Loading...
FIRST STREET 4-10-17 Council Meeting Presentation FINALFIRST STREET IMPROVEMENTS OAK TO HARRISON April 10, 2017 1 FIRST STREET IMPROVEMENT WHAT WE HAVE HEARD Desired Project Elements Pedestrian Friendly Improvements Streetscape Amenities Project Challenges Parking Availability Constrained Truck Turning Movements Feasibility of Utility Undergrounding Project Questions Couplet or Two-Way Design? Angled or Parallel Parking? 2 FIRST STREET IMPROVEMENT OPTION 1 Couplet Design With Angled Parking OPTION 1 Preliminary Estimated Cost $3,964,000 3 FIRST STREET IMPROVEMENT Option 1 South Half OPTION 1 OAK TO GARFIELD 4 FIRST STREET IMPROVEMENT Option 1 North Half OPTION 1 GARFIELD TO HARRISON 5 FIRST STREET IMPROVEMENT OPTION 2 Couplet Design With Mixed Parking OPTION 2 Estimated Cost $3,964,000 6 FIRST STREET IMPROVEMENT Option 2 South Half OPTION 2 OAK TO GARFIELD 7 FIRST STREET IMPROVEMENT Option 2 North Half OPTION 2 GARFIELD TO HARRISON 8 FIRST STREET IMPROVEMENT Two-Way with Bulb-Outs OPTION 3 OAK TO HARRISON OPTION 3 Estimated Cost $3,800,000 9 FIRST STREET IMPROVEMENT COUPLET DESIGN vs. TWO-WAY DESIGN Couplet Design Slightly Less Parking Available In Angled Option Minor Arterial Thru Traffic is Required to “Detour” to First Street Event Street Closure Issues Higher Traffic Flow – Southbound First Street First Street Delivery Issues Queueing Issues Two-Way Design Slightly More Parking Available (Parallel) Maintains Existing Traffic Flows 10 FIRST STREET IMPROVEMENT ON STREET PARKING COMPARISON Oak to Harrison OPTION 1, COUPLET DESIGN WITH ANGLED PARKING First Street On-Street Angled Parking Spaces = 68 Front Street On-Street Angled Parking Spaces = 67 Total On-Street Angled Parking Spaces = 135 OPTION 2, COUPLET DESIGN WITH MIXED PARKING First Street On-Street Parallel Parking Spaces = 76 Front Street On-Street Angled Parking Spaces = 67 Total On-Street Mixed Parking Spaces = 143 PARALLEL PARKING First Street On- Street Parallel Parking Spaces = 76 Front Street On-Street Parallel Parking Spaces = 80 Total On-Street Parallel Parking Spaces = 156 11 FIRST STREET IMPROVEMENT OFF STREET PARKING OPTION Restoration of Existing Second Street Parking Lot Provides 45 Parking Spaces Estimated Cost =$150,000 Upgrade Illumination Reconstruct Asphalt Surface Upgrade Storm Sewer Permanent Striping Upgrade Approaches 12 FIRST STREET IMPROVEMENT Truck Traffic Concerns Truck Way Traffic Pattern 13 FIRST STREET IMPROVEMENT Truck Traffic Concerns Truck Way Traffic Intersection Harrison 14 FIRST STREET IMPROVEMENT Truck Traffic Concerns Truck Way Traffic Intersection Cleveland Street 15 FIRST STREET IMPROVEMENT Truck Traffic Concerns Truck Traffic Local Delivery, Hayes Street 16 FIRST STREET IMPROVEMENT Truck Traffic Concerns Truck Traffic Local Delivery, Garfield Street 17 FIRST STREET IMPROVEMENT Truck Traffic Concerns Bus Traffic , Grant Street 18 FIRST STREET IMPROVEMENT Undergrounding Existing overhead utilities estimated Cost of utility undergrounding 19 FIRST STREET IMPROVEMENT URA Projects Alley Improvements Alley Improvements between Cleveland and Garfield Design Provides Concrete Pad Area for Dumpsters, Asphalt Travel Lane Estimated Project Cost $356,000 20 FIRST STREET IMPROVEMENT Cost Estimate 1st Street Project Elements 1st Street Improvement Cost $3,964,000 Rehab Downtown Second Street Parking Area $ 150,000 Alley improvements, Cleveland to Garfield $ 356,000 Total Cost of Project Elements $4,470,000 NOTE: Utility Undergrounding is NOT included in the above cost estimates due to cost and logistical constraints. 21