Agenda - 01/29/1996 Workshop AGENDA UNPAVED STREETCOUNCIL WORKSHOP JANUARY29,1996 (estimatedtimeofdiscussionl½ to2hours) Am General Information from engineering perspective Why gravel streets remain unpaved and what can be done to improve these streets. The following were considerations used in recommended Policy Development. Best use of limited resources and identification of street improvement needs: unpaved gravel streets paved streets needing resurfacing minor streets needing reconstruction major improvements identified in Transportation Plan 2. Fairness to all residents of the community 3. Importance of having a plan and policy to guide future direction 4. Other revellent issues C. Final Policy Discussion MEMO TO: FROM: SUBJECT: DATE: City Council through City Administrator for Information Public Works Director~ Long Range Plan for Improvement of Unpaved Streets in City Janua~ 26,1996 BACKGROUND: The subject of improvement of unpaved streets has been discussed during council meetings. There has been general agreement that a policy needs to be established so that a long term plan to improve these streets can be implemented. The City currently has approximately 2.7 miles of unpaved streets. A listing of these streets is provided as attachment "A". The Public Works Department has prioritized the attached list of unpaved streets. The street improvement requested by the majority of property owners it should be given higher priority and be done ahead of those remaining on the prioritized list. It is estimated that to improve all of these streets will cost approximately $3.2 million. There are distinct advantages to having streets paved. They include: reduction in dust problems reduction in maintenance costs improved storm drainage and elimination of the problems associated with potholes. improved overall appearance for the street and image for the entire community. gravel will no longer be drug onto adjacent paved streets The reason why most streets have remained unpaved is the high initial costs associated with the improvement and the unwillingness of the property owners along the street to pay for the improvement. Historically improvement of these streets has been the responsibility of the benefitted property owners. Those benefitted properties have normally been those located along the street. When a subdivision is incorporated into the city any required street and public right-of-way improvements are made to City standards by the developer of the property at their expense and then turned over to the city for maintenance. Copies of representative city street standards are also attached. When unpaved streets have been improved in the past it has normally been through formation of e local improvement district and assessment of property owners along the City Council through City Administrator for Information January 26, 1996 page 2 street. The last streets to be improved through the assessment procedure were Bradley Street and Queen City Blvd. in 1985. On Bradley Street project funds from Federal Revenue Sharing and a rehabilitation grant subsidized about 25% of the cost. The last gravel street paved by a private party was Commercial Way where the city assumed responsibility of construction of a sidewalk on one side at a future date, which amounted to about 15% of the total cost. Since the city has helped out with a portion of the costs of such projects in the past, it would be only proper that some sort of subsidy be applied to future improvements of unpaved streets. Due to the large number of unpaved streets such a project would have to be phased in over time. Fifteen to 20 years or longer may be required to complete all of the city's unpaved streets. Staff is proposing that city gas tax funds pay for the cost of the asphalt required to complete the project. The City Council may wish to consider some revenue enhancement. The property owners would be required to pay for road base course preparation, curb, gutter, sidewalk installation, construction engineering and storm drainage improvements through the local improvement district process. Public Works would pay for engineering design costs for the improvement. Local improvement district financing costs would be paid from the general fund. Approximate percentages from each area would be: City Gas Tax - 17% Property Owners - 67% Public Works - 14% General Fund 02% Ordinance 2105 provides procedures for local improvements and special assessment districts. These districts can be initiated by decision of the council or by request of two- thirds of the property that would benef'r~ from the improvement. Since there has been little interest shown by property owners along unpaved roads to initiate the improvements it is anticipated that most of the improvements districts would have to be initiated by the council. Staff feels that council would have to initiate the majority of these improvements and that there may be opposition from the property owners along the street who would be assessed for their cost. The costs to the property owner would be spread out over 10 years if the property owner desired this type of payment. It should be noted that most property owner supported projects take approximately three years of time to complete from the time of initiation. RECOMMENDATION: That the improvement of gravel streets within the city be through the use of local improvement districts with the city subsidizing a portion of the total costs. There may be grants or other outside funding sources that could recover some costs on an individual project. Changes in the formula for cost responsibility on these projects would be at the City Council through City Administrator for Information January 26, 1996 page 3 direction of the governing body. The projects be divided into two categories: a) normal gravel street improvement project, b) urgently needed top priority gravel street improvement project. The cost apportioning method for these categories is outlined below: A. Normal Street Imorovement Pro!ect Cost for asphalt for the resurfacing of the street be paid by the city from the city gas tax fund. This would be approximately 17% of the costs. Cost for design engineering including surveying and contract document preparation be paid by the Public Works T&E fund. This would be approximately 14% of the costs. a Financing costs for a local improvement district be paid by the general fund. This would account for approximately 2% of the costs. Costs for rock, curb, sidewalk, drainage improvements and construction engineering, which would typically be approximately 67% of the costs, be paid by the benefitted property owners along the street through a local improvement district unless additional property tax assistance is approved by the council due to stated objectives of the governing body. Uruentlv Needed Gravel Street Imorovement Pro!ect: (Note: This action to be taken by council through a resolution.) 1. All costs be apportioned as stated under 'A'. Property owners share of the cost under A-4 is reduced from 67% to 50% or below utilizing property tax, grant or other resources. (Note: The money accumulated from housing rehabilitation grant refunds may be dedicated toward this cause.) This could be a long term, 15 to 20 year, process and would be in accordance with a prioritized list. Gravel street improvements requested by property owners would be given higher priority. Staff feels that most projects will not be initiated by benefitted property owners, therefore, local improvement districts for these gravel streets will require council action for initiation. LIST OF ATTACHMENTS ATTACHMENT A: A'R'ACHMENT B: Unpaved Streets Priority List and Paving Requirements Paved Streets Resurfacing Needs The following are mentioned for discussion only. ATTACHMENT C: ATTACHMENT D: No material is provided. Street Reconstruction Projects Construction of New and Reconstruction of Existing Arterial and Collector Streets (outlined in Transportation Plan) ATTACHMENT A IMPROVEMENT OF GRAVEL STREETS TO PAVED STREETS Improve gravel roads to paved roads. 1. Lincoln St. 2. Wilson St. 3. Alexandra St. 4. Carol St. 5. Tooze St. 6. Ogle 7. Tout St. 8. Christensen St. 9. Elm St. 10. "A" St. 11. Brown St. 12. Fir St. 13. Hayes St., East 14. Oswald St. 15. Cupid Ct. 16. Cherry St. 17. Mill St. 18. Church St. 19. No Name St. 20. Yew St. 21. 2nd St. 22. 3rd St. 23. 6th St. 24. Broadway ext. 25. Shenandoah 245,065 82,277 95,143 117,046 149,614 712,884 105,378 86,598 68,72O 245,065 153,572 147,039 73,520 163,118 50,013 86,773 110,279 53,913 53,913 58,816 46,851 37,481 18,740 93,125 172,188 Subtotal $3,227,131 I I I I I I I I i~1 I I / I / I I I I I I I I I I I I i '1 I I I ----I I ,$-4 1TI ~ 1'1(.-/-/' II1~- Iv I .D TO: FROM: SUBJECT: DATE: Public Works Director ~ Randy Scott, C.E. Tech III Resurfacing Cost Projections January 24, 1996 Attached is the preliminary resurfacing cost projection list for streets which have had no asphalt surface improvement for over 15 or 20 years. The projected cost for streets having ' no surface improvement 15 years and more is $4.9 million, streets 20 years and more, $3.9 million. The projected cost is based on $1.06 per square foot of street surface. The estimated cost includes construction cost but not engineering, administration and construction control which would represent an additional 23% in the cost. Attachment 'A' represents streets with no surface improvement for 15 years or more, listed alphabetically. Attachment "B" represents streets with no surface improvement for 20 years or more,, listed alphabetically. Attachment 'C" represents streets with no surface improvememt for 15 years and more, listed by year of last Improvement. RS:Ig RSRFCOST.NEH TO: FROM: SUBJECT: DATE: Public Works Director Randy Scott, C. E. Tech III Resurfacing Projects through 1998 January 23, 1996 The following is a list of resurfacing projects for budgetary purposes through the 1997/98 fiscal year. 1~195-96 RESURFACING A. Corby Street Lincoln to Hardcastle B. Jansen Way West of Umpqua C. Evergreen West Hayes to Stacy Allison E;~;imated Cost 40,000 60,000 19.800 Subto~l $ 119,800 e 1996-1997 RESURFACING A. Oregon Way West Hayes to Hwy 214 B. Progress Way Hwy 214 to north end 42,000 149.000 Subto~l $ 191,000 e 1997198 RESURFACING A. Industrial Ave, Progress Way to Hwy 99E B. Myrtle Street Woodland to Willow Subtotal 76,O0O 50,000 126,000 Page I - Resurfacing Projects to 1998 1998199 RESURFACING C. Lincoln Street Front St to Hwy 99E Subtotal 131.000 $ 131,000 Various Small Areas for ResurfacinQ as FundinQ Allows A. Park Avenue Park Circle to Hwy 214 B. Garfield Alley to second Street C. Fir Street Fifth to Sixth E. King Way/Newport Completion to Newport Subtotal 10,000 15,000 12,000 29,000 66,000 BUDG'~.ESRFCTO.9~ Page 2 - Resurfacing Projects to 1998 ~ 1.996 ATTACHMENT "B' -- 20 years & older ST. liYRTLE ST. LINDA TIERRA LYNN $ILtIl~IDN RD. Gl~lt ST. STREE~ 214 E. HARI)CLgfI~ RD. I~OVED TO ~IDTH LENGTH BROAD~AY 29 200 CEDAR AVE. 33 600 STEVE~ 20 400 END 26 150 R/R 36 450 HWY. 99E 25 2,000 ]~) 34 450 C STREET 26 230 SALLAL RD. 34 450 LII~)L~ ST. 30 700 YOO#G ST. 30 1,200 ~fU.T~S AVE. 36 600 SA~flA# DR. 34 1,600 19~Y. 214 34 1,700 ACACIA 34 500 ~ 34 - 400 SEITI~I~ AVE. 28 ~0 ~ 34 2,740 FR0~ ST. 34 250 #. ~HES ST. 34 2,000 END 34 300 END 34 1,000 #AL~ #A~ 34 1,200 I~D 30 350 BRAND~I]IE C~. 34 1,200 E OP 36 500 #. i~S ~. 40 500 LIIa)LN S~. 18 250 LAST DATE IMP~VEI) 1916 1967 1973 1974 1961 1955 1974 1924 1960 1955 1960 1954 1966 1966 1967 1962 1966 1966 1966 1917 1946 1966 1954 1964 1964 1973 1961 1961 1962 1974 1955 1971 1947 ESTIMATED $6,148.00 $20,988.00 $8,480.00 $4,134.00 $17,172.00 $22,260.00 $38,160.00 $12,720.00 $22,896.00 $57,664.00 $61,26L00 $18,020.00 $4,240.00 $14,416.00 $98,749.~0 $9,010.00 $22,048.00 $72,0~0.00 $27,560.00 $10,812.00 $36,040.00 $43,248.00 $11,D0.00 $11,024.00 $43,248.00 $19,080.00 $21,200.00 $4,770.00 $20,670.00 FILBERT ST. FINZER WAY FIR STREET FIRST STREET F~ STIr, {AYES b~, W. ~MAY MARION ST. PRINCETON RD. FIFTH ST. HARRISON OAK ST. GARFI~Y~ ST. UDS, INC. HAR~ AVE. PARR RD. SETT~MIER AVE. HWY. 99! W]II~ AW. ~W~SS MAY JUDY ST. JON~SON ST. UMI~2UA RD. HWY. 214 MARRISON ST. CITY LIMITS C]I{ETARY SgC~ ST. ASTOR MAY SgOOND ST. _}[{[_J.TE I{WYo PAI{K AVE. OMP~A RD. 3O 34 15 26 34 26 2O 2O 2O 34 36 34 3O 26 34 2O 33 34 2O :}2 32 26 44' 34 34 34 26 34 500 85O 6OO 1,650 1,900 2,000 3,050 2,400 1,2O0 1,000 25O 1,100 1,100 500 750 70O 1,700 700 1,050 1,800 1,600 450 1,500 1,000 7O0 LAST DATE IMPROVED 1961 1962 1954 1973 1970 '1961 1960 1961 1970 1973 19S~ 1963 1963 1954 1971 1974 1973 1974 1974 196~, 1974 1974 1965 1955 1955 1971 1974 1974· ESTIMATED 00ST $15,900.00 $30,634.00 $9,540.00 $45,474.00 $68,476.00 $55,12O.00 $64,660.00 $50,880.00 $25,440.00 $36,040.00 $9,540.00 $39,644.00 $34,980.00 $19,080.00 $20,670.00 $2S,228.00 $36,040.00 $25,228.00 $S,300.00 $20,352.00 $6,784.00 $18,020.00 $74,624.00 $16f218.00 $9,010.00 $54,060.00 $31,800.00 $16,536.00 $28,832.00 $9,222.00 $2§,228.00 TIEP, P,A LYNH DR. JAHSDI gAY JANSEH MAY ~EEN CIT/BL~. T~LIH AVE. M. 99E WILLOW AVE. T[ERP, A LYNN IH. FII21~ ST. ~TE D., E. SF/. 214 NYRTLE AVE. PAiK AVE. H~Y. 214 FIHSER WAY SAIJ.A~ ~ A,%TOR UA¥ ~¥ST. P~,R RD. gm) NI~dP(HT ~A¥ END NORTll END K~I)LAND AVE. END JO¥CE SI'. BR¥1u Si'. ElD WILLOW AVE. KX])LA~ AVE. PALN AVE, #o HAYES STo OLIVE AVE. iJOITH VAIIDERBi~ LANE CASCiSE IH. CLEVELAND ST. 34 26 34 34 29 34 34 34 30 34 30 26 3O 27 34 34 34 34 34 34 34 34 44 34 34 30 34 34 34 26 26 700 150 700 1,100 500 20O 400 95O 150 650 350 2OO 1,600 1,050 1,400 5OO 800 500 4OO 1,350 700 1,200 3,300 1;100 3~300 1,050 2~150 300 LAST DATE IMPROV~ 1972 1974 1965 1970 1972 1911 1973 1972 1965 1955 1961 1960 1967 1967 1963 1967 1970 1965 1965 1967 1972 1974 1974 1963 1965 1962 1963 1965 1946 1963 1965 1973 1973. EST~[XTED $25,228.00 $4,134.00 $25,228.00 $39,644.00 $15,370.00 $7,208.00 $14,416.00 $34,238.00 $4,770.00 $23,426.00 $11,13O.00 $50,~0.00 $3O,0~1.00 $50,4~.00 $18,020.00 $2~,832.00 $18,020.00 $14,416.00 $48,6~4.00 $25,228.00 $9,010.00 $1~3,912.00 $$9,644.00 $15,900.00 $46,852.00 $6,360.00 $118,932.00 $37,842.00 $6,890.00 $32,436.00 $6,890.00 $59,254.00 $9,222.00 ~I'J.T3J~ ~ ~ff. ld,ml AVmlUE m~Y. 214 WLX,Lml AVSo I~V~ WIPrH 28 34 34 34 28 34 26 30 34 34 30 30 26 34 34 34 3O 40 3O 32 3O 40 34 LENGTH 2~000 1,000 20O 1~600 90O 1~000 1~700 3O0 1~100 1~000 100 100 1,700 1,700 450 1;550 2~400 1;950 L~ST DATE IHPROVED ~TI~T~ COST 1964 1965 1973 1974 1963 1973 1924 1962 1963 1972 1965 1955 1974 1965 1965 1954 19~7 1974 1973 1966 $59,360.00 $36,040.00 $7,208.00 $57,664.00 $26,712.00 $36~040.00 $46;852.00 $9,540.00 $39;644.00 $36;040.00 $3;18{).00 $3;180.00 $46;852.00 $61,268.00 $72,080.00 $34,238.00 $14,310.00 $65,720.00 $76,320.00 $39,008.00 $73f140.00 $38,160.00 $70,278.00 $3,969;265.40 PROJECT LIST OF C.I.P. PROJECTS (Prepared in March 1993) PRELIMINARY ESTIMATE A. MAJOR CONSTRUCTION/RECONSTRUCTION PROJECTS 1. N. Front St, incl walkway w/o overpass of Hvvy 214 to high school 2. Cou,;~i-y C;ub P, aiOrego,, Wa¥_~;:;~r. mc,,t At Hwy 2i4 w!~,~,,,,' ,m,,,u,,,~o,,u,,-'"': 3. Prairie Blvd. a. Stacy Allison to Hayes b. Hayes to Parr Rd 4. Railroad crossing improvements b. Settlemier/Front c. Hardcastle 5. Hayes/Settlemier to Cascade and beyond Improved signal modification Categories: a. Signals 1. Woodland & Hvvy 214 2. Bi-;v~, i./',~mr_.rt~ 3. Progress Way and 214 b. Pedestrian improvements Ce 2. 3. 4. Golf 1. 2. Boones Ferry (214 to Country Club) Broughton to Country Club on north side of 214 Bike lane along Hwy 214 from I-5 to Boones Ferry Hayes at Settlemier cart crossings Hayes St crossing (two) Rainier St crossing d. Intersections 1. Parr/Settlemier/Front St 2. Hayes/Bottle/SettlemierU,'/JeEO ~t~,/~ (- 8. South Front St. improvements (including sidewalks) 9. East Hardcastle widening (E. of 99E w/Cooley intersection) 10. Woodland/Arney at Hwy 219 (old 214) to Crosby 12. South Bypass (Butteville to 99E) 13. Cooley Rd widening (Hardcastle to Molalla Rd) 14. Crosby connecting Front St. to 99E (w/ railroad crossing) 15. Improve existing I-5 interchange a. Signals & striping for northbound traffic b. Cloverleafs (northwest & southeast) $. I-5 interchange modification for Butteville on-off ramp exten, from 214 435,000 680,000 800,000 3S,OOO 25,000 25,000 364,000 150,000 150,000 123,003---- 123,000 70,400 32,000 280,000 45,000 90,000 55,000 92,500 .150,000 270,000 520,000 350,000 3,350,000 158,000 380,000 145,000 3,500,000 1,500,000 DRAFT 3/22/93- Page I 17. 18. Lawson to possibly become right-turn-in/right-turn-out Widening Hwy 214 a. Country Club to I-5 b. Boones Ferry to Park Ave c. Boones Ferry to Country Club Rd d. Double left turn on Evergreen onto Hwy 214 19. Parr Rd from Prairie to Settlemier 20. East Bypass: Cooley Rd extension from hardcastle to Silverton Rd 21. 99E widening from Lincoln to south city limits 22. N. Front St widening 23. Boones Ferry (from Hwy 214 to Country Club Rd) 24. Country Club Rd a. Boones Ferry to Astor Way b. Boones Ferry to west of Front.St 25. Butteville connection to Woodland (south of HWl) 30,O00 1,500,000 300,000 300,000 125,000 800,000 1,000,000 3,500,000 572,000 412,000 212,5O0 212,500 550.000 Subtotal ~ DRAFT 3/ .2,,93 - Page 2