Ord 2256 - Grant App 99-02 Subd
COUNCIL BILL NO. 2023
ORDINANCE NO. 2256
AN ORDINANCE GRANTING AN APPLICATION FOR SUBDIVISION 99-02 AND
VARIANCE 99-09; ADOPTING FINDINGS; IMPOSING CERTAIN CONDITIONS OF
APPROVAL; AND DECLARING AN EMERGENCY.
WHEREAS, on September 23, 1999, the Woodburn Planning Commission adopted a
final order approving an application for Subdivision 99-02 and Variance 99-09; and
WHEREAS, this approval was called up by the Woodburn City Council; and
WHEREAS, the City Council conducted a public hearing on the application on
November 22, 1999; and
WHEREAS, at the time of the public hearing a representative of the Luckey Company
appeared and objected to the application; and
WHEREAS, after the applicant waived the 120-day rule under ORS 227.178(1) and
agreed to meet with the Luckey Company, the City Council continued the public hearing until
January 24, 2000; and
WHEREAS, the City Council closed the public hearing on January 24, 2000, after the
parties represented that they had reached an agreement; and
WHEREAS, the applicant and the Luckey Company have advised the City Council that
they reached an agreement and that the Luckey Company no longer has any opposition to the
application; NOW, THEREFORE,
THE CITY OF WOODBURN ORDAINS AS FOLLOWS:
Section 1. That the real property which is subject to this application is owned by Grigory
and Olga Saverchenko and described in Attachment ";I,;' which is affixed hereto.
Section 2. That based upon the Findings and Conclusions which are affixed hereto as
Attachment "B," the application on the subject property is granted.
Section 3. That the application is subject to the Conditions of Approval contained in
Attachment "C," which is affixed hereto and which the Council finds reasonable.
Page 1 - COUNCIL BILL NO. 2023
ORDINANCE NO. 2256
~
~
Section 4. This ordinance being necessary for the public peace, health and safety, an
emergency is declared to exist and this ordinance shall take effect immediately upon passage by
the Council and approval by the Mayor.
Approved as to form/)};n-~
City Attorney
~O~
Date
Z()OO
Approved: ~ /
Richard Jennings, May ~
Passed by the Council
Submitted to the Mayor
Approved by the Mayor
Filed in the Office of the Recorder . /J
ATTEST: /'l~ ~V-
Mary TtfJlnant City Recorder
Februarv 14. 2000
February 15, 2000
Februarv 15. 2000
February 15, 2000
Page 2 - COUNCIL BILL NO. 2023
ORDINANCE NO. 2256
, ~.
... ,.. ..-----.....---.T ,
f
;/ '"
ATTACHMENT A
NORTH
1" =60
.....-:uil~~MIL"
RS "Rls1rlloHI.L
~i~ttl~~llll'
RS ~SIOfNTlA.L
.....
._~,,-
..._.y.~.'~v'~
~
....r
.
.-r--....'
ATIACHMENTB
FINDINGS AND CONCLUSIONS
A. Woodburn Comprehensive Plan
FINDING: The applicable comprehensive policies have been addressed by the implementing
ordinances of the adopted subdivision standards, zoning ordinance and any other ordinances in
affect at the time of approval.
B. Woodburn Zoning Ordinance
FINDING: The applicant's proposal will access onto an existing street (Parr Road) that
meets city standards.
FINDING: Each lot will require a separate building permit. At such time that building
permits are issued, each lot will be reviewed for compliance with vision clearance standards.
FINDING: Each lot will require a separate building permit. At such time that the building
permits are issued, each lot will be reviewed for compliance with residential set back
requirements. Any new fencing will also be reviewed for compliance with this section prior
to permit issuance.
FINDING: A condition of approval is that the applicant shall comply with the required front
yard setbacks.
FINDING: A condition of appro val is that each lot will be subject to single family driveway
standards.
Variance:
FINDING: Requiring 30 foot wide drives for each lot would waste valuable residential
land, a 60 foot access to serve two residential lots is a needless waste of residential property.
The proposed 15' lot frontages for lots 6 and 7 with reciprocal easements would combine
together to form a 30 foot access which would be sufficiently wide to permit a 24' paved
driveway to both flag lots. The city driveway standards ordinance requires that where the
property frontage is 30' or less the maximum driveway width is 12 feet. The proposed 30'
easement has sufficient width for utilities to access the two lots.
FINDING: The flag lots are created be dividing a land locked parcel which, otherwise
would have no roadway access. This parcel is approximately 100' removed from a public
street. Requiring the pole section of flag lots to meet the lot width requirement defeats the
generally accepted purpose for flag lots (to provide a means to develop residential property
where the geometry is difficult.) Creating an access easement to these properties which is
larger than necessary would remove buildable land from the adjoining lots to the east and
Page 1 - Findings and Conclusions
~.
'.'...T........--r---r--....''----.--,....,'
west, and place it in nonbuildable areas as part of access to lots 6 and 7. The proposed
variance provides adequate access while using the residential land efficiently in spite of
difficult geometry.
FINDING: Granting this application will in no way be detrimental or hazardous to the
public welfare. The proposed plat provides adequate access and turn around for fire and
emergency vehicles. This configuration will make the area more visually pleasing by
reducing driveway area which is generally not as aesthetically pleasing as home landscaping.
The same access configuration is used in the Steklov addition just north of Parr Road.
FINDING: The variance will allow the petitioner to create lots in this subdivision which are
consistent in size with the lots of the surrounding area and reflective of the property zoning.
Without the variance the applicant would lose one lot which would significantly reduce the
density for this plat.
FINDING: Granting of this application will not compromise the health or well being ofthe
citizens working or living in the surrounding community. Adequate access and turnarounds
are provided for fire and emergency vehicles. If the variance is approved, this development
would be similar to recent developments in the area. The same access configuration is used
in the Steklov addition just north of Parr Road.
FINDING: Granting of this application would be in accordance with the Woodburn
Comprehensive Plan. Although there is confusion as to ordinances that may apply to flag
lots, the zoning ordinances clearly allow for flag lots. The variance is required because
there is a section of the subdivision standards that requires a 30 foot minimum width for flag
lots and that is being interpreted a applying to the pole or access section. It may be
appropriated to clarify the interpretation to apply to the body of the lot and in particular at
the building line. Approval of this variance will allow practical application of flag lots to
provide density consistent with the zoning ordinance.
FINDING: The proposed subdivision and single family residences are an allowed use.
FINDING: Each of the proposed lots meet the 6,000 square foot minimum lot area
requirement as shown by the applicant on the preliminary plat. The side and rear yard
setbacks specified in the Woodburn Zoning Ordinance vary according to the height of the
proposed home. If the applicant proposes to build two story homes, then greater side and
rear setbacks are required. The applicant is requesting a variance to the flag lot width
requirement for lots 6 and 7. The existing residence meets the side yard setback
requirements.
FINDING: The System Development Charge for park purposes is $483 per lot. A
condition of approval specifies that the applicant shall pay the required parks systems
development charges in full, or on a per-lot basis as building permits are issued. See
Attachment C.
Page 2 - Findings and Conclusions
~
,...,-_..,.......~_..-'.....-I
,
Woodburn Subdivision Standards:
FINDING: Sufficient information has been submitted by the applicant. Attached with
this application is a preliminary plat that indicates the proposed lots.
FINDING: The applicant has met this criteria with the exception oflots 6 and 7. The
applicant is requesting a variance to the flag lot width standards from 30 feet to 15 feet.
FINDING: Parr Road is a improved residential street. Ten vehicle trips per day is
standard for single family residential units. Additional road dedication along Ogle street
is a condition of approval as well as a non-remonstrance consent form to participate with
improvements to Ogle street.
CONCLUSION:
The applicant is requesting approval to subdivide approximately 1. 8 acres into 9 single
family lots with lot sizes of greater than 6,000 square feet. Lot number 1 will already have
a single family residence on it that will meet the required setback. Lot numbers 6 and 7
are proposed to be flag lots. The subdivision ordinance requires the lot width to be 30
feet wide, the applicant is requesting to make the lots 15 feet wide. With conditions of
approval, the proposal can meet applicable policies and standards of the city of
Woodburn, as found in the previous sections.
Page 3 - Findings and Conclusions
,-.-, ..,.
,
f
.--.............,.~--_.__._.>',."'.--,,.. .----..-."
ATTACHMENT C
CONDITIONS OF APPROVAL:
1. The proposed development shall be in substantial conformance with the preliminary plan.
2. Prior to recordation with Marion County submit two paper copies of subdivision plat for review to
planning department.
3. Applicant shall provide for the installation of all franchised utilities and shall provide any required
easement on final plat.
4. Prior to any construction, a reproducible mylar of the final plat shall be filed with the public works
department after all required signatures have been obtained and the plat has been recorded with
Marion County.
5. On site construction shall not commence until the improvements plans have been reviewed for
compliance with subdivision and street width standards and approved by the public works
department and all right-of-way permits, park fees and system development charges have been paid.
6. Prior to building permit issuance the applicant shall submit one set of reproducible as-builts.
7. Meet vision clearance standards.
8. The applicant shall comply with the Woodburn Subdivision standards.
9. Meet residential setback requirements.
10. Meet private driveway standards.
11. Prior to building permit issuance the applicant shall comply with the comments provided by the fire
department and public works department.
12. Comply with the following chapters of the Woodburn Zoning Ordinance:
Chapter 8, 9, 10, 13,22,39.
13. Construct property line sidewalks
14. Provide street plantings as approved by Planning Staff
Waste Water Department:
15. Cross connections; Water Department - All units that put in either a underground irrigation system,
swimming pool, hot tub and fire sprinkler system will be required to install backflow prevention
Page 1 - Conditions of Approval
.. ~
..,-,.....,..,......., ,.
assemblies (DC) (Double Checks). The assemblies shall be installed by the water meter next to the
property line. Unless approved by city engineers. Please see Inspector on Installation Standards
phone 982- 5283.
Public Works Conditions:
16. Final plan shall conform to the construction plan review procedures and standards.
17. The subdivision shall be platted according to standard surveying practice, approved and recorded
with Marion County.
18. The owner/applicant will be required to enter into an improvement agreement as outlined in the
Woodburn Zoning Ordinance, Chapter III, Section 6 prior to acceptance of the final plat. Also, prior
to construction of the subdivision commencing the city will require approved construction plans,
a performance bond in the amount oflOO% ofthe improvement cost and public works pennit fee's
paid.
19. Existing on-site water wells or sewage disposal systems shall be abandoned by the applicant in
accordance with state regulations.
20. The applicant, not the city is responsible for obtaining pennits from any state and/or federal agencies
which may require approval or pennit.
21. This development shall not cause storm water runoff to be impounded on adjacent properties
22. Applicant shall dedicate to the City of Woodburn an additional 30 feet wide strip ofland adjacent
to Ogle Street for roadway purposes.
23. All work shall conform to the City of Woodburn standards and all State Building Codes and
Regulations.
STREET:
24. To accommodate the installation of the required services. The applicant shall grind the existing
asphalt surface of Parr Road to a depth of 1 Y:z ", and inlay with 1 Y:z" of class "C" mix asphaltic
concrete, after all services have been installed. The grinding and inlay shall be required adjacent to
the entire north line of this subdivision, and shall include the intersection ofLuba Street.
25. The shared driveway access serving the flag lot 6 and lot 7 shall conform to Chapter 10 of the
Woodburn Zoning Ordinance for driveways serving more than one dwelling unit. A proper road
maintenance agreement shall be recorded for shared driveway with the subdivision plat, this shall
be reviewed and approved by the city prior to recording.
Page 2 - Conditions of Approval
, .,
-.----.-.-......--'-....--.-r ~
f ----..
26. This development shall be responsible for street improvements to Ogle Street. The owner will be
required to sign a non-remonstrance consent form to participate and pay the fair share cost of such
improvements meeting city standards on Ogle Street as determined by the City Council.
27. The driveway approach serving the shared access shall comply with the City of Woodburn
Commercial Driveway Standards.
DRAINAGE:
28. Single family residential lots, other then the flag lots, shall drain to the street though weep holes in
the curb.
29. The flag lots shall be served by an underground piped storm sewer service connecting to the existing
city storm sewer main within Parr Road. The applicant shall install a separate service to each lot.
New taps on the storm sewer main will be done by the city, tap fee shall be paid by the applicant.
SANITARY SEWER:
30. The existing sanitary sewer main within Parr Road shall be extended westerly and a sanitary service
installed to each of the proposed lots by the applicant. The lots adjacent to the existing sewer main
shall require a sanitary service line to be installed to each lot by the applicant. New taps on the
sewer main will be done by the city, tap fee shall be paid by the applicant.
WATER:
31. The applicant shall install a water service in conformance with city standards from the existing city
water main on the north side of Parr Road to each lot. New taps on the water main will be done by
the city, tap fee shall be paid by the applicant.
WOODBURN FIRE DISTRICT
32, Driveable access to within ISO feet of all side of all structures is required. Access ways more than
ISO feet in length require a turnaround provision. Minimum width of access way is 20 feet.
33. Residential flow is 1000 gpm.
34. One hydrant within 250 feet of all properties. Coordinate with Woodburn engineering department
prior to placement of any hydrants.
Page 3 - Conditions of Approval
....'
.
._-.._--,...,........._--'--,,~.."-~._-
35. Local residential alarms as required by ORS.
36. Flag lots need to be addressed on a sign located at entrance way from public road. address numbers
to be assigned by the fire district in cooperation with the city building official. (parr road name is
incorrect. Please change to Bridlewood Lane).
37. An onsite water supply system must be available, operational and acceptable to the city prior to the
construction of combustible buildings. Access during construction must support the weight of fire
apparatus and allow access to facility.
Any conditions attached to the approval of the site plan shall be conditions on the issuance of a
building permit. A violation of the conditions shall be considered a violation of the ordinance.
Page 4 - Conditions of Approval
~
.
,
--,--,.._.,._"--,~-,-