Loading...
Agenda - 08/23/1993 CITY OF WOODBURN 270 MONTGOMERY STREET, WOODBURN. OREGON WOODBURN CITY COUNCIL AUGUST 23. 1993 - 7:00 P.M. CALL TO ORDER AND FLAG SALUTE MINUTES A. Council minutes of July 26, 1993, August 9, and August 11, 1993. B. Planning Commission minutes of July 22 and August 12, 1993. C. Library Board minutes of July 21, 1993. D. Recreation & Park Board minutes of July 12, 1993. SUPPORTING DOCUMENTATION INCLUDED IN SUPPLEMENTAL AGENDA PACKET APPOINTMENTS AND ANNOUNCEMENTS APPOINTMENTS ANNOUNCEMENTS: Transportation Plan public hearing continuation Monday, September 27, 1993. 7:00 p.m. et City Hall. PROCLAMATIONS COMMITTEE REPORTS A. Chamber of Commerce B. Woodburn Comeback Campaign COMMUNICATIONS A. Written - BUSINESS FROM THE PUBLIC (This allows public to introduce items for Council consideration not already scheduled on the agenda.) Dangerous building: Dangerous building: Dangerous building: Dangerous building: 237 N. Front Street (Bahai). 573 N. Front Street (Pool Hall). 479 N. Front Street (Smart Shop). 347 N. Front Street (Salud Medical Clinic). Traffic Impact Fees/System Development Charges. Highway 99E Sidewalk Assessments. PUBLIC HEARINGS A. B. C. D. E. F. Page 1 - Woodburn City Council Agenda - August 23, 1993. 8A 8B 8C 8D 8._~E 8F 9. TABLED BUSINESS 10. GENERAL BUSINESS 11. 12. 13. 14. 15. 16. 17. Ao Bo D. E. F. Council Bill No. 1488 - Ordinance accepting Youth Services Commission grant. 10A Council Bill No. 1489 - Resolution amending agreement with State of Oregon APPROVAL OF CLAIMS A. Bills for the month of July 1993. PUBLIC COMMENT NEW BUSINESS SITE PLAN ACTIONS A. Astor Way well house. STAFF REPORTS for Country Club Road realignment/signalization project. Acceptance of utility easement: Fir Street. Salary range adjustment - Communications Center Manager. Clarification of bid award on sale of surplus property. Bid award for WWTP vehicles. Agreement for resufacing of Hardcastle. Request for workshop with Swimming Pool Committee. Request for workshop with Cable Access Committee. B. C. C1. D. E. F. Jerine Estates subdivision replat. Building Activity Report for July 1993. Marion County Solid Waste Management Plan. Total coliform in City water. Update on gang activity/recent homicide. Response to Barclay Square inquiry. Draft ORS 190 agreement for 9-1-1 services. 10B 10C 10D 10E 10F 10G 10H 101 11A 14A 15A 15B 15C 15Cl 15D 15E SUPPORTING DOCUMENTATION INCLUDED IN SUPPLEMENTAL AGENDA PACKET MAYOR AND COUNCIL REPORTS EXECUTIVE SESSION Authority: ORS 192.660 (1)(d) To conduct deliberations with persons designated by the governing body to carry on labor negotiations. 18. ADJOURNMENT Page 1 - Woodburn City Council Agenda - August 23, 1993. MEMO TO: FROM: SUBJECT: DATE: Mayor and City Council through City Administrator Steve Goeckritz, Community Development Director Continuation of Public Hearing of May 10, 1993 Concerning Disposition of the Dangerous Building Located at 237 N. Front Street (BAHAI) August 18, 1993 The BAHAI structure was inspected by staff on August 13, 1993. The loose bricks located on the south east corner of the parapet had been removed. The bricks were then put back in place with cement. RECOMMENDATION: The BAHAI building be removed from the dangerous building list. MEMO TO: FROM: SUBJECT: DATE: Mayor & City Council through City Administrator Steve Goeckritz, Community Development Director ~.r~ Continuation of Public Hearing of May 10, 1993 Concerning Disposition of the Dangerous Building Located at 573 N. Front Street (Pool Hall) August 18, 1993 All the structural framing has been completed on the main floor. On the second floor, the brick on the south wall has been removed and replaced with structural lumber. All roof trusses have been removed and are being replaced with new trusses. The roof sheathing and wall sheathing on the second floor should be in place by Friday (8/20/93). It is anticipated the project should be completed within two to three weeks. RECOMMENDATION: Continue the hearing until the September 13, 1993 Council meeting. poolhaff .con SG:bw MEMO TO: FROM: SUBJECT: DATE: Mayor and City Council through City Administrator Steve Goeckritz, Community Development Director ~t..G Continuation of Public Hearing of May 10, 1993 Concerning Disposition of the Dangerous Building Located at 479 N. Front Street (Smart Shop) August 18, 1993 As of this date the city has yet to receive an engineering report that details the improvements that will have to be made to make the structure safe for occupancy. Staff will continue to attempt to contact Mr. Lindenmuth to find out what the financial and engineering disposition is regarding this building. RECOMMENDATION: Mr. Lindenmuth's or his representative presence is necessary for the City Council to determine what course of action to take in the near future. 8D MEMO TO: FROM: SUBJECT: DATE: Mayor and City Council through City Administrator Steve Goeckritz, Community Development Director Continuation of Public Hearing of May 10, 1993 Concerning Disposition of Dangerous Building Located at 347 N. Front Street ($alud Clinic)Salud Medical Clinic August 5, 1993 At the hearing of May 10, 1993 the City Council reviewed the disposition of the Salud Medical Clinic as it related to the dangerous building criteria under Ordina~ce'1999. A preliminary inspection by a City of Portland structural engineer and the Woodburn Building Official determined extensive damage had been realized to the Salud structure. A second inspection by a consulting engineer hired by Salud confirmed the evaluation made by the City at an earlier date. The complexities associated with the need to temporarily relocate the Salud clinic, evaluating alternative building renovation designs and securing public and private funding led the City Council to conclude the hearing should be continued until August 9, 1993. Since the City Council hearing of May 10, 1993 Salud has taken steps to temporarily resolve their most immediate problems since moving from the Front Street facility. Attached to this memo is a chronology of events prepared by Al Nunez, Director of the Salud Clinic, that outlines events that have taken place since the Council hearing of May 10, 1993, as well as a preliminary outline of the testimony Mr. Nunez apparently intends to present to Council on Monday night. RECOMMENDATION: Any recommendation would rest with the testimony provided by Mr. Al Nunez, Director for Salud. 8D Testimony, city Council Meeting of Monday, August 9, 1993 Mr. Mayor, Members of the City Council, you have asked me here to explain Salud's plans for its building at 347 N. Front St. You have a copy of a chronology of events since the earthquake. Your Mayor and City Administrator both received a copy of the feasibility study Marion County Commissioned on Salud's behalf. The feasibility study indicates that the best option for Salud's recovery is to remodel Brack's Restaurant into a medical center. To that end we have ordered an appraisal from the firm of Powell, Gass and Herman. As of the date of this writing it has not been received.. Although, we expect it within the next week. Based on the information in the feasibility study and in consultation with the Farmers Home Administration, who hold the mortgage on the building, a tentative decision has been made to sell it as is. We have not listed the building for sale-because the U.S. Public Health Service has a recorded interest in the property and until they have completed their assessment they cannot give the approval. Today August 9th, two consultants for U.S. PHS arrived in Woodburn to do that assessment and help Salud apply for an emergency capital improvement grant. We have spoken to several non-profit organizations to determine their interest in the Salud building. Hopefully, another service agency will be interested and working together a deal can be worked out for the sale and rebuilding of Salud's old site. At this time I cannot give you a specific time line. However, once I receive the consultants' final report I will ask Region X of the U.S. Public Health Service to give me the authority to sell Salud's building. a:\al\testimon.eq 8D Report to Woodburn City Council Salud Medical Center Recovery Plan Chronoloq¥ of Events: *Thursday, March 25, 1993, 5:35 a.m. - earthquake Patients seen all day primarily on the first floor. *Friday, March 26th, City of Woodburn declares building unsafe for occupancy. Staff and patients evacuate building. *Saturday, March 27th, Woodburn City Council holds special meeting to discuss earthquake. Approves the use of the downtown parking lot by Salud Medical Center to treat patients. *Monday, March 29th, Salud treats patients in tents, motor homes and U-haul truck in the downtown city parking lot. This continues through Friday, April 2nd. *Thursday, April 1st, Governor Roberts declares a state of emergency thereby allowing the Oregon National Guard to he}p ~alud. At 1:30 p.m. Guard officers meet with Salud management and agree on a plan to allow Salud use of the Woodburn Armory. *Friday, April 2nd, Salud starts moving into the Woodburn Armory while still seeing patients in the parking lot. *Saturday, April 3rd, Congressman Mike Kopetski visits the Salud staff while they are setting up in the Armory. *Tuesday, April 6th, Congressman Mike Kopetski, again visits Salud and tours Woodburn along with Major General Katke, Adujant General of the Oregon Military Department. *Tuesday, April 13th, Craig Luderman of Marion County Housing and Ray Teasley of the Mid-Willamette Council of Governments prepare a grant application to the State of Oregon office of Economic Development for $10,000 to fund a feasibility study-for Salud. *Thursday, April 15th, Jerry Sheridan and David Wilson, Community Programs Specialists for Farmers Home Administration tour the Armory and Salud's building downtown. FmHA holds the mortgage on the Salud building. *Friday, April 16th, Representatives Patti Armory. Governor Milne tour Barbara Roberts and State Salud's old building and the *Monday, May 3rd, Salud management attends a FEMA orientation at the Salem National Guard Armory. *Friday, May 7th, FEMA consultants start working with Salud staff. *Monday, May 10th, Viacom Cable spends the day at the Armory to put 8D Report to Woodburn City Council Salud Medical Center Recovery Plan Page -2- together a video commissioned and paid for by Commercial Bank in Salem to help Salud in is recovery. *Thursday, May 20th, cable access 25 CCTV tours Salud and does a 30 minute video for broadcast on Salud's situation. *Wednesday, May 26th, Marion County Commissioners held a public hearing relative to apply for $600,000 grant from the Oregon Office of Economic Development to assist Salud in its rebuilding. As a result, County staff was instructed to submit the application. *Tuesday, June 8th, meeting at Woodburn City Hall to review and discuss the feasibility study commissioned by Marion County on Salud's behalf. This meeting was attended by City staff, the Mayor and Federal, State and County agency officials. A representative of Congressman, Mike Kopetski's office also attended. *Wednesday, July 7th, Key Bank of Oregon officials plan a capital campaign to assist Salud in its recovery. *Thursday, July 8th, meeting in Salem with County and State officials to discuss and firm up the $600,000 grant application. *Tuesday, July 25th, the Director for Primary Care for Region X of the U.S. Public Health Service visits Salud, tours the Armory, the old building and the proposed sites. *Monday, July 26th, U.S. Public Health Service Consultant telephones and arranges to be in Woodburn on August 9th and 10th to assist in applying for an emergency capital improvement grant from PHS to complete the financing package for Salud. *Tuesday, July 27th, representative of Kaiser Permanente indicates that they will apply to their national headquarters for a substantial grant to assist Salud's rebuilding. a:\al\chronlst.eq MEMO 8E TO: FROM: SUBJECT: DATE: The City Council through City.Administrator Public Works Director Implementation of Traffic Impact Fee (TIF) for Transportation and Systems Development Charge (SDC) for Storm Water August 5, 1993 RECOMMENDATION: Direct staff to bring an ordinance of approval and a resolution establishing TIFs and SDCs. 1) Traffic Impact Fee at 50% level until December, 1994, then increased to approximately 58% and finally to approximately 66% level on January 1, 1996. 2) Systems development charge for storm water as established in the draft're~olution. BACKGROUND: City council has already established Systems Development Charge (SDC) for water, wastewater and parks. The state law allows establishment of transportation and storm water SDC also. Oregon State law requires that these fees be used to fund respective improvements to increase capacity. The methodology for establishing the fee was discussed in the council meeting of July 26, 1993. A copy of the executive summary was provided in the last meeting and a copy of the complete report was provided in the council workshop of July 19. Although the public hearing is continued from the last council meeting, it is desirable that the staff receive direction after this hearing is closed. The council may want to focus on the policy issues outlined in the attached draft ordinance and in draft resolution. The highlights of the proposed ordinance are as follows: 1. Legal authority ORS 223.297-223-314 Methodology: a) Current average traffic on collectors and arterials have been used as a basis for standard. b) Traffic impact fee is proportional to the trip generated by different developments. Fee Schedule: See Resolution Note: It is proposed that the fees be phased in starting at 50% of the legally permitted charges. .. Payment Plan of Fee: A five-year payment plan for developments with a fee of $100,000 or more has been proposed· The interest rate has been fixed at "prime + 3 percent". Alternate Rate Calculation: Developer is allowed to present alternate data for city review and decision. Credits to Developers: No credits are provided for standard improvements inside the boundary of a development. However, credits will be provided under the conditions outlined below. Up to 100 percent credit of TIFCSDC) [reouired bv state law] a) For qualified public improvements that are: 1) Required as a condition of residential development, and 2) identified on CIP, and 3) not located on or contiguous to property. b) Up to 50 percent of TIF(SDC) [not reouired bv state law1 For improvements required by the city that: 1) exceed the capacity needed to service the development alone, and 2) exceed the specific type of city. standard for residential, commercial, or industrial improvement. Other Features: Appeal process, rate review, accounting requirement, and challenge provision as required by the law have been included. Repealing of Ordinance 1842 will eliminate current street and storm drain fee on developments. The current established fee on residential units is $200.00. The ordinance does include an emergency clause and it will become effective after council's approval and mayor's signature. 8E Highlights of Resolution Fee schedule: a) TIF proposed at 50, 58, and 66 percent, b) storm water SDC is established at $55 per 500 square feet of impervious area or 11 cents per square foot· Alternate Rate Review Fee: $250.00 plus sharing of 50 percent city paid consultant fee, if any. Alternate Payment Plan Fee: A 9100.00 fee is proposed for establishing a five-year payment plan with interest. The rate of interest proposed in ordinance is "prime + 3 percent." If the city council wishes to modify certain policy decisions outlined in' the ordinance and resolution, then it should direct the staff to bring the final ordinance and resolution with modifications. INTIFSDC.CC COUNCIL BILL NO. ORDINANCE NO. 8E AN ORDINANCE ESTABLISHING TRAFFIC IMPACT FEES(TIF) AND STORMWATER DRAINAGE SYSTEM DEVELOPMENT CHARGES; REPEALING ORDINANCE NO. 1842; AND DECLARING AN EMERGENCY . WHEREAS, future growth should contribute its fair share to the cost of improvements and additions to City transportation and stormwater drainage facilities that are required to accommodate the needs of such growth; and WHEREAS, the imposition of system development charges will provide a source of revenue to fund the construction or improvement of the City's transportation and stormwater drainage facilities necessitated by growth; and .- = WHEREAS, ORS 223.297 - 223.$14, adopted in 1989, authorizes local .. governments to impose system development charges; and WHEREAS, system development charges are charges incurred upon the election to develop property at a specific use, density and/or intensity, and the incurred charge equals, or is less than the actual cost of providing public facilities commensurate with the needs of the chosen use, density, and/or intensity; election of other uses, densities, and/or intensities causes direct and proportional changes in the amount of the incurred charge; and system development charges are separate from and in addition to any applicable tax, assessment, charge, fee in lieu of assessment, or other fee provided by law or imposed as a condition of development; and WHEREAS, system development charges are fees for services because they are based upon a development's receipt of services considering the specific nature of the development; and WHEREAS, system development charges are imposed on the activity of development, not on the land, owner, or property, and therefore, are not taxes on property or on a property owner as a direct consequence of ownership of property within the meaning of Section 1 lb, Article XI of the Oregon Constitution or the legislation implementing that section; and WHEREAS, this Ordinance is intended only to be a financing mechanism for needed extra capacity capital facilities associated with new development and does not represent the consideration of land use planning issues, funding for maintenance of existing roads, or elimination of any possible existing capacity deficiencies; T 8£ NOW, THEREFORE, THE CITY OF WOODBURN ORDAINS AS FOLLOWS: Section 1. D~J~altJo~:~s. The following definitions apply: (A) "Applicant" shall mean the owner or other person who applies for a building permit or development permit. (B) "Bancroft Bond" shall mean a bond issued by the City to finance a capital improvement in accordance with ORS 223.205 - 223.295. (C) 'Building" shall mean any structure, either temporary or permanent, built for the support, shelter or enclosure of persons, chattels or property of any kind. This term shall include tents, trailers, mobile homes or any vehicles serving in any way the function of a building. This term shall not include temporary construction sheds or trailers erected to assist in construction and maintained dudng the term of-a _building (D) 'Building Permit" shall mean an official document or certificate authorizing the":.: construction or siting of any building. For purposes of this Ordinance, the term "Building Permit" shall also include any construction or installation permits which may be required for those structures or buildings, such as a mobile home, that do not require a building permit in order to be occupied. (~) 'Capital Improvements" shall mean public facilities or assets used for'any of the following: (1) Transportation; or (2) Stormwater Drainage (F) "Citizen or Other Interested Person" shall mean any person who is a legal resident of the City of Woodbum as evidenced by registration as a voter in the City, or by other proof of residency; or a person who owns, occupies, or otherwise has an interest in real property which is located within the City limits or is otherwise subject to the imposition of system development charges, as outlined in Section (3) of this ordinance. (G) "City" shall mean the City of Woodburn, Oregon. (H) "Credit" shall mean the amount of money by which the TIF or Stormwater Drainage SDC for a specific development may be reduced because of construction of' eligible capital facilities as outlined in this ordinance. (I) "Development" shall mean a building or other land construction, or making a Physical change in the use of a structure or land, in a manner which increases the usage of any capital improvements or which will contribute to the need for additional or enlarged capital improvements. (J) "Development Permit" shall mean an official document or ~ertificate, other than a building permit, authorizing development. (10 "Dwelling Unit" shall mean a building or a portion of a building designed for residential occupancy, consisting of one or more rooms which are arranged, designed or used as living quarters for one family only. (L) "Encumbered" shall.mean monies committed by contract or purchase order in a manner that obligates the City to expend the encumbered amount upon delivery of goods, the rendering of services, or the conveyance of real property provided by a vendor, supplier, contractor or Owner. (M) "Improvement Fee' shall mean a fee for costs associated with ~apital improvements to be constructed after the effective date of this ordinance:... Notwithstanding anything in this ordinance to the contrary, it is an incurred charge or :: cost based upon the use of or the availability for use of the systems and capital improvements required to provide services and facilities necessary to meet the routine obligations of the use and ownership of property, and to provide for the public health and safety upon development. (N) "Off-site" shall mean not located on or contiguous to property that is the subject of development approval. (0) "On-site" shall mean located on or contiguous to property that is the subject of development approval. (P) "Owner" shall mean the person holding legal title to the real prOperty upon which development is to occur. (Q) "Person" shall mean an individual, a corporation, a partnership, an incorporated association, or any other similar entity. (R) "Qualified Public Improvement" shall mean a capital improvement that is: (1) Required as a condition of residential development approval; (2) Identified in the capital improvement plan adol~ted pursuant to Section (4)(D); and (3) Not located on or contiguous to property that is the subject of residential development approval. (S) "Right-of-Way" shall mean that portion of land that is dedicated for public use. 8E (T) "System Development Charge" shall mean an improvement fee assessed or collected at the time of increased usage of a capital improvement or issuance of a development permit or building permit. System development charges are separate from and in addition to any applicable tax, assessment, fee in lieu of assessment, or other fee or charge provided by law or imposed as a condition of development. (U) "Traffic Impact Fee" shall mean a system development charge for transportation capital facilities. (V) "Traffic Impact Fee and Stormwater Drainage System Development Charge Methodology Report" shall mean the report adopted pursuant to Section (3)(B), as amended and supplemented pursuant to Section (3)(H). Section 2. Rules of Construction. For the purposes of administration and enforcement of this ordinance, unless otherwise stated in this ordinance, the f~owing rules of construction shall apply: " (A) In case of any difference of meaning or implication between the text of this ordinance and any caption, illustration, summary table, or illustrative table, the text shall control. (B) The word "shall" is always mandatory and not discretionary: the word "may" is Permissive. (C) Words used in the present tense shall include the future; words used in the singular shall include the plural and the plural the singular, unless the context clearly indicates the contrary; and use of the masculine gender shall include the feminine gender. (D) The phrase "used for" includes "arranged for", "designed for", "maintained for", or "occupied for". (E) Unless the context clearly indicates the contrary, where a regulation involves two or more items, conditions, provisions, or events connected by the conjunction "and", "or" or "either...or", the conjunction shall be interpreted as follows: (1) "And" indicates that all the connected terms, conditions, provisions or events shall apply. (2) "Or" indicates that the'connected items, conditions, or provisions or events may apply singly or in any combination. (3) "Either...or" indicates that the connected items, conditions, provisions or events shall apply singly but not in combination. 8E (F) The word "includes" shall not limit a term to the specific example, but is intended to extend its meaning to all other instances or circumstances of like kind or character. Section 3. Imposition of System Development Charges. System development charges .are hereby imposed, subject to the following conditions. (A) Development Subject to Charges~ System development charges are imposed on all new development within the City for capital improvements for transportation and stormwater drainage. The system development charges shall be paid in addition to all other fees, charges and assessments due for development, and are intended to provide funds only for capital improvements necessitated by new development. (B) Rates of Charges. (1) The City hereby adopts and incorporates by reference the report entitled "City of Woodburn Traffic Impact Fee and Stormwater Drainage System Development Charges Methodology Report", dated June 30, 1993, p.art~ularly the assumptions, conclusions and findings in such study as to the dete. rm~ation of anticipated costs of capital improvements required to accommodate growth.~ and the rates for system development charges to reimburse the City for such'.'.; capital improvements. (2) System development charges shall be imposed and calculated for the alteration, expansion or replacement of a building or dwelling unit if such alteration, expansion or replacement results in an increase in the use of capital improvements compared to the present use of the development. The amount of the system development charge to be paid shall be the difference between the rate for the proposed development and the rate that would be imposed for the development prior to the alteration, expansion or replacement. (3) The City shall, based upon the report referred to in subsection (1) above, adopt by resolution the amounts of system development chargeS. (4) An additional systems development charge may be assessed by the City if the demand placed on the City's capital facilities exceeds the amount initially estimated at the time systems development charges are paid. The additional charge shall be for the increased demand or for the demand above the underestimate, and it shall be based upon the fee that is in effect at the time the additional demand impact is determined, and not upon the fee structure that may have been in effect at the time the initial systems development charge was paid. This provision does not apply to single family or other residential units unless additional rental units are created. 5 (C) Payment of Charges. Except as otherwise provided in this Section, applicants for building'permits or development permits shall pay the applicable system development charges prior to the issuance of the permit by the City. 8E (1) When the total amount due for Systems Development Charges due exceeds one-hundred-thousand dollars ($100,000), the applicant may request alternative payment arrangements to pay the fee in annual payments over a period of five (5) years, to be secured by a lien on the property on which the subject development is to occur. Such request for alternative payment arrangements shall be made in writing to the City Administrator, shall be accompanied by the application review/recording fee established by resolution for this purpose, and shall contain the following information: (a) The name and address of the applicant; (b) The location of the property which is the subject Of the system development charges; ° ' (c) A notarized sworn statement demonstrating that the applicant ~as the.. authority to assent to the imposition of a lien on the property on behalf of ~ which the system development charges are to be paid and that the interest" of the applicant is adequate to secure payment of the lien, and waiving all dghts to contest the validity of the lien to be placed on the property; (2) Within ten (10) days from the date of receipt of the request for alternative payment arrangements, the City Administrator will advise the applicant of the status of the request. If the information contained in such request is valid and sufficient to protect the City's interests, the City administrator shall arrange for a lien to be place on the property, and the request shall be approved. From that time until final payment of the system development charges is made, the City shall have a lien upon the subject property for the amount of the systems development charges, together with interest on the unpaid balance at the rate established by this Ordinance. The lien shall be enforceable in the manner provided in ORS Chapter 223, and shall be superior to all other liens pursuant to ORS 223.230. (3) Payments shall be made in five (5) annual installments to include a principal amount equal to one-fifth (115) cf the total amount of system development charges due, plus interest. Interest shall be calculated based on the prime lending rate on the date the request for alternative payment arrangements is submitted, plus three percentage points, or, should the City exercise its option to issue a Bancroft Bond in association with this debt, the applicable interest rate charged to the applicant shall be 'fixed at the Bancroft Bond rate plus two percentage points. (4) When an account becomes thirty (30) days or more past due, the City Administrator may send a letter to the defaulting party demanding payment of all amounts due to bring the account current, including any applicable interest, within thirty (30) days. If payment is not received within the thirty (30) day period, the City Administrator may refer the matter to the City Attorney for collection. The City Attorney may proceed with foreclosure of the assessment lien or take other legal action authorized by law which is deemed most appropriate under the circumstances. (5) In the event that altemative payment arrangements are made with the City, the City shall be entitled to collect the entire amount of any systems development charges due upon determination that a facility has been operationally abandoned. For purposes of this section, there is a rebuttable assumption that a facility which is nOt in operation for a consecutive 18 month period is operationally abandoned. The City ^dministrator, upon recommendation of the City Engineer shall make the determination as to whether an existing facility has bccn operationally abandoned. This determination shall be in writing a. nd=.m_ ailed to the last oPerator of the facility at the last known address. Appeal of t.he City Administrator's determination shall be in strict accordance with the procedures.. contained in Section 3(G). '" (6) Under no circumstances shall payment of the TIF or SDC exempt development from complying with any and all standards, rules, and regulations required of the development as a condition of development approval. Specifically, development must meet all road standards, stormwater retention requirements, and stormwater quality requirements intended to minimize the degradation of water quality resulting from development (D) Altemative Rate Calculation. Applicants may submit altemative rates for system development charges, subject to the following conditions: (1) In the event an applicant believes that the impact on City capital Improvements resulting from a development is less than the fee established in Section (3)(B), the applicant may submit alternative system development charge rate calculations, accompanied by the alternative rate review fee established by resolution for this purpose, to the City Administrator. The City may hire a consultant to review the alternative system development charge rate calculations, and may pay the consulting fees from system development charges revenues. (2) The alternative system development charge rate calculations shall be based on data, information and assumptions contained in this ordinance and the adopted system deveiopment charges study or an independent source, provided that the independent source is a local study supported by a data base adequate for the conclusions contained in such study performed pursuant to a generally accepted methodology and based upon generally accepted standard sources of information relating to facili_ties planning, cost analysis and demographics. 7 (3) If the City Council determines that the data, information and assumptions utilized by the applicant to calculate the alternative system development charges rates comply with the requirements of this Section by using a generally accepted methodology, the alternative system development charges rates shall be paid in lieu of the rates set forth in Section (3)(B). 8E (4) If the City Council determines that the data, information and' assumptions utilized by the applicant to calculate the alternative system development charges rates do not comply with the requirements of this Section or were not calculated by a generally accepted methodology, then the City Council shall provide to the Applicant (by Certified mail, return receipt requested) written notification of the rejection of the alternative system development charges rates and the reason therefor. (5) Any applicant who has submitted a proposed alternative system development charges rate pursuant to this Section and desires the immediate issuance of a building permit or development permit shall pay the 8pl~licable system development charges rates pursuant to section (3)(B). Said_ pa~yment shall be deemed paid under 'protest" and shall not be construed as a waiver of .. any dght of review. Any difference between the amount paid and the amount.'.; due, as determined by the City Council, shall be refunded to the applicanL " (E) F_Y, em.~3~. The following development shall be exempt from payment of the system development charges: (1) Alterations, expansion or replacement of an existing dwelling unit where no -~ additional dwelling units are created. (2) The construction of accessory buildings or structures which will not create additional dwelling units and which do not create additional demands on the City's capital improvements. (3) The issuance of a permit for a mobile home on which applicable system development charges have previously been made as documented by receipts issued by the City for such prior payment. (4) Development with vested rights, determined as follows: (a) Any owner of land which was the subject of a building permit or development permit issued prior to the effective date of this ordinance may petition the City for a vested rights determination which would exempt the landowner from the provisions of this ordinance. Such petition shall be evaluated by the City Attorney and a decision made by the City Council based on the following criteria: (i) The existence of a valid, unexpired permit issued by the City authorizing the specific development for which a determination is sought; (ii) Substantial expenditures or obligations made or incurred in reliance upon the authorizing governmental act; (iii) Other factors that demonstrate it is highly inequitable to deny the owner the opportunity to complete the previously approved development under the conditions of approval by requiring the owner to comply with the requirements of this ordinance. For the purposes of this paragraph, the following factors shall be considered in determining whether it !s inequitable to deny the owner the opportunity to complete the previously approved development: (aa) Whether the injury suffered by the owner outweighs the public cost of allowing the development to go forward without pa. y~_ent of the system development charges required by this ordinal, cea. and (bb) Whether the expenses or obligations for the development;'; were made or inourred prior to the effective date of this Ordinance. ~- (F) Credits for Developer Contributions of Oualified Public Improvements. The City shall grant a credit, not to exceed 100% of the applicable TIF or SDC, against the s .y~tem development charges Imposed pursuant to Section (3)(A) and (B) for the do.nation of land as permitted by Ordinance 1807, or for the construction of any qualified public improvements. Such land donation and construction shall be subject to the approval of the City. (1) The amount of developer contribution credit to be applied shall be determined according to the following standards of valuation: (a) The value of donated lands shall be based upon a written appraisal of fair market value by a qualified and professional appraiser based upon comparable sales of similar property between unrelated parties in a bargaining transaction; and (b) The cost of anticipated construction of qualified public improvements shall be based upon cost estimates certified by a professional architect or engineer. (2) Prior to issuance of a building permit or development permit, the applicant shall submit to the City Administrator a proposed plan and estimate of cost for contributions of qualified public improvements. The proposed plan and estimate shall include: 8E (a) a designation of the development for which the proposed plan is being submitted; (b) a legal description of any land proposed to be donated pursuant to Chapter 39 of the Woodburn Zoning Ordinance, Ordinance 1807, and a written appraisal prepared in conformity with subsection (1)(a) of this Section; (c) a list of the contemplated capital improvements contained within the plan; (d) an estimate of proposed construction costs certified by a professional architect or engineer; and (e) a proposed time schedule for completion of the proposed plan. (3) The City Administrator shall determine if the proposed qualif[ed.j3ublic improvement is: - - (a) · Required as a condition of residential development approval; (b) Identified in the capital Improvement plan adopted pursuant to Section (4)(D); and (c) Not located on or contiguous to property that is the subject of residential development approval. (4) The decision of the City Administrator as to whether to accept the proposed plan of contribution and the value of such contribution shall be in writing and issued within f'Reen (15) working days of the review. A copy shall be provided to the applicant. (5) A proposed improvement which does not meet all three (3) of the criteria included in Section 3(F)(3), above shall not be considered a qualified public improvement, and the City is not required by ORS 223.297 - 223.314 to provide a credit for such an improvement. However, the City shall grant a credit, in an amount not to exceed fifty percent (50%) of the total amount of the applicable TIF or SD(3, for certain other contributions of capital facilities under the following conditions: (a) the capital facilities being contributed must exceed the local street standard (for TIF) or stormwater drainage capacity (for SD(3) required for the specific type of development (i.e., residential, industrial, etc.); and ]0 (G) (b) only the value of the contribution which exceeds the local street standard required for specific type of development (i.e., residential, commercial, industrial, etc.) or stormwater drainage capacity shall be considered when calculating the credit; and (c) donations for on-site right-of-way are not eligible for the credit. (6) Any applicant who submits a proposed plan pursuant to this Section and desires the Immediate Issuance of a building permit or development permit, shall pay the applicable system development ch.arge?. Said p?yme~, t s_h_al_l. ~.be_..d.e_._e~,~_ paid under "protest' and shall not be construed as a waver oT any rewew Any difference between the amount paid and the amount due, as determined by the City Administrator, .shall be refunded to the applicant. In no event shall a refund by City under this subsection exceed the amodnt originally paid by the .applicant. : 8E ~.m3~ e~l.~ and Review He~rings. (1) An applicant who is required to pay system development charges s~all have the right to request a hearing to review the denial by the City Administrator of. a proposed credlt for contribution of qualified public Improvements pursuant t~ Sec on (3)(F). (2) Such hearing shall be requested by the applicant within r~teen (15) days of the date of first recelpt of the denial by the City Administrator. Failure to request a hearing within the time provided shall be deemed a waiver of such right. (3) The request for hearing shall be filed with the City Administrator and shall contain the following: (a) The name and address of the applicant; (b) The legal description of the property in question; (c) If issued, the date the building permit or development permit was issued; (d) A brief description of the nature of the development being undertaken pursuant to the building permit or development permit; ~ (e) If paid, the date the system development charges were paid; and (f) A statement of the masons why the applicant is requesting the headng. (4) Upon receipt of such request, the City Administrator shall schedule a hearing before the City Council at a regularly scheduled meeting or a special meeting called for the purpose of conducting the hearing and shall provide the applicant written notice of the time and place of the hearing. Such hearing shall be held within forty-five (45) days of the date the request for headng was filed. (5) Such hearing shall be before the City Council and shall be conducted in a manner designed to obtain all information and evidence relevant to the requested headng. Formal rules of civil procedures and evidence shall not be applicable; however, the hearing shall be conducted in a fair and impartial manner with each party having an opportunity to be heard and to present information and evidence. (6) Any applicant who requests a headng pursuant to this Section and desires the immediate issuance of a building permit or development permit shall pay prior to or at' the time the request for hearing is filed the applicable system development charges pursuant to Section(3)(B). Said payment shall be cl~emed paid under "protest" and shall not be construed as a waiver of any revie~y rights. (7) An applicant may request a headng under this Section without paying the applicable system development charges, but no building permit or development" permit shall be Issued until such system development charges are paid in the amount initially calculated or the amount approved upon completion of the review provided in this Section. (H) Review of Study and Rates. This ordinance and the Traffic Impact Fee and StOrmwater Drainage System Development Charge Methodology Report shall be reviewed at least once every four years. The review shall consider new estimates of population and other socioeconomic data, changes in the cost of construction and land acquisition, and adjustments to the assumptions, conclusions or findings set forth in the report adopted by Section (3)(B). The purpose of this review is to evaluate and revise, if necessary, the rates of the system development charges tO.assure that they do not exceed the reasonably anticipated costs of the City's capital improvements. In the event the review of the ordinance or the report alters or changes the assumptions, conclusions and findings of the report, or alters or changes the amount of system development charges, the report adopted by reference in Section (3)(B) shall be amended and updated to reflect the assumptions, conclusions and findings of such reviews and Section (3)(B) shall be amended to adopt by reference such updated reports. 8E uteri Section 4. Receipt and Expenditure of System Development 8E (A) Tru~ Account.~. The City hereby establishes a separate trust account for each type of system development charge to be designated as the "Traffic Impact Fee SDC Account" and the "Stormwater Drainage SDC Account", which shall be maintained separate and apart from all other accounts of the City. All system development charge payments shall be deposited into the appropriate trust account immediately upon receipt. (B) Use of System Development Charges. The monies deposited into the trust accounts shall be used solely for. the purpose of providing capital improvements necessitated by development, including, but not limited to: (1) design and construction plan preparation; (2) permitting and fees; ° -_ (3) land and materials acquisition, including any costs of acquisition or condemnation; (4) construction of improvements and structures; (5) design and construction of new drainage facilities required by the construction of capital improvements and structures; (6) relocating utilities required by the construction of improvements and structures; (7) landscaping; (8) construction management and inspection; (9) surveying, soils and matedal testing; (10) acquisition of capital equipment; (11) repayment of monies transferred or borrowed from any budgetary fund of the City which were used to fund any of the capital improvements as herein provided; (12) payment of .principal and interest, necessary reserves and costs of issuance under any bonds or other indebtedness issued by the City to fund capital improvements; I3 (13) direct costs of complying with the provisions of ORS 223.297 to 223.314, including the costs of developing system development charges methodologies and providing an annual accounting of system development charges expenditures. (14) consulting costs for the review of alternative rates as provided for in Section 3(D) of this Ordinance. (C) Prohibited Uses of System Development Charges. Funds on deposit in system development charge trust accounts shall not be used for: (1) any expenditure that would be classified as a routine maintenance or repair expense; or (2) costs associated with the construction of administrative office facilities that are more than an incidental part of other capital improvements. (D) Canital Improvements Authorized to be Financed by System Dev'eld~3. ment Charges. Any capital improvement being funded wholly or in part with system.:. development charges revenue shall be included in the City's capital improvement... program. The capital improvement program shall: (1) list the specific capital improvement projects that may be funded with system development charges revenues; (2) provide the cost of each capital improvement project, and an estimate of the amounts of each revenue source, including system development charges, that will be used to fund each project; (3) provide the estimated timing of each capital improvement project; and (4) be updated at least once every four years. (E) Investment of Trust Account Revenue. Any funds on deposit in system development charges trust accounts which are not immediately necessary for expenditure shall be invested by the City. All income derived from such investments shall be deposited in the system development charges trust accounts and used as provided herein. (F) Refunds of System Development Charges. System development charges shall be refunded in accordance with the following requirements: (1) An applicant or owner shall be eligible to apply for a full or partial refund if: (a) The building permit or development permit has expired and the development authorized by such permit is not complete; (b) An error was made in calculating the amount of the system development charges resulting in overpayment, and the error is discovered within three months of the date the SDC was paid. The amount of the refund will be limited to the amount collected in excess of the appropriate SDC. 8E (c) The system development charges have not been expended or encumbered prior to the end of the fiscal year immediately following the ninth anniversary of the date upon which such charges were paid. For the purposes of this Section, system development charges collected shall be deemed to be expended or encumbered on the basis of the first system development charges in shall be the first system development charges out. (3) The application 'for refund shall be filed with the City Administrator and contain the following: (a) The name and address of the applicant; o (b) The location of the property which was the subject of the system development charges; (c) A notarized swom statement that the petitioner is the then current owner of the property on behalf of which the system development charges were paid, Including proof of ownership, such as a certified copy of the latest recorded deed; (d) The date the system development charges were paid; (e) A copy of the receipt of payment for the system development charges; and, ff appropriate, (f) The date the building permit or development permit was issued and the date of expiration. (3) The application shall be filed within ninety (90) days of the expiration of the building permit or development permit or within ninety (90) days of the end of the fiscal year following the ninth anniversary of the date upon which the system development charges were paid. Failure to timely apply for a refund of the system development charges shall waive any right to a refund. (4) Within thirty (30) days from the date of receipt of a petition for refund, the City Administrator will advise the petitioner of the status of the request for refund, and if such request is valid, the system development charges shall be returned to the petitioner. ]5 (5) Refunds will not be granted based on a change in use of the property which results in a reduced impact on the City's capital facilities. 8E (6) A building permit or development permit which is subsequently issued for a development on the same property which was the subject of a refund shall pay the systems development charges as required by Section (3). (G) Annual Accounting Reports. The City shall prepare an annual report accounting for system development charges, including the total amount of system development charges revenue collected in each trust account, and the capital Improvement projects that were funded. (H) Challenge of Expenditures. Any citizen or other interested person may challenge an expenditure of system 'development charges revenues. (1) Such challenge shall be' submitted, in writing, to the City Administrator for- review within two years following the subject expenditure, and shall include the following information: (a) The name and address of the citizen or other interested ~erson challenging the expenditure; (b) The amount of the expenditure, the project, payee or purpose, and the approximate date on which it was made; and (c) The reason why the expenditure is being challenged. (2) If the City Administrator determines that the expenditure was not made in accordance with the provisions of this ordinance and other relevant laws, a reimbursement of system development charges trust account revenues from other revenue sources shall.be made within one year following the determination that the expenditures were not appropriate. (3) The City Administrator shall make written notification of the results of the expenditure review to the citizen or other interested person who requested the review within ten (10) days of completion of the review. Section 5. ~..~.J~3jJj~. If any clause, section or provision of this ordinance Shall be declared unconstitutional or invalid for any reason or cause, the remaining portion of said ordinance shall be in full force and effect and be valid as if such invalid portion thereof had not been incorporated herein. Section 6. ~ Ordinance No. 1842 is hereby repealed. Section 7. Emey. g.t~3.~ This ordinance being necessary for the immediate preservation of the public peace, health and safety, an emergency is declared to exist and this ordinance shall take effect immediately upon passage by the Council and approval by the Mayor. 8E Approved as to Form:, "' ~. City Attorney Date Passed by the Council Submitted to the Mayor AI?p. roved by the Mayor Filed in the Office of the Recorder APPROVED: . . Len Kelley, Mayor " ATTEST: City of Woodbum. Oregon 17 COUNCIL BILL NO. RESOLUTION NO. A RESOLUTION SETTING THE AMOUNTS OF THE TRAFFIC IMPACT FEE (TIF), STORMWATER DRAINAGE SYSTEMS DEVELOPMENT CHARGE, * ALTERNATIVE RATE REVIEW FEE, AND ALTERNATIVE PAYMENT REQUEST FEE IMPOSED BY ORDINANCE NO. . WHEREAS, ORS 223.297 - 223.314. adopted in 1989. authorizes local governments to Impose system development charges; and WHEREAS, the City has developed methodologies to support the implementation of a Traffic Impact Fee and a Stormwater Drainage Systems Development Charge, and WHEREAS, the City has adopted Ordinance No. establishing a Traffi~ Impact Fee and a Stormwater Drainage Systems Development Charge,_._and WHEREAS, Ordinance No. provides that the amounts of-th~Traffic.. Impact Fcc and Stormwater Drainage Systems Development Charge shall be set by'.-! resolution, and WHEREAS, Ordinance No. provides for the Imposition of fees to be charged for the review of alternative rates and altemative payment requests, and WHEREAS, Ordinance No. provides that the amounts of the fees to be charged for the review of alternative rates and alternative payment requests shall be set by resolution; NOW, THEREFORE, THE CITY OF WOODBURN RESOLVES AS FOLLOWS: Section 1. TRAFFIC IMPACT FEE AMOUNTS. The schedule of Traffic Impact Fee (TIF) charges attached as Exhibit 'A" and, by this reference incorporated herein, is hereby adopted. Section 2. STORMWATER DRAINAGE SYSTEM DEVELOP- MENT CHARGE AMOUNTS. The Stormwater Drainage System Development Charge shall be $0.11 per squ'ar.e foot of impervious sudace. Except for single-family residential development, the fee shall be calculated based on the total number of square feet of impervious surface to be included in the development. For residential development, the fee shall be calculated in five-hundred (500) square foot increments at the rate of fifty-five dollars ($55.00) for each 500 square foot Increment of Impervious surface. Page 1 of 5 RESOLUTION NO. The schedule of Stormwater Drainage System Development Charges for single family residential development attached as Exhibit 'B" and, by this reference incorporated · herein, is hereby adopted, Section 3. ALTERNATIVE RATE REVIEW FEE. The minimum fee for review of an alternative rate calculation shall be two- hundred-and-fifty dollars ($250). to be paid at the time the alternative rate calculation is submitted for review. If-the City hires a consultant to assist in reviewing the Information submitted, the cost of the consultant's review shall be shared equally by the City and the applicant, and the applicant shall pay this additional fee at the time the City decides whether or not to accept the alternative rate. Section 4. ALTERNATIVE PAYMENT REQUEST FEE. The fee for review of an altemative payment request shall be one-hundred dollars ($100.00), This fee Includes the cost of recording a lien against the property associated with the request. _ Approved as to Form: ......................... - :... City Affomey Date :-~. 8E Passed by the Council Submitted to the Mayor Approved by the Mayor Filed In the Office of the Recorder APPROVED,' ... Lea Kelley, Mayer ATTEST: .... City of Woodbum, Oregon .Page 2 of 5 CO--iL 8ILL NO. RESOLUTION NO. i page 1 of 2 EZHI0tT_.A'. TRAFFIC IMPACT FEE BY LAND-USE CATEGORY TIF ~om 'I-IF from maximum adoption 111/95 'I'IF allowable through through effective ITF lAND U~F~ CODF~CATE. GQBY TIF 1.2/3.1~4 ~ ~ RESIDENTIAL 21o Single Family Detached 220 Al~adment ~3,020~0 $1.510.10 $1.751.71 $1.g93.33/unit ~,046.14 $1.023.07 $1.188.75' $1.350.48 lunit $1.8.53.23 $926.02 $1,07467 $1,223.13 lunit $1.521.17 $760.58 $86220 $1,00~.97 lunlt RECREATIONAL $742.64 $371.32 S430;73 $400.14 Ibedh ~.431~5 $4,71s~2 ~6,475.01 se,2'z4,4e Ihote $4,300`30 $2.150.16 ~2,494.17 ~/..,636,2~ IT'~3.BJ:,. INSTITUTIONAL 51o Presdx~ Sl.647.O4 $823.52 $955.28 620 Ele~enta~ School ,~86.08 $163.04 ~23.g3 $e0 Chumh $2.,240.07 $1.120.03 $1~4 665 Day C~e Center $2.235.26 $1.117.63 $1,296.45 ~ Ubra~ $10,935.96. ~,46~.98 el0 Hoepltal ~.033.09 ~2,016.54 820 Nu~ Home $624.91 ~312.46 $362.45 BUSINESS & COMMERCIAL 320 Hotel/Motel S2.558.66 $1.278`30 812 8~ilding Matedals/Lumber $5.86321 ~.,931.60 815 Ditcount St~e~ 67.516.75 $3.758.~ 816 Hardware/P~ Stores $6A83.61 S8.491.76 817 Retail Numery :$4.612.56 $2,450.26 020 s~o~p~ Cer~r under 50.000 G.S.F. $14,470.13 $7.2.38.07 (321Shopping Center ,50.000 - 99.g99 G.$.F. $10,550,32 $5,275.16 8~2 Shopping Center 100.000 - 199,999 G.$.F. $10,673.39 $5,338.69 823 Stropping Center 200.000 - 269,999 G.S.i=. $8,553.26 $4,276.63 824 Shopplr~ Center 300.000 - 399,999 G.S.F. $7,869.68 $3,934.64 825 Shopping Cent~' 400,000 - 499,999 G.S.F. $7,301.94 $3,650.97 NOTE: T.G.LS.F. = Thousand Gross Leasable Square Feet T.G.S.F. = Thousand Gross Square Feet S6.119.19 $8.190.58 $4.960.89 $4.564.41 $4.235.13 $7,044.43/T.G.L.$.F. $5,~45.15 / T.GJ..S.P. $5,193.99 / T.G.LS.F. $4,819.28 I.T.G.L.G.F. 8E t~O ' d Page 3 of 5 'COUNCIL BILL NO. RESOLUTION NO. C9 8E TRAFFIC IMpACT FEE BY LAND,USE C^TEG ,DRY BUSINESS & COMMERCIAL e26 Shopp~ Cemer 500.000 - 599.~ e27 Cen ~ ~~~h ~ ~~e 912 ~~e: ~ve4n 711 Generai Olfl~ under 100.000 G.S.F. 712 General OffK~ 100,000- Igg,ggg G.S.F. 713 Gene~ Office 760 ReMatch Cen~ 770 Busine~ Park TIF from TIF ma.~w,~ edoption 111195 allowable through through TIF 12Z3.1~¢ $5,493.47 $2.746.73 $3.16621 'i'iF effective 11119G $4.993-97 IT.G£.$.F. INDUSTRIAL 1 lo C, ener~ Ught tndusm~ 120 General Heaw Ir~lustrial 130 Indusffial Park 140 Manulactuflng 150 W~reho~se 151 Mini-Warehouse 170 Utilith~e 860 Who~te NOTE: $3,62S.69 -IT.G.LG.F. $4,759.20 $2,379.60 · $2,760.33 $3,141.07 IT.GJ--S.F. $27.926.48 $13.963.24 $16,197.36 $16,431.4~ IT.G.~.F. S38,661~2 $19,280.76 $22,3O5.68 ~,25.450.61 IT.G.$.F. $9,191.96 $4,595.96 $5,331.34 $~.06~.~ I 'r'-GJ~=- $13,035.91 $6,517.95 $7,660.83 $8.603.70 Ipump' $tS.4~,68 tl;7.746.7g $3,986.28 $10,225.76/T.G.S.F. $40.~.'~? $20.2S2.0S ~2~.4~42 $2S.l'a2.?6 IT.G.a.F. t~38.sg $31g.4S $370.56 t~L21.67 IT-G-Sae- Ssa2.e7 t,,416.as t~..g5 t,~54e~ IT.~.$.F- l~Jt.g77.2g 613,488.64 $15.~48.8~ $17.805.01 IT.G.S.F. S50,682.91 $25.441.45 $29,E12.09 ti~.582.72 IT.G.S.F. S7R70.03 $3.98S.02 $4.622.62 $6,744,24 $3,372.12 S3,911.66 $5,696.31 $2,648,16 $3.303.86 $16.425.57 $8,212.79 $9,526.83 $3,701.40 $1.650.70 $2,146.61 $6.907.68 $3,453.84 $4,006.45 $3.350.49 $1.675.24 $1,943-2.8 $961.40 ~,80.70 $557.61 $4,467.32 $2.2::33.66 $2,501.05 $2,467.60 $1.233.80 $1,431.21 $1,172.91 $586.48 $680.29 $836.42 $418.21 $485.12 $339.70 $169.86 $197.02 $1,817.55 $808.78 $938.1g T.G.LS.F. = Thousand Gross.Leasable Square Feet T.G.S.F. ---Thousand Gross Square Feet S5.260~22 IT.G.S.F. $4,46120 IT.G.S.F. $3,759.57' IT.G.$,F. $10,840.88 1T.G,S.F. $2.,442.~3 IT.G.S.F. $4:$5g.07 I T.G.$.F. $2.211.32. IT.G.$.F. $634.63 I T.G.S,F. $2,948.43 IT.G,$.F. $1.628.62 I T.G.S.F. $774.12/T.G.S.F. $552.04/T.G.S.F. $224.20 / employee $1,067.59 I T.G.S.F. Page 4 o! 5 COUNCIL BILL HO.. _ RESOLUTION NO. C~SSSbgCOS=G! CG-~0-80 STORMWATER DRAINAGE SDC .FOR SINGLE-FAMILY RESIDENTIAL DEVELOPMENT Cost Per 500 X Impervious = SOC Per F~lUa~ ~eeJ. SUdaO~_,Ad,e e..f~S~l~d, ) D.~IIIAg UJ:d~ f;~ss.oo 5ol to 1,ooo $~1o.oo $55.00 %ool to 1,5oo $185:o0 SSS.oo' 1,sol to 2,ooo $55.00 2.001 to 2,600 ~-75'00 $55.00 mo~e ~han 3,001 $385.00 (~55.00 for each ~ Page5 of 5 COUNCIL BILL-NO. RESOLUTION NO. MEMO TO: FROM: SUBJECT: DATE: City Council through the City Administrator Public Works Program Manager x~/'~ Public Hearing on Special Assessment for New Sidewalks Along 99E Widening Project August5,1993 ' 8F RECOMMENDATION: Direct staff to bring an ordinance to council at the next regular council meeting establishing a special assessment district for new sidewalks along the Hvvy 99E widening project. BACKGROUND: Council entered into an agreement with the State of. Oregon for improvement of Highway 99E from Lincoln Street to the north city limits on January 13, 1992. As part of that agreement the city paid the state $63,000 for installation of sidewalks where none had existed oreviouslv along this segment of Highway 99E. The state paid for replacement of existing sidewalk. Resolution 1117 authorized preparation of an engineering report on installation of the sidewalks through special assessment. The council approved the engineering report on June 14, 1993. Resolution 1190 was approved by council on July 12, 1993 declaring its intent to make the sidewalk improvement through special assessment and setting the public hearing date for August 9, 1993. A copy of the resolution is attached. There were mathematical errors in the original resolution that made less than a ~10.00 change in the total estimated cost. They have been corrected in the attached copy. Required legal notice has been published in the newspaper and all the property owners of the proposed assessment district have been informed by mail, No remonstrances have been received by the city to date. Note that remonstrance by a majority of property on sidewalk projects does not require postponement for a 6-month period as required for other projects, It is only fair that the properties benefitting by the installation of the sidewalk pay for the cost of its installation. The state is not charging for the installation of storm drain or pavement improvements fronting the properties. Staff recommends that council direct that an ordinance be brought to the next council meeting establishing a special assessment district for new sidewalks along the Hwy 99E widening project. RR:Ig Attachment PUBHRG99. cc COUNCIL BILL NO. RESOLUTION NO. A RESOLUTION SETTING A PUBLIC HEARING ON THE COUNCIL'S INTENT TO MAKE SPECIAL ASSESSMENT FOR INSTALLATION OF NEW SIDEWALKS WHERE NONE HAD PREVIOUSLY BEEN IN PLACE ALONG OREGON STATE HIGHWAY 99E FROM LINCOLN STREET TO THE NORTH CITY LIMITS. WHEREAS, Resolution No. 1117 authorized preparation of an engineering report relating to installation of sidewalks along Oregon State Highway 99E from Lincoln Street to the north city limits; and WHEREAS, the engineering report has been prepared and approved by council, and WHEREAS, Ordinance No. 2105 requires that council declare its intent to make the improvement by special assessment and to hold a public hearing on the improvement, NOW, THEREFORE, THE CITY OF WOODBURN RESOLVES AS FOLLOWS: Section 1. That the Woodburn City Council passed Resolution 1099 on January 13, 1992 which authorized the city to enter into a cooperative improvement agreement with the Oregon State Highway Division for improvement of Oregon Highway 99E from Lincoln Street to the north city limits. As a part of that agreement the city agreed to reimburse the state $63,000.00 for costs of new sidewalks required by the project. The state would replace existing sidewalks as a part of the project. The reimbursement was to place sidewalks where none had existed previously. Section 2. That the cost of said improvement shall be at the expense of property specially and peculiarly benefitted by such improvement. Section 3. With the addition of sidewalks along the entire length of Oregon Highway 99E from Lincoln Street to the north city limits benefitted properties' are those who had sidewalks installed as part of this project. Benefitted properties indicated by an * are located outside the Woodburn city limits. Properties benefitted are depicted in Exhibit "A" and by this reference incorporated herein. They were benefitted by the sidewalk installation and should share in the cost of the improvement. That the property specially and peculiarly benefitted by such improvement is hereby declared to be the parcels of real property described in the Marion County Record of Deeds as follows: Tax Lot *42145.000 *42147.000 *42150.000 42189.000 Owner of Record Ivan & Betty Orton William & Twyla Whistler Daryl & Dorothy Wiesner Miller Brewing Co. Page 1 - COUNCIL BILL NO. RESOLUTION NO. 8F *42525.000 42535.001 42538.O0O 42571.666 42596.O00 42605.000 42639.000 42639.001 42643.429 42647.000 42656.000 42667.000 42669.000 42955.000 42964.000 92450.020 92440.000 92440.010 92440.020 92440.030 92440.040 92440.190 92730.000 92890.000 92890.010 92890.016 92890.020 92890.031 92890.044 State of Oregon Ira Gordon, Et al Robert HugeS (Richard Henkes) Leroy & Margaret Meyers Pablo Alverez, Et al Gerald & Betty Yoder Leroy Miller Diana Schwab Tomseth Leroy Miller Robert & Gloria Bigej Yacov & Nina Konovalov Real Estate Properties LTD Real Estate Properties LTD Roth's IGA Foodliner Inc. Richard Kreitzberg Milo Bibelheimer Et al John & Vera Grigorieff Milo Bibelheimer Et al Peter Lood Golden Coral Corporation Golden Coral Corporation FGC Investments Doug & Betty Livesay (Mistry) Helen Ruebesam Dempsy & Mary Sullivan George & Doris Yoder Josele Taylor Floyd Lenhardt Dempsy & Mary Sullivan Section 4. That the city engineer's cost estimate, including already reimbursed construction costs and future engineering costs, finance, legal, and administrative is estimated to be $69,531.68. Based on the front footage of the properties involved, the fair share cost has been estimated to be $6.95 per front foot. Costs per lot are: FRONT ESTIMATED TAX LOT FOOTAGE COST SHARE 1. 42147.000 600.00 4,170.00 2. 42145.000 386.04 2,682.98 3. 42150.000 57.02 400,40 4. 42189.000 1,277.54 8,878.90 5. 42525.000 1,947.22 13,533.18 6. 42535.001 644.93 4,482.26 7. 42538.000 162.48 1,129.24 8. 42571.666 118.59 824.20 9. 42596.000 160.00 1,112.00 10. 42605.000 168.00 1,167.60 Page 2 - COUNCIL BILL NO. RESOLUTION NO. 11. 42639.000 9.47 65.82 12. 42639.001 85.73 595.82 13. 42643.429 147.80 1,027.21 14. 42647.000 145.34 1,010.11 15. 42656.000 144.81 1,006.43 16. 42657.000 170.00 1,181.50 18. 42667.000 453.35 3,150.78 19. 42669.000 271.00 1,883.45 20. 42955.000 523.08 3,635.41 21. 42964.000 500.26 3,476.80 22. 92440.000 70.00 486.50 23. 92440.010 70.00 486.50 24. 92440.020 70.00 486.50 25. 92440.030 70.00 486.50 26. 92440.040 70.00 486.50 27. 92440.190 30.00 208.50 28. 92450.020 166.59 1,157.80 29. 92730.000 117.71 818.08 30. 92890.000 100.00 695.00 31. 92890.010 100.00 695.00 32. 92890.016 490.00 3,405.50 33. 92890.020 208.00 1,445.60 34. 90890.031 268.00 1,862.60 35. 90890.044 200.00 1,390.00 9,994.09 69,524.78 Section 5. That the benefitted property owners shall pay their share: 1) at the completion of the project, or 2) shall sign the Bancroft application with the city within the allowed time and make yearly payments for a period of ten years. The owners shall be allowed to pay off the remaining balance at any time during the bonding period. In case legal or jurisdictional difficulties exist, the properties outside the city limits may be billed directly by the city or state and be excluded from special assessment participation. Section 6. That it is estimated that the interest rate will be 7.0 percent. Section 7. That a public hearing on the city's intent to install the sidewalks through special assessment be held at 7:00 pm on August 9, 1993 in the Council Chambers of Woodburn City Hall at 270 Montgomery Street in Woodburn, Oregon. Approved as to form: City Attorney Date APPROVED: Len Kelley, Mayor Page 3 - COUNCIL BILL NO. RESOLUTION NO. IOA STAFF REPORT TO: THRU: Mayor and City Council Chris Childs, City Administrator FROM: Nevin Holly, Director Recreation and Parks SUBJECT: Acceptance of Youth Services Commission Grant DATE: August 3, 1993 Tonight, by Resolution, the Council is being asked to accept a Marion County Youth Services Commission Grant in the amount of $35,250.00. The grant was written on behalf of the community to allow for a more extensive intersession recreation program to assist in meeting community needs as a result of the onset of year-round scheol in Woodburn. The grant was endorsed by the Woodburn School District and by you prior to submitting on May 10, 1993. It has been said many times, both informally and' in formal structure, that a key need in Woodbum is enhanced youth programming. These needs have been intensified over the past 3 years with the emergence of a gang sub-culture, and now by the presence of large numbers of unsupervised youth as a result of year round school. The grant will enable the Department to offer organized recreation drop-in centers. The centers will be staffed by program leaders and will be funded from grant proceeds. Additional revenues within the context of the grant will allow the Department to hire public school teachers who are on intercession to conduct intersession educational sessions as well. The first drop-in center is scheduled to open by September 1st at the Woodburn Community Center. The second drop-in center is scheduled to open November 1st and will be housed at the Recreation Room (JC Building) at Legion Park. If public demand does not necessitate the opening of the second center, then grant proceeds would be channeled into Community Center project. The hours of operation for the drop-in center are scheduled for 1:00pm to 6:00pm daily, Monday through Friday. The target population is 8 to 14 year old children. This is the age group that we feel will be likely to be home alone during intercession periods. The acceptance of this grant will allow the Department to move forward with establishing this much needed community program. NH:swp NOTE: TEXT OF THE YOUTH SERVICES GRANT AGREEMENT IS INCLUDED IN SUPPLEMENTAl. AGENDA PACKET AS ITEM 2-A. A COPY WILL BE ATTACHED TO THE PERMANENT RESOLUTION FILED WITH THE CITY RECORDER. 10A COUNCIL BILL NO. J4~ ORDINANCE NO. AN ORDINANCE ACCEPTING A MARION COUNTY YOUTH SERVICES COMMISSION GRANT RECEIVED DURING FISCAL YEAR 1993-94, MAKING APPROPRIATIONS, AND DECLARING AN EMERGENCY. WHEREAS, Oregon Revised Statutes 294.326 provides for the expenditure of grant funds transferred to a municipal corporation for a specific purpose, and WHEREAS, a grant has been received from the Marion County Youth Services Commission for the purposelof providing an organized recreation drop-in center for youth to meet community needs as a result of year-round school, now, therefore, THE CITY OF WOODBURN ORDAINS AS FOLLOWS: Section 1. That the grant be accepted for its specific purpose and the Mayor be authorized to sign the Marion County Youth Services Commission contract, a copy.~of which is attached for reference. Section 2. That appropriations be increased within the Park and Recreation Fund for fiscal year 1993-94 as follows: REVENUES PARK AND RECREATION FUND: MCYSC Grant ~ 35,250 Total Park & Recreation Fund Revenue EXPENDITURES PARK AND RECREATION FUND: Leisure Services Program- Personnel Services (MCYSC Grant) 35.250 Total Park & Recreation Fund Appropriation 35,250 Page I - COUNCIL BILL NO. ORDINANCE NO. 10A Section 3. This ordinance being necessary for the immediate preservation of the public peace, health and safety, in that adoption of the appropriations will allow the availability of funds to proceed with the program, an emergency is declared to exist and this ordinance shall take effect immediately upon passage by the Council and approval by the Mayor. City Attorney APPROVED LEN KELLEY, MAYOR Passed by the Council Submitted to the Mayor Approved by the Mayor Filed in the Office of the Recorder ATTEST Mary Tennant, Recorder City of Woodburn, Oregon Page 2 - COUNCIL BILL NO. ORDINANCE NO. lOB MEMO TO: FROM: SUBJECT: DATE: City Council through City Administrator Public Works Program Manager ,~"~ Amendment to cooperative agreement for Country Club Road/Oregon Way signal and realignment August 11, 1993 RECOMMENDATION: Approve the attached resolution authorizing the Mayor and City Recorder to sign an amendment to cooperative agreement number 11,362 with the Oregon Department of Transportation for roadway realignment and signal installation at Country Club Road and Oregon Way. BACKGROUND: Council passed Resolution 1161 on January 11, 1993, entering into cooperative support agreement number 11,362 with the State of Oregon operating through the Department of Transportation. The agreement concerned the installation of a traffic signal and realignment of Country Club Road and Oregon Way. The state had originally intended to show signal design as its responsibility but it was not specifically stated leaving the city responsible by inference for the signal design. The first two changes in the amendment clarify the design responsibility. The third change in the amendment is to require the city to provide a base map to the state to be utilized for their signal design work. The state and city have been proceeding with the responsibility split indicated in the amendment but it must be formalized at this time. Staff recommends that the resolution be approved. ccrowt'ea.lig RR:bw COUNCIL BILL NO. RESOLUTION NO. A RESOLUTION AMENDING COOPERATIVE AGREEMENT NUMBER 11,362 WITH THE STATE OF OREGON FOR ROADWAY REALIGNMENT AND SIGNAL INSTALLATION AT COUNTRY CLUB ROAD AND OREGON WAY AND AUTHORIZING THE MAYOR AND CITY RECORDER TO SIGN SUCH AMENDMENT. WHEREAS, Resolution number 1161 was approved on January 11, 1993 by City Council authorizing entering cooperative agreement number 11,362 with the State of Oregon for roadway realignment and signal installation at Country Club Road and Oregon Way. WHEREAS, Cooperative agreement number 11,362 requires amendments to clarify some city and state tasks included in the agreement, NOW THEREFORE THE CITY OF WOODBURN RESOLVES AS FOLLOWS: Section 1. That the City of Woodburn enter into an amendment to cooperative agreement number 11,362 which is attached as Exhibit "A" and by this reference incorporated herein, with the State of Oregon for roadway realignment and signal installation at Country Club Road and Oregon Way. Section 2. That the Mayor and City Recorder are authorized to sign said agreement on behalf of the City of Woodburn. // /~.._~ Approved as to form:/'~.~*~/~~¢~''~ ~ ~- city Attorney Date APPROVED: Len Kelley, Mayor Passed by the Council Submitted to the Mayor Approved by the Mayor Filed in the office of the Recorder A-R-EST: Mary Tennant, City Recorder City of Woodburn, Oregon lOB Page 1 - COUNCIL BILL NO. RESOLUTION NO. ccmwrea.lis RR:bw lOB July 6, 1993 City of Woodburn 270 Montgomery Street Woodburn, OR 97071 AMENDMENT TO: Misc. Contracts & Agreements No. 11,362 People: The State of Oregon, by and through its Department of Transportation (State), and the City of Woodburn, by and through its Elected Officials (City), entered into Cooperative. Improvement Agreement No. 11,362, dated January 5, 1993, concerning the installation of a.traffic signal and realignment of Country Club Road in Woodburn. State and C%.~- have now determined that the aforementioned agreement, although remaining in full force and effect, should be amended by this agreement in order to show State 'to be responsible for signal design at Country Club Road and State Highway 140. City shall provide State a base map from which State will design signal. Any further reference to the aforementioned agreement numbered 11,362 shall be amended to show the following: Recital No. 2, Page 2, shall now read: 2. State shall provide signal design, and a fully-tested traffic signal controller and cabinet for the new signal. Recital No. 1, Page 3, shall now read: 1. City 'shall conduct the.necessary field surveys, perform all design work (with the exception of the signal design) required to produce plans, specificatons and cost estimates, prepare the contract and bidding documents, advertise for bid proposals, award all contracts and furnish all construction engineering, field testing of materials, technical inspection and project manager services for administration of the contract. Recital No. 13, page 4, shall read: 13. City shall provide base map to State for State's signal design. AMENDMENT TO: B1292008 EXHIBIT "A" City of Woodburn Amendment No. 11,362 lOB City shall authorize execution of this Amendment during a duly authorized s'ession of its City Council. IN WITNESS WHEREOF, the parties hereto have set their hands and affixed their seals as of the day and year hereinafter written. This project was approved by the Oregon Transportation Commission on July 21, 1992, as part of the Six Year Transportation Improvement Program, page 7~. The Oregon Transportation Commission, by a duly adopted delegation order, authorized the S~ate Highway Engineer to sign this agreement for and on behalf of the Commission. Said ' authgrity has been further dele-gated to the Traffic Engineer by Subdelegation Order HWY-4, paragraph 3, dated October 15, 1992. APPROV;%~ RECOM~. NDED Reg~ Engineer { STATE OF OREGON, by and ~h~ough its Department of Transportation By State Traffic Engineer Date -THE CITY OF WOODBURN, by and through its Elected Officials By Mayor By City Recorder Date 10C MEMO TO: FROM: SUBJECT: DATE: City Council through City Administrator Randy Scott, C.E. Tech III ~'~,~'· Acceptance of Utility Easement, Fir Street July 22, 1993 RECOMMENDATION: It is being recommended the city council accept the attached utility easement. BACKGROUND: The attached easement is for the installation of a 15" diameter storm sewer and for future maintenance. City forces will be installing a storm sewer within Fir Street, to eliminate ponding prob!ems and to prepare for future improvements. The easement will allow access to the existing'~8" dia. located along State Hwy 214 at the end of Fir Street. The document has properly been signed by the property owner, Mr. Floyd Leininger. FIRSTR.EAS ~(NOW ALL MEN BY THESE PRESENTS, that the FLOYD C. LEININGER. for the consideration of One Dollar (91.00) and other valuable conslderations'~o them paid, the receipt whereof hereby is acknowledged, hereby do forever grant unto the CiTY OF WOODBURN, a Municipal Corporation of Marion County, Oregon referred to herein as the CITY, a permanent right-of-way and easement over and along the full width and length of the premises described as follows, to wit: A 16-foot wide utility easement located on Tax Lot # 92820-16'0 in Section 7 Township 5 South, Range 1 West of the Willamette Meridian, Marion County; Oregon, the centerline which is more particularly described as follows. Beginning at a point which is North 41'15' East 54.00 feet from the northeast corner of lot four block three, Chappell's Addition to the City of Woodburn, Marion County, Oregon; thence North 00"45'West 35.0 feet more or less to the southerly line of Oregon State Highway 214, the terminus of said center line. With the right, privilege and authority, to said City, to construct, maintain, replace, reconstruct, remove, and add to, a [[[[U.~E pipeline or pipelines, with all appurtenances Incident thereto or ne(~essary therewith, in, under and across the said premises, and to cut and remove from said right-of-way any trees end other obstructions which may endanger the safety or interfere with the use of said pipeli'nes, or appurtenances attached or connected therewith; and the right of Ingress and egress to and over said above described premises at any and all times for the purpose of doing anything necessary or useful or convenlent for the enjoyment of the easement hereby granted. THE CITY SHALL, upon each and every occasion that such JZ[]J.[]~ facility is constructed, maintained, replaced, reconstructed or removed, or added to, restore the premises of the Grantors, and any Improvements disturbed bythe City, to as good condition as they were In prior to any such Installation or work, but if not practicable, then pay to Grantors reasonable compensation. THE GRANTORS, heirs and assigns, reserve the right to use the premises for walkways, driveways, planting, and related purposes, and all [J]]l.l]~ facilities shall be at a depth consistent with these purposes. EXCEPTION.. No structure shall be placed within the easement, or within 45" projection [Jpward from the bottom of the pipeo FLOY~I' (~. LEININGER (./ STATE OF OREGON ) )SS COUNTY OF MARION ) On this the. 2Z_~ ~day of July, 1993, before me a Notary Public in and fOr the County and State personally appeared, known to me toke the same person~) whose names are subscribed to the within instrument and acknowledged that they voluntarily executed the same fOr the purpose therein contained. IN WITNESS WHEREOF, I hereunto set my hand and official seal. ~ LYNN A. GERSTNER ~ ~,.~J NOTARY PUgLIC-OREGON ~ ~ ~UMISSION N0. 025262 MY COMMISSION EXPIRES JUNE 33 ~7 ho uc· My Commission Expires: ~, - ! ..~ - ~ .7 EIN/NG~.UTL CONSTRUCT ~TA. 0+~§ · - RIM EL. MATCH EXXSTXN6 INV. IN t73. t4 '-' '-' ZNV. OUT t.73.3g 1:1~. ZN i.73.4g / / l. ':FIR STF 8' SANITA~.Y-SEtqER ~ 640 1OD MEMO TO: FROM: SUBJ.: DATE: Mayor and City Council Chris Childs, City Administrator Selarv Range - Communications Center Manager August 5, 1993 RECOMMENDATION: Authorize City Administrator to fill Communications Center Manager position within salary range M-24.0. ISSUE: Two well qualified candidates for the Communications Center Manager position have emerged from the recruitment process. A top candidate has been identified, although the city's advertised salary range is problematical in b~in~able to attract either of the top two individuals identified. The importance placed on recruiting a suitable candidate, as well as the qualifications of the candidate selected,.. have been echoed by representatives of the User Board who participated in the interview process. OPTIONS: There appear to be three alternatives available at this stage of the process: 1) As per recommendation, authorize the position to be filled within a competitive range at salary range M-24.0. 2) Go further down the recruitment list to find a lesser qualified or experienced individual willing to assume the position at the advertised range. 3) Re-evaluate position duties and responsibilities and readvertise (start process over). BACKGROUND: When created, this position was placed at non-union salary range 21.0. There is evidence that, at the time the position was initially filled in August, 1990, there was some uncertainty as to what salary level should be considered, because it was a "new job with unknown values". It appears that numerous assurances were given that the position would, in fact, be re-evaluated on the first anniversary date (August, 1991); something that did not happen, as the incumbent city administrator left the city's employment in July, 1991 and the interim administrator apparently chose not to address the issue. I have located documented evidence that as early as May-June of 1991 there was discussion regarding upgrading the position to either M-24.0 or M-24.5. There was apparently similar discussion in October, 1991, and in April, 1992 I received a specific request from the incumbent director that the position be placed in the upper end of range M-26.0. The latter was accompanied by a "comparability study" put 1OD Page 2 - Communications Center Manager (8/5/93) together by the director, using five similar sized dispatch centers for comparison. The list of comparables failed to justify an M-26.0 range, but certainly lent credibility to consideration of either the M-24.0 or M-24.5 ranges. Facing the relative certainty that this position was underfunded, I initially approached the Council on April 26, 1993 to request that we be allowed to advertise the position at non-union salary range 22.0 to improve our chances of getting generally better qualified candidates to apply. The recruitment resulted in a total of thirteen applicants and, in the final analysis, only two of them clearly possessed the qualities as well as qualifications sought for this position. It became apparent during the interview process that our advertised salary range (22.0) would be a problem in being able to accomodate either of these top two candidates. In the past several weeks, I have done a comparability study (if r~y own regarding this position, utilizing eight similarly sized dispatch centers, each employing between eight and ten dispatchers (Woodburn's center employs nine). My research- indicates that Woodburn's salary range for this position is some 12-1/2 - 19% less than the everaae of the eight comparators. A 15% upward adjustment in our ranges would come in at about range M-25.0. It must be noted that Woodburn management employees, on average, are generally compensated somewhat less than the average of their peers in similar sized cities. In evaluating the applicability of range M-24.0 for this position, some comparison is necessary. A position currently at range M-24.0 is that of Library Director. Like the Library Director position, the Communications Center Manager position is responsible for a very specialized and focused program where advances in technology can create a steadily ongoing re-evaluation of program direction and goals. Neither position presently has the benefit of subordinate supervisory staff; the Director/Manager is totally responsible. Both positions are responsible for similar sized operating budgets and number of employees supervised (Library Director - $485,000 budget/7.5 FTE supervised; Communications Center Manager- $441,000/9.0 FTE). In placing the Communications Center Manager position at a management salary range, there will also be certain expectations of the position that were not required of the previous manager. These include increased community involvement, participation in staff meetings and planning sessions and periodic attendance at Council meetings. Each of these are positive considerations and should enhance public perception of the importance of the position, and the 9-1-1 program in total, within the community. Two other options regarding the Communications Center Manager position were identified on Page I of this memo; going further down the recruitment list or simply 1OD Page 3 - Communications Center Manager (8/5/93) readvertising the position and starting the recruitment process over again. Neither of these can be seen as a positive option. Unless the fundamental issue of compensation is addressed, as otherwise accomplished in this memo, the pool of candidates available for the position simply won't match the qualifications and experience the position demands. Re-recruitment, in particular, would be very counter-productive in terms of staff time, cost and the additional time lost in moving forward with direct management of the communications center. Similarly, the energies of the interim manager, a Police Lieutenant, need to be redirected back to his normal law enforcement duties. In keeping with Resolution 1081 (Sept. 1991), "a minimum and maximum range level shall be set for newly appointed management employees". Minimum and maximum compensation within range M-24.0 is presently set at $2,698 - $3,280 over five progressive steps. The five-step format would not apply to the Com~unTcations Center Manager position. In practical terms, it would likely not apply anyway, given the prospect that this position may be shifted to an independent ORS 190 agency-- within the next year. 10E MEMO TO: FROM: SUBJECT: DATE: City Council through the City Administrator Public Works Program Manager ,~ '~-~ Clarification of Bid Award on Sale of Surplus Property August 17, 1993 RECOMMENDATION: By motion, clarify that the successful bidder for the sale of surplus city property located in the Woodburn Industrial Park was Leland E. G. Larson. BACKGROUND: Council, at the June 14, 1993 meeting, accepted the bid of School Bus Services, Inc. for $68,225 for purchase of approximately 2.03 acres of surplus city property in the Woodburn Industrial Park (memo included as attachment A). The bid proposal page (included as attachment B) indicated that Leland E. G. Larson was the bidder and prospective purchaser of the property. Mr. Larson is president and owner of School Bus Services, Inc. and desires to be shown as purchaser of the property. As a result of council's action and discussions with School Bus Services' officers, the Woodburn City Attorney has prepared an owner's sale agreement with Mr. Larson as the purchaser. This agreement was forwarded to School Bus Services where it was reviewed by their attorney and signed by Mr. Larson. The Mayor does not believe he should sign this form of agreement without further council action since the actual purchaser is different than the bid acceptance approved by council at the June 14, 1993 meeting. Staff incorrectly listed School Bus Services, instead of Leland E. G. Larson, as the bidder in the memo included as attachment A and this led to the discrepancy. To allow the transaction to proceed, staff requests that council, by motion, clarify that the bid was awarded to Leland E. G. Larson. RR/kv 10E MEMO TO: FROM: SUBJECT: DATE: City Council through City Administrator Public Works Program Manager ,~,'-~ ~ Award for Sale of Surplus Property June 10, 1993 RECOMMENDATION: Accept the bid of School Bus Services, Inc. for $68,225.00 for purchase of surplus city property located in the Woodburn Industrial Park. BACKGROUND: Council through resolution number 1179 declared an approximately 2.03 acre parcel off National Way in the Woodburn Industrial Park to be surplus property. Council authorized the property to be sold by a sealed bid process and set a minimum bid of 865,000. Bids on the sale of the property were opened and publically read at 11:00 am on June 10, 1993. Results were: Bidder School Bus Services, Inc. Amount 868,225.00 The bid of $68.225.O0 from School Bus Services, Inc complies with the minimum bid requirements and should be accepted. Property Sale.693 RR:bw ATTACHMENT A SECTION IV STANDARD FORMS 10E Property Description: Township § South, Range I West= OFFER TO PURCHASE REAL PROPERTY BID PROPOSAL FOR INDUSTRIAL PARK SITE Parcel #2, Lot 1, Block 10 Industrial Park Addition No. 3, Section 8, Purchaser Name, Address, and Telephone= Leland E.G. Larson Signature: 1625 S.E. Hogan Road p~,esham~ OR 97080 667-8090 Name: Title: Ron Coleman School Bus Vice President, Services, Inc. I Bid Price: $68. 225.. (Note - This amount is inclusive of the value of the property. All other costs associated with escrow transaction fees for closing shall be borne as standard practice between Seller and Purchaser}. Property Included: Please see copy of plat attached. Sale Includes lend only. Title Insurance: The city shall furnish a preliminary title report showing the condition of the property prior to sale~ and shall furnish en owner's standard title Insurance policy in the amount of · purchase price for the real property from a title Insurance company showing good and marketable title. Page I - Section IV ATTACHMENT B 10F MEMO TO: FROM: SUBJECT: DATE: City Council through City Administrator Public Works Program Manager ~ Bid Award for New Compact Truck and Used 5 Passenger Sedan August 18, 1993 RECOMMENDATION: Award Bid Number 94-01 for a new compact pickup truck to Hillyer's Mid-City (Sauvain) Ford, Inc. for $7,422.00 and Bid Number 94-02 for a used 5-passenger sedan to Miles Chevrolet for $7,840.00. NOTE: Total cost of $15,260 is less than approved budget line item 93-930-710.035 which included $15,500 for pickup and automobile replacement. BACKGROUND: These two bid items were for the Wastewater Treatment Plant operations. City of Woodburn Bid Number 94-01 for a new compact pickup truck was opened and publicly read at 2:00 pm on August 13, 1993. The results were: Bidder Model Price Hillyer's Mid City (Sauvain) Ford Cascade Chevrolet Miles Chevrolet Ford Ranger Chevy S-10 Chevy S- 10 $7,422.00 $8,1 69.00 $8,484.83 All vehicles complied with specifications. This vehicle will replace a 1980 Ford Grenada which is in very poor mechanical condition and will be disposed of when the new vehicle is received. A comparable vehicle purchased under last years state bid price agreement would have cost $8,150.00. The pickup will provide reliable transportation for treatment plant operations involving Industrial and cross connection inspection. Staff recommends award to Hillyer's Mid City (Sauvain) Ford, Inc. for $7,422.00. 1OF City Council through City Administrator August 17, 1993 page 2 City of Woodburn Bid Number 94-02 was opened and publicly read at 2:00 pm on August 6, 1993. The request was basically for a used 1990 or newer, four door, five passenger sedan. Specified also was a maximum of 25,000 miles and $8,000 price. Standard items along with air conditioning and white color, if possible, was specified. The results were: Met Bidder Model Price Specs. Herschberger Motors Midway Motors Miles Chevrolet Cascade Chevrolet Cascade Chevrolet Cascade Chevrolet Midway Motors Cascade Chevrolet Cascade Chevrolet Cascade Chevrolet 1990 Dodge Shadow $ 6,975.00 No 1991 Mazda Protege $ 7,490.00 No 1991 Chev Corsica $ 7,840.00 Yes 1992 Chev Cavalier $ 7,997.00 No 1992 Geo Prizm $ 8,590.00 No 1992 Geo Prizm $ 8,779.00 No 1992 Plym Acclaim $ 8,950.00 No 1992 Chev Corsica $ 9,250.00 No 1992 Chev Corsica $ 9,545.00 No 1992 Buick Skylark $10,350.00 No The only vehicle that met the specifications down to the color requested was the 1991 Chevrolet Corsica with 22,230 miles from Miles Chevrolet. Other vehicles below the dollar limit in the specification exceeded the miles specification. This vehicle replaces a 1984 Ford LTD which is in very poor mechanical condition and will be disposed of upon delivery of the used vehicle. The July, 1993 NADA average retail value for a comparable 1991 Corsica was $8,875 or more than $1,000 above the Miles Chevrolet offer. The other two vehicles below $8,000 were offered at more than NADA average retail for example NADA average retail for the 1990 Dodge Shadow offered was $6,375 or $600.00 less then bid price. Staff has examined the Miles Chevrolet vehicle and found it to be in excellent condition and an exceptional value for the bid price. This vehicle has the size to comfortably transport five persons and will provide enhanced economy of operation that was desired by the treatment plant. Staff recommends that the Miles Chevrolet bid of $7,840.00 be accepted. lOG MEMO: TO: FROM: SUBJECT: DATE: The City Council Public Works Director ~ ~ Hardcastle Resurfacing Extension Cost Approval August 19, 1993 RECOMMENDATION: Approve Hardcastle 'resurfacing extension contract payment $6,000.00 to be paid from budgeted Local gas tax revenues. amount estimated at BACKGROUND: City Council previously approved the resurfacing cost sharing agreement between the State Highway Division and the City. The agreement calls for the State to pay 50 percent of the cost of Hardcastle street resurfacing between Hwy. 99E and Gatch Street. The State's willingness to share the resurfacing cost has been based on the fact that the storm drain installation, requiring a street cut, was necessary on Hardcastle to drain 99E. City's willingness was based on the need to improve the deteriorated condition of the pavement. At the time of agreement approval, the City Council advised Public Works staff to negotiate with the State and extend the resurfacing from Gatch to Front St. Staff has completed these negotiations and the contractor is willing to extend the boundary of the resurfacing project at the accepted unit bid price. The asphalt unit bid price of approximately 924.00 per ton of asphalt is substantially lower than the city's recent year contracts. Asphalt resurfacing is scheduled to be done on Friday, August 27, 1993. Council approval is requested. HARDCSTL. RSF 1OH MEMORANDUM TO' THRU: Mayor and City Council Chris Childs, City Administrator FROM: Nevin Holly, Recreation and Parks Director SUBJECT: Pool Workshop Meeting Request DATE: August 12, 1993 Per Council authorization, the City has now signed a contract with Mr. Don Carey and Associates to provide the City of Woodburn with construction/remodel plans for Woodburn War Memorial Swimming Pool. As we discussed at the July 12th Council meeting, it is imperative we have ample public input into the planning of the pool. The Woodburn Pool committee will be meeting with Mr. Carey on Sunday, August 29th. I feel confident that the Pool Committee, which is comprised of local community leaders from the City Council, Park Board, Budget Committee and School District, will do an excellent job of reviewing proposals and recommending alternatives to the City Council for adoption. At this time I ask the Mayor to set a Council Workshop on Monday, August 30 at 7:00pm. At this time Mr. Carey will be present and will provide the Council with a variety of development and planning options. Representatives of the Pool Committee will also be present and provide the Council with its findings and recommendations. Thank you. 101 MEMO TO: FROM: Mayor and City Council Chris Childs, City Administrator SUBJ.: DATE: Cable Access Committee Issues August 2, 1993 (Revised August 12, 1993) The city's franchise agreement with Northland Cable Television, Inc. calls for the creation of a formal "Access Provider" organization. The Woodburn Cable TV Community Access Advisory Committee is continuing to review options and planning for a permanant cost-effective local cable access organization. As conveyed to the Council in a January 18, 1993 staff report, the Advisory Committee has identified a 501 (3) (C) non-profit corporation as the primary means of accomplishing this goal. Other nearby community access organizations studied by the Advisory Committee (Salem, Tualatin Valley) have successfully utilized the non- profit corporation format. At this point, the Advisory Committee has located a local attorney who is willing to prepare and file the paperwork for a 501 (3) (C) organization. Adequate funds are budgeted for this purpose in the community access component of the Cable Management Fund. Otherwise, the Advisory Committee is nearing completion of a community "Ascertainment" study, as required by the franchise agreement, to determine the local cable access needs within the Woodburn community. Also, the Committee is in the process of identifying appropriate community access equipment to be purchased with the $55,000 provided by Northland for this purpose under the terms of their franchise. Northland's recent decision to begin a "Northland Cable News" show in October has apparently resulted in a commitment by that company to purchase a certain amount of equipment for this purpose. I am advised by Committee members that the Northland equipment may be available to complement whatever is purchased by the access organization, and visa versa. This is an encouraging prospect, but will have to be planned carefully. Before proceeding with the expense of forming the 501 (3) (C) non-profit corporation, members of the Advisory Committee would like to meet with the Council in a workshop session to discuss the matter and make sure that the City Council is comfortable with the recommended direction. It is suggested that a workshop session for this purpose could be accomplished during one hour immediately prior to a regular Council meeting (6 p.m. start), perhaps your September 13, 1993 meeting. · 11A 8/04/93 A/P CHECK LISTING FOR THE MONTH OF JULY 1993 Page Check Nuaber 19376 19377 19378 19380 19381 19382 19519 19520 19521 19522 19524 19525 19526 19527 19528 19530 19531 19532 19533 19534 19535 19536 19537 19538 19539 19540 19541 19542 19543 195~ 19545 19546 19547 19548 19549 19550 19551 19552 19553 19554 19555 Budgetary Account Number Vendor Name SEUERBOND COUPONS SEUERBONDCOUPONS SEUERBONDCUUPONS SEgERBONO REI#BURSENENT-PARKS LAND SALE CONTRACT-PARKS SUPPLIES-NON DEPT SUPPLIES-NON OEPT $E~ERBONOCOUPONS SEUERBOND SE~ERBONDCOUPONS SUPPLIES-PARKS SERVICE$-UATER VOID V 0 [ D VOID REGISTRATION-UUTP REFUND-PARKS SERVICES-POLICE SUPPLIES-PUBLICUORKS SUPPLIES-PARKS SUPPLIES-PARKS SUPPLIE$-UUTP SUPPLIES-PARKS SUPPLIES-PARKS SUPPLIES-VARIOUS SUPPLIES-911 $Ek~RBONDCOUPONS INSURANCE-RSVP REFUND-BUSINESS LICENSE SEI~R BO~DCOUPONS SUPPLIES-PARKS SERVICES-PARKS SERVICES-PARKS SUPPLIES-kq~I'P SUPPLIES-C STORES SERVICES-PARKS SERVICES-911 SERVICES-911 SUPPLIESoU~I'P SERVICES-ENGINEERING SUPPLIES-M~TP REIMBURSEMENT-NON DEPT SERVICES-UUI'P SERVICES-BUILDING Vendor Nceber Check - Date Uritten Amount of Check CHASE MANHATTAN BANK 00~ 7/01/93 SECURITY PACIFIC 018339 7/01/93 JERRY DAUGHERTY 003064 7/01/93 CEDE & CO 002299 7/01/93 BRIAN SJOTHUN 018456 7/01/93 ROBERT SAgTELLE 018217 7/01/93 At~RD$ & ATHLETICS 000580 7/01/93 SOLO SPECIAL EDITION 018603 7/01/93 CHASE MANHATTAN BANK 002380 7/01/93 U.S. BANK 020058 7/07/93 U.S. BANK 020070 7/09/93 U.S. POST OFFICE 020090 7/09/93 US POST OFFICE 020090 7/09/93 VOID VOID VOID VOID VOID VOID OR ASSOC OF CLEAN UATER NONE 7/09/93 DEBBY HAYCOCK NONE 7/09/93 INTERCULTURAL COMMUNICATIONS NONE 7/09/93 A- 1 TYPEURITER SERVICES 000008 7/09/93 ALL PURE CHEMICAL CO 0001:56 7/09/93 ALDUS CORPORATION 000137 7109193 AUTO#ATED OFFICE SYSTEMS 000563 7/09/93 BEN FRANKLIN STORE 001205 7/09/93 BI-KRRT CORPORATION 0012~5 7/09/93 BOISE CASCAOE 0013~,0 7/09/93 BUSINESS CONNECTIONS 001627 7109193 CHASE MANHATTAN BANK 007_T~80 7/09/93 CIMA INSURANCE 002485 7/09/93 COASTAL FARH SUPPLY 002625 7/09/93 THE COI4MERCIAL SANK 002695 7/09/93 EMERALD POOL & PATIO 004150 7/09/93 ENGINEERED CONTROL PRCO 00~180 7/09/93 EVERGREEN STAGE LINE INC 004433 7/09/93 FARMERS OIL 005040 7/09/9~5 FIRST BANK OF MARIETTA 005133 7/09/93 BRIAN FLANNIGAN 005170 7/09/93 GERVAIS TELEPHONE CO 006143 7/09/93 I B 14 CORPORATION 008010 7/19/93 INOUSTRIAL FASTNERS 00807] 7/09/93 JOR SHOPPERS INC 09119 7/09/93 J.T. SPRAY SERVICES INC 009198 7/09/93 TCO0 LONOIN 011315 7/09/93 MAPLE RIOGE JANITORIAL 01207] 7/09/93 MARION COUNTY BLDG INSPEC 012090 7/09/93 7,585.00 540.00 265.00 70,000.00 291.50 5,000.00 29.90 1,205.40 120.00 55,000.00 927.50 116.00 232.37 125.00 27.00 65.00 81.00 330.8~ 97.95 ~6.08 249.06 13.02 305.99 15.00 265.00 1,760.00 50.00 132.50 526.00 9~6.02 779.01 1,206.40 178.87 25.00 95.44 310.00 54.32 1,482.00 101.80 380.00 2~396.92 154,222.64 11A 8104193 A/P CHECK LISTING FOR THE MONTH OF JULY 1993 Page 2 Check Nurber Budgetary Account Nteber 19556 SERVICES-POLICE 19557 SERVICES-~rP 19558 SUPPLIES-VARIOUS 19559 SUPPLIES-FINANCE 19560 SERVICES-911 19561 SUPPLIES-PARKS 19562 SERVICES-NON OEPT/UATER 19563 EXPENSES-UUTP 1956/, SUPPLIES-C STORES 19565 REIMBURSEMENT-PARKS 195~ SERVICES-V~J~[~J$ 19567 SERVICE$-COLJRT 19568 SUPPLIES-M,rrP 19569 SUPPLIES-PARKS 19570 SUPPLIES-PA~KS 19571 SERVICES-911 19572 SUPPLIES-UUTP 1957~ SERVICES-PARKS 19574 SUPPLIES-PARKS 19575 SERVICES-C[TY ATTY 19576 SUPPLIES-POLICE 19577 SERVICES-LIBRARY 19578 SUPPLIES-PARKS 19579 SERVICES-I~ATER/STREET 19580 SERVICES-ENGINEERING 19581 SUPPLIES-POLICE 19582 $E~ER BOND COUPONS 195~ SERVICES"RSVP 19584 SERVICES-VARIOUS 19585 SUPPLIES-ggTP 19586 SUPPLIES-PARKS 19587 SUPPLIES-PARKS 19588 SERV[CES-M~TP 19589 SERVICES-PARKS 19590 SERVICES-PARKS 19591 SUPPLIES-IA~rP 19592 SUPPLIES-POLICE 19593 PETTY CASH-VARIOUS 19594 SUPPLIES-POLICE 19595 SE~ER BOND COUPONS 19596 SEU~R BONO r.~3UPONS 19597 SERVICES-UATER 19598 V 0 [ 0 195~ VOID 19600 V 0 I D 19601 V 0 I D Vendor Name vendor Nc~nber Check - Date Written Amount of Check MARION ENVIRONMENTAL SERVICES 012227 7/09/93 10.60 KRRYATT INDUSTRIES 012240 7/09/93 154.51 NETROFUELING INC 012~4~ 7/09/93 571.04 MONEY MAGAZINE 012547 7/09/93 18.99 NONITOR CO-OP TELEPHONE 012550 7/O9/93 170.00 N.U. REGIONAL MAGAZINE 013365 7/09/93 26.95 NPA UEST 013389 7/09/93 775.00 ANN O'ROKE 01/,6~0 7109193 40.00 PITNEY BCYdES 015350 7/09/93 179.50 SHIRLEY PITT 015359 7/09/93 129.99 PORTLAND GENERAL ELECTRIC 015420 7/09/93 5,621.o2 TERRY R~IIREZ 017050 7/O9/93 32.00 TERRY L RICHARDSON 017192 7/09/93 ~46.40 ROOOA PAINT 017280 7/09/93 _ 614.10 RUGGED IgC 01~1 7/09/93 150.00 ST PAUL C~X~PERATIVE TELEPHONE 018035 7/09/93 177.60 SANOERSON SAFETY SUPPLY 018170 7/(~)/93 405.96 SALNAIN MOTOR CO 018210 7/09/93 969.54 SCOT CUSTOOIAL SUPPLY Ola]O~ 7/09/93 2,066.08 N. ROeERT SN[ELOS 018450 7/09/93 4,117.50 SILVERFLEET SYSTEMS 018~65 7/09/93 1,601.44 SOUNO ELEVATOR CO 018610 7/09/93 15&.50 SPORTgIOE 018698 7/09/93 261.50 TELECOI~4 SYSTEMS ]NC 019043 7/09/9~ 62.25 DAVID L TRAPP & ASSOC 019210 7/09/93 4,200.00 U-LEAD SYSTEMS INC 020006 7/o9/93 lo6.oo u.s. BANK 020070 7/09/93 1,576.25 US POST OFFICE 020090 7/09/93 400.00 U.S. gEST COI4MUNICATIONS 020(~5 7/09/93 1,107.36 VALLEY UELD[NG SUPPLY 021050 7/09/93 9.00 VIESKO REO[oNIX 021140 7/09/93 198.8/, VIKI#G OFFICE PROOUCTS 021180 7/09/93 372.93 AL gAKEF[ELO 022015 7/09/93 3,1GB.O0 k~3OOBURN FIRE DISTRICT 022595 7/O9/93 220.00 k~3OOBURN PLUMBING 022695 7/O9/93 4,429.20 k~:)OOBURN RADIATOR & GLASS 022700 7/09/93 45.30 TERRY RICHARDSON CONSULTING 017192 7/12/93 1,610.00 CITY OF I,K)COBURN o15255 7/13/93 159.49 TERRY RICHARDSON CONSULTING 017192 7/14/93 220.00 FIRST INTERSTATE BANK 005140 7/15/93 132.50 U.S. BANK 020070 7/15/93 810.00 US POST OFFICE 020090 7/15/93 1/,6.19 VOIO VOID VOID VOID VOID VOID VOID VOID 191,830.17 · . 11A 8104193 A/P CHECK LISTING FOR THE MONTH OF JULY 19~3 Page Check N~r 19602 19603 196O4 19605 19606 19608 196O9 19610 19611 19612 19613 19614 19615 19616 19617 19618 19619 1~0 19621 19622 1962 4 19625 19626 19627 19628 19650 19631 19652 196~ 19655 19657 19638 19639 19640 19641 19B2 19643 19644 196/,5 19646 196/,7 Budgetary Account Nted~er VOID SIDEWALK SUBSIDY-STREET SUPPLIES-POLICE SUPPLIES-COUNCIL SERVICES-VARIOUS SERVICES-VARIOUS SERVICES-WATER SERVICES-LIB/CITY HALL SUPPLIES-VARIOUS SUPPLIES-CITY ATTY SEgER BONO COUPONS SERVICES-ENGINEERING SERVICES-911 SUPPLIES-CITY ATTY/PW SUPPLIES-POLICE SERV]CE$-C STORES SERVICES-ENGINEERING FEES-WWTP SUPPLIES-PARKS/M~TP SERVICES-tRaTP/UATER SUPPLIES-PARKS SUPPL%E$-UWTP SERVICES'CITY HALL $UPPL]ES-COOE ENF/POLICE SUPPLIES-NON DEPT SERVICES-CITY HALL/LIB $UPPLIES-C STORES $ERVICES-COOE ENFORCEMENT SERVICE$-UUTP MEMBERSH]P'VARIOUS SUPPLIES-POLICE SUPPLIES-ENGINEERING SUPPLIES-ENGINEERING SERVICES-$~JTP SERVICES-STREET SERVICES-BUILDING FEE-tA~TP SERV[CES-COOE ENFORCEMENT SUPPLIES-PW SERVICES-COOE ENFORCE SERVICES-WATER/STREET SUPPLIES-FINANCE MEMBERSHIP-POLICE/911 SERVICES-C(XJRT SERVICES-STREET/WATER SERVICES-POLICE Vendor Naee Vendor N~irloer Check - Date Written Aeount of Check VOID VOID VLN)IMIR SHEVCHUK NONE 7/16/93 250.00 AUTOMATED OFFICE SYSTEMS 000565 ?/16/93 172.75 AWARDS & ATHLETICS 000580 7/16/93 5.00 AT&T INFORMATION SYSTEMS 000620 7/16/93 /,70.00 AT & T 000~ 7/16/93 258.64 Ak~A N.U. OREGON SUBSECT. 000663 7/16/93 &O.O0 BLUE RIBBON JANITORIAL 001305 7/16/93 288.00 BOISE CASCADE 001340 7/16/93 235.31 BUTTERSI~THS LEGAL PUBLISH 001590 7/16/93 65.8~ CHASE MANHATTAN BANK 002380 7/16/93 265.00 CH2N- H ! LL 002478 7/16/93 5,000. O0 CLACKAHAS COMHUNICAT IONS 00?.540 7/16/93 263.3Q CLARK BOAROHAN CALLAGHAN 002543 7/16/93 . 213.54 JOHN COGGINS 002590 7/16/93 40.00 COPY OFFICE PROOUCTS 002875 7/16/93 178.75 DE HAAS & ASSOCIATES 003108 7/16/93 785.00 DEPT OF ENVIR. QUALITY 003205 7/16/93 7,357.00 FARM PLAN 005062 7/16/93 8~1.60 G.T.E. HOSILNET 006373 7/16/93 134.51 G.W. NAROWARE CENTER 006/,05 7/16/93 57.35 N2ONLY 007010 7/16/93 46.50 C.J. HANSEN CO ]NC 007055 7/16/93 547.50 HARRIS UNI FORMS 007090 7/16/93 350.80 INOUSTRIAL ~ELDING SUPPLY 008100 7/16/93 53.90 LANOIS & GYR 011032 7/16/93 912.00 NAIL-WELL ENVELOPE 012047 7/16/93 311.65 MARION COUNTY FISCAL $VCS 012140 7/16/93 10.00 I~RYATT INDUSTRIES 012240 7/16/93 279.14 MID-WILLAHETTE VALLEY COUNSEL 012460 7/16/93 5,107.00 NATIONAL CRIME PREVENTION 013058 1/16/93 24.95 NATIONAL TECH INFO SERV 013110 7/16/93 94.50 NESSCO SUPPLY lNC 013160 7/16/93 110.43 (NC ELECTRIC 014025 7/16/93 103.50 ONE CALL CONCEPTS INC 014054 7/16/93 60.75 OR BLDG CODES AGENCY 014160 7/16/93 57'7.80 OR DEPT OF REVENUE 014217 7/16/63 225.00 OR DEPT OF MOTOR VEHICLE 014240 7/16/93 2.00 PACIFIC PRINTERS 6.50 7/16/93 6.50 LAWRENCE PARADI S 015115 7/16/93 35.00 PORTLANO GENERAL ELECTRIC 015420 7/16/93 8,852.14 PORTLAND STAMP & SEAL 015450 7/16/93 24.40 RAIN/HARION COUNTY FISCAL SVS 017042 7/16/93 9,078.75 TERRY RAM1REZ 017050 7/16/93 39.50 RAWLINSON' S LAUNDRY 017055 7/16/93 19.55 TERRY RICHARDSON CONSULTING 017192 7/16/93 107.40 235,720.47 · llA 8/04/93 A/P CHECK LISTING FOR THE MONTH OF JULY 1993 Page Check Nunber Budgetary Account Nmber 196~8 SUPPLIES-CITY ATTY/Pg 196~9 SERVICES-tw~TP 19650 FUEL-VARIOUS 19651 REI#BURSENENT-LIBRARY 19652 SUPPLIES-BUILDING 19053 SUPPLIES-POLICE 1965/* SUPPLIES-W~TP 1~655 SERVICES-VARIOUS 19656 SERVICE$ -VAR ! OUS 19657 SERVICE$-~P 19658 SUPPL ] ES°VAR IOUS 19659 SUPPLIES-NON DEPT 19660 SERVICES-VARIOUS 19661 SUPPLIES-NAYOR 19662 SERVICES-LIBRARY 19663 SE~ER BONO COUPONS 1966~ SE~ER BONO COUPONS 19665 PETTY CASH-VARIOUS 19666 ADMISSIONS-PARKS 19667 SERVICES°UATER 19668 VOID 19669 VOID 1967O VOID 19671 REGISTRATION-POLICE 19672 SERVICES-M~rP 19673 SUPPLIES-LIBRARY 1967/* SUPPLIE$-MJTP 19675 SUPPLIES-LIBRARY 19676 REIMBURSEMENT-BUILDING 19677 SERVICES-POLICE/911 19678 SUPPLIES-VARIOUS 19679 SUPPLIES-LIBRARY 19680 SERVICES-PARKS 19081 SERV]CE$-I~rrP 19682 SUPPLIES-WATER 19683 SUPPLIES-LIBRARY 1968~ SUPPLIES-POLICE 19685 SUPPLIES-LIBRARY 19686 SUPPLIES-RSVP 19687 SERV[CES-POLICE 19688 SUPPLIES-M~TP 19689 SERVICES-ENGINEERING 19690 SERVICES-POLICE 19691 SUPPLIES-LIBRARY 19692 SUPPLIES-VARIOUS 19693 SERVICES-CCOE ENFORCE Vendor Name Vendor Nmber Check - Date Written Amount of Check ROSE CITY STAMP ZNC 017~13 7/16/93 RSS ARCHITECTURE, P.C. 018189 7/16/93 SI LVERFLEET SYSTEMS 018~65 7/16/93 LINOA SPRAUER 018710 7/16/93 S.T.S.S. 018721 7/16/93 TELECOHH SYSTEMS INC 019043 7/16/93 UNOCAL:ERNIE GEAI~U4 OIL 020010 7/16/93 U.S. WEST COHHUNICAT]ONS 020091 7/16/93 U.S. UEST O]414UNICATIONS 020095 7/16/93 ~TER,FOCO & RESEARCH LAB 022062 7/16/9'5 UEST COAST PAPER CO 022133 7/16/93 gESTERN FIREWORKS CO 022181 7/16/93 gouOBURN INDEPENDENT 022630 7/16/93 YES GRAPHICS 024025 7/16/93 JOHN INSKEEP ENVIRONHENTAL NONE 7/19/93 BANK OF AMERICA 001129 7/19/93 FIRST INTERSTATE BANK 0051&0 7/16/93 CITY OF la3COBURN 015255 7/20/93 t/liD UATER ADVENTURE NONE 7/22/9:3 U.S. POST OFFICE 020090 7/23/93 VOID VOID VOID VOID VOID VOID 1993 LEOS UORKSNOP NONE 7/25/93 A & A PEST CONTROL INC 000011 7/25/93 ADAHS NEWS CO INC 000063 7/25/93 AG WEST SUPPLY 000096 7/25/93 ASSOCIATED LIBRARIES INC 000517 7/25/93 ROBERT ARZOI AR 000536 7/23/93 AT&T LANGUAGE LINE SERVICES 000659 7/25/95 BOISE CASCADE 001~0 7/23/9:3 BORLAND INTERNATIONAL oo13~:~. 7/25/93 DON CAREY & ASSOCIATES 002126 7/23/93 DALLY JOURNAL OF COI4HERCE 003020 7/23/93 N D FOULER CO INC 005210 7/23/93 GRAPHIC ARTS CENTER 006277 GRID SYSTEMS 006~2~ 7/2:3/93 HARRIS UNIFORMS 007090 7/25/93 PATRICIA HELLHAKE 007117 7/2]/93 INN OF THE 7TH MOUNTAIN 008030 7/23/93 INDUSTRIAL WELDING SUPPLY 008100 7/25/9:3 JON SHOPPERS INC 009119 7/23/93 JR ELECTRIC 009185 7/2:3/93 LIBRARY ASSOCIATES 0112/,2 7/23/93 METROFUELING INC 012/~8 7/25/93 LAgRENCE PARADIS 015115 7/23/93 47.60 175.oo 5~4.94 85.oo 749.65 99.80 161.70 479.82 2,536.22 430.00 953.07 5,256.65 198.00 50.00 135.00 2,430.00 158.26 160.00 168.23 1:30.00 85.00 15.57 :30 ~8.62 118.50 Z97.00 159.95 36°00 194./.0 29.61 2,382°00 269 30.75 588.00 123.32 399.55 674.16 77.50 260,258.68 11A 8104193 A/P CHECK LISTING FOR THE HONTH OF JULY 1993 Page 5 Check N~mnber 19695 19696 19697 19698 19700 19701 19702 1970:5 1970~ 19705 19706 19707 19708 197O9 19710 19711 19712 1971:] 19714 19715 19716 19717 19718 19719 19720 19721 19722 19723 19724 19725 19726 19727 19728 19729 19730 19731 19732 19733 197'~ 19735 '19736 19737 1973B 19739 Budgetary Account N~r Vendor Name Vendor Ncmd3er SUPPLIES-POLICE PC COMPUTING 015212 SERVICES-VARIOUS PORTLAND GENERAL ELECTRIC 015420 SERVICES-COURT TERRY RAJ41REZ 017050 SERVICES-tRITP REED ELECTRIC COMPANY 017143 SUPPLIES-I&/TP REMARKABLE PROOUCT$ INC 017165 SUPPLIES-TRANSIT SCflETICt' NORTflU~ST SALES 018240 SUPPLIES-LIBRARY SCIENTIFIC AMERICAN LIBRARY 018287 SUPPLIES-LIBRARY SCOT CUSTCOIAL SUPPLY 018108 SERVICES-WATER SERVICENTER 018.Td50 SERVICES-~&/I'P SH[LO lng 0184~0 SUPPLIES-CITY ATTY STATE COURT AONINISTRATOR 018745 SUPPLIES-C GARAGE UNOCAL:ERNIE GRAHAM OIL 020010 SERVICES-POLICE/911 U.S. UEST COMI4UNICATIONS 020095 SERVICES-U~/TP WASTEUATER NETWORK 022053 SUPPLIES-UUTP WOOOBURN FERTILIZER 022590 SERVICES-NON DEPT i~30DBURN INDEPENDENT 0226]0 SUPPLIES-POLICE YES GRAPHICS 024025 SUPPLIES-UUTP ZEE NEDICAL $ERV]CE CO 025070 PAYROLL-PARKS INTERNAL REVENUE SERVICE 060]00 SERVICES-NON DEPT PERSONAL TOUCH COMPUTING 015237 SEUER BOND COUPONS U.S. BANK 020070 PETTY CASH-VARIOUS CITY OF WOOOBURN 015255 SE~ER BONO COUPONS U.S. BANK 020070 SERVICES-WATER U.S. POST OFFICE 020090 VOID VOID VOID VOID VOl O VOID VOID VOID VOID VOID VOID VOID VOID VOl O VOID VOID VOID VOID SUPPLIES-MJTP JOHN HARRIS NONE REFUND-WATER/SEWER A.C. EIKENBERRY NONE REFUND-WATER/SEI~R GAREY MARK NONE REFUNOoBU[LDING GUAL[TY PLUS ROOFING NONE SERVICES-RSVP A-GUALITY TYPEWRITER 000~20 SERVICES-POLICE/CITY HALL ARATEX SERVICES ]NC 000535 REIMBURSEMENT-BUILDING ROBERT ARZOIAN 0005~6 SUPPLIES-POLICE AST RESEARCH l#C 000568 SUPPLIES-POLICE BALLOON WHOLESALERS INTL 001072 SEWER BONO COUPONS BANK OF AMERICA 001129 SERVICES-UWTP BECKUITH & KUFFEL 001174 SUPPLIES-PARKS BI-MART CORPOP. ATION 001275 SUPPLIES-VARIOUS BOISE CASCADE 001340 SUPPLIES-STREET CANBY SAND & GRAVEL 002060 SERVICES-IAfrP CINTAS 00248~ AUTO INSURANCE-NON DEPT ClS: CITY-CTY INS. SERV. 002~8~ Check - Date Written Amount of Check 7/23/93 14.97 7/23/93 3,858.68 7/23/93 54.50 7/23/93 608.00 7/?3/93 15.95 7/23/93 1,750.00 7/23/9] 28.26 7/23/9] 80.50 7/23/93 ~9.25 7/2]/93 92.02 7/23/93 35.00 7123/93 219.00 717.3193 197.3~ 7/23/93 ,. 3,095.54 7/23/93 270.63 7123193 23.63 7123193 98.00 7123193 60.05 7123193 37.76 7/23/93 ~0.00 7/26/93 265.00 7/26/93 1~.4~ 7/28/9~ 1,192.50 7/29/93 163.93 7/30/93 40.00 7/30/93 21.65 7/30/93 21.65 7/30/93 193.20 7/30/93 100.00 7/30/93 77.10 7/30/93 224.99 7/30/93 2,377.43 7/30/93 348.90 7/30/93 675.00 7/30/93 7,833.56 7/30/93 66.26 7/30/93 65.71 7/30/93 113.52 7/30/93 279.74 7/30/93 75,224.70 361,017.04 11A 8/04/93 A/P CHECK LISTING FOR THE MONTH OF JULY 19~3 Page 6 Check Nunber 19760 19741 19743 197~ 19745 197~6 19747 19768 19769 19750 19751 19752 19753 19754 19755 19756 19757 19758 19759 19760 19761 19762 19763 1976~ 19765 19766 19767 19768 19769 19770 19771 19772 19773 19774 19775 19776 19777 19 778 19779 19780 19781 19782 19783 19786 19785 Budgetary Account Ntm~er SERVICES-WATER SUPPLIES-VARIOUS SERVICES-CITY HALL SUPPLIES-VARIOUS SUPPLIE$-gATER SUPPLiES-LIBRARY SERVICES'PARKS REIMBURSEMENT-PLANNING SERVICES-PARKS SUPPLIE$-t&/TP SUPPLIES-POLICE SUPPLIES-VARIOUS SUPPLIE$-tNTP SUPPLIE$'C STORES UNEMPLOY INS-VARIOUS SUPPLIES-PARKS SERVICES-PARKS SUPPLIES-VARIOUS SUPPLIES-POLICE SUPPLIE$-WWTP RE]HSURSEMEMT-RSVP SUPPLIE$-M~TP SUPPLEES-U~I'P SUpPLIES-ENGINEERING SERVICES-WATER SLIPPL]E$-BLI[LDING SERVICES-ENGINEERING SUPPLIES-VARIOUS SUPPLIES-PARKS DUES-NON DEPT PERMITS'I&~I'P SUPPLIES-VARIOUS SERVICES'PARKS MEMBERSHIP-RSVP SUPPLIES-ENGINEERING SERVICES'STREET SUPPLIES-POLICE SUBSCRIPTION-COURT SUPPLIES-PUBLIC t,~)RKS SUPPLIES-RSVP SUPPLIES-VARIOUS SERVICES-WATER SUPPLIES-MSTP SERVICES-VARIOUS SERVICES-POLICE SUPPLIES-PARKS Vendor Name Vendor Number Check - Date Written Amount of Check COFFEY LABORATORIES INC 002627 7/30/9'5 150.00 CONVENIENCECARD 002815 7/30/93 421.47 DAVE WHITEHEAD CONSTRUCTION 003066 7/30/93 7,056.00 DAVISON AUTO PARTS 003080 7/30/93 1,188.99 DAVI$O~ AUTO PARTS 003081 7/30/93 3.75 EGGHEAD DISCOUNT SOFTUARE 00~088 7/30/93 586.00 ENCHANTEO PARKS INC 00616~ 7/30/93 330.00 TERESA ENGELDINGER 00~188 7/30/93 2~.25 ENGELMAN ELECTRIC 00/,190 7/30/93 88.55 ENVIRONMENTAL CONCEPTS 004204 7/30/93 378.00 FARMERS OIL 005040 7/30/93 175.26 FARM PLAN 00506~ 7/30/93 752.28 FLOMER FURNITURE & APPLZANCE 005180 7/30/93 1,158.00 61.33 FURCE 4 COMPUTER 005242 7/30/93 GIBBENS COI4PANY 006180 7/30/93 327.60 GRAND SLAM 006275 7/30/93 174.50 G.T.E. I~XiILNET 006~7-5 7/30/93 65.2] G.W. HARDWARE CENTER 006405 7/30/93 590.04 HARRIS UNIFORNS 007090 7/30/93 13.95 HIGH-PURITY CHEHICAL IHt 007189 7/30/93 177.17 JACGUE HOVEY 007518 7/30/93 32.00 I#CRED%BLE UR%VERSE 008065 7/30/93 334.92 INDUSTRIAL WELDING SUPPLY 008100 7/30/93 39.90 ]NMAC 008120 7/30/93 21.6~ INSTANT FIRE PROTECTION 008140 7/'50/93 129.50 [NTL COMF OF BLDG OFFLS 008290 7/30/93 ?.3.20 JOg SHOPPERS %NC 009119 7/30/93 864.00 L & L BU%LOING SUPPLIES 011010 7/30/93 ~8.17 LIMOS MARKET 011240 7/30/93 60.76 LOCAL GOV'T PERSON'L INST 011300 7/30/93 757.00 MARION COUNTY BLDG INSPEC 012090 7/30/93 207.28 MR P'S AUTO PARTS 012510 7/30/93 520.62 MUFFLERS, HITCHES & MORE 012655 7/30/93 99.95 NARSVPO, INC 013008 7/30/93 35.00 NESSCO SUPPLY INC 013160 7/30/93 7.20 NORTHU~ST NATURAL GAS 013350 7/30/93 5.00 OPTICOLOR FILM & PHOTO 014056 7/30/93 141.94 OREGON CRIMINAL DEFENSE 016163 7/30/93 65.00 OREGON STATE HEALTH DIV 016562 7/30/93 200.00 PACIFIC PRINTERS 015058 7/30/93 93.50 PIONEER ELECTRONICS 015345 7/30/93 111.85 PORTLAND GENERAL ELECTRIC 015420 7/30/93 205.42 JACK RAWLINGS 017054 7/30/93 669.71 RA~LINSON'S LAUNDRY 017055 7/30/93 71.70 RINGEY'S RAOAR 017210 7/30/93 145.00 SALEM POOL & SUPPLY INC 018135 7/30/93 74.80 379,159.45 11A 810419~ A/P CHECK LISTING FOR THE HONTH OF JULY 1993 Page 7 Check Number Budgetary Account 19786 SUPPLIES-STREET 19787 SUPPLIES'PARKS 19788 SUPPLIES-POLICE 19789 REINBURSE#ENT-LIBRARY 19790 SUPPLIES-PARKS 19791 SERVICES-911 19792 SUPPLIES-POLICE 19793 REIHBURSE#ENT-PARKS 19794 SUPPLIES-STREET 19795 SERVICES-PARKS 19796 SERVICES-PARKS 19797 SERVICES-PARKS 19798 SUPPLIES-VARIOUS 19799 SUPPLIES-PARKS 19800 SERVICES-POLICE 19801 SUPPLIES-POLICE 19802 SUPPLIES-PARKS 19803 SERVICE$ - RSVP 19804 SERVICES-RSVP 19805 SERVICES-RSVP 19806 SERVICES-RSVP 19807 SERVICES-RSVP 19808 SERVICES-RSVP 19809 SERVICES-RSVP 19810 SERVICES-RSVP 19811 SERVICES-DAR 19812 SERVICES-DAR 19813 SERVICES-DAR 19814 SERVICES-DAR 19815 SERVICES-DAR 19816 SERVICES-DAR 19817 SERVICES-DAR 19818 SERVICES-DAR 19819 SERVICES-DAR 19820 SERVICES-DAR 19821 POSTAGE-VARIOUS Vendor Nane Vendor N~T~oer LES SCHUA8 TIRE CENTER 018300 SCOT CUSTOOIAL SUPPLY 018308 SLATER COMMUNICATIONS 018522 HAtJREEN SNITH 018564 TEK CHEMICAL 019047 U.S. T/EST C, OHI4UNICATI(N,,IS 020095 WAL-14ART STORES [#C 022035 TERRY WlLLIARS 022396 WOODBURN FERTILIZER & GRAIN 07..2590 I~X)OBIJRN INDEPENDENT 022630 WOODBURN LANES 022655 t~:X)OBURN LOCK & SAFE 022657 t~3ODBURN LUMBER CO 07_2660 t~3OOBURN OFFICE SUPPLY 027.670 WOOOgURN PHARHACY 022680 YES GRAPHICS 024025 ZEE HEDICAL SERVICE 025070 ELIZABETH 8ROOESSER 035067 MARGARET KANE 035390 ETTA KOPPES 035415 LEO LA ROQUE 035~65 LARRY SCOTT 035645 INGER STIGERTS 035668 JAY W(X)OS 035763 GERALD gO00 035790 HATTIE CLARK 04.5100 CORNEL]US DONNELLY 045230 UINN] FRED FACHINI 0/,5245 FRENONT GREEHLING 045~90 BETTY PARK 045515 GERTRUOE REES 045545 BARBARA STROUP 045596 DEAN TATOH 045653 LO~ELL WIKOFF 045705 JUOY YOUNG 045740 POSTAGE BY PHONE SYSTEM 015466 Check - Date Written Amount of Check 7/30/93 100.94 7/30/93 2,202.82 7/30/93 219. O0 7/30/93 24.40 7/30/93 1 ~8. O0 7/3O/93 69.80 7/30/93 241.40 7/30/93 146.42 7/30193 1,818. O0 7/30/93 154.90 7/30/93 141.25 7/30/93 12.00 7/30/93 1,091.01 7/30/9~ . 11.52 7/30/93 3.50 7/30/93 660. O0 7/30/93 -* 201.60 7/30/93 5. O0 7/30/93 10.56 7/30/93 15.8~ 7/30/93 164.64 7/30/93 41.76 7/30/93 27.36 7/30/93 96.00 7/30/93 28.80 7/30/93 87.~6 7/30/93 190.32 7/30/93 13.68 7/30/93 4.08 7/30/93 30.88 7/30/93 46.56 7/30/93 22.99 7/30/93 25.20 7/30/93 71.76 7/30/93 34.56 7/30/93 600. O0 387,923.36 14A MEMO TO: FROM: SUBJECT: DATE: City Council and Mayor through City Administrator Community Development Director Astor Way Well House SPR 93-08 August 18, 1993 At their August 12, 1993 meeting the Planning Commission reviewed city staffs decision for administrative approval of a new well house on Astor Way to replace an old well house. APPLICANT: City of Woodburn, Public Works 270 Montgomery Street Woodburn, OR 97071 II. NATURE OF THE APPLICATION: The Public Works Department is requesting administrative approval to construct a well house to enclose the existing municipal well that is located on this property. In addition to the well house, this site will be improved with landscaping. Because this request involves less than 4,000 square feet, no public hearing is required. III. RELEVANT FACTS: This site is located at 1180 Astor Way. The site can be specifically identified as TL 1400, Tax Account #92940000 Map 5S,lW, Section 7BC. See attached site plan. The proposed location of the well house and proposed landscaping have been identified on attached map. The lot is approximately 80 X 85. The proposed building will be 13 X 30. Fifty-six percent of the site will be landscaped. Maintenance of the site and of the landscaping will be the responsibility of the Public Works Department or its designee. we~lhous .est SG:bw 14A City Council and Mayor through City Administrator August 18, 1993 page 2 DECISION: Based on the finding in this report, staff recommends approval of this application subject to the following conditions. A. All work will conform to the City of Woodburn Standard specifications and all State Building Codes. B. The proposed improvements shall conform to submitted site plan. C. All landscaped areas shall be maintained, irrigated, and kept free of debris, weeds and tall grass. weflhous .a~t SG:bw 14A MEMO TO: FROM: SUBJECT: DATE: Mayor and City Council through City Administrator Planning Commission A Replat of Jerine Estates Subdivision August 3, 1993 At their hearing of July 22, 1993 the Woodburn Planning Commission approved, with conditions, Jerine Estates Subdivision consisting of five lots with a private drive. Originally this same property was platted as a nine lot subdivision in 1985. 17-1ova, ever, the property owner felt the property was a more attractive sale item as a five lot subdMsion rather than a nine lot subdivision. For this reason he requested a replatting from nine tO. five lots. Jerine Estates Sub. lteplat SG:bw STAFF REPORT Replat of Jerine Estates # 93-01 APPLICANT: Dave Trapp and Associates for Phyllis Gregory & Warren Grim 1235 Mt. Hood Ave. Woodburn, OR 97071 II III NATURE OF THE APPLICATION: The applicant is requesting preliminary approval of a 5 lot subdivision and not a 6 lot subdivision as has been indicated in the application. This request.is a, replat of Jerine Estates which was a 9 lot subdivision previously approved-in'the early RELEVANT FACTS: Jerine. 'Estates is located on the north side of West Hayes Street east of Smith Drive. It ~ be identified specifically on Marion County Assessors Map as Lots 1,2,3,4,5,6,7,8,& 9 Township 5 South, Range 2 West, Section 7CC. The subject property is zoned RS, single family residential. The subdivision was previously approved for the creation of 9 lots in the early 1980's. The applicant's statement indicates that "the 6 lot subdivision-.will have a 24 foot wide curbed private street which all six lots will access to. By reducing t13e number of lots and private street length the developer intends to recoup his initial investment only. The lots in the proposed subdivision were configured to create an above standard size lot in order to attract a higher standard priced home. The developer is willing to conform to all cOnditions set forth by City Staff". The preliminary subdivision plat was numbered incorrectly, requesting approval of five lot subdivision and not six. the applicant is $ 88°29' 12" E 194.8:3' I ;.,1/~, I 44.83' 92368-051 92368-061 q I00.00' 92368-071 re' I-- .J / 92568-051 I ! 00301 , WEST 92368-021 2 92368-011 94.69' N8 00501 5 00201 7 45.~0~ 92368-041 006.01 9 00401 92368-001 ~7Z-/~g Z 8 -- ?&93' 00701 92568-081 ;TZ- . / /. ./ 00801 00101 I 194 00001 -HAYES- -STREET- Ifff Io I I 1 5A 15B MEMO TO: FROM: SUBJECT: DATE: Community Development Director Bob Arzoian, Building Inspector Building Activity for JULY, 1993 August 3, 1993 New Residence Value Multi Family Residential Adds & Alts Industrial Commercial Value Signs, Fences, Driveways Mobile Homes .IULY 1991 No. Dollar Amt 4 $ 318,600 2 70,000 10 47,300 0 0 11 1,261,000 4 2,300 5 175,000 ,IULY 1992 No. Dollar Amt 1 $110,800 0 0 15 65,655 0 0 I 3,200 12 13,750 4 183,896 ~-LY 1993 No. Dollar Amt. 8 91,014,961 0 0 11 99,860 0 -' 0 1 25,000 7 6,150 I 15,000 TOTAL: 36 $1,874,200 33 $377,301 28 91,160,971 July 1-June 30 Fiscal Year-to-Date $7r376r183 $1 f8741200 $ 1r160r971 Robert Arzoian Building Official RS:bw BLDACT07.93 15C MEMO TO: FROM: SUBJ.: Mayor and City Council Chris Childs, City Administrator ~ Marion County Solid Waste Manaqement Plan DATE: August 16, 1993 As noted in the accompanying material, Jim Sears, Director of Marion County Solid Waste Management Dept., had originally requested time on the August 23, 1993 agenda to discuss the department's solid waste planning process, city and public involvement, and upcoming workshops, including one here in Woodburn on September 14, 1993. In view of the Council's busy August 23rd agenda, this material is presented in report format only, and does not appear as an item of General Business. As noted in his letter of June 24, 1993, Mr. Sears emphasizes the importance of public participation and requests city representation at pertinent meetings. Although solid waste management is only peripherally related to day-to-day city operations, due to our franchise arrangement with United Disposal Service, the overall issue is one that will require significant interjurisdictional cooperation along with the occasional political implications that can accompany such an endeavor. Although everyone's participation is welcomed, it might be particularly appropriate for the Mayor or an interested Council member to represent the city in such discussions on an ongoing basis. If Council desires further specific information on this topic, I will gladly reschedule to allow Mr. Sears time on the Council's agenda during one of the regular September meetings. 15C DIRECTOR James V. Sears (503) 588-5169 BOARD OF COMMISSIONERS Randall Franke Gary Heer Mary Pearmine ADMINISTRATIVE OFFICER Ken Roudybush Marion County OREGON DEPARTMENT OF SOLID WASTE MANAGEMENT June 24, 1993 Woodburn City Council Chris Childs, City Admin. 270 Montgomery Street Woodburn, OR 97071 Dear Mr. Childs: Marion County Solid Waste Management has hired a consultant to prepare a solid waste management plan. This plan will address how we will manage solid waste in our county over the next twenty years. The key to the development of the management plan is public involvement. The Marion County Solid Waste Management Advisory Council will be hosting four different public input meetings over the course of this project. This plan will have an impact on how waste from your city will be handled and disposed. I believe that it is important that the city have a representative attend each of these meetings. This will assure us of a plan that will meet all jurisdiction needs. I have included a fact sheet about this project for your information. I am planning to attend your council meeting on August Z3, 1993 to present this program and answer question that you may have. I am requesting time on your agenda to present this issue to the council. I greatly appreciate your cooperation and am looking forward to working with you to develop ways to address our solid waste needs in the future. JVS:caa Attachment [ // Jam~es Sears, Director v Solid Waste Management c: Board of Commissioners; swmpcity.jvs MVGRA (~ Printed on Recycled Paper ,.duce., .... R~c,e. ~ ...... Capitol Center · 388 State Street · Suite 735 · Salem, Oregon 97301-3670 l]Marion County il II DEPARTMENT OF U SOLID WASTE MANAGEMENT 15C DIRECTOR James V. Sears (503) 588-5169 BOARD OF COMMISSIONERS Randall Franke Gary Heer Mary Pearmine ADMINISTRATIVE OFFICER Ken Roudybush July 14, 1993 Dear Concerned Citizen: The Marion County Department of Solid Waste Management is currently in the process of updating the County's Solid Waste Management Plan. The plan is being prepared by an Oregon consultant, Parametrix. Attached is a fact sheet describing the background to this process and the opportunities for public involvement in both the policy issues surrounding solid waste management, as well as specific waste management options which will be investigated (ie., waste reduction, recycling, and disposal). The fact sheet also includes the dates and locations of the initial public workshops to be held. We would greatly appreciate your insight and input into the planning process, and encourage you to take advantage of this opportunity to express your views on solid waste management here in Marion County. Should you have any questions, you may call 588-5169 and ask for Jeff Bickford, Senior Civil Engineer, Ext. 5992 or myself at Ext. 5056. SinTy, ]~mes V. Sears, Director Solid Waste Management JVS:jab:caa Attachment swmp__pub, let (Printed on Recycled Paper Reduce · Reuse. Recycle - Recover Capitol Center ® 388 State Street · Suite 735 · Salem, Oregon 97301-3670 15C FACT SHEET ON PREPARATION OF MARION COUNTY'S SOLID WASTE MANAGEMENT PLAN Background: The management of solid waste in Marion County is a complex and dynamic activity. In order to plan for efficient and effective management, typically a solid waste management plan is prepared which looks at current and future management practices and provides a direction in which to focus efforts. The last solid waste management plan prepared for Marion County was in 1974, when the County was a member of the Chemeketa Region Solid Waste Management Program. This also included Linn, Benton, Polk, and Yamhill counties. Since this plan was prepared, numerous changes in waste management in the County have occurred. The greatest single change was the construction and operation of the Marion County Waste-to-Energy Facility (WTEF), which dramatically altered the County's primary method of waste disposal, making the County less reliant on landfilling of wastes. Other significant changes were the construction of two transfer stations and the closure of the Brown's Island Landfill. A solid waste management plan is used by decision makers to assist them in planning, siting, and coordinating solid waste management facilities, recycling programs, and other waste management options. Marion County is approaching a point where many key decisions will need to be made regarding which direction to go, from possible facility siting issues to expansion of recycling and waste reduction programs. Therefore, a solid waste management plan needs to be prepared for Marion County. The Marion County Department of Solid Waste Management chose a consultant, Parametrix, Inc. of Portland, Oregon, to prepare the County's solid waste management plan. The plan that they will put together will include such things as: [] An overview of the existing solid waste management system. [] A characterization of the types of materials found in Marion County's waste. [] Projections of waste volumes for Marion County for the next 20 years. [] Proposed alternatives for handling of the solid waste generated in Marion County. Presentation of a final plan which will be approved by the Marion County Board of Commissioners. 15C The other three sets of workshops will be scheduled as the project progresses. Notification will be sent to interested members of the public. Anyone with questions should contact either Jim Sears, Director (extension 5056), or Jeff Bickford, Senior Civil Engineer (extension 5992) at 588-5169. jab swmpcity.fct 15C1 MEMO TO: FROM: SUBJECT: DATE: City Council through City Administrator for Information Public Works Program Manager J~.~ ~ Total Coliform in City Water August 19, 1993 The City is continuing to experience some tests that are positive for total coliform. On August 9 a sample taken from a sampling point near Country Club Court tested positive for the presence of total coliform. On August 11 repeat samples were taken at the sampling point and at service connection upstream and downstream of the sampling point. The next day results showed all three of these samples were negative for the presence of total coliform. State Health Division was notified. On August 16 a sample taken at the Country Club Road sampling point that was the center of the recent total coliform problem also tested positive for total coliform. Since this was the second total coliform positive for the month of August it placed the City in violation of the Maximum Containment Level (MCL) for total coliform. On August 18, as required by regulation, repeat samples were taken at the Country Club Road sample point and service connections upstream and downstream of the sampling point. The results of these tests will determine what direction the City will take. The direction will be determined in consultation with State Public Health Division. Neither positive sample contained any fecal or E. Coli bacteria. No action is required by city residents at this time. If necessary an update will be presented at the Council meeting. 15D City Of Woodburn Police Department /~Montgomery Street Woodburn, Oregon 97071 August 19, 1993 To: Subject: Mayor and Council C. Childs, City Administrator Special Impact Report - Homicide of 081393 / Gang Activity (503) 982-2345 On Friday, August 13, 1993, at 8:17pm police were called to the Kmart parking lot, 1475 Mt. Hood Ave. Upon arrival it was determined that a homicide had taken place. Upon investigation an individual was taken into custody and lodged in Marion County Jail, charged with murder. At the time of the occurrence, the on-duty staff consisted of one Lieutenant and three officers. Upon securing the initial crime scene additional staff were required to assist with the investigation as follows: Woodburn Police Marion County Sheriff Marion County Victims Assistance Oregon State Police Marion County Medical Examiner TOTAL 5 3 2 1 1 12 The initial investigation proceeded from time of occurrence 8:17pm, Friday through 8am, Saturday. All Staff were released and returned Saturday at 12:00pm to continue the investigation throughout the afternoon and evening of Saturday and Sunday. Total man hours of the initial investigation were as follows: 15D STRAIGHT TIME Woodburn Police 70.0 Sheriff's Office 20.5 District Attorney 19.0 State Police 7.5 Victims Assistance 14.0 Medical Examiner 3.0 OVERTIME 66.00 Total 134.0 66.0 (Woodburn) Officers returned to duty Monday morning along with evidence custodians to continue processing and investigation. The initial investigation was presented to the District Attorneys office Wednesday, Aug. 18, 1993. Average police officer hourly rate is $27.12. Ancillary costs to the investigation are yet to be all accounted for. Initially costs which are outstanding are the towing and storage of two crime scene vehicles, estimated to be in the neighborhood of $300. The continued storage of one vehicle, in secure evidence, $250 - $300 per month until trial and appeals have mn-out. We are working with the district attorney to minimize this as much as possible. There will be on-going follow-up as required. This is estimated to be 20 - 60 hours within the next few weeks. There have been and will continue to be trips to the crime lab in Springfield, and ID Bureau in Salem over the course of the investigation. The next major personnel expense will be during the trial when all involved officers will be required to appear and testify. This is yet to be determined. PURPOSE OF TI-IIS REPORT: It is important to keep the council appraised of major investigations. Those costs associated with the investigations are not directly budgeted for. We must budget based upon history. Historically the city has experienced one homicide every two to three years. This rate has increased this year so far to two. Homicide, along with all persons crimes, are one of the highest priority investigations for law enforcement. But, along with the high priority comes a high price of investigatory costs. With multiple major investigations comes the costs. One of the methods that law enforcement in Marion county has developed to reduce some of the costs is through the H.A.R.T. (Homicide Assault Response Team). The team is headed by the district attorneys office and manned by officers of all agencies. This may mean we will pay some of our officers overtime to assist other agencies with their investigations but, the other agencies in turn pay their officers overtime when they assist us. The HART officers receive additional specialized training through the district attorneys office. 2 During the 96hrs surrounding the homicide investigation the police department additionally respond to 161 calls for service. Of the 161 there were 9 gunshot reports, 8 graffiti, and an additional 16 gang related calls. This incident was a gang related shooting. Gangs and Gang Violence continues to be an extremely serious problem in Woodbum, North Marion County, Portland and the entire state of Oregon. Through the month of July 1993 the Woodbum Police have documented and reported 284 gang incidents in 1993. Last year Woodbum Police reported 84 gang related incidents. This is an increase of over 200 %. To date (Aug 18) the police have responded to and investigated 5,972 total incidents. In the same period of 1992 we investigated 5,224. This is and increase of over 14%. Our ability to continue the response rate has been reasonably maintained only through the use of the DPR (deferred patrol response) program. Should you have any further questions I would be more than happy to answer them. B:C'nclRpt. HOMI 3 OODBURN POLICE DEPART Rene' Bravo Staff Sergeant ARNG Date: August 19, 1993 To: Lieutenant Don Eubank Thru: Detective Jason G.Tlusty STATE YOUTH GANG STRIKE FORCE MONTHLY REPORT -JULY 1993 For the month of July 1993, there were a total of 40 calls, involving gang members, and/or affiliates, in Woodburn. One of the calls was a Code 0 (Officer needs help). Shots were fired by an unknown person from a field south of a known gang safe house. The bullets went in the air over the head of a Marion County Deputy, and into the trees. This month also, there were three calls involving Woodburn 14 (Norte 14). Three gang members were contacted wearing red sweatshirt's, black "Do Rags", and throwing gang hand signs. Suspects advised police that "Hobz 13" and "Norte 14" are united together. II HOBZ IYTO!j 18TH STREET li~DI WDBN ~4 I:~1 M,SC I::~:;~1: TOTAL I~01 HARASSMENT 3 : :5.: :~: ::9 SUSP. ACTIVI~ ~. ~ ...... 13 . :: .... :::: ... DATE CASE # INCIDENT GANG SET 7/3 93-3695 7/3 93-3702 7/3 93-3729 7/7 93-3802 7/8 93-3835 7/9 93-3855 7/9 93-3857 7/10 93-3870 GANG CONTACT/ASSIST CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI ASSAULT GANG CONTACT DISTURBANCE CURFEW/GANG CONTACT 2895 NEVVBERG HVVY/DENNY'S RESTAURANT 1233 W LINCOLN ST BRADLEY & OGLE ST 868 N FRONT STANDBN FERTILIZER 200 SETTLEMIER ST 200 BLK OAK ST/SEI-rLEMIER PARK 1000 PARK AVE YOUNG & BRYAN ST 18TH HOBZ 18TH HOBZ HOBZ WB14 18TH HOBZ 270 Montgomery Street (cnntir~liPrl nn n~yt pROR) Woodburn, OR. 97071 (503) 982-2345 Ext.349 '1 ~L) WOODB URN POLICE DEPARTME Ren~' Bravo Staff Sergeant ARNG Date: August 19, 1993 To: Lieutenant Don Eubank Thru: Detective Jason G.Tlusty STATE YOUTH GANG STRIKE FORCE MONTHLY REPORT - MAY 1993 (continued) DATE CASE/f INCIDENT GANG SET 7/10 93-3881 7/12 93-3925 7/13 93-3934 7/15 93-3965 7/15 93-3970 7/15 93-3990 7/18 93~4050 7/18 93-4056 7/18 93-4079 7~20 93-4117 7~20 93-4119 7/22 93-4157 7~23 93-4209 7/25 93-4242 7/24 93-4267 7/26 93-4269 7~26 93-4270 7~26 93-4271 7~27 93-4299 7~27 93-4301 7~27 93-4303 7~27 93-4304 7~27 93-4315 7~28 93-4330 7J28 93-4353 7/29 93-4381 7~30 93-4389 7/31 93-4406 7~30 93-4408 7/31 93-4422 7/31 93-4426 7/31 93-4434 DISTURBANCE CRIMINAL MISCHIEF/GRAFFITI GANG CONTACT/ESCAPE Ill/ARREST CURFEW CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI RECK ENDANGER/SHOTS FIRED CRIMINAL MISCHIEF/GRAFFITI GANG CONTACT/HIT & RUN/ARREST CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI RUNAWAY CRIMINAL MISCHIEF/GRAFFITI MIP CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEF/GRAFFITI CRIMINAL MISCHIEFNANDALISM ASSAULT KNIFE/MENACING CRIMINAL MISCHIEF/GRAFFITI DISTURBANCE GANG CONTACT DISTURBANCE 114 BRADLEY ST 100 ARNEY RD/WESTVIEW TEXACO 1191 PARK CIRCLE 695 N SETTLEMIER AVE 1100 N 6TH/7TH DAY ADVENTIST CHURCH 1630 PARK AVE/ARMORY 11340 GOUDY GARDENS LN/GANG SAFE-HOUSE 438 OGLE ST 1542 MT HOOD AVE 950 GATCH ST 705 E LINCOLN ST 153 BRADLEY ST 371 S PACIFIC HWY/EAGLES 1740 PARK AVE SETTLEMIER PARK 1600 PARK AVE 1785 N FRONT ST/HIGH SCHOOL 1041 N BOONESFERRY RD/F.P. MIDDLE SCHOOL FRONT ST & HWY 214 1800 W HAYES ST 1600 PARK AVE/LEGION PARK 141 FRONT ST/FRONT ST LAUNDRY 3002 STACEY ALLISON WY/WAL-MART 1600 MT HOOD AVE 1600 PARK AVE/LEGION PARK 1175 E LINCOLN/4 SQUARE CHURCH 2363 W HAYES ST //43 673 YOUNG ST//12 1385 MERIDIAN AVE 715 GARFIELD 417 HARRISON ST/ST LUKES 1068 N 2ND HOBZ WB14 18TH HOBZ 18TH HOBZ HOBZ HOBZ HOBZ HOBZ HOBZ 18TH HOBZ WB14 HOBZ HOBZ HOBZ HOBZ HOBZ HOBZ HOBZ HOBZ HOBZ HOBZ HOBZ HOBZ 18TH HOBZ 18TH 18TH 18TH HOBZ Detective Jason G.Tlusty 270 Montgomery Street Woodburn, OR. 97071 (503) 982-2345 Ext.349 15E MEMO TO: FROM: SUBJECT: DATE: City Council through ~__~ ~ ~o~ Public Works Director (~ Information on City's Response to Barclay Square Apartment Attorney's Inquiry August 19, 1993 Last month staff responded to a letter written by Mr. Engle, an attorney who represents the owners of Barclay Square Apartments. This exchange of communications, although routine for city staff, is being brought to council's attention only because city council was involved in a prior dispute resolution involving vegetation issues and transfer of property between the city, Klaw Holdings, and Barclay Square Apartments. I am attaching the city staff response as well as Mr. Engle's letter of inquiry for your information. The main topics of the communication could be explained as follows: Mr. Engle wanted to know if staff would recommend conveyance of a piece of property that he thought was owned by the city and lies between the public right-of-way and Barclay Square Apartments. Because the city does not own the property, our answer simply stated that Walmart owns the property and the city has no jurisdiction over it. = Mr. Engle wrote that once again there exists an encroachment problem similar to the problem experienced on the north side of Barclay Square property. But the encroachment issue in the letter related to the parcel described above that is not owned by the City. Therefore, we did not address this topic in our response except to clarify our understanding of Walmart's ownership to this piece of property. Inquiry was made regarding shifting of public right-of-way and also regarding the possibility of constructing a pavement center line that is not the center line of public right-of-way. We responded verbally, as well as in writing, that the public right-of-way could be shifted but pavement center must be placed at the center of public right-of-way. It was made clear that there should be no cost to the city for any proposed modifications. CC: City Administrator City Attorney Engineering File/Randy Scott Enclosures RESPONSE CITY OF 270 Montgomery Street · WOODBURN Woodbum, Oregon 97071 · 982-5922 July 19, 1993 Mr. Robert L. Engle 610 Glatt Circle Woodburn, OR 97071 Dear Bob: Our response to the contents of your letter of June 11, 1993 should be fully known to you and to your clients since we have already discussed the issues on the phone and in person. However, I am writing this letter for your records. Please be aware of the following: Walmart owns parcel "2" and the city has no jurisdiction over it. The staff is willing to recommend acceptance of shifting the public right-of-way to the west as long as there is no cost to the city. However, the center of the pavement must remain at the center of public right-of-way. Because of the previous complex legal agreement that is still in effect on this property, the City Attorney is expected to be involved from the initial stages, whether it is a vegetation issue or right-of-way issue. Please note that until a final decision is made by the council, your client should not take any action based on staff's decision since these decisions are only recommendations to the council. Please do not hesitate to call me if you have any question· Sincerely, G.S. (Frank)Tiwari, P.E. Public Works Director GST:Ig cc: City Administrator City Attorney Engineering Planning PARCEL2 1 5E ROBERT L ENGLE KIR~ A. ~I!~"IMIDTMAN JOANN K. BECK AS~OClATI~ OOUNSEL June 11, 1993 Frank Tiwari, P.E. City of Woodburn 270 Montgomery St Woodburn, OR 97071 ENGLE & SCHMIDTMAN A'Vi'ORNEYS AT LAW NORTHWOOD OFFICE PARK - 610 GLATT CIRCLE WOODBURN, OR 97071 (~) FAX (~) Re: Barclay Square / Wal-Mart Drive Dear Frank: I enclose a copy of the survey which shows the proposed site of Wal-Mart Drive in relationship to the westerly boundary of the Barclay Square property. My letter addresses the parcel designated as Parcel 2 on the survey. It is my understanding from my discussion with Steve Goeckritz that the City of Woodburn owns that Parcel 2. ! would ask that you consider whether or not you would be willing to recommend to the City Council that the City convey Parcel 2 to Barclay Square Associates in return for the agreement of Barclay Square Associates to landscape and maintain that parcel. We again have a Problem similar to the problem that we experienced on the north side of Barclay Square, that the trees and landscaping have extended across the surveyed property line' into the Parcel 2 area. Although those trees and bushes have existed for more than ten years, my client and I would much prefer to negotiate a mutually acceptable agreement with the City over the unfortunate situation that occurred with regard to the north property line. I would also like to discuss with you the actual location of Wal-Mart Drive. That location may be fixed in such a manner that it could not now be changed. However, if any changes in the location of the street are still possible, I would' like you to consider the proximity of the most northeasterly corner of Wal-Mart Drive Frank Tiwari, P.E. City of Woodburn June 11, 1993 Page 2 where it meets Stacy Allison Blvd, as well as the location of the 5/8" iron rod W/PL CAP which appears to be designated as C.S. 29364. Both of those points are in such close proximity to the property line that the existing bushes and foliage extend into the street fight of way. If there is any way to move the street two or three feet to the west at those points, it would solve the landscaping infringement problem. I look forw~ard to__discussing these issues with you. R L ENGLE CC: Roger Midura Priscilla Church, Landura Management Assoc. 15E a