Loading...
2018-06-11 Council Chambers PresentationCOUNCIL CHAMBERS June 11, 2018 CITY OF WOODBURN Existing skylightsTransoms and sidelites for enhanced daylighting Open counter with rolling grille Brochure display shelf Tackable surfaces Accent laminate material (Torzo or similar) Ballistic glazing at transaction windows 42” (standing) and 36” (ADA) counter segments COMMUNITY DEVELOPMENT FINANCECOMMUNITY RELATIONS June 11, 2018 Woodburn City Hall MAIN HALL-WEST ELEVATION SCALE: 3/16” - 1’-0”0’3’6’12’ June 11, 2018 Woodburn City Hall OPT C Step up New single door Raised dais platform Furred out walls -see elevation Raised dais w/ ballistic rated front Woodburn Signage Torzo panels Wood panel - no joints Dn FLOOR PLANELEVATION SCALE: 1/8” - 1’-0”0’4’8’16’ Continuous reveal in wood paneling • New carpet, wall finishes, lighting, furniture and audio visual system throughout. • East, West and North walls to recieve new gyp board finish and paint. • Raised Dais is accessible for city staff only. • Provides one accessible exit from raised Dais platform. • New transom windows in corridor wall to allow for natural daylight from corridor skylights. Existing ceiling level Wood base Drop down projector screen/ digital display Viewing windows Digital display Relocate existing double door Council Chambers Hallway Viewing windows Drop down projector screen N June 11, 2018 Woodburn City Hall OPT C.1 Step up Drop down projector screen/ digital display Viewing windows Digital display Relocate existing double door Council Chambers Hallway New single door New ballistic rated wing walls - see elevation Viewing windows Woodburn Signage Existing ceiling level Torzo panels Wood base Wood panel - no joints Dn FLOOR PLANELEVATION N SCALE: 1/8” - 1’-0”0’4’8’16’ Continuous reveal in wood paneling • New carpet, wall finishes, lighting, furniture and audio visual system throughout. • East, West and North walls to recieve new gyp board finish and paint. • Raised Dais is accessible for city staff only. • Provides one accessible exit from raised Dais platform. • Wing walls behind Dais between back wall and Dais • New transom windows in corridor wall to allow for natural daylight from corridor skylights. Raised dais platform Raised dais w/ ballistic rated front Drop down projector screen Furred out walls -see elevation June 11, 2018 Woodburn City Hall City of Happy Valley June 11, 2018 Woodburn City Hall City of Canby June 11, 2018 Woodburn City Hall City of Hillsboro June 11, 2018 Woodburn City Hall City of Chandler June 11, 2018 Woodburn City Hall City of Oregon City June 11, 2018 Woodburn City Hall City of Keizer