1. An Overview
m
5o
So
Detailed Outline
a) General Maintenance
b) Pavement Protection
Listing of Street Resurfacing (and some improvement)
Projects completed since 1977
Revenue/Expenditure
a) Revenue source and its overall use
b) Revenue need for overall street programs
Current policy on sharing of cost by project type
Conclusion/discussion/policy direction and attachments to
facilitate decision making
Attachment A Listing of Streets that have not been resurfaced for: 1) 20 years or more, $6.5 million
2) 25 years or more, $4.4 million
3) 30 years or more, $3.6 million
4) 35 years or more, $1.4 million
5) Plot of above information
Attachment B
List of gravel streets and approximate cost of improvement
(approximate estimated cost $3.2 million)
Attachment C Pavement Protection/Construction Cost Statistics
Interesting information for policy makers and managers
Attachment D Some policy decision alternatives
AGENDAg. 10
STREET MAINTENANCE/IMPROVEMENT
OVERVIEW
STREET MAINTENANCE
A. GENERAL MAINTENANCE WORK
B. PAVEMENT PROTECTION WORK
1. IN-HOUSE
2. CONTRACTED RESURFACING
C. OTHER MISCELLANEOUS ISSUES
1. STREET LIGHTING
2. RIGHT-OF-WAY TREES NOT OBSTRUCTING TRAFFIC
3. SIDEWALK/BIKEWAY ISSUES
II.
STREET AND DRAINAGE {~APITAL IMPROVEMENTS
A. CAPACITY IMPROVEMENT
B. SUB-STANDARD STREET IMPROVEMENT
C. TRANSPORTATION PLAN RELATED ACTIVITIES
GST\STRT\I~AINTIHP
STREET MAINTENANCE/IMPROVEMENT
DETAILED OUTLINE
STREET MAINTENANCE
A. GENERAL MAINTENANCE WORK
1. CLEANING OF ROAD SURFACE
2. CLEANING AND REPAIR OF DRAIN PIPES, CATCH BASINS AND
MANHOLES
3. PRUNING OF TREE BRANCHES AND TREE ROOT CUTTING THAT
OBSTRUCT FREE FLOW OF TRAFFIC
4. MOWING OF CERTAIN PUBLIC RIGHTS-OF-WAY AND STORM
WATER DITCHES
5. LEAF PICK UP AND DISPOSAL
6. APPROVED CHEMICAL SPRAYING
7. INSTALLATION, MAINTENANCE, AND REPLACEMENT OF STREET
SIGNS
8. PAVEMENT STRIPING FOR CHANNELIZATION AND PARKING
9. GRADING OF GRAVEL STREETS
10. REPAIR OF UNDERGROUND DRAINAGE
GST\STRT\MAINTIMP
2
STREET MAINTENANCE/[MPROVEMEN"[' -- DETAILED OUTLINE (cont'd)
PAVEMENT PROTECTION MANAGEMENT
1. IN-HOUSE PAVEMENT PROTECTION WORK ACTION
B.
C.
D.
E.
MINOR DRAIN SYSTEM REPAIRS AND EXTENSIONS
CRACK SEALING
SURFACE PATCH REPAIRS
TREADWAY REPAIRS
DRAG BOX SKIN COAT SEALING ~ ~'~ ~ ~-~-~ ~
CONTRACTED PAVEMENT PROTECTION WORK
A. MAJOR SURFACE/TREADWAY REPAIR
B. STORM DRAIN CORRECTIONS AND RESURFACING
NOTE:
PREPARATION OF CONTRACT DOCUMENTS FOR STORM
DRAIN INSTALLATION, TREADWAY/SURFACE REPAIR
AND RESURFACING IS DONE BASED ON TECHNICAL
NEEDS, BIDS ARE INVITED, AND THEN CITY COUNCIL
AWARDS CONTRACT TO LOW BIDDER FOR MAJOR
SURFACE/TREADWAY REPAIRS AND RESURFACING.
3
STREET MAINTENANCE/IMPROVEMENT - DETAILED OUTLINE (cont'd)
OTHER MISCELLANEOUS ISSUES
1. ONGOING SAFETY IMPROVEMENTS SUCH AS CURB-RETURNS,
WHEEL CHAIR RAMPS, AND TRAFFIC SIGN MODIFICATIONS
2. ALL RECOMMENDED STREET LIGHTING MAINTENANCE AND
IMPROVEMENT DONE BY PGE; ENGINEERING FULLY INVOLVED
IN ANALYSIS AND APPROVAL PROCESS
3. RIGHT-OF-WAY TREE MAINTENANCE EXISTING POLICY BEING
IMPLEMENTED BY ENGINEERING
4. EXISTING SIDEWALK POLICY, INCLUDING SUBSIDY PROGRAM,
BEING IMPLEMENTED BY ENGINEERING
II.
STREET and DRAINAGE CAPITAL IMPROVEMENTS
A. CAPACITY IMPROVEMENTS SUCH AS:
1. COST SHARING ON PROPOSED WIDENING OF HWY. 214 ~ l'J~i
eSL
2. SOUTH FRONT/SETTLEMIER/PARR ROAD INTERSECTION -l~,~~''~ '~ ....
B. SUB-STANDARD STREET AND DRAINAGE IMPROVEMENTS
1. RECONSTRUCTION OF MAJOR STREETS SUCH AS CLEVELAND
2. GRAVEL STREETS SUCH AS BRADLEY OR QUEEN CITY BLVD
3. CONSTRUCTION OF STORM DRAINS SUCH AS SO. FRONT ST.
CJ
RESPONDING TO TRANSPORTATION PLAN
1. MAJOR SAFETY RELATED IMPROVEMENTS
A. SUCH AS I-5 RAMP SIGNAL OR IMPROVEMENT
SETTLEMIER W/INSTALLATION OF WIDE SIDEWALKS
2. ARTERIAL EXTENSIONS/IMPROVEMENTS
A. SUCH AS COUNTRY CLUB REALIGNMENT
I-5 CROSSING IMPROVEMENTS
BIKEWAYS, SIDEWALKS, AND GOLF CART
IMPROVEMENTS
5. TRANSIT RELATED ISSUES
OF
FLOW-RELATED
STRT\HAINTIMP
4
LIST OF STREET RESURFACING PROJECTS
1977
DOUD STREET
THIRD STREET
UMPQUA PLACE
UMPQUA ROAD
MONTGOMERY STREET
SIXTH STREET
UMPQUA COURT
1979
ARTHUR STREET
GARDEN WAY
QUINN ROAD
BROWN STREET
COUNTRY CLUB ROAD
1980
LINCOLN STREET
W. HAYES STREET
1981
HARRISON STREET
THOMPSON ROAD
STARK STREET
COUNTRY CLUB CIRCLE
MONTGOMERY STR~T
FIFTH STREET
HERMANSON STREET
QUINN ROAD
!
JAMES STREET
1982
YOUNG STREET
RAIHIER ROAD
!
W. CLEVELAND STREET
t'
1983
GARFIELD STREET
LINCOLN STREET
MARSHALL STREET
1984
GATCH STREET
TIERRA LYNN DRIVE
PARK AVENUE*
5
LIST OF STREET RESURFACING PROJECrs
1985
COUNTRY CLUB ROAD TIERRA LYNN DRIVE
QUEEN CITY L.I.D./RECONSTRUCT
BRADLEY STRF-~T L.I.D./RECONSTRUCT
MARSHALL STREET
1986
RAINIER ROAD
SMITH DRIVE
1987
I-~RITAGE COURT
GATCH STREET*** *
1988
OAK STEEET
(1987/88 ST.LT. COSTS
TRANSFERRED FROM
PROP. TAX TO GAS TAX)
W. CLEVELAND STREET,2ND TO SETTI.FM1FRMIER
NO PROJECTS IN 89
1989
(CITY GAS TAX
IMPL M n I))
1990
ASTOR WAY FRONT STREET
EAST CLEVELAND L.I.D./RECONSTRUCT: FRONT TO 99E
RAILROAD CROSSING-CLEVELAND STREET
BOON'ES FERRY ROAD/WIDEN ADJACENT TO MIDDLE SCHOOL
1991
UMPQUA ROAD W.HAYES STREET** CASCADE DRIVE**
6
.... LIST OF STREET RESURFACING PROJECTS
NEWPORT WAY **** EVERGREEN ROAD *** WOODLAND AVE
EXT.**
RAIL~RAIL---'I~'ROAD CROSSING-LINCOLN STREET
1992
PRINCETON ROAD
VANDERBECK LANE**** KING WAY****
1993
HARDCASTLE AVENUE [ RAILROAD CROSSING-YOUNG STREET
HARDCASTLF~ SIDEWALK REPLACEMENT
1994
SETTLEMIER AVENUE
1995
JANSEN WAY CORBY STREET
I
COUNTRY CLUB ROAD REALIGNMENT/RECONSTRUCT
N. EVERGREEN EXT.**
1996
PROGRF~ S/TREADWAY OREGON WAY
DOUD~LINCOLN INTERSECTION
* RECONSTRUCTION PRO/ECT DONE USING DWFERENT FUNDING SOURCES
** PART OF FORCE MAIN PRO~ECT.
*** SHARED FUNDING WiTH DEVELOPER.
**** A PORTION OF THE STREET
7
CURRENT REVENUE FOR STREET PURPOSES
RESOURCES AMOUNT USE
Operations and General Maintenance
1. State Gas Tax
700K
Subtotal 7001(
Overall operation, maintenance,
and repairs
B. Capital UoQrades (Major Resurfacing)
1. City Gas Tax 107K
Resurfacing large projects
2. State Revenue Sharing
70 - 28
= 421(
Subtotal 150K
(or in 20 years - $3,000,000)
Railroad crossings, small storm and
resurfacing projects
Ce
Mai0r Caoital Imorovements (and Servicing of Transportation Plan)
1. Privilege Tax 1451( Accepted CIP for street/storm
improvements and reconstruction
2. Traffic Impact Fees 1201(
Capacity improvement only
3. Special Assessment Varies
4. ISTEA 651(
Property Tax Levy -O-
Approx subtotal--- 3301(
Major Capital Improvement/20 years -- $330,000 x 20
= 96,600,000
As needed
Federal funds for state approved
city project
for Capital Improvement
STRREV
PRELIMINARY ST ET
IMPROVEMENT NEEDS
Resurfacing 20 year and older
(Estimate updated in Sept. 1996)
$ 6,518,978
e
City system street improvement projects
(15 Projects estimated by Public Works)*
9,070,940
a. State system within city boundary
(10 State system cost estimated by Public Works)*
b. OTHER TRANSPORTATION
PROJECTS IDENTIFIED
(10 other major transportation plan projects)*
11,639,800
10,222,564
c. TRANSPORTATION PLAN
MISC. PROJECTS
(This cost is derived fxom quick educated guess with
understanding that transportation plan cost estimate
by consultants exceeded $60 million)
10,000,000 ±
Gravel Streets
(25 gravel street improvement costs estimated by
Public Works)*
3,227,131
TOTAL
$50.679.413
*not updated in September 1996
9
I,U
0
0
Z
0
>-
0
Z
c -I- -I- -t-
'o ~'~ o o o o o o
n- n n n ~ ~ [3O Z
4.,I
....... ~' *~ ~.. ~ *~ m..
~ ~ ~ ~ 0 0 ~ 0
Z 0 0 0 Z Z 0 Z
~ ~ ~ ~e o .-
E ~ ~ ~
._ o $
10
· >'~
ATTACHMENTS
STREETS NOT RESURFACED WITHIN 20 YEARS
II, ROVED
FRO~ TO WIDTH LI~IGTH IMPROVED
YOONG ~. ~AY 29 ~ 1961
~LE ST. C~ l~. 33 ~ 19~
L~ ~ ~ 4~ 1973
~ ~. 99E 34 1~ 1976
~ A~. ~ ~ ~ 1976
TI~ L~ ~. ~ 26 1~ 1974
SIL~ ~. R~ 36 4R 1~1
~ SY. ~. ~E ~ 2,~ 1~5
~ ~AY ~ 34 4~ Z974
~ C ~ 26 ~ 1924
214 ~IJ~L ~. 34 4~
~ ff. ~ ~. 30 ~ 1955
J~ ~. Y~ ~. 30 1~
L~ ~. ~ l~. 36 ~ 1954
~Y~ S~. ~ ~. 34 1~ 1966
~ A~ 34 ~ 1~7
~ ~' ~ ~ ~ 1~2
~. ~ 34 ~
~. S~ 1~. 28 ~
~ ~ 34 2,740
~~ A~. FI~ ST. 26 ~ 1946
~Y ~ ~ ~ 34 ~ 1~4
~TllitT~
COS?
$10,20~.00
$34,848.00
$14,080.00
~;62,832.00
$13,200.00
$6,864.00
$28,512.00
$26,928.00
$10,524.80
$26~928.00
$63,360.00
$21,120.00
$38,016.00
$95,744.00
~101~728.00
~7~040.00
~23~936.00
$44~352.00
~163~961.60
$14,960.00
$36,608.00
$119,680.00
$17,952.00
11
STREET
COONTRY CLUB TERRACE
D STREET
DELL~R WAY
DUIIN (I~RT
ECOLA WAY
ELA#A ~A¥
ELM STREET
EV~ ROAD
F[I~ STREET
FILBERT ST.
FINZER #~
FIR STREET
$~ORGE STREET
HAMPTON
END
BROADWAY ST.
WALTO# WAY
Elm
$,~T.T,~T. RD.
I~YW[BE ~T.
EOP
#. HAYES ST.
IIWY. 214
C~ARY
$1~Olm ST.
HAI~ AVE.
SECOND
FIl~ ST.
ASTOR MAY
#[LSON ST.
34
26
34
50
26
34
36
40
18
26
3O
34
15
34
26
26
34
36
34
36
2~
34
20'
33
L~TH
1,000
25O
1,200
350
4OO
1,200
5O0
500
750
850
1,900
1,650
2,4~
1,200
1,100
1,700
DATE
IMPi~)VED
1964
1973
1961
1961
1962
1974
1955
1971
1947
1961
1962
1954
1973
1970
1960
1970
1973
1955
1963
1963
1954
1971
ESTIHATED
COST
$59,840.00
$11,440.00
$71,808.00
$18,480~00
$18,304;00
$71,808.00
$31,680.00
$35,200.00
$7,920.00
$34,320.00
$26,400.00
$50,864.00
$15,840.00
$113,696.00
$75,504.00
$84,480.00
$107,360.00
$42,240.00
$59,840.00
$15,840.00
$65,824.00
$58,080.00
$31,680.00
$34,320.00
$41,888.00
$59,840.00
$52,272.00
12
~ eEL DRIVE
sgTrLff(Iglt AVE.
LELqURE ST.
SECOlfl) sr.
FROlff ST.
PROGRESS MAY
TIEI~A LYNN DR.
srLRIC sr.
srAMC Sr.
JUDY S~.
PLRR RD.
TIEI~ LYNN DR.
JAIlS~I I~Y
YOIIL~ AVE.
I~Y. 99E
k'ILLO~ AVE.
M~R CEL DR.
YIERRA LYNN DR.
LEASDRE ST.
NELLIE HUIR SCHOOL
Si~Ft,IIIIER
SECDIID ST.
¢L~ADS DRIVE
m~. 99E
PML~ AVE.
~LSOll sr.
Elm
PARR RD.
llEb'PORT
mlPQOA ltd
))(X)DLAIID AVE.
IMPROVlm
MIl)TH
34
20
32
28
26
34
32
44
34
LAST DATE
LENGTH IHPROVED
700 1974
250 1973
600 1974
1,050
1,600 1974
f:~ 1965
450 1974
34 250 1974
30 1,000 1955
26 f~]O 1955
34 800 1971
29 300 1974
34 700 1974
34 700 1972
26 150 1974
34 1,100 1965
34 700
29 500 1970
34 ~50 1976
34 200 1972
20 450 1976
34 400 1911
34 950 1973
30 150 1972
34 650 1965
ESrIHATED
COST
$8,800.00
$33,792.00
$88,704.00
$4~,048.00
$29,920.00
$11,264.00
$123,904.00
$38,896.00
$26,928.00
$14,960.00
$52,800.00
$47,872.00
$15,312.00
$41,888.00
$41,888.00
$6,864.00
$65,824.00
$41,8M.00
$25,520.00
$38,896.00
$11,968.00
$15,840.00
$23,936.00
$56,848.00
$7,920.00
$38,896.00
13
JOYCE ST.
BWY.
~OODLAIiD AVE.
#ILI~ AVE.
~.
~l~.
~. 214
~U~T. ~
~YST.
~. 99E
TO
JOYCE ST.
BRY~ ST.
END
~ AVE.
~)ODLAND AVE.
KII~ ~.
Pil~ AVE.
EI[D
~I~
C~ L~
~E ~.
~Y~.
~Y ~ ~
IMPROVln)
#IlYrlt
30
26
3O
27
34
34
34
34
34
34
34
22
44
34
3O
34
3O
34
34
26
34
26
26
28
34
35O
200
1,600
1,050
1,400
500
800
50O
4~
700
25O
1,l~O
3,~X)
3,300
2,150
LAST DATE
II~OVED
1955
1961
1960
1967
1967
1963
1967
1970
1965
1967
1972
1974
1974
1963
1965
1962
1963
1965
1946
1963
1965
1973
1973
1964
1965
COST
$18,480.00
$9..152.00
$84,480.00
$49..896.00
$83,776.00
$29~920.00
~47,872.00
$29,920.00
$23,936.00
$41,888.00
$14,960.00
$46,464.00
$255,552.00
$65,824.00
$26,400.00
$77,792.00
$10,560.00
$197,472.00
$62,832.00
$11,440.00
$53,~56.00
$11,440.00
$98,384.00
$15,312.00
$98,560.00
$59,840.00
14
Total:
11~. 214
HWY. 214
FIMZER WAY
VAIID~ LAME
LANDAU DR.
ASTOR WAY
COt~rfR¥ CLUB RDo
C, ARDL ST.
h~X)I)LAliD AVE.
WILLOW AVE.
IMPROVED
34
34
28
34
26
30
34
34
200
1,600
9OO
1,000
1,700
3OO
1,100
1,000
30 100
30 100
26 1,700
34 1,700
29 275
34 2,000
34 950
30 450
30 2,400
40 1,550
32 1,150
40 900
30 2,300
34 1,950
DATE
IMPROViH)
1973
1974
1963
1973
1924
1962
1963
ESTI~TEI)
COST
$11,968.00
$95,744.00
$44,352.(M)
$59,840.00
$77,792.00
$15,840.00
$65,824.00
1972
1965 $5,280.00
1955 $77,?92.00
1974 $101,728.00
1976 $14,036.00
1965 $119,680.00
1965 $56,848.00
1954 $23,760.00
1967 $126,720.00
$109,120.00
1974 $64,?68.00
1973 $63,360.00
$121,440.00
1966 $116,688.00
$6,518,978.40
15
SEPT.96
STREETS NOT RESURFACED WITHIN 25 YEARS
STREET
A STREET
ACACIA STREET
BLAINE STREET
BH)ADWA¥ STREET
BHW~2~O~ WAY
~RYAR STREET
CANELL #AY
C.A.~%DE ~IVE, NORTH
CEDAR AV~UE
COU~R¥ C~UB TERRACE
DELLHOOR #AY
ECOLA #AY
ELM STREET
IMPROVED LAST DATE
~ ~0 ~ID~ I2~TH I~ROV~)
¥OUI~ S?. B~AY 29 ~ 1961
~ ~. C~ A~. 33 ~ 1967
SIL~ ~. R/R 36 4~ 1961
~ ST. ~. 99E ~ 2,~ 1955
D ~ C ST~ 26 2~ ~924
~. 214 S~ ~. 34 4~
~ ST. L~ ST. ~ 7~ 1955
~ ~. ~ ST. ~ 1,~
~ ~. WI~I~ A~. 36 ~ 1954
W. ~ ~. ~I~ DR. 34
W. ~Y~ ~. ~. 214 34 1~7~
~ A~CIA 34 ~ 1~7
~ ~' } ~ ~ 1~2
~Y ST. ~ 34 4~ 1~6
FI~ ~. S~ A~. 28
W. ~ ~ 34 2~740
S~ ~. ~ ST. 34 ~ 1917
~~ A~. F~T ~. 26 ~ 1946
~ ~. W. ~ ~. 34 2~ 1966
~Y ~ ~ ~ 34 ~ 1~4
~Y ~ ~ ~ 34 1,~ 1964
~ ~. W~ WAY 34 1~ 1~1
E. ~ ~. ~ 30 3~ 1961
~ ~. S~ D. 26 4~ 1962
J~ ~. E O P 36
ESTIHATED
COST
$10,208.00
$34,848.00
$28,512.00
$88,000.00
$10,524.80
$26,928.00
$36,960.00
$63,360.00
$21,120.00
$38,016.00
$95,744.00
$101,728.00
$29,920.00
$7,040.00
$23,936.00
$44,352.00
$163,961.60
$14,960.00
$36,608.00
$119,680.00
$17,952.00
$59,840.00
$71,808.00
$18,480.00
$18,304.00
$31,680.00
16
STREET
HARRISON ST.
LINCOLN ST.
MARION ST.
PRIN~ RD.
FIFTH ST.
GARFII~ ST.
UDS, INC.
HXRI)CASYLE AVE.
PXRR RD.
SiffT.,mfIgll AVE.
SK)OND Si'.
m6,~A RD.
II~Y. ggE
JAMS1BI WAY
JUISEII WAY
~ CIT/BLVD.
~Iglll~ LI~N DR.
FILBEET ST.
LIMCOLN ST.
GARFIELD ST.
JOIINSON ST.
I~. 214
CITY LIMITS
CI~4[T~Y
CLEVlff~fl) STo
C~RISTIAItSEN
S~ ST.
FI~ ~.
~A~
~C~ ~.
30~ ST.
IMPROVED
WII)'I'H
40
18
26
30
34
15
26
20
2O
2O
34
36
30
36
26
34
2O
33
34
30
26
34
34
34
29
34
34
3O
25O
75O
5O0
850
2,000
3,050
2,400
1,200
1,000
250
1,100
5O0
75O
70O
1,700
90O
650
1,000
1,100
700
400
650
350
LAS?DA?E
IHPROVEI)
1971
1947
1961
1962
1954
1970
1961
1960
1961
1970
1955
1963
1963
1954
1971
19~5
19~5
1955
1971
1965
1970
1911
1965
1955
I~I~?ED
$35,200.00
$7,92O.00
$34,320.00
$50,864.00
$15,840.00
$91,520.00
$107,360.00
$84,480.00
$42,240.00
$59,840.00
$15,840.00
$58,080.00
$31,680.00
$34,32O.00
$41,888.00
$59,840.00
$52,272.00
$52,800.00
$Z7,456.00
$65,824.00
$41,888.00
$25,520.00
$23,936.00
$38,896.00
$18,480.00
STREET
SA~IA~ DR/VE
SEO~D STREET
SlL~ ~
TI~ L~ ~
~ A~E
MY~q,E AVE.
· ~I~SLTE RD., E.
OR~OM NAY
03~TRY CLUB RD.
F~Z~ WAY
~IA ~.
0=~.
~ A~.
~ST.
F~Z~ NAY
~NAY
~Y~.
~. 99E
BRYAN ST.
WIU/N AVE.
WOODIARD AVE.
KIIi~ ~Y.
PUJ! AVE.
ERD
Em)
OLIVE AVE.
(I~Y CI2B RD.
YAIIDERBECK LAME
C~E DR.
MOlrl~y ~.
COUIITRY CLUB ROAD
FDiZER ~AY
VAlIDlY:BECK LANE
LARDAU DR.
26
30
27
34
34
34
34
34
34
34
34
30
34
34
26
34
26
34
28
26
34
34
30
26
LDIGT~
2O0
1,600
1,050
1,400
5OO
80O
5OO
4OO
7O0
1,100
1,300
3,300
1,050
250
2,000
1,000
1,700
1,100
1,000
100
1JO0
LAST DATE
1961
1960
1967
1967
1963
1967
1970
1965
1967
1963
1965
1962
1963
1965
1946
1963
1965
1965
1963
1924
1962
1963
1965
1955
I~TI~ATED
COST
$9,152.00
$84,480.00
$49,896.00
$83,776.00
$29,920.00
$47,872.00
$29,920.00
$23,936.00
$41,888.00
$65,824.00
$26,400.00
$77,792.00
$10,560.00
$197,472.00
$62,832.00
$11,440.00
$53,856.00
. $11,440.00
$98,560.00
$59,840.00
$44,352.00
$7?,?92.00
$15,840.00
$59,840.00
$5,280.00
$7?,?92.00
18
#ALTO~ WAY
WILLIA~ STREET
NIl/OW AVEN~
Total:
l~I)EEfO~ ~.
AF~H MAY
214
TO
ASTOR WAY
CO~Y ~ RD,
CAROL ST.
~00DLU~ A~.
I](HOVED
NIl)TH
34
34
4O
3O
34
2,000
95O
450
1,550
2,400
1,950
LAST DATE
1965
1965
1954
1967
1966
ESTImATeD
$119,680.00
$56,848.00
$23,760.00
$109,120.00
$126,720.00
$116,688.00
$4,422,334.40
I PT.96
STREETS NOT RESURFACED WITHIN 30 YEARS
A STI~T YOUNG ST. IH~OAI~AY 29 200 1961
BIIU~ EYE AVENUE SILVEI~K)N ~. R/R 36 4~ 1~1
~ S~ ~ ~. ~. 99E 25 2,~ 1955
~AY ~ D ~ C ~ 26 2~ ~924
~ ~AY ~. 214 ~UlL ~. 34 4~ 19~
~y~ ~ ~ ~. ~ ~. 30 1,~ 1955
~ ~. ~ ~. 30 7~
~ S~ ~ ~. ~ AVg. 36 ~ 1954
~g ~ N. ~ ~. ~ ~. 34 1,~ 1966
~E ~, ~ ~. ~ ~. ~. 214 34 1,~ 1~
~ ~ ~ ~. ~ 20 ~ 1~2
~ ~ ~ ~. ~ 34 4~ 1~6
~ ~. ~ ~. S~ A~. 28 ~ 19~
~ CItE ~. ~ ~ 34 2,740 1~
~ ~, W. S~ ~. ~ ST. 34 2~ 1917
S~ A~. F~ ST. 26 ~ 1946
~y ~ ~ ~ ~ ~ ~ 34 ~ 1964
~Y ~ T~ ~ ~ ~ ~ 34 1,~ 1964
D~ ~AY ~I~ ~. M~ WAY 34 1,~ 1~1
~ ~ E. ~ D. ~ 30 3~ 1961
' ~ ~AY ~ ~. ~ ~. 26 ~ 1~2
E~ ST~ ~ ST. E O P 36 ~ 1955
FI~ S~ ~ ST. ~[~ ST. 26 7~ 1947
FI~T ~. ~I~ ~. ~ ~T. ~ ~ 1~1
F.~TIHA?ED
$10,208.00
$28,512.00
$88,000.00
$10,524.80
$26,928.00
$36,960.00
$21,120.00
$95,744.00
$101,728.00
$7,040.00
$44,352.00
$163,961.60
$14,960.00
$~6,60S.00
$119,680.00
$17,952.00
$59,840.00
$?1,80S.00
$18,480.00
$18,304.00
$31,650.00
$3¢,320.00
$?,920.00
$26,400.00
20
STREET
FIN21~ MAY
FIR
~ MA~
~ ST.
FI~
FIFTH ST.
OIB, INC.
PAP~ RD.
~I~,RA
3~ MAY
TI~ L~
~R MAI
!~. 214
CIT~ LIMITS
CHRISTIANSEM ST.
FIPIII ST.
S~ ST.
~ MAY
~ MAY
~Y~ ~,
~,
~~,
~Y~,
V~ ~
34
15
20
20
2O
34
3O
26
36
34
30
26
34
34
34
34
30
26
30
34
34
34
34
30
34
3,05O
2,400
1,200
1,000
1,100
75O
5O0
700
1,700
65O
1,000
6O0
700
1,100
400
65O
35O
1,600
1,100
1,300
200
3,300
LAST DATE
II~'~VI~D
1962
1954
1961
1960
1961
1955
1963
1963
1954
1965
1955
1955
1965
1911
1965
1955
1961
1960
1963
1965
1963
1965
1962
1963
ESTIMATED
COST
$50,864.00
$15,840.00
$107,360.00
$84,480.00
$42~240.00
$59,840.00
$58,080.00
$34,320.00
$31~680.00
$41~888.00
$59~840.00
$38~896.00
$52,800.00
$27,456.00
$41~888.00
$65~824.00
$23~936.00
$38,896.00
$18~480.00
$9,152.00
~4,480.00
$29~920.00
$23~936.00
$26~400.00
$65~824.00
$77~792.00
$10,560.00
$197~472.00
21
$?1~
$ILVEIP~ AVI~UE
STAIWI~D
STD~ STi~I~
~ STi~ET
~ROAD
TIERRA LYI~ COURT
Total:
~.~fO~ ~A¥
TIEI~ LI~ I~.
~. ~E
I~D.
C~ELD ~.
FI~Z~
VUiDERBE(li LINE
L~DIU DR.
C0~¥ CLUB D.
S~I~ D~IVE.
I~ROVED
34
26
34
26
28
34
28
26
30
3O
34
34
~0
34
1,0~0
250
9OO
25O
2,000
1,000
9OO
1,700
3OO
1,100
1,000
100
1,700
95O
1,950
LAST DATE
Dll~O~
1965
1946
1963
1965
1964
1965
1963
1924
1962
1963
1965
1955
1965
1965
1954
1966
ESTIHATED
COST
$62,832.00
$11,440.00
$53,85~.00
$11,440.00
$98,560.00
$59,840.00
$44,352.00
$77~792.00
~15,840.00
$65,824.00
$59,840.00
$5,280.00
$77,792.00
$119,680.00
$56,848.00
$23,760.00
$116,68~.00
$3,600,150.40
22
STREETS NOT RESURFACED IIWITHI# 35 YEARS
IMPROVED LAST DATE
DELLq~R ~¥
FRONT STREET, N.
JOYCE
LINOO[J ROAD, E.
BRO~DMAY 29 200
RD. R/R 36 450
ElY. ~E 25 2,~
C ~ 26 230
~[JAI. ~. 34 4~
~. Y~ ~. 30
~. ~u.u. ~.. 30
~. ~ A~. 36
~. ~ ~. 34
S~ A~. F~ ~. 26
~. W~ WAY 34 1,~
~ D. ~ 30
~. E 0 P 36
~. ~I~ ~. 26
~. L~ ~. 18
~. ~ ~. 30
~ A~. ~Y ~ 2,4~
~ D. 20 1~7~
~. ~ ~. 30 1,~
34
1961
1961
1955
1924
1960
1955
ESTIMATED
COST
$10,208.00
$28,512.00
$88,000.00
$10,524.8{)
$26,928.00
$36,960.00
$63,360.00
1960 $21,120.00
1954 $38,016.00
1917 $14,960.00
1946 $36,6~.00
1961 $71,808.00
1961 $18,480.00
1955 $31,680.00
1947 $34,320.00
$7,920.00
1961 $26,400.00
1954 $15,840.00
1961 $107,360.00
$84,480.00
1960 $42,240.00
1961 $59,840.00
1955 $~8,080.00
1954 $59,840.00
1955 $52,800.00
1955 $27,456.00
1911 $23,936.00
23
STREET
FI~EIIT ST.
JOYCE ST.
!~. 99E
!~. 99E
~0
JOYCE ST.
BRYAN ST.
lIAl~/SO[ ST.
LAI~A~ DR.
CAROL ST.
#IDT~
30
26
30
26
26
26
30
35O
2OO
1,600
25O
1,700
1,700
45O
LAST DATE
II~H)VD
1955
1961
1960
1946
1924
1955
1954
ESTIHATED
$18,480.00
$9,152.00
$84,480.00
$11,440.00
$77,792.00
$';7,792.00
$23,760.00
$1,400,572.80
24
SJellOP UO!ll!l~l
25
IMPROVEMENT OF GRAVEL STREETS TO PAVED STREETS
(Cost Estimate not up-dated in September 1996)
Cost to improve gravel roads'to paved roads:
1. Lincoln Street, West $245,065
2. Wilson Street 82,277
3. Alexandra Street 95,143
4. Carol Street 117,046
5. Tout Street 105,378
6. Ogle Street 712,884
7. Tooze Street 149,614
8. Christensen Street 86,598
9. Elm Street 68,720
10. "A" Street 245,065
11. Brown Street 153,572
12. Fir Street 147,039
13. Hayes Street, East 73,520
14. Oswald Street 16:},118
15. Cupid's Court 50,01:}
16. Cherry Street 86,773
17. Mill Street 110,279
18. Church Street 53,913
19. No Name Street (between 1st & 2nd) 53,913
20. Yew Street 58,816
21. Second Street 46,851
22. Third Street 37,481
23. Sixth Street 18,740
24. Broadway extension 93,125
25. Shenandoah Lane 172.188
Subtotal $3.227.13~1
26
PAVEMENT PROTECTION COSTS STATISTICS
(Aug, 1996 - Approx. costs based on prior history)
IN-HOUSE REPAIR
A. Crack sealing
B. Patching
1. Surface Repair
2. Treadway Repair
C. Drag-box skin patch
1. 1/2' thick average
2. 1-1/2' thick average
$ 1.00/ft
$ 14.15/sq yd
$ 22.75/sq yd
$10.00/ft. length *
$20.00/ft length*
II.
CONTRACT REPAIRSIRESURFACING
A. Crack sealing**
B. Patching
1. Surface Repair **
2. Treadway Repair **
$1.15/ft
916.25/sq yd
$27.50/sq yd
C. Normal resurfacing
D. Resurfacing w/minor reconstruction
E. Paving w/major reconstruction
and improvement; also paving of gravel
streets will fall in this category
$55-60.00/ft length*
9100-110.00/ft length*
$200-220.00/ft length*
Length is for 34-feet wide street on average
Average depth of drag-box asphalt skin patch is I inch thick
Average depth of asphalt resurfacing is 1-1/2 inches thick
Average depth of asphalt pavement for reconstruction projects is 2-1/2 inches
thick
** Average of 1997 contracts
STRT\PAVEPROT
27
POLICY DIRECTION ALTERNATIVES
NOTE:
STAFF CAN ACCOMPLISH GOALS OF THE GOVERNING BODY IF
CLEAR GOALS ARE ESTABLISHED, RESOURCES ARE MADE
AVAILABLE, AND REALISTIC TIME FRAME IS ESTABLISHED
ACCOUNTING FOR TECHNICAL AND OUTSIDE INFLUENCES.
EXAMPLE:
WATER METERS in Senior Estates, a sensitive political and financial
issue. A five-year time was established and public works staff
implemented a program acceptable to the governing body and it was
accomplished without problems.
PAVEMENT POLICY ISSUES:
1)
2)
3)
4)
5)
Is current policy working and serving its intended purpose?
Does it need to be modified or changed?
Clear articulation of modified or changed policy.
Are enough resources being made available for modified policy?
Is there enough time allowed to implement the modified policy?
POLICY ALTERNATIVES
1)
Governing body may change the entire current policy and establish
new policy to be followed by staff.
2)
Continue pavement protection based on technical needs as it has
been done in the past.
3) In addition to "2" above, add more streets and expand program.
4) In addition to "2" above, add paving of certain gravel streets.
a)
Governing body may establish priorities and a time
frame with percent of participation from property
owner and make resources available
5)
In addition to "2" above, add more streets but these streets need
to be based on age of streets and not on technical need.
a)
Governing body may establish that all streets which
have not been resurfaced in last 25 to 35 years be
resurfaced first.
C:FRANK~POLDIR.ALT