Ord 2189 - Site Plan App 95-10 COUNCIL BILL NO. 1784 ORDINANCE NO. 2189 AN ORDINANCE GRANTING SITE PLAN REVIEW APPLICATION 95-10 (LUBA NO. 95- 195) ON REMAND; MAKING FINDINGS AND CONCLUSIONS; AND DECLARING AN EMERGENCY. WHEREAS. the applicant, Gary LaPoint, originally applied for Site Plan Review approval in case 95-10; and WHEREAS. the City Council granted the application in Site Plan Review Case 95-10 and this decision was appealed to the Land Use Board of Appeals (LUBA) in LUBA No. 95-195; and WHEREAS, after its review, LUBA remanded the case to the City Council to address two assignments of error: Woodburn Zoning Ordinance 11.020(d) (Exterior Surfaces) and Woodburn Zoning Ordinance 11.020(e) (Sign Plan); and WHEREAS. the City Council conducted a remand hearing on March 10, 1997, and heard testimony relevant to the assignments of error; NOW. THEREFORE. THE CITY OF WOODBURN ORDAINS AS FOLLOWS: Section 1. The City Council, after considering the testimony at the remand hearing, grants Site Plan Review Application 95-10 (LUBA No. 95-195). Section 2. This site plan review application is approved based upon the findings and conclusions contained in Exhibit" A' which is attached hereto and by this reference is incorporated herein. Section 3. This ordinance being necessary for the immediate preservation of the public peace, health and safety, an emergency is declared to exist and this ordinance shall take effect immediately upon passage by the Council and approval by the Mayor. Approved as to fO;:r;.~ ~ City Attorney :sfzoJq T l Date Page 1 - COUNCIL BILL NO. 1784 ORDINANCE NO. 2189 ......., . . - -~"_.. ..-."......,<._~-_._.._.~~,,-_.~ """"" - APPROVED: Passed by the Council Submitted to the Mayor Approved by the Mayor Filed in the Office of the Recorder ATTEST: ~~~tE~~~;~or~er City of Woodburn, Oregon Page 2 - COUNCIL BILL NO. 1784 ORDINANCE NO. 2189 March 24. 1997 March 25. 1997 March 25, 1997 March 25, 1997 SPR 95-10 Findinqs and Conclusions EXHIBIT. A. FINDING: WZO 11.020 requires, as part of any application for site plan review, "Specifications as to type, color and texture of exterior surfaces of proposed structures." The applicant has submitted colored exhibits with explanatory text, in compliance with this standard, and adequately addressing the issue remanded from LUBA. FINDING: WZO 11.020 requires, as part of any application for site plan review, "A sign plan, drawn to scale, showing the location, size design, material, color and methods of illumination of all exterior signs." The applicant has submitted colored exhibi ts with explanatory text, in compliance with this standard, and adequately addressing the issue remanded from LUBA. FINDING: Applicant submitted a modified site layout diagram, identified as the "Proposed Submittal", and at hearing, through counsel, explained the modifications. The "Proposed Submittal" is in substantial compliance with the standards for review of a site plan, and is substantially similar to the site layout diagram submitted with the application originally, such that it does not substantially change the application nor substantially alter the consequences, upon other landowners or the public, of this proposed use of the subject property. CONCLUSION: 1. The applicant is requesting site plan review approval of a gas station and car wash. 2. SPR 95-10 is a permitted use. 3. The applicant has submitted evidence satisfying the remaining issues remanded from LUBA, fUlfilling the site plan review approval. 4. The site plan, with "Proposed Submittal" applicable standards, the submitted evidence and layout diagram complies and should be approved. with with the all The applicant has governing Woodburn remanded from LUBA. submitted data adequately satisfying the Zoning Ordinances, and satisfying the issues ,