
shall evaluate the traffic impacts projected of a development
proposal and the estimated effectiveness of potential traffic
impact mitigation measures. The methodology for a TIA shall
be consistent with Public Works Department guidelines.
FINDING: The Woodburn Transportation Manager indicated that the
proposal would not require a TIA because the proposed development
is not anticipated to generate 100 or more additional, peak hour trips,
or 1,000 or more additional daily trips, within ten years of the
development application. This approval criterion is met.
C. Access to State Streets, Highways, and Interchanges.
ANNX 04-02, ZC 04-02 & DR 04-18
Page 15
Access to a transportation facility under the jurisdiction of the
Oregon Department of Transportation (ODOT) shall be subject to the
requirements of OAR 734-051.
FINDING: The Oregon Department of Transportation commented that the
applicant will have to apply for and obtain an approach road permit from
ODOT for access to the state highway.
Section 3.104.03 Driveway Access Guidelines, Type II and III Applications
Section 3.104.05 Driveway Dimension and Improvement Standards, Type I,
II and III Applications
E. Commercial and Industrial Use.
1. Paved Two-way Driveway Width.
a. With no turn lane: Throat and travel lane width 26
feet minimum, 36 feet maximum. ("No parking"
restrictions shall be posted by the owner.)
FINDING: The applicant is proposing a 36 foot wide paved two-way
driveway width which meets the 26 foot minimum and 36 foot
maximum driveway width requirement.
Section 3.104.02 Driveway and Drive-Through Measurements and
Dimensions
A. Driveways Crossing a Setback.
The portion of a driveway crossing a setback shall be perpendicular
to the setback lines.
FINDING: The proposed site plan shows the driveway crossing the setback to be
perpendicular to the setback. This approval criterion is met.
Section 3.104.03.A.2 Joint/Shared Access.
c. Medium density residential, commercial, industrial uses and other
development subject to Type II or III Design Review located on the
same lot, or on abutting lots, that abut a Major Arterial, Minor
Arterial, or Service Collector should be designed to share access to
those streets...
d. Shared/Joint Access Agreements. Shared access agreements
serving properties under separate ownership shall be subject to
legal documentation, to the satisfaction of the City Attorney,
ANNX 04-02, ZC 04-02 & DR 04-18
Page 16
~
establishing permanent use of the access. The agreement shall be
recorded with the County Recorder and filed with the Community
Development Director.
FINDING: The subject site and the adjacent commercial properties to the west
are located on Highway 211 which is classified in the Woodburn Transportation
System Plan as a Major Arterial. The proposed use and abutting uses to the
west should share access to Highway 211. A condition of approval is that the
applicant shall provide a shared/reciprocal access easement agreement for the
proposed driveway on the subject site with the properties located to the west to be
reviewed and approved by the legal department per Section 3.1 04.03.A.2.d prior to
the issuance of the building permit. The agreement shall be recorded with the
County Recorder and filed with the Community Development Director.
Section 3.105 Off-Street Parking and Loading
Section 3.105.01 Applicability
The provisions of this Section shall apply to the following types of
development:
A. New Building or Structure.
All requirements and standards of Section 3.105 shall apply to any
new building or structure erected after the effective date of the WDO.
FINDING: The proposed 25,000 square foot building on the subject site is
required to meet all of the requirements in this section of the WDO.
Section 3.105.02 General Provisions for Off Street Parking and Loading
E. Off Street Vehicle Parking Requirements.
1. Off street vehicle parking spaces shall be provided in amounts
not less than those set forth in Table 3.1.2.
FINDING: The parking requirement for the site is 272 spaces: 1 space per
35 square feet of gross floor area of the primary assembly room (9,508
square feet of primary assembly room). The submitted site plan shows a
total of 292 spaces to be provided. This approval criterion is met.
3. The number of disabled person vehicle parking spaces shall
be provided to the standards of the state Building Code and
applicable federal standards. The number of disabled person
vehicle parking spaces shall be included as part of total
required vehicle parking spaces.
ANNX 04-02, ZC 04-02 & DR 04-18
Page 17
FINDING: The submitted site plan shows 7 disabled person vehicle
parking spaces provided which meets the 7 disabled person vehicle
parking spaces required for parking lots containing 201-300 spaces per
the Uniform Building Code. This criterion is met.
G. Off Street Loading Requirements.
1. Off street loading spaces shall comply with the dimensional
standards and amounts not less than those set forth in Table
3.1.3.
FINDING: According to Table 3.1.3, the proposed church is required to
have two loading spaces measuring 30 in depth and 12 feet in width with
14 feet of clearance. The submitted site plan shows two 12 foot by 30 foot
loading spaces on the north side of the proposed parking facilities. This
approval criterion is met.
H. On-site Vehicle Parking and Loading Area Improvement
Requirements.
1. Surfacing. All vehicle parking and loading areas shall be paved
with asphalt, concrete or other hard surfacing approved by the
Public Works Director.
FINDING: The applicant is proposing to pave all vehicle parking
and loading areas. This approval criterion is met.
2. Drainage. All vehicle parking and loading areas shall be
graded and provide storm drainage facilities approved by the
Public Works Director.
FINDING: Vehicle parking and loading areas will be graded to
provide storm drainage facilities as approved by the Public Works
Director.
3. Bumper Guards and Wheel Barriers. All vehicle parking
spaces, EXCEPT those for single family and duplex dwellings,
shall be constructed with bumper guards or wheel barriers
that prevent vehicles from damaging structures or projecting
over walkways, access ways or abutting property or rights of
way.
FINDING: Bumper guard and wheel barriers are not necessary for
the proposed parking spaces because none of the parking spaces
abut a building, or rights of way. In addition, the walkways are wide
ANNX 04-02, ZC 04-02 & DR 04-18
Page 18
enough (minimum of 6 feet) to allow for the overhang of vehicles.
This approval criterion is met.
4. Size of Vehicular Parking Spaces and Maneuvering Areas
within Off Street Parking Areas.
a. Off street vehicle parking spaces and maneuvering
areas, EXCEPT those for single family and duplex
dwellings and those for disabled persons, within off
street parking areas shall be designed in compliance
with Table 3.1.4. Three or more off street parking spaces
provided subject to Table 3.1.4 shall be designed so that
no backing or maneuvering within a public street right
of way is required.
FINDING: The applicant has submitted a site plan showing 292
parking spaces, which include 7 disabled parking spaces. The
disabled parking spaces are not subject to Table 3.1.4. The parking
spaces have been designed at a 450 angle with a minimum width of
9 feet, minimum stall depth of 20 feet, and minimum 2-way aisle
width of 24 feet. Off street parking and maneuvering areas with
these dimensions meet the minimum 9-foot width, 19-foot stall
depth and 24-foot 2-way aisle width required by Table 3.1.4.
These standards are met.
c. Off street parking for disabled persons shall be
designed to the standards of the state Building Code
and applicable federal standards.
FINDING: The applicant is required to provide 7 disabled person
vehicular parking spaces. Compliance with the State and Federal
design standards will be reviewed when the building permit is
submitted. This approval criterion will be met.
5. Directional Marking. EXCEPT for vehicle parking areas for
single family and duplex dwellings, off street parking and
maneuvering areas shall have directional markings and signs
to control vehicle movement.
FINDING: The applicant is not proposing directional markings and
signs to control movement because all traffic is proposed to be two-
way traffic.
6. Space Marking. EXCEPT for vehicle parking areas for single
family and duplex dwellings, off street parking spaces shall be
delineated by double parallel lines on each side of a space.
ANNX 04-02, ZC 04-02 & DR 04-18
Page 19
r
The total width of the lines shall delineate a separation of 2
feet.
FINDING: The applicant has submitted a site plan showing parking
spaces delineated by double parallel lines with a 2-foot separation,
which complies with the above requirement.
8. Outdoor Lighting. EXCEPT for vehicle parking areas for single
family and duplex dwellings, all outdoor lighting shall be
designed so as not to shine or reflect into any adjacent
residentially zoned or used property, and shall not cast a glare
onto moving vehicles on any public street.
FINDING: The applicant submitted an electrical site plan showing
that all outdoor lighting is contained on the subject site. This
approval criterion is met.
9. Landscaping. EXCEPT for vehicle parking spaces for single
family and duplex dwellings, all parking areas shall be
landscaped to the standards of Section 3.106.
FINDING: Compliance with landscaping requirements is discussed
in Section 3.106 of this report.
10. On-site Bicycle Parking Requirements. All uses required to
provide 10 or more off street parking spaces shall provide a
bicycle rack within 50 feet of the main entrance. The number
of required rack spaces shall be one plus one per ten vehicle
parking spaces, with a maximum of 20 rack spaces.
FINDING: The required off street parking for the site is 292 parking
spaces which requires 20 bicycle parking spaces. The site plan
shows 5 bicycle parking spaces adjacent to each side of the south-
east and south-west entrances to the building for a total of 20
bicycle parking spaces. This approval criterion is met.
I. Joint Use Vehicle Parking.
1. A parking area may be used for a loading area during those
times when the vehicle parking area is not in use for parking.
FINDING: The applicant is proposing to use parking spaces located on
the north side of the subject site for their loading area. The applicant
stated in their submitted narrative that "If any loading occurs, it will not
occur during hours of operation." The above stated approval criterion will
be met.
ANNX 04-02, ZC 04-02 & DR 04-18
Page 20
Section 3.106 Landscaping Standards
Section 3.106.01 Applicability
The provisions of this section shall apply:
A. To the site area for all new structures and related parking
EXCLUDING single-family and duplex dwellings and accessory
structures; and
B. To the entire site area of the development, where the cumulative
effect of additions to structures and/or parking areas increases the
total area covered by structure and parking by 50 percent or more
than existed at the date of the WDO adoption.
FINDING: The applicant submitted a landscaping plan in conjunction with this
proposal. Compliance with the requirements of Section 3.106 is discussed
below.
Section 3.106.02 General Requirements
A. Landscaping and Irrigation Plans Required.
Building plans for all uses subject to landscaping requirements shall
be accompanied by landscaping and irrigation plans to City
standards.
FINDING: The applicant submitted a landscaping plan in conjunction with
this proposal. A condition of approval is that an irrigation plan be provided
to the Community Development Department for review and approval prior
to the issuance of the building permit. This criterion is met.
B. Irrigation.
All required landscaped areas shall be permanently irrigated unless
a planting plan without irrigation is submitted by a licensed
landscape architect or a licensed nursery person demonstrating that
the proposed landscaping will thrive without irrigation.
FINDING: The applicant states that irrigation will be provided for all of the
proposed landscaping. All of the landscaping on the site is required to be
irrigated. A condition of approval is that prior to issuance of the building
permit, a final irrigation plan shall be submitted showing irrigation to all of
the proposed landscaping on the site.
ANNX 04-02, ZC 04-02 & DR 04-18
Page 21
r
E. Maintenance.
The property owner shall be responsible for maintaining all
landscaping in good condition so as to present a healthy and orderly
appearance. Unhealthy and dead plants shall be removed and
replaced in conformance with the original landscape plan.
FINDING: This requirement is a condition of approval for all landscaping located
on the subject site.
Section 3.106.03 Landscaping Standards
A. Streetscape.
1. Street Trees. Within the public street right of way abutting a
development, or within an alley right of way in the DDC zone,
street trees shall be planted to City standards prior to
occupancy.
a. Acceptable Types of Trees. See. Section 6.103 for a
description of acceptable and unacceptable trees for
this purpose, classified by size and species.
b. Tree Density. Trees shall be planted to the following
intervals within the right of way, subject to Clear Vision
Area standards, Section 3.103.10 and Section 6.103:
1) Four (4) small trees per 100 feet of street frontage;
2) Three (3) medium trees per 100 feet of street
frontage; or
3) Two (2) large trees per 100 feet of street frontage.
FINDING: The subject site possesses approximately 440 feet of frontage
abutting Highway 211. The submitted landscaping plan shows 36 "Red
Alder" trees (Alnus rubra) which are classified as a large tree according to
Section 6.103. Eight large trees are required for 440 feet of frontage.
The applicant is proposing to far exceed the 8 large street tree
requirement. This approval criterion is met.
2. Front Yard and Yard Abutting a Street.
a. Landscaping Density for non-residential uses in the RS
and R1 S zone and all uses in the RM, P, IL and IP zones.
All front yards and yards abutting a street shall be
ANNX 04-02, ZC 04-02 & DR 04-18
Page 22
T
landscaped at a density of one (1) plant unit (PU) per 20
sq. ft.
FINDING: Approximately 3,903 Plant Units (PU) are required in the front
yard of the subject site to meet the 1 PU per 20 square foot requirement.
The applicant is proposing to provide 79, 170 Plant Units in the front yard
of the subject site which far exceeds the 1 PU per 20 square foot front
yard landscaping requirement. This approval criterion is met.
B. Buffer Yards.
All buffer yards shall be landscaped at the rate of one (1) plant unit
PU per 20 sq. ft. EXCEPT for interior buffer yards abutting a wall
which are paved and which may be used for parking or site access
and vehicular circulation.
FINDING: Commercial uses are located to the west of the subject site.
The proposed church use and abutting commercial uses are compatible
so no buffer yard landscaping is required on the west side of the subject
site. The property located to the north of the subject site is zoned Marion
County "Exclusive Farm Use" (EFU), is located outside of the Urban
Growth Boundary and is the location of the Maclaren Youth Correctional
Facility. Buffer yard landscaping is not necessary between the proposed
church use and the correctional facility because the church use is not
more intensive than the correctional facility use. The abutting properties
located to the east of the subject site are zoned Marion County "Urban
Transition Farm." A single family dwelling and vacant land are located on
the properties located to the east of the subject site. A buffer yard is
necessary between the church use and the single family dwelling use
because the church use is a more intensive use than the dwelling use.
Approximately 1,400 plant units are required in the buffer yard on the east
side of the site to meet the 1 plant unit per 20 sq. ft. requirement. The
applicant is proposing 18,205 plant units in the buffer yard on the east side
of the site which far exceeds the 1,400 plant unit requirement. This
approval criterion is met.
C. Off Street Parking Areas.
1. All unpaved land within the off street parking area, and within
20 feet of the paved edge of off street parking and/or
circulation improvements, shall be landscaped in the following
proportions:
a. RM, CO and CG zones: Landscaped area(s) equivalent
to 20% of the paved surface area for off street parking
and circulation.
ANNX 04-02, ZC 04-02 & DR 04-18
Page 23
FINDING: Approximately 26,100 square feet of landscaping is required
within the parking and circulation facilities to meet the landscaping
equivalent to 20% of the paved surface area requirement listed above.
The applicant is proposing approximately 41,050 square feet of
landscaping in the paved parking area and within 20 feet of the edge of
the off street parking improvements which exceeds the 26,100 square feet
of landscaping required for the parking area. This approval criterion is
met.
E. Yards.
The entire yard area of a property, EXCLUDING areas subject
to more intensive landscaping requirements and all yards of
residential uses in a RS or R1 S zone, shall be landscaped to a
standard of at least one (1) plant unit (PU) per 50 square feet
prior to final occupancy.
FINDING: Approximately 7,500 plant units are required on the yard area
of the subject site to meet the 1 plant unit per 50 square feet requirement
listed above. The applicant is proposing over 121,373 plant units in the
yard areas of the subject site which far exceeds the 7,500 plant unit
requirement. This approval criterion is met
Section 3.106.05 Planting Standards
B. Curbs.
A six-inch concrete curb shall be provided between a landscaped
area and a parking area or access way.
FINDING: The submitted site plan shows a 6-inch concrete curb between off
street parking and circulation areas and the landscaped areas on the site. This
approval criterion is met.
Section 3.107
Architectural Design Guidelines and Standards
Section 3.107.06 Guidelines and Standards for Non-Residential
Structures in RS, R1 S, RM, CO, CG and P/SP Zones
A. Applicability.
The following design guidelines shall be applicable to all non-
residential structures and buildings in the RS, R1 S, RM, CO, CG and
P zones.
ANNX 04-02, ZC 04-02 & DR 04-18
Page 24
T
FINDING: The House of Worship facility, including the proposed main
church building, proposed storage building and pavilion, are non-
residential structures proposed within the CG zone, and are subject to the
architectural design guidelines of Section 3.107.06.
B.
Architectural Design Guidelines.
1. Mass & Bulk Articulation Guidelines.
a. Building facades visible from streets and public parking
areas should be articulated in order to avoid the
appearance of box-like structures with unbroken wall
surfaces.
b. The appearance of exterior walls should be enhanced by
incorporating three dimensional design features,
including the following.
1) Public doorways and/or passage ways
through the building.
2) Wall offsets and/or projections.
3) Variation in building materials and textures.
4) Arcades, awnings, canopies and/porches.
FINDING: The southern fac;ade of the proposed main church building
is visible from Highway 211. The north, west and east facades are
visible from the proposed parking areas on the subject site. The
submitted building elevations show the southern fac;ade offset laterally
by a 15 foot structural protrusion and covered porch. The submitted
building elevations show the northern fac;ade offset laterally by a 19
foot structural protrusion and covered porch. The west and east sides
of the proposed building have 10 foot structural protrusions and
covered walkways. Brick columns and quoins accent all of the
proposed building facades of the main church building. Building
materials for the proposed main church building include brick and
stone. In addition, the structure incorporates public doorways and
passageways through the building. The proposed 10 foot tall storage
building located to the east of the main church building is proposed to
be constructed with brick and roof shingles to match the main church
building. The pavilion has steel columns, vaulted ceiling and
composition shingles on the roof. These criteria are met.
2. Materials and Textures Guidelines.
ANNX 04-02, ZC 04-02 & DR 04-18
Page 25
T
a. Building exteriors should exhibit finishes and textures
that reduce the visual monotony of bulky structures and
large structural spaces; enhance visual interest of wall
surfaces and harmonize with the structural design.
b. The appearance of exterior surfaces should be
enhanced by incorporating the following:
1) At least 30% of the wall surface abutting a street
should be glass.
2) All walls visible from a street or public parking
area should be surfaced with wood, brick, stone,
designer block, or stucco or with siding that has
the appearance of wood lap siding.
3) The use of plain concrete, plain concrete block,
corrugated metal, plywood, T -111 and sheet
composite siding as exterior finish materials for
walls visible from a street or parking area should
be avoided.
4) The color of at least 90 percent of the wall, roof
and awning surface visible from a street or public
parking area should be an "earth tone" color
containing 10 parts or more of brown or a "tinted"
color containing 10 parts or more white.
Fluorescent, "day-glo," or any similar bright color
should not be used on the building exterior.
FINDING: The south elevation of the subject site faces Highway 211.
Doors with windows and additional windows are located on the east
and west sides of the south main building fagade. A series of arches in
the roof line, brick columns, brick quoins and a steeple will enhance
the visual interest of the south wall surface. The proposed building
materials include brick and stone which meet the design guidelines
listed above. The combination of the earth tone brick color and stone
will be aesthetically pleasing. The earth tone brick color will comprise
the majority of the building surface. The proposed colors and materials
are included on the materials sample board submitted in conjunction
with this application. The proposed 10 foot tall storage building located
to the east of the main church building will be constructed with brick
and roof shingles to match the main church building. The pavilion
(covered picnic shelter) has steel columns, a vaulted ceiling and
ANNX 04-02, ZC 04-02 & DR 04-18
Page 26
composition shingles on the roof which will match the proposed
buildings on the subject site. This design guideline is met.
3. Multi-planed Roof Guidelines.
a. The roof line at the top of a structure should establish a
distinctive top to the building.
b. The roof line should not be flat or hold the same roof
line over extended distances. Rather the roof line should
incorporate variations, such as:
1) Offsets and/or jogs in the plane of the roof.
2) Changes in the height of the exterior wall for flat roof
buildings, including parapet walls with variations in
elevation and/or cornices.
FINDING: The roof of the main church building, storage building and
pavilion are arched. The proposed steeple provides for an offset in the
plane of the roof of the main church building. The porches and
covered walkways on the main church building also provide for offsets
in the plane of the roof. This design guideline is met.
4. Roof Mounted Equipment Guidelines. All roof mounted
equipment, EXCEPT solar collectors, should be screened from
public view from streets abutting the building site by:
a. Locating room mounted equipment below the highest
vertical element of the building; or
b. Screening roof top equipment using materials of the
same character as the structure's basic materials.
FINDING: The submitted elevations do not show any roof-mounted
equipment atop the proposed structure. Any future roof-mounted
equipment will be required to be screened in compliance with the
above criteria.
5. Weather Protection Guidelines. All building faces abutting a
street or a public parking area should provide weather
protection for pedestrians. Features to provide this protection
should include:
ANNX 04-02, ZC 04-02 & DR 04-18
Page 27
~
a. A continuous walkway at least 8 feet wide along the face
of the building utilizing a roof overhang, arcade,
awnings and/or canopies.
b. Awnings and canopies that incorporate the following
design features:
1) Angled or curved surfaces facing a street or
parking area.
2) A covering of canvas, treated canvas, awning
fabric, or matte finish vinyl.
3) A constant color and pattern scheme for all
buildings within the same development.
4) No internal back lighting.
FINDING: The applicant is proposing vestibules ranging in size from
48 square feet to 160 square feet on the main pedestrian entrances
located on the south, east and west sides of the main church building
to provide weather protection for pedestrians. Roof overhangs are
also proposed on all sides of the main church building to provide
weather protection for pedestrians. The main church building and
storage building are constructed with brick and matching roofing
materials to provide for a constant color and pattern scheme. The
pavilion is intended to provide for a cover (weather protection> for a
picnic area. No internal back lighting is proposed. This design
guideline is met.
6. Landscaping and Screening Guidelines. The landscaping
required by the standards of the WDO should be augmented to
address site specific visual impacts or abutting uses and the
visual character of the surrounding area.
FINDING: The applicant is proposing to far exceed the front yard
landscaping requirement, parking lot landscaping requirement, overall
site landscaping requirement, and buffer yard landscaping requirement
on all sides of the subject site as was previously discussed in this
report. This design guideline is met.
7. Buffer Wall. A solid brick or architectural wall with anti-graffiti
surface, no less than 6 feet or greater than 7 feet in height:
a. Should be constructed on the perimeter property line of
non-residential development to mitigate adverse visual,
ANNX 04-02, ZC 04-02 & DR 04-18
Page 28
~
noise and/or light impacts on the abutting use when no
comparable buffer exists.
b. Shall be constructed where the standards of the
underlying zone require such a wall for non-residential
use in, or abutting, a RS, R1s or RM zoning district.
FINDING: RS, R1 S, and RM zoned properties do not abut the subject
site so a solid brick or architectural wall is not required on the subject
site as is specified in Table 2.1.11 of the CG zone.
8. Sidewalk location and Street Trees. Sidewalks should be
located at the property line along streets with street trees.
FINDING: Highway 211 is under the jurisdiction of the Oregon
Department of Transportation (ODOT) so the sidewalk requirement will
be determined through the ODOT permitting process. The subject site
possesses approximately 440 feet of frontage abutting Highway 211.
The submitted landscaping plan shows 36 "Red Alder" trees (Alnus
rubra), classified as large trees according to Section 6.103. Eight
large trees are required for 440 feet of frontage. The applicant is
proposing to far exceed the 8 large street tree requirement.
9. Solar Access Protection. Obstruction of existing solar
collectors on abutting properties by development should be
mitigated.
FINDING: The proposed structure and landscaping will not impede
solar access on adjacent properties. This criterion is met.
C. Site and Building Access Guidelines.
1. Access to and from the site and circulation within the site
should separate facilities for cars, trucks and transit from
those for bicycles and pedestrians.
2. Site access in compliance with Section 3.104 should be
augmented by the following considerations:
a. Vehicle Access.
1) Vehicle access points should be identified by
accentuated landscaped areas, by entrance throats
designed to control access from abutting parking and
by monument type entrance signs.
ANNX 04-02, ZC 04-02 & DR 04-18
Page 29
2) New parking lots abutting major streets should connect
internally with the parking lots of abutting commercial
uses or land zoned for commercial use.
b. Pedestrian Access and Circulation.
1) The buildings should be linked to the sidewalks
on abutting streets by internal pedestrian ways.
Such pedestrian ways should be either raised or
delineated by distinctive pavers.
2) Parking areas should be designed in multiples of
no more than 50 spaces separated by landscaped
buffers or raised pedestrian ways in order to
minimize negative visual impacts associated with
expansive parking.
FINDING: The site plan shows a direct pedestrian access to the proposed
main church building and the storage building from the sidewalk abutting
Highway 211. Sidewalks are shown around the perimeter of the main
church building and to the storage building. A textured pedestrian warning
strip is located between the rear <north side) of the parking area to the
main church building to improve pedestrian safety within the parking area.
Landscape islands are located throughout the proposed parking area to
minimize negative visual impacts associated with expansive parking. The
applicant is proposing extensive landscaping on both sides of the
driveway access to the subject site to improve the visual interest of the
entrance to the subject property.
D. Building Location Guidelines.
Within the prescribed setbacks, building location and orientation
should compliment abutting uses and development patterns.
FINDING: The proposed main church building incorporates architectural
elements (columns, arches in the roofline and quoins), materials (brick
and stone) and earth tone coloration complementary to the surrounding
properties. The proposed main church building, storage building, pavilion
and parking are located over 180 feet from the front property line to soften
the visual impact of the buildings from Highway 211. The applicant is
proposing to exceed the front and interior yard setbacks required for the
proposed project so that an extensive amount of landscaping can be
provided on all sides of the buildings to improve the visual appeal of the
development. The applicant stated at the September 22 Planning
Commission Meeting that they will relocate the storage building and the
trash enclosure on the east side of the site to the west side of the subject
ANNX 04-02, ZC 04-02 & DR 04-18
Page 30
r
site to minimize the visual and noise impact from the property owner
located to the east of the subject site. The applicant recommended a
condition of approval be added to their project that allows the applicant to
work with staff to place the trash receptacle and storage unit on the west
side of the subject site. A condition of approval has been added to this
report which states "Prior to building permit issuance, the applicant shall
submit a revised site plan to the Community Development Department for
review and approval showing the relocation of the trash receptacle and
storage unit to the west side of the site." This design guideline is met.
E. Parking Location Guidelines.
Off street parking areas between the architectural front of a building
and the setback line abutting street should be limited to a depth of
not more than 130 feet.
FINDING: The applicant is not proposing to provide parking between the
architectural front of the building and the front setback line. This design
guideline is met.
F. Design Standards.
1. Outdoor Storage Standards. Outdoor storage, when permitted,
shall be screened from the view of abutting streets by a solid
brick or architectural block wall not less than 6, nor more than
7 feet in height.
2. Outdoor Lighting Standards. All outdoor lighting shall be
designed so that:
a. Parking areas are evenly illuminated at ground level at
one foot candle;
b. Entrance and loading areas are illuminated at ground
level of two foot candles;
c. Illumination does not shine or reflect into any adjacent
residentially zoned or used property;
d. Lighting does not cast a glare onto moving vehicles on
any public street.
FINDING: The trash enclosure will be enclosed with a 6 foot brick wall and solid
metal door. A condition of approval requires the applicant to submit a lighting
plan to the Community Development Department showing compliance with
ANNX 04-02, ZC 04-02 & DR 04-18
Page 31
r
Section 3.105.02.H.8 prior to building permit issuance. This approval criterion
will be met.
Section 5.103.02 Design Review for All Structures 1000 Sq. Ft. OR MORE
C. Criteria. The criteria are pursuant to the standards and guidelines of
Section 3.1. And other applicable sections of the WDO.
FINDING: The compliance of the applicant's proposal with the applicable
standards and guidelines of the WDO is discussed throughout this report.
This approval criterion is met.
VI. CONCLUSION:
Based on the findings of fact contained herein, all relevant approval criteria
relating to approval of Annexation 04-02, Zone Change 04-02 and Design
Review 04-18 have been met.
ANNX 04-02, ZC 04-02 & DR 04-18
Page 32
EXHIBIT "0"
CONDITIONS OF APPROVAL
COMMUNITY DEVELOPMENT DEPARTMENT:
Desian Review 04-18:
1 . The proposed development shall be in substantial conformance with this
approval and the attached preliminary plans provided in Exhibit "A" (Site Plan
Sheet CO.3, Floor Plan Sheet CO.4, Exterior Elevations Sheets CO.5 and
CO.6, Utility Plan Sheet C2.0, Grading Plan Sheet C2.1, Erosion Control
Plan Sheet C2.2, Onsite Civil Details Sheet C3.0 and Planting Plans Sheets
L 1.1, L 1.2 and L 1.3 date stamped June 02, 2005), except as herein modified
by these conditions of approval.
2. The existing single family dwelling and accessory structure shall be removed
prior to final building occupancy.
3. A 6 foot chain link fence, subject to the vision clearance standards in Section
2.202.03, shall be constructed on the east property line of the subject site
prior to final occupancy.
4. The applicant shall provide a shared/reciprocal access easement agreement
for the proposed driveway with the properties located to the west to be
reviewed and approved by the legal department per Section 3.104.03.A.2.d
prior to the issuance of the building permit. The agreement shall be
recorded with the County Recorder and filed with the Community
Development Director.
5. All vehicle parking and loading areas shall be graded and provide storm
drainage facilities approved by the Public Works Director prior to issuance of
building permit final occupancy.
6. Off-street parking for disabled persons shall be designed to the standards
of the state Building Code and applicable federal standards.
7. A final irrigation plan shall be submitted to the Community Development
Department for review and approval prior to issuance of building permits.
8. Prior to building permit issuance, the applicant shall submit a final lighting
plan showing that all outdoor lighting has been designed so that parking
areas are evenly illuminated at ground level at one foot candle, entrance and
loading areas are illuminated at ground level of two foot candles, illumination
does not shine or reflect into any adjacent residentially zoned or used
property, and lighting does not cast a glare onto moving vehicles on any
public street.
ANNX 04-02, ZC 04-02 & DR 04-18
Page 33
9. All shrubs and ground cover shall be of a size upon installation so as to
attain 80% of ground coverage within 3 years. The property owner shall be
responsible for maintaining all landscaping in good condition so as to present
a healthy and orderly appearance. Unhealthy and dead plants shall be
removed and replaced in conformance with the original landscape plan.
10. The property owner/applicant shall submit to the Community Development
Department a signed "Acceptance of Conditions" agreeing to all conditions of
approval prior to the issuance of building permits for the project.
11. No buildings, structures, storage of materials, or parking shall be permitted
within the required landscape and buffer areas. All landscape and buffer
areas shall be maintained and kept free of all debris, weeds and tall grass.
12. Prior to building permit issuance, the applicant shall submit a revised site
plan to the Community Development Department for review and approval
showing the relocation of the trash receptacle and storage unit to the west
side of the site.
PUBLIC WORKS DEPARTMENT:
GENERAL CONDITIONS:
13. Final plans shall conform to the construction plan review procedures and
standards.
14. The applicant, not the city, is responsible for obtaining permits from any
state and/or federal agencies which may require approval and/or permit.
15. Existing subsurface wastewater systems found to be on the site shall be
abandoned in accordance with state requirements.
16. All work within the public rights-of-way shall require plan approval and
permit issuance from the Public Works Department.
17. Existing city maintained facilities on private property will require proper
easements to be conveyed to the city.
18. System Development fees shall be paid at the time of building permit
issuance.
SANITARY SEWER:
19. The existing sanitary sewer main on Highway 211 can be utilized to
provide wastewater service to the development. This is an abandoned
ANNX 04-02, ZC 04-02 & DR 04-18
Page 34
force main being converted to a gravity sewer system by the City. The City
has done some rehabilitation work on the system, however, further
rehabilitation may be required to meet current standards prior to being put
into service. As noted on the applicant's site plan, a portion of this cost as
determined by the Public Works Department will be the responsibility of
the applicant/property owner.
WATER:
20. The applicant is proposing to connect to the existing 12" diameter water
main on the south side of Highway 211. The main is adjacent to the
Woodburn Crest Subdivision only and is a dead end system being served
by an 8" diameter main from June Way. To ensure proper fire flows and
two system feeds for fire protection, the 12" diameter in Highway 211 shall
be looped to existing 12" diameter water main near the northeast corner of
the Safeway site as shown on the applicant's site plan.
21. Domestic, lawn irrigation and/or the fire sprinkler system, if installed, shall
require the installation of a proper type of backflow preventer. If the
existing on-site well is not abandoned in accordance with state
requirements, the level of protection will need to be upgraded. Contact
Larry Arendt, City of Woodburn Cross Connection Inspector, for the type
and installation requirements at 503-982-5283.
22. The on-site water main providing fire protection shall be a city maintained
looped system and shall be sized in accordance with the flow
requirements as shown on the applicant's site plan.
23. A minimum 16 foot wide easement shall be conveyed to the City of
Woodburn for the on-site city maintained water system.
ANNX 04-02, ZC 04-02 & DR 04-18
Page 35
l'