Ord 2135 - Modify Ord 2095
COUNCIL BILL NO. 1583
ORDINANCE NO. 2135
AN ORDINANCE MODIFYING THE CONDITIONS OF APPROVAL CONTAINED IN
ORDINANCE 2095, APPROVING A SITE PLAN FOR A RETAIL OUTLET CENTER TO
BE CONSTRUCTED BY CAPITAL DEVELOPMENT, AND DECLARING AN EMERGENCY.
WHEREAS, Ordinance 2095 reclassified certain property located in the
southeast quadrant of Interstate 5, south of State Highway 214, from Marion County
Urban Transition (UT) zone to City of Woodburn Single-Family Residential (RSl. Multi-
Family Residential (RM) and Commercial General (CG) zoning districts, and
WHEREAS, this reclassification approval was subject to certain conditions of
approval, and
WHEREAS, the applicant, Capital Development, has requested modification of
these development conditions, and
WHEREAS, the Planning Commission and City COl,lncil have noticed and
conducted public hearings on the proposed modification of said conditions, and
WHEREAS, the applicant has also submitted a site plan for consideration and
approval, NOW, THEREFORE,
THE CITY OF WOODBURN ORDAINS AS FOLLOWS:
Section 1. Ordinance 2095, Exhibit "A", Condition of Approval No.1, is
amended to read:
1.
Phase 1 of the development is allowed to proceed conditioned upon the
applicant's use of the existing land use designations with no
reconfiguration, as depicted in the following map of the subject property:
Page 1 -
Council Bill No. 1583
Ordinance No. 2135
,.-
.-
~
~~~i~
;IN
N€WB€RC RO.'D
~
!:!
'"
~
..ftT 2H
~ CURRENT Pl.IIN IiJ.p .AREAS I
. COMI.IERCIAI.. - 51,B acres
-- ~N.llLY - 31,B acres
lijISINGu:.fAMllY - 87.3 acres
1UTAI.. N:if/ES 176.ll:f: acres
MAP 2
/
Page 2 -
Council Bill No. 1583
Ordinance No. 2135
- ~."._'.'~"'"."'"~-'-"""'---"'"~-~'"'-~""".-r----'~~---~-"'-'--"'^
Section 2. Ordinance 2095, Exhibit "A", Condition of Approval No.2, is
amended to read:
2. Development of the site is permitted but no configuration change of the
land use designations is allowed until the transportation plan for this area
complies with OAR 660-12-060(1)(b).
Section 3. The Site Plan Review application in Case No. 93-22, previously
approved by the Planning Commission, is granted.
Section 4. Modification of the Conditions of Approval herein and the approval
of the site plan review application are based upon the staff report and, specifically,
the findings contained in the staff report which are attached hereto as Exhibit "A" and
by this reference are incorporated herein.
Section 5. This ordinance being necessary for the immediate preservation of
the public peace, health and safety, and emergency is declared to exist and this
ordinance shall take effect immediately upon passage by the Council and approval by
the Mayor. ." .~ '\ /
Approved as to form~)n/v\T ,{y;(~ ~p-v/ --, , (1 2/ r) (f
City Attorney ~ Dat
APPROVED: ~ ~
Le Kelley, Mayor
Passed by the Council September 26, 1994
Submitted to the Mayor September 27, 1994
Approved by the Mayor September 27, 1994
Filed in the Office of the Recorder September 27, 1994
ATTEST:
Mar Tennant, City Recorder
City of Woodburn, Oregon
Page 3 -
Council Bill No. 1583
Ordinance No. 2135
~.
...- .....-.- ---..-------r
.
EXHIBIT "A"
Capital Development Staff Report
Due to the volume of this exhibit (79 pages) it is not included with your
agenda.
A copy will be available at the meeting, as well as filed with the office of
the City Recorder.
,..,.,..,
.. c..........----.--1
.... ~~_.,.~-~--
----;.......
.'l.
EXHIBIT "A"
Page 1 of 7&
~
CAPITAL DEVELOPMENT
II
INDEX
Introduction
Pagels)
PART I
Chronology of Events
Maps 1 - 6
Attachments I - III
1-3
4-8
9-15
PART II
Request to Amend Ordinance Nos. 2095 and 2098
Applicant's Request
Staff's Response
1 6-1 8
19
PART III
Traffic Impact - Staff comments
Goals and Policies - Applicant's findings
Consultant Traffic Engineer reports
Oregon Department of Transportation
20-21
22-24
25-30
31-32
PART IV
Site Plan Review - Staff Report
Attachments A - E
Applicant's request
1-12
1 3-24
;
;
PART V
Supplemental Documents
Memorandum Opinion 93-04
Oregon Department of Transportation and Map I
Planning Commission recommendation to City Council
1-3
4-5
6
CAPDEV.INX
~
. , '-"~'-"--'""-r-
r--....._
I
~
PART I
G:"':1
EXHIBIT "A"
Page 2 of 79
. ,.. r-' .<----,~.,--..-. --
~
~~,
.J.
EXHIBIT "A"
Page 3 of 79
!i]~ft~~~E{1}t~:{t~~:lli1.j~1l.t':/~~I~~~I~~;~~.1.lifjl:Kil~t~:b.~~::I:~lrS~~!.~~!f:I~~i:?~.:~;:t111:ttl~tt~tf~J1~t1.:1~:
M.....,.................,...~~V::V:)\:J> ... ClD:\J"F\PI"'N;;i:-F\W'Q- --' - ;I})l..\:I-..}...w.x::J.%v..<<$-;m.
ttlmWHmWk1:'*i:ht:~::;:~:h~:~:::i:~::{:::::::::~bB:::t:h::::::&t;tt:::~:::(:::h/::;~:~::::i:::::;::::::::::::::::::~ij::;:t::::::>lMt1mtimlM~
CHRONOLOGY OF EVENTS
On ___ an application was submitted for the development of 177 acres located
adjacent to Interstate 5, south of the Wal-Mart Store and bordered on the east by the
Evergreen Road right-of-way (see Map 1 of Part I).
Owner of property - Prairie Corporation
Applicant - George Brice Investments
Consultant - Waker Associates
There were four requests associated with this application:
1. To annex 177 acres to the City of Woodburn (#91-01)
2. A zone change request from Marion County EFU (Exclusive Farm Use) zone to
City of Woodburn Commercial General District--approx 57.8 acres, Multi-Family
District--approx 31.8 acres, Single Family Residential District--approx'87.3 acres
(see Map 2).
3. The request also called for the reconfiguration of commercial and high and low
density residential properties on the Comprehensive Plan Map (see Map 3).
4. Lastly, applicant proposed to subdivide the 177 acres into 11 lots (see Map 4 of
Part I).
On ~ the Woodburn Planning Commission heard the applicant's request. The
report contained:
1. Staff and applicant's report
2. A soils and wetlands study (J.E.S. Associates)
3. JRH Transportation engineering study - traffic impacts of full build out
After taking testimony, the Planning Commission recommended the Woodburn City Council
approve with conditions the annexation, zone map and comprehensive plan map
configuration.
In ~ the city council passed Resolution No. 1053 to hold a hearing on the
applicant's annexation, zone map and comprehensive plan map reconfigurations on June
10,1991.
On ~'ItB the applicant requested the hearing before the council be continued to
June 24, 1991.
On ~ the applicant requested the hearing regarding the subdivision be
continued until the June 27, 1991 hearing.
On ~JIl the applicant withdrew their request from the council for a hearing and
withdrew their request for a hearing before the planning commission on June 27, 1991.
.L
Page 1 - CAPDEV.SYN
~
"l--'..'-.-...-.----~..
,'.
EXHIBIT "Au
Page 4 of 79
,..
tt""""t-...~
This proposal remained inactive until ItiJI when the land was purchased by Capital
Development.
On ..... Capital Development submitted their application request for the
Annexation, Comprehensive Plan, Zone Map Amendments, and Partition for the 177 acres.
This was necessary since the prior applicant did not finalize the hearing process and receive
final approval from the city council.
The proposal consisted of:
1 . A 24-page staff report
2. Correspondence from a) Marion County, b) Oregon Department of land
Conservation and Development, and c) Oregon Department of Transportation.
3. The applicant's 50-page staff report
4. level I environmental assessment report
5. JRH Transportation Impact Analysis
On ~ the Woodburn Planning Commission held a hearing on the applicant's
proposal.
On ~ the Planning Commission recommended approval of the applicant's
request to the city council. The plan called for the reconfiguration of the Comprehensive
Plan and Zoning Map similar to Prairie Corporation's proposal (see Map 5-6 of Part I).
The city council approved a resolution on September 14, 1992 calling for a hearing on
September 28, 1992.
The council approved the applicant's request and adopted Ordinance 2095 on ~
.. (see Attachment 1 of Part 1- ODOT letter).
On ~ the Oregon Department of Transportation (ODOTI raised concerns
regarding condition number two (21 of Ordinance 2095. The wanted the city council to
amend that ordinance to reflect their requirements (see Attachment 2 of Part I).
The council then amended Ordinance 2095 with Ordinance 2098 to meet ODOT's request
on ~ (see Attachment 3 of Part I).
Now Capital Development is coming before the planning commission to basically make
three requests:
Al Modification of Condition #1, Exhibit" A" of Ordinance 2095 (Attachment I of
Part I)
Existing:
1. Prior to any development of the 173.84 acre parcel the Comprehensive
Map be amended to generally reflect the applicant's proposed land
configuration (C.P. 92-021. /
To be amended to reflect:
The applicant's ability to proceed with development based on the existing,
not reconfigured, map amendment.
AND
"
L
Page 2 - CAPDEV,SYN
.
'.-------..---1
.. .----_.~-~._,--,............._.~-_..._-"
....-.
-:.
EXHIBIT "A"
Page 5 of 7~
\
(B) Modification of Condition #2, Exhibit "A" of Ordinance 2095 and amended by
Ordinance 2098 (Attachment III of Part I).
Existina Lanauaae:
"Assist the city in amending its 1985 transportation plan for the Highway
214, 1-5 Interchange Parr Road area, prior to development, to bring it into
compliance with OAR 660-12-060(1 lib) regarding adequate transportation
facilities to support proposed land uses. No development of the property
or reconfiguration of the land use designations will be permitted until the
transportation plan for this area complies with OAR 660-12-060(1 lib)."
To be amended to read:
"Development permitted by New Land Use Applicant to the property and no
configuration change of the land use designation allowed until the
transportation plan for this area complies with OAR 660-12-060(1 lib)."
(C) Approval of their site plan.
The Planning Commission held its first hearing on ~ regarding thE! ordinance
amendment requests of Ordinance #2095 and #2098 along with Site Plan Review 93-22
and continued the hearing until ~. The reason for the continuation was that
the city had not received ODOT's comments regarding highway mitigation requirements
(see ODOT correspondence, pg 4-5 and Map I of Part V).
The May 19, 1994 hearing was continued until July 14, 1994 due to a request by a
client's attorney requesting a continuance.
On ~ the commission approved SPR #93-22 and recommended the city council
amend Ordinances #2095 and 2098 to allow Capital Development to proceed with
developing the property (see page 6 of Part V).
/
Page 3 . CAPDEV.SYN
'3
~
"-".-<''''-'.'r.~-'-----_>o'~~'~'._--''.''--~-
,
--
,
\
~
, -
Nt
--
MAP 1
/
- .,... +_~. __'.,...._"_.__...._..__. ...----d"."'--1..'.
EXHIBIT "A"
Page 6 of 79
-4-
~
EXHIBIT "A"
Page 7 of 79
,
IN
HEW&RC ""'"
RT 21<4-
1 CURRENT PIAN tiN> AAf}S I
i
~
~
2
. cot.o.fERCW.. - fi1 Jj Gens
..
--IMll-f'N.IlI.Y - :llJj CICR$
un'
~uSlNGlE. fN.lll.Y - t:1.:5 CICR$
10TAL ICflES 176Jl:1: CICR$
~
~
MAP 2
!
...-... ""'"
i
f
If 214
tN
"
MAP 3
I
-5-
~
.-...........---...-.....-".---.1-.-----..-
,--
",,",,-,
(~ ,~
EXHIBIT "A"
Page 8 of 79
,
tN
PROPOSED SUBDIVISION
~:S?@-9'
.
.
t
.
.
J
,
,
,
,
,
,
,
,
,
,
,
,
,
/
,
,
,
,
,
,
,
"I.
!I!
I
fI
~
I
.~ !
~
, tI f
UJW DENSITY RESIDENl1AL ,
......X .
tl 1Il
-
I
t.
t
I
I
.
~~--~~--~~~~---~~~"1
,_~
.. I
'''-.1
..
..
..
..
. ..
----------- ------ - - ~.
,j
i
I!;
UJW DENSITY
ReSlDENlW,
t... x.
MAP 4
- fa-
~
., --"-""'-'-'1---~
--------..--.-
"
" ' ,..-,
-l~;
~
q "j.
EXHIBIT "A"
Page 9 of 79
,
I
'"
!,j
....
..
....
..
!;~
fi~ ~g
I I g~
~ tl lii~
i ~ ~z
~ ~ 0(')
! og i:J:o
f ~ QO
:I ~ 000
t C"t" zoo
....
~ ~ N\f'\\l')[
~
~ ~ ~'!M[rn
=i~ ~
SO' __ - hO
......y Ctua...-;-- - - -' ~
1m ~~
! mH~ i *
~ ~Ul ~
, ~....;3
~ ~~i~g; o~
i UUU Z
..
II
I.
I
9
-1-
.
I
~~~.
_.
'it
,...,......,.
.....
"-
,
""'. ,
~~',
>!1~,
o ,
,
: ~',
I 00-2 ~.~ ",
. I a.al AC11ci:t. ~"~' r-
~ COWlER ~~;:,. I
~ ,~
~ ~'" k'<~, I 0
"1 !!!.. 5 -~ ~:t. ~~" I "'Iili
q lri~ 0 J:: -f~ ~,,&; , <:
· ~E ~ eP ""'~" ~
~I ~e ;0 ~;f ~~; "- ".. '&: ~
.. i!:fjl Ql >0" "'"', ~
~I " ~ E= s..., ~
. ~ l'J ...... fe '~
~ ,l:1 0( s:<>g .....,,~;s; tb:~~', .
. ~o:.:t~ . P "
M~'''' ,,",,.,,., ~ ......... ~ _..:
t-'" ./', "'............
, ,......
, , ,
",-.... " '
,,\' ,
''\' ,
'\ " "
'\'\
'\~
I
I
~
~
"I
N
'"
..
q
...
_.. STUBB
~I ~i::rJ
~ f"'G'fJ
:..1 ~>..
~I ~E
~ _ ~lT40'40"1I' (2110.83')
- 143 ACRES
~
-: ~
:. 0
~ g
c:
~
z ___~__
o
~
o
CO
CO
....
Z
Q
'"
Zoo
Cl;;
.....g:
~>.
"'0"
>1>'
~El
...
0(
lUl-l
10.6~,.t~y
Mtru - g:
OJ
'"
"1
...
Cl
EXHIBIT "A"
Page 10 of 79
----.,
L_
~
-I
\~
,\\
'\\
, "-
, ,
"
, ,
......
......,
..
ICl
r/~
......_J
!A \/Sa! ROAD
~
~
~ ROAD"!
el'"
fr~g, .~~
It ~O 00
is .. 0......
J 'g, t"...
I ~ ll:lttl
e. c:c:
> t:l ~~
~ ~ . Z
X ~ 00
~ 0 :<l~
'OS ~O
"'t/)
.. >t/)
t:l Z....
... Z
~ 0
J
t
t
oil
~
>
~
El
~~~t~~
00""Z80
oioi~C...S:
tIl>~~::!f;j
OJ....~:d
"'>;.,9
1>'''1::>
l'iI::-r-
~!<!<
~
o
E::
z
o
tl
......
t/)
8
:>:'
......
ttl
~
....
o
Z
~
i
..
..
..
~
i
. . . . . .
_0&01::
oo!"9tt:o.
c.~8:Ot....
.. >>
>>i;i;oo
ldldl>'l>'&l&l
f2ElIU~",
,i\[\? ~
~
~
..
-8-
-'T
~-
.- ,(
"'~
f
EXHIBIT "A"
Page 11 of 7~
COUNCIL BILL NO. 1426
ORDINANCE NO. 2095
AN ORDINANCE ANNEXING AND RECLASSIFYING CERTAIN PROPERTY LOCATED
IN THE SOUTH EAST QUADRANT OF THE INTERSTATE 5 SOUTH OF STATE
HIGHWAY 214 FROM MARION COUNTY URBAN TRANSITION (UT) ZONE TO CITY
OF WOODBURN SINGLE FAMILY RESIDENTIAL (RS), MULTI-FAMILY RESIDENTIAL
(RM) AND COMMERCIAt GENERAL (CG) DISTRICTS.
WHEREAS, the Woodburn Comprehensive Plan Map has established certain land
uses within the City of Woodburn's Urban Growth Boundary, and
WHEREAS, the Woodburn City Council has reviewed the record in Annexation
Case No. 92-02 and Zone Change Case No. 92-03 and considered the public !e!?timony
previously presented, NOW, THEREFORE,
THE CITY OF WOODBURN ORDAINS AS FOLLOWS:
Section 1. The legal description of the involved real property is as follows:
A parcel of land lying in the A Dubois Donation Land Claim No. 98, and the M. Lore
Donation Land No. 61, in Sections 12,13, and 14, Township 5 South, Range 2 West of
the Willamette Meridian, Marion County, Oregon, said parcel being more particularly
described as follows:
Beginning at a % inch iron rod marking the Southwest corner of the A. Dubois Donation
Land Claim No. 98, in said Township and Range and running thence South 000 39' 31"
West 530.27 feet to a V. inch iron pipe; thence North 890 32' 20" West 2110.97 feet to a
point on the Easterly right of way line of Interstate Highway 5; thence alol!g said right of
way line North 350 53' 54" East 3649.14 feet to a point on the Westerly line of said
Donation Land Claim No. 98; thence along said Donation Land Claim line South 000 31'
65" West 69.04 feet; thence continuing along said Easterly right of way line North 350 57'
00" East 246.21 feet; thence South 880 51' 55" East 1349.22 feet; thence North 00040' 55"
East 27.96 feet to a point on the Southerly line of West Hayes Street; thence along said
Southerly line South 880 51' 55" East 628.17 feet to a point on the Westerly line of
Evergreen Road; thence along said Westerly line South 000 47' 17" West 2111.00 feet
to a 6fs inch iron rod; thence North 890 28' 13" West 2110.60 feet to a point on first said
Westerly line of said Donation Land Claim No. 98; thence along said Westerly line South
000 31' 55" West 470.58 feet to the point of beginning all in Marion County, Oregon.
Section 2. The real property described in Section 1 of this Ordinance is hereby
annexed to the City of Woodburn. /
L
Page 1 - COUNCIL BILL NO. 1426
ORDINANCE NO. 2095
P\\\~C~ 1.
,
-~ -
~
."," "I -.--..-.----~."'~...-,~--"'"---.,~---'-..-'~~-..
,I(~<~~
,',
"""~
'1"
)
EXHIBIT "A"
Page 12 of'.
Section 3. The zoning designation of said real property is hereby reclassified from
its present designation of Marion County Urban Transition Zone (Ul) to the City of
Woodburn Single Family Residential (RS), Multi-family Residential (RM) and Commercial
General (CG) districts.
Section 4. The zoning reclassification is subject to the conditions contained in
Exhibit "A", attached hereto and incorporated herein, that the Council finds reasonable.
Section 5. The ann1:lxation, and zoning reclassification of said real property are
based upon the staff report and, specifically, the findings contained in the staff report
which are attached hereto as Exhibit "B" and by this reference incorporated herein.
Section 6. The City Administrator or his designee is hereby directed to correct the
Woodburn Zoning Map to the classification herein made.
Approved as to fO:J'l ~ ~
City Attorney
I'D I r /i2-
Dete I
/1. I .
APPROVED: 'i/'LR-J" 7J/
FRED W. KYSER, MAYOR
,
14 . r
; l- C. ',!..../; .
! ."../... v-
.
Passed by the Council
October 12, 1992
Submitted to the Mayor
October 13, 1992
October 13, 1992
Approved by the Mayor
Filed in the Office of the Recorder
October 13, 1992
Attest: /71~ ~ o-.-.f
MARY TE NANT, CITY RECORDER
CITY OF WOODBURN, OREGON
/
l/
Page 2 - COUNCIL BILL NO. 1426
ORDINANCE NO. 2095
1
,
-\0-
~.
....--.-.-.- I
_,._~,_'.~n__'.__
L,
~
,~,.
.-.;'
. '( "
EXHIBIT "An
Page 13 of 79
- ,
"
EXHIBIT "A"
CONDITIONS OF APPROVAL
1. Prior to any development of the 173.84 acre parcel the comprehensive map be
amended to generally reflect the applicant's proposed land configuration (C.P.
92-02).
2. Assist the city in amending its 1985 Transportation Plan'for the Highway 214,
1-5 interchange Parr Road area, prior to development, to bring it into compliance
with OAR 660-12-060(1)(bl regarding adequate transportation facilities to
support proposed land uses. "
3. Any reconfiguration of the land use designations maintain the same ratios as
identified on the original comprehensive plan.
/
1-
;
,....--'----.-'"-~t.......--.------
- \ \-
~
^~
t'..'"'';j.-,
~, 3
\"
October 23, 1992
Steve Goeckritz, Director
Woodburn Community Development Services
270 Montgomery Street
Woodburn, OR 97071
Subject: Condition of approval #2, Ordinance #2095
Dear Steve:
The Oregon Department of Transportation (OD01) has concerns with the
wording in Condition #2, Ordinance #2095. This is the ordinance authorizing
annexation and land use designations for the property known as Woodburn
Crossing and owned by Capital Development Company.
The condition states:
Assist the city in amending its 1985 Transportation Plan for the Highway
214, 1-5 Interchange Parr Road area, prior to development, to bring it
into compliance with OAR 660-12-060(1)(b) regarding adequate
transportation facilities to support proposed land uses.
Our concerns are that the wording does not clearly state that the
Transportation Systems Plan amendment must occur before development can
occur, and that it does not state that reconfiguration of the land use
designations is dependent upon amendment of the Transportation Systems
Plan. Based upon ODOTs testimony and our telephone conversation on
Friday, I believe this is the intent of the condition. However, the use of assist
in the condition creates concern. The wording states only that the developer
must assist. How much assistance must be provided? A little or a lot? If the
developer partially funds the study, hasn't it "assisted" prior to development?
How is compliance to be measured? The potential for variance in
understanding the condition's intent could result in a widernnge of results,
inclUding property development regardless of the Transportation Planning Rule
issues.
I
If I have misunderstood the conditions's intent, please let me know as soon
as possible. If Woodburn agrees that this is the council's intent, OOOT
l"", requests that the condition be modified as follows:
fJ\ P\ C t-\
IT
{67 (3-91)
EXHI~II "A"
Page 14 of -
Vregon
DEPARTMENT OF
TRANSPORTATION
Highway Division
Region 2
FILE COOs,
...
.. .
.,.-
2960 State Street SE
Salem, OR 97310
(503) 378-2626
FAX (503) 378-4317
;
- \ 1-
~
.-~""r".--~-.""'-----"..._"" '-"'.''''
;"
;-,
,.:.\
Steve Goeckritz
Ordinance 2095
page 2
I
I
i/
(
Assist the city in amending its 1985 Transportation Plan for the Highway
214,1-5 Interchange Parr Road area, prior to development, to bring it
into compliance with OAR 660-12-o60(1)(b) regarding adequate
lrdnsportation facilities to support proposed land uses. No development
of the properly or reconfiguraJion of the land use designations will be
permitted until the transportation plan for this area complies with OAR-
660-12-060 (1)(b).
I know that this development proposal remains a volatile issue in Woodburn.
We hope this matter can be resolved without unduly elaborate city councilor
other land lIse procedures. If some other way of accomplishing this is
proposed, please let me know.
We must hear from you relatively soon in order to avoid further land use
procedures.
-
hn G. deTar
Region Planner
cc: Dick Reynolds, OOOT
Bob Rindy, OLeO
Larry Knudsen, Justice
L".'
.'
11
EXHIBIT "A"
Page 15 of 7,
;
- \~-
~
.,~..."t+~~-__"'''''._.''_'.'-''""''--'"'--~''''_'''k'
~.
,~
\, \ ._.J
EXHIBIT "A"
Page 16 of 7$:.
COUNCIL BILL NO. 1443
ORDINANCE NO. 2098
AN ORDINANCE AMENDING THAT SECTION OF ORDINANCE 2095 WHICH
RECLASSIFIED CERTAIN PROPERTY LOCATED IN THE SOUTHEAST QUADRANT OF
INTERSTATE-5, SOUTH OF STATE HIGHWAY 214, FROM MARION COUNTY URBAN
TRANSITION (UT) ZONE TO CITY OF WOODBURN SINGLE FAMILY RESIDENTIAL
(RS), MULTI-FAMILY RESIDENTIAL (RM) AND COMMERCIAL GENERAL (CG)
DISTRICTS AND DECLARING AN EMERGENCY.
WHEREAS, a section of Ordinance 2095 reclassified certain property located
in the southeast quadrant of Interstate-5, south of State Highway 214, from Marion
County Urban Transition (UT) zone to City of Woodburn Single Family Residential
(RS), Multi-Family Residential (RM), and Commercial General (CG) districts, and
WHEREAS, this reclassification was subject to three conditions which were
agreed to by the applicant, Capital Development Company, and
WHEREAS, the Oregon Department of Transportation has proposed a minor
change in one of the conditions, and
WHEREAS, Capital Development Company has agreed to the change in said
condition, NOW, THEREFORE,
THE CITY OF WOODBURN ORDAINS AS FOLLOWS:
Section 1. Condition number two of Ordinance 2095, referenced in Section 4
of Ordinance 2095 and set out in Exhibit" A" of that ordinance, is amended to read
as follows:
Assist the city in amending its 1985 transportation plan for the Highway
214, 1-5 Interchange Parr Road area, prior to development, to bring it
into compliance with OAR 660-12-060(1)(bl regarding adequate
transportation facilities to support proposed land uses. No development
of the property or reconfiguration of the land use designations will be
permitted until the transportation plan for this area complies with OAR
660-12-060(1 )(b).
Section 2. The city finds that Capital Development Company has consented
to.the amendment of this condition. A copy of the written consent is appended to
this ordinance and, by this reference, incorporated herein. .
L Page 1 -
COUNCIL BILL NO. 1443
ORDINANCE NO, 2098
AT\ACM m=
,
-\1.\-
~..
._ .,....'_~..I'.~~__m__...._'__,.____.__~__~__......,W"O*. --_..,.-
.--'
EXHIBIT" A"
Page 17 of 79
Section 3. This ordinance being necessary for the immediately preservation of
the public peace, health and safety, an emergency is declared to exist and this
ordinance shall take effect immediately upon passage by the Council and approval by
the Mayor.
Approved as to form~.~ ~
City Attorney
APPROVED:
For:
12/2'2/72
ate'
Council President
Passed by the Council
December 28, 1992
Submitted to the Mayor
December 30, 1992
Approved by the Mayor
December 30, 1992
Filed in the Office of the Recorder
---- ~
ATTEST: ~~ !.JL.
Mary Tenna ,City Recorder
City of Woodburn, Oregon
December 30, 1992
/
lo/ Page 2 -
COUNCIL BILL NO. 1443
ORDINANCE NO. 2098
TIT-
;
-\~
.
.....-'..-r..~--.__._-->--~.~'--~>--_.,.-..__.- ..~~~
~
r'-
,
D
EXHIBIT" A"
Page 18 of 79
PART II
/
. '~."'^"'l-~--'-------'-'~'-
-
--,
/..J"
EXHIBIT "AU
Page 19 of 79
~
Capital Development Company
March 14, 1994
Planning Commission
City Council
270 Montgomery Street
Woddburn, Oregon 97071
RE: Case File Number Annexation 92-02.with information contained in Council Bill No.
. 1426 of Ordinance No 2095 and Council Bill No. 1443 of Ordinance No 2098.
The cont~nt of this letter is directed to both the PllInning Commksion and the City Council
in request of your review and approval for a new Land Use Application on a portion of the
173.84 acre parcel owned by Capital Development Company (Capital). The directive
entitled New Land Use Application is the reco=endation by City Attorney, Mr. Shields,
to the Co=w:rity Development Director, Mr. Geokrltz, as .the procedure Capital is to
request for land use. This document is recognized as Memorandum Opinion 93-04.
The portion of land which we have selected to become a phase one development is in a
General Co=ercial zone and does not effect a conditionallanduse or a zone change from
the original Woodburn Comprehensive Plan previous to our annexation. Please, also note
that the same 13 acre land portion requested for development in the New Land Use
Application does not cause any variation to the zone change approved under the Council
Ordinance No. 2095.
The land use intentions upon which Capital purchased the parcel for development in 1991
as a single owner and privately held company, have not changed. Historic reference shows
that the land request, New Use, is and has been zoned for co=ercial development from
the early 1980's adoption of the comprehensive land use plan within Woodburn's urban
growth boundary. 1brough the land purchase and request for annexation, we became
involved with Woodburn and their transportation issues and Capital partially funded the-
Woodburn Transportation Study and participated as a member of the Transportation Task
Force.' Therefore in presenting the conditions of zone change and our requested. changes
within Exhibit "AU of Ordinance ijo. 2098, this is an acceptable request. The request and
purpose is granting a limited de~lopment, completely within the zoning guidelines of the
city's comprehensive plan, O.D.O.T.'s level of service compliance and the original intent of
the land purchase agreement.
P.O. Box 3487.691 Sleater.Kinney Rd. S.E.. Suite 100. L:tcey. Washington 98503-1069. 206/491~6850
ID# 0 l-CA-P~ TO . 323D5 ,
FAX# 206/459.8747
~\.~-
~
"_----.---.-...........--.-.--...-.4....'
.-
~"
~
EXHIBIT "A"
Page 20 of 79
Page Two: March 14, 1994
The City Attorney has advises the Co=unity Development Director that the property
owner should present (to the Planning Commission and City Council) their specific revisions
to the conditions of their zone change. May Woodburn please review and acknowledge our
conditional changes for a New Land Use Application as follows:
1. Condition one of Exhibit "N, Ordinance No. 2095 needs to be amended to reflect
the applicants ability to initiate Phase 1 of this project prior to any adjustment to the
comprehensive plan map reflecting the applicants proposed land use configuration on the
entire 173.84 acre parcel. That portion of the property intended to be utilized in Phase 1
currently conforms to the comprehensive map plan and is properly zoned for the uses
intended in Phase I.
2. Condition two of Exhibit "N, Ordinance No. 2095 and amended under Ordinance
2098 is requiring a change and is effected by our request. Please note the amended portion
under this current condition was required by O.D.O.T. to be incorporated by Woodburn,
creating Ordinance No. 2098. To proceed we must change the condition as it reads: "No
development of the property or reconfiguration of the land use designation will be permitted
until transportation plan for this area complies with OAR 66Q-l2-060(1)(b). We require the
amended to read: Development permitted by New Land Use Application to the property
and no configuration change of the land use designation allowed until the transportation
plan for this area complies with OAR 660-12-060 (1)(b). Capital gives three reasons that
provide support in our request of Woodburn to amend the condition for the approval of
development.
1. The original Ordinance No. 2095 was modified by O.D.O.T. requesting Woodburn
and Capital to consent to the no development language placed in the second condition.
O.D.O.T. now concedes that the transportation plan has advanced to a level of acceptance
which could permit limited development. Therefore we believe that Woodburn could
modify the constraint or condition number 2 without objection from it's author.
2. To facilitate a phased development through the new land use application, Capital
would make an improvement to the 1-5/214 Interchange area. This improvement will assist
by providing adequate support to the transportation plan by increasing existing capacity
which is in compliance with OAR 660-12-060 (l-f(b). .
3. The third reason is a condition of time. Capital's property was annexed in October
of 1992. It is now March of 1994, one year and five months later. Woodburn has made
signifi,Cant progress on their transportation plan for the interchange area and is developing
a -long term plan to fund the necessary improvements. Tin;1e continues to be a major
concern for Capital. Further delays in this process potentially will create competitive
environments in nearby co=unities that would eliminate the potential to develop this site.
,
-\1-
c-,.
~
EXHIBIT "A!L.
Page 21 01
Page Three: March 14, 1994
Condition 3 of Exhibit. A", Ordinance No. 2095 and Ordinance No. 2098, is not effected by
our request. The New Land Use Application imposes no change to condition three because
there is no configuration change within the present land use. We understand the statement
to read: "any reconfiguration of the land use designation maintain the same ratios as
identified on the original comprehensive plan." At this time, Capital has no request to
modify condition 3. We do not effect this condition because the phase one project is scaled
down to a nominal 13 acre portion contained in the approximate 58.61 acres as zones for
Commercial General. Again, we show the 13 acres are within the appropriate zoned
boundary formed by the original comprehensive plan.
Capital Development's request for aNew Land Use Application is a rational response in
acknowledging the land owner's right to improve his land to the highest and best qse within
the conditions of the approved zone. Please recognize this application to be consistent with
the requirements of the Oregon Administrative Rules. Our project goals continue to
recognize that the Woodburn Transportation Plan is in the best interest for both present and
future growth.
Sincerely,
John R. Donaldson
Senior Vice President
JRD/jd
;
-\8-
..............-.
,-
~
; 1.
EXHIBIT "A"
Page 22 of .
STAFF REPORT
REQUEST TO AMEND ORDINANCES #2095 AND #2098
As earlier described in the chronology and requested and
correspondence of March 14, 1996 Capital Development is requesting
the city council amend Ordinance 2095 and 2098.
staff Comments:
A. Under the existing ordinances no development can
take place until the transportation plan OAR 66-12-
060 (1) (b) is completed.
B. The applicant is requesting the ordinance be
amended to allow the development of 13.04 +/- acres
of a 58 acre commercially designated area.
If the amendments were
could, under specific
proposed development and
transportation rule.
D. The state' transportation rule only takes effect
when a Comprehensive Plan Map or Zone Map Amendment
occurs.
approved the applicant
conditions, build his
not be affected by the
C.
E. The applicant in not requesting a Comprehensive
Plan Map nor Zone Change at this time.
F. The application would allow the applicant to
develop 13.04 acres that is presently designated
for commercial development.
G. The 13.04 acres represents property that is
presently designated as commercial. At the time
reconfiguration occurs, the property will still be
designated as commercial.
H. The Oregon Department of Transportation and the
City have required the applicant to submit a
traffic impact and mitigation study.
I. On site and off site street and highway
~mproveme~ts will have to be made.
-\9-
.Om"."_ .._ ,....."..,.. .,__.._... _._,_.~_.....,,_____.____.__......___._~~__.~H__._--<__.
""".-
t '. \
,("">:-
\. 1...1
PART III
-.
.......-.....,.-''"
__._..,_.,,_..O'-....._.__..~~__..~_.I""
EXHIBIT "A"
Page 23 of 79
.-
,..,."....
EXHIBIT "A"
Page 24 of 79
TRAFFIC IMPACT
STAFF COMMENTS:
It was a requirement by the City and Oregon Department of
Transportation to require Capitol Development to develop a traffic impact
and mitigation study. The objective of the study is to basically analyze
the impacts this retail outlet center would have on existing streets and
highways and secondly to mitigate any negative traffic impacts on these
streets and highways.
The attached correspondence consists of the applicants response to City
Comprehensive Plan Goals and Policies that must be addressed in
evaluating the legitimacy of the proposal.
The remainder of the aftachments consist of studies and discussion
between the Oregon Department of Transportation and Howard Stein,
transportation consultant representing the developer regarding
transportation analysis methodologies and various traffic mitigation
techniques.
As for various street and highway improvements staff has broken them
into two parts. Those being street improvements that are on and off
site. Those that are on-site consists of streets that are built by Capital
Development on their property and properties that adjoin their property.
Off-site improvements address primarily the interchange area.
As for on-site improvements they consist of the following:
.5..tacy Allison extension from where it ends north of the Wal-Mart store
and turns south running parallel to Interstate 5 for 1,200 feet where it
connects to "Outlet" Avenue.
Right of way -
60 feet with a 10 foot utility easemelJt on the
east side, two travel lanes I
Improved Road Surface -
42 feet asphalt curb to curb, two 6-8
foot bike lanes, and sidewalks.
-2.0-
..-",
~,
-0-..
EXHIBIT "Au
Page 25 of 7,
Outlet Avenue runs east/west for approximately 900 feet and connects"
Stack Allison with Prairie Boulevard.
Right of way -
60 feet with 5 foot utility easements one each
side.
Improved Road Surface -
42 feet asphalt curb to curb, two 6-8
foot bike lanes, and sidewalks.
Prairie Boulevard (Wal-Mart Ave.) runs north/south
Right of way -
100 feet no easement necessary, two travel lanes
and turn lane.
Improved Road Service -
54 feet curb to curb, two 6-8 foot bike
lanes, and sidewalks. .
Two off-site improvements are obvious. One is the installation of a
traffic signal at the north bound interchange ramp on the east side of the
interchange. A second off-site improvement would be the widening of
the north bound ramp to two lanes in addition to widening the north
bound ramp accessing 1-5. An additional improvement, prior to retail
operations could be changing Lawson Avenue to a right in-right out only.
The traffic study concluded the retail outlet center will generate 3,200
daily vehicles trips with 320 trips being generated in the peak pm hour
with 10% of those trips being multi-stop shopping trips.
It should be noted that an assumption is being made on the part of
OOOT when evaluating this proposal. This assumption is that if the
conditions of Ordinance #2095 and #2098 are amended by Council
relating to the zone reconfiguration and completion of the City's
Transportation Plan then the developer can proceed with his proposal. _
In other words, this proposal could be developed on existing commercial
land subject to OOOT conditions and not be in violation of the
Transportation Rule.
/
As for OOOTS specific recommendations for off site improvements they
are forthcoming.
-"2.\ -
,.._..._..."_.".-,._.,.,.._--_.-.-....----"~---_._".__...---"
,......,..~
A?? \J ( I-\~\ \~~l
EXHIBIT "A"
Page 26 of 7':>
CERTAIN SPECIFIC CITY OF WOODBURN GOALS AND POLICIES APPLY TO 1HE
PROPOSED PHASE I OF WOODBURN CROSSING OUTLET SHOPPING CENTER.
1HE SPECIFIC COMMERCIAL LAND DEVELOPMENT POLIrTF.<; lHAT REIATE
TO 1HE APPLICANTS PROmCf ARE IDENl1FlED BELOW WITH 1HE
APPLICANfS RESPONSE.
COMMERCIAL LAND DEVELOPMENT POLICIES
B-1. The City should at all times have sufficient land to accommodate the retail
needs of the City and the surrounding market area. The City presently has
four major commercial areas: 99E, 1-5 Interchange, the downtown area and
the 214/211/99E four comers intersection area. No new area should be
established.
Phase I of the Woodburn Factory Outlet Shopping Center will help to promote
the above City policy by providing additional commercial area for retail services
in one of the four existing major commercial areas near the Interstate 5
Interchange.
B-2. Lands for high traffic generating uses (shopping centers, malls, restaurants,
etc.) should be located on well improved arterials. The uses should provide
the necessary traffic control devices needed to ameliorate their impact on the
arterial streets.
The Woodburn Factory Outlet Shopping Center Phase I helps the Qty meet the
intent of this policy because the project will be located sufficiently on improved
arterials utilizing typical traffic control devices, like limited access points to
provide limited impact on arterial streets.
1.1.2. Develop a transportation system that interconnects residential areas with
employment centers, commercial areas, schools, parks, churches, and regional
transportation networks.
The proposed center will assist the City in attempting to enhance the
transportation system by providing additional opportunities for commercial area
to interconnect residential areas with new commercial activities.
/
-22--
_ _ ,____~ .4~___""""""""_'__' '_"'~~'__~~___"_______"'__'___'~_"~
:'~
/..
EXHIBIT "A"
Page 27 of 7':.
1-1-3. Develop a street system wherein arterial streets are of sufficient width to
accommodate traffic flows without interruption. Collector streets should
function to conduct traffic between arterial streets, which serve to
accommodate movement within neighborhoods.
The proposed project increases the City's ability to comply with this policy because
all streets within the project meet or exceed the City's street width requirements.
Prairie Boulevard, when completed in Phase II of the project, will function as a
major north/south thoroughfare. This new major road network will provide
additional opportunities for collector streets and arterials to function in such a
way to accommodate traffic movement within neighborhoods to and from
commercial areas and adjoining neighborhood road networks.
1-1-4. To insure that state and federal highways with routes through the City are
improved in accordance with projected traffic volumes and the elements
contained within this plan.
The developer is negotiating presently with the Region II Department of
Administration for Oregon Department of Transportation to provide assurance
that state and.federal roads through the City are improved in accordance with
acceptable traffic volume levels.
1-2. Develop a transportation system that avoids or reduces a reliance upon any
one fonn of transportation.
The proposed plan provides for a transit station and bike paths within Phase I
and subsequent phases of the project. This will encourage use of alternate
transportation methods to and from the site and is consistent with the intent of
the above policy.
1-2-2. Develop a bikeway and pedestrian system which will provide routs connecting
residential areas to schools, parks, places of employment and commercial
areas.
Thirteen feet of bike path along Prairie Boulevard provided by the developer
will have the ability to connect to adjoining residential and employment centers
as well as other commercial areas and help the City meet this policy.
/
-23 -
,...",.....,- +.~+,..~._.
'1
.~-
fh.
'. ;j ,
EXHIBIT "A"
Page 28 of 79
1-2-3. Promote optimum efficiency within the transportation system by the use of
traffic management techniques including access controls on major arterials
and the utilization of available transit system capacity prior to the
construction of major new transportation facilities.
Phase I and subsequently other phases help to promote efficiency within the
transportation system by restricting access from the development to a limited
number of points on major arterials like Prairie Boulevard. Also the development
incorporates and promotes use of transit by establish transit stations within the
project as an additional means of reducing automobile traffic.
1-2-4. Encourage the design and development of transportation facilities that can
be readily modified to accommodate future demands.
The project provides for additional right-of-way to be utilized to widen additional
lanes of traffic on major streets within all phases of the development. This right-
of-way will help the City stay in compliance with its' policy to meet future
transportation demands. .
1-3-2. Provide a level of transportation services to the urban area that are
compatible with the environmental, economic and social objectives of the
community.
The completion of Prairie Boulevard, which will provide a new north/south
corridor from the existing area to the urban growth boundary, will significantly
enhance the City's desired intent to provide acceptable levels of transportation to
the urban area.
-24--
. .", .. _.___...__4...4__"__.._"_._.__'..___'_-'~___<'_'_.'__'_.___..._.,....._.,_
H. S. Stein
Consulting Engineer
EXHIB;T~
Page 29 0, J
13340 SW, Hanson Rd.
Beavertan. OR 97005
Phone/Fax (503)641-1437
March 28, 1994
Project No.: 105.2
Mr. Terry Hockett
Planning Section
Oregon Department of Transportation
325 13th Street NE Room 501
Salem, OR 97310
SUBJECT: Results of Additional Analyses Requested for the First Phase of Woodburn
Crossing in Woodburn, Oregon
Dear Mr. Hockett::
Based on your letter dated March 15, I have prepared the additional analysis you have requested
of the traffic impact for an initial phase of the proposed Woodburn Crossing mixed-use
development. As before, this flI'St phase will consist of a 100,000 square foot factory outlet retail
center. This center will be located completely within commercially zoned land parcels on the
east side of the I-5jHighway 214 interchange. The following paragraphs document the details
of the analysis methodology, results, and major findings.
BASELINE TRAFFIC VOLUMES
As noted in the past, several traffic counts have been taken in this study area. The most
complete set of counts were those conducted in November of 1992. Consequently, these were
used as the baseline traffic volumes. (These volumes were previously submitted to ODOT.) As
you requested, these traffic volumes were adjusted for peak summer season by increasing them
by 10 percent. Figure 1 show the peak summer traffic volumes that resulted from this
adjustment. All traffic volumes except those less than 20 vehicles per hour were rounded
upward to the nearest 5 vph.
. Traffic Operations . Development Impact . Parking . Accident/Safety Analysis .
'1c::--
- 1-...,:)
-* ".,._-"..,.....~ ,-..."-
.....,.
"
~,"',--:',
>-
EXHIBIT "A"
Page 30 of 79
T. Hockett
March 28, 1994
Page 2
FUTURE YEAR 2000 TRAFFIC VOLUMES
As you have requested, I have analyzed traffic conditions for the year 2000 which will be several
years after this first phase has been opened. To estimate future year 2000 traffic volumes, the
baseline traffic volumes were increase using a general growth factor 0(4 percent per year. This
growth factor was verified with you earlier. Thus, all the traffic volumes in Figure 1 were
multiplied by 1.37 (1.04 factored for 8 years). These resulting volumes are shown in Figure 2.
SITE GENERATED TRAFFIC VOLUMES
The first phase of Woodburn Crossing will consist of a 100,000 gross square foot factory. outlet
retail center which will be located on commercial zoned land. Based on your comments and
discussions with you, it was recommended that the trip generation rates for this center be based
on those obtained in the Boston area that were detailed in recent ITE article. This article
reported a weekday p.m. peak hour trip rate of 3.2 vehicles per 1,000 square foot and an average
daily trip rate of 32 trips per 1,000 square foot. Based on these rates and as shown in Table 1,
it is estimated that the r1l'St phase of Woodburn Crossing will generate 3,200 vehicle trips (both
into and out of the site) throughout a typical weekday, including 320 vehicle trips during the p.m.
peak hour. Traffic to the center during the a.m. peak hour should be minimal. The percentage
going into and out of the site during the p.m. peak hour was assumed to be the same as a general
retail center: 4S percent inbound and SS percent outbound. It should be noted that this estimate
does not take into account the fact that a substantial portion of the traffic to the factory outlet
retail center during the p.m. peak hour will likely come from vehicles already on the roadway
as well as people already shopping at the nearby Wal-Mart store. To account for some of these
trips, this analysis assumed that 10 percent of the p.m. peak hour trips to/from the center would
come from multi-stop trips in which shoppers currently going to the Wal-Mart store and/or fast
food restaurants in the area will also shop at the proposed factor outlet retail center and will not
increase the number of vehicles on Highway 214.
/
-2<0-
i""\ EXHIBIT "A"
Page 31 of 79
T. Hockett
March 28, 1994
Page 3
Table 1: Trip Generation for First Phase of Woodburn Crossing
Dally A.M. Peak Hour P.M. Peak Hour
Trips Total I In lOut Total Iu Out
Land Use
FactoIy Outlet Cooler 3,200 Minimal 320 145 175
(100,000 asp)
Adjusted for Local Multi-Stop 288 130 158
Shopping Trips
(10 % Reduction)
.
Distribution and Assignment of Site Generated Traffic
The directional distribution of traffic associated with the factory outlet retail center was assumed
to be the same as the distribution used in the traffic impact study for the Olappell Development
and is shown in Figure 3. Figure 3 also shows the resulting assignment of site-generated traffic
during a weekday p.m. peak hour.
TRAFFIC IMPACT ANALYSIS
Traffic capacity analysis was conducted for both the baseline and future year 2000 traffic
volumes using ODors SIGCAP program at the three major intersections in the study area:
. 1-5 Southbound Ramp/Highway 214,
. I-5.s=und Ramp/Highway 214, and
. Evergreen RoadJHighway 214.
It should be noted that the future year 2000 scenario assumed that Lawson Drive would be
limited to right in/right out maneuver&.-
/
.'
- 11,-
. .. -- T"'. --.... . ..... '-'--"'- --. .-.. -------.
r-,.....,~,.
~; ,
EXHIBIT "A"
Page 32 of 79
T. Hockett
March 28, 1994
Page 4
Tables 2, 3, and 4 show the results of these capacity analyses under the baseline traffic volumes
and year 2000 traffic volumes as well as for different intersection lane configurations. The first
set of calculations were performed assuming existing roadway conditions. For the year 2000
traffic volumes. additional analyses were conducted to determine what roadway improvements
would be necessary for achieve LOS C at the 1-5 Ramp intersections and LOS D at the
intersection of Evergreen Road and Highway 214. In some cases. there are more than one set
of improvements that would achieve this objective. Afterwards, these analyses were performed
again adding in the traffic that would be generated by the first phase of Woodburn Crossing.
These results are also shown in Tables 2, 3 and 4. All the SIGCAP worksheets are attached to
this letter.
In all cases, the traffic that would be generated by the first phase of Woodburn Crossing would
IIOt necessitate additWnal roadway improvements beyond those needed to bring baseline year
2000 traffic COrulitiOllS up to acceptable levels of service.
If there are any questions related to the data or analysis contained in this report, please contact
me directly.
Sincerely,
II~ s: ~
Howard S. Stein, P.E.
Attachments
cc: Steve Goeckritz, City of Woodburn
Dan Fricke, OOOT
John deTar, ODOT
John Grassman, ODOT
John Donaldson, Capital Development Company
ODOT2000.RPT
AI.) ~ \\ \ O~ l\L \j t\ TI\
\ f \<.'tD.IJ~~\~'CJ.
.'
-2B-
. ~~,. .,.,- ...-,~ -1"""'-
H. ... Stein
Consulting Engineer
,~
EXHIBIT "~
Page 33 c.. 9
133-40 S.w. Honwn Ro.
Beaverton. OR 97005
Phone/FtDt (503) 64H4U
April 6, 1994
Mr. Steve Goeckritz
Director, Community Development
City of Woodburn
270 Montgomery Street
Woodburn, Oregon 97071
S.bJect: TrqJftc Gen,rat,d by till Flnt Ph"II 0/ W/1odbum Croll''',
Dear Steve:
It has come to my attention thatS6veral of the citizens Jiving in Senior Estates are concerned
about the traffic that would be generated by the first phase of the Woodburn Prossing
development, a fllClOry oullel center. In particular, lhey life collcem about the number of vehicle
trips that might use West Hayes to go to/from the site.
It is likely that after the center has been opened for a while, the number of vehicle usin8 West
Hayes will be minimal. First, the factory outlet center wJ1l attract most of its traffic from
patrons traveling along 1-5. Second, most patrons in the greater market area will also use 1-5
to travel to the center. Only local patrons, such as the residents of Senior Estates, might benefit
from using West Hayes.
It is difficult to predict how many vehicle lrips to the factory outlet center ACtually would use
West Hayes. Some counts were taJeen after the nelIrby Wal-Mart store that could provide insight
regarding this issue. A letter report that I wrote (while I was at Kittelson & As&ociatea) to
Randy Rohman (dated Decentber 9, 1992) presented these traffic t'(.)unlli. TIle cbanges illlraffic
in the vicinity of this area revealed that:
1) The total number of new trips on the nearby roadways (I-S, Highway 214, and
West Hayes) were about half the numbel' that was estimated using 1TE trip
generation rates, and
2) The directional distribution used in the Itafflc study to assign trips to/from the
Wal-Mart store appears to different Ihan the actual pattem of increased vehlele
trips exhibited in the traffic rounts.
These counts found thal about 20% of the vehicle trips to the Wal-Mart slore canle from vehicles
along West Hayes. (These counts did not distinguish between rcsidcnts of Scnior Estates and
other residents of the Woodburn area.)
. TfOfflc OperotlOll, . "'vSlo~nt Impact . Porltlng . AecldantlSafety Analysis .
- '29, -
"
\
EXHIBIT "A"
Page 34 of 79
s. Oocckritz
April 6, 1994
Page 2
Given that Woodburn Qossing is a faclory oullet maJl center rather than a general relaillltore
which offers goods people need on a daily basis. it is highly likely that the trips to this outlet
center via Weat Hayea will be leaS than the percentage noted for WaI.Mart. As shown below,
the tolal estimate of p.m. peak hour traffic to/from Woodburn Crossing is 288 vehicle trips
including 130 trips entering the lite and 158 trips exiting the site. If the pen:ent using West
Hayes is estimated to be 10 percent, then during the p.m. peak hour there would be an additional
13 vehielc trips would travel westbound and 16 vehicle trips would travel eastbound on this
roadway. (Throughout the remainder of the day and on weekends the number of the trips will
be lower than these values.) These numbers of IIdditional vehicles would not significantly affect
traffic operations and safety cbar~r1sdcs along West Hayes.
Dally A.M. Peak Jlollt P.M. P.... Rour
TrIp. TotIIl I In I Oat .
Lad U.. Tota. III OUt
Factory ODdet Ceater 3,200 Minimal 320 14S 17S
(100,000 OSF)
Adjuted for Local Mulll-Slop 288 130 151$
SIaoppfDI Tripe
(10 'l\\ Recluaioa)
Tul. 1: TrIp GeIIent10a ror I'IrIl P1w. or Woodb.... eroN's,
It would be premature at this time to set in motions mitigation plans because the actual number
of trips anticipate is relatively low and the pattern of these trips is unknown. If a probl6ln does
arise, a study could be pelformed to Identify the pattern of these additional trips and then
lppropriate mitigation measures could be implomented.
If you have any question regarding the traffic analysis I have submitted or this letter, please
contact me direci1y.
Sincerely,
!I~ Su.# All:.
Howard S. Stein. P.E.
cc: J. Donaldson, Capital Devel~pment
WIIt!lAYIlS.LTll
/
-~o-
~ ...~~ .."...
06/0./84 10:Zft tr~
,
7:t: 1038
,
I"
nrST 3 RW\. MA'NT .
EXHIBIT "An
Page 35 of 79
,..,
.., /.-
.-
April 22, 1QQ4
-
......
.
. Mr:-steve G<)eekritz, Director
'Plaiinlng OQpartment
City of Woodburn .
270 Montgomery Street
Woodburn, OR 97071
.1U: CODE:
SUBJECT: Woodburn Cros.lng FactoryOuUetCenter_Caplf.a1 Development co.
DEPARTMENT OF
!RANSPo~noN
Di&tdct J
Dear Mr. GoeckrItz:
Thank you for meeting with Oregon Department ofTralllpOl'tatlon (0001) staff on April
21 to diccuea rctoIution of ~llon Issues. OOOT'c principle concern 1$ with
encuring that the operation of Slate HIghway 219 and the l-6 interchange ere not
further degraded by area development We hllVG limited our review and
recommend~tions to Impacts and improvements fo the etate highway system onry.
. In recognition of the above, lII1d in an effort to ensure that project-generated tnIffic
nu;ults I/:l Wno net impact". to the transportation system, ODOT requests that the
following conditions be adopted. as part offhe aGtion on the Proposed factoly outlet
center.
1. Prfoi to the luuance of 8 grading permit or buOdIng permit. wh/ehever
occurs first, the sppffCflnt malT submit pfamJ for tha following
ImproV9fnents fortho ,.\liQw and epproVtJl of the D/sfric;t Msnsaer; Of8(JOn
Depsrtment of Transportation. DIstrict 3:
Widenfng and 8fr/pIng the 1-5 northbound oH-ramp to inclUde
separate left and rfghf tum fanes.
Widening and sttfp/Jlg the 1.5 $Outhbound off-ramp to ir<<,-(ude .
separate left end tfght tllm lane$.
Install" traffic signal at the J-5 notthbourJd rsmpsMighway 214
interssctfon.
"lma.~
InstsIJ centormedian control on Highway 214 from ths northbound
1-5 Tampa to Evergreen.
Install righttum ItJ/Iea at the folloWing locations:
sastbound Highway 214 to ~outhbound Evergreen .
eastbound H'tghway 219 to southbound l-5on-rsmp
westboUnd HIghway 214 to northbound 1.5 tn-ramp , .
88.5 Ahpert Rood
s.J...., OR 97.310
15(J3} 98&-2874
!lAX (503) 986-2061
,
.
I
3\
"'.--.- ".-.......,.---. .._,-~->"..
- oil _.~ .t.. J..V~Q
VI>! 3 IlWY IlAINT ":'
EXHIBIT "A"
Page 36 of 7S
2.
Prior to the isl1UMCe of sny pennit for use and OCCUpancy. the
improvements 8fJBCi/ied in Condition 1l1haU be Installed and operational
in a manner meeting the 11pprOva/ of the DIWict Manager, Oregon
DePBttment of TfIIIISfJOrtalion. District 3. .
. Based on ana/y5es prepared by Iho apprlCant 8!l<l ODOT &taft, we are confident that
iostaJJallon of thoso impRM!lllentl will 4UUle that existing levels of service on state
CaclllUes are maintained. OOOT is a/eo prepared to patticipate In the alSt Of installation
of the traffic signal at HIghway 2191/-6 notfhbound ramps lntel'8ection aod the center
median COotroI on Highway 219.
,
,
Thank you for the opportunity to n1'1iow and comment 00 thIa project. OOOT
~ the COOperative e/forts of the City of WOOdburn staff in bringing lhese
isaues to closure. This /otter .hoU/d be Included In U1e hearing record 8S OOOT
teatimony. OooT ahould be considered a party to Ihe hearrng and be entitled to
no~ of future hearinga, or homfng continuances or oxtenalons. Please provide me
. with a copy of the dty'c deeilloo. k1dudlog findings and c:oneJlI$/onc.
YoUl'8 truly,
JO/1~~sman. P.E.
District 3 M8nager
C: Dan Fricke, ODoT. Region 2
D1cIc Reynolds, ODOT Corridor and General Planning
Mellucas. OLCO
John Donaldaori, Capital Development Co.
/
,
i
- -. - .-- .--- ---_.. - '-. - .-. _. -".- ... .--....-. -.- .
~2.
- ~~~- 4_ 'T"- ---
~
~
EXHIBIT" A"
Page 38 of 79
STAFF REPORT
Site Plan Review 93-22
Modification 93-01
APPLICANT:
Capital Development
PO Box 3487
691 Sleater-Kinney Rd. SE Suite 100
Lacey, WA 9850-1069.
II NATURE OF THE APPLICATION:
The applicant is requesting site plan review approval of an approximate 85,000
square foot retail outlet center and the modification of Ordinance 2095 and 2098.
III
RELEVANT FACTS:
/
This staff report will address the Comprehensive Plan and Zoning Ordinance as it
relates to the Site Plan. The request for the modification has been addressed
previously. The site is located along Interstate 5 and south of Hayes Street. The
subject property can be identified specifically on Marion County Assessor Maps as
Tax Lot 200, 5S,2W, Section 12C. Tax lot 200 is 124.58 acres in its entirety. On
this property there are three zoning designations, single family residential, multi-
family residential and commercial general. Approximately 58 acres of tax lot 200
is zoned commercial. This commercially designated portion of tax lot 200 runs
parallel to Hayes Street in a east, west direction from 1-5 to the back of Senior
Estates. The applicants original request for annexation and a zone change was
approved with conditiOflS (Ordinanca2095 and 2(98), One oHhose conditions was
to move this commercially zoned portion of tax lot 200 in a north, south direction
to front entirely along 1-5, therefore, moving -it away from Senior Estates. The
second condition of approval was imposed by ODOT. It stated that no
reconfiguration of the zoning designations could occur until the transportation plan
was approved. The applicant understands the conditions of approval from
Ordinances 2095 and 2098 and will comply with them. The applicant is requesting
a new application which includes site plan review, and permission to build one phase
of their retail outlet center along 1-5 in what is already zoned commercial. It will be
located to be in compliance with Ordinance 2095 so that when the transportation
Page 1 - SPR93-22
_._-_._-----,.,,--~_.-..__.-
~
/
r, ,
'i --
..
f,i""" 'I
,.j~, l
~.
EXHIBIT "A"
Page 37 of 79
PART IV
/
II
/
"
---~._-~
--
r.
EXHIBIT" A"
Page 39 of 79
plan is finished, the reconfiguration of the commercial and residential land can take
place as approved by the Planning Commission and City Council. The applicant is
requesting to develop on approximately 13.04 acres of commercial property that
runs along 1-5. Once the transportation plan is complete, the applicant will proceed
with the original condition of approval and reconfigure the remaining Commercial
General Property away from the existing residential areas to the east.
The site is currently being leased for farming.
IV RELEVANT APPROVAL CRITERIA:
A. Woodburn Comprehensive Plan
Commercial Land Development Policies
Public Services Goals and Policies
Transportation Goals and Policies
B. Woodburn Zoning Ordinance
Chapter 5 Permits and Enforcement
Chapter 6 Planning Commission
Chapter 7 Public Hearings
Chapter 8 General Standards
Chapter 10 Off Street Parking, Loading & Driveways Private Street Standards
Chapter 11 Site Plan Review
Chapter 29 Commercial Retail
Chapter 30 Commercial General
C. Landscaping Policies
D. Sign Ordinance
Page 2 - SPR93-22
,-_. ."....
........
".,..~"
EXHIBIT "A"
Page 40 of 79
Woodburn Comprehensive Plan
Transportation policies have been addressed in Part III of this report.
Commercial Land Development Policies
B-1 The City should at all times have sufficient land to accommodate the
retail needs of the City and the surrounding market area. The City
presently has four major commercial areas: 99E. 1-5 Interchange. the
downtown area and the 214/211/99E four corners intersection area.
No new areas should be established.
STAFF: The subject property and development complies with this policy
because the applicants request for the retail factory outlet is located at the
1-5 interchange area. This proposal will help to accommodate the retail needs
of the City and surrounding market.
B-2 Lands for high traffic generating uses (shopping centers. malls.
restaurant. etc.) should be located on well improved arterial. The uses
should provide the necessary traffic control devices needed to
ameliorate their Impact on the arterial streets.
STAFF: The proposed use has complied with this policy because the site plan
and property owner will be complying with Public Works requirements relative
to streets and drainage. The site will be served by three streets. The
applicant will dedicate 100 feet of right-of-way and improve 54 feet of
roadway for Prairie Blvd. It will have two travel lanes, two bike lanes and one
turn lane. This will be improved from its intersection south of Stacy Allison
Way to the intersection of Outlet Ave. Prairie Blvd. will eventually connect
to Parr Road.
Interstate Way will run parallel to 1-5 between the Interstate and the
development. It is an extension of Stacy Allison Way. The applicant will
provide 60 feet of right-of-way and 42 feet of improved surface down to
Outlet Ave and 34 feet from Outlet Ave south. The third street is Outlet
Av.e. This street runs in an east, west direction and connects Interstate Way
with Prairie Blvd. This, like Interstate Way will include 60 feet ofR.O.W. and
42 feet of improved surface. Phase In will have ingress and egress onto
Outlet Ave. which in north of the development. Restricting access here will
reduce impacts on Prairie Blvd.
Page 3 - SPR93-22
~..
,._,.., "'-"~~"-'''-"-''--'''--''~'-'-~''''''--''''I'-'- ..
~
.,.-.
EXHIBIT "A"
Page 41 of 79
B-3 Strip zoning should be discouraged as a most unproductive form of
commercial land development. Strip zoning is characterized by the use
of small parcels of less than one acre. with lot depths of less than 150
feet and parcels containing multiple driveway access points. Whenever
possible. the City should encourage or require commercial
developments which are designed to allow pedestrians to shop
without relying on the private automobile to go from shop to shop.
Therefore. acreage size lots should be encouraged to develop "mall
type" developments that allow a one stop and shop opportunity.
Commercial developments or commercial development patterns which
required the use of private automobile shall be discouraged.
STAFF: The request complies with this policy because the proposal is
designed as a "mall type" development. in that shoppers will have an
opportunity to go from shop to shop without relying on a private automobile.
The applicant has made allowance for alternative forms of transportation.
Bicycle areas. bike paths and transit areas have been identified on the site
plan.
B-4 Architectural design of commercial areas should be attractive with a
spacious feeling and enough landscaping to reduce the visual impact
of large expanses of asphalt parking areas.
STAFF: The applicant has complied with this policy because of compliance
with the landscaping standards. The required landscaping is that at least
15 % of the total development be landscaped. the applicant is proposing that
16.40% of the site will be landscaped.
B-5 It would be of benefit to the entire City to have the historical center
of Woodburn an active. healthy commercial area...
ST AFF:The proposed land use application is not subject to this policy because
the development is not proposed to be located in the historical center or
downtown area of Woodburn.
B-6 Commercial office and other low traffic generating commercial retail
uses can be located on collectors or in close proximity to residential
areas.. .
ST AFF:The proposed land use application is not subject to this policy because
the proposed development is for commercial general and commercial ~tail
use.
Page 4 - SPR93-22
"_ 4__..,,-...._ ,__.0____"_"'__'_""
,'. I
,
.--
EXHIBIT "A"
Page 42 of 79
Public Services Goals and Policies
H-' It is the policy of the City to provide facilities at the least long range
cost to the City.
H-2 Efficient design of all facilities should be encouraged. The sizing of all
lines should be adequate to accommodate the expected growth within
the expected lifetime of those lines.
H-3 The City should oversize the lines where it is deemed reasonable that
during the life of the facility the lines will be carrying additional
capacity .
STAFF: The applicant has complied with these Policies because utilities will
be designed for future extensions. The proposed utilities will be subject to
Engineering approval at final review and comply with City standard
specifications.
H-4 The City shpuld minimiZe the number of high maintenance and
operational cost facilities such as lift stations whenever possible. To
maximize the utility of existing city services. and to minimize
maintenance costs. existing lands which are vacant should be
developed to their highest potential. subject to constraints of the Land
Use Plan. and excepting areas set aside for open space preservation
of parks.
STAFF: The development will utilizing the existing lift station that was in
existence prior to development. The developer will be subject to final review
and comply with City standard specifications. The proposed utilities will of
designed to provide for future needs at the highest and best use of the
property which is commercial and residential, therefore this poliCY has be
complied with.
H-5 The City should encourage development in areas of existing facilities
first. Secondly. the City should encourage development in areas
where extensions of existing City services can be accommodated.
The City should encourage development of new areas to which
services can be most cheaply extended. The City should develop any
other areas only as a last resort. The City will adhere to the policies
in the Storm Water and Water and Sewer elements of the
Comprehensive Plan.
STAFF: City services are to the site. The pro'erty owner will be responsible
for providing services throughout the development. This site is was identified
as one of four major commercial areas that has been identified in the
Comprehensive Plan.
Page 5 - SPR93-22
. .,-- ....". ,,'-.',-_. _."._._...".,...._..,._.~"
---
~
L
EXHIBIT "A"
Page 43 of 79
H-6 To insure that the growth does not increase the cost to the present
City residents, the City's policy should Insure that new developments
pay for any additional services they demand. The City shall institute
the necessary taxes and fees to insure that this is accomplished as far
as is practical.
STAFF: The applicant shall fund the construction costs for the required
infrastructure and pay the appropriate Systems Development Charges.
H-7 It shall be a policy of the City to maintain a working Capital
Improvement Plan which shall detail a set of public facility projects,
their costs, and funding for a six year period, and for the logical
extension of public facilities over a projected twenty year period. It
shall further be the policy of the City to conduct an annual review of
the CIP and amend it as necessary to insure adequate public
infrastructure where needed and to maintain compliance with Policy
(HI(1) of the document and the statewide land use goal eleven (Public
Facilities Planning).
STAFF: The City has a working Capital Improvement Program that is in a
constant state of revision. The most recent CIP regarding the interchange
area consists of over $13,000,000 in new construction.
/
Page 6 - SPR93-22
....,.
-
....
,.._V..'
EXHIBIT "An
Page 44 of 79
Woodburn Zoning Ordinance
The following sections of the zoning ordinance were found to be relevant to the
approval of this application.
Chapter 8 General Standards
Section 8.010 Minimum Street Width
Staff: The applicant has complied with the required street right-of-way width,
therefore, this criteria has been met.
Section 8.040 Special Setback Distances
Staff: There are no requirements for special setbacks for this proposal
therefore, this criteria is not applicable. The applicant has provided setback
distances from the centerline of the new roads Ipg.6)
Section 8.190 Vision Clearance
Staff: The applicant shall comply with the requirements for vision clearance
at any intersections. This will be necessary for any proposed signage or
landscaped areas.
Chapter 10 Off Street Parking, Loading & Driveway Standards
Section 10.030 Location
Staff: The applicant complies with this criteria because parking is provided
within 500 feet of the outlet center and employee parking is provided
on site and within 2000 feet of the outlet center.
Section 10.050 Off-Street Automobile Parking Requirements
Off-street automobile parking shall be provided in the amounts not less than
those listed below: Iwl Retail store 11 lone space per 200 square feet of
gross floor area, plus one per every two employees.
Staff: Four hundred twenty-six parking spaces are required per the Zoning
Ordinance. The applicant is-providing 512-, therefore this standard 'flas
been met. . -
Section 10.060 Off-Street Loading Requirements
/
Staff: Deliveries will taken within the "figure eight" shape of the building.
The applicant shall comply with the loading space requirements.
Page 7 - SPR93-22
.~ ., ,.-. -.- .,.~-_.. .,,-- "-.-.."'.. -_.-
.
/"'0
/-
,..-
t:}\'HI~1I "A"
Page 45 of 79
Section 10.070 Parking and Loading Area Development Requirements
Staff:The applicant has provided evidence in the site plan and narrative that
indicates compliance with this criteria. Specific design requirements of (a)
through (j) shall be subject to final review.
Section 10.080 Driveway Standards
Staff: Two driveways will provide ingress and egress on to Outlet Ave. The
driveways will be 28 feet wide. Both driveways exceed 50 foot of
distance from the intersection of Interstate Way and Prairie Blvd,
therefore, this standard has been met.
Chapter 11 Site Plan Review
Section 11.030 Approval of Site Plan Required
(a) No building permit for construction of structures governed by this
chapter shall be issued until the Site Plan for that structure has
received approval under the provisions of this Chapter.
(b) Any conditions attached to the approval of the Site Plan shall be
conditions on the issuance of the building permit. A violation of the
conditions shall be considered a violation of this Ordinance.
Section 11.070 Criteria for Evaluating a Site Plan
Staff: The applicant has addressed this site plan review criteria adequately,
see attached narrative (pg.11) from applicant.
(a) The placement of structures on the property shall minimize adverse
impact on adjacent uses.
Staff: The adjacent uses in this case are vacant property zoned for
commercial and residential use. The applicant has indicated that the
center is designed as a figure 8, creating two fronts. The service
corridors are contained inside "this design enables the project to keep
service traffic, refuse collection , utility connections and other
unsightly activity away from potential visual pollution to nearby
neighbors". The applicaRt has complied with the landscaping
requirements for a. commercial general district. Once the
reconfiguration of the commercially zoned portion of tax lot 200 is
realized as part of the original condition of approval for the zoned
change (Ordinance 2095), the entire 58 acres of commercial property
will be shifted along 1-5 and single family residential land will adjacent
to Senior Estates. Because of the location of the phase I development
along 1-5 the future reconfiguration of the commercially zoned portion
of tax lot 200, the proposal meets this criteria.
Page 8 - SPR93-22
. """- .~
- .....------.- ..------ I
Page 9 - SPR93-22
~
r-
~
J
EXHIBIT "A"
Page 46 of 7
(b) Landscaping shall be used to minimize impact on adjacent uses.
Staff:The applicant's proposal complies with the landscaping
standards, therefore this standard has been met.
(c) Landscaping shall be located as to maximize its aesthetic value.
Staff:The applicant's proposal complies with the landscaping
standards. The applicant has indicated that a landscaped architect will
design the landscaping to conform to the surrounding area, therefore,
this criteria has been met.
(d) Access to the public streets shall minimize the impact of traffic
patterns. Wherever possible, direct driveway access shall not be
allowed to arterial streets. Wherever possible, access shall be shared
with adjacent uses of similar nature.
Staff: The applicant has complied with Chapter 10 standards for
parking, loading and driveways. Two access points will be provided
for to the north of the development onto Outlet Ave, therefore
restricting access on to Prairie Blvd.
(e) The design of the drainage facilities shall minimize the impact on
the City's or other public agencies drainage facilities.
Staff: The applicant will be providing onsite detention. This will be
designed to City standard specifications following preliminary
approval. Therefore this criteria can be met following preliminary
approval.
(f) The design encourages energy conservation, both in its siting on
the lot and its accommodation of pedestrian and bicycle traffic.
Staff: The proposal does accommodate pedestrian and bicycle traffic.
The applicant will be providing bicycle paths and sidewalks and a
transit station, therefore this standard has been met.
(g) The proposed site development, including the architecture,
landscaping and graphic design, is in conformity with the site
_development requirements of this Ordinance and with the standards
of this and other ordinances insofar as the location and appearance of
the proposed development are involved.
Staff: This staff report has discussed the approval criteria as it relates
to site plan review. The applicant's proposal has complied with the
current ordinances and standards as discussed in this staff report.
..........--.--.--.1
/'"
,~~~...;}.
. :....J
EXHIBIT "A"
Page 47 of 79
(h) The location, design, color and materials of the exterior of all
structures and signs are compatible with the proposed development
and appropriate to the character of the immediate neighborhood.
Staff: The proposal is compatible with the immediate character of the
neighborhood which is commercial. Once the reconfiguration of the
commercially zoned property takes place as was approved in
Ordinance 2095, the character of the neighborhood will still be
commercial.
Section 11.085 Time Limitation
At the time of final approval the applicant has six months to initiate
construction. If construction has not begun within this time frame,
the applicant can request, in writing, a six-month extension. The site
plan becomes void one year after final approval, therefore, the
applicant would have to reapply after that time period.
Chapter 29 Commercial Retail
Section 29.010
Within any CR Commercial Retail District, No building, structure or
premises shall be used, enlarged or designed to be used, erected,
structural altered or enlarged except for one or more of the following
uses:
(a) Any use permitted in RM district and Commercial Office District
(b) Amusement and recreation
(c) Communication
(d) Community service
(e) Printing and publishing
(f) Retail
(g) Retail and service
(h) Service
Staff: The proposed retail outlet center shall be permitted to conduct
anyone of these allowed uses in a Commercial Retail zone.
Page 10 - SPR93-22
. ., .~,. ..,... ,
~--,
~ - - \
~--~"
...
EXHIBIT "An
Page 48 of 79
Chapter 30 Commercial General
Section 30.010 Use
Within any CG Commercial General District, no building, structure or premises
shall be used or arranged, except for one or more of the following uses:
(a) Any use permitted in the RM, CO, and CR Districts
Landscaping Standards
Staff: The applicant is providing 93242.94 Sq feet ( 16.40%) of landscaping,
the standards require 85,235.68 Sq. feet ( 15% ) of landscaping be provided.
The applicant has meet this criteria.
Sign Ordinance Standards
Staff: Any proposed sign will be subject to review and will require a permit
issued by the Building Official. .
V COMMENTS FROM OTHER DEPARTMENTS:
Engineering: See attachment A
Fire Dept:
See attachment B
Wastewater Dept: See attachment C
Building:
See attachment D
Police:
See attachment E
VI ADDITIONAL STAFF COMMENTS:
A. The request complies with the Comprehensive Plan and Comprehensive Plan
Map.
B. The proposed use is allowed per Chapters 29 and 30 of the Zoning
Ordinance.
C. The site plan is in substantial conformance with Chapter 11 Site Plan Review.
D. The applicant has submitted sufficient information as required Po/ Chapter 11
Site Plan Review.
Page 11 - SPR93-22
T
"--'-"--~----"-~--~'~._'-' I
,..............,.$..,
VII
CONCLUSION:
EXHiBiT "A"
Page 49 of 79
The applicant is requesting site plan review approval of an approximate 85,000
square foot retail outlet center. The proposed use and improvements have been
discussed in detail by the applicant and in this staff report.
VIII RECOMMENDATIONS AND DECISION:
Based on the findings in this report, staff recommends approval of this application
subject to the following conditions:
A. No development can be permitted until the Planning Commission and City
Council have approved modifications to Ordinance 2095 and 2098.
B. The proposed development shall be in substantial conformance with the
preliminary plan.
.
C. After preliminary approval, submit a landscaping and irrigation plan to the
Planning Department for review.
D. Approved backflow devices and grease traps shall be required (Ann O'Roke
Wastewater 982-5283).
E. Submit sign plan to Building Official for approval and permit (Bob Arzoian
982-5250).
F. On-site construction shall not commence until the improvement plans have
been reviewed and approved by the Public Works Department and all right-ot-
way permits, system development charges have been paid. Refer to part two
Pg 9 of the standards document for site plan preview (Randy Scott 982-
5247).
G. Upon acceptable completion of all improvements to be maintained by the
City, the applicant shall provide the City a maintenance bond good for one
year, in the amount of 10% of the improvement cost.
H. Prior to occupancy permit issuance, the applicant shall submit one set of
reproducible as-builts.
I. Conditions of Approval also include the following attachments as submitted
by:
Public Works Department
Wastewater Department /
Building Department
Fire Department
J. Prior to building permit issuance, pay appropriate Systems Development
Charges in effect at that time.
Page 12 - SPR93-22
. T
'~.,~'-"~~
~
,......
~XHIBIT "A"
Page 50 of 79
SITE PLAN REVIEW
--..----- -. --.
Capital Development
GENERAL COMMENTS:
1. Show split diamond interchange
a. Minimum 100 ft. right-of-way
b. Slope easements
c. Locate development outside of that area
2. Show proposed utilities
3. Payment of conditional grant will be required.
GENERAL CONDITIONS:
1. Final plan shall conform to the construction plan review procedure and stmdards.
2. Franchised utilities and street lights shall be installed with the development.
3. The applicant is responsible for all permits or approval from state and federal
agencies which may be required.
4. All work sball comply with the City of Woodburn's standards and specifications.
5. Off-site traffic mitigation may be required by Oregon Department of
Transportation.
STRRHT AND DRAINAGE
1. Prairie Blvd. shall be a 100 ft. dedication, 54 ft. improved surface providing two
travel lane, two bike lanes and one turn lane.
It shall be improved from Stacy Allison Way to it's intersection with Outlet Ave.
This will be required to be connected to Parr Road, however, not with Phase
One.
2. Interstate Way shall be a 60 ft. right-of-way dedication with a 10 ft. utility on the
east side; a 42 ft. wide improved surface to Outlet Ave., 34 ft. wide improved
surface from Outlet Ave. south.
/
AJ.A~(.~ men\- A
.. T
,. .'-~~-~-"-"-----r'~<'
r.
.~_.
EXHIBIT "A"
Page 51 of 79
Interstate Way shall be improved from the end of Stacy Allison Way to the
intersection of Outlet Ave. Interstate Way shall be completed south with Phase
Two.
3. Outlet Ave. shall be a 60 ft. right-of-way dedication, with 5 ft. utility easements
on each side, 42 ft. wide improved surface from Interstate Way to Prairie Blvd.
4. Sidewalks shall be required with street improvements.
5. Storm sewer for streets and on-site storm discharge shall be provided by the
drainage way on the west side of Interstate 5. This will require a bore under 1-5,
on-site detention and sized for future improvements. This will also require
approval and permit from the Oregon Department of Transportation.
SANITARY SEWER
1. Sanitary sewer service will be provided by a gravity main from the lift station at
the southwest corner of the Wal-mart site.
The sanitary sewer shall be sized and of sufficient depth to provide for future
development.
2. Dedicate to city a 25 it. wide utility easement from the above referenced lift
station to the south line of this development for future installation of sanitary
sewer improvement.
3. On-site services shall be private, not city maintained.
WATER
1. Water main for domestic and fire protection service shall be as follows:
a. Install 12" dia. water main from existing main at the southwest corner of
Wal-mart site along Interstate Way to Outlet Avenue, along Outlet Ave.
to Prairie Blvd., extend to south end of Prairie Blvd.
b. Install an 8" diameter main from the existing main at the end of West
Hayes, amng Prairie Blvd. ~o the propoSed 12" diameter main to complete
the loop. .
c. On-site water main shall be sized according to fire protection requirements
and shall be a looped system. A 16 ft. wide easement will be required.
-.or ~.. . ~._~...~._--
I
r
,
~
EXHIBIT "A"
Page 52 of 79
d. Backflow prevention devices will be required depending on water usage
and on all fire and lawn sprinkler systems.
e. Backflow devices shall be installed outside of the buildings
f. Water meters shall be placed within easements.
....._'
~
vv~
Tf~
MEMO TO: Teresa Engeldinger, Planner
City of Woodburn
FROM: Bob Benck, Fire Marshal
Woodburn Fire District
RE: Woodburn Crossing
DATE: Dec. 8, 1993
2/23/ q1
EXHIBiT "A"
Page 53 of 79
Site Plan Review Comments
WOODBURN FIRE DISTRICT
A. ACCESS: Minimum access is provided, concerns over "control gates & location of 7 ft.
fence on south property line.
B. FIRE FLOW: Maximurn for anyone building based on sprinkled facilities will be
2000 gpm.
C. HYDRANTS: Hydrants to be spaced at intervals not to exceed 450 feet apart and
located within 25 feet of the sprinkler FDC. Buildings A & B will have a minimum
of three hydrants with in 500 feet of all sides, and building C two hydrants within
500 feet of all sides.
D. SPRINKLERS IFDC: Buildings A,B, and C are to be sprinkled to meet Fire flow
requirements. Fire Department Connections for the sprinkler systems are to be
located clI.ofthe building at a location within 25 feet of a hydrant and at a location
approved by the Fire District. .
E. ALARM SYSTEM: Sprinkler systems will be monitored by an a approved 24 hour
central station.
F. PREMISE IDENTIFICATION: Address to be located and visible on each building.
GCONDITIONS FOR CONSTRUCTION: No cOmbustible construction may begin
until an acceptable and approved on site water system is installed and operational.
This system must be accepted by the City of Woodburn and meet their standards.
Driveable access to within 150 of all sides of all buildings capable of supporting Fire
Apparatus must be in place prior to combustible construction.
1776 Ncwberg Highway
Woodburn, Oregon 97071
A~\iYY\e(\-t B
T
"- -"""-"'"'~'..'-~"-'~'."~"-'--'-"'-j-
.
,...
~-
,
-
EXHIBIT "A"
Page 54 of 79
H. BUILDING PLANS: All Fire and Life Safety review must be completed by Marion
County Building Department prior to the issuance of construction pencits.
All buildings must meet minimum Code requirements as established by City,
County,and State regulations. Note: No combustible merchandise or stock may be
paced in any building until the sprinkler system is operational.
/
"- T
("'\
SUBDIVISION/ Silo:: . AN REVIEW - PRE-APPL:l"-""ION/I\I(l~ThIT "A"
AAA^^AAAAAAA^~A^AAA.^AAAAA.^AAAAAA.AAAAA Page 55 of 79
REQUEST DATE: 2/ID/<?( DEPARTMENT: W~~
""""
CONTACT PERSON: Teresa Engeldinger; Planning Dept, 982-5246
APPLICANT: CCjj?f'bl Uc-ve/oprr1r:-rrf c,.
TYPE OF PROJECT: W<A::lIbum CV05:>;':j - 72-e-&d/~..e
PROJECT LOCATION: ~ o-P WA/Nlr;rl-
CONFERENCE
PLACE: Conference Room
Woodburn City Hall
DATE: ,1993
~/dJl11
TIME:
/.30
GENERAL INFORMATION TO APPLICANT
I have read the information sheet provided me and understand that which is pertint!nt to my
Site Plan Review/Pre-Application request. All materials are to be collated and folded.
Signature - Owner/Agent
'1 _
(t/2h..A- a}~Y
a
G-_",,",o ;'> ","'"d or ~~'r ""' ?V<':;:::;{1(Jb-
t:j f? d -, '1;2. :;j (J
-/--93
THE FOLLOWING IS REQUIRED AFTER PRE-APPLICATION CO FERENCE:
1) Eight (8) copies of Final Plan must be brought into Public Works
2) "As Builts" must be provided prior to issuance of the building permit
SPRPRE.FMl
Ai-to..cnmpn-t c..
T
'_."....-~~'~---'-_..~-_..t.
.-
~_:'
EXHIBIT "An
Page 56 of 79
CITY OF WOODBURN CONSTRUCTION REQUIREMENTS
~ACKFLOW ~REVENTION DEVICES
:. FI~E LINE" If any a~tifreeze or chemicals are used in the
f:_re ;,>ystem an approved reduced pressure device (RPI must be
io!stalled on the fire line and on the bypass line. If no
chemicals are used, an approved double check detector check
assembly (DeDel may be used.
Th~ detector meter register must be located on
line outside any enclosed building or structure.
",r,a!:.>le the Water Department personnel to read the
the bypass
This will
meter.
mete-4J -0 RP or
rw~t~.~..J[..~-~_JI
l~et~J.- -E.--I-.
DC
---)
2. DOl-tEST-IC \.ATER LINE- A reduced pressure device. is required
unless otherwise noted. The reduced pressure device is
nel:'essary wherE~ theTe is a potential for a cross connection
'''}.th t'ub" tances thr..t could cause a health problem. A double-
-:he!::-}:: '.-]AVi.C''':''' wOllld be required if where contamination \llouId
~e ('o~lsiJered 2 nuj.sance.
3. IFR:GATION LINE- A reduced pressure device is required
"heTe ;chemicals or fertilizer are used in the irrigation
syster". It double check, pressure. vacuum breaker or
atmospheric v;:,.cuum bre.aker is required if no chemicals are
llsed ~
1\11 devices must. be inst.alled adjaeent. too the water
The deviee must. be inspeet.ed by a St.at.e eert.ified
2f':".t~}" inst.alJat.j.on. The t.est. result.s mailed t.o:
met.er.
t.est.er
Ci t.y of Woodburn
2815 Molalla Rd.
~!oodburn, OR. 97071
WASTE TREATMENT
'..Ias t.e trea tnlen t_ s ys t.ems are required where the f aei I i ty
discharges mat.erial/ int.o t11e sewer t.hat. eould be harmful to
(it.y per5011nl=.1. t.he sewerage syst.em, or the environment.~
GREASE
fc.und
t..r2tl:-
TRAP/OIL ,,<
in t.he Oregon
SAND SEPARATOR- Requirement.s are
Ur:iformed Plumbing Code. A grease
gpm/40 Ibs capaci t.y is required in
meat. depart.!11ent.:..') and ot.her similar
of 2.t least. 20
~eS~atlrallts. bakerVt
~
,
,._-....~.,....._-_...".."_.~.~._..t...~-~_ ..,.
/""l,
EXHIBIT "A"
Page 57 of 79
raciJitie3. A properly sized separator is required for
...=:;1] ca_':.~ ';.la::::!1G:::, t gas st.at.ions and similar facili t.ies.
L. WASTE TREATJ.\ENT SYSTEM- More. complex systems may be
require/j t.e: redu('!e organic loading t met.als, t.oxic and
flammable mat.erials. and <'t.her pollut.ants. The new
facility would he required t.o complet.e an applicat.ion
regardil~g i +- I.; prc.duct.ion and waste discharge.
/
. ... r-'
SUBDIVISION/ Sj ~lA.N REVIEW - PRE-APP;r''3TION/ '--'EXHIBIT "A"
^^^^^~ '^^^^^^^^^^^^~^^^^^^^~ '^ Page 58 of .
REQUEST DATE: /2.~-C(3 DEPARTMENT: 13\A.\ \c\i':j
CONTACT PERSON: Teresa Engeldlnger; Planning Dept, 982-5246
APPLICANT: c...u:p(.\--M- t:::ii2V E l...6p}.1EA/t
TYPE OF PROJECT: ~'i Ou!:\.& .M::<.\l
PROJECT LOCATION: bO\.A...~ c+ VJ~~
CONFERENCE
PLACE: Conference Room
Woodburn City Hall De.e.13
DATE: ,1993 TIME:
7: 3D - ~ 2/~5/qt(
GENERAL INFORMATION TO APPLICANT
I have read the Information sheet provided me and understand that which Is pertll)ent to my
Site Plan RevlewlPre-Application request. All materials are to be collated and folded.
Signature - Owner/Agent
DEPARTMENT COMMENTS
.
/ILl- ?t.II"-'$ .('~,.. e...u""~",";;-":'" S",.'I.. bJ!'" 'u{,_,r7'"EJ. r.. e:r, C<'~ Lob"',
.".'
.f- tf1If.Rtr>< e"''''~7ir' F,R/! L.,'.( E
i- s~~"'.,. ~ r''-~A( R..J, i.w . "'0
/
.
'(.... r,~tf"
.
/:> Prc.v,J.rtt. /ILl- ~E!""S $I,ALL. ~I!" ,?~,d """,,,.,.. r" r...NST,.....r.-:.. S..,L>
.. . .'
lE?T
rJrf ."..a-trd
-
,':JrliTr
.
To
.
PL.,II.t..,.v~
. '""
O'--P
e"f\fc."" rE. e"NcrE Tc-
l,yJ :A/LE?- 5"'--[l- 6 rr TAJ;t'"J( -{".r 115'.$ T5
~ 1/ JTi?y s- t>" v "'rei> .
I '
/11.1. b~IL6:","< ShALL C"",,(JLV ~ ,,0.14.
THE FOLLOWING IS REQUIRED AFtER PRE-APPLICATION CONFERENCE:
1) Eight (8) copies of Final Plan must be brought into Public Works
2) "As Builts. must be provided prior to issuance of the building permit
SPRPRE.FMl
~nmem-D
r
... .-.-,.... ....--.....----.--'-..-.-.'1
...............-.....~_._.,~~-_..------_._-~_.~_...-
~,
-
EXHIBIT "A"
Page 59 of 79
CITY OF WOODBURN
POLICE DEPARTMENT
~~~(Q)~[M[Q)(1JJ~
Paul Null
Servlcas Ueutenan
Woodburn, Oregon 97071
982-2345 Ext, 352
December 8, 1993/ '2-/2!3/q1
TO: Teresa Engeldinger, Planning Dept,
RE: Site Plan Review - Factory Outlet Store
The following is a list of recommendations and/or concerns regarding the sIte plan
review of the Factory Outlet Store.
1. Off street parking should be prohibited, "No Parking" signs posted.
2, In order to deter the likelihood of businesses becoming a victim of burglaries,
it is highly recommended that all stores be pre-wired for alarms and that
intrusion alarm systems be installed,
3, Lighting plan for parking, pedestrian and security be submitted, It is
recommended that the builder consider the use of Low Pressure Sodium Vapor
Lighting for street and parking lot.
4.
Please submit a landscape plan for review. Low shrubbery,
are recommended to prevent concealment.
and open trees
5. Restrooms are a location that draw criminal activity, Please submit plans which
include location of restrooms. Restrooms should be in a highly visible location,
well lite.
6. It a Automatic Teller Machine (A TM) is going to be installed, please submit plan
a~ to its location and design. The A TM should also be in a high visibility area
and well lite.
k-\-to.ctw\'\en-t- E
T
, __"_""n"__~ ....-......---------r---,...-
("'"
(""'-
~
EXHIBIT "A"
Page 60 of 79
WOODBURN CROSSING FACfORY OuTLET SHOPPING CENTER
PHASE I, WOODBURN, OREGON
Since the reviewers of this proposal may be unfamiliar with the concept of factory
outlet shopping centers, we have provided a basic description, identifying how they differ
from traditional shopping centers, key industIy definitions of other forms of retail centers
and a profile of typical outlet center shoppers. Much of the statistical information contained
herein is taken from Value Retail News, the official journal of outlet and off price retlliling.
VRN is recognized as the principle authority on the outlet shopping center industIy,
Outlet centers, while in some ways similar to other forms of retail development, stand
out in a class of their own. Here is a snapshot of how outlet projects differ from other kinds
of retail development:
All outlet center development and leasing strategies revolve around what is known
as retail sensitivity. .
The term refers to a manufacturers strict policy of not opening outlet stores close
to its primary wholesale customers, usually major department stores and specialty stores.
Research by Value Retail News quantifies the practice: In a survey conducted late
in 1991, 92 manufacturers said they maintain a buffer zone averaging 20.9 miles from
department stores. Though outlet stores can be highly profitable, their revenues usually are
only a fraction of a manufacturer's total income. That's why manufacturers refuse to open
stores that compete directly with their primary customers.
Because of retail sensitivity, outlet center sites are usually in the outlying areas, well
away from population centers. Most outlet centers developed today are close to major
interstates. They strive for high visibility from the roadway, excellent accessibility, and a
strong passby traffic count.
Three preferred kinds of sites have emerged:
1. Tourist destinations - Outlet centers perform well in, or on highways leading
to, tourist destinations. This market is lucrative because tourists tend to be in a spending
mindset. Examples of tourists locations where outlets are thriving are Branson, Mo.;
Orlando, Fla.; Pigeon Forge, Term; and Iincoln City, Ore.
2. Passby locations - These sites, developed next to busy interstates between
major cities, attract daytrippers, motorcoach tours and interstate travelers. Examples of
outlet passby locations are Kenosha, Wis.; Slidell, La.; Valdosta, Ga.; Our Woodburn
location fits this description.
-I~-
.,..
.-,-
~
-.
EXHIBIT "A
Page 61 of 79
3. Shopper destination - These sites are in "outlet towns," co=unities with such
a high concentration of outlet retailing that shoppers are attracted to them as a primary
destination. Examples of shopper destinations include Reading, Pa.; Boaz, Ala; and
Freeport, Maine.
Of course, some sites do not fit into just one category; there is often some blurring.
Unlike traditional shopping centers and malls, outlet projects usually do not have
anchors. Instead, outlet centers rely on the combined firing power of their tenants.
A few large outlet stores of anchor proportions have emerged, notably WestPoint
Pepperell and VF. Additionally, a sprinkling of hard goods retailers, like Carolina Pottery
and Reading China & Glass, could be considered anchors in outlet projects.
More often, though, it is the cache of a group of sought-after tenants - such a
Polo/Ralph Lauren, Nike and Donna Karan - that become the collective drawing card.
Outlet chains generally prefer to open stores in centers that are tenanted
predominantly by other outlet tenants. Some go as far as to stipulate 80 percent of a
center's tenants must be manufacturers outlets, which is why supermarkets, office-supply
stores or real estate offices are not found in outlet centers.
Further, many outlet chains will not commit to an outlet center until certain industry
leaders do so. Among influential outlet chains in this regard are the Phillips-Van Heusen
stores (PVH operates more than a half-dozen chains), Nike, Polo/Ralph Lauren, Bugle Boy,
Liz Claiborne, Donna Karan and others.
Marketing an outlet center is strikingly different than marketing a regional center.
Because of retail sensitivity, outlet retailers abate advertising that pits them against their
parent company's primary accounts, Additionally, because of their low margins, outlet
chains have small advertising budgets, As part of their rents, however, outlet chains do
contribute promotional/advertising funds, which are controlled by the developer, These
funds are used to promote the center through billboard advertising, direct-mail promotions
aimed at motorcoach operators, brochures distributed at rest stops, and ads in tourist and
regional publications. Radio spots are sometimes used; television much less so.
Kick-out clauses, once co=onplace, are all but dead in the outlet industry. Five
year leases are the status quo with some leases of seven years or more being consummated.
Increasingly the trend is toward longer leases.
In 1991, Value Retail News asked outlet retailers about the average discount in their
stores and they said it was just over 40 percent.
/
-\It-
'....^..
,-""_.~. _.~'T"--,..-..~.-."
..-
.-
EXHIBIT "A'
Page 62 of 7~
Value Retail News asked nearly 3,000 shoppers what they thought their average
savings would be during an outlet trip, and they estimated about 25 percent.
Then Value Retail News sent researchers into the field to check prices on identical
items found in outlets and conventional retail stores. The result: on 13 identical, first
quality items, the outlet savings averaged 27,5 percent.
Whatever the true percentage of savings is, outlet retailers say they are cogni"Jlnt of
the critical importance sharp pricing plays in attracting consumers.
Some Key Industry Definitions
Outlet stores are owned and operated by the manufacturer, They sell primarily the
parent company's merchandise, generally end-of-season, overruns and closeouts, and allow
the manufacturer to control distribution of these goods. Most outlet chains also buy a
limited percentage of outside goods to supplement their merchandise mix. Outlets must
avoid competing with their wholesale accounts, so site selection principles for these chains
are unique and critical to their success. .
Off-price chains sell branded goods at reduced prices every day. Off-price retailers
are distinguished from outlet chains by the fact that they are not owned and operated by the
manufacturer whose goods they carry. The percent of branded merchandise and amount
of markdown varies chain to chain. Examples of this niche are off-price apparel chains,
category killers and membership warehouse clubs.
Value retailing is the "umbrella" term describing the industry, including all stores that
sell branded merchandise at reduced prices. The term encompasses outlet and off-price
retailing.
Discount stores sell inexpensive merchandise cheaply, as opposed to value retail
stores, which sell branded or quality merchandise at reduced prices. The distinction is not
always clear, however: 25 percent of K-Mart's apparel mix today is branded merchandise
and another 25 percent consists of its own heavily promoted private-label goods.
/
- \~-
,."___._, . ,e.',' ,.".._., _~"_.._~_~.___.~_..__.,.., ._.____~__.~".__.____.
P""!j.-.
EXHIBIT "A"
Page 63 of 7,
I..,...;,
"
Outlet Center Shopper Profile
:.T" .... he majority of outlet shoppers are affluent,
~ well-educated , working women who shop
~ mainly for brands and bargains, according
~... . to two surveys conducted by Value Retail
News in December 1990 and August 1991.
So similar were the results of each survey,
conducted at 25 outlet centers across the country,
that a clear shopper in all.
Furthermore, a separate survey of 7,399 outlet
shoppers, conducted in July 1990 by New York
City-based Dataplan Inc., revealed a corresponding
shopper profIle.
An Upclose Look at the Outlet Center Shopper
When Shopping, what's Important?
According to these surveys:
. the income level of outlet center shoppers is high: 44
percent put their annual household incomes at more than
$50,000;
. the average amount spent by shoppers during an outlet
visit is $147;
. the average distance travelled to a center is 77 miles;
. 77 percent of those surveyed will visit a center more
than seven times a year if the drive is less than one hour;
. 46 percent will visit centers more than fIve times a year
if the drive is less than one day, according to Dataplan;
. an extensive survey conducted by a major outlet
developer showed that 28 percent of its shoppers visit one
specifIc outlet center seven times a year.
Household Income
Price
Quality
Selection
Convenience
Service
47%
37%
90/0
4%
2%
$100,000 or more
$75,000 to $100,000
$50,000 to $75,000
$30,000 to $50,000
$20,000 to $30.000
Up to $20,000
Some high school
High school graduate
Some college
College graduate
Post-graduate studies
Sour.:.a:Value~News
Sol.aru: v..... .... News
iowa: v*", htaI News
Frequency of Outlet Center Visits
:l
0"
"> 6
-
o
~
.8 4
E
~ 2
7.29 D This year . Next year
'""en<
responding 67'M:l ~
42'Mo ....
,... .....
Proximity WIthin.
of centen l-hour drive
Sow.:e:o.uplanIlK.
< l-d.ys drive
Visited while
tr..vellng
7%
10%
27%
26%
18%
11%
'90 '91
6% 6%
26% 22%
32% 29%
24% 29%
10% 13%
,...- The Outlet Shopper by Age
25.. 0 1990
.1991
"
01_
..
~
c
~
"
Q.
,...
20-29 30-39
ScM.ru: V41.... Retail News
40-49 50-54 55--64
age
65+
-.-..... ...,-_."r'....,,_._-_..,.._--~.,-"
-\10-
~
~-
"'- ,..~,~:
EXHIBIT "A"
Page 64 of 79
Project Design
Although the approvals sought in connection with this request involve only a small
portions of the total shopping center project, we felt it important for the reviewer to
understand the rationale for the unique figure eight design of the completed project.
WOODBURN CROSSING has both exceptional exposure from Interstate 5 and to a major
aterial (Prairie Boulevard), In an effort to keep from creating a traditional "front and back"
of the center, Thomas Ellicott created a center with effectively two "fronts" with service
corridors contained within the figure eight. In the center of the eight is a common mall and
food court that acts as a passage way to either side of the center, This design enables the
project to keep service traffic, refuse collection, utility connections and other unsightly
activity away from potential visual pollution to nearby neighbors in the Senior Estates
Development. The developer proposes to work closely with Senior Estate's representative
as this project moves forward.
/
- n-
"-,.,.----......--......-. ..._~-~-" ." ~."----_.--..._---. ..'-'-"""'--
~-
~.
.,....J
BUILDING CONSTRUCfION AND MATERIAL
EXHiBiT" A"
Page 65 of 79
1. FOUNDATION: The foundation will be slab on grade, engineered and designed
by a licensed structural engineer.
Each building will be separated by a minimum of a 24 foot wide drive way with
controlled access. This will allow access to the center courts which will contain
employee parking, delivery area and emergency vehicle access, We will provide knox
boxes at each access gate for emergency purposes.
2. Roof construction will use pre-engineered manufacturer metal trusses covered with
a blue corrugated metal roofing. Building "B" will have a multi-colored, pyramid
shaped metal structure on top.
3. The building shell will be constructed with metal studs. The exterior material will
be off-white rough textured dry-vito
4. Interior construction will be metal studs with 5/8" gwb type "x" for fire separation
between retail tenants. Each tenant space will have HDC accessible restrooms, one
for employees and one for customers. Each tenant space will be fully sprinkled.
5. The building will have a sprinkler system designed and engineered by a licensed fire
protection company.
6. Sanitary sewer service will be provided by a gravity main from the existing lift
station at the southwest comer of the Wal-Mart site, A 25' utility easement will run
from the above lift station south along Interstate Way to the most southerly property
line owned by Capital Development Company, The sanitary sewer line will be 6"
diameter pipe at an average depth of 15'. We believe this will provide adequate size
and depth to allow for future development.
7. In addition to sanitary sewer line, we propose to incorporate a 12" water main from
the existing main at the southwest comer of Wal-Mart site south along Interstate
Way to Outlet Avenue. Also to install an 8" main from the existing main at the end
of West Hayes, along Prairie Boulevard. A 6" main will be installed to provide on
site fire protection. A 16" wide easement along Prairie Boulevard will be dedicated
for water main. Approved backflow prevention devices will be installed on all fire
and lawn sprinkler systems and on the outside of all buildings.
-\8-
'....-..--..--...'---.".--.-..------.....---'.'."
......
--.-
,-,;(
EXHIBIT "A"
Page 66 of 79
Section 8,040,
Special setback distances.
(19) Oregon State Highway 214, Interstate 5 to Oregon Way 50 foot
setback
The proposed setback from the center line of Interstate Way to the nearest structure is
238'1 ".
The setback from the center line Prairie Boulevard to nearest structure is 370'0",
The setback from center line of Outlet Avenue to nearest structure is 82'0",
Section 8.140, No parking in front yard or landscaped areas.
"No Parking" signs will be placed around the perimeter of the site at an interval of no less
than 200' and no more than 500' or as required.
Section 10.050. OfT street automobile parking requirements.
(w) Retail store (1) one space per 500 square feet of gross floor area, plus one space per every
two employees.
Our site parking calculations are based on tenant requirements which in most cases exceed
city ordinances. In this case, our calculations are based on (1) one space per 200 square
feet of gross floor area, plus one space for every two employees.
Section 10.070. Parking and loading area development requirements.
(b) Surfacing:
All parking areas will be paved with asphalt, all areas will be graded for on site
retention of storm water runoff,
(c) Bumper guards or wheel barriers.
Every other parking area will be constructed with a 5' landscaped island with curbing
for vehicle stops. Other area's including HDC stalls, to have appropriate wheel
stops._
-\~-
_ ,_~_ .k__.__....__'_.,..___'__~~.._.~~__".,
"""'
EXHIBIT "A"
Page 67 of 79
(d) Size of parking spaces and driveways.
1. All parking spaces are designed to exceed required sizes. Standard stalls are
9' -0" wide, 20' - 0" depth with 24' drives, With the exception of handicap
stalls. All HDC stalls are of sufficient size and design to meet or exceed
HDC van requirements. HDC stalls are to be 13' - 0" wide by 20' - 0" deep
with a 9' - 0" wide stripe access island. All HPC stall areas and curb cuts are
to meet ADA standards,
2. A maximum of 8 percent grade will be used for all parking areas,
3. Painted direction arrows will be used in all parking areas to control traffic
flow.
Section 10.080. Driveway standards,
(d) (Two) driveways are proposed for Phase I off of Outlet Avenue, will provide
ingress and egress to the site, These driveways are designed for two lane approach
28 feet wide with 20 foot radius at curb cut.
(i) Driveway 1 is 150' from the intersection of Interstate Way and Outlet Avenue,
Driveway 2 is 240' from the intersection of Outlet Avenue and Prairie Boulevard,
Section 11.020. Site plan composition (A-H)
(a) Site plans are submitted, drawn to scale and submitted, showing layout of Phase I and
Phase II of project. These plans are divided into (1) general site plans, (2) parking layout,
to include set backs, parking lot lighting, traffic flow, stall details, HDC stall details, HDC
sign details, utility easements, bike paths, sidewalks and street widths, (3) landscape plan,
showing landscape areas, percentages, plant types and locations. Also including fire hydrant
locations and street lighting.
Typical building elevations drawn to scale showing exterior dimensions, type of construction
material and colors.
/
-10-
, -----..,.. ,.~.- 1"
-.
~
, L
Chapter's 29 and 30 "Commercial Retail District"
EXHIBIT "A"
Page 68 of 79
"Commercial General District"
As described in the beginning of this narrative, Phase I will be for factory outlet retail
spaces.
We propose to separate the co=ercial retail area from residential area by a major arterial
"Prairie Boulevard". Also, the center is surrounded by landscaped areas providing a visually
pleasant transition from co=ercial retail areas and residential zoning areas,
Section 29.080.
"Conditions Imposed Where Zone Change to CR District Abuts
a Residelltial District.
(a) A pole sign will be located on the north east property approximately 800 feet away
from residential areas. Individual tenants will only have a wall mounted sign on the
building facia.
(b) Outdoor lighting will be installed in such a manor as to deflect the light only to
illnrninllte the streets and parking areas.
(c) Landscaping is designed to provide a pleasant transition between the two areas.
(d) No screening.
(e) Building setbacks exceed the requirements set forth by appropriate ordinances,
(t) Ingress and egress are designed to be on property lines of two co=ercial retail
areas.
/
- 2\-
L
EXHIBIT "A"
Page 69 of 79
Woodburn Crossing Parking and Landscaping
3 a. Garbage collection will be placed in the center court area consisting of a cement
apron and screened on all sides by a cyclone storm fence. Also a 3 foot landscaped
strip on 3 of the 4 sides.
b. Loading and unloading areas will be in the center court area of the figure eight
constructed building, as well as the utility areas. As stated above, the utility areas
will be provided with a 3 foot buffer area.
IV. Landscape Maintenance.
All landscaping will be maintained on a weekly basis to keep it free from debris,
assure proper growth and promote visual appeal, At no time will parking be allowed
on any landscaped area.
VI. lighting of the street frontage will consist of high sodium vapor with 10 and 15 foot
arms to insure proper spread of light. The off street parking will also ronsist of
single and double high sodium vapor lights to insure proper lighting of all areas.
VII. Landscape Plan Elements.
1. The number and size of all trees are listed (A1)
2. Buffer areas are not applicable at this time,
3. The proposed landscaping is broken into two (2) major components, street
frontage and parking lot.
a. Street frontage to be a minimum of 42,228.32 square feet consisting of
two (2) large trees per 100 feet and various plants, shrubs, and
evergreens as required by City of Woodburn standards document.
4. Irrigation will be as stated in the irrigation section of this narrative.
VIII. Landscaping Requirements (see sheet A-1)
B. Co=ercial Strip Zones.
1. Total surface area = 568,237.68 sq. ft.
Required 15% = 85,235.68 sq. ft.
Street frontage actual = 42,228.32 sq. ft.
Parking lot actual = 51,014.62 sq. ft.
Site actual =/ 93,242.94 sq. ft.
-1L.-
..........- ,.'------.. .._"-~,-_... --"-,".,,_...,.._-,-,--~.,_. -~~,_.---,---,.
~,
:;;-.
..L
t::XHIBIT "A'
Page 70 of 79
2.a The street frontage landscaping will consist of a 10 foot wide (min.)
landscaped strip, that will exceed the required landscape percentages, police
department and fire department standards.
3. The site is to have fire hydrants placed not less than 450 feet apart and
located within 25 feet of the sprinkler FDC. Building's "A & B" will have a
minimum of 3 hydrants within 500 feet of all sides, Building "A" will have 2
hydrants within 500 feet of all sides. As required by City of Woodburn fire
marshals.
4. Impervious surface requirements:
Total impervious surface =
Required at 10% =
Total site actual =
233,868.5 square feet
23,386.85 square feet
25,196.1 square feet
Approximately 1809 square feet in excess of the required amount needed, As per City of
Woodburn ordinance.
SIGNAGE
We propose to erect a pylon sign advertising Woodburn Crossing Factory Outlet Center on
the north comer of our property at the intersection of Outlet Avenue and Interstate Way.
It will be a freestanding sign directly supported by poles or foundation supports in or upon
the ground and meet the appropriate requirements outlined in the state of Oregon structural
specialty code (Ordinance No. 2092 Section B freestanding sign, item 1) and not to exceed
a maximum area of 150 square feet and height of 35 feet per ordinance integrated business
center, item A
Also proposed is a freestanding monument sign for secondary frontage on Prairie Boulevard
and Outlet Avenue. This sign will not exceed 32 square feet in area and will not obstruct
driver visibility from any direction.
Individual business tenants in the Woodburn Crossing Factory Center will be allowed one
wall (or fascia) sign limited to an area no larger than 30 square feet or one square foot per
foot of frontage on a street or parking lot in compliance with Council Bill No 1421,
Ordinance No. 2092, Section 12 Signs allowed for an integrated business center, Items C &
D and one under the canopy sign not to exceed 60 square feet in area.
/
-l~-
_.' _.__' - __ ,_._.,_......._.,_~.__ ~.__ ,_.+_.~,._.__.. .__..___.,...._._. . h'.__..__...._-__._."'._
........
EXHIBIT "A"
Page 71 of 79
Chapter 11
Section 11.070 (a) through (h)
(a) The adjacent properties are at this time undeveloped and are owned by Capital
Development. The properties that abut this site are zoned for commercial use.
(b) Landscaping will be designed to have a visually appealing break between properties.
(c) Landscaping will be designed by a landscape architect that is familiar with this area.
This will allow us to design the landscaping so as to conform to the surrounding area.
(d) Phase I has been designed to have ingress and egress at "Outlet Avenue" north of the
structure. By having access at Outlet Avenue, this will allow traffic to flow east to
Interstate Way or west to Prairie Boulevard. Phase II of our project will be designed
to have ingress and egress on the south property line. Minimi7.ing traffic problems
on the main arterial, Prairie Boulevard.
(e) The project is designed to have on site retention with overflow to be tied in with an
existing overflow system north of our site.
(t) By placing the structures north and south, this allows pedestrian and bicycle traffic
to flow easily from north of WalMart to the south. With this figure eight open
design, we believe this will allow more exposure to the sun for solar heating. The
placement also minimizes shadow casting on major streets and roadways.
(g) As stated in this narrative and with the preliminary drawings we have shown great
concerns in following the appropriate codes and ordinances.
(h) The immediate area surrounding our project is undeveloped at this time.
-24-
~. --~- '--..r.. -..-. ---
;1,!>
\.. )
!l.tl
PART V
EXHIBIT" A"
Page 72 of 79
"-.'ll
" .~~
--
MEMORANDUM OP/NION 93-04
EXHIBIT "A"
Page 73 of 79
--------- -- ---
RE:
STEVE GOECKRllZ, COMMUNITY DEVELOPMENT DIRECTOR
N, ROBERT SHIELDS, CITY ATTORNE~~
PROCEDURE APPLICABLE TO CAPITAL DEVELOPMENT COMPANY
LAND USE REQUEST
To:
FROM:
DATE:
NOVEMBER 23, 1993
* * . . . . . . . . . . * . . . .
.
You have recently provided me a copy of a letter from Capital Development Company
(Capital) to the city (attached) requesting that the city -amend its' current no
development condition on our annexation ordinance to reflect a Phase I development
of 95.000 square feet, provided we can satisfy O.D,O.T. and the City of Woodburn
that we can Improve existing levels of service on the 214 Interchange by the time the
Phase I construction is complete,-
Your question, as I understand It, Is what procedure should be followed for the city
to consider Capital's land use request while stili complying with applicable state law,
Since I know that time is a critical factor in most development proposals, I have
expedited my response to your question so that you can advise Capital of the
appropriate procedure.
Facts
In May 1992. Capital submitted applications for an annexation and a zone change.
The Woodburn Planning Commission recommended approval of both applications. On
October 13, 1992. the Woodburn City Council passed Ordinance 2095 approving the
annexation and granting the zone change subject to certain conditions, On December
30. 1992 the City Council. with the consent of the applicant, acted to clarify the
language of one of the three conditions attached to the zone change approval. The
final form of the condition reads as follows:
Assist the city in amending its 1985 transportation plan for the Highway
214, 1-5 Interchange Parr Road area, prior to development, to bring it
into compliance with OAR 660-12-060 (1 lib) regarding adeq!Jate
transportation facilities to support the proposed land uses, No
development of the property or reconfiguration of the land use
\
~
'(~l
. L
Memorandum Opinion 93-04
Novembe 23, 1993
Page 2
EXHIBIT "A"
Page 74 of 79
designations will be permitted until the transportation plan for this area
complies with OAR 660-12-060 (1)(b).'
The remaining two. conditions on the zone change approval are as follows:
Prior to any development of the 173.84 acre parcell the. comprehensive
map be amended to generally reflect the applicant's proposed land
configuration (C,P 92-02),
\'
Any reconfiguration of the land use designations maintain the same
ratios as identified on the original comprehensive plan,
Procedure
Under Oregon state law, the actions taken by the city councit to approve the
ordinances were .Iand use decisions. and were subject to appeal to the Land Use
Board of Appeals (LUBA) within 21 days of final action. ORS 197.830, An appeal
to LUBA could have included a request to modify or delete any conditions attached
to the approval, However, at the time the decisions were made, Capital agreed to the
conditions and a LUBA appeal was not filed,
Since no LUBA appeal was filed within the required time, both land use decisions
became final. Thus, Capital is presently subject to the condition imposed on the zone
change that no development of the property or reconfiguration of the land use
designations occur until the transportation plan for this area complies with the state
transportation planning rule.
As acknowledged in Capital's letter, the transportation plan for this area is not yet
approved and is still under consideration, Yet Capital indicates that it now wants to
proceed ahead with a phased development proposal and solicits the city's response
as to how to "amend" the "no development" condition,
Legally, it is clear that Capital can not proceed under the terms of the present land use
decision until the transportation plan amendment occurs. If Capital now wants the
city to consider a phased development proposal without fulfillment of the condition,
it must submit a new land use application to the city for a modification or deletion of
the "no development" condition, This new application should be submitte4 to the
planni'ng department and is subject to the normal process of planning commission and
city council consideration, When the city's process is complete, it will result in a new
2
.~ "'-~'T"--" ._,....~._._._. _u.
".
1.
EXHIBIT "A"
Page 75 of 7
Memorandum Opinion 93-04
Novembe 23, 1993
Page 3
land use decision (approval or denial) by the city council that is again subject to appeal
to LUBA,
Conclusion
In conclusion, it is my opinion that Capital must submit a new land use application in
order for the city to consider Its proposal for a phased development at this point in
time. This is because the zone change approval granted by the city contained a
condition that no development of the property or reconfiguration of the land use
designations occur until the transportation plan for the area is completed. Since
Capital originally agreed with and did not appeal this condition to LUBA, It must now
submit a new land use application if it wants the city to consider modification or
deletion of this requirement,
NRS
cc: Chris Childs, City Administrator
.
/
3>
"'._"~".~ ~"",-~""-"~,,,,,-,,"""-'--'''--"-'''~--'''''--'-'-~'-'
'-
"};,,
nrST 3 Hit',. 1<AtNT
EXHIBIT "A"
Page 76 of 7~
5/04/84 10 \Ze
April22,1004
.,...
....
AI..
DIlPMn'MIlNT OF
~SPOR1lTION
. Mr;-8teve Goee\aitz. Director
. Plailnlng Department
City of Woodburn .
270 Montgomery Street
Woodburn. OR 97071
tlLE COllE:
SUBJECT: Woodburn Croa.lng FactoryOuOetConler-Capltlll Development co.
Distdct 3
Dear Mr. Goeckritz:
Thank you for meeting with Oregon Department ofTralllportatlon (0007) .taff on April
21 to disCUG8 rcaofution of transportallan 1ss1Hl8. ODOrs principle concern 1$ with
ensuring that the operation of Slate HIghway 219 and the J.5 interchange are not
futther degraded by area development. We hevv limited our review and
recommend~ns to Impaeta and improvements to the state highway system only.
In reeognition of the above, and in an effort to ensure that proJect-g.nerated traffio
reli:uit$ In Wno net impoc:t" to the transportation 6}'St8m, ODOT requests that the
following conditioll$ be adopted as part of the ac:tion on the proposed faetoly outlet
center:
1. Prfor. to the Issuanoe of a grading permit or buDding permit. whichever
occurs first, the applicant aheN submit plans for the folloWing
Improwmentl fortho ,.lIiGw and approve} oftha DIs1ric:t Manager; OfR(1On
Department of T,.nf~fion. DIstrict 3:
WidenIng end striping the /-5 northbound off-ramp to Include
separate left and tfght tum lanes.
Wtd6f1ing snd strfplng the /.5 ~uthbound off-ramp to il1c;{ude .
separate left Bnd rfght tllm lane$,
Instell a traffic signal et the 1.5 northboUnd rampsA-lighway 214
Interseotion.
. Install centormedlan conftol on Highway 214 from the northbound
1.5 ramps to Evergteon,
Instafl right tum lanes at the follOWing locations:
eastbound Highway 214 to ~outhbound Ellerprean
eastbound Highway 219 to southbound 1-5 on-remp
/westbOUnd HIghway 214 to northbound 1-5 on-ramp
.
~lmll~
88.~ A 1'J'<"l Road
Sol""" OR 97310
lS03} 986-2Jl74
PAX (503) 986-2081
Lt
. ..-- ..---...,.--..- ,_.~---_...._._-'
U~/U4/g4 JO:27
-,
U30. 1038
,~
DIST 3 llltY 1l.'INT '...-
EXHIBIT" A"
Page 77 of 7~
2.
Prior to the muMCe of sny Ps""it for use and OCCUpancy, the
inIPlO~/$ specir/ed in Condition 1 shaH be Installed and operational
In a manner mHting the approval of thtJ DIWict MBlIager, Oregol/
Def)aftment of T ranspotfaUon. DisIrict 3.
. Based on analysea prepared by tho epprlCllnt 8.M ODOr ataff, we are conrldent that
iostallaUoo of thoso ~ will a$Sure that existing levers of service on state
fad/Illes are maintained, ODOT Ie also prepaced to Participate In the cost of installation
of tile traffic lignal at HIghway 21W1-6 nolthbound ramp-Intersection and the conter
median control on Highway 219.
,
,
Thank you for the opportunity to review and comment on thla proJect. ODOr
apP/llC/ates tho OOOperative ell'orts of the City of WOOdburn stat!' In bringing rhese
issues to dosure. This Iettor .hou/d be Included In the hearing record 8S ODOT
testimony. OOOT should be conslc/ered a party to the hearing and be entitled to
nolkea of future hearing., or helllfng continuancea or extensions. P/eaee Provide me
. with II copy of the dty'c dOci$Ion. inclUding findings and coneIllslOne. .
Yours truly,
d;\-.
JoIin\Gl'lI8sman. P,E.
District 3 Manager
C: Dan Fricke. OOOT. Region 2
Dlck Reynolds, OOOT Corridor and General Planning
Mellucas, OLCO
John Donaldaon, Capital Development Co,
/
- -.. ~ .-- ._---~._.. -.-.- .-. -. -...-... --....-.-.- .
5
,..___~.. .~A..~'--.."--'-...--
WlDeNANDSTRiP~OfT lWoa>
EXHIBIT "A"
Page 78 of 7
-
,
. INSTALL RIGHT
1lIRN I..AlfE
.~
I
I
,
I'
I
1
I
I
I
I
,
I
I
,
,
I
"'
.
I
I
I
I-
I
,
I
I
I
.,
."
i
,
KV 400,0J0 S1n
ImIlllU1iQrj CI:Hlal
~
..
!
.f,1
~
IIIU'
------~-------------
.. ..-
---
,
I
---
':~l'" .:.
,
, I
,.
11
'"
.,"
II
mi'
"!-'
----------
. ..'
II
. 11
:
,
,
1\/\ A ? I
- - -----. . _..-.." '--r- ------.....----.-..---. ---... --_.0
...~
EXHIBIT "An
Page 79 of 79
t'ROPOSED ACTIONS
Recommend to Council:
A. Amend Ordinance No. 2095 Exhibit" A"
. . .
,
,
~onditions of Approval
1. Prior to any development of the 173.84-acre parcel, the
comprehensive map be amended to generally reflect the applicant's
proposed land configuration (C.P. 92-02).
2. Assist the city in amending its 1985 transportation plan for the
Highway 214, 1-5 Interchange, Parr Road area, prior to
development, to bring it into compliance with OAR 660-12-
060(1 Hb) regarding adequate transportation facilities to.support
proposed land uses.
Number 2 was amended by Ordinance No. 2098 to read:
Assist the city in amending its 1985 transportation plan for the
Highway 214, 1-5 Interchange, Parr Road area, prior to
development, to bring it into compliance with OAR 660-12-
060(1 Hb) regarding adequate transportation facilities to support
proposed land uses. No development of the property or
reconfiguration of the land use designations will be permitted until
the transportation plan for this area complies with OAR 660-12-
060(1 Hb).
Numbers 1 and 2 of Exhibit" A" of Ordinance 2095 as amended by 2098
Be amended to reflect the applicant's ability to initiate Phase I
development of this project prior to any adjustment of the
comprehensive plan map which would reflect the applicant's proposed
land use re-configUration.
B. Approve the site plan with conditions as outlined by the city and Oregon
Department of Transportation.
MISC\SUPDOC.CAP
Co
- _.._. ._._._ _.__...,....- ._.__..__...... ._.._.. .__. __. ...0_.', __...