Ord. 2569 - Updated Public Facilities Plan for Comp Plan (LA 2018- 03) COUNCIL BILL NO. 3091
ORDINANCE NO. 2569
AN ORDINANCE ADOPTING AN UPDATED CITY OF WOODBURN PUBLIC FACILITIES
PLAN AS EXHIBIT "B" OF THE WOODBURN COMPREHENSIVE PLAN (LA 2018-03)
WHEREAS, ORS 197.175 requires cities to prepare, adopt and implement
Comprehensive Plans consistent with statewide planning goals adopted by the
Land Conservation and Development Commission; and
WHEREAS, the ORS 197.712 (2)e requires cites to develop and adopt a
public facilities plan for areas within an Urban Growth Boundary containing a
population greater than 2,500 persons and shall include rough cost estimates
for projects needed to provide sewer, water, and transportation uses; and
WHEREAS, Goal 11 of the Oregon Statewide Planning Goals, Public
Facilities and Services, is intended to ensure that communities plan for and
develop public facilities and services in a "timely, orderly and efficient
arrangement"; and
WHEREAS, on August 17, 2016, the City applied for and received a Special
Public Works Fund Technical Assistance Grant to complete a review and
update of the City's Public Facilities Plan; and
WHEREAS, on December 13, 2018, the Planning Commission in
conformance with WDO 4.01 .096. and 4.01.10B. held a public hearing and
recommended approval of this amendment to the Comprehensive Plan; and
WHEREAS, on March 11, 2019, the City Council held a public hearing,
reviewed the record, accepted testimony and requested this Ordinance
effecting the amendment (LA 2018-03); NOW, THEREFORE,
THE CITY OF WOODBURN ORDAINS AS FOLLOWS:
Section 1. The City of Woodburn Comprehensive Plan is amended to
repeal and replace Exhibit B (the City of Woodburn Public Facilities Plan) as
provided in Exhibit 1, which is attached to this Ordinance and incorporated
herein.
Section 2. The legislative action taken by the Ordinance is explained and
justified by the Findings and Analysis in Exhibit 2 which is attached to this
Ordinance and incorporated herein.
Page - 1 - Council Bill No. 3091
Ordinance No. 2569
Approved as to form: e2?-��r—)k:�D za
City Attorney Date
Approved:
Eric Swenson, Mayor
Passed by the Council 41
Submitted to the Mayor a01
Approved by the Mayor ;2-611
Filed in the Office of the Recorder 13, 9;101
ATTEST:
Heather Pierson, City Recorder
City of Woodburn, Oregon
Page - 2 - Council Bill No. 3091
Ordinance No. 2569
Exhibit
Page 1 0149
'Op
murraysmilh
hr
W00DBUAN
Public Facilities Plan
July 2018
Exhibit 1
Page 2 of 49
Public Facilities Plan
City of Woodburn
July 2018
k N
UKr-
CAMILV-S
RENEWS: �
Murraysmith
Water, Wastewater,Storm Water
888 SW 5th Avenue
Suite 1170
Portland,OR 97204
Exhibit 1
Page 3 of 49
Acknowledgements
is exrvessed to (.:711 who contribi ited t(.:) the c(.wnf..)1eb(.�)n this
City of Woodburn
Eric Liljequist, PE
George Kuznetsoz
Dago Garcia
Curtis Stulz
Frank Sutter
Murraysmith
Brian Ginter, PE
Natalie Jennings, PE
Claire DeVoe
DKS Associates
Mat Dolata, PE
Exhibit 1
Pane 4o 49
_�-�� ����� ���� Contents
� �� ����� �� �
1N �" m�� ���������~�on
1.1 General.............................................................................................................................1-1
1.2 Service Area Characteristics------------------------------'1-1
��� Water" �����er m��N man
2.1 Introduction.....................................................................................................................2-1
2.2 Water Demand -------------------------------------.2-1
2.2.2 Existing Drmond--------------------------------.2-2
2.2.2 Projected 2O57Drmond.....................................................................................2-5
2.3 Water Source--------------------------------------.2-3
2.3.2 Wells....................................................................................................................2-5
2.3.5 Source N/otrrProtrction ----------------------------2-4
2.4 Treatment........................................................................................................................2-4
2.5 Storage and Pumping......................................................................................................2-4
2.5 Water Distribution System..............................................................................................2-5
2.6.2 Existing System...................................................................................................2-6
2.6.2 Design (ritrriG.....................................................................................................2-7
2.6.5 Anoknis Findings--------------------------------.2-7
2.6.4 Svtem 8rconncndotions......................................................................................2-7
2.7 Capital Improvement Projects........................................................................................2-8
2.8 Funding ----------------------------------------. 2-12
3" Sanitary Sewer Plan
3.1 Wastewater Planning History-----------------------------'3-1
3.2 Treatment........................................................................................................................3-2
3.3 Primary Collection System -------------------------------.3-3
3.4 Capital Improvement Projects........................................................................................3-5
3.5 Funding -----------------------------------------.3-5
Exhibit 1
Page 5 of 49
4. Storm Water Plan
4.1 Introduction.....................................................................................................................4-1
4.2 Design Storms..................................................................................................................4-1
4.3 Existing Inventory............................................................................................................4-2
4.4 Needed Drainage Improvements to Support Growth...................................................4-4
4.4.1 Detention Policy Implementation.......................................................................4-4
4.5 Requirements for New Developments...........................................................................4-5
4.5.1 City of Woodburn Runoff Detention Requirement............................................4-5
4.5.2 Safety Requirements...........................................................................................4-6
4.6 SWIR Expansion Area Projects........................................................................................4-6
4.7 Funding ............................................................................................................................4-7
5. Transportation Plan
5.1 Introduction.....................................................................................................................5-1
5.2 Capital Improvement Plan for SWIR Area......................................................................5-1
Exhibit 1
Page 7 of 49
c Iii uiri I,,.
Introduction
1.1 General
The Public Facilities Plan (PFP) identifies major infrastructure projects necessary to serve the Year
2037 projected population of 35,025 and documents the effect on utility and transportation
infrastructure resulting from the Southwest Industrial Reserve expansion of the City of Woodburn.
As required by state statute, four elements have been studied: Domestic Water, Sanitary Sewer,
Storm Drainage, and Transportation. Information for this plan was derived from existing individual
utility Master and Facilities Plans, and the previous public facilities plan, updating where necessary.
A comprehensive analysis was performed for the SWIR expansion area as a part of this update.
Tables summarizing projects and associated costs have been included in the body of this Public
Facilities Plan Update. Maps showing the locations of infrastructure elements (Water, Sanitary
Sewer, and Storm Drainage) are included in the end of each section. Transportation projects and
maps were derived from the Woodburn Transportation Systems Plan (TSP), which is currently
being updated.
1.2 Service Area Characteristics
Woodburn is located in Oregon's Willamette Valley approximately 18 miles north of Salem and 31
miles south of Portland in the Pudding River basin. The topography of the service area slopes
slightly to the northeast. The area is relatively flat with an elevation differential of only 50 feet,
ranging from 150 to 200 feet above sea level.
The main drainage through the City is Mill Creek, which drains to the Pudding River. Senecal Creek
drains a small portion of the City's UGB area west of I-5. A very small portion of the east part of
the City (east of highway 99E) naturally drains directly to the Pudding River.
The climate is mild with wet winters and dry summers. Rainfall averages about 45 inches per year
and one year in ten will exceed 52 inches. The wettest months are usually November through
February.
The soils in the area are primarily of two associations, Amity silt loam and Woodburn silt loam.
Both of these formations are found throughout the City in most areas except drainage channels.
The Amity series consists of somewhat poorly drained soils formed in mixed alluvial silts. The layer
is general 17 inches thick overlaying a 7-inch silt loam subsurface layer and a 13-inch silty clay loam
subsoil. The Woodburn series consists of moderately well drained soils formed in silty alluvium
and loess. The 17-inch surface layer overlays 37 inches of subsoil and a silt loam substratum to a
Exhibit 1
Page 8 of 49
depth of 68 inches. The course of Mill Creek is etched in bashaw clay and dayton and concord silt
loams as well as terrace escarpment are also found in the service area.
The geology of the area consists of Troutdale formation materials and Willamette silts overlaying
Columbia River basalt. Depth to basalt is unknown but thought to be approximately 600 feet. The
Troutdale formation consists of alternate layers of clay, silt, sand and gravel. The Willamette silt
formation consists of stratified silt, sandy silt, clayey silt and silty clay and has poor drainage
characteristics. The City is located in a Seismic Zone 3.
Two major highways traverse the City; Interstate 5 along the west side of the City and 99E along
the east side of the City. Both routes run generally north-south through Woodburn. Oregon
Highway 214 is an east-west route through the City, and Highway 211 connects Woodburn to
Molalla.
Woodburn is bisected by the Union Pacific Railroad main line. The railroad extends north-south
through Woodburn and parallels Front Street through the City. Willamette Valley Railroad uses
spur tracks that parallel Front Street and a line that proceeds east from Front Street along
Cleveland Street.
Exhibit 1
Page 10 of 49
Ct Iii oIIri 2
Water Plan
2.1 Introduction
Murraysmith is in the process of updating the City of Woodburn Water Master Plan. It is expected
to be completed in late 2018. The City's Water Master Plan was first prepared in 1997 and was
updated in 2001. The current update provides a 20-year plan for the water system through the
year 2037. The plan was based on a projected permanent population potential of 35,025, the
coordinated Year 2037 population projection for this report. The City has 7,509 single family,
multi-family, commercial, industrial, and public connections. The current service area of the water
system is mostly inside the City limits with a few customers outside, although the service area will
expand as annexations to the City occur within the Urban Growth Boundary (UGB).
It is assumed that all growth will occur within the current 5,066-acre UGB. The water system
analysis for the PFP includes future service to the SWIR area. The City anticipates that industrial
land will be annexed to the City in the short term.Although most improvements necessary to serve
expansion areas will be paid for by the developer, the CIP will be amended on an annual basis to
include sanitary, sewer, water, storm drainage and transportation projects necessary to serve
recently annexed areas.
2.2 Water Demand
2.2.1 Existing
Water demand refers to all potable water required by the system including residential,
commercial, industrial, and institutional uses as well as unaccounted for water. Potable
water demands are described using three water use metrics: average daily demand (ADD),
maximum day demand (MDD), and peak hour demand (PHD). Each of these metrics are
stated in gallons per unit of time such as million gallons per day(mgd).ADD is the total annual
water volume used system-wide divided by 365 days per year. MDD is the largest 24-hour
water volume for a given year. In western Oregon, MDD usually occurs each year between
July 1st and September 30th. PHD is the estimated largest hour of demand on the maximum
water use day. Data was unavailable to calculate PHD thus a PHD:MDD peaking factor of 2 is
used, consistent with water use patterns at other Willamette Valley water providers. Table
2-1 summarizes the City's current system-wide ADD and MDD based on water production
data.
Exhibit 1
Page 11 of 49
Table ®1
Historical Water Demand Estimates
2012 2.2 4.5 9.0
2013 2.2 3.9 7.8
2014 23 4.2 8.4
2015 2.4 4.5 9.0
2016 2.3 4,0 8,0
The City's water utility billing records are categorized by service type and meter size. For
purposes of the graphic, records were summarized into five divisions: Residential,
Commercial < 1-inch diameter, Commercial > 1-inch diameter, Industrial, and Sprinkler.
Sprinkler consumption includes irrigation services supplied from the drinking water system at
many of the City's public parks and schools.
Percentages of current water consumption by customer type are calculated based on 2016
City water billing records. As illustrated in Figure 2-1, approximately 61% of Water
consumption in Woodburn is by residential customers.
Figure 2®1
2016 Water Demand per Customer Category
IndusSprinkler,6%
trial, 1%�,
a
�j
jj
Commercial<=
1",8%
Does not include"Unaccounted-for Water'
Exhibit 1
Page 12 of 49
2.2.2 Projected 2037 Demand
Estimates of future growth and related water demand within the Woodburn UGB are
developed for 5-year increments to the year 2037 and a buildout condition. Population
projections and the per capita water use developed for the Water System Master Plan
were used to estimate demands for each 5-year increment, while current water use by
zoning and comprehensive planning maps are used to estimate buildout demands.
Projections are shown in Table 2-2.
Table ®2
Woodburn Demand Projections
2017 2.4, 4.6 9.2
2022 2.6 4.9 9.8
2027 2.81 5.3 10.6
2037 3.2 6.1 12.2
Build-out 3.8 7.2 14.4
2.3 Water Source
2.3.1 Wells
The City's seven wells tap the Troutdale aquifer, a large semi-confined aquifer. It is
anticipated that the City will continue to utilize this aquifer as the sole source of water.
Current wells are listed in Table 2-3 and shown in the figure at the end of this section. The
existing total water source capacity is adequate to meet existing demands, but additional
wells will be needed for future demands through build-out of the UGB.
Table 2®3
Existing Wells
Nazarene Well Located on Emergency
7 1967 1,000 1,000 333
Woodland Avenue' backup
9 Warren Donell Well located 1979 1,000 650 280 Supply
on Country Club Road
Centennial Well located
10 1988 ,1,000 ' 279 Supply
2205 National Way 800
11 1108 Astor Way 1989 1,000 650 288 Supply
12 Parr Road WTP 2003 1,200 650 305 Supply
13 555 S Settlemeir Road 2003 600 400 260 Supply
14 3099 Pacific Highway 2004 1,400 1,000 297 Supply
Total Existing Non-Emergency Source Capacity 4,150 gpm(5.98 MGD)
Exhibit 1
Page 13 of 49
2.3.2 Source Water Protection
The State of Oregon Department of Human Services and Department of Environmental
Quality have developed a Source Water Protection Plan for the City. The plan inventories
potential sources of contamination, establishes best management practices for industries
within the influence zone of the City's wells, allows the City to develop ordinances to provide
protection of the aquifer, and maps the flow patterns of the aquifers. The Troutdale aquifer,
from which the City's wells obtain the City's drinking water supply, is not a critical or
restrictively classified groundwater area.
The City does not at this time plan to request certification of the delineations in the Source
Water Protection Plan for Statewide Planning Goal 5 purposes.
2.4 Treatment
Historically,the City of Woodburn provided no water treatment or disinfection because the quality
of water derived from City wells did not require disinfection and neither state nor federal water
regulations required treatment or disinfection for wells. Increasing concerns with the odor, taste
and staining problems generated by iron and manganese in the groundwater, a potential decrease
in the federal arsenic standard and potential regulation of radon led the City to update its master
plan and develop a treatment plan for the City's water supply in 2001.
Iron and manganese levels in the City's water source caused numerous complaints about the
aesthetic quality of the water. To eliminate the iron and manganese problems, the City
constructed three treatment plants to treat all of the City's groundwater sources except Well 7
which is only operated for emergency supply.
The three treatment plants are located at well sites on National Way, Country Club Road, and Parr
Road. These treatment facilities treat water from wells at their sites and water transmitted from
nearby wells through raw water transmission lines constructed with the treatment plants in 2003-
2004. The locations of the treatment facilities are shown in the figure at the end of this section.
The existing total treatement capacity is adequate to meet water supply needs through 2037 and
to build-out of the existing UGB. Treated water is pumped in the distribution system by booster
pumps located at each water treatment plant, On-site ground level storage reservoirs provide
suction supply to the pump stations. These facilities are described further in the next section.
2.5 Storage and Pumping
Water system storage is considered to be comprised of four elements: equalizing, operational, fire
flow, and emergency. "Equalizing storage" provides water supply when customer demand exceeds
Exhibit 1
Page 14 of 49
the capacity of the wells and pumps to produce water flow. "Operational" accounts for the amount
of reservoir volume between when the pumps come on and when they turn off, "Fire flow
reserves" provides the volume of water needed to provide the demand for fire flow for a fire
having a finite duration. "Emergency storage" supplies water when a portion of the water supply
system is out of commission. Woodburn has 4 reserviors as shown in Table 2-4 and in the figure
at the end of this section.
Table ®4
Reservoir Inventory
EME
Parr Road 2.9 ' Ground Level Steel Tank
National Way 1.7 Ground Level Steel Tank
Country Club Road 0.3 Ground Level Steel Tank
Elevated Tank 0.75 Elevated Steel Tank
In normal operating conditions, pressure within the water system is established by the elevated
tank. When demand in the system draws down the elevated tank level, booster pumps at the
treatment plants are turned on to pump into the system from the ground level reservoirs and refill
the elevated tank. If the level in the elevated tank continues to drop after the first pump has turned
on, more pumps receive signals to turn on and pump into the system until the elevated tank water
level reaches the pre-determined shutoff level.
In addition to the hydraulic grade established in the system by the elevated tank, pressure is
maintained throughout the system by the booster pumps at each of the treatment plant sites
controlled by pressure sensors located at various locations in the City. The booster pumps at each
plant operate to maintain water levels in the elevated tank and to supply demands placed upon
the system by users from the ground level reservoirs at each water treatment plant. If the elevated
tank is out of service for maintenance or other reasons, the treatment plant booster pumps and
pressure sensor system will maintain desired system pressure.
Ground level storage utilizes pumps to move water into the distribution system and work with the
elevated storage reservoir to maintain water pressure. The pumps need to be large enough to
satisfy anticipated peak demand flow rates. A summary of booster pumping capacity is presented
in Table 2-5. They also need to have an automated auxiliary power supply to assure water is
available during power failure. All three of the treatment plants have emergency generators
capable of plant operation as well as operation of the wells located at each of the treatment plant
sites. The City has portable generators that can be used to provide emergency power to other
wells.
Exhibit 1
Page 15 of 49
Table ®5
2018 Water System PumpStation Inventory
Parr Road 2 75 1,819 S/SE
National Way 2 60 1,650 N/E
Country Club Road 2 60 1,150 NW/W
TOTAL CAPACITY 6 - 9,238 gpm(13.3 MGD) All
Firm Capacity 3 4,619 gpm(6.7 MGD) All
'The target flow rate for all pump stations is approximately 1200-1300 gpm,in order to move equal amounts of
water through all treatment plants,reservoirs,and pump stations.Pumps can ramp up to full capacity if needed.
The City has adequate storage volume and pumping capacity to serve the needs of the City through
2037 and to buildout of the UGB.
2.6 Water Distribution System
2.6.1 ExistingSe
There are approximately 97 miles of transmission and distribution piping, ranging from 4-
inch to 20-inch in diameter. The majority of the pipe within the service area is 6-inch or fl-
inch diameter service piping. A summary of the quantity of pipe by diameter is outlined in
Table 2-6. The majority of the pipe in the system is ductile or cast iron, in addition, there is a
significant amount of asbestos-cement pipe in the Senior Estates area.
Table 2®
2018 Water System Pipe Inventory
�11!tli'I'I� tl 11 'I� l�
s- -,Iliii'i I Iii V II ® i�, ® I
4® 13,963
6 160,417
8 217,320
10 22,816
12 79,853
14 8,382
16 2,174'
18 6,797
20 633
Exhibit 1
Page 16 of 49
2.6.2 Designea
State administrative rules require the system maintain a minimum pressure of 20 psi at all
service connections at all times. A pressure range of 40-80 psi is recommended under
normal operating conditions.
The City requires the maximum day demand plus fire flow for a proposed development to
be calculated. Demand must not exceed available supply. Calculated available fire flow is
compared to the standards in Table 2-7.
Table ®7
Fire Flow Demands by Zoning Classification
Low Density Residential (IRS, R15, RSN) 1,000 2
Medium Density Residential (RMN) 3,000 3
Commercial (CG, CO, DDC) 3,000 3
Public 3,000 3
Industrial. 3,000 3
If the available fire flow is less than the required value, the developer may be required to
either modify the proposed method of construction to reduce the required fire flow or make
system improvements to increase the available fire flow in the water system to the
development.
2.6.3 Analysis Findings
Pressure within the distribution system is generally between 50 and 60 psi.The water system
master plan did not identify significant pressure deficiencies during maximum day flows.
Under peak demand conditions, simulated as maximum day demand with a simultaneous
fire flow event, pressures in the system may drop below 20 psi under existing conditions.
Recommended improvements to address these deficiencies follow.
2.6.4 Systemeco e aio s
As areas within the UGB develop, the City will require developers to extend the transmission
mains into these areas. A number of capital improvement projects have been identified to
address these current and future deficiencies.
The 2018 Water System Master Plan recommends replacing inadequate segments of the
water distribution system before emergency situations occur or before capacity problems
Exhibit 1
Page 17 of 49
arise. The City will continue annual funding of an ongoing substandard main replacement
program. The priorities for replacing pipes is as follows:
■ Pipes in areas of related frequent customer complaints.
■ Leaking pipes.
■ Pipes identified by either maintenance or operations as problem pipes.
■ Pipes four inches or less in diameter, and in areas that have the potential for growth.
■ Undersized transmission mains.
■ Aged Asbestos cement pipe.
■ Aged steel or cast-iron pipe.
■ Lead joint pipes.
2.7 Capital Improvement Projects
The 2018 Water System Master Plan assumed that the SWIR area would be included in the 2022
scenario. Table 2-8 displays the water distribution system improvements needed to serve the
SWIR expansion areas and other system improvements with estimates the cost of constructing the
improvements. The only projects that are required for the SWIR expansion area is the project
entitled "SWIR Extension," and the proposed wells. The CIP figure from the WSMP and the
proposed water system map for the SWIR Master Plan are included in the appendix of this report.
Exhibit 1
Page 18 of 49
Table 2-8
Project List—Water Plan Summary
W-1 Well rehabilitation $ 150,000 $ 150,000 $ 300,000 $ 600,000 0%
W-2 New Wells $ 1,300,000 $ 1,300,000 $ 2,600,000 900%
Water Supply W-3 Hydrogeological Study $ 100,000 $ 100,000 100%
W-4 Well 7 Improvements $ 1,000,000 $ 1,000,000 25%
W-5 Water Rights Implementation $ 40,000 $ 40,000 100%
W-6 Auxillary power for wells#9,11&14 $ 225,000 $ 225,000 0%
rrr r rrr err rrr rrr mmr rrr
Pump P-1 Parr Rd 3rd booster pump&SCADA $ 175,000 $ 175,000 99%
Stations update
P-2 National Wall,/3rd booster um $ 150,000 $ 150,000 100%
rrr r rrr rrr rrr
R-1 Coating Elevated Reservoir $ 400,000 $ 400,000 0%
Reservoirs R 2 Altitude Valve Replacement Elevated $ 80,000 $ 80,000 0%
Reservoir
rr rrr sr rrr sr rrr
10-42 Country Club to elevated tank $ 3,484,000 $ 3,484,000 36%
transmission replacement
M-38A SWIR water system extension ieveloper Funded $ - 100%
Distribution M-38B I-5 Crossing $ 1,200,000
Mains OR-99E connect existing mains to
M-39 to M-41 $ 367,000 $ 367,000 100%
complete network i
M-1 to M-37 Fire flow improvements $ 1,684,000 $ 1,684,000 $ 3,306,000 $ 6,674,000 36%
Routine Main Replacement Pro ram "$ 2,000,000 $ 2,000,000' $ 8,000,000 $12,000,000 0%
• rrr m rrr rrr rrr r rrr
BBB BBB BBB BBB B B B
Annual Average CIP Cost
$1,454,800 $1,467,200 $1,454,750
5-year 10-year 20-year
Exhibit 1
Page 19 of 49
Table 2-9
Project List —Water is ri u i®n System Plan
1101
SEP
Transmission Replacement
14111611
M-42 Country Club to elevated tank transmission replacement ' 7,573 $ 3,484,000
Projects for Future Development
M-38 SWIR 10111141
01'1 2" 13,612 $ 5,027,000
M-39 OR-99E Southern Extension 8" 927 $ 214,000
M-40 OR99E:Aztec St to Blaine St 81" 389 $ 90,000
M-41 OR-99E: Lincoln St South to Existing Stubout 8" 271 $ 63,000
� 1
r
l t /
f /
( J /
/ ( 1
1
5-Year Fire Flow Projects
M-1 Reconnect: Brown St to Vine St 121' 54 $ 40,000
M-2 Front St: Stonehedge to Newberg Hwy &Newberg Hwy: Front 12" 1,817 $ 627,000
St to Bulldog Dr
Park Ave': Hardcastle Ave to Lincoln St& East/West sections of
M-3 81" 1,852 $ 426,000
Woodpark Ter
M-4 Lincoln St: Park Ave to hydrant west of Bryant St 8" 756 $ 174,000
M-5 Nuevo Amencer 8" 1104 $ 254,000
M-6 Loop Front St to Salud Medical Center 8" 706 $ 163,000
r
/ I /
t
(
/ 1 �
10-Year Fire Flow Projects
M-7 Southeast Industrial Area Improvements 8111011 5,390 $ 1,520,000
Front St: hydrant east of Hardcastle Ave to hydrant west of
M-9' 10" 569 ' $ 163,000
Hardcastle Ave
Exhibit 1
Page 20 of 49
NEW. ®® ®
20-Year Fire Flow Projects
M-8 OR-99E:Tomlin Ave to Young St 8" 459 $ 106,:000
M-10 Loop: Barclay Sq to Harvard Dr 8" 166 $ 39,000
M-11 Loop: High St to Settlemier Ave 81" 234 $ 54,000
M-12 James St: Legion Park to east end of Apts.& Park Ave: Parkview 8" 10" 1,390 $ 339,000
Ct to James St
M-13 Woodburn RU Park: North Leg 81" 348 $ 81,000
M-14 French Prairie Middle School:Hwy 214 & Boones Ferry Rd 8" 907 $ 209,000
M-15 OR-214:Tomlin Ave to Cascade Factory Homes 611811 759 $ 150,000
M-16 Blaine St& McKinlet St: OR-99E west to hydrant 8" 10" 882 $ 229,000
M-17 Glatt Cir: North and South legs 8111011 561 $ 143,000
M-18 Loop: 2213 Country Club Ct to Country Club Rd 8" 226 $ 52,000
M-19 Loop: Industrial,area at end of Shenandoah Ln 10" 703 $ 201,000
M-20 Loop: Northernmost Driveway on Commerce Way 8" 762 $ 176,000
M-21 West ends of Hayes St and Young St 81" 381 $ 88,000
M-22 Park Cir: Park Ave to hydrant,south leg 8" 315 $ 73,000
M-23 Yew St: across 3rd 81" 35 $ 9,000
M-24 Loop: Lincoln Rd to North Pacific Plaza 8" 515 $ 119,000
M-25 Line West of Wellspring Confrence Center 81" 253 $ 59,000
M-26 Rainier Rd: Randolph Rd to Cascade Dr 8" 381 $ 88,000
M-27 Charles St: Charles Ct to Corby St 6" 342 $ 60,000
M-28 Greenview Ct: Greenview Dr. to hydrant 8" 220 $ 51,000
M-29 Oak St:2nd St to 1st St 81" 190 $ 44,000
M-30 Nuevo Amencer extention: 5th St to 6th St 8" 423 $ 98,000
M-31 Safeway on OR-99E 81" 649 $ 150,000
M-32 Loop: Apartments South of Stonehenge 8" 10" 1,114 $ 288,000
M-33 Line to Kerr Contractors 10" 159 $ 46,000
M-34 Newberg Hwy Dairy Queen 6" 193 $ 34,000
Evergreen Rd to line to North and Evergreen Estates to hydrant
M-35 101" 307 $ 88,000
east
M-36 Lincoln St. OR-99E to first hydrant north on Carol St 8" 493 $ 114,000
M-37 Stacy Allison Way: West end of Walmart Parking Lot 81" 512 $ 118,000
0
Exhibit 1
Page 21 of 49
2.8 Funding
The City allocates its water budget into three funds: Water fund, Water Equipment Replacement
Reserve Fund, and the Water System Development Trust Fund. The available sources of revenues
come from water user fees, service fees, interest revenues, system development charges and
miscellaneous revenues.
The City last completed a rate study in 1999, and is currently completing an update incorporating
items from the 2018 Water System Master Plan Update. The purpose of a rate study is to
determine the rates and system development charges that would be necessary to fund needed
capital improvements and to ensure the ongoing fiscal health of the water system.The rate studies
also ensure that required increases are equitable in terms of what each class of user pays. The
rates and charges provide revenue for capital improvements and for operation of the water
supply, treatment, and distribution system.
Water rates were determined utilizing a cost-of-service or functional allocation of costs.The intent
of this allocation is to recover revenue from classes of customers according to the demands that
they place on the system.
System Development charges can fund projects for growth. The system development charge is the
sum of a calculated reimbursement fee and improvement fee. The reimbursement fee recovers
costs associated with capital improvements already constructed or under construction. The
improvement fee recovers costs associated with capital improvements to be constructed in the
future.
Exhibit 1
//
ai„ ,.o /„ ,,, 111r' / <, r., ,/, r ✓ ",,r 11 r ,,;,/r ,,,,e,,, ",'/
��,�
♦ /„n,,, �.�.�ic, ,�Jarr,", „/„”„ � � „✓ �(� iii/ �,;;; r //��r „�;,,ii ,;,,:. r/,,./,,,r✓, .,A
1,fllfrJi/ rrrrr,;,;' e ....rd
OFF/ / ,p.,1r
r / ♦,..rr rl/b, J "� r,,. ,2 r; ,h'..i /'r11f
t
/ r11 rrr /♦ / /,3, /,r,// C/r, / „f,¢lr
////,
rr r I
r, rr r /III ,.; r rrr//r,
/rc /,.: ,,r, r.. .,v. II ./. AR, .,..
,l,.. r ,J,,. r Il, r : cr.,r !„r. / ♦ /, .r rrri,, r
rli ,rel.3”,�
J Yf r6/,,
/,r,,, ,f r/.Y oi�,✓ �,/ a„«^ :✓�v: �;%G ♦ „//,,,
I` r '/r,
r ',,�/,,�%/«il(I�� oy ”/„✓,�'«,” ///rr, rV'; /-a 6rtlf�;or r r//ff/l rvi%/�� l r «'" "+' ,0 / ,:
�country�Ciub
•Q/ o
',„ a //� /r'/iFr�,lri/�/� ,- r� r,w«e,;� •' ';'�N” or�a'•;�•I rr r' wqe/�/d 1 1r' /rNy„�� 'rr +"J/w� ��/�r��/��1/rr/J�pr!JJ %✓ir//r/r��///r' / °
yi�irWI df4onal e1r1r�1�0
,,, - /M/1/ir//
Qr�f
11
%, �/p ry�%//rl//�Q/ /air/ /� « ,%-�ar� �qe a� ��� �✓j
// 8
ll
v
r rrn
p� �! � ,'„ ,;,:, „„ ,,✓, „ ,� :. m";". / /// /r � 9 14s1�"„ r� « rr « n'rrrr 0,.4'o
e,
,,,,,,,,, /%r /�,, kr,4 // ., �"„/ � A//r fid„ Y,�✓'�r.�����i�/f��t. m�y r,�,.,Qrr I m �r?%�r/ /r�/'i"%i„
I ji
♦ 'r,/% /ml �t« I �ppI{ Ql «� ,r�� I �y� l//Q/ � r p°���:°« �,/i�/ �/� ,�,,;��ii Ira
r'OeyWell3 Library",
/, ,♦ /iia a villi/ ,a r «„ / r /j l�Pllr f::
air ' ur”'
%G �, R
;! i,/ �// ,Well 13 �;n;1 t
r ,, ,;v.. �t
1.
�nrda,
Exhibit 1
Page 24 of 49
Secduiri
Sanitary Sewer Plan
3.1 Wastewater Planning History
In November 1993, the City of Woodburn was notified by the U.S. Environmental Protection
Agency (EPA) and the Oregon Department of Environmental Quality (DEQ) of a new requirement
to develop a plan to meet the more stringent Publicly Owned Treatment Works (POTW) effluent
limits developed for the Pudding River. The volume of water in the Pudding River, during the
summer months (July and August), is so low the river cannot dilute the treatment plant effluent
sufficiently. Low flows result in oxygen levels, needed by certain aquatic life, to be below
acceptable limits. The inability to maintain sufficient oxygen levels is the main reason the Pudding
River has been classified as a water-quality limited stream. Total maximum daily loads were
established for the Pudding River and waste load allocations were set for the Woodburn POTW.
Waste load allocations are formally required as part of the National Pollutant Discharge
Elimination System (NPDES) permits. DEQ cannot reissue expired permits until some ongoing
litigation is resolved, so many communities have to operate off of existing expired permit terms.
Woodburn is currently one of those cities running under an expired permit, so technically it does
not have to meet the new TMDL requirements. However, the City should prepare their system to
be in compliance with their allocated waste load allocation in preparation for the day that DEQ
can reissue permits.
On December 28, 2004, the U.S. Environmental Quality Protection Agency (EPA) and Oregon
Department of Environmental Quality (DEQ) issued the City a National Pollutant Discharge
Elimination System (NPDES) Permit. The compliance schedule with this permit requires the City to
develop a plan and construct facilities for meeting the more stringent POTW effluent limits
developed for the Pudding River. The treatment plant's wastewater effluent temperature/winter
ammonia discharge is higher than can be directly discharged to the Pudding River during parts of
the year. Increased river temperatures/winter ammonia levels have an adverse effect upon
aquatic life. DEQ has established temporary temperature and winter ammonia limits until the
establishment of total maximum daily loads for the Pudding River and waste load allocations are
required for the Woodburn POTW by the next NPDES.
In response to DEQ's Pudding River notification, the City prepared and adopted the 1995
Wastewater Facilities Plan for its wastewater treatment and collection system. This plan was
updated in May 2010. This plan is designed to guide operations and improvements to the City's
treatment system through the year 2030. In addition to providing upgrade guidelines for the
existing system, to meet regulatory requirements, the facilities plan provides for increasing the
system's capacity to accommodate planned residential, commercial and industrial growth.
Exhibit 1
Page 25 of 49
Additional efficiency is built into the plan by providing for phased construction of the
improvements. The estimated cost of treatment facilities is divided into three phases that coincide
with previous plans. Phase 1 improvements have already been completed, so they were excluded
from the updated plan's CIP. Phase 2 represents year 2020 improvements and phase 3 represents
year 2030 improvements. Phase 2 estimated costs (in 2017 dollars) are $30.3 million, Phase 3
estimated costs (in 2017 dollars) are $0.1 million. The plan will enable the City to look ahead to
long-term needs through the year 2030, while implementing the improvements only as they are
needed.
The 2010 Wastewater Facilities Plan's CIP was developed assuming 38,916 persons in 2030, and
thus can readily accommodate the coordinated Year 2037 population projection (35,025). The
projection for this plan was based on an average annual growth rate that ranged from 1.22 percent
to 1.56 percent (based on Marion County's projections for each 5-year period), whereas the
Wastewater Facilities Plan utilized a growth rate of 2.8 percent until 2020 and then 1.9 percent.
Based on this information, the proposed improvements presented in the existing Wastewater
Facilities Plan will provide sufficient capacity for the SWIR area and projected population growth
through 2037. Table 3-4 identifies projects to serve the UGB with the SWIR area. The Wastewater
Facilties Plan study area encompassed the area within the Woodburn UGB and potential UGB
expansion areas that are now included within the UGB. Some areas outside the UGB were also
included in the study for public health reasons.
3.2 Treatment
Phase 1 of planned improvements to the wastewater treatment facility was completed in 2003.
A diagram showing the physical layout of the treatment facility is shown in the Wastewater
Facilities Plan. The system flows were updated for this plan since the last wastewater facilities
plan flows were calculated nearly a decade ago. The current flows and loading are presented in
Table 3-1 with the hydraulic design capacity of the treatment plant. The City reports that
biochemical oxygen demand (BODS) levels have remained approximately the same, so no update
to these values have been made.
Exhibit 1
Page 26 of 49
Table ®1
WWTP Loading and Capacity
®,m
®ee ® me
Annual Dry Weather Flow(ADWF) 1.90 4.1
Annual Average Daily Flow(AADF) 3.00 4.8
Maximum Month Wet Weather
5.96
Flow (MMWWF5)
Peak Week Flow(PWkF) 7.19
Peak Daily Average Flow(PDAF5) 11.45
Peak Instantaneous Flow (PIF5) 11.53 16
Average Daily BOD5 4,500 Ib/day 6,500 Ib/day
Maximum Daily BODS 10,575 Ib/day
No major improvements to the facility have been necessary since Phase 1 construction. Phase 2
improvements will be constructed when Phase 1 facilities near capacity. The facilities plan
estimated this to be around 2020 but will likely be further out based on the recent flow analysis.
The WWFP recommends construction of a separate industrial WWTP. The City maintains at least
four large contracts with industrial facilities stating how much water can be discharged. These
contracts currently allow for the release of far more discharge than is currently being released and
as such, this is not currently a critical need to meet existing treatment requirements. If the SWIR
area develops as anticipated with flows typical of other light industrial areas in the City, an
additional 0.4 MGD peak wet weather flow is expected from the area according to WWFP
projections for base flow and Rainfall Derived Inflow and Infiltration (RDI I).This will not necessitate
a separate industrial treatment plant, and therefore it was excluded from the project list in section
3.4.
The instantaneous capacity of the plant is not growing as quickly as projected and is currently only
72% of the design capacity of the WWTP. The City should remain proactive in analyzing new
development impacts to determine when WWTP expansion will be needed. When the actual peak
instantaneous flows to the WWTP come within 1 MGD of the existing capacity, alternatives should
be reevaluated to determine what are the appropriate improvements to be implemented.
3.3 Primary Collection System
The wastewater collection system conveys wastewater from residential, commercial, and
industrial facilities to the treatment facility. A diagram showing the layout of the existing sewer
trunk and interceptor lines and pump stations is shown in the figure at the end of this section. The
Woodburn sanitary sewerage collection system is composed of approximately 87 miles of sewer
line and 8 pump stations as shown in Tables 3-2 and 3-3. Figure 1 shows the sewerage service area
analyzed in the Wastewater Facilities Plan and shows areas considered for service expansion
outside of the current UGB.
Exhibit 1
Page 27 of 49
The Wastewater Facilities Plan provides a description of potential needed improvements to the
collection system in existing and future conditions. The 2020, 2030, and 2060 conditions in the
Facilities Plan assume that the SWIR area is developed at 750 gallons/acre/day. The results of the
hydraulic analysis showed that the Mill Creek Pump Station and I-5 Pump Station require capacity
upgrades, as well as the I-5 Pump Station Forcemain. Further analysis of the condition of
wastewater collection facilities is included in Volume II of the Wastewater Facilities Plan. The CIP
shows projects that will be needed through the Year 2030 within the City Limits.
Table ®2
Pipe Diameter and Material Inventory (Lengths in Feet)
unknown 45 368 32 " 3,272 3,717 !19%.
4 896 101 1,747 2,745
6 1,894 1„387 145 2,270 3,114 15,765 24,575 6%
8 63,254 87,014 1186 580 92,294 4957 20,870 27,0153 64%
10 10,060 1,2,329 147 105 13,748 2,510 339 39,236 9%
12 5,919 8,687 2701 5,707 1,921 4,096 29,030 7%
14 209 2171 426 0%
15 223 13,557 745 1,323 15,848 4%
16 3082 155 167 i 3,404 1%
18 8,763 1,987 500 11,250 3%
24 1„576 437 3,993 29 6,035 " 1%
27 2,177 2,177 1%
36 1934 1,934 0%'
Forcemain 14,355 14,355 3%
sum 84,418 124,133 4,983 685 134,483 13,503 62,680 424,885 100%
%of total 20% 29% 1% 0% 32% 3% 15% 100%
Table 3®3
Pump Station Capacities
1-5 1215 3160
Santiam 112 --
Stevens 191 226
Greenview 406 --
Industrial 550 --
Mill Creek 9800 11,797
Rainier 300 --
Vanderbeck 700
'Firm Capacities from Table 5-1 and Additional Capacity from Table 5-2 of the2010 Wastewater Facilities Plan
Exhibit 1
Page 28 of 49
3.4 Capital Improvement Projects
The 2010 Wastewater Facilities Plan assumed that the SWIR area would be included in the 2020
scenario. It notes that both of the pump stations downstream of the SWIR area are undersized in
the 2020 scenario.
Table 3-4 presents the wastewater collection system improvements needed to serve the SWIR
expansion areas and estimates the cost of constructing the improvements. The existing
wastewater collection system would not have sufficient capacity to efficiently serve the SWIR
expansion area. These are illustrated in Figure 8-1 of the WWFP which is included in the appendix
of this plan. The proposed wastewater map from the SWIR Master Plan is also included in the
appendix of this plan.
Table ®4
Project List —Sanitary Sewer Plan
® . ® ® `®
Mill Creek PS Stage 1 $616,500
Mill Creek PS Stage 2 $3,212,000
1-5 Pump Station $1,611,500
1-5 Forcemain $3,813,500
SWIR Area Sanitary Sewer Extension $11,987,000
Woodburn POTW Phase 2 $28,050,000
Woodburn POTW Phase 3 $6,000
Natural Treatment Systems Phase 2 $9,481,500
Natural Treatment Systems Phase 3 $138,000
Stevens PS Pump Station $1,220,500.
Young Street Pipeline $2,186,000
Front Street Pipeline $1,282,500
Mill Creek Interceptor Pipeline $2,287,000
Progress Way Pipeline $1,679,500
Hays Street Pipeline $2,503,000
Brown Street Pipeline $1,148,000
Sanitary Sewer Service to North Pipeline $6,435,000
Sanitary Sewer Service to South Pipeline $986,500
Area outside UGB Pipeline $10,554,000
Pump Station Upgrades Reliability $339,000
SWIR Total $58,916,500
Overall Total $89,537,000
SWIR specific projects are shown in bold.
Exhibit 1
Page 29 of 49
3.5 Funding
To assure that the impact of providing and maintaining new sewer collection facilities is not a
burden to the community, new development will be required to pay for the cost of collection
facilities needed to serve such development. Extra capacity facilities required to meet the
standards of the Wastewater Facility Plan will be paid from accumulated revenue of the System
Development Charge Fund.
The City will continue paying the cost of maintaining and improving the existing collection system
with funds derived from user fees. Treatment plant upgrades will be financed through a
combination of system development charge funds, loans, and grants.
Exhibit 1
r
%,, ,r ♦/,,,,,, r f .,,. J -`O�Dl!/ ,r. ,l u,..,,,, ,,, / �, ,. ,,,,,rr r c,.,,,.,e a/,,,,,,/ ,,,%/� ////�i, ,/Gr. 11111
',a%// ♦/ rt,✓,,,r, r - 5/ J ,,r ,,, ,>,,;,:,,,,,,, e -+�>:wl,y�>,a ,rr< ,/ ,,"r+r� / %,, r, ,i/ %/„
1 ur r , rr, ra A♦ �, a � a r / / � i r,,
venry„�� .� am a 1,�..�r/ /,� r // r.� � :1Jn,�/ �,,, ,ma ,..0/��, ,./ ,,'� ;,� ,,✓/r
<� >�/,i �/ / ,.// /Stes+.PS� !r% ♦.;:. r„c /1,11>%,� .rl i,/. ,ry 3 ,,, .h� / i /
v,. r/1%r-,: JJ/i %�/ ,u�;r„ �, /i� /i . ,.%„ ,;, ,�„, /; ,.o/I ,,,r. ,�;� ,,,ii�il/ r�./ /„ /,,.. 1,/ro,„ a /r ,✓r �,,,,,,�,,,�r
,♦, �11/ �!//l� /,,,/// a,r///i N
Vanderbeck PS a P ar NJ ter, �K Jl!,/y/ / /,
♦ �I l �� �” ,.,,�: ��/r, k„Rv„6�., �;- ,/ :w,r ^� r %�° yJ,�' '''Yt' ;/° '�';%irLu�f
t
,t rr I1
^
„,/r / 'd♦c:g/a/a i/�/��/.%�//�'n1//1//r/i�f�///,7i r;„,<frr dy fr!/r�w/r»ra�r�v�r/at(j�,/r i,0"fr'N,,'�,,,/„,''r//r/,/:, ,n,b///,f.,%,�,r�rir/it/ ,�;I,�,,{q / ;#,Y.;,«,p/-,,, rV
rr%�/%/%
rLa, ➢ /r
/ / a
industrial ial PS�^,.1ri
J
r,r;,/,m,,e:,„;sg:gyj,/%O/G/„J 'r/J-5,,;; r,,1j,�p,u'',; r,;,,!r,r', u, ,r ,,',u'�.:„�/K.1,.„„,,, r,�e.;' ssaRt„r�aal��Y'me;r:ShPr'y"prkf"'�,,o ,e,"*yu'''„"eu'y��n !m✓.ar ,,,/�1'�'i�/m�%'i�j�1"%/i'; ✓�,//�.u:��/ir'/,%i//,Di! ,,,'P(,,���µµ�% '.�.;,%,. .Psss /'�
7 S .0 rP�d♦GuW^oJo1id5 wigV lrul u,oPmWSifd
0a,
,
.
c, �'
r,
r t
7R, ".y � ,,^SI
•
F/ N ,ar .m'I�PS rn f ,/ ' �
r /
/JK� it //rte ss ryiru 1rj ^ wu ./,+ r'Sc '!;,
.-�e;''e ;,; r .,,d,,,` � '� ,'' ," ,',� ;” », ,r ,%,W,FI � i;�' ,�'>',, '^'"r %/%�%,r n�A i'If1(fifr„�' �♦ �%� % !,// r:a n` r
r/ / u i, /„ ',+wti, ,v' ,'✓ r r,^:7. ^"K .f �/i%o:r S, r [ :' ri., ��, N/�1 I ”%/r
A /,, ,, / `,p�4 irJ� ,• / ,,,. (q n ,^N+' �� �l �� n� ,;;/r ^"i'ra,a5 I(% / „���� /'�,�r
:p r', / ', rv '%'//("M',,mum"'n, �r ((�,, �,,. G/l/�/�u r ?fi :m�f b�(�r♦^��Jf IIS/ 9��"'.r
a'^ b
::: �°;,;i ,,,,, Xr�pj♦, �« &„' /%ra;////� „'�` r rV�.:” k',r;/ e,��,' „�„, wr/,e ;:, / "t"'a� r*,,, ,Gree,nwew PS
; �' �i s ' ��'.:/,,;,, ps-
a
� �, ✓ r/ � �� ,ter// s! / ry; :,� FAY 1
,
Ps s r /
rg / �, � r '%%%;,,, '' ,, /rl °o ��1, � ;;/ s. ,b � / !dam w' l rr riu �rf, ,W„"//�//i / ,,, ��i % �J 1 ✓a!
ii„r,
,,
Mal
�ii
;..
,,.✓ in;;r. `/ ii r/i .,, Ml.
��
i
f
S�' /
I°
, /„ m� „�, ��Ynrr, �J r G°/' ,,i,irr {' /� ♦�/ �flr ,,,.r//%r/'%%/I� ';.J/fj��IJ/I�I jr
Legend ;✓ & M1 ^,ren mPrf mf rrr ,3R!Ir r/ l ;u, ,t,; o��//�ir �� //�� r/p'! /��JG/ rn�'.
Pipe SWIRconnecti »,
PIP 7"d on /vll,r?�i/
` /
6”or less • Nodes
aty
/ e
g.,-10" ss Pump Station %"� %� %%//�„ to wm ✓/.9i; 'e /..... e „
/riII G.
-^^--w 12"-16" wwwTP w/rP ;r'! / /%r 'f ' 'e ai, e, ,Food Serwce,of/Ameoca'PS
,,,,,,,,,,,,,,,18"-20" SWIR Area /i%
�,,.: ..24"-36" Tax Lots
....Force Main - �UGB //i
' (fir City of Woodburn
0 750 1,500 Feet
murraysmf7h
/C7Cd.1.71fPublic Facilities Plan Update Wastewater System �`
J,,IY 2013 17-1993
Exhibit 1
Page 32 of 49
Sectlairi
Storm Water Plan
4.1 Introduction
The Woodburn Storm Drainage Master Plan was prepared by Crane and Merseth
Engineering/Surveying between 1996 and 2001.The study area of the Storm Drainage Master Plan
included the area within the UGB as it existed before the 2005 amendments and areas
immediately surrounding the City that contribute runoff to Mill Creek and Senecal Creek upstream
of the City. The study area comprised approximately 9,447 acres.
The Storm Drainage Master Plan was based on the impervious area that existed in the base year,
1994. Impervious areas were projected for future land uses based on an assumption that every
parcel within the UGB would fully developed at the maximum density allowed by the 2001
Woodburn Comprehensive Plan Land Use Map.
As noted, there are two major drainage basins within Woodburn - Senecal Creek and Mill Creek.
The smaller basin, Senecal Creek, is divided into 13 sub-basins and the larger basin, Mill Creek, is
divided into 51 sub-basins. These drainage basins contain development in SWIR area, although the
land use assumptions may have changed.
4.2 Design Storms
The National Oceanic and Atmospheric Administration (NOAA) Published the Atlas 2 which defines
how much rainfall will fall in every area throughout the United States during several different
storm events. Table 4-1 shows the rainfall depth for 24 hours duration of different storm event
frquencies in Woodburn. Since it is impossible to protect against every storm that could possibly
occur, communities must pick a level of protection that is reasonable when factors such as cost
and consequence of failure are considered. The City has selected the 25-year, 24-hour storm to
be their design storm for pipe facilities and 100-year, 24-hour event for new detention facilities.
Exhibit 1
Page 33 of 49
Table 4®1
AA Atlas 2 Volume 10 Rainfall Depths
R11
i
R2-year 2.3
5-year 2.9
10-year 3.3
25-year 3.8
50-year 4.2
100-year 4.4
4.3 Existing Inventory
The Storm Drainage Master Plan contains a June 1999 inventory of the existing public storm water
system's facilities in the Mill Creek and Senecal Creek basins in the City of Woodburn, but it is
missing manyfacilities in the system. Since the master plan, the City has put together a Geographic
Information System (GIS) to better catalogue and map their system. Although it is currently still a
work in progress, it is more complete than the master plan. Tables 4-2, 4-3, 4-4, and 4-5 list the
currently catalogued information for culverts, conveyance piping, ditches, and other storm water
infrastructure.
Table 4®2
Existing Culvert Length Inventory
IMINEMESimmil=
811 44 44 0.5%
12" 148 3,548 39 58 3,793 45%
15" 107 117 224 3%
18" 7 291 146 444 5%
24" 226 226 3%
30" 112 112 1%
36" 148 148 2%
42" 483 483 6%
481' 275 403 244 922 11%
54" 393 393 5%
60" 618 618 7%
72" 301 301 4%
96" 172 172 2%
108" 170 170 2%
Other 215 246 461 5%
Total 1,950 5,664 448 302 146 8,509 100%
%of total 23% 67% 5% 4% 2% 100% 100%
1. Indicates approximate length only, no field survey data
Exhibit 1
Page 34 of 49
Table ®3
Storm rain Piping Length Inventory
4" 175 175 0.1%
6" 2514 260 617 174 3566 1%
8" 19577 661 5272 180 352 26041 8%
10" 23643 2158 10465 1152 187 958 38562 12%
12" 458 1563 41411 5260 17996 1244 149 761 68841 21%
14" 359 359 0.1%
15" 214 3456 15252 7496 8004 20 748 35191 111%
16" 270 270 0.1%
18" 2163 21646 5207 5182 2345 36542 11%
21" 232 4053 1309 235 5830 2%
24" 723 1842 17600 2549 3443 543 389 27088 8%
27" 1313 59 1371 0.4%
30" 390 1891 7202 2144 270 977 12873 4%
36" 2655 7540 494 95 2054 2323 15161 5%
42" 2695 1151 868 225 4939 2%
48" 1187 1273 18 2478 1%
54" 440 440 0.1%
72" 99 99 0.03%
78" 144 144 0.04%
Unknown 1 1 929 3157 112 1 1 1 36563 40760 1 13%
Total 1627 4475 11843 ; 169585 26545 54608 2755 3420 45873 320732 100%
%oftotal 1% 1% 4% 53% 8% 17% 1% 1% 14% 100% 100%
1. Indicates approximate length only, no field survey data
Table 4®4
Existing Ditch Length Inventory
�����mqupi�IIIIV u1
III, t iIPV �UIII
1' 682 682 4.9%
2' 50 50 0%
3' 300 300 2%
4' 131 131 1%
5' 1,652 1,652 12%
6' 3,892 3,892 28%
7' 420 420 3%
8' 274 5,062 5,336 39%
9' 262 262 2%
10' 1,133 1,133 8%
Total 274 13,584 P100%
3,858 100.0
%of total 2% 98% 100.0%
Exhibit 1
Page 35 of 49
Table 4®
Other Storm Water Infrastructure
ENIMEM=
Manhole 698
Catch Basin 1716
Outfall 56
Dry Well Sump 4
Detention Facilities 8
Inlets 108
4.4 Needed Drainage Improvements to Support Growth
Recommendations for needed storm drainage projects through the year 2006 within City Limits
are found in Chapter 9 of the Storm Drainage Master Plan. Very few of these projects were actually
completed and growth has been the main driver of stormwater projects. The City plans on creating
an updated Storm Water Master Plan in the near future, and new system inventories have been
completed to better understand the system, since completion of the last plan.
New additions to the system such as the SWIR area will be required to detain peak flows onsite to
avoid additional impacts to the system downstream as described in the following subsections.
4.4.1 DetentionPolicy Implementation
The Storm Drainage Master Plan includes a Storm Water Flow Management Program, including
policies regarding detention. This policy requires on-site detention for new developments and
identifies several locations in the City where a public detention facility may be sited.
Portions of the existing drainageways function as detention sites. These sites will continue to
function as detention areas. Programs directed at improving public safeguards during periods of
high flow and incorporation of storm water treatment will be continued whenever possible.
Detention facilities are sized based on the City Council adopted guide presented in Table 4-6,
"Volumes for Different Intensity Storms for 10-Acre Site." The values in this table are based on the
rational method. It requires that the difference in flow before and after development for each
storm recurrence interval be detained.
Exhibit 1
Pane 36 of 49
Table 4-6
Volumes for Different Intensity Storms for a 10-acre site
INE
LZL 0.71 3.313 32,205
2.7hr 0.25 L167 11,340
LZL 0.71 3.087 30,672
2.76hr 0.25 1.087 10,800
2.86hr 0.25 M96 10,255
L2L 0.71 2.582 27,605
2.97hr 0.25 0.909 9,720
0.935" U1 2.024 23,899
3.28hr 0.25 0.713 8,415
To analyze the system, the SVV|R area was broken into two portions that are divided by 1-5. It is
assumed that flow will not be conveyed across 1-5. The 50.8-acre portion to the east of |5 will be
referred to as South SVV|R, and the 130.0-acre portion to the west of 1-5 will be referred to as the
West SVV|R. The South SVV|R is expected to drain to existing storm pipes, and new pipes are
planned for the West SVV|R area which will outfall toSeneca| Creek. Both areas will need detention
for the difference in runoff volume between pre- and post-development conditions. The results
are presented in Table 4-7.
Table 4-7
Volumes for Different Runoff Calculation Methods
South SWIR 2.2
West SWI R 5.6
4.5 Requirements for New Developments
s
4,5,1 [^'tV Of UUOOdbU[D RUDOff FleteDt'OD Requirement
1> Construct device that has capacity for detaining difference in run off volume received by
undeveloped and developed land for a 25-year storm.
Exhibit 1
Page 37 of 49
2) Construct a discharge orifice of a size that the quantity of run off through the orifice is equal
to run off flow from a storm of 5-year or less, undeveloped land.
3) Construct a detention facility to have a post-development 25-year capacity with a discharge
orifice (or structure) sized to limit outflow to no more than the undeveloped site peak run off
for the existing (undeveloped) 5-year frequency storm. Detention volumes calculated by the
following methods are acceptable:
A. Santa Barbara Urban Hydrograph routing model (as prescribed by the King County
Surface Water Design Manual) for the post development 25-year runoff hydrograph
detained back to the existing 5-year peak site discharge.
B. 18,883 CF/ 10 Acre drainage area as per City of Woodburn standard table, above, based
on the rational method.
4.5.2 Safety Requirements
1) Depth of storm water within 30 feet from the edge of detention ponds, if open to public,
shall be limited to 3 feet, then gradual slope (3%) to higher depth shall be allowed. Maximum
pond side slopes shall be 3' horizontal to 1' vertical, however, gentler slope is desirable.
4.6 SWIR Area Projects
Table 4-8 identifies storm water projects that will be needed to support planned development in
SWIR area. For the purposes of this Public Facility Plan, storm water system improvements are
focused on detention facility volumes to serve the fully developed SWIR area. Based on
development timing, phasing and final development type, this volume may ultimately be met
through multiple local detention facilities. Further analysis and planning for the SWIR area will
better define how detention volumes are achieved. Note that minor collection piping within SWIR
area is not included in the pond cost estimates as they will primarily be part of on-site development
planning. The preliminary master plan for the area was created by others and is included in the
appendix of this report. It does not show detention locations. An estimated cost for the projects
in the figure is shown in Project 3 in table 4-8.
The City highlighted a need to replace the culverts in Seneca Creek, as they are in disrepair, and
likely undersized. Further study will be needed to determine culvert sizing and configuration. The
price shown is based on a similar large culvert project but may vary significantly from the actual
costs based on site and hydraulic conditions. The culverts are in ODOT right-of-way, so it may not
be the City's financial responsibility to replace them.
Exhibit 1
Page 38 of 49
Table ®8
Project List- Storm Drainage Plan
1 West Area Detention Pond(s) $1,239,000
2 South Area Detention Pond(s) $561,000
3 SWIR Master Plan piping $2,877,000
4 0DOT Culverts $2,000,000
4.7 Funding
To assure that the impact of providing and maintaining new storm drainage facilities is not a
burden to the community, new development will be required to pay for the cost of storm drainage
facilities needed to serve such development. Extra capacity facilities required to meet the
standards of the Master Storm Drainage Plan may be paid from accumulated revenue of the
System Development Charge Fund.
The City will continue paying the cost of maintaining and improving the existing storm drainage
system with funds derived from a combination of system development charges, Local
Improvement Districts, and street maintenance and construction funds.
Exhibit 1
o, Fl"!r ✓ror�k Fg Age 39
IV
/i/%, i / rr, o
l
m"°a r''".rr
li
" i
/,,
Of,
s
r
�Rnll Q,O s� R' ,; sr nra q)06
y /�
ri x ,, y mw "''C m leis
1flp�'C� 6 p
r s � ,� �. .g��,*' t •. 'oaf d
r
m r
y ,a r/
17
} 1
y
r
er N
•9, r1 //,„a
N °
.dk /����//� a 'qµ „�sb., s o,w.sy T ar
�roa Y
/ c ArNF" ,'
71
A
Legend
Pipe Diameter -culverts ;Detention
�»Unknown Ditch SWIR Area
10 or Smaller Stream or River 100-Year Flood Plain
12"-15" Q Outfall 500-Year Flood Plain
18 21" o Manhole Wetland
Catch Basin Tax Lots
72 and Larger
10 Foot Contours ,�r m,��//����/���/�%%//aA�a 4 p�r.,�f%�'(�%uir /Ii /� Q;a�� ri✓�N
g
(bra City of Woodburn Mapped Storm Water System
� -. 0 750 1,500 Feet
murraysmf7h WC7Q'1.71f IJPublic Facilities Plan Update and Flood Plain
J,,IY 2013 17-1993
Exhibit 1
Page 41 of 49
Public Facilities Plan
City of Woodburn
Transportation Plan
July 2018
PR
Glke
6922
OFIEGiON
C12
U
DKS Associates
Transportation
720 SW Washington St.
Suite 500
Portland,OR 97205
Exhibit 1
Pane 42 of 49
������ �. �
���� �
Transportation ��� �� ��
�[ ��� � �
5°1 Introduction
The Transportation System Master Plan is currently in progress. Details of the transportation
system components will be found in the Transportation System Master plan when it is complete.
5.2 Capital
ap~tN Nmprovement Nan for SWNR A
rea
A transportation project list has been provided as part of the Woodburn Facilities Plan Update.
The project list includes a package of 13 roadway and intersection improvements identified to
serve the Southwest Industrial/Urban Reserve (SVV|R) area. The transportation project list was
developed by DKS Associates based on review of the adopted Transportation System Plan (TSP)
and draft documents from theSVV|R Master Plan. Planning-level cost estimates were developed
for each of the identified transportation projects based on project assumptions, regional
construction unit costs, and engineering judgement. Costs do not include the costs for land
acquisition and easrnents as they can vary significantly depending on the property and the
owner.
The updated transportation project list was developed to aid the City in implementing
community-supported transportation projects and support pursuing external funding
opportunities until the Transportation System Plan (TSP) Update is completed (expected in late
2018). The TSP will provide a comprehensive revaluation of long range transportation needs,
priorities, and solutions for the community.
17-1993 Page 5-1 Public Facilities Plan
]u|y2018 City ofWoodburn
Exhibit 1
Woodburn F.dlifi..Pl.. Tm-p—ti—P,,j,a LM Page 43 of 49
Em Emmm Emm mmm
..........
III R.—d 1—g—Ild 1—Rd Rd III I
T11/1. 1 1 (11).
--d,"p:
em Mio1111,11,Rd I. --,hdlf—1
dZldl"" "p` III —ddm-l— I—ld —1-11.1d
Z'.
A ZId —I IRld-
I-- Sl�A�so)n W, I�'no�'<�os�'-I h'7'� I��enterto�o is
1,
I TSI/SWll I—TSIAll.—l—Iploi-Ill.(AI).
nd ddnn I- ='oon'h.hgl'./p d foss —'d dt'
d� III Rd 1—Rd 11 111 mo,A—dl I I.s I.s TSI/SWII
11-d A Wyd I- Ih I I Ih I
I S"'y I 1�sno. ___ Is"_TS, I.
SlAll,son Wy 1—son lonl—I lo nI.—n —d 1.1p.d A I'
I--loll-o, III I.,1-d SIAll,son Wy 1—Rd S-y All,so Wy I— .,I S."-loll-lo, 1� 1 1- 1.s TSI/SWII Ip'oj-Il' (AI).
Ipg,,d,lo lly=,,,hdb
ertom A
III dem-IRn 11 211 lull—Ile Rd WIllow Rd ",I .Ale,dl 111 2 1 les les TSI/SWII (2)
Wood- on—c"o
Access S,=eSl
_d III I o�d Wo o dl— A ull—I le I d 1 1211 Access Sl,eel 11 2 Rone les swil Wo 2,—,—
le 1,un Rd Ilens, lo—ucl lo Access Ih A Rd fulu,e
S"ee'_n_ds III Rew 1-d Ie 1,un Rd lull—Ile Rd Indu.,,dl 'I Access Sl,eel 11 2 Rone les Rew A�=s2SI'2 P� _d 1,211,111
lon—e lo Access Sl,eel Bun Rd Rec—end Access SI,el SWIR lols w,Ih 2
III Rew 1-d Indu.,,dl Illens on) Wood—Rd —I Access Sl,eel 11 2 Rone les Rew 2
lwy=sRd lon—cl lo ncass, (oeaisOeAccess , Ra A d III.dI I,om Wooeiaoe A.e I I R us wpm h 2 12 1 p
R d lwy Access Rd I R 2 11 '1 Access Sl,eel 11 2 Rone les SWIR
e nl Ind den n lude
ewe RdllR 21IInle,sel,on Bull—lle—n-R I So pwe d'loo bee h
211 IS I/SW I R 111 2,111,111
:dpengb,nd �lnd Ae�l Ipnco udes
I I bngW enue
Wood-dA—,dblocklnIe,secIRn n ghl,ng pm e en
112 Woodl--e SWIR Access Sl,eel--d.
ewe RdlIlllRd Inle,secImnBull—lle—ndl— sou'hcd ou nod d el—k--Solu,o n
Rd Rew e.pe led I be ef ned I h gh III upd:e
T1.1
Exhibit 1
Page 44 of A9
V
219 /
/
219 ; 214
1IILSBORO 1 SILVERTON
1 1 i
Sr8" l9/ y
l WOODLANE A6/ / 0
�%aiaai
i
1 '
„ aaaaa �
1
1
o _
C4
i 1
1
1 ii• .11
HOOPER Sr
, o
/aa�'aa�
W@
']tE V.
CSWEET WA
y �i� �►
LE,BRUN RD NE
fl� � '„
/ fl�
i i /
PARF;`
,'wwuwr aGG auk Gu6GGf ani uouu saaNUG iiiiiiiuoY f
ROWE-
AP,
MauGa
% ia .....
%11111,
c�fl,.
ii
%%%%%%%%/ice � .::... ..............iii...............
i 1 ,,,,,,,,, /
Note:Proposed Roadway a /aa,,,�/����i f,,� aaaaaaaaaaaa�? Scale(approxima#e)
Alignments are Preliminary
and May be Modified a ��°' a '���
Y i // / % 0' 500' 1000'
During Development Review
LEGEND iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillilillilI -Improve MajorArterial
uuul-Project Number 11111 -Construct MinorArterial
00000000000000000000000000000001001011101 -Improve MinorArterial Transportation Projects
uuuuua uu11 uuuuuua
Intersection mumu uumumu uumumu uumumu uumuu -Construct Service Collector M ,
Improvement _Construct Access Street Woodburn Facilities Plan Update
No Scale
Exhibit
Pa e45 of 49
Appendix
• Water Cll' figure from lNntrr System
Master Plan
• Wastewater Clk' figure from Wastewater
Facilities Plan
• .SWIR .SiormwTier CII' figure. from SWIR
Master Plan
Exhibit 1
Page,46 of 49
II_
s� � •��'� -y�,l Well 14
J I, 0
a"
J ( .�
e
(well :
l 7
Country c 1 v
,I( s �a4onal Way Wai110
u well] I I J= Well 1
1
1`
l
'0
�� � � L•I m I 1
�
g.
WVeYl3 Lvlbrary�< � I
-�i
it,evrated Tank ar
n�
well 13 �/
r well T2
r Parr Road +.
% �4,
2,000 4,000 Feet
IIIIIIIIIIIIIIIIIIIF w ri-Fre Department eevar
Cit of Woodburn
v� Y uuuuuum°°uuV � C1 P
W. �;Pli Water System Master Plan �i� 3- °w °" ® RgeN rP�P°psm°°° ���
murraysrmth .. a-z °w 4s1°°°1 ® w�
�Decem Ver 2017 16-1934
Exhibit 1
Page 47 of 49
r
v I
� ... r
ri
Map Location
1-11
,
Stevens P.S /�// ,� �
p
pt LEGEND
Pp P t t /"`"4j9 Pump Station Improvement
,i,,,,, Industrial PS's
® Pump Station(PS)
w� Manhole
Y'� � %/ T a Existing Pipe Improvements
Way 2020 Pipe Improvements
�, Pp line g
Project
Rtalmer PS a s " � - r 2030 Pipe Improvements
",
Force Main Pipe Improvements
Creek PS ISFM 'tea " : MS ®�SWMMPip es 10"or Greater
v a r ` .. , t ;. `Pofin
ri ri
Project
j;
Mill Creek PS r Collection System Pipe
,rr i' I 2 /
H sit t
Project
Ph 1 s
L. uoa zoosi
Pipeline1 r � � - r // °YFx .. �.. Roadway Centerlines
r l r
f
•Greenvldw PS
yy
tett
t5
f
r
� / 3 Y ng St t
IneProt t // r
irownStreet
Pp Pi
tett ' ;
Pia
r�
n ,
"South
rrStrePS FIGURE 8-1
Identified Capital Improvements
r:: CH2MHILL
Exhibit 1
,l
r i ifr i/ it r
E TI S'p D
OF-�OSE?ST RM/D�R+
X]ST1NSF EF fi
T9NG 11ETBUF ER
G
i
�°
aP
WOODBURN SWIR MASTER PLAN 'embe,°�' s`"®
Job h 21a022B.0m
FIGURE 8. STORM SEWER SYSTEM N...m.`"Elgll"la
Exhibit 1
Page 49 of 49
R(",(" `�,rv;VV ')I.Ii AV I'VIJI , ,`�rv;lJl l l //ff70
I"()RI I Alvll..,R, OR 9/,?C)4
vvvvvv.I1"1Urroy"I"IIiti-I.U57
Exhibit 2
Page 1 of 4
Analyses & Findings
This attachment to the staff report analyzes the application materials and finds through
statements how the legislative amendment relates to and meets applicable provisions.
Section references are to the Woodburn Comprehensive Plan, Oregon Administrative Rules or
Woodburnlf) li .i .! O[ „....................ince
„ ,l ,,,,,, ,, ,, WINO .
Legislative Amendment LA 2018-03 Page 4 of 7
Exhibit 2
Page 2 of 4
Legislative Amendment Provisions of the WDO
4.01 Decision-Making Procedures
4.01.02E.Type V Decisions(Legislative):Type V decisions involve legislative actions where the City
Council enacts or amends the City's land use regulations, comprehensive plan, Official Zoning Map or
some component of these documents.Type V decisions may only be initiated by the City Council.The
Planning Commission holds an initial public hearing on the proposal before making a recommendation to
the City Council.The City Council then holds a final public hearing and renders a decision. Public notice is
provided for all public hearings(Section 4.01.14).The City Council's decision is the City's final decision
and is appealable to LUBA within 21 days after it becomes final.
This legislative amendment to the WDO Comprehensive Plan and qualifies as a Type V decision.
Staff completed the public notices for the Commission hearing date of December 13, 2018,
specifically a newspaper ad in the Woodburn Independent and mailed notice to select agencies—
including Marion County, the Woodburn Fire and School Districts, and the Oregon Department of
Transportation (ODOT). The Planning Commission's recommendation will be forwarded to the City
Council for consideration for adoption.
Comprehensive Plan Policies, OAR's & Statewide Planning Goals
Comprehensive Plan
I. Public Facilities
Goal 1.9 To ensure that growth is orderly and efficient,the City shall phase the needed public services in
accordance with the expected growth. Extensions of the existing public services should be in accordance
with the facility master plans and Public Facility Plan in this Comprehensive Plan.
Policy 1-1.1 Public Facilities and services shall be appropriate to support sufficient amounts of land to
maintain an adequate housing market in areas undergoing development or redevelopment.
Legislative Amendment LA 2018-03 Page 5 of 7
Exhibit 2
Page 3 of 4
B. Citizen Involvement and Agency Coordination
Policy B-2. Woodburn shall coordinate with affected state agencies regarding proposed comprehensive
plan and land use regulation amendments, as required by state law.
The PFP ensures orderly and efficient growth in the City. It includes projects and associated costs
necessary to provide public facilities and services. All state, county and regional entities were
notified pursuant to state law.
Statewide Planning Goals
Goal 11 Public Facilities and Services
To plan and develop a timely, orderly and efficient arrangement of public facilities and services to serve
as a framework for urban and rural development.
The proposal directly addresses the intent of Goal 11 by adopting a Plan that provides for orderly
and efficient public facilities and services.
�,�
Goal 14 Urbanization OAR 660-015-0000,,
,,,,,,,,,,,,,,,,,,,
To provide for an orderly and efficient transition from rural to urban land use,to accommodate urban
population and urban employment inside urban growth boundaries,to ensure efficient use of land, and
to provide for livable communities.
The proposal furthers this goal by ensuring efficient use of land and providing for livable
communities by planning for infrastructure to address future growth within the city's UGB.
Oregon Administrative Rules:
660-011-0045
Legislative Amendment LA 2018-03 Page 6 of 7
Exhibit 2
Page 4 of 4
Adoption and Amendment Procedures for Public Facility Plans
(1)The governing body of the city or county responsible for development of the public facility plan shall
adopt the plan as a supporting document to the jurisdiction's comprehensive plan and shall also adopt as
part of the comprehensive plan:
(a) The list of public facility project titles, excluding (if the jurisdiction so chooses) the descriptions or
specifications of those projects;
(b) A map or written description of the public facility projects' locations or service areas as specified in
sections(2)and (3) of this rule; and
(c)The policy(ies)or urban growth management agreement designating the provider of each public facility
system.If there is more than one provider with the authority to provide the system within the area covered
by the public facility plan,then the provider of each project shall be designated.
The proposal includes each of the required elements for Public Facilities Plans stipulated in OAR
660-011-0045
CONCLUSION
Based on the above Findings, Staff finds that the proposal is consistent with all applicable
Comprehensive Plan, Development Ordinance and state provisions for adoption. It is
recommended that the City Council ultimately adopt the 2018 Woodburn Public Facilities Plan as
Exhibit B of the Comprehensive Plan (LA 2018-03)
Legislative Amendment LA 2018-03 Page 7 of 7