Loading...
June 26, 2017 Agenda FIGLEY,MAYOR HRYN CITY OF WOODBURN VACANTTCOUNCILOR WARD 1 LISA ELLSWORTH,COUNCILOR WARD II CITY COUNCIL AGENDA ROBERT CARNEY,COUNCILOR WARD III SHARON SCHAUB,COUNCILOR WARD IV FRANK LONERGAN,COUNCILOR WARD V JUNE 26, 2017 - 7.00 P.M. ERIC MORRIS,COUNCILOR WARD VI CITY HALL COUNCIL CHAMBERS-270 MONTGOMERY STREET 1. CALL TO ORDER AND FLAG SALUTE 2. ROLL CALL 3. ANNOUNCEMENTS AND APPOINTMENTS Announcements: A. The City Council meeting scheduled for July 10, 2017 is cancelled. The next City Council meeting will take place July 24, 2017 at 5:30 p.m. at Centennial Park. Appointments: B. Woodburn Tourism Advisory Committee Appointments 1 • Carisa Rangel Gottuso • Lisa Ellsworth • Hythum Ismail • Paul Iverson • Camron Settlemier • Robby Truong • Kayla Waldron • Renee Willer 4. COMMUNITY/GOVERNMENT ORGANIZATIONS None. 5. PROCLAMATIONS/PRESENTATIONS Proclamations: None. Presentations: A. West Hayes Street This facility is ADA accessible. If you need special accommodation, please contact the City Recorder at 503-980- 6318 at least 24 hours prior to this meeting. **Habrd int6rpretes disponibles para aquellas personas que no hablan Ingl6s, previo acuerdo. Comunfquese al (503) 980-2485.** June 26, 2017 Council Agenda Page i 6. COMMUNICATIONS None. 7. BUSINESS FROM THE PUBLIC - This allows the public to introduce items for Council consideration not already scheduled on the agenda. 8. CONSENT AGENDA - Items listed on the consent agenda are considered routine and may be adopted by one motion. Any item may be removed for discussion at the request of a Council member. A. Woodburn City Council minutes of June 12, 2017 2 Recommended Action: Approve the minutes. B. Crime Statistics through May 2017 5 Recommended Action: Receive the report. 9. TABLED BUSINESS None. 10. PUBLIC HEARINGS None. 11. GENERAL BUSINESS-Members of the public wishing to comment on items of general business must complete and submit a speaker's card to the City Recorder prior to commencing this portion of the Council's agenda. Comment time may be limited by Mayoral prerogative. A. Council Bill No. 3036 - A Resolution Adopting the City of 10 Woodburn Representation in the Updates to the Marion County Multi-Jurisdictional Hazard Mitigation Plan Recommended Action: Adopt the Resolution. B. Intergovernmental Agreement for School Resource Officers 280 Recommended Action: It is recommended the City Council authorize the City Administrator to sign a new Intergovernmental Agreement (IGA) with the Woodburn School District for School Resource Officer services. C. Transit Vehicle Maintenance and Repair Acceptance of 286 Proposal Recommended Action: It is recommended that the City Council authorize the City Administrator to accept the proposal of Woodburn Carcraft for transit vehicle maintenance and repair services. June 26, 2017 Council Agenda Page ii 12. PLANNING COMMISSION OR ADMINISTRATIVE LAND USE ACTIONS - These are Planning Commission or Administrative Land Use actions that may be called up by the City Council. None. 13. CITY ADMINISTRATOR'S REPORT 14. MAYOR AND COUNCIL REPORTS 15. ALLEYWAY/FIRST STREET TOUR 16. ADJOURNMENT June 26, 2017 Council Agenda Page iii OFF I Iii♦ r} B V' June 21 , 2017 TO: City Council FROM: Kathryn Figley, Mayor SUBJECT: Committee Appointments The following appointments are made, subject to the approval of the Council. Please forward any adverse comments to me prior to the Council meeting on Monday, June 26, 2017. No reply is required if you approve of my decision. Woodburn Tourism Advisory Committee Appointments Carisa Rangel Gottuso Lisa Ellsworth Hythum Ismail Paul Iverson Camron Settlemier Robby Truong Kayla Waldron Renee Willer 1 COUNCIL MEETING MINUTES JUNE 12, 2017 0:00 DATE COUNCIL CHAMBERS, CITY HALL, CITY OF WOODBURN, COUNTY OF MARION, STATE OF OREGON, JUNE 12, 2017 CONVENED The meeting convened at 7:11 p.m. with Mayor Figley presiding. ROLL CALL Mayor Figley Present Councilor Carney Present Councilor Lonergan Present Councilor Schaub Absent Councilor Morris Present Councilor Ellsworth Absent Staff Present: City Administrator Derickson, City Attorney Shields, Assistant City Administrator Row, Police Chief Ferraris, Community Development Director Kerr, Interim Public Works Director Liljequist, Finance Director Montoya, Sr. Management Analyst Moore, Community Relations Manager Gutierrez-Gomez, City Recorder Pierson 0:00 ANNOUNCEMENT The July 24th City Council meeting/Community Barbecue will take place at Centennial Park at 5:30 p.m. 0:01 APPOINTMENTS Mayor Figley announced that there is still a council vacancy for Ward 1 and encouraged anyone in that ward who is interested to apply. The deadline to apply will be by the end of this week. 0:03 PROCLAMATIONS Freemason Appreciation Week—The Mayor read a proclamation declaring June 12-18, 2017 as Freemason Appreciation Week and encouraged residents to celebrate the 125th anniversary of the Woodburn Masonic Lodge 4106 at the July 11,2017 Music in Library Park and Masonic Lodge Open house. Mayor Figley presented a framed copy of the proclamation to the Woodburn Masonic Lodge 4106 and called for a 15 minute break. 0:09 BUSINESS FROM THE PUBLIC Ellen Bandelow, 199 Smith Dr., stated that she is pleased to see the improvements that are happening around the City and added that the City has a responsibility to the people making those improvements by making sure homeowners and businesses are not allowed to be in violation of code for such long periods of time. Merrie Berlin, 167 N. Settlemier, stated that when people call to complain about ordinance violations they are told that not much can be done because of the way the ordinance is written. She added that perhaps the ordinances need to be reviewed by a committee and revised so the police department has more ability to do something about the violations. Page 1 - Council Meeting Minutes, June 12, 2017 2 COUNCIL MEETING MINUTES JUNE 12, 2017 0:16 CONSENT AGENDA A. Woodburn City Council minutes of May 22, 2017, B. Woodburn City Council Executive Session minutes of May 22, 2017, C. Liquor License Application for MJ Brother Inc., D. Building Activity for May 2017. Carney/Lonergan... adopt the Consent Agenda. The motion passed unanimously. 0:17 PUBLIC HEARINGS Fiscal Year (FY) 2017-2018 State Revenue Sharing A Public Hearing to consider input on State Revenue Sharing. Mayor Figley declared the hearing open at 7:45 p.m. for the purpose of hearing public input on State Revenue Sharing. City Administrator Derickson provided a staff report. Mayor Figley asked if anyone from the public would like to speak on this subject. No members of the public wished to speak in either support or opposition of State Revenue Sharing. Mayor Figley declared the hearing closed at 7:47 p.m. Fiscal Year (FY) 2017-2018 City Budget Adoption A Public Hearing to consider input on the FY 2017-2018 Budget Adoption. Mayor Figley declared the hearing open at 7:47 p.m. for the purpose of hearing public input on the FY 2017-2018 Budget Adoption. City Administrator Derickson provided a staff report. Mayor Figley asked if anyone from the public would like to speak on this subject. No members of the public wished to speak in either support or opposition of the FY 2017-2018 Budget Adoption. Mayor Figley declared the hearing closed at 7:50 p.m. 0:21 COUNCIL BILL NO. 3034 - A RESOLUTION DECLARING THE CITY OF WOODBURN'S ELIGIBILITY AND ELECTION TO RECEIVE STATE REVENUE SHARING Lonergan introduced Council Bill No. 3034. Recorder Pierson read the bill by title only since there were no objections from the Council. On roll call vote for final passage, the bill passed unanimously. Mayor Figley declared Council Bill No. 3034 duly passed. 0:22 COUNCIL BILL NO. 3035 -A RESOLUTION ADOPTING THE FISCAL YEAR(FY) 2017-2018 BUDGET; MAKING BUDGET APPROPRIATIONS; AND CATEGORIZING TAXES Lonergan introduced Council Bill No. 3035. Recorder Pierson read the bill by title only since there were no objections from the Council. On roll call vote for final passage, the bill passed unanimously. Mayor Figley declared Council Bill No. 3035 duly passed. 0:23 2017 OREGON MAIN STREET REVITALIZATION GRANT — BUNGALOW THEATER AND MUSEUM RESTORATION PROJECT Lonergan/Morris... accept the Oregon Main Street Revitalization grant in the amount of $100,000 for the Bungalow Theater and Museum Restoration Project and authorize the City Administrator to sign the Grant Agreement. The motion passed unanimously. 0:24 REDFLEX CONTRACT EXTENSION AMENDMENT Police Chief Ferraris provided a staff report. Lonergan/Morris... authorize the City Page 2 - Council Meeting Minutes, June 12, 2017 3 COUNCIL MEETING MINUTES JUNE 12, 2017 Administrator to sign the attached Third Extension of the Agreement with Redflex Traffic Systems, Inc. to provide Red Light Photo Enforcement Services. Councilor Carney asked if Police Chief Ferraris could provide the yield that has been received on this contract at some point. Councilor Morris stated that he supports this and would like to see it extended. Councilor Lonergan concurred with Councilor Morris. City Administrator Derickson stated that staff will reach out to Redflex about reevaluating other locations for red light cameras in the City. The motion passed unanimously. 0:30 CITY ADMINISTRATOR'S REPORT The City Administrator stated that they will be foregoing the alleyway tour for the next meeting since Economic Development Director Johnk is out sick and rain is expected. 0:31 MAYOR AND COUNCIL REPORTS Councilor Carney noted that the roof above him appeared to be fixed as it was no longer leaking. Mayor Figley stated that the new museum looks great and is a lot of fun. She also congratulated the class of 2017. She added that there has been a request to turn lights on the overpass orange for the days the Beavers are playing in the College World Series and wanted to be sure there was a consensus with the council. Councilor Lonergan was in favor. Councilor Morris stated that citizens have been doing a good job of taking care of tall grass this year. He also encouraged anyone in Ward 1 who is interested in the open council position to apply. 0:35 ADJOURNMENT Morris/Lonergan... meeting be adjourned. The motion passed unanimously. The meeting adjourned at 8:04 p.m. APPROVED KATHRYN FIGLEY, MAYOR ATTEST Heather Pierson, City Recorder City of Woodburn, Oregon Page 3 - Council Meeting Minutes, June 12, 2017 4 6/20/2017 Woodburn Police Department MONTHLY ARRESTS BY OFFENSES 2017 Year to Date CHARGE DESCRIPTION Jan Feb Mar Apr May Total AGGRAVATED ASSAULT 2 4 1 3 5 1 ANIMAL CRUELTY 0 1 0 0 0 1 ANIMAL ORDINANCES 0 0 1 2 0 3 ASSAULT SIMPLE 10 5 13 10 12 50 ATTEMPTED MURDER 1 0 0 0 0 1 BURGLARY- BUSINESS 0 1 2 0 2 BURGLARY-OTHER STRUCTURE 0 1 1 2 0 BURGLARY- RESIDENCE 0 5 3 1 1 10 CHILD NEGLECT 0 1 1 0 0 2 CRIME DAMAGE-NO VANDALISM OR ARSON 3 6 6 6 4 2 CURFEW 0 0 1 0 0 1 CUSTODY- DETOX 0 0 0 1 0 1 CUSTODY- MENTAL 0 5 3 6 4 18 DISORDERLY CONDUCT 7 33 4 11 10 6 DRIVING UNDER INFLUENCE 7 2 9 6 6 30 DRUG LAW VIOLATIONS 10 12 16 14 12 6 DWS/REVOKED-MISDEMEANOR 1 2 0 4 4 11 ELUDE 1 4 1 0 1 7 ESCAPE FROM YOUR CUSTODY 2 0 0 0 0 2 FAIL TO DISPLAY OPERATORS LICENSE 0 1 2 0 0 3 FORCIBLE RAPE 0 0 1 0 0 1 FRAUD -CREDIT CARD/AUTOMATIC TELLER MACHINE 1 0 1 0 0 2 FRAUD -OF SERVICES/FALSE PRETENSES 0 2 0 0 0 2 FUGITIVE ARREST FOR ANOTHER AGENCY 35 26 39 49 38 187 FURNISHING 0 0 0 0 2 2 GARBAGE LITTERING 1 0 0 0 0 1 HIT AND RUN FELONY 0 0 0 1 0 1 HIT AND RUN-MISDEMEANOR 1 2 4 2 1 10 IDENTITY THEFT 1 0 0 0 0 1 INTIMIDATION /OTHER CRIMINAL THREAT 2 6 3 7 4 22 KIDNAP -HOSTAGE/SHIELD OR REMOVAL/DELAY WITN 0 0 0 0 1 1 MINOR IN POSSESSION 1 5 0 0 3 9 MOTOR VEHICLE THEFT 2 1 3 3 3 12 OTHER 5 5 7 5 2 2 PROPERTY RECOVER FOR OTHER AGENCY 0 0 0 1 0 1 RECKLESS DRIVING 2 1 5 2 4 1 RECKLESSLY ENDANDERING 2 2 3 1 2 10 RESTRAINING ORDER VIOLATION 0 1 1 1 2 ROBBERY- BUSINESS 6 0 0 0 0 6 ROBBERY-OTHER 0 0 0 0 4 ROBBERY- RESIDENCE 0 0 1 0 0 1 RUNAWAY 1 0 1 0 0 2 EX CRIME -CONTRIBUTE TO SEX DELINQUENCY 0 0 0 0 2 2 EX CRIME -EXPOSER 0 0 0 0 1 1 EX CRIME -FORCIBLE SODOMY 0 0 1 0 0 1 EX CRIME -INCEST 0 0 3 0 0 3 EX CRIME -MOLEST(PHYSICAL) 1 0 1 0 01 2 EX CRIME -NON-FORCE RAPE 0 0 1 0 0 1 EX CRIME -PORNOGRAPHY/OBSCENE MATERIAL 0 0 0 0 2 2 EX CRIME -SEXUAL ASSAULT WITH AN OBJECT 0 0 1 0 0 1 TALKER 0 0 1 0 0 1 TOLEN PROPERTY- RECEIVING,BUYING,POSSESSING 4 0 0 0 0 HEFT- BUILDING 0 2 3 1 01 6 HEFT- FROM MOTOR VEHICLE 1 0 2 01 41 7 5 Page 1 of 2 6/20/2017 Woodburn Police Department MONTHLY ARRESTS BY OFFENSES 2017 Year to Date an Feb Mar Apr May Total HEFT-OTHER 2 2 3 3 4 1 HEFT- PURSE SNATCH 3 2 0 0 0 HEFT-SHOPLIFT 11 2 4 4 4 2 TRAFFIC VIOLATIONS 4 7 12 12 10 4 TRESPASS 6 11 8 7 6 38 UNAUTHORIZED ENTRY INTO MOTOR VEHICLE 0 4 1 1 2 8 VANDALISM 0 4 1 1 3 9 VEHICLE RECOVERD FOR OTHER AGENCY 0 2 1 0 0 3 EAPON -CARRY CONCEALED 0 0 2 0 1 3 EAPON -EX FELON IN POSSESSION 2 0 2 0 0 EAPON -POSSESS ILLEGAL 2 7 1 1 1 12 EAPON -SHOOTING IN PROHIBITED AREA 2 0 0 0 0 2 Jan Feb Mar Apr May Total 2017 Total 142 177 181 168 167 83 2016 Total 140 108 144 144 156 692 2015 Total 206 157 155 187 166 871 Arrests/Year 1000 800 600 Q 400 200 0 2015 2016 2017 Year 6 Page 2 of 2 6/20/2017 Woodburn Police Department MONTHLY CRIMINAL OFFENSES 2017 Year to Date CHARGE DESCRIPTION Jan Feb Mar Apr May Total AGGRAVATED ASSAULT 3 5 1 7 4 20 ANIMAL CRUELTY 0 1 0 0 0 1 ANIMAL ORDINANCES 1 0 1 2 0 ARSON 0 0 1 0 2 3 ASSAULT SIMPLE 16 8 15 15 18 72 ATTEMPTED MURDER 1 0 0 0 0 1 BURGLARY- BUSINESS 5 2 7 6 6 26 BURGLARY-OTHER STRUCTURE 2 5 4 1 2 1 BURGLARY- RESIDENCE 4 4 5 6 5 2 CHILD NEGLECT 1 1 1 1 2 6 CITY ORDINANCE 0 1 0 0 0 1 COMPUTER CRIME 0 0 0 2 0 2 CRIME DAMAGE-NO VANDALISM OR ARSON 18 17 23 17 14 89 CRIMINAL MISTREATMENT 0 2 2 1 0 CURFEW 0 0 1 0 0 1 CUSTODY- DETOX 0 0 0 1 0 1 CUSTODY- MENTAL 1 6 3 6 4 20 DISORDERLY CONDUCT 7 11 10 13 14 5 DRIVING UNDER INFLUENCE 7 2 9 6 5 29 DRUG LAW VIOLATIONS 11 14 16 14 13 68 DWS/REVOKED- FELONY 1 0 0 0 0 1 DWS/REVOKED-MISDEMEANOR 1 2 0 4 4 11 ELUDE 4 7 1 1 1 1 EMBEZZLEMENT 0 0 0 1 0 1 ESCAPE FROM YOUR CUSTODY 1 0 0 0 0 1 FAIL TO DISPLAY OPERATORS LICENSE 0 1 2 0 0 3 FAILURE TO REGISTER AS SEX OFFENDER 0 1 0 0 0 1 FAMILY-OTHER 0 0 0 1 0 1 FORCIBLE RAPE 1 0 3 1 0 FORGERY/COUNTERFEITING 5 4 7 5 6 27 FRAUD-ACCOUNT CLOSED CHECK 2 0 0 0 2 FRAUD- BY DECEPTION/FALSE PRETENSES 3 3 3 5 3 17 FRAUD- CREDIT CARD/AUTOMATIC TELLER MACHINE 1 4 3 3 3 1 FRAUD- OF SERVICES/FALSE PRETENSES 1 3 0 2 0 6 FUGITIVE ARREST FOR ANOTHER AGENCY 30 22 31 32 29 14 FURNISHING 0 0 0 0 1 1 GARBAGE LITTERING 1 0 0 0 0 1 HIT AND RUN FELONY 1 1 0 2 0 HIT AND RUN-MISDEMEANOR 20 11 16 3 11 61 IDENTITY THEFT 5 6 4 7 6 28 INTIMIDATION /OTHER CRIMINAL THREAT 4 8 6 10 7 3 KIDNAP - FOR ADDITIONAL CRIMINAL PURPOSE 0 0 0 1 0 1 KIDNAP - HOSTAGE/SHIELD OR REMOVAL/DELAY WITNE 0 0 0 0 1 1 MINOR IN POSSESSION 1 4 0 0 1 6 MISCELLANEOUS 15 11 10 10 22 68 MOTOR VEHICLE THEFT 18 14 15 7 17 71 NON CRIMINAL DOMESTIC DISTURBANCE 17 10 12 10 6 5 OTHER 8 5 7 6 2 28 PROPERTY- FOUND LOST MISLAID 2 2 1 1 0 6 PROPERTY RECOVER FOR OTHER AGENCY 1 1 0 0 2 RECKLESS DRIVING 2 2 6 3 3 16 RESTRAINING ORDER VIOLATION 0 2 5 1 2 10 ROBBERY- BUSINESS 4 0 1 0 0 ROBBERY- OTHER 1 1 1 1 3 7 ROBBERY- RESIDENCE 0 1 0 0 0 1 RUNAWAY 41 41 3 6 17 SEX CRIME - CONTRIBUTE TO SEX DELINQUENCY 1 01 01 0 1 2 Page 1 of 2 6/20/2017 Woodburn Police Department MONTHLY CRIMINAL OFFENSES 2017 Year to Date Jan IFeb Mar Apr May Total SEX CRIME - EXPOSER 0 0 0 0 2 2 SEX CRIME - FORCIBLE SODOMY 1 0 2 0 0 3 SEX CRIME - INCEST 0 0 2 0 0 2 SEX CRIME - MOLEST (PHYSICAL) 2 2 5 3 4 16 SEX CRIME - NON-FORCE RAPE 1 0 0 1 1 3 SEX CRIME - OBSCENE PHONE CALL 1 0 0 0 0 1 SEX CRIME - OTHER 0 1 1 1 0 3 SEX CRIME - PORNOGRAPHY/OBSCENE MATERIAL 1 0 0 0 0 1 SEX CRIME - SEXUAL ASSAULT WITH AN OBJECT 0 1 1 0 0 2 STALKER 0 0 2 0 0 2 STOLEN PROPERTY- RECEIVING,BUYING,POSSESSING 4 1 0 0 0 SUICIDE 0 1 0 0 0 1 HEFT- BICYCLE 0 2 2 0 1 HEFT- BUILDING 7 101 7 5 11 40 HEFT- COIN OP MACHINE 1 0 0 0 1 2 HEFT- FROM MOTOR VEHICLE 9 9 16 17 9 60 HEFT- MOTOR VEHICLE PARTS/ACCESSORIES 1 1 0 0 1 3 HEFT- OTHER 20 15 8 25 24 92 HEFT- PICKPOCKET 0 0 0 1 0 1 HEFT- PURSE SNATCH 0 1 2 0 2 HEFT- SHOPLIFT 22 8 10 13 15 68 TRAFFIC VIOLATIONS 10 11 27 12 13 73 TRESPASS 6 6 7 7 8 3 UNAUTHORIZED ENTRY INTO MOTOR VEHICLE 4 2 6 14 10 36 UNLAWFULLY BEING WHERE MINORS CONGREGATE 0 2 0 0 0 2 VANDALISM 30 56 32 18 24 160 VEHICLE RECOVERD FOR OTHER AGENCY 3 2 5 2 0 12 WEAPON -CARRY CONCEALED 0 0 2 0 1 3 WEAPON - EX FELON IN POSSESSION 1 0 2 0 0 3 WEAPON - POSSESS ILLEGAL 31 61 1 2 1 13 WEAPON -SHOOTING IN PROHIBITED AREA 11 11 0 0 1 3 Jan I Feb I Marl Apr IMaylTotal 2017 Total 1 3561 3471 3771 3391 357 1,776 2016 Total 1 3001 2511 3171 2741 363 1,50 2015 Total 1 3571 2701 2711 3091 290 1,497 Offenses/Year ,800 ,600 aoo 1200 — N ,000 Z LL 800 0 600 00 2 200 0 . . 2015 2016 2017 YEAR 8 Page 2 of 2 Woodburn Police Department ORDINANCE VIOLATIONS 2017 Year to Date 6/20/2017 Ordinance Discription Jan Feb Mar Apr May Total Animal Complaint 29 22 24 30 61 166 Ordiinance -Abate/Nuisances 0 0 1 0 1 2 Ordinance -Abandoned Vehicles 18 18 29 75 64 204 Ordinance -Abate Graffiti 13 26 15 14 8 76 Ordinance - Land Use Violations 0 0 3 1 3 7 Ordinance -Oth Violation 34 60 104 57 68 323 Ordinance -Tall Grass 0 0 0 0 85 85 2017 Total 94 126 176 177 290 863 2016 Total 122 159 131 106 239 757 2015 Total 125 125 149 120 250 769 Ordinance Violations / Code Enforcement Officers 800 700 600 Z 500 O 3 400 O 300 200 100 0 2015 2016 2017 COMBINED TOTAL-CODE ENFORCEMENT OFFICERS Ordinance Violations / Year 1000 800 i N Z 600 O F J 0 400 200 0 2015 2016 2017 YEAR TOTALS FOR ALL OFFICERS 9 1 �'I'1�r I Iii♦ r} Y 9M& Its BU Pri,,�arrt rr rf aA'!87 June 26, 2017 TO: Honorable Mayor and City Council through City Administrator FROM: Jason Horton, Communications Coordinator SUBJECT: Marion County Multi-jurisdictional Hazard Mitigation Plan RECOMMENDATION: Adopt the Resolution. BACKGROUND: Marion County Emergency Management partnered with the University of Oregon on a multi-jurisdictional hazard mitigation plan. Many communities, including Woodburn, participated in the process. This FEMA-approved plan will allow Woodburn to have access to resources should a disaster take place. This is a regulatory plan that will give Woodburn access to FEMA grants which would buy down and mitigate risks. Not passing the Resolution would make Woodburn ineligible to resources in the event of a disaster. DISCUSSION: The Council is asked to pass this resolution in order to protect the City in the event of a disaster. The focus of the plan was infrastructure system, vulnerable populations and an all-hazard approach. FINANCIAL IMPACT: No immediate financial impact. Agenda Item Review: City Administrator_x_ City Attorney_x Finance_x- 10 COUNCIL BILL NO. 3036 RESOLUTION NO. 2098 A RESOLUTION ADOPTING THE CITY OF WOODBURN REPRESENTATION IN THE UPDATES TO THE MARION COUNTY MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN WHEREAS, the City of Woodburn recognizes the threat that hazards pose to people, property and infrastructure within our community; and WHEREAS, undertaking hazard mitigation actions will reduce the potential for harm to people, property and infrastructure from future hazard occurrences; and WHEREAS, an adopted Natural Hazard Mitigation Plan is required as a condition of future funding for mitigation projects under multiple FEMA pre- and post-disaster mitigation grant programs; and WHEREAS, the City of Woodburn has fully participated in the FEMA prescribed mitigation planning process to prepare the Marion County, Multi- Jurisdictional Hazard Mitigation Plan (HMP), which has established a comprehensive, coordinated planning process to eliminate or minimize these vulnerabilities; and WHEREAS, the City of Woodburn has identified hazard risks and prioritized a number of proposed actions and programs needed to mitigate the vulnerabilities of the City of Woodburn to the impacts of future disasters within the Marion County, Multi-Jurisdictional Hazard Mitigation Plan; and WHEREAS, these proposed projects and programs have been incorporated into the Marion County, Multi-Jurisdictional Hazard Mitigation Plan that has been prepared and promulgated for consideration and implementation by the cities of Marion County; and WHEREAS, the Oregon Office of Emergency Management and Federal Emergency Management Agency, Region X officials have reviewed the Marion County, Multi-Jurisdictional Hazard Mitigation Plan and pre-approved it (dated, April 14, 2017) contingent upon this official adoption of the participating governments and entities; and Page 1 - Council Bill No. 3036 Resolution No. 2098 11 WHEREAS, the HMP is comprised of comprised of three volumes: Volume I - Basic Plan, Volume 11 - City Addenda, and Volume III - Appendixes, collectively referred to herein as the HMP; and WHEREAS, the HMP is in an on-going cycle of development and revision to improve its effectiveness; and WHEREAS, City of Woodburn adopts the HMP and directs the City Administrator or his/her designee to develop, approve and implement the mitigation strategies and any administrative changes to the HMP; NOW, THEREFORE, THE CITY OF WOODBURN RESOLVES AS FOLLOWS: Section 1. The City of Woodburn adopts the Marion County Multi- Jurisdictional Hazard Mitigation Plan as an official plan. Section 2. That the City of Woodburn will submit this Adopted Resolution to the Oregon Office of Emergency Management and Federal Emergency Management Agency, Region X officials to enable final approval of the Marion County Multi-Jurisdictional Hazard Mitigation Plan. Approved as to form: City Attorney Date Approved: Kathryn Figley, Mayor Passed by the Council Submitted to the Mayor Approved by the Mayor Filed in the Office of the Recorder ATTEST: Heather Pierson, City Recorder Page 1 - Council Bill No. 3036 Resolution No. 2098 12 Marion County Multi-jurisdictional Hazard Mitigation Plan Marion County and the Cities of: IIII�I�III pOpp iuuuu Imuuuuuuu�uouoguuuu�fooll � Aumsville, Aurora, Detroit, Gates, Idanha, Keizer, i Silverton, Stayton, Turner and Woodburn ------------------ it �, ff9i f- i f' i' f p i Prepared for: Marion County Emergency Management Prepared by: University of Oregon Community Service Center Community Planning Workshop & Oregon Partnership for Disaster Resilience UNIVERSITY OF ORE'GrDN S' C Ian C.dIArYreaula"ssy ses'w Y7 B,S el"xN ISR "iec�.�:D tc, 13 This Natural Hazard Mitigation Plan was prepared by: CS C C�ItI'I:oON IJP,N.Y':`rFp iE^L"VnR'aiC Community Service Center n� „^......,m...r.^............................^_.^.. With support from: PPPM�i v�vua:oss s > efa ��o °: 'fr Department of Planning,Putaiic Policy andManagement School of Archkecture and AllierdArts Planning grant funding provided by: FEMA Federal Emergency Management Agency(FEMA) Pre-Disaster Mitigation Program Grant: EMS-2014-PC-0005 Sub-grant Application Reference: PDMC-PL-10-OR-2013-001, and Additional Support Provided by: Or py This material is a result of tax-supported research and, as such, is not copyrightable. It may be freely reprinted with the customary crediting of the source. 14 SPECIALTHANKS & ACKNOWLEDGEMENTS Marion County developed this Multi-Jurisdictional Hazard Mitigation Plan (MJHMP)through a regional partnership funded by the Federal Emergency Management Agency's (FEMA) Pre- Disaster Mitigation (PDM) Competitive Grant Program: EMS-2014-PC-0011, Sub-grant Application Reference: PDMC-PL-10-OR-2014-002.This updated Hazard Mitigation Plan is a collaboration between Marion County and the Cities of Aumsville, Aurora, Detroit, Gates, Idanha, Keizer, Silverton, Stayton,Turner and Woodburn. Planning process, plan templates and plan development support provided by the Oregon Partnership for Disaster Resilience (OPDR) at the University of Oregon's Community Service Center. Special thanks to Ed Flick, Marion County Emergency Manager for his enterprise-wide vision for resilience in Marion County; and to Kathleen Silva, Marion County Emergency Preparedness Coordinator for her leadership in convening the steering committee and lifeline sector advisory committees. 15 Marion County HMP Update Steering Committees Marion County Name Position Organization Bill Lawyer Director City of Keizer Public Works Boyd Keyser Superintendent North Marion School District Brandon Reich Senior Planner Marion County Planning Brent Stevenson Manager Santiam Water Control District Caitlin Esping AmeriCorps VISTA Marion County Emergency Management Dale Huitt Deputy Sheriff Marion County Sheriff DanielIeGonzaIez Ma nagement Ana I yst Marion County Community Services David Sawyer Administrator City of Turner Derrel Lockard Superintendent City of Aurora Public Works Dianne Hunt Director City of Si Iverton Administrative Services Don Cha rpiI Ion East Salem Suburban Neighborhood Association Ed Flick Emergency Manager Marion County Emergency Management Jason Horton Communications City of Woodburn Coordinator Jeff Fossholm Chief of Police City of Silverton Police Department Jennifer Warner Technician City of Keizer Public Works Jim Ferraris Police Chief Woodburn Police Department Kathleen Silva Emergency Preparedness Marion County Emergency Coordinator Management Kelly Richardson Manager/City Recorder City of Aurora City Hall Administration Kris Sallee Councilor City of Aurora City Council Mathias Reyes Project Manager City of Keizer Public Works Matt Knudsen Environmental Specialist Marion County Public Works Michael Johnson Chair East Salem Suburban Neighborhood Association Randy Scott Director City of Woodburn Public Works Rick Sebens Chief of Police City of Stayton Police Department Roger Stevenson Emergency Manager City of Salem Emergency Management City of Aumsville • Richard Schmitz, Chief of Police • Steve Oslie, Public Works Director City of Aurora • Kris Sallee, City Council • Kelly Richardson, City Recorder • Derrel Lockard, Public Works Superintendent • Boyd Keyser, Marion County School District 16 City of Detroit • Christine Pavoni, City Recorder • Robert Bruce, Certified Water Technician City of Gates • Jerry Marr, Mayor • Traci Archer, Recorder • Leeroy Davis City of Idanha • Karen Clark, Mayor • Robert Bruce, Certified Water Technician City of Keizer • Bill Lawyer, Public Works Director • Jennifer Warner, Public Works Technician • Mathias Reyes, Drinking Water Technician • Nate Brown, Community Development Director • Elizabeth Sagmiller, Environmental Division Manager • Sam Litke, Senior Planner • Shane Witham,Associate Planner City of Mill City • David Kinney, Planning Advisor • Stacie Cook, City Recorder City of Silverton • Dianne Hunt, Emergency Manager • Jeff Fossholm, Police Chief City of Stayton • Dan Fleishman, Planning & Development Director • Henry Porter, Mayor • Rich Sebens, Emergency Manager • Lance Ludwick, Public Works City of Turner • David Sawyer, City Administrator • Garry Tiffin, Mayor • Richard Bates • Chuck Roberts • Larry Lullay • John Taylor 17 City of Woodburn • Jason Horton, Public Information Officer • Randy Scott, Public Works Director • Jim Ferraris, Chief of Police • Paul Iverson, Fire District Chief Community Service Center Team • Robert Parker, Director • Josh Bruce, Director OPDR • Michael Howard, Assistant Program Manager • Aniko Drlik-Muehleck, Project Director • Craig Wiroll, Project Manager • Amanda Kohn, Research Associate • Bree Nicolello, Research Associate • Dan Lokic, Research Associate • Tyce Herrman, Research Associate • Mugs Scherer, Research Associate Additional Thanks: To the Department of Geology and Mineral Industries for assistance with hazard data;the Department of Land Conservation and Development staff in the hazards for flood data, mapping and process support;to the Oregon Military Department Office of Emergency Management for grant administration and process support. Special thanks to all of the local Marion County partner agencies and representatives who participated in the lifeline sector analysis: • Communications: Capital Community Television (CCTV),Amateur Radio Emergency Service (ARES), Marion Area Multi-Agency Emergency Telecommunications Dispatch Center (METCOM 911), Santiam Canyon Phone, Willamette Valley Communications Center (WVCC), Frontier, Verizon, Oregon Statewide Interoperability Coordinator (SWIC), Service Master of Salem, Pacific Gas and Electric Company(PGE). • Energy: Pacific Gas and Electric. • Transportation: City of Salem, City of Woodburn, Marion County Public Works, Marion County Sherriff's Office, ODOT, Salem Public Works, Salem-Keizer School District, Salem-Keizer Transit, Woodburn Transit Service. • Water: City of Stayton, City of Salem, City of Keizer, City of Turner, Marion County, North Santiam Watershed Council. About the Community Service Center The Community Service Center (CSC), a research center affiliated with the Department of Planning, Public Policy, and Management at the University of Oregon, is an interdisciplinary organization that assists Oregon communities by providing planning and technical assistance 18 to help solve local issues and improve the quality of life for Oregon residents.The role of the CSC is to link the skills, expertise, and innovation of higher education with the transportation, economic development, and environmental needs of communities and regions in the State of Oregon, thereby providing service to Oregon and learning opportunities to the students involved. About the Oregon Partnership for Disaster Resilience The Oregon Partnership for Disaster Resilience (OPDR) is a coalition of public, private, and professional organizations working collectively toward the mission of creating a disaster- resilient and sustainable state. Developed and coordinated by the Community Service Center at the University of Oregon, the OPDR employs a service-learning model to increase community capacity and enhance disaster safety and resilience statewide. Plan Template Disclaimer This Hazard Mitigation Plan is based in part on a plan template developed by the Oregon Partnership for Disaster Resilience.The template is structured to address the requirements contained in 44 CFR 201.6; where language is applicable to communities throughout Oregon, OPDR encourages the use of standardized language.As part of this regional planning initiative, OPDR provided copies of the plan templates to communities for use in developing or updating their hazards mitigation plans. OPDR hereby authorizes the use of all content and language provided to Marion County in the plan template. 19 20 This page left intentionally blank. 21 TABLE OF CONTENTS 22 Volume I : Basic Plan PlanSummary........................................................................................................i-1 Section1: Introduction...........................................................................................1-1 Section2: Risk Assessment....................................................................................2-1 Section 3: Mitigation Strategy...............................................................................3-1 Section 4: Implementation and Maintenance........................................................4-1 Volume II: City Addenda Aumsville .............................................................................................................A-1 Aurora.................................................................................................................. B-1 Detroit ..................................................................................................................0-1 Gates.................................................................................................................... D-1 Idanha...................................................................................................................E-1 Keizer....................................................................................................................F-1 Silverton...............................................................................................................G-1 Stayton................................................................................................................. H-1 Turner....................................................................................................................1-1 Woodburn.............................................................................................................J-1 Volume III: Appendices AppendixA: Action Items.....................................................................................A-1 Appendix B: Planning and Public Process ............................................................. B-1 Appendix C: Community Profile.............................................................................0-1 Appendix D: Lifeline Sector Summaries................................................................ D-1 Appendix E: Economic Analysis of Natural Hazard Mitigation Projects..................E-1 AppendixF: Grant Programs..................................................................................F-1 23 CITY OF AUMSVILLE ADDENDUM Purpose This document serves as the City of Aumsville's Addendum to the Marion County Multi- Jurisdictional Hazards Mitigation Plan (MHMP, HMP).This addendum supplements information contained in Volume I (Basic Plan) of this HMP.The Basic Plan serves as the foundation for this jurisdiction's addendum. Volume III (Appendices) provides additional information (particularly regarding participation and mitigation strategy).This addendum meets the following requirements: • Multi-jurisdictional Plan Adoption §201.6(c)(5), • Multi-jurisdictional Participation §201.6(a)(3), • Multi-jurisdictional Mitigation Strategy§201.6(c)(3)(iv), and • Multi-Jurisdictional Risk Assessment§201.6(c)(2)(iii). Plan Process, Participation, and Adoption This section of the HMP addendum addresses 44 CFR 201.6(c)(5), Plan Adoption, and 44 CFR 201.6(a)(3), Participation. In the summer and fall of 2016, the Oregon Partnership for Disaster Resilience (OPDR) at the University of Oregon's Community Service Center (CSC) partnered with the Oregon Military Department's Office of Emergency Management(OEM), and Marion County cities, including Aumsville, to update their addendum to the Marion County HMP, which expired July 8, 2016.This project is funded through the Federal Emergency Management Agency's (FEMA) FY14 Pre-Disaster Mitigation Competitive Grant Program (PDMC-PL-10-OR-2014-002). By developing this addendum to the Marion County HMP, locally adopting it, and having it approved by FEMA, the City of Aumsville will gain eligibility for FEMA Hazard Mitigation, Pre-Disaster Mitigation, and Flood Mitigation Assistance grant program funds. The Marion County HMP, and Aumsville addendum, are the result of a collaborative effort between citizens, public agencies, non-profit organizations, the private sector, and regional organizations. A project steering committee guided the process of developing the plan. For more information on the composition of the steering committee see the Acknowledgements, Plan Summary, and Plan Process (Volume III, Appendix B). The Aumsville City Administrator is the designated local convener of this addendum.The Convener will take the lead in implementing, maintaining, and updating the addendum to the HMP in collaboration with Marion County Emergency Management. Representatives from the City of Aumsville steering committee met formally on one occasion: October 12, 2016(see Appendix B for more information). Marion County HMP:Aumsville March 2017 Page AM-1 24 The city's addendum reflects decisions decided upon at the plan update meeting and during subsequent work and communication with OPDR. The City of Aumsville Steering Committee is comprised of representatives from the following departments: • Convener, City Administrator • Police representative • Fire representative • Public Works Director • School District • Marion County Emergency Management (as necessary) • Marion County Public Works representative (as necessary) Aumsville used multiple approaches to engage the public. First, the City established steering committee representatives from across the city. Next, the city actively participated in countywide community engagement activities described in Volume I, Section 4 and in Appendix B. City staff also presented the draft plan to the City Council during an open public council session.The Steering Committee was closely involved throughout the development of the plan and served as the local oversight body for the plan's development. In addition, community members outside of the steering committee were provided an opportunity for comment via the plan review process (see Appendix B for more information). The Marion County HMP was approved by FEMA on [Month] [Day],2017 and the Aumsville addendum was adopted via resolution on [Month] [Day],2017.This HMP is effective through [Month] [Day],2022. Mitigation Strategy This section of the HMP addendum addresses 44 CFR 201.6(c)(3(iv), Mitigation Strategy. During the 2016 Marion County and Aumsville update process, OPDR and a representative from Marion County Emergency Management assisted the steering committee with developing mitigations that will meet Aumsville's unique situation.The proposed actions were then re-reviewed by the steering committee to finalize. Aumsville developed a list of priority actions (Appendix A-1), any actions that were not prioritized were placed in the Action Item Pool (Appendix A-2)and will be considered during the semi-annual meetings. Priority Actions The city is listing a set of high priority actions in an effort to focus attention on an achievable set of high leverage activities over the next five-years.The city's priority actions are listed in Table AM-1 on the following page. Action Item Pool Table AM-2 on the following pages presents a pool of mitigation actions.This expanded list of actions is available for local consideration as resources, capacity, technical expertise and/or political will become available. Page AM-2 March 2017 Marion County HMP 25 Table AM-I. Aumsville Priority Action Items Action Coordinating Partner Hazard Action Item �� Timeline Item ID Organization Organizations 21 w, .:• P-1 Flood Remove culvert on 1st and Gordon and replace with a bridge. Public Works City Short-Term Administration/ P-2 Flood Upsize culverts on Bishop Rd. Public Works City Short-Term Administration/ Create an agreement for flood mitigation along Beaver Creek and Mill Creek/Highberger Ditch(agreement would have to be regional). Aumsville could do the following: Public Works, State P-3 Flood *Use city property as a water detention space City Administration Ongoing *Increase the detention capacity to accommodate effects of new Representatives, regional partners development *Update the Stormwater Mangement Plan Assess the seismic vulnerability of the City's reservoir(as described in City Short-Term/Long P-4 Earthquake Public Works Administration/ the 2015 Water Plan). Retrofit facility as funding becomes available. Term City Council Source:City of Aumsville HMP Steering Committee,2016. Marion County HMP March 2017 Page AM-3 26 Table AM-2. Aumsville Action Item Pool Action coordinating Partner Hazard Action Item �� � � Timeline Item ID pj pj Organization Organizations io��lw, llll�l��lll Develop memorandum of understanding with the gas station that MH-1 Multi-Hazard City Administration Short-Term gives emergency services first access to station's stored fuel. Update the City's Emergency Operations Plan.Important components to include are: Police Chief and City MH-2 Multi-Hazard *A list of vulnerable populations staff Marion Co. Short-Term *Fuel management and access plan *Detailed asset inventory Identify and purchase materials the City needs to operate MH-3 Multi-Hazard City Administration Police,Fire Short-Term successfully in an emergency situation. Develop a communications plan between the City,Police,and Fire. MH-4 Multi-Hazard This will include purchasing more radios so all key personnel can be Public Works Police,Fire Short-Term in contact during an emergency. Develop memoranda of understanding with facilities that could MH-5 Multi-Hazard City Administration Red Cross Long-Term function as emergency shelters during a hazard event. Update the Aumsville Comprehensive Plan to reflect statewide land Mid-Willamette MH-6 Multi-Hazard City Administration Valley Council of Long-Term use Goal 7 language surrounding natural hazards. Governments Include emergency preparedness resources in the City's monthly MH-7 Multi-Hazard City Executive Office Marion Co. Ongoing newsletter. MH-8 Multi-Hazard Hold an annual preparedness fair. City Executive Office Ongoing MH-9 Multi-Hazard Participate in Maron County's MORE Agreement. City Administration Marion Co. Ongoing Develop stronger connections with the business community and MH-10 Multi-Hazard City Administration Businesses Ongoing encourage businesses to develop continuity of operations plans. 1 111 1 Partner with Marion County to support local agencies'training on DT-1 Drought Public Works Marion Co. Ongoing water conservation measures. DT-2 Drought Participate in Marion Co Drought Contingency Plan. Public Works Marion Co. Short-Term/ Ongoing Source:City of Aumsville HMP Steering Committee,2016. Page AM-4 March 2017 Marion County HMP 27 Table AM-2. Aumsville Action Item Pool (Continued) Action coordinating Partner Hazard Action Item Timeline Item ID Organization Organizations of w Complete seismic assessment on criticial facilities(water tower City EQ-1 Earthquake assessment currently underway).Retrofit facilities based on Public Works Administration/ Short-Term recommendations of the assessment. City Council EQ-2 Earthquake School seismic retrofitting action-need to talk to school district School District Business Oregon- Short-Term representative. IFA Purchase a 4-wheel drive vehicle that could provide transportation if EQ-3 Earthquake Public Works City Council Short-Term major access points to the city are not passable. Consider requiring new city facilities to exceed the minimum Marion Co. EQ-4 Earthquake City Council Building Long-Term structural requirements for seismic loading. Inspection EQ-5 Earthquake Install automatic shut-off valves in all city facilities that use natural public Works City Council Long-Term gas. EQ-6 Earthquake Develop dam inundation maps. Risk MAP Long-Term EQ-7 Earthquake Encourage residents to prepare and maintain 2-week survival kits. City Executive Office Marion Co. Ongoing EQ-8 Earthquake Send city employees to Marion County's ATC 20 training. City Administration Marion Co. Ongoing iI I II+ 1, FL-1 Flood Develop updated floodplain maps. Risk MAP Long-Term Host an educational event targeted at flood-vulnerable residents that City Executive FL-2 Flood provides information about participating in the National Flood Public Works Office Ongoing Insurance Program and other flood mitigation activities. I I 1u 1 11 11 .111 I 11 J I J I� 1�f�'"i�1�" '��llllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll SW-1 Severe Storm Require new development to put power lines underground. City Administration Short-Term SW-2 Severe Storm Encourage Pacific Power to underground lines as they are able. City Administration Ongoing Source:City of Aumsville HMP Steering Committee,2016. Marion County HMP March 2017 Page AM-5 28 Plan Implementation and Maintenance The City Council will be responsible for adopting the City of Aumsville addendum to the Marion County HMP.This addendum designates a convener and a coordinating body to oversee the development and implementation of action items. Because the city addendum is part of the county's multi-jurisdictional HMP, the city will look for opportunities to partner with the county.The city's steering committee will convene after adoption of the City of Aumsville addendum on an annual schedule; the county meets on a semi-annual basis.The City of Aumsville convener will participate in the Marion County HMP meetings and will report on city specific activities as appropriate.The steering committee will be responsible for identifying new risk assessment data, reviewing status of mitigation actions, identifying new actions, and seeking funding to implement the city's mitigation strategy(actions).The convener will also remain active in the county's implementation and maintenance process (see Volume I, Section 4 for more information). The city will utilize the same prioritization process as the county(See Volume I, Section 4: Plan Implementation and Maintenance and Volume IV, Appendix D: Economic Analysis of Hazard Mitigation Projects for more information). Implementation through Existing Programs Many of the Hazards Mitigation Plan's recommendations are consistent with the goals and objectives of the city's existing plans and policies. Where possible, the City of Aumsville will implement the HMP's recommended actions through existing plans and policies. Plans and policies already in existence have support from local residents, businesses, and policy makers. Many land-use, comprehensive, and strategic plans get updated regularly, allowing them to adapt to changing conditions and needs. Implementing the HMP's action items through such plans and policies increases their likelihood of being supported and implemented. The Aumsville Comprehensive Plan was first acknowledged by Oregon Land Conservation and Development Commission in 1977.The City most recently updated the entire plan, including updates to the Natural Hazards section, in December of 1999.1 The Aumsville Comprehensive plan (Chapter 5, Goal 7) calls out floods and seismic hazards as the two hazards likely to impact Aumsville.The plan does not mention landslide or wildfire in the natural hazards section (Chapter 5, Goal 7).The plan does contain a general goal "to protect life and property of area residents from natural disasters and hazards." In addition,the plan contains two specific policies related to the flood hazard and two related to seismic hazard. There are no other hazard-related policies listed.The City implements the plan through regulatory controls found in the Development Ordinance.The City first adopted the Development Ordinance in 1986 and has completed numerous updates since, with the most recent occurrence in May of 2016.2 1 Aumsville Comprehensive Plan (1999). Chapter 5: Resources. Goal 7: Natural Disasters and Hazards, p. 19-21; p. 24-25. 2 Ordinance No. 323. "An Ordinance establishing comprehensive planning regulations for the City of Aumsville, Oregon." http://www.aumsville.us/files/Ord-323--Dev-Reg-8-1_4o8kcgk2.pdf Page AM-6 March 2017 Marion County HMP 29 Aumsville also implements elements of the Comprehensive Plan related to natural hazards through the following Plans: • City of Aumsville Visioning Plan, August 2015, updated April 20163 • Aumsville Water Master Plan, April 20154 • City of Aumsville Transportation System Plan, October 20105 Continued Public Participation Keeping the public informed of the City's efforts to reduce the risk associated with future hazards events is important for successful plan implementation and maintenance.The City is committed to involving the public in the plan review and updating process.The City will add all-hazard mitigation activities to the City of Aumsville Visioning Plan which is reviewed monthly by the City Council.This will give the public an opportunity to remain aware of efforts surrounding mitigation and create a regular space for input. Also see Volume I, Section 4, for more information about the public input process for this Multi-Jurisdictional Hazards Mitigation Plan. Plan Maintenance The Marion County Multi-Jurisdictional Hazards Mitigation Plan and city addendum will be updated every five years in accordance with the update schedule outlined in the Disaster Mitigation Act of 2000. During the county plan update process, the city will also review and update its addendum.The convener will be responsible for convening the steering committee to address the questions outlined below. • Are there new partners that should be brought to the table? • Are there new local, regional, state, or federal policies influencing natural hazards that should be addressed? • Has the community successfully implemented any mitigation activities since the plan was last updated? • Have new issues or problems related to hazards been identified in the community? • Are the actions still appropriate given current resources? • Have there been any changes in development patterns that could influence the effects of hazards? • Have there been any significant changes in the community's demographics that could influence the effects of hazards? • Are there new studies or data available that would enhance the risk assessment? • Has the community been affected by any disasters? Did the plan accurately address the impacts of this event? 3 This document guides the City in day-to-day operations and is revisited regularly by the City Council. Related to natural hazards, the Plan includes goals and projects around water, sewer, street and storm drainage, police, public works, transportation, and emergency management. hftp://www.aumsville.us/files/April-2016-Visioning-Plan.pdf 4 http://www.aumsville.us/files/Aumsville-WMP.pdf 5 http://www.aumsville.us/files/Aumsville-TSP-ORD-603.pdf Marion County HMP March 2017 Page AM-7 30 These questions will help the steering committee determine what components of the mitigation plan need updating.The steering committee will be responsible for updating any deficiencies found in the plan. Risk Assessment This section of the HMP addendum addresses 44 CFR 201.6(b)(2) - Risk Assessment. In addition, this chapter can serve as the factual basis for addressing Oregon Statewide Planning Goal 7—Areas Subject to Natural Hazards.Assessing natural hazard risk has three phases: • Phase 1: Identify hazards that can impact the jurisdiction.This includes an evaluation of potential hazard impacts—type, location, extent, etc. • Phase 2: Identify important community assets and system vulnerabilities. Example vulnerabilities include people, businesses, homes, roads, historic places and drinking water sources. • Phase 3: Evaluate the extent to which the identified hazards overlap with, or have an impact on, the important assets identified by the community. The local level rationale for the identified mitigation strategies (action items) is presented herein, and within Section 2, Risk Assessment, and Appendix C, Community Profile.The risk assessment process is graphically depicted in Figure AM-1 below. Ultimately, the goal of hazard mitigation is to reduce the area of risk, where hazards overlap vulnerable systems. Figure AM-I. Understanding Risk Z S G S1 Understanding Risk Y � nx�m ortira�r.�vaiµ�r��aaww:�rr� 1�..5Ytl,B ��,1;. Natural ral In r l+ )W- Ablifty, n 16 r Yn'atlR4-"cu rd"tlXC°�+Y4�t�roals % j�j papoYttp1)04 uump it uON01Yu4�yr �// Exonga m0c,G "SMr"d"d '1 9'Wwrr1'.PNll;�rg"O"tktltl' Y Y r119; 1 tYi':arn�l lllttt tm*rh191dgato IRPrL aw R �a�r5,�'rtA,�C3`,�.CAra�x��a�"avtsi�^sJnw�r�'ar�Fyu�r�ra��stCJ� �is�rraarh�e?Ptal�aranc�a-rq,„,��t��{ Risk Assessment Approach A risk assessment is intended to provide the, "factual basis for activities proposed in the strategy to reduce loses from identified hazards."6 To complete the risk assessment, the 6 44 CFR 201.6(2)(i) Page AM-8 March 2017 Marion County HMP 31 HMP update team first updated the description, type, location and extent of each hazard. Next, the team updated the vulnerability information based on each hazard's potential impact on the community. The Marion County Basic Plan (Volume I, Section II) Risk Assessment describes in detail the methods used to assess risk. In summary, Marion County has prepared a Threat Hazard Identification and Risk Assessment as a formal annex to the Marion County Emergency Operation Plan.The assessment uses a method developed by BOLD Planning.This city addendum builds on the county level assessment to produce a similar assessment for the City of Aumsville.The assessment specifically examines: 1. Probability(frequency) of event 2. Magnitude of event 3. Expected warning time before event 4. Expected duration of event Refer to Page 2-4 of the Marion County Basic HMP for a description of the scoring values for each ranking category. Hazard Analysis The assessment identifies three levels of risk: High, Moderate and Low. High - High probability of occurrence; at least 50 percent or more of population at risk from hazard; significant to catastrophic physical impacts to buildings and infrastructure; major loss or potential loss of functionality to all essential facilities (hospital, police, fire, EOC and shelters). Moderate - Less than 50 percent of population at risk from hazard; moderate physical impacts to buildings and infrastructure; moderate potential for loss of functionality to essential facilities. Low- Low probability of occurrence or low threat to population; minor physical impacts. A summary of the risk assessment findings and rankings is presented in Table AM-3. 7 BOLD Planning is a consulting firm specializing in the development of actionable emergency plans. For more information, visit: http://www.boldplanning.com/ Marion County HMP March 2017 Page AM-9 32 Table AM-3. Hazard and Vulnerability Assessment Summary Warning- Local Planning CountyFlanning , Natural Hazard Probability - Maghitudo. Duration CPRE - Time Significance Significance Weight Factor 0.45 0.3 015 01 Earthquake* 4 4 4 4 4.00 Illogh V-Ilogh Severe Weather/Storm** 4 1 3 3 2.85 1 figh Flood 3 2 3 4 2.80 1 figh Drought 3 1 3 4 2.50 1figh Extreme Weather-High Temperature 3 1 2 4 2.35 Wildland Interface Fire 1 4 2 2 2.15 Dam or Levee Failure 1 2 4 4 2.05 Landslide 1 2 2 2 1.55 low I figh Volcanic Eruption 1 1 1 1 4 1 1.30 low Iow *Note:Earthquake probability listed to match county level analysis.See below for more detailed probability assessment. **Note:Includes tornado hazard Source: BOLD Planning Risk Assessment Method;Analysis by UO Community Service Center. Community Asset Identification This section provides information on city specific assets. For additional information on the characteristics of Aumsville, in terms of geography, environment, population, demographics, employment and economics, as well as housing and transportation see Volume III, Appendix C, Community Profile. Many of these community characteristics can affect how hazards impact communities and how communities choose to plan for all-hazard mitigation. Considering the city specific assets during the planning process can assist in identifying appropriate measures for hazard mitigation. Community Characteristics The city of Aumsville is located in Marion County, Oregon, southeast of Salem,just south of Hwy 22 at Exit 9. Aumsville is located in Oregon's Willamette Valley, which experiences a moderate climate. In August, the average high temperature is 80 degrees and the average low temperature is 52 degrees. Wintertime temperatures in January range from an average high of 47 degrees to an average low of 33 degrees.The average annual precipitation is 39.6 inches. Aumsville is bordered on the north by Beaver Creek and on the south by Mill Creek. Mill Creek has a small offshoot on the southeastern side of town called Highberger Ditch. Aumsville is almost completely flat. The Population Research Center at Portland State University lists Aumsville's 2015 population at 3,945.This represents a 26% increase from 2000. For more demographic information, refer to Appendix C. Economy Historically, Aumsville was an agricultural community.Although agriculture is still an important industry in the surrounding areas, almost three-quarters of the labor force in Aumsville are now employed in construction, services, and retail trade.a Median household a Business Oregon—Oregon Prospector. Total Employees by Major SIC (2016)for Aumsville, OR. hftp://oregon.zoomprospector.com/ Page AM-10 March 2017 Marion County HMP 33 income in Aumsville in 2014 was $50, 319. For more economic information, refer to Appendix C. Critical and Important Facilities Aumsville's critical and important facilities include the following: Transportation • Highway OR-22 (North Santiam Highway) • Shaw Hwy overpass on Hwy 22 • Aumsville Highway SE • Mill Creek Bridge on W. Stayton Rd. • Mill Creek Bridge on W end of Mill Creek Rd (this bridge hosts a fiber optic cable) • Beaver Creek Bridge on Aumsville Hwy Note: City of Aumsville is not responsible for any of these highways or bridges—they are all managed by Marion County or ODOT Energy • Electricity Source: Pacific Power o All transmission lines, no substations • Fuels used by the City: o City does not have a fuel station—fuel bought retail (note that the local fuel station probably does not have a back-up power source to pump gas from underground tanks) o City Hall back-up fuel: diesel generator for a well, City Hall/Police, and Fire Department—diesel will last for 24 hours o Public Works back-up fuel: 500 gallons of diesel, up to 1000 gallons of gas above ground—there are electric pumps now, but fuel could be manually pump if necessary o Wastewater Treatment Plan back-up fuel: diesel generator—diesel will last for 24 hours o Well site#1 back-up fuel: diesel generator—diesel will last for 24 hours • School District has propane and diesel back-up Water • Drinking water sources: o Reservoir—1 million gallons o Tower Well, located at 195 N. 5th St. (has back-up generator)—100,000 gallons o Boone Well #1, located at 1105 Main St. (has back-up generator) o Reservoir Well, located at 9313 Mill Creek Rd. o Boone Well #2, located at 1105 Main St. o Church Well, located at 675 Grizzly St. o Two water filters that will filter 3,000 gallons per day(pumped from surface water sources) • Wastewater Treatment Plant, 955 Olney St.: pond system Marion County HMP March 2017 Page AM-11 34 Communication • Water Tower, 195 N. 5th St.: hosts 4 cellular providers • Wastewater Treatment Plant, 955 Olney St.: hosts one cell tower(owned by a cellular provider)with a diesel generator with back-up fuel for 24 hours • Telephone (ground line) switching station, 980 Main St.: has a diesel generator with back-up fuel for 24 hours • City-owned vehicle mounted radios provide the ability to interconnect Police and Fire • Police and Fire can dispatch out of the Police and Fire stations • 1 amateur radio, located off of Cedar Lane Emergency Services • Police: o Police Department, 597 Main St. • Fire: Aumsville Rural Fire Protection District 0 490 Church St. o Shaw Station, 5604 Shaw Highway SE • Medical o Aumsville Medical Clinic, 205 Main St. (note this is really just a doctor's office) Cultural/Historical Resources • Old City Hall is the Historic Museum, 599 Main St. • Events that may have large crowds: o June: Emergency Preparedness fair/School Carnival o June—August, Mondays & Fridays: Kids summer parks program (run by the City) o August: Aumsville Corn Festival (10,000—12,000 attendance) o November: Saturday before Thanksgiving:Turkey Bingo (500-600 attendance) Functional and Access Needs (Vulnerable Populations) • Schools: o Aumsville Elementary School, 572 N. 11th St. (3 separate buildings) o Willamette Valley Baptist Church and School, 650 N. 1st St. o Kuntry Kids (Daycare), 200 Main St. • Lower-income areas: o S5 Ih St next to Mill Creek 0 111h St and Olney See hazard sections below and Section 2, Risk Assessment, for potential hazard vulnerabilities to these facilities. Page AM-12 March 2017 Marion County HMP 35 Hazard Characteristics Drought The characteristics of drought in Aumsville are the same for the county as a whole. Table AM-4. Drought Summary Hazard Drought Type Climatic Speed of Onset Slow Location Varies, County Wide Extent Moderate to Severe Drought* Prior Occurance Three>6 months duration since 1982 Probability _9% *Defined as between-2 and-4 on the National Resource Conservation Service (NRCS)Surface Water Supply Index(SWSI) Sources:Oregon NHMP;NRCS;analysis by OPDR The probability of drought in Aumsville is likely,the same as for the county as a whole.The City's water supply comes primarily from subsurface sources, making vulnerability to drought moderate. Overall,the planning significance of drought is moderate, slightly lower than the county. Volume I, Section 2, Risk Assessment, adequately describes the characteristics of drought hazards, as well as the location and extent of a potential event. Due to a cool, wet climate, past and present weather conditions have generally spared Marion County communities from the effects of drought. Governor Kate Brown declared a drought emergency for all of Marion County in September 2015. According Aumsville's 2015 Water Master Plan, Aumsville's five wells deposit water into a 1- million-gallon reservoir. Water is treated in the reservoir with chlorine and then distributed out via a booster pump station to water customers. In the future, water will receive additional filtration before entering the reservoir. The 2015 Water Master Plan includes a section on water conservation, including a list of exiting or proposed water conservation programs.The Plan also provides a Water Curtailment Plan with accompanying curtailment actions. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Earthquake The characteristics of both a crustal earthquake and a Cascadia Subduction Zone (CSZ) earthquake are similar to the county as a whole. Marion County HMP March 2017 Page AM-13 36 Table AM-5. Earthquake Summary Crustal Hazard Earthquake-Crustal Type Geologic Location Multiple active faults;Willamette Valley Speed of Onset Rapid Extent Very Strong to Severe shaking—500 yrs* Prior Occurance One over Magnitude 5 last 100 yrs** Probability Approximately 1%annual *DOGAMI HazVu;**PNSN-1993 Scotts Mills just north of Marion County Sources: DOGAMI-Oregon HazVu;Oregon NHMP;Pacific Northwest Seismic Network Table AM-6. Earthquake Summary Subduction Hazard Earthquake-Subduction Type Geologic Location Primarily west of the Cascades;CA- BC Speed of Onset Rapid Extent Catastrophic Prior Occurance One over Magnitude 9 last 500 yrs Probability Magnitude 9+is 7%- 12%over 50 yrs** *DOGAMI HazVu;**Oregon Natural Hazard Mitigation Plan,anlysis by Oregon Department ofGeologyand Mineral Industries. Sources: DOGAMI-Oregon HazVu;Oregon NHMP;Pacific Northwest Seismic Network Aumsville's probability for a Crustal Earthquake event is "possible" and their vulnerability to a Crustal Earthquake event is "limited".The county steering committee determined that the probability for a Cascadia Subduction Zone (CSZ) Earthquake event is "highly likely' and that the vulnerability to a Cascadia Earthquake event is "catastrophic".This hazard was not rated as distinct CSZ and crustal events in the previous HMP.There is one locally active fault within the Aumsville city limits, one crossing over on the far northwest corner of the town. Other active faults also exist about six miles to the northwest and west.The 1993 Scott Mills quake caused $28 million in damages to cities throughout Marion County. No damaging earthquake events occurred during the previous five years. Volume I, Section 2, Risk Assessment, adequately describes the characteristics of earthquake hazards, history, as well as the location and extent of a potential event. Generally, an event that affects the county is likely to affect Aumsville as well. Previous occurrences are well- documented within the county's plan, and the community impacts described by the county would generally be the same for Aumsville as well. Earthquake-induced damages are difficult to predict, and depend on the size, type, and location of the earthquake, as well as site-specific building and soil characteristics. Presently, it is not possible to accurately forecast the location or size of earthquakes, but it is possible to predict the behavior of soil at any particular site. In many major earthquakes, damages have primarily been caused by the behavior of the soil. Figure AM-2 shows that ground shaking in Aumsville for both crustal and subduction earthquakes are expected to be very strong. Page AM-14 March 2017 Marion County HMP 37 Figure AM-2. Active Faults and Expected Shaking or „ng Layers Curtcvatly Shrwwro 'LxPeckad Lartrn9-kc:Sh akirng. Severe PIP ❑ Strong Med—t, Iii f rill LQht Q F i i Source: Oregon HazVu:Statewide Geohazards Viewer(DOGAMI) The Aumsville steering committee identified liquefaction as a primary concern related to the earthquake hazard.The committee suggested conducing analysis of the city's critical facilities to understand how they will be impacted by earthquake.As a top priority identified in the 2015 Water Master Plan, the City would like to assess the seismic vulnerability of the 1-million-gallon reservoir that contains the City's entire drinking water supply. In 2007,the Department of Geology and Mineral Industries (DOGAMI) conducted a seismic needs assessment for public school buildings, acute inpatient care facilities, fire stations, police stations, sheriffs' offices, and other law enforcement agency buildings. Buildings were ranked for the "probability of collapse" due to the maximum possible earthquake for any given area.This report assigned a "low" probability of collapse to Aumsville's police station and rural fire protection district station.The report did not rate the probability of collapse for Aumsville Elementary School, originally built in 1910 and remodeled in 1987. In the future, the school district should conduct a seismic assessment to identify any structural issues that should be addressed to reduce potential for collapse. It is possible that after City employees attend the ATC 20 training, they may have the capacity and ability to help perform a preliminary assessment of the school facility. In an effort to prepare residents for a potentially devastating seismic event, the Aumsville Executive Office will begin to encourage residents to prepare 2-week survival kits through various outreach events. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Marion County HMP March 2017 Page AM-15 38 Flood Table AM-7. Flood Summary Hazard Flood Type Climatic Speed of Onset Slow to moderate Location Mapped flood zones,floodplain Extent Moderate to severe Prior Occurance Four significant events since 1964 Probability 1%annual within SFHA Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, describes the causes and characteristics of flooding hazards within the region. Aumsville's probability for riverine flood is likely and vulnerability to flood is critical. Portions of Aumsville have areas of flood plains (special flood hazard areas).These include areas along Mill Creek and the Highberger Ditch, and Beaver Creek(see Figure AM-3). Furthermore, other portions of Aumsville, outside of the mapped floodplains, are also subject to significant, repetitive flooding from local storm water drainage. Figure AM-3. Special Flood Hazard Area A"I i .Layers!Currently 51— W" _ iR.W Hazard :. _.. Type mid S.G—d Fbod Dtl to h\� Eff'.ct-FEMA IGO y Flr.d P.Ahlh—y FEMA Fain Y,Fh.d a Start.digutiaed Fl-d D7 U Q3 FEMA FII.nd'Cat. w Source: Oregon HazVu:Statewide Geohazards Viewer(DOGAMI) Historically, Aumsville has experienced major floods in 1996, around 2000, and in 2011. Since then, no major floods have affected the population, but Aumsville continues to experience regular localized flooding during the wet season. In particular, the steering Page AM-16 March 2017 Marion County HMP 39 committee noted issues along Bishop Road, 1St Street, and in the Highberger Ditch area.The steering committee also noted that Porter Boone and Mill Creek Parks often flood during the winter. According to the steering committee, many of the flooding issues affecting Aumsville can be attributed to poor ditch maintenance. National Flood Insurance Program (NFIP FEMA modernized the Aumsville Flood Insurance Rate Maps (FIRMS) in January of 2000.The table below shows that as of October 2016, Aumsville has 19 National Flood Insurance Program (NFIP) policies in force. Of those, 7 are for properties that were developed before development of the initial FIRM. Aumsville has not had any Community Assistance Visit (CAV) and is not a member of the Community Rating System (CRS).Table AM-8 shows that all of the flood insurance policies are for single-family residential structures.There have been no paid flood claims in Aumsville. The Community Repetitive Loss record for Aumsville identifies no Repetitive Loss Properties9 and no Severe Repetitive Loss Properties,o. Table AM-8. Flood Insurance Detail Marion County 2,067 1,239 1,614 115 105 232 97 0 Aumsville 1/19/2000 3/1/1979'- - "1 7 - 19 0 0 . 0 2' 0' Marion County $ 514,268,700 298 226 16 $ 5,732,543 11 2 - - AumsviRe 4,515,700 0, 01 4f ,,,,,,,, ,,,,,,,,, 0 0 N/A none Source: Information compiled by Department of Land Conservation and Development,October,2016. Please review the Risk Assessment(Volume 1,Section 2)for additional information on this hazard. 9 A Repetitive Loss(RL)property is any insurable building for which two or more claims of more than $1,000 were paid by the National Flood Insurance Program(NFIP)within any rolling ten-year period, since 1978.A RL property may or may not be currently insured by the NFIP. to A Severe Repetitive Loss(SRL)property is a single family property(consisting of 1 to 4 residences) that is covered under flood insurance by the NFIP and has incurred flood-related damage for which 4 or more separate claims payments have been paid under flood insurance coverage, with the amount of each claim payment exceeding $5,000 and with cumulative amount of such claims payments exceeding $20,000; or for which at least 2 separate claims payments have been made with the cumulative amount of such claims exceeding the reported value of the property. Marion County HMP March 2017 Page AM-17 40 Landslide Table AM-9: Landslide Summary Hazard Landslide Type Climatic/Geologic Speed of Onset Slow to rapid Location Waterways(banks)and transportation facilities Extent Minor Prior Occurance No major events Probability Low for minor events;less than 5%major events Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of landslides, and appropriately identifies previous landslide occurrences within the region. Aumsville has a relatively flat topography. Aumsville's probability for landslide is unlikely (which is lower than the county's rating) and their vulnerability to landslide is limited (which is also lower than the county's rating). Figure AM-4 shows that landslide risk in Aumsville is very low. Figure AM-4. Landslide Susceptibility Exposure Layers C—fitly Slnuuen _ i ,L-chide Rl—dl Landslide Susceptibility , Law-L-dslhdNiig Llrnhkely ❑ 'Mcd.n-ate-LexrdslllldBmg P—Ible Highs-Lt,dlsli&91 Likely V.1y High-Exisldivig LendsHde PI r m.s Rnu Source: _Oregon HazVu:Statewide Geohazards Viewer(DOGAMI) Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Page AM-18 March 2017 Marion County HMP 41 Volcano Table AM-10: Volcano Summary Hazard Volcano Type Geologic Speed of Onset Slow to rapid Location Cascade Mountains Extent Minor Prior Occurance One significant event since 1916(Mount St.Helens) Probability <1%annual Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, adequately describes AumsviIle's risk to volcanic events.The steering committee determined that the city's probability for volcanic event is unlikely and their vulnerability to volcano is negligible. The causes and characteristics of a volcanic event are appropriately described within the county's plan, as well as the location and extent of potential hazards. Previous occurrences are well-documented within the county's plan. Aumsville is very unlikely to experience anything more than volcanic ash during a volcanic event. When Mt. Saint Helens erupted in 1980, the city was not impacted. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Wildfire Table AM-1 I: Wildfire Summary Hazard Wildfire Type Climatic,Human Caused Speed of Onset Moderate to rapid Location Outside city limit Extent Minor to moderate Prior Occurance No history inside city limit Probability <1%annual Sources: Marion County NHMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of wildfires, as well as the county and city's history of wildfire events.The City's probability for wildfire is unlikely and the vulnerability to wildfire is limited.Aumsville is surrounded on all sides by open farmland and waterways, and there are no forests within the city limits. Due to its location, Aumsville faces minimal risk of experiencing wildfires.There is no history of wildfire events in Aumsville. The County updated the Community Wildfire Protection Plan in 2016 and Aumsville is not listed as a "Community at Risk." Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Marion County HMP March 2017 Page AM-19 42 Severe Weather Table AM-12: Severe Weather Summary Hazard Severe Weather/Storm Type Climatic Speed of Onset Slow to moderate Location Countywide Extent Minor to severe Minor events occur annually;—30 moderate to severe Prior Occurance events countywide over the past 130 years 100%for minor events,23%for moderte to severe Probability events Sources: Marion County NHMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of windstorms and severe winter storms, as well as the location and extent of these hazards. Aumsville's probability for windstorm and severe winter storms is highly likely and vulnerability is critical. Significant wind events occur in Aumsville each year, sometimes interrupting services, downing trees, and causing power outages. In December 2010, a tornado touched down in Aumsville, causing around $1.2 million dollars in damage.11 Since this event, Aumsville has not experienced wind events that were quite as severe. Because windstorms typically occur during winter months,they are sometimes accompanied by ice, freezing rain, flooding, and very rarely, snow. Severe winter storms can consist of rain, freezing rain, ice, snow, cold temperatures, and wind.They originate from troughs of low pressure offshore that ride along the jet stream during fall,winter, and early spring months. Severe winter storms affecting Aumsville typically originate in the Gulf of Alaska or in the central Pacific Ocean.These storms are most common from November through March. Major winter storms can and have occurred in the Aumsville area, and while they typically do not cause significant damage, they are frequent and have the potential to impact economic activity. During a storm in the winter of 2012-13,the steering committee reported that residents experienced power outages for 4 days, accompanied by numerous downed tree limbs.The most recent winter storms (December 2016—January 2017) included snow and ice and resulted in transportation and power interruptions combined with government office and school closures. A disaster declaration is currently pending. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. 11 Joseph Rose (2010). "Aumsville Tornado: `Amazingly, no one was seriously hurt."' The Oregonian. http://www.oregonlive.com/weather/index.ssf/2010/12/aumsville tornado_amazingly_no.html Page AM-20 March 2017 Marion County HMP 43 CITY OF AURORA ADDENDUM Purpose This document serves as the City of Aurora's Addendum to the Marion County Multi- Jurisdictional Hazards Mitigation Plan (MHMP, HMP). This addendum supplements information contained in Volume I (Basic Plan) of this HMP.The Basic Plan serves as the foundation for this jurisdiction's addendum. Volume III (Appendices) provides additional information (particularly regarding participation and mitigation strategy).This addendum meets the following requirements: • Multi-jurisdictional Plan Adoption §201.6(c)(5), • Multi-jurisdictional Participation §201.6(a)(3), • Multi-jurisdictional Mitigation Strategy§201.6(c)(3)(iv), and • Multi-Jurisdictional Risk Assessment§201.6(c)(2)(iii). Plan Process, Participation, and Adoption This section of the HMP addendum addresses 44 CFR 201.6(c)(5), Plan Adoption, and 44 CFR 201.6(a)(3), Participation. In the summer and fall of 2016, the Oregon Partnership for Disaster Resilience (OPDR) at the University of Oregon's Community Service Center (CSC) partnered with the Oregon Military Department's Office of Emergency Management(OEM), and Marion County cities, including Aurora, to update their addendum to the Marion County HMP, which expired July 8, 2016. This project is funded through the Federal Emergency Management Agency's (FEMA) FY14 Pre-Disaster Mitigation Competitive Grant Program (PDMC-PL-10-OR-2014-002). By developing this addendum to the Marion County HMP, locally adopting it, and having it approved by FEMA, the City of Aurora will gain eligibility for FEMA Hazard Mitigation, Pre- Disaster Mitigation, and Flood Mitigation Assistance grant program funds. The Marion County Multi-Jurisdictional HMP, and Aurora addendum, are the result of a collaborative effort between citizens, public agencies, non-profit organizations, the private sector, and regional organizations. A project steering committee guided the process of developing the plan. For more information on the composition of the steering committee see the Acknowledgements, Plan Summary, and Plan Process (Volume III, Appendix B). The Aurora City Recorder is the designated local convener of this addendum.The Convener will take the lead in implementing, maintaining, and updating the addendum to the HMP in collaboration with Marion County Emergency Management. Representatives from the City of Aurora steering committee (including representatives from the North Marion School District) met formally on one occasion: October 12, 2016(see Appendix B for more information). The city's addendum reflects decisions decided upon at the plan update meeting and during subsequent work and communication with OPDR. Marion County HMP:Aurora March�V17 Page AR-1 The City of Aurora Steering Committee is comprised of representatives from the following departments: • Convener, City of Aurora City Recorder • City of Aurora Administrative Assistant • City of Aurora Wastewater Treatment Plant Operator • City of Aurora Finance Officer • Marion County Sheriff • Fire Chief, Aurora Rural Fire Protection District • North Marion School District—Public/Private Schools K-12 • Marion County Emergency Management Representative (as necessary) • American Red Cross Representative • CenturyTel Representative • Willamette Broadband Representative Aurora used multiple approaches to engage the public. First,the City established steering committee representatives from across the city. Next,the city actively participated in countywide community engagement activities described in Volume I, Section 4 and in Appendix B. City staff also presented the draft plan to the City Council during an open public council session.The Steering Committee was closely involved throughout the development of the plan and served as the local oversight body for the plan's development. In addition, community members outside of the steering committee were provided an opportunity for comment via the plan review process (see Appendix B for more information). The Marion County HMP was approved by FEMA on [Month] [Day], 2017 and the Aurora addendum was adopted via resolution on [Month] [Day], 2017.This HMP is effective through [Month] [Day], 2022. Mitigation Strategy This section of the HMP addendum addresses 44 CFR 201.6(c)(3(iv), Mitigation Strategy. During the 2016 Marion County and Aurora update process, OPDR and a representative from Marion County Emergency Management assisted the steering committee with developing mitigations that will meet Aurora's unique situation.The proposed actions were then re-reviewed by the steering committee to finalize. Aurora developed a list of priority actions (Appendix A-1), any actions that were not prioritized were placed in the Action Item Pool (Appendix A-2) and will be considered during the annual meetings. For a status update on each of Aurora's 2009 mitigation actions, see Appendix A-2. Priority Actions The City is listing a set of high priority actions in an effort to focus attention on an achievable set of high leverage activities over the next five-years.The City's priority actions are listed in Table AR-1 on the following page. Action Item Pool Table AR-2 on the following pages presents a pool of mitigation actions.This expanded list of actions is available for local consideration as resources, capacity,technical expertise and/or political will become available. Page AR-2 March 4917 Marion County HMP Table AR-1. Aurora Priority Action Items Action Coordinating Partner Hazard Action Idem Timeline Item ID Organization Organizations Create and publicize alternative transportation routes in the event of P-1 Multi-Hazard City Planner Public Works Short-Term road closures. Seek funding to further assess the"probability of collapse"for North N. Marion School P-2 Earthquake Short-Term Marion High School. District Work with the Salem Red Cross to identify potential shelters within Administrative P-3 Earthquake the city.Create MOUS and partner with Red Cross to make it official. City Recorder Assistant Short Term Identify backup power needs and acquire new backup generators N. Marion School P-4 Windstorm (not propane)for the School District(which serves as the Emergency District Short-Term Shelter). Acquire emergency backup generators for all critical facilities Administrative P-5 Windstorm (including City Hall and 2 wells). Do not purchase generators fueled Public Works Assistant Short-Term by propane. Source:City of Aurora HMP Steering Committee,2016. Marion County HMP March 2017 Page AR-3 46 Table AR-2. Aurora Action Item Pool Action Coordinating Partner Hazard Action teem ' Timeline Item ID Organization Organizations 1 4illaw, 1��� mffiffiffiw�l City of Aurora,N. Short-Term/ MH-1 Multi-Hazard Publicize and sign residents up for the reverse 911 system. Fire District Marion School Ongoing District MH-2 Multi-Hazard Publicize/educate residents about signing up for the Aurora Alerts City Recorder Administrative Short-Term/ email system/expand to include text and social media. Assistant Ongoing Expand the emergency communication system to include text and N. Marion School MH-3 Multi-Hazard Short-Term social media. District MH-4 Multi-Hazard Build relationships with sister counties/jurisdictions/districts and City Recorder N. Marion School Long-Term/ create mutual aid agreements. District Ongoing MH-5 Multi-Hazard Partner with private sector and create mutual aid agreements. City Recorder N. Marion School Long-Term/ District Ongoing Develop amulti-agency emergency response team for northern Marion County N. Marion School MH-6 Multi-Hazard Marion Co. District Emergency Short-Term Management 1 1J DT-1 Drought Update the Water Conservation Plan. Public Works City Planner Long-Term Partner with Marion County to support agencies'determination of DT-2 Drought locations for additional aquifer studies that might lead to greater City Council Marion County Long-Term water supplies and help determine funding sources for the studies. ! I 1 1 1 11 ��1 'IIY��������������������������������Jlllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111J1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111m EQ-1 Earthquake Send city employees to the County's ATC 20 training. Public Works City Recorder Short-Term/ Ongoing Encourage reduction of nonstructural and structural earthquake Administrative EQ-2 Earthquake hazards in homes,schools,businesses,and government offices City Recorder Ongoing Assistant through public education. EQ-3 Earthquake Seek funding to further assess the`probability of collapse'for Aurora Public Works City Recorder Long-Term City Hall. EQ-4 Earthquake Continue to run earthquake drills. N. Marion School Ongoing District Encourage residents to prepare and maintain 2-week survival kits. City Recorder/ N. Marion School Short-Term/ EQ-5 Earthquake Publicize through City newsletter,website,and the resilience and Administrative District Ongoing preparedness trainings the School District is creating. Assistant Source:City of Aurora HMP Steering Committee,2016. Page AR-4 March 2017 Marion County HMP 47 Table AR-2. Aurora Action Item Pool (Continued) Action Coordinating Partner Hazard Action Item Timeline Item ID Organization Organizations WA I 1 FL-1 Flood Create a Stormwater Master Plan. Public Works City Planner Long-Term Continue compliance with the National Flood Insurance Program FL-2 Flood Public Works Ongoing through the enforcement of local floodplain ordinances. FL-3 Flood Identify strategies for mitigating and/or preventing flooding from Public Works Long-Term/ impacting the city's wastewater lagoon system. Ongoing Work with property owners who regularly experience flooding along FL-4 Flood Public Works Long-Term the Pudding River to mitigate their risks. i I�J���y�y ��� IIJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ� � IJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ 1�Ir fi�r�irr,�i Iri�ilNl>H»�it���������������������������������������lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll����������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������llllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll SW-1 Severe Storm Educate citizens about ways to weatherize their homes,as well as City Recorder Administrative Short-Term/ safe emergency heating equipment. Assistant Ongoing Support/encourage electrical utilities to use underground SW-2 Windstorm construction methods where possible to reduce power outages from Public Works Ongoing windstorms. Review code and revise to require new developments to SW-3 Windstorm City Planner City Recorder Long-Term underground utilities if requirement doesn't currently exist. Outreach to PGE about undergrounding power lines that run along N. Marion School SW-4 Windstorm Short-Term Grim(serving the School District). District I�i��i� �' llllllllllllllllllllllllllllllllllllllll>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>l>1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 Outreach to residents on the hillside at the end of 4th Street adjacent WF-1 Fire Fire District Short-Term to Pudding River about performing fuel reduction projects. Check with the fireworks storage facility at the end of Ottaway to WF-2 Fire Fire District Short-Term make sure they have a safety plan. Source:City of Aurora HMP Steering Committee,2016. Marion County HMP March 2017 Page AR-5 48 Plan Implementation and Maintenance The City Council will be responsible for adopting the City of Aurora addendum to the Marion County HMP.This addendum designates a convener and a coordinating body to oversee the development and implementation of action items. Because the city addendum is part of the county's multi-jurisdictional HMP, the city will look for opportunities to partner with the county.The city's steering committee will convene after adoption of the City of Aurora addendum on an annual schedule (in late-July or early-August before the school year begins);the county meets on a semi-annual basis.The City of Aurora convener will participate in the Marion County HMP meetings and will report on city specific activities as appropriate.The steering committee will be responsible for identifying new risk assessment data, reviewing status of mitigation actions, identifying new actions, and seeking funding to implement the city's mitigation strategy(actions).The convener will also remain active in the county's implementation and maintenance process (see Volume I, Section 4 for more information). The city will utilize the same prioritization process as the county(See Volume I, Section 4: Plan Implementation and Maintenance and Volume IV, Appendix D: Economic Analysis of Hazard Mitigation Projects for more information). In the near future,the City of Aurora would like to transition to updating the city addendum via a North Marion County Coordinating Board, which will include members of the current steering committee, in addition to representatives from surrounding communities. When first formed, the North Marion County Coordinating Board will meet two to three times to establish relationships and a mission, and thereafter meet once or twice per year. By bringing together representatives from multiple jurisdictions and agencies, the North Marion County Coordinating Board aims to better align mitigation actions that will benefit the entire region. Implementation through Existing Programs Many of the Hazards Mitigation Plan's recommendations are consistent with the goals and objectives of the city's existing plans and policies. Where possible, the City of Aurora will implement the HMP's recommended actions through existing plans and policies. Plans and policies already in existence have support from local residents, businesses, and policy makers. Many land-use, comprehensive, and strategic plans get updated regularly, allowing them to adapt to changing conditions and needs. Implementing the HMP's action items through such plans and policies increases their likelihood of being supported and implemented. Aurora's Comprehensive Plan: 2009—2029 was first acknowledged by the Oregon Land Conservation and Development Commission in 1980.The City most recently updated the entire plan, including updates to the Natural Hazards section, in November of 2009.1 The Aurora Comprehensive Plan (Part V, Section B(4)) calls out floods, soil instability, and earthquakes as the hazards likely to impact Aurora.The plan does not mention directly 1 Aurora Comprehensive Plan (2009). Ordinance 458. Part V: Resources, Section B(4), p. 71-72. Part IX: Policies, Section G: Natural Hazards(Goal 7), p. 91-92. Page AR-6 March 2017 Marion County HMP 49 mention drought, severe storms, or wildfire in the natural hazards sections.The plan does contain a general objective "to protect life and property from natural hazards due to flood or landslides." In addition, the plan contains two policies and three implementing actions. The policies prohibit development within the 100-year flood plain and require special consideration for structures that will be built on slopes.The City implements the plan through regulatory controls found in the Land Development Ordinance.The City's latest update to the Land Development Ordinance occurred in December of 2016.2 Aurora also implements elements of the Comprehensive Plan related to natural hazards through the following Plans: • City of Aurora Transportation System Plan, updated in 2009 • City of Aurora Water System Master Plan, updated in March 2009 • City of Aurora Water Management and Conservation Plan, updated in June 2009 Continued Public Participation Keeping the public informed of the City's efforts to reduce the risk associated with future hazard events is important for successful plan implementation and maintenance.The city is committed to involving the public in the plan review and updated process. See Volume I, Section 4,for more information. Plan Maintenance The Marion County Multi-Jurisdictional Hazards Mitigation Plan and city addendum will be updated every five years in accordance with the update schedule outlined in the Disaster Mitigation Act of 2000. During the county plan update process,the City will also review and update its addendum.The convener will be responsible for convening the steering committee to address the questions outlined below. • Are there new partners that should be brought to the table? • Are there new local, regional, state, or federal policies influencing natural hazards that should be addressed? • Has the community successfully implemented any mitigation activities since the plan was last updated? • Have new issues or problems related to hazards been identified in the community? • Are the actions still appropriate given current resources? • Have there been any changes in development patterns that could influence the effects of hazards? • Have there been any significant changes in the community's demographics that could influence the effects of hazards? • Are there new studies or data available that would enhance the risk assessment? • Has the community been affected by any disasters? Did the plan accurately address the impacts of this event? 2 Ordinance No. 484. "Title 16: Land Development."http://www.ci.aurora.or.us/images/stories/amc- pdf/or-a u rora-t16a.pdf Marion County HMP March 2017 Page AR-7 50 These questions will help the steering committee determine what components of the mitigation plan need updating.The steering committee will be responsible for updating any deficiencies found in the plan. Risk Assessment This section of the HMP addendum addresses 44 CFR 201.6(b)(2) - Risk Assessment. In addition, this chapter can serve as the factual basis for addressing Oregon Statewide Planning Goal 7—Areas Subject to Natural Hazards.Assessing natural hazard risk has three phases: • Phase 1: Identify hazards that can impact the jurisdiction.This includes an evaluation of potential hazard impacts—type, location, extent, etc. • Phase 2: Identify important community assets and system vulnerabilities. Example vulnerabilities include people, businesses, homes, roads, historic places and drinking water sources. • Phase 3: Evaluate the extent to which the identified hazards overlap with, or have an impact on, the important assets identified by the community. The local level rationale for the identified mitigation strategies (action items) is presented herein, and within Section 2, Risk Assessment, and Appendix C, Community Profile.The risk assessment process is graphically depicted in Figure AR-1 below. Ultimately, the goal of hazard mitigation is to reduce the area of risk, where hazards overlap vulnerable systems. Figure AR-I. Understanding Risk Z S G S1 Understanding Risk Y � nx�m ortira�r.�vaiµ�r��aaww:�rr� 1�..5Ytl,B ��,1;. Natural ral In r l+ )W- Ablifty, n 16 r Yn'atlR4-"cu rd"tlXC°�+Y4�t�roals % j�j papoYttp1)04 uump it uON01Yu4�yr �// Exonga m0c,G "SMr"d"d '1 9'Wwrr1'.PNll;�rg"O"tktltl' YtntY Y r119; 1 tYi':Alli ty R s arn�l lllttt tm*rh191dgato IRPrL aw R �a�r5,�'rtA,�C3`,�.CAra�x��a�"avtsi�^sJnw�r�'ar�Fyu�r�ra��stCJ� �is�rraarh�e?Ptal�aranc�a-rq,„,��t��{ Risk Assessment Approach A risk assessment is intended to provide the, "factual basis for activities proposed in the strategy to reduce loses from identified hazards."s To complete the risk assessment, the s 44 CFR 201.6(2)(i) Page AR-8 March 2017 Marion County HMP 51 HMP update team first updated the description, type, location and extent of each hazard. Next, the team updated the vulnerability information based on each hazard's potential impact on the community. The Marion County Basic Plan (Volume I, Section II) Risk Assessment describes in detail the methods used to assess risk. In summary, Marion County has prepared a Threat Hazard Identification and Risk Assessment as a formal annex to the Marion County Emergency Operation Plan.The assessment uses a method developed by BOLD Planninga.This city addendum builds on the county level assessment to produce a similar assessment for the City of Aurora.The assessment specifically examines: 1. Probability(frequency) of event 2. Magnitude of event 3. Expected warning time before event 4. Expected duration of event Refer to Page 2-4 of the Marion County Basic HMP for a description of the scoring values for each ranking category. Hazard Analysis The assessment identifies three levels of risk: High, Moderate and Low. High - High probability of occurrence; at least 50 percent or more of population at risk from hazard; significant to catastrophic physical impacts to buildings and infrastructure; major loss or potential loss of functionality to all essential facilities (hospital, police, fire, EOC and shelters). Moderate - Less than 50 percent of population at risk from hazard; moderate physical impacts to buildings and infrastructure; moderate potential for loss of functionality to essential facilities. Low- Low probability of occurrence or low threat to population; minor physical impacts. A summary of the risk assessment findings and rankings is presented in Table AR-3. a BOLD Planning is a consulting firm specializing in the development of actionable emergency plans. For more information, visit: http://www.boldplanning.com/ Marion County HMP March 2017 Page AR-9 52 Table AR-3. Hazard and Vulnerability Assessment Summary Warning LocAf PEann€ng County Punning NituratHazard Probability Time Gvagitwde aeration' CPR[ Signtficahce" Signfficahce" Weight Factor 0.45 0.3 0.15 0.1 Earthquake* 4 4 4 4 4.00 11 uLglll I !!Ellll Severe Weather/Storm** 4 1 3 3 2.85 k..iiLglll Flood 3 2 3 4 2.80 k..iiLglll Drought 3 1 3 4 2.50 11 iiLglll Extreme Weather-High Temperature 3 1 2 4 2.35 Wildland Interface Fire 1 4 2 2 2.15 Dam or Levee Failure 1 2 4 4 2.05 Landslide 2 2 2 2 2.00 11 iifglll Volcanic Eruption 1 1 1 4 1.30 1 1u,W Iu,W *Note:Earthquake probability listed to match county level analysis.See below for more detailed probability assessment. **Note:Includes tornado hazard Source: BOLD Planning Risk Assessment Method;Analysis by UO Community Service Center. Community Asset Identification This section provides information on city specific assets. For additional information on the characteristics of Aurora, in terms of geography, environment, population, demographics, employment and economics, as well as housing and transportation see Volume III, Appendix C, Community Profile. Many of these community characteristics can affect how hazards impact communities and how communities choose to plan for natural hazard mitigation. Considering the city specific assets during the planning process can assist in identifying appropriate measures for natural hazard mitigation. Community Characteristics The city of Aurora is located in the Willamette Valley in Marion County, Oregon, approximately 23 miles south of the city of Portland. Aurora experiences a moderate climate with an average high temperature of 82 degrees and low of 54 degrees in August, and an average high temperature of 47 and low of 35 in January.5 The city receives an average annual precipitation of 40.67 inches.s Aurora is located on a gently sloping hill bordered by Mill Creek to the west and the Pudding River to the east. Surrounding the rural community is hilly farm and forest land. The Population Research Center at Portland State University lists Aurora's 2015 population at 950.This represents a 30% increase from 2000. For more demographic information, refer to Appendix C. Economy Historically, Aurora's economy focused on agriculture and manufacturing,which remain major employment sectors today.The city also has large heritage tourism component, which capitalizes on Aurora's history as a religious colony and large number of historic buildings dating to the 1850s. Aurora is also known as the "Antique Capital," and the city's 5 Weatherbase.com, "Aurora Oregon," http://www.weatherbase.com, accessed 2/21/17. s Western Regional Climate Center, "Aurora Oregon," http://www.wrcc.dri.edu/summary/Climsmor.html, accessed 2/21/17. Page AR-10 March 2017 Marion County HMP 53 downtown has several large antiques retailers which draw a number of visitors to the community. Median household income in Aurora in 2014 was $72,656. For more economic information, refer to Appendix C. Critical and Important Facilities Aurora's critical and important facilities include the following: Transportation • Two bridges provide primary access to the city from 1-5 and Hwy 99E: o Mill Creek Bridge (County-owned)—City sewer and water co-located o Pudding River Bridge (ODOT-owned) o If either collapsed, transportation in and out of the city would require lengthy detours. • Aurora State Airport, 22801 Airport Rd NE, Aurora • School district: contracts out bus service to Canby (diesel) • Canby CAT bus runs along Hwy 99E between Canby and Woodburn Note:Hwy 99E and Ehlen Rd are the only 2 entrances to town (if bridges are out, it would be difficult to get in and out). Note:Intersection of Ehlen Rd. and the railroad tracks is dangerous. Note: The wastewater treatment plant is across a bridge—in the event of a train derailment or bridge collapse, the wastewater treatment plant would not be accessible. Energy • PGE—electricity(all above ground lines) • NW Natural—natural gas • City gets fuel from Shell Station in town • Fire gets fuel from various gas stations • City Hall (21420 Main St.)would likely shut down without power, even if the building did withstand seismic activity. City Hall does not currently have a backup generator. • Fire Station (21390 Main St.) has a generator that would run the whole station. Generator runs on natural gas, but could also run on propane.The fire station does not keep reserves of natural gas or propane. Water • City Water and Wastewater: o Water treatment plant (14682 Ottaway Rd.)—Includes filtration system and a reservoir that treats water drawn from 5 city wells.Water from the treatment plant is then pumped back to residents. o Three city wells have generators, 2 do not, and there is 1 traveling diesel generator. o Wastewater treatment plant (21496 Mill Race Rd.)—Completed in 2001 with a maximum capacity of 2000 residents. Note:Sewer pump station is vulnerable to Mill Creek flooding events, and the wastewater treatment plant could be vulnerable as well. Note: The water tower in town does not have water,just communications. Marion County HMP March 2017 Page AR-11 54 • North Marion School District Water and Wastewater: o Two wells and a 355,000-gallon water tank with its own filtration system. This system is equipped with a propane back-up generator. Propane is stored in a 100-gallon above ground storage tank. o Sewer system, equipped with a propane back-up generator. Communication • City Communications: o The City has a server with a backup system, but the three hard drives with backed-up data are stored on-site. o All City records, including finances, utility billing records, payroll accounts, etc., are stored at City Hall. o Public Works has a cell phone but no radio capabilities. o Fire and Sheriff have radio communications with each other. • Water Tower (this is actually a communications tower; it does not hold water): o The Fire District has their communications located on the water tower.They also have a backup generator. o The Sheriff has communications equipment located on the water, but it is currently turned off. o Three cell phone companies—Verizon, Sprint, AT&T—use the water tower and they all have backup generators. • North Marion School District: o The School District has a radio connection with the County and other emergency responders, along with emergency backup power. Emergency Services • Police: o Located at City Hall (21420 Main St.)—the Marion County Sheriff provides police services. • Fire: Aurora Fire District o Located at 21390 Main S. o The building is in the process of seismic upgrades (about 90%complete). • Medical (none in Aurora): o Woodburn and Canby have immediate care facilities (Providence in Canby— sometimes not staffed by doctors, Legacy in Woodburn) o Meridian Park Hospital in Tualatin o Willamette Falls Hospital in Oregon City o Silverton Hospital in Silverton o Providence Medical Center in Newberg o Salem General Hospital o Ambulance is out of Woodburn, secondary out of Canby, third out of Wilsonville or Tualatin Cultural/Historical Resources • Historic district encompasses 150 acres of the city and includes buildings and historic sites, including the Aurora Old Colony Historical Museum (1538 2nd St.). • Events that may have large crowds: Page AR-12 March 2017 Marion County HMP 55 o City Hall—court held here Wednesdays every 3 months; monthly 3 evening meeting held o American Legion Hall: church services on Sundays o Aurora Presbyterian Church &Christ Lutheran Church: services on Sundays o McLaren Auction House: some evening events o Aurora Historical Museum: Colony Hand Spinners Guild in March and Strawberry Social in June o Mothers' Day weekend: wine and chocolate walk o August: Aurora Colony Days Festival—biggest event of the year with a couple thousand visitors o Summer: Music in the Park on Wednesday nights o School District events Functional and Access Needs (Vulnerable Populations • Schools: o North Marion Primary School o North Marion Middle School o North Marion Intermediate School o North Marion High School 0 2,000 students and 250 staff on the 55-acre North Marion School District property(20246 Grim Rd.) • Lower-income areas: o Deer Creek Trailer Park(southwest of the airport) o Walnut St. and Filbert St. Note:Aurora is a retirement community, so there may be residents with special medical needs. See hazard sections below and Section 2, Risk Assessment, for potential hazard vulnerabilities to these facilities. Hazard Characteristics Drought The characteristics of drought in Aurora are the same for the county as a whole. Marion County HMP March 2017 Page AR-13 56 Table AR-4. Drought Summary Hazard Drought Type Climatic Speed of Onset Slow Location Varies, County Wide Extent Moderate to Severe Drought* Prior Occurance Three>6 months duration since 1982 Probability —9% *Defined as between-2 and Aon the National Resource Conservation Service (NRCS)Surface Water Supply Index(SWSI) Sources:Oregon NHMP; NRCS;analysis by OPDR The probability of drought in Aurora is likely, the same as for the county as a whole.The City's water supply comes primarily from subsurface sources, making vulnerability to drought moderate. Overall,the planning significance of drought in Aurora is moderate. Volume I, Section 2, Risk Assessment, adequately describes the characteristics of drought hazards, as well as the location and extent of a potential event. Due to a cool, wet climate, past and present weather conditions have generally spared Marion County communities from the effects of drought. According to the steering committee, Aurora has twice implemented their water curtailment ordinance,first in 2010 and then in 2014. Governor Kate Brown declared a drought emergency for all of Marion County in September 2015. Aurora has five wells that send water through a filtration system and into a reservoir, located on Ottaway Rd. Water from the reservoir is then pumped back to residential and commercial customers in Aurora. Aurora has a Water Management and Conservation Plan, last update in 2009.The Plan will be updated again soon to more directly address drought issues.The City also has a water curtailment ordinance. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Earthquake The characteristics of both a crustal earthquake and a Cascadia Subduction Zone (CSZ) earthquake are similar to the county as a whole. Page AR-14 March 2017 Marion County HMP 57 Table AR-5. Earthquake Summary Crustal Hazard Earthquake-Crustal Type Geologic Location Multiple active faults;Willamette Valley Speed of Onset Rapid Extent Very Strong to Severe shaking—500 yrs* Prior Occurance One over Magnitude 5 last 100 yrs** Probability Approximately 1%annual *DOGAMI HazVu;**PNSN-1993 Scotts Mills just north of Marion County Sources: DOGAMI-Oregon HazVu;Oregon NHMP;Pacific Northwest Seismic Network Table AR-6. Earthquake Summary Subduction Hazard Earthquake-Subduction Type Geologic Location Primarily west of the Cascades;CA-BC Speed of Onset Rapid Extent Catastrophic Prior Occurance One over Magnitude 9 last 500 yrs Probability Magnitude 9+is 7%-12%over 50 yrs** *DOGAMI HazVu;**Oregon Natural Hazard Mitigation Plan,anlysis by Oregon Department of Geology and Mineral Industries. Sources: DOGAMI-Oregon HazVu;Oregon NHMP;Pacific Northwest Seismic Network Aurora's probability for a Crustal Earthquake event is "possible" and their vulnerability to a Crustal Earthquake event is "limited".The county steering committee determined that the probability for a Cascadia Subduction Zone (CSZ) Earthquake event is "highly likely' and that the vulnerability to a Cascadia Earthquake event is "catastrophic".This hazard was not rated as distinct CSZ and crustal events in the previous HMP.There are no locally active faults within the Aurora city limits.The nearest active fault runs northwest to southeastjust outside of Canby, about five miles away from Aurora.The 1993 Scott Mills quake caused $28 million in damages to cities throughout Marion County. No damaging earthquake events occurred during the previous five years. Volume I, Section 2, Risk Assessment, adequately describes the characteristics of earthquake hazards, history, as well as the location and extent of a potential event. Generally, an event that affects the county is likely to affect Aurora as well. Previous occurrences are well- documented within the county's plan, and the community impacts described by the county would generally be the same for Aurora as well. Earthquake-induced damages are difficult to predict, and depend on the size, type, and location of the earthquake, as well as site-specific building and soil characteristics. Presently, it is not possible to accurately forecast the location or size of earthquakes, but it is possible to predict the behavior of soil at any particular site. In many major earthquakes, damages have primarily been caused by the behavior of the soil. Figure AR-2 shows that ground shaking in Aurora and the North Marion School District's property for both crustal and subduction earthquakes are expected to be very strong. Marion County HMP March 2017 Page AR-15 58 Figure AR-2. Active Faults and Expected Shaking �II iEayers ICu[TEIN[ly 5hrn+m _ Awy, M Eartlatp.kE.H.-rd �1l a.r E.,.a.d Eert"q ke shl.khg n la Vtalelnt Severe Veo st—g E] o Source: _Oregon FlazVu:Statewide Geohazards Viewer(DOGAMI) The Aurora steering committee identified liquefaction as a primary concern related to the earthquake hazard.The committee indicated that many critical facilities and transportation routes might not withstand a high magnitude earthquake. In particular,the committee expressed concerns over City Hall, the two bridges in the north of town, and the North Marion High School.The committee identified mitigation efforts to address these vulnerabilities as "priority actions" in this plan. In 2007,the Department of Geology and Mineral Industries (DOGAMI) conducted a seismic needs assessment for public school buildings, acute inpatient care facilities, fire stations, police stations, sheriffs' offices, and other law enforcement agency buildings.? Buildings were ranked for the "probability of collapse" due to the maximum possible earthquake for any given area.This report assigned a "moderate" probability of collapse to Aurora's fire district station, which has since undergone seismic retrofits.The report assigned a "moderate" probability of collapse to Aurora's police department (located at City Hall).The report rated the schools owned by the North Marion School District as low, with the exception of North Marion High School, which received a high rating.The North Marion School District intends to perform a seismic assessment of the high school in the near future. In an effort to prepare residents for a potentially devastating seismic event, the Aurora City Recorder and Administrative Assistant will begin to encourage residents to prepare 2-week survival kits through various outreach events. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. 7 Lewis, Don (2007). "Statewide Seismic Needs Assessment: Implementation of Oregon 2005 Senate Bill 2 Relating to Public Safety, Earthquakes, and Seismic Rehabilitation of Public Buildings." Department of Geology and Mineral Industries, Open-File Report 0-07-02. Page AR-16 March 2017 Marion County HMP 59 Flood Table AR-7. Flood Summary Hazard Flood Type Climatic Speed of Onset Slow to moderate Location Mapped flood zones,floodplain Extent Moderate to severe Prior Occurance Four significant events since 1964 Probability 1%annual within SFHA Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, describes the causes and characteristics of flooding hazards within the region. Aurora's probability for riverine flood is likely and vulnerability to flood is critical. Portions of Aurora have areas of flood plains (special flood hazard areas).These include areas along Mill Creek and the Pudding River (see Figure AR-3). Historically, Aurora has experienced major floods in 1986, 1996, and in 2011 on the Pudding River. Since then, no major floods have affected the population, but Aurora continues to experience regular localized flooding during the wet season. According to the steering committee, properties along the Pudding River experience the most regular flooding. In these instances, structures are rarely affected. In the past, Mill Race Rd. (the gravel road leading to the Wastewater Treatment Plant) experienced flooding issues, but these issues have been resolved. Figure AR-3. Special Flood Hazard Area r� V IrypR L.V—C.—fly 5[ 1 J trl1A /F�H rAl Typo o d no©R Flood l Ma f Effective FEMA 100 Yr Flood FEMA 1007 Y,M.d S ., St.Ce D ti-d Flood DA QU FEMA Fd LYata ,' `r, j `• .•• J / F � r North Mr11Marion schools� y / _.. ti Source: Oregon HaZVU:Statewide Geohazards Viewer(DOGAMI) National Flood Insurance Program (NFIP� FEMA modernized the Aurora Flood Insurance Rate Maps (FIRMS) in January of 2000.The table below shows that as of October 2016, Aurora had 2 National Flood Insurance Program (NFIP) policies in force. Of those, 1 was for a property that was developed before Marion County HMP March 2017 Page AR-17 60 development of the initial FIRM. Aurora has not had any Community Assistance Visit(CAV) and is not a member of the Community Rating System (CRS).Table AR-8 shows that one flood insurance policy is for single-family residential structure and the other is for a 2-4 family residential structure.There have been no paid flood claims in Aurora. The Community Repetitive Loss record for Aurora identifies no Repetitive Loss Propertiesa and no Severe Repetitive Loss Properties9. Table AR-8. Flood Insurance Detail Marion County - - 2,067 1,239 1,614 115 105 232 97 0 Aurora 1/19/2000 6/5/1997 2 1 1 1 0 0 0 0 Marion County $ 514,268,700 298 226 16 $ 5,732,543 11 2 - - Aurora $ 700,000 0 0 0 $ - 0 0 N/A none Source: Information compiled by Department of Land Conservation and Development,October,2016. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Landslide Table AR-9: Landslide Summary Hazard Landslide Type Climatic/Geologic Speed of Onset Slow to rapid Location Waterways(banks)and transportation facilities Extent Minor Prior Occurance No major events Probability Low for minor events;less than 5%major events Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of landslides, and appropriately identifies previous landslide occurrences within the region. Aurora has a relatively flat topography. Aurora's probability for landslide is possible (which is lower than the county's rating) and their vulnerability to landslide is limited (which is also lower than the county's rating). Figure AR-4 shows that landslide risk in Aurora is low to a A Repetitive Loss(RL)property is any insurable building for which two or more claims of more than $1,000 were paid by the National Flood Insurance Program(NFIP)within any rolling ten-year period, since 1978.A RL property may or may not be currently insured by the NFIP. 9 A Severe Repetitive Loss(SRL)property is a single family property(consisting of 1 to 4 residences) that is covered under flood insurance by the NFIP and has incurred flood-related damage for which 4 or more separate claims payments have been paid under flood insurance coverage, with the amount of each claim payment exceeding $5,000 and with cumulative amount of such claims payments exceeding $20,000; or for which at least 2 separate claims payments have been made with the cumulative amount of such claims exceeding the reported value of the property. Page AR-18 March 2017 Marion County HMP 61 moderate in most populated areas, but moderate to high in other areas, particularly along Mill Creek and the Pudding River. Figure AR-4. Landslide Susceptibility Exposure LaideH—d ., PLsrnNsl de SWscsptllhkllttyf ❑ Low L­d0dmgi 43nik.y r' ❑ M©de t.-Lsndsrding Poasl11N. High-ILanidedid mpg Likely i ,• ;;,,, ,'" ;• ,,, J- ® Very HigR-Existting Lsndsllde North Marion Schools Source: _Oregon HazVu:Statewide Geohazards Viewer(DOGAMI) Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Volcano Table AR-10: Volcano Summary Hazard Volcano Type Geologic Speed of Onset Slow to rapid Location Cascade Mountains Extent Minor Prior Occurance One significant event since 1916(Mount St.Helens) Probability <1%annual Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, adequately describes Aurora's risk to volcanic events. The steering committee determined that the city's probability for volcanic event is unlikely and their vulnerability to volcano is negligible. The causes and characteristics of a volcanic event are appropriately described within the county's plan, as well as the location and extent of potential hazards. Previous occurrences are well-documented within the county's plan.Aurora is very unlikely to experience anything more than volcanic ash during a volcanic event. When Mt. Saint Helens erupted in 1980, the city was impacted only by falling ash. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Marion County HMP March 2017 Page AR-19 62 Severe Weather Table AR-1 I: Severe Weather Summary Hazard Severe Weather/Storm Type Climatic Speed of Onset Slow to moderate Location Countywide Extent Minor to severe Minor events occur annually;—30 moderate to severe Prior Occurance events countywide over the past 130 years 100%for minor events,23%for moderte to severe Probability events Sources: Marion County NHMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of windstorms and severe winter storms, as well as the location and extent of these hazards. Aurora's probability for windstorm and severe winter storms is highly likely (which is the same as the county's rating) and that their vulnerability is critical (which is lower than the county's rating). Significant wind events occur in Aurora each year, sometimes interrupting services, downing trees, and causing power outages. Since 1957, five reported tornadoes have struck Marion County—one of which occurred near Aurora on August 26, 1984.The tornado destroyed a machine shop and scattered its pieces over a half-mile area. More recently, windstorms in April 2010, May 2014, and July 2015 toppled trees in the Aurora Municipal Park, with one tree causing damage to a nearby house. Severe winter storms can consist of rain, freezing rain, ice, snow, cold temperatures, and wind.They originate from troughs of low pressure offshore that ride along the jet stream during fall,winter, and early spring months. Severe winter storms affecting Aurora typically originate in the Gulf of Alaska or in the central Pacific Ocean.These storms are most common from November through March. Major winter storms can and have occurred in the Aurora area, and while they typically do not cause significant damage, they are frequent and have the potential to impact economic activity. During a storm in April 2009, snow and ice caused City Hall to lose power for one day and debilitated the City's water tanks. During the winter of 2012-13,the steering committee reported that residents experienced power outages.These power outages also affected the pump stations used to transfer water to customers.The most recent winter storms (December 2016—January 2017) included snow and ice and resulted in transportation and power interruptions combined with government office and school closures.A state of emergency was declared on January 11 and a Presidential Disaster was declared for the State of Oregon on January 25, 2017. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Page AR-20 March 2017 Marion County HMP 63 Wildfire Table AR-12: Wildfire Summary Hazard Wildfire Type Climatic,Human Caused Speed of Onset Moderate to rapid Location Outside city limit Extent Minor to moderate Prior Occurance No history inside city limit Probability <1%annual Sources: Marion County NHMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of wildfires, as well as the county and city's history of wildfire events.The City's probability for wildfire is unlikely and the vulnerability to wildfire is limited (lower probability and vulnerability ratings than for the county). Due to Aurora's isolation from the majority of at- risk areas, Aurora is unlikely to be affected directly by wildfires. Should they occur nearby, however, the city could be affected by smoke, impacting people with respiratory problems, and potentially the elderly or very young. Although there is no history of wildfire events in Aurora, the steering committee identified the hillside above the Pudding River at the end of 4t"St. as a potential issue. As part of the action items for this plan, the committee wanted to reach out to the property owner to encourage fuel-reduction projects. The County updated the Community Wildfire Protection Plan in 2016 and Aurora is not listed as a "Community at Risk." Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Marion County HMP March 2017 Page AR-21 64 CITY OF DETROIT ADDENDUM Purpose This document serves as Detroit's Addendum to the Marion County Multi-Jurisdictional Natural Hazards Mitigation Plan (MNHMP, NHMP).This addendum seeks to supplement information contained in Volume I (Basic Plan) of this multi-jurisdictional NHMP which serves as the foundation for this jurisdiction's addendum and Volume III (Appendices)which provides additional information (particularly regarding participation and mitigation strategy).This addendum meets the following requirements: • Multi-jurisdictional Plan Adoption §201.6(c)(5), • Multi-jurisdictional Participation §201.6(a)(3), • Multi-jurisdictional Mitigation Strategy§201.6(c)(3)(iv), and • Multi-Jurisdictional Risk Assessment§201.6(c)(2)(iii). Plan Process, Participation, and Adoption This section of the NHMP addendum addresses 44 CFR 201.6(c)(5), Plan Adoption, and 44 CFR 201.6(a)(3), Participation. In the summer of 2016, the Oregon Partnership for Disaster Resilience (OPDR) at the University of Oregon's Community Service Center (CSC) partnered with Marion County and Santiam Canyon cities, including Detroit,to create the first region-specific NHMP. Part of the Santiam Canyon Regional Hazard Mitigation Plan (RHMP) required the creation of city addenda which would be adopted into the 2016 Marion County NHMP.This project is funded through the Federal Emergency Management Agency's (FEMA) FY14 Pre-Disaster Mitigation Competitive Grant Program (PDMC-PL-10-OR-2014-002). By developing this addendum to the Marion County NHMP, locally adopting it, and having it approved by FEMA, Detroit will gain eligibility for FEMA Hazard Mitigation, Pre-Disaster Mitigation, and Flood Mitigation Assistance grant program funds. The Marion County NHMP, and Detroit addendum, are the result of a collaborative effort between citizens, public agencies, non-profit organizations, the private sector, and regional organizations. A project steering committee guided the process of developing this addendum, and was composed of city staff, county representatives, and emergency service management. The Detroit city recorder is the designated convener of the NHMP and will take the lead in implementing, maintaining, and updating the addendum to the Marion NHMP in collaboration with the Santiam Canyon liaison for Marion County Emergency Management. Representatives from the City of Detroit steering committee, along with Marion County Emergency Manager Ed Flick, had a formal discussion on one occasion: October 14, 2016, but Detroit NHMP Addenda November 2016 Page PA-1 65 also communicated electronically throughout the creation of this document.The city's addendum reflects decisions decided upon at the plan update meeting and during subsequent work and communication with OPDR. The Detroit Steering Committee was comprised of the following representatives: • Christine Pavoni; City Recorder, Detroit • Robert Bruce; Certified Water Technician, Detroit • Kathleen Silva; Santiam Canyon Liaison, Marion County Public participation was achieved with the establishment of the steering committee, which was comprised of city officials and county representatives. The Steering Committee was closely involved throughout the development of the plan and served as the local oversight body for the plan's development. In addition, community members outside of the steering committee were provided an opportunity for comment via the plan review process. The Marion County NHMP was approved by FEMA on [Month] [Day],2017 and the Detroit addendum was adopted via resolution on [Month] [Day],2017.This NHMP is effective through [Month] [Day],2022. Mitigation Strategy This section of the NHMP addendum addresses 44 CFR 201.6(c)(3(iv), Mitigation Strategy. During 2016, Marion County and OPDR evaluated the Action Items set by the county and their particular relevance to the Santiam Canyon region. Following the review, actions with relevance to the region were added into the RHMP, noting what accomplishments had been made, and whether the actions were still relevant; any new action items were identified at this time. Detroit developed a list of priority actions (Table A-1), any actions that were not prioritized were placed in the Action Item Pool (Table A-2) and will be considered during the semi-annual meetings. Priority Actions The city is listing a set of high priority actions in an effort to focus attention on an achievable set of high leverage activities over the next five-years.The city's priority actions are listed below in the following table. Detailed implementation information for each action is listed in within (Table A-1). Action Item Pool This expanded list of actions is available for local consideration as resources, capacity, technical expertise and/or political will become available. Many actions carry forward from prior versions of the Marion County NHMP and other local planning documents including the Community Wildfire Protection Plan, Drought Contingency Plan, and Mid-Willamette Economic Development study. Page PA-2 November 2016 Detroit NHMP Addenda 66 (Table A-1) Detroit Priority Action Items r� u i ,rr r r r r , (II llr , i r r .i f l l 11 1 1 1 11 11>t 1 111 11 1 � r t 11 � , rr I 11 r ii 1 r 11 ri 1 l I 1 1 1 rrrllrr!111 lil l�ll� I��I�lt>'1>' 111�� �� t � 1 l r I �r Updateplanning documents Planning&City Staff (comprehensive plan,development code) General Fund September 2017 to reflect new hazard information. City staff should assess the amount of (e.g) KITH needed to run city facilities. City General Fund,MWCOG Minta-Hazard staff should purchase propane storage grants/loans, December 2017 accordingly to run their generator Detroit NHMP Addenda November 2016 Page PA-3 67 -ONGOING- (Table A-2) Detroit Action Item Pool 1 , , � � 1 r, v O O r � u m r Ifr i,r u r , a� u I f„ , , i, r 111 Ill f111 ii,,i .r I 1 1 o o f 11�I II11111111�1J)lJJ)J�11JI1)J1JJl,JJJJJJl1llJJl�,JJJ�11111��rr�11 Jlll1�)`11J l)1llJ„llllll)1lll�)l,�J� J o s. O U N C Q r U Sr N r r x O U ✓� x � r x �. Sr 7: r CZ w a z Promote Great Oregon Shakeout Awareness month in October. Participate in activities for schools, Public Works, Safety Marion County Ongoing Earthquake business, and industry.Participating Committee,Marion #I with the Mid-Willamette Emergency County Risk,Red every X X X Emergency Communications Management Cross,OEM and Media October Collective on initiatives that are focused on household preparedness. Collaborate with GROW EDC to Earthquake develop relevant public-private Detroit,Marion #2 partnerships with businesses that County Emergency GROW EDC Ongoing X X X X X X can contribute to response and Management recovery.(Multi-Hazard 4) Multi- Develop an Energy Assurance Plan. Detroit,MarionDepartment of Energy, Ongoing Hazard#I (Multi-Hazard 2) County Emergency Whole Community revisions X X X X Management Source:City of Detroit NHMP Steering Committee,2015. Page PA-4 November 2016 Detroit NHMP Addenda 68 -SHORT TERM- ® ONEEN ® � r r r r � iiiiF °� mm � � � •�' � r r r r r o o o r N Q.. cC '� r" 'O r r 7� a w a z Incentivize and assist local fueling Multi- stations to purchase diesel Detroit,Marion County Emergency Public Works Short Term X X Hazard#2 generators capable of pumping fuel from in-ground storage tanks. Management Conduct an assessment of the short Marion County Public Multi- and long term needs for sheltering Detroit,Marion Health,Red Cross, Hazard#3 access and functional needs County Emergency Cities,NGO's,Oregon Short Term X X populations for all hazards. Management public Health Develop a MOU with community Detroit,Marion Multi- fuel stations to utilize fuel resources County Emergency Santiam Quick Mart, Short Term X X Hazard#4 found in below-ground tanks after a Management RFPD hazard event. Marion County Multi- Establish a Detroit CERT team. Emergency CERT,Whole Short Term X X X Hazard#5 Management, Community Detroit Detroit NHMP Addenda November 2016 Page PA-5 69 r , r U � "S '� Sr N C". r r wCZ CZ p x ctCZ 0. r CZ z Develop a community education Marion County Multi- program-such as an all hazard Emergency Public Works and Short Term X X X X Hazard#6 community outreach forum for Management, Whole Community students and residents.* Detroit Expand auxiliary radio capabilities Marion County ARES, CERT, Private Multi- by developing a team of HAM Emergency partners,Whole Short Term X X X X Hazard#7 Radio operators for EMS and Management, Community interested public. Detroit *Identified in Marion County Community Wildfire Protection Plan(Action Plan&Priorities) **Identified in North Santiam Watershed Drought Contingency Plan(Priority Drought Mitigation Actions) ***Identified in Mid-Willamette Valley Council of Governments Comprehensive Economic Development Study(Appendix C) Page PA-6 November 2016 Detroit NHMP Addenda 70 -LONG TERM- Cz C ct O O •�' s. O U � � r U Cz � s� N U a) r� � r P' CzO wCzCz a x ct 0. � � r Cz w a z Monitor economic impacts on Detroit,Marion County Drought#I recreation,tourism and Community Services Long Term X X X X X X agriculture communities. Emergency Management Collaborate with NSWC to complete WMCP's and improve community North Santiam Drought#2 NSWC,Detroit Watershed DCP Long Term X X X X understanding of water usage and opportunities to increase Partners efficiencies." Collaborate with Detroit Lake Recreation Area Business USACE,USFS,Marion Drought#3 Association(DLRABA) to Detroit,DLRABA County Community Long Term X X X X X create a Detroit Lake Master Services/Board of Recreation Plan focused on Commissioners economic drought resiliency." Collaborate with local Marina's Detroit,Kane's Marina, USACE,USFS,Marion Drought#4 and DLRABA to excavate Detroit Lake Marina, County Community Long Term X X X X X marinas and allow for use at DLRABA Services/Board of low water levels." Commissioners Detroit NHMP Addenda November 2016 Page PA-7 71 r Q. 7� U r r a z Collaborate with Detroit Marion County Drought#5 Ranger Station to extend boat Detroit,Detroit Ranger Community Long Term X X X X X ramps that are usable year- Station Services/Board of round.** Commissioners Conduct leak detection surveys Drought#6 for the water system to increase Detroit,Marion County NSWC Long Term X X X efficiency and prevent further Public Works water loss.** Multi- Designate evacuation routes Detroit,Marion County RFPD Long Term X X Hazard#8 outside of Hwy 22 for EMS. Emergency Management Collaborate with Marion Marion County Marion County Multi- County to connect to a more Community Services Emergency Long Term X X X X Hazard#9 resilient regional water/sewer Department/Board of Management system.*** Commissioners,Detroit g Gather community support for Marion County Multi- the installation of resilient fiber Community Services Hazard#10 communication infrastructure Detroit Department/Board of Long Term X X X X throughout the community."* Commissioners Collaborate with Detroit ODF,BLM,Detroit Marion County Wildfire#I Ranger District, ODF, and Ranger District, Idanha- Emergency Long Term X X X BLM to conduct fuel hazard Detroit RFD Management reduction along the Wildland Page PA-8 November 2016 Detroit NHMP Addenda 72 r Q. 7� U r r a z Urban interface and Hwy 22.* Collaborate with ODF and ODF,BLM,Detroit Marion County Wildfire#2 Detroit RFD to develop Ranger District,Idanha- Emergency Long Term X X X strategic community fuel Detroit RFD Management breaks. Collaborate with ODF and Idanha-Detroit RFD on the ODF,BLM,Detroit Marion County Wildfire#3 North Santiam River acres Ranger District,Idanha- Emergency Long Term X X X project to develop defensible Detroit RFD Management space.* Integrate new DOGAMI Environmental Landslide landslide hazard information #I into land use Detroit Services,Engineering, Long Term X X ODOT,DLCD zoning/development codes. Collaborate with Marion County to survey and assess Marion County Flood#I current culvert infrastructure Detroit Emergency Long Term X X X most susceptible to natural Management/Public hazards Works Detroit NHMP Addenda November 2016 Page PA-9 73 Plan Implementation and Maintenance The City Council will be responsible for adopting the City of Detroit addendum to the Marion County NHMP. This addendum designates a coordinating body and a convener to oversee the development and implementation of action items. Because the city addendum is part of the county's multi-jurisdictional NHMP, the city will look for opportunities to partner with the county.The city's steering committee will convene after re-adoption of the City of Detroit addendum on a semi-annual schedule; the county is also meeting on a semi-annual basis and will provide opportunities for the cities to report on NHMP implementation and maintenance during their meetings.The City Recorder will serve as the convener and will be responsible for assembling the steering committee (coordinating body).The steering committee will be responsible for identifying new risk assessment data, reviewing status of mitigation actions, identifying new actions, and seeking funding to implement the city's mitigation strategy (actions).The convener will also remain active in the county's implementation and maintenance process. Implementation through Existing Programs Many of the NHMP's recommendations are consistent with the goals and objectives of the city's existing plans and policies. Where possible, the City of Detroit will implement the NHMP's recommended actions through existing plans and policies. Plans and policies already in existence have support from local residents, businesses, and policy makers. Many land-use, comprehensive, and strategic plans get updated regularly, allowing them to adapt to changing conditions and needs. Implementing the NHMP's action items through such plans and policies increases their likelihood of being supported and implemented. Detroit's acknowledged comprehensive plan is the Detroit Comprehensive Plan.The Oregon Land Conservation and Development Commission first acknowledged the plan on July 11, 2002. The City last completed a transportation update to the plan on July 20, 2009, but no major update of the plan has occurred since.The City implements the plan through regulatory ordinances. Detroit currently has the following plans that relate to natural hazard mitigation. For a complete list visit the city website for planning and public works: • Comprehensive Plan • Development Code • Transportation System Plan Continued Public Participation Keeping the public informed of the city's efforts to reduce the city's risk to future natural hazards events is important for successful plan implementation and maintenance.The city is committed to involving the public in the plan review and updated process.This includes: • Annual briefings to city council • Articles and information in The Canyon Weekly • Postings and media on social media/website. Page PA-10 November 2016 Detroit NHMP Addenda 74 Plan Maintenance The Marion County Multi-Jurisdictional Natural Hazards Mitigation Plan and city addendum will be updated every five years in accordance with the update schedule outlined in the Disaster Mitigation Act of 2000. During the county plan update process, the city will also review and update its addendum.The convener will be responsible for convening the steering committee to address the questions outlined below. • Are there new partners that should be brought to the table? • Are there new local, regional, state, or federal policies influencing natural hazards that should be addressed? • Has the community successfully implemented any mitigation activities since the plan was last updated? • Have new issues or problems related to hazards been identified in the community? • Are the actions still appropriate given current resources? • Have there been any changes in development patterns that could influence the effects of hazards? • Have there been any significant changes in the community's demographics that could influence the effects of hazards? • Are there new studies or data available that would enhance the risk assessment? • Has the community been affected by any disasters? Did the plan accurately address the impacts of this event? These questions will help the steering committee determine what components of the mitigation plan need updating.The steering committee will be responsible for updating any deficiencies found in the plan. Risk Assessment This section of the NHMP addendum addresses 44 CFR 201.6(b)(2) - Risk Assessment. In addition, this chapter can serve as the factual basis for addressing Oregon Statewide Planning Goal 7—Areas Subject to Natural Hazards. Assessing natural hazard risk has three phases: • Phase 1: Identify hazards that can impact the jurisdiction.This includes an evaluation of potential hazard impacts—type, location, extent, etc. • Phase 2: Identify important community assets and system vulnerabilities. Example vulnerabilities include people, businesses, homes, roads, historic places and drinking water sources. • Phase 3: Evaluate the extent to which the identified hazards overlap with, or have an impact on, the important assets identified by the community. The local level rationale for the identified mitigation strategies (action items) is presented herein.The risk assessment process is graphically depicted in (Figure B-1) below. Ultimately, the goal of hazard mitigation is to reduce the area of risk, where hazards overlap vulnerable systems. Detroit NHMP Addenda November 2016 Page PA-11 75 (Figure B-1) Understanding Risk Z S G S1 Understanding Risk Natural ral IH r [nerable Sys-tem PtwtentiaTcatd,trophic F pr�dwswp,Senslflv""Y lk7iitJ N�Ca�p^rror,Pl ymcal Evetr �/O ��/ aft"7dl Re'sill nco of,; i .g'r�i�+tI�erMu�^r��nreN�Y.aNv�+a1� r"Uv un ii�rohoblhty ���p ��tuw�nrnis�twr a "$Peed of Oa so, r P I u io�Ntrurl� y ( r r r�d'",ueYC x�rNd e e �rN N%kArwfi�aon, Duration .S�Auq�i�a�r;u^nrt ���/�� �mrl"rua,Crct�cM1xuirur Ability„Resources iri l l ra � al I i�� essw -Wagate Res'polnd Prepare w Recover . $*vrcr,V$G5-[3e a a� rtlsra ,rdri�rrn r rwwCrr�usuCJ � t��arrharuPr�ab w�C�rr 2Pp Hazard Analysis Methodology This NHMP utilizes a Threat Hazard Identification and Risk Assessment methodology that is consistent with the Marion County Multi Jurisdictional Hazard Mitigation Plan. Mill City developed this assessment from historical data of events that have occurred in Marion County. The assessment uses the calculated priority risk index(CPRI) methodology to specifically examine: 1. Probability(frequency) of event 2. Magnitude of event 3. Expected warning time before event 4. Expected duration of event Table (A-3) below shows the scoring values for each ranking category. Table (A-3) Risk Assessment Hazard Ranking Scoring Values Score Probability Warning Time Magnitude/Severity Duration 4 Highly Likely Less than 6 hours Catastrophic More than 1 week 3 Likely 6-12 hours Critical Less than 1week 2 Possible 12-24 hours Limited Less than 1day 1 Unlikely 24+hours Negligible Less than 6hours Source: Marion County Emergency Management; BOLD Planning Hazard Analysis For emergency management planning purposes, this critical analysis is an assessment of the consequences of each hazard, including potential areas of impact, population exposed and impacted, duration of the hazard, and potential economic consequences.These rankings utilize the criteria laid out in THIRA to weigh them proportionally between historic data as well as future projections based on economic, demographic, the critical infrastructure information. Page PA-12 November 2016 Detroit NHMP Addenda 76 These rankings were reviewed and revised by steering committee members to reflect specific community attributes and risks. (Table A-4) Probability and Vulnerability Comparison Warning ,Planning Hazard Magnitude agnitiude Duration dPRIl Time Significance; Earthquake 4 4 4 4 4.00 Illh°°iliii IIID Severe Weather/Storm 4 4 2 3.5 3.65 Illh°°iliii IIID Power Failure 3 4 3.5 3 3.38 1114°°iliii Illli Drought 3.5 4 1 4 3.33 Illh°°iliii IIID Wildland Interface Fire 3.5 3.5 2 3 3.23 Illh°°iliii IIID Extreme Weather- High Temperature 3.5 2.5 1 4 2.88 Transportation Accident/Train Derailment 3 3 1 3 2.70 School &Workplace Violence 1.5 4 4 2 2.68 Epidemic 2 4 1 4 2.65 IP�II(�p,("lI(�1'� a�, Pandemic 2 4 1 4 2.65 Ifii"hlrcil� t Volcanic Eruption 2 4 1 4 2.65 Landslide 2 2.5 4 2.5 2.50 IP�II(�p,("lI(�1'� a�, Animal Disease Outbreak 2 3 2 4 2.50 Dam or Levee Failure 2 1 4 4 2.20 Biological Chemical, Sabotage and Cyber Incident and Explosives Radiological 1 4 1 3 2.10 Attack-Terrorism Hazardous Materials Incident 1.5 3 1 3 2.03 Civil Disorder 1 Terrorism 1 2 4 3 1.95 Lo Radiological Release 1 2 4 3 1.95 Low PFlood 1 2 2 2 1.55 Low Tornado 1 1 1 1 1.00 Lo Source: Detroit NHMP Steering Committee and Marion County NHMP Steering Committee,2016. Detroit NHMP Addenda November 2016 Page PA-13 77 Hazard Characteristics Drought The steering committee determined that the city's probability for drought is moderate and their vulnerability to drought is high. Although dryer conditions in the summer months have impacted the North Santiam Canyon as a whole, Detroit has experienced major impacts from drought. Detroit's economy relies heavily upon the recreation provided by the water levels of Detroit Lake, which can experience low levels during years of major drought. Dry conditions throughout 2001 caused Detroit Lake water levels to recede below 1,546 feet (min. elev.for moorage), contributing to a Detroit Area Economic loss of over$5 million dollars. Recently during the 2015 drought, similar economic impacts were experienced with additional damage caused by tree and vegetation die off.This has created an increased risk of wildfire hazards. If dryer conditions become the new norm, Detroit could experience timber die-off, making them more susceptible to wildfires, as well as economic hardships if their current seasonal economy does not expand. Earthquake The steering committee determined that the city's probability for a Cascadia Subduction Zone (CSZ) Earthquake event is high and that their vulnerability to this event is moderate.The steering committee determined that the city's probability for a - Crustal Earthquake event is moderate and that their r, vulnerability to this event is moderate. Historically, Detroit has experienced one crustal earthquake on August 19, 1961. A 4.5 magnitude earthquake struck 6 miles from Mill City, with shaking felt throughout the Santiam Canyon, up to Detroit. If another larger and more substantial earthquake occurs (Cascadia), Detroit could experience damage to buildings, utility (electric power, communication,water, wastewater, natural gas) and transportation systems (ex. bridges, and pipelines). Cascadia Earthquake:Expected Shaking Flood Violent ® Severe Very Strong. The steering committee determined that the city's ❑ Strong probability for flooding is low and that their vulnerability to flooding is low. 1 http://agsci.oregonstate.edu/sites/agsci.oregonstate.edu/files/ruralstudies/pub/pdf/detroitlake-srl07l.pdf (Table 5) Page PA-14 November 2016 Detroit NHMP Addenda 78 Historically, Detroit experienced one major flooding event in 2006. Heavy rains and high winds created a multitude of damage in the Detroit, Idanha, and Breitenbush area. Impacts included roofing damage, flooding of public facilities, sinkholes, erosion and water facility intake-clogging due to turbidity. Landslide i.// The steering committee determined that the city's probability for landslide is moderate and that their vulnerability to landslide is moderate. Historically, Detroit has not experienced major impacts from , landslides within city limits. Areas in the east and northern portion of the city are susceptible because of steep " mountainous terrain.The western portion and remainder that Landslide Susceptibility border Detroit Lake are also at higher risk. ❑ Low-Landslidi'nag Unlikely Moderate-Landslliding Possible; Potential landslide-related impacts are adequately described H„ -Landsridling Likely within the county's plan, and include infrastructural damages, ® Very High-Existing Landslide economic impacts (due to isolation and/or arterial road closures), property damages, and obstruction to evacuation routes. Rain-induced landslides and debris flows can potentially occur during any winter in Marion County; thoroughfares beyond city limits are susceptible to obstruction as well. Volcano The steering committee determined that the city's probability, for volcanic event is low and that their vulnerability to � ' ;% volcanic event is moderate. %/f( Detroit has not been impacted previously by volcanic activity, 6 however Mount Jefferson is located east of the city into they cascade mountains, and could produce problems if an eruption occurs.The city sits in the Mount Jefferson Moderate Hazard Zone and could experience ash fall, debris avalanches, pyroclastic flows, lahars and slow-moving lava ` flows. City residents should be evacuated before an eruption begins in case of impassible roads and dangerous conditions. Mq.h H82ard Zone Wildfire Im oderarte Lazard Tore The steering committee determined that the city's probability for wildfire is high and that their vulnerability to wildfire is high. In 2001 the "breitenbush fire"threatened city residents creating road closures and hazardous conditions. In 2002 and 2004, Detroit was impacted by wildfire's which caused closure of Hwy 22.This impacted local residents, restricting travel, and negatively impacting the local economy. Detroit NHMP Addenda November 2016 Page PA-15 79 In 2011,the "nasty fire"threated the Opal Creek Wilderness, while the 2014"Bingham complex fire" restricted travel and required Detroit Ranger Station response. Detroit could experience more fires as dryer conditions occur in the North Santiam Canyon. Less rainfall and snowpack can kill of tree's dependent on large amounts of water,which could ultimately lead to an increase of wild fire fuels. Marion County updated the Community Wildfire Protection Plan (CWPP) in 2016, which mapped wildland urban interface (WUI) areas and developed actions to mitigate wildfire risk.The city is a participant in the CWPP, and has included hazard mitigation action items directly in line with the CWPP actions. Windstorm The steering committee determined that the city's probability for windstorms is high and that their vulnerability to windstorms is high. In April of 1931, winds in the Santiam Canyon region felled hundreds of trees causing road closures between Mill City and Detroit.The winds also caused several devastating fires throughout the Santiam Canyon. On December of 1995, high wind gusts of up to 60mph downed trees and disrupted power and communication services in the lower Santiam. In 2002, a windstorm caused similar damages, blowing down trees onto roads and power lines. About once or twice per year the city will experience a windstorm event that can interrupt services, down trees, and cause power outages.Typically,windstorms occur during winter months, they are sometimes accompanied by ice,freezing rain, flooding, and very rarely, snow. Winter Storm (Snow/Ice) The steering committee determined that the city's probability for winter storm is moderate and that their vulnerability to winter storm is high. Major winter storms have occurred in the Detroit area; in January of 1937, heavy snowfall of over 2 feet caused property damage. Major roads were closed and residents of Detroit were stranded for five days as heavy snow and a landslide blocked Hwy 22. In 1950, A large snow event caused 54 inches of snow in Detroit, while 122 inches blanketed Detroit Dam. During that storm, the cities Rod-and-Gun Club's roof collapsed under the weight of 20 inches of snow.2 In January of 1957, cold temperatures brought eleven inches of snow to Detroit, as well as icy roads throughout the Santiam Canyon. Cold temperatures also caused the Bonneville Power Authority to cut interruptible power to the regions' industrial customers because ice behind the dam slowed water flow and limited the ability to generate power.3 In January of 1963, Detroit recorded 13 inches of snow, while cold temperatures created hazardous road conditions.4 During the last couple days of December 2003, the Detroit/Idanha area received an accumulation of 4-5 feet of snow. Both cities declared a State of Emergency as the City of Idanha lost power between December 291h and January 6th; Detroit lost power between January 1St and January 4th. In early 2008, Detroit received over 12 feet of snow in a two-month period.Three 2 http://www.co.marion.or.us/PW/EmergencyManagement/Documents/14_severewinterstorm.pdf 3 http://www.co.marion.or.us/PW/EmergencyManagement/Documents/14_severewinterstorm.pdf 4 http://www.co.marion.or.us/PW/EmergencyManagement/Documents/14_severewinterstorm.pdf Page PA-16 November 2016 Detroit NHMP Addenda 80 dozen Oregon National Guard personnel were called in to help with snow removal. Damage included collapsed roofs and cracked walls, mostly impacting homeowners.s Record and Near Record Snow, Landslides and Mudslides occurred in Oregon between December 20, 2008 and December 26, 2008. By December 22, Detroit already measured 4 feet of new snow and experienced power outages. Between December 18 and December 30, the City of Detroit spent$10,407 (or 129 hours)for contracted snow removal services,which created a financial hardship to the city's budget for the second time in one year. Winter storm conditions starting late December 2016 and lasting into January, 2017 left Detroit and Idanha with approximately four feet of snow that quickly turned into ice due to low temperatures. Residents, especially the elderly, were unable to shovel the heavy snow to get in and out of their driveways. Large, heavy snow berms quickly became a hazard throughout both cities and also blocked hydrants, water meters and water pipes.The water supply in Idanha was at risk because of blocked access to water meters to detect multiple leaks.The two cities declared an emergency with Marion County, who sent crews up to remove and relocate the piles of snow, dig out water meters and hydrants, and help the elderly and sick where needed. Freres Lumber continued the snow removal work on a volunteer basis or an additional couple of days. A sudden temperature upswing started a slow melting process, but created pure ice conditions on steep city streets. On January 19, 2017 ODOT was approached to sand the most affected roads under a Mutual Service Agreement,which was accepted immediately.The sanding took place the same night. Winter storms are more frequent hazards in Detroit and usually cause transportation issues and communication failures from downed trees and icy/snow filled roads.The ability to respond to these hazards quickly and effectively determines the potential impacts these regular occurrences will have in the community. Community Asset Identification This section provides information on city specific assets. Many of these community characteristics can affect how natural hazards impact communities and how communities choose to plan for all types of hazard mitigation. Considering the city specific assets during the planning process can assist in identifying appropriate measures for natural hazard mitigation. Community Characteristics Detroit is located approximately 50 miles east of Salem, bordering the Detroit Reservoir. It is the third largest community in the North Santiam River Canyon with a population of 210. With an elevation of 1630 feet, the climate of Detroit is moderate;the average monthly temperatures range from 51—79 degrees in July and August, and 31-42 degrees in December and January. Detroit receives approximately 68 inches of rain and 10 inches of snow each year.The city's topography is relatively flat, but does possess terrain attributed to Detroit Reservoir. Outside of city limits, steep slopes surround the city on all sides. s http://www.co.marion.or.us/PW/EmergencyManagement/Documents/14 severewinterstorm.pdf Detroit NHMP Addenda November 2016 Page PA-17 81 Economy Detroit benefits from its location along Hwy 22, a major east-to-west transportation route connecting Salem to Bend. It serves as a recreation hub with two marinas, restaurants, and lodging, for residents of the North Santiam Canyon and the traveling public along the Hwy 22 corridor. Historically, Detroit prospered from the development of the railroad and dam, which helped spur growth in manufacturing and logging.Today, the economy relies upon the recreational opportunities available through state/federal lands, and Detroit Lake. Critical and Important Facilities/Infrastructure Communication/Information Technology There is currently one communication provider in Detroit. Frontier provides phone service, and broadband internet with limited fiber infrastructure adjacent to Hwy 22. Strengths: • Limited fiber internet infrastructure already present along Hwy 22. • Cellular Tower(AT&T/Verizon) east of Detroit, past the ranger station, with diesel generator backup. • AT&T cellular tower at entrance of town. • Public Works possesses low range walk-talkie access (>1/2) mile. Weaknesses: • Limited communication access including internet and phone. • Currently no known HAM radio operators in the community. • Main communication line runs down highway 22, and is susceptible to tree's and wind. • Phone lines are both buried and overhead; which could prove difficult for maintenance. Water The City of Detroit has two water sources which include Mackie creek and the Breitenbush intake. Mackie Creek is Detroit's main water source in the winter months, located approximately 1/3 mile uphill from the water treatment plant.The Breitenbush intake, located approximately 1/3 mile up from Breitenbush Road, is utilized in the summer months. Detroit's water treatment facility is located at the top of Gaymore, with a backup propane generator. The generator is accompanied by a 500-gallon propane storage tank, and can power water facilities for approximately one week. Detroit has two treated water storage tanks equaling 440,000 gallons (200,000 and 240,000). The city also has one un-treated water storage tank which holds 35,000 gallons.This tanks water level is maintained from the Breitenbush intake and is gravity fed from the treatment plant. Page PA-18 November 2016 Detroit NHMP Addenda 82 Waste Water Detroit does not have any municipal waste-water infrastructure.The city's residents and business owners rely on individual septic tanks.These septic tanks can be up to 60-years old and could be leaching hazardous material into the ground water/ Detroit Reservoir. Dams Two dams sit below Detroit, Detroit Dam and Big Cliff Dam. Previous steering committee's have concluded that the likelihood of Dam Failure is Lows. Current conditions still represent the previous decision. If Dam failure occurred in either dams, Detroit would most likely lose access to the western portion of Hwy 22. Strengths: • (2)water intake sources (Mackie& Breitenbush). • (1) Backup propane generator on-site. • (2)Above-ground storage tanks located near water treatment facility. o Equivalent to (440,000)gallons or 3-4 days of water storage in summer months or 4-8 days in winter months. Weaknesses: • Current backup generator runs on propane. • Water intake sources are susceptible to wildfire damage. • The city is losing approximately 40%of water distributed through leaky pipes. Roughly 40%of the water travelling through the water pipes is lost due to deficient infrastructure. • Water usage estimates are 60,000 gallons in the Winter and 120,000 in the Summer. Transportation Systems Oregon Route 22 is the major transportation route for auto, public transit, and emergency vehicle access throughout the Santiam Canyon. Hwy 22 spans about 50 miles west, connecting Detroit to Salem and the remainder of the Willamette Valley.To the east, the highway connects to Idanha, and ends at the Santiam Pass interchange. The Cherriots Canyon Connector is the only existing public transit service in the entire Santiam Canyon.This route has three total roundtrips with buses running approximately every (5) hours. Detroit residents are forced to drive to Gates to utilize these services, as the canyon connector does not reach Detroit or Idanha. In case of a major Oregon Route 22 closure, Detroit residents will have to rely on alternate routes to reach supplies or safety.The cities alternate routes are limited with Breitenbush Road and French Creek Road. Depending on weather conditions, these roads may be unpassable. 6 http://www.co.marion.or.us/PW/EmergencyManagement/Documents/6_damfailure.pdf Detroit NHMP Addenda November 2016 Page PA-19 83 Bridges Structure Name Year Built Structural Condition Tumble Creek 1949 Fair Breitenbush River 1949 Fair Strengths: • Proximity to ODOT facility may increase access to public works services. • Docked boats along Detroit Lake can be utilized to transport residents to safety during concentrated hazard events (ex. hazardous materials, and wildfire). • Fuels reduction measures have been taken along Weber Street to minimize risk to water system infrastructure. Weaknesses: • Loss of Breitenbush river bridge would isolate Detroit from the remainder of the Santiam Canyon and the Willamette Valley. • Alternate routes are long, and most likely impassible in winter months. • Hwy 22 closures could make travel outside of North Santiam Canyon extremely difficult. • Public transportation options are limited and only reach to the city of Gates. • City's drain and culvert infrastructure is old and getting to the point where some won't flush a lot of water away anymore (street maintenance person keeps them in best shape and unclogs them at all times). Energy & Utilities Detroit receives energy and utility services from Consumer Power Inc.There are no substations located in Detroit. One main power line runs along Hwy 22, connecting to Gates and Mill City. Strengths: • Gas stations with fuel storage exist within Detroit and possess both gasoline and diesel fuel. • An electric car powering station and a Tesla electric car powering station exists within city limits; the capability to utilize this infrastructure is unknown. Weaknesses: • Gas stations possess below ground tanks which cannot be pumped without electricity. • Gas stations do not currently possess backup diesel generators to pump fuel from storage tanks. • No alternate sources of energy(wind, solar) exist to power basic services. • Citizen rely on propane and there is limited access to propane during a disaster. Page PA-20 November 2016 Detroit NHMP Addenda 84 Agriculture and Food Although Detroit possesses the "Detroit Market" and "Mountain High Grocery' the closest large-scale grocery exists down Hwy 22 in Stayton, Oregon.While other restaurants and lounges exist on Detroit's Main street, the loss of Hwy 22 as a transportation route would cause serious concern for residents and food accessibility.The city is surrounded by steep slopes that are state and federal land.There is no agricultural capability other than small-scale "urban" farms within city limits. Strengths: • Private sector entities possess limited (1-2 days)food supplies. Weaknesses: • No major(full service)grocery store inside of city limits. • Surrounding land not suitable for agricultural purposes. Banking and finance Detroit's nearest option for banking services is located in Mill City.This one-story structure sits along Hwy 22 and could be utilized for emergency financial services during a hazard event. Detroit does not have any financial services within city-limits. Strengths: • Cash flow from nearby businesses could possibly be utilized. Weaknesses: • Lack of banking/financing institutions within city limits. • Full "urban"financial services unavailable. Hazardous Materials The cities reliance on propane as a backup fuel source can be hazardous in certain conditions. These above ground propane tanks can be susceptible to leaking after an earthquake, or explode during a wildfire. Detroit does not possess any large manufacturing firms that possess hazardous materials.The city has identified current brownfields which may be susceptible to leaching or are unsuitable for development.The Kanes Marina, Detroit Lake, and Detroit School Tank brownfields currently require no further action. Brownfields DEQ ID Facility Name Location 2267 Kanes Marina 530 Clester Road Detroit NHMP Addenda November 2016 Page PA-21 85 771 Breitenbush Hot Springs 4688 Forest Road 1204 Detroit Forest Service Hwy 22 3770 Detroit Lake MP 46, Hwy 22 5652 Detroit School Tank 110 Patton 1094 Heidgerken Property Forest Road 46 Strengths: • There are currently not enough known hazardous materials to cause major concern. • Brownfield sites could be utilized and attract privates sector development. Weaknesses: • Current brownfields maybe susceptible to leaching of unknown materials. • Propane tanks within city limits can be extremely hazardous. Emergency Services Detroit receives emergency service support from Marion County Sheriffs and the Idanha-Detroit Rural Fire Protection District. • Detroit Police Department (Marion County Sheriffs), 160 Detroit Ave • Idanha-Detroit Rural Fire Protection District, 160 Detroit Ave Strengths: • Detroit possesses emergency services for fire and law enforcement. • An emergency propane generator with 70-gallons of storage exists inside City Hall; utilized by both fire and law enforcement. Weaknesses: • Fire and law enforcement rely on City Hall facilities to operate. • Ambulance services must travel from the City of Lyons. • First responders are very limited to basic life monitoring services. • Currently, emergency services do not have trained HAM radio operators. Government Facilities Detroit City Hall contains the office space for all city services as well as the headquarters for the Detroit Fire Department and Marion County Sheriffs.The city has a generator that assures continuance of city business, and also provides power to the meeting hall (emergency center). This includes outlets for electric heaters and lights only. • Detroit City Hall, 160 Detroit Ave • Post Office, 170 Detroit Ave Page PA-22 November 2016 Detroit NHMP Addenda 86 Strengths: • City Hall facility has (1) kitchen, (2) bathrooms, and (1) emergency generator with (2) 25- gallon propane storage tanks that work in unison. Weaknesses: • City Hall is small with space already utilized by other emergency services. • Propane fuel maybe limited, and could only power City Hall for a couple of days. Environmental/Historical Preservation Sites Detroit is surrounded by environmental preservation sites including federal land, state parks and designated wilderness areas.The housing stock in Detroit was built after the 1950s and does not contain any sites of historical significance.The city does possess the Detroit Ranger Station, Detroit State Park, and Detroit Lake, which help to bring in a high volume of recreational tourism in the summer months. Strengths: • Proximity to pristine state and federal land could attract residents or business. • Some remnants remain of the old Detroit location (now at the bottom of Detroit Lake) Weaknesses: • Detroit lacks buildings with historical "timber". Education Detroit is part of the Santiam School District.This district encompasses all cities in the Santiam Canyon including Mill City, Gates, and Idanha.This district includes the Santiam Elementary School, and the Santiam Junior/Senior High School. • Santiam School District o Santiam Elementary School, 450 SW Evergreen St. o Santiam Junior/Senior High School, 265 SW Evergreen St. Strengths: • School facilities could be utilized to shelter a large amount of community residents including Access and Functional Needs populations. • School facilities possess needed infrastructure for a shelter which includes restrooms, showers and a kitchen. • School buses could be utilized for transportation after an emergency or disaster. Weaknesses: • Detroit is over 20 miles from school services. • There are no current agreements or MOU's between the City and School District to utilize facilities after an emergency or disaster. Detroit NHMP Addenda November 2016 Page PA-23 87 Healthcare & Public Health Detroit's nearest medical services are located in Mill City which possesses one clinic with limited services.The nearest hospital and full service health clinic is located in Stayton, Oregon. • Santiam Medical Clinic, 280 S 1St Ave. • Emergency Medical Technician (EMT) services are located in the City of Lyons. Strengths: • A clinic with minor services exists within the North Santiam Canyon. Weaknesses: • Closest health services are located over 20 miles. • No facilities with major life-saving equipment currently exist within city limits. • Emergency health supplies are limited to what exists within the community. Access and Functional Needs Detroit's vulnerable population consists of the elderly and those that may have mobility issues. About 5%of Detroit's population is characterized as being elderly, and over 20%of full-time residents are considered low-income.The City is quickly turning into a 2nd home community, increasing actual population to 1000+ (210 full-time, 790+ part-time). Strengths: • Over 65%of full-time residents are over the age of 45, this older populous can volunteer and promote social cohesion in the community. Weaknesses: • No medical services exist for aging population. Page PA-24 November 2016 Detroit NHMP Addenda 88 CITY OF GATES ADDENDUM Purpose This document serves as Gates's Addendum to the Marion County Multi-Jurisdictional Natural Hazards Mitigation Plan (MNHMP, NHMP).This addendum seeks to supplement information contained in Volume I (Basic Plan) of this multi-jurisdictional NHMP which serves as the foundation for this jurisdiction's addendum and Volume III (Appendices)which provides additional information (particularly regarding participation and mitigation strategy).This addendum meets the following requirements: • Multi-jurisdictional Plan Adoption §201.6(c)(5), • Multi-jurisdictional Participation §201.6(a)(3), • Multi-jurisdictional Mitigation Strategy§201.6(c)(3)(iv), and • Multi-Jurisdictional Risk Assessment §201.6(c)(2)(iii). Plan Process, Participation, and Adoption This section of the NHMP addendum addresses 44 CFR 201.6(c)(5), Plan Adoption, and 44 CFR 201.6(a)(3), Participation. In the summer of 2016, the Oregon Partnership for Disaster Resilience (OPDR) at the University of Oregon's Community Service Center (CSC) partnered with Marion County and Santiam Canyon cities, including Gates, to create the first region-specific NHMP. Part of the Santiam Canyon Regional Hazard Mitigation Plan (RHMP) required the creation of city addenda which would be adopted into the 2016 Marion County NHMP.This project is funded through the Federal Emergency Management Agency's (FEMA) FY14 Pre-Disaster Mitigation Competitive Grant Program (PDMC-PL-10-OR-2014-002). By developing this addendum to the Marion County NHMP, locally adopting it, and having it approved by FEMA, Gates will gain eligibility for FEMA Hazard Mitigation, Pre-Disaster Mitigation, and Flood Mitigation Assistance grant program funds. The Marion County NHMP, and Gates addendum, are the result of a collaborative effort between citizens, public agencies, non-profit organizations, the private sector, and regional organizations. A project steering committee guided the process of developing this addendum, and was composed of city staff, county representatives, and emergency service management. The Gates city recorder is the designated convener of the NHMP and will take the lead in implementing, maintaining, and updating the addendum to the Marion NHMP in collaboration with the Santiam Canyon liaison for Marion County Emergency Management. Representatives from the City of Gates steering committee met formally on one occasion: September 22, 2016, but communicated electronically throughout the creation of this Gates NHMP Addenda November 2016 Page PA-1 89 document.The city's addendum reflects decisions decided upon at the plan update meeting and during subsequent work and communication with OPDR. The Gates Steering Committee was comprised of the following representatives: • Leroy Davis; Community Member, Gates • Greg Benthin, Public Works Superintendent, Gates • Jerry Marr; Mayor, Gates • Traci Archer; City Recorder, Gates • Kathleen Silva; Santiam Canyon Liaison, Marion County • Gates City Council Public participation was achieved with the establishment of the steering committee, which was comprised of city officials, county representatives, and the general public. The Steering Committee was closely involved throughout the development of the plan and served as the local oversight body for the plan's development. In addition, community members outside of the steering committee were provided an opportunity for comment via the plan review process. The Marion County NHMP was approved by FEMA on [Month] [Day],2017 and the Gates addendum was adopted via resolution on [Month] [Day],2017.This NHMP is effective through [Month] [Day],2022. Mitigation Strategy This section of the NHMP addendum addresses 44 CFR 201.6(c)(3(iv), Mitigation Strategy. During 2016, Marion County and OPDR evaluated the Action Items set by the county and their particular relevance to the Santiam Canyon region. Following the review, actions with relevance to the region were added into the RHMP, noting what accomplishments had been made, and whether the actions were still relevant; any new action items were identified at this time. Gates developed a list of priority actions (Table A-1), any actions that were not prioritized were placed in the Action Item Pool (Table A-2)and will be considered during the semi-annual meetings. Priority Actions The city is listing a set of high priority actions in an effort to focus attention on an achievable set of high leverage activities over the next five-years.The city's priority actions are listed below in the following table. Detailed implementation information for each action is listed in within (Table A-1). Action Item Pool This expanded list of actions is available for local consideration as resources, capacity, technical expertise and/or political will become available. Many actions carry forward from prior versions of the Marion County NHMP and other local planning documents including the Community Wildfire Protection Plan, Drought Contingency Plan, and Mid-Willamette Economic Development study. Page PA-2 November 2016 Gates NHMP Addenda 90 (Table A-1) Gates Priority Action Items Updateplanning documents Planning&City Staff (comprehensive plan,development code) General Fund September 2017 to reflect new hazard information. City staff should assess the amount of (e.g) KITH needed to run city facilities. City General Fund,MWCOG Multi-Hazard staff should purchase propane storage grants/loans, December 2017 accordingly. Gates NHMP Addenda November 2016 Page PA-3 91 -ONGOING- (Table A-2) Gates Action Item Pool 11�1 ell CZ CZ CZ CZ CZ Q r � U U N Sr N r� �.O U ✓� wCZQ x CZ r x �. Sr � N r w a z Promote Great Oregon Shakeout Awareness month in October. Participate in activities for schools, Public Works, Safety Marion County Ongoing Earthquake business, and industry.Participating Committee,Marion #I with the Mid-Willamette Emergency County Risk,Red every X X X Emergency Communications Management Cross,OEM and Media October Collective on initiatives that are focused on household preparedness. Collaborate with GROW EDC to Earthquake develop relevant public-private Gates,Marion #2 partnerships with businesses that County Emergency GROW EDC Ongoing X X X X X X can contribute to response and Management recovery. (Multi-Hazard 6-9) Marion Multi- Develop an Energy Assurance Plan. Gates, Department of Energy, Ongoing Hazard#1 (Multi-Hazard 2-4) County Emergency Whole Community revisions X X X X Management Source:City of Gates NHMP Steering Committee,2015. Page PA-4 November 2016 Gates N H M P Addenda 92 -SHORT TERM- CZ ° o CZ CZ o � o � o CZ CZ N U U NCZ r w 7�CZ �C a x ct 0. � � r CZ w a z Conduct an assessment of the short Marion County Public Multi- and long term needs for sheltering Gates,Marion Health,Red Cross, Hazard#2 access and functional needs County Emergency Cities,NGO's,Oregon Short Term X X populations for all hazards. Management public Health Multi- Develop a MOU with the Santiam Gates,Marion Santiam School District, School District to utilize facilities County Emergency Short Term X X Hazard#3 for sheltering residents. Management RFPD Multi- Develop a MOU with First Student Gates,Marion Hazard#4 to utilize buses during/after hazard County Emergency First Student Short Term X X events Management Multi- Develop a MOU with Frank& Gates,Marion Hazard#5 Ferris Lumber to share fuel County Emergency Franks Lumber,RFPD Short Term X X resources after a hazard event. Management Gates N H M P Addenda November 2016 Page PA-5 93 O � O N r a z Purchase and store emergency Multi- rescue rafts for EMS to allow for Gates,Marion Hazard#6 the use of the North Santiam River County Emergency RFPD Short Term X X as an emergency transportation Management option. Marion County Multi- Continue to train and expand Gates Emergency CERT,Whole Short Term X X X Hazard#7 CERT team. Management, Community Gates Develop a community education Marion County Multi- program-such as an all hazard Emergency Public Works Whole Short Term X X X X Hazard#8 community outreach forum for Management, Community students and residents.* Gates Expand auxiliary radio capabilities Marion County ARES, CERT, Private Multi- by developing a team of HAM Emergency partners,Whole Short Term X X X X Hazard#9 Radio operators for EMS and Management, Community interested public. Gates *Identified in Marion County Community Wildfire Protection Plan(Action Plan&Priorities) Page PA-6 November 2016 Gates N H M P Addenda 94 "Identified in North Santiam Watershed Drought Contingency Plan(Priority Drought Mitigation Actions) 'Identified in Mid-Willamette Valley Council of Governments Comprehensive Economic Development Study(Appendix C) -LONG TERM- ° o t z ct cC 7� 7: Czr a z Monitor economic impacts on Gates,Marion County Drought#I recreation,tourism and Emergency Community Services Long Term X X X X X X agriculture communities. Management Collaborate with NSWC to complete WMCP's and improve North Santiam Drought#2 community understanding of NSWC,Gates Watershed DCP Long Term X X X X water usage and opportunities to Partners increase efficiencies." Create partnerships and Marion County Parks strategic plans with NSWC to Marion County Department, Oregon Flood#1 conduct leak detection Environmental Services, Department of Fish Long Term X X X X surveys.** Gates and Wildlife, Gates N H M P Addenda November 2016 Page PA-7 95 0 � O N r a z Create partnerships and Marion County Parks strategic plans with NSWC to Marion County Department, Oregon Flood#2 explore alternative water supply Environmental Services, Department of Fish Long Term X X X X sources.** Gates and Wildlife, Multi- Conduct road improvements on RFPD,Gates,Marion Marion County Hazard#10 Gates Hill Road and Hudel Road County Public Works Emergency Long Term X X as identified in the CWPP Management Collaborate with Marion County Marion County Marion County Multi- to connect to a more resilient Community Services Emergency Long Term X X X X Hazard#11 regional water/sewer Department/Emergency Management system.*** Management, Gates g Gather community support for Marion County Multi- the installation of resilient fiber Community Services Hazard#12 communication infrastructure Gates Department/Board of Long Term X X X X throughout the community.*** Commissioners Collaborate with Detroit Ranger District, ODF,and BLM to ODF,BLM,Detroit Marion County Wildfire#I conduct fuel hazard reduction Ranger District Emergency Long Term X X X along the Wildland Urban Management interface.* Page PA-8 November 2016 Gates N H M P Addenda 96 O � O N r CZ CZ z Integrate new DOGAMI Environmental Landslide landslide hazard information #I into land use Gates Services,Engineering, Long Term X X ODOT,DLCD zoning/development codes. Gates N H M P Addenda November 2016 Page PA-9 97 Plan Implementation and Maintenance The City Council will be responsible for adopting the City of Gates addendum to the Marion County NHMP. This addendum designates a coordinating body and a convener to oversee the development and implementation of action items. Because the city addendum is part of the county's multi-jurisdictional NHMP, the city will look for opportunities to partner with the county.The city's steering committee will convene after re-adoption of the City of Gates addendum on a semi-annual schedule; the county is also meeting on a semi-annual basis and will provide opportunities for the cities to report on NHMP implementation and maintenance during their meetings.The City Recorder will serve as the convener and will be responsible for assembling the steering committee (coordinating body).The steering committee will be responsible for identifying new risk assessment data, reviewing status of mitigation actions, identifying new actions, and seeking funding to implement the city's mitigation strategy (actions).The convener will also remain active in the county's implementation and maintenance process. Implementation through Existing Programs Many of the NHMP's recommendations are consistent with the goals and objectives of the city's existing plans and policies. Where possible, the City of Gates will implement the NHMP's recommended actions through existing plans and policies. Plans and policies already in existence have support from local residents, businesses, and policy makers. Many land-use, comprehensive, and strategic plans get updated regularly, allowing them to adapt to changing conditions and needs. Implementing the NHMP's action items through such plans and policies increases their likelihood of being supported and implemented. Gates's acknowledged comprehensive plan is the Gates Comprehensive Plan.The Oregon Land Conservation and Development Commission first acknowledged the plan in 1977. The City last completed a major update of the plan in 2009.The City implements the plan through Gates regulatory ordinances. Gates currently has the following plans that relate to natural hazard mitigation. • Comprehensive Plan • Zoning Ordinance • Water Master Plan Continued Public Participation Keeping the public informed of the city's efforts to reduce the city's risk to future natural hazards events is important for successful plan implementation and maintenance.The city is committed to involving the public in the plan review and updated process.This includes: • Annual briefings to City Council • Articles and information in The Canyon Weekly • Postings and media on social media/website. Page PA-10 November 2016 Gates NHMP Addenda 98 Plan Maintenance The Marion County Multi-Jurisdictional Natural Hazards Mitigation Plan and city addendum will be updated every five years in accordance with the update schedule outlined in the Disaster Mitigation Act of 2000. During the county plan update process, the city will also review and update its addendum.The convener will be responsible for convening the steering committee to address the questions outlined below. • Are there new partners that should be brought to the table? • Are there new local, regional, state, or federal policies influencing natural hazards that should be addressed? • Has the community successfully implemented any mitigation activities since the plan was last updated? • Have new issues or problems related to hazards been identified in the community? • Are the actions still appropriate given current resources? • Have there been any changes in development patterns that could influence the effects of hazards? • Have there been any significant changes in the community's demographics that could influence the effects of hazards? • Are there new studies or data available that would enhance the risk assessment? • Has the community been affected by any disasters? Did the plan accurately address the impacts of this event? These questions will help the steering committee determine what components of the mitigation plan need updating.The steering committee will be responsible for updating any deficiencies found in the plan. Risk Assessment This section of the NHMP addendum addresses 44 CFR 201.6(b)(2) - Risk Assessment. In addition, this chapter can serve as the factual basis for addressing Oregon Statewide Planning Goal 7—Areas Subject to Natural Hazards. Assessing natural hazard risk has three phases: • Phase 1: Identify hazards that can impact the jurisdiction.This includes an evaluation of potential hazard impacts—type, location, extent, etc. • Phase 2: Identify important community assets and system vulnerabilities. Example vulnerabilities include people, businesses, homes, roads, historic places and drinking water sources. • Phase 3: Evaluate the extent to which the identified hazards overlap with, or have an impact on, the important assets identified by the community. The local level rationale for the identified mitigation strategies (action items) is presented herein.The risk assessment process is graphically depicted in (Figure B-1) below. Ultimately, the goal of hazard mitigation is to reduce the area of risk, where hazards overlap vulnerable systems. Gates N H M P Addenda November 2016 Page PA-11 99 (Figure B-1) Understanding Risk Z S G S1 Understanding Risk Natural ral IH r [nerable Sys-tem PtwtentiaTcatd,trophic F pr�dwswp,Senslflv""Y lk7iitJ N�Ca�p^rror,PI1ymcal Evetrl, �/O ��/ aft"7dl Re'sill nco of,; i .g'r�i�+tI�erMu�^r��nreN�Y.aNv�+a1� r"Uv un ii�rohoblhty ���p ��tuw�nrnis�twr a "$Peed of Oa so, r P I u io�Ntrurl� y ( r r r�d'",ueYC x�rNd e e �rN N%kArwfi�aon, Duration .S�Auq�i�a�r;u^nrt ���/�� �mrl"rua,Crct�cM1xuirur Ability„Resources iri l l ra � al I i�� essw -Wagate Res'polnd Prepare w Recover . $*vrcr,V$G5-[3e a a� rtlsra ,rdri�rrn r rwwCrr�usuCJ � t��arrharuPr�ab w�C�rr 2Pp Hazard Analysis Methodology This NHMP utilizes a Threat Hazard Identification and Risk Assessment methodology that is consistent with the Marion County Multi Jurisdictional Hazard Mitigation Plan. Mill City developed this assessment from historical data of events that have occurred in Marion County. The assessment uses the calculated priority risk index(CPRI) methodology to specifically examine: 1. Probability(frequency) of event 2. Magnitude of event 3. Expected warning time before event 4. Expected duration of event Table (A-3) below shows the scoring values for each ranking category. Table (A-3) Risk Assessment Hazard Ranking Scoring Values Score Probability Warning Time Magnitude/Severity Duration 4 Highly Likely Less than 6 hours Catastrophic More than 1 week 3 Likely 6-12 hours Critical Less than 1week 2 Possible 12-24 hours Limited Less than 1day 1 Unlikely 24+hours Negligible Less than 6hours Source: Marion County Emergency Management; BOLD Planning Hazard Analysis For emergency management planning purposes, this critical analysis is an assessment of the consequences of each hazard, including potential areas of impact, population exposed and impacted, duration of the hazard, and potential economic consequences.These rankings utilize the criteria laid out in THIRA to weigh them proportionally between historic data as well as future projections based on economic, demographic, the critical infrastructure information. Page PA-12 November 2016 Gates N H M P Addenda 100 These rankings were reviewed and revised by steering committee members to reflect specific community attributes and risks. (Table A-4) Probability and Vulnerability Comparison aming Planning Hazard Probability Magnitude Duration CPRI Time Significance Earthquake 4 4 4 4 4.00 iliig Severe Weather/Storm 4 4 2 3.5 3.65 iliig Landslide 3 3 4 3 3.15 iliig Power Failure 2.5 4 3.5 3 3.15 iliig Wildland Interface Fire 3.5 3 2 3 3.08 iliig Drought 3 3 1 4 2.80 Flood 2 4 2.5 3 2.78 Extreme Weather - High 3.5 2 1 4 2.73 Temperature " Transportation Accident/Train 3 3 1 3 2.70 Derailment School & Workplace Violence 1.5 4 4 2 2.68 Epidemic 2 4 1 4 2.65 Pandemic 2 4 1 4 2.65 Dam or Levee Failure 1 4 4 4 2.65 Animal Disease Outbreak 2 3 2 4 2.50 Biological Chemical, Sabotage and Cyber Incident and Explosives 1 4 1 3 2.10 Radiological Attack-Terrorism Hazardous Materials Incident 1.5 3 1 3 2.03 Civil Disorder/Terrorism 1 2 4 3 1.95 1.-o Radiological Release 1 2 4 3 1.95 1.-o Volcanic Eruption 1 2.5 1 4 1.75 1.-o Tornado 1 1.5 1 1 1.15 1.-o Source:Gates NHMP Steering Committee and Marion County NHMP Steering Committee,2016. Gates NHMP Addenda November 2016 Page PA-13 101 Hazard Characteristics Drought The steering committee determined that the city's probability for drought is moderate and their vulnerability to drought is low. Although dryer conditions in the summer months have impacted the North Santiam Canyon as a whole, Gates has not experienced major impacts from drought. Recently during the 2015 drought, many tree's and vegetation died off which has created increased risk of wildfire hazards. If dryer conditions become the new norm, Gates could experience timber die-off, making them more susceptible to wildfires. While the Detroit and Big Cliff dams control the flow of water into the North Santiam river, (required to meet minimum cubic-feet-per-second standards for salmon/steel head populations) years of substantial drought can lower water levels, threatening the water intake system. Earthquake The steering committee determined that the city's probability for a Cascadia Subduction Zone (CSZ) Earthquake event is high and that their vulnerability to this event is moderate.The steering committee determined that the city's probability for a Crustal �� Earthquake event is moderate and that their vulnerability to this event is moderate. r� ✓ ����i y���i���//���8 �imi �,!„ ���r� ��pr�f'«F��/i �jj"%�ii%// Historically, Gates has experienced one crustal earthquake on August 19 1961. A 4.5 magnitude q g g earthquake struck 6 miles from Mill City,with shaking felt throughout the Santiam Canyon, up to Detroit. �g �1 1 If another larger and more substantial earthquake occurs (Cascadia), Gates could experience damage to buildings, utility(electric power, water, wastewater, � and natural gas) and transportation systems (bridges ` " and pipelines). Cascadia Earthquake Expected Shaking Flood Violent ® Severe SCr��n�. : .. The steering committee determined that the city's probability for flooding is low Strong Very S and that their vulnerability to flooding is high. Historically, Gates experienced minor flooding events in 1964 and 1996.This was due to a specific weather pattern named "Pineapple Express", which blows warm, most air from the southwest into the Pacific Northwest. In February 1996, A combination of snowpack, warm temperatures, and record-breaking rain caused streams including the North Santiam to rise near Page PA-14 November 2016 Gates N H M P Addenda 102 or above all-time flood record levels. Gates experienced significant impacts as high/dirty water levels prevented their water facility from operating properly. Gates had no water from February 7-12.With assistance from the National Guard, Gates used a portable generator and pump to transfer water from a pond outside of city limits until February 27th In December of 2007, heavy rain hits the Santiam Canyon with 6.39 inches of rain recorded by the Detroit Dam monitoring station.1 In January of 2011, heavy rain combined with snowmelt runoff in Eastern Marion County produced flooding on the North Santiam River.The North Santiam River near Mehama crested at 11.7 feet, and flooded homes in Lyons and Mehama.2 Landslide The steering committee determined that the city's probability �P f iiti o "rG� for landslide is moderate and that their vulnerability to landslide is moderate.'' p r�ir��l✓rm�f�.,�,y'p � "'w p °'�i ��ONrr r ,. Historically, Gates has not experienced major impacts from landslides within city limits. Areas near Hwy 22 and the northern edge of the city are more susceptible to this hazard because of steep slopes. p Potential landslide-related impacts are adequately �i " ',�g(� described within the county's plan, and include infrastructural damages, economic impacts (due to isolation and/or arterial road closures), property damages, and obstruction to evacuation routes. Rain-induced landslides and debris flows can Landslide Susceptibility potentially occur during any winter in Marion ❑ Low-Landsliding Unlikely County, and thoroughfares beyond city limits are ❑ Moderate-Landsll;dling Possible susceptible to obstruction as well. F� Hugh-Landslidling Likely ® Very Higih-Existing LandslideVolcano The steering committee determined that the city's probability for volcanic event is low and that their vulnerability to volcanic event is moderate. Gates has not been impacted previously by volcanic activity, however Mount Jefferson is located east of the city, further into the cascade mountains, and could produce problems if an eruption occurs. Wildfire The steering committee determined that the city's probability for wildfire is high and that their vulnerability to wildfire is high. 1 http://www.ncdc.noaa.gov/stormevents/eventdetails.jsp?id=72206 2 http://www.ncdc.noaa.gov/stormevents/eventdetails.jsp?id=278644 Gates N H M P Addenda November 2016 Page PA-15 103 In 2002 and 2004, Gates was impacted by wildfire's which caused closure of Hwy 22.This impacted local residents, restricting travel, and negatively impacting the local economy. Gates could experience more fires as dryer conditions occur in the North Santiam Canyon. Less rainfall and snowpack can kill of tree's dependent on large amounts of water, which could ultimately lead to an increase of fuels and wild fire ignition probability. Marion County updated the Community Wildfire Protection Plan (CWPP) in 2016, which mapped wildland urban interface (WUI) areas and developed actions to mitigate wildfire risk.The city is a participant in the CWPP, and has included hazard mitigation action items directly in line with the CWPP actions. Windstorm The steering committee determined that the city's probability for windstorms is high and that their vulnerability to windstorms is high. In April of 1931, winds in the Santiam Canyon region felled hundreds of trees causing road closures between Mill City and Detroit.The winds also caused several devastating fires. In December of 1995, high wind gusts of up to 60mph downed tree's and disrupted power and communication services in the lower Santiam. Gates residents reported power and phone outages. In 2002, gusts of up to 70mph caused similar damages, blowing down tree's onto roads and power lines. About once or twice per year the city will experience a windstorm event that can interrupt services, down trees, and cause power outages. Because windstorms typically occur during winter months, they are sometimes accompanied by ice, freezing rain, flooding, and very rarely, snow. Winter Storm (Snow/Ice) The steering committee determined that the city's probability for winter storm is moderate and that their vulnerability to winter storm is high. Major winter storms have occurred in the Gates area; in January of 1937, heavy snowfall of over 2 feet caused property damage. Major roads were closed and residents of Detroit and Gates were stranded for five days as heavy snow and a landslide blocked Hwy 22. In the winter of 2006-07 ice storms caused the city to lose power for 2-3 days. In 2012, a winter storm accompanied by flooding and landslides left Gates residents without electricity for 3-5 days. Downed trees and power lines obstructed Hwy 22, requiring emergency vehicles to restore regular access. In 2014, a similar storm knocked down tree's and caused hazardous road conditions.These types of storms are more frequent and usually cause transportation issues and communication failures from downed trees and icy/snow filled roads. Community Asset Identification This section provides information on city specific assets. Many of these community characteristics can affect how natural hazards impact communities and how communities Page PA-16 November 2016 Gates N H M P Addenda 104 choose to plan for all types of hazard mitigation. Considering the city specific assets during the planning process can assist in identifying appropriate measures for natural hazard mitigation. Community Characteristics Gates is nestled along the North Santiam River bordering both Marion and Linn Counties. With a population of 474, it is the second largest city in the Santiam Canyon. Its elevation, at 945', creates a moderate climate. Summer temperatures hover between 51-76 degrees, while winter brings near freezing temperatures usually ranging from 32-44 degrees. Gates receives approximately 64 inches of rain and 10 inches of snow each year.The city's topography is relatively flat, but does possess terrain attributed to the North Santiam River. Outside of city limits, steep slopes surround the city on the North and South sides. Economy Gates benefits from its location along Hwy 22, a major east-to-west transportation route connecting Salem to Bend. Existing businesses types include hospitality, restaurants, and service stations. Most residents in the community still rely on resource extraction employment which includes agriculture,forestry,fishing, or hunting. Gates economy is limited because of its small population size and lack of infrastructure capacity, which has caused the regression of non Hwy 22 frontage development. Critical and Important Facilities/Infrastructure Communication/Information Technology There are currently two communication providers in Gates. Wave provides broadband internet and phone services, while Frontier provides phone services and broadband internet with limited fiber infrastructure adjacent to Hwy 22. Strengths: • Fiber internet infrastructure already present along Hwy 22 • Cellular Tower 1 mile east of Gates Weaknesses: • Unknown extent and availability of fiber infrastructure • Currently limited/none certified HAM radio operators Water The City of Gates has a membrane water treatment facility located on the North Santiam River at 117 Riverview Street.The facility has a diesel generator with a 400-gallon storage tank. Although the city replaced its main water lines in 2015, 40%of the water distributed is being lost through leaky pipes.Two intake lines exist on the North Santiam as well as an intake wet well. The city has two storage tanks that total 500,000 gallons (150,000 and 350,000 tanks).This above ground storage can last the city and its residents for approximately 4-5 days. Gates N H M P Addenda November 2016 Page PA-17 105 The city continues to invest in the water system to date one mile of waterlines were upgraded and in October 2016 a study was conducted on the water system to assess the vulnerable infrastructure.The city also maintains a Water Conservation Plan and is updated by the Water Resource Department; last updated in 2015. There are currently no alternative water sources available. If power is lost, propane powered generators are available for fire lines, and submersible pumps are available for municipal water. Waste Water Gates does not have a municipal wastewater treatment system. Residents and commercial businesses utilize individual septic tanks. Many residential septic tanks have never been replaced and could be over 50 years old. City staff believes that many of these tanks may be leaching biohazardous waste into the surrounding soil. Dams Two dams sit above Gates, Detroit Dam and Big Cliff Dam. Previous steering committee's have concluded that the likelihood of Dam Failure is Lows. Current conditions still represent the previous decision. If Dam failure occurred in either dams, Gates would experience catastrophic impacts from a surge of water expelled from either Detroit or Big Cliff lake. Strengths: • (1) Backup diesel generator with 400-gallon storage tank • (2)Above-ground storage tanks o Equivalent to (500,000)gallons or 4-5 days of water storage Weaknesses: • Inefficient water lines and leaks equate to higher stress on water system components • Propane powered generators for fire lines • Water system is susceptible to North Santiam water turbidity and flooding. • North Santiam PH has risen to 8, and Blue-Green Algae has been spotted. Transportation Systems Oregon Route 22 is the major transportation route for auto, public transit, and emergency vehicle access throughout the Santiam Canyon. Hwy 22 spans about 32 miles west, connecting Gates to Salem and the remainder of the Willamette Valley.To the east,the highway connects to Mill City, Gates, Detroit, Idanha, and ends at the Santiam Pass interchange. The Cherriots Canyon Connector is the only existing public transit service in the entire Santiam Canyon.This route has three total roundtrips with buses running approximately every(5) hours. In case of a major Oregon Route 22 closure, Gates residents will have to rely on alternate routes to reach supplies or safety in the Willamette Valley. In case of a catastrophic event, Gates could utilize the North Santiam River as an alternate transportation option. s http://www.co.marion.or.us/PW/EmergencyManagement/Documents/6_damfailure.pdf Page PA-18 November 2016 Gates N H M P Addenda 106 Bridges Structure Name Year Built Structural Condition East Sorbin Street Bridge 1994 Good Strengths: • Bridge is in good condition and was built relatively recently. • Lyons/Gates Drive serves as an additional evacuation route Weaknesses: • Hwy 22 closures could make travel outside of North Santiam Canyon extremely difficult. Energy & Utilities Gates receives energy and utility services from Pacific Power.There is one main power line that runs south of Gates, connecting to the main substation in Lyons. Strengths: • Gas stations with fuel storage exist near Gates within Mill City. • Businesses including Ferris & Frank Lumber possess fuel storage that could be shared with Mill City and Gates. • City Hall propane generators? Weaknesses: • Mill City gas stations possess below ground tanks which cannot be pumped without electricity. • Mill City gas stations do not currently possess backup diesel generators to pump fuel from storage tanks. • No alternate sources of energy(wind, solar) exist to power basic services. Agriculture and Food Although Gates is near Mill City which possesses the "Mill City MarketPlace" and "J&S Deli & Pub"the closest large-scale grocery exists down Hwy 22 in Stayton, Oregon. While other restaurants and cafes exist on the north side of the river in Gates, the loss of Hwy 22 as a transportation route would cause serious concern for residents and food accessibility. Although some farm land exists outside of city limits, a large majority is not used for substantial food production. Strengths: • Private sector entities which possess limited (>1 days)food supplies. • Agricultural land availability near Gates. Weaknesses: • No major(full service)grocery store inside of city limits. Gates N H M P Addenda November 2016 Page PA-19 107 • Surrounding agriculture currently not used for food production. Banking and finance The closest banking services exist in Mill City, where a U.S Bank exists on the north side of the North Santiam river.This one-story structure sits along Hwy 22 and could be utilized for emergency financial services during a hazard event. Strengths: • Presence of a banking/financing institution within nearby in Mill City Weaknesses: • Full "urban"financial services unavailable. Hazardous Materials Gates does not possess any large manufacturing firms that possess hazardous materials. The city has identified current brownfields which may be susceptible to leaching. DEQ has recently discovered items from the Detroit and Big Cliff Damn builds, none of which are currently a large concern. Brownfields DEQ-ID Facility Name Location 5820 Detroit Lake (Remedial Action) MP 42; Hwy 22 Strengths: • There are currently not enough known hazardous materials to cause major concern. • Brownfield sites could be utilized and attract privates sector development. Weaknesses: • Current brownfields maybe susceptible to leaching of unknown materials. Emergency Services Gates does not receive any police support. Emergency service support relies heavily on the Gates Rural Fire Protection District and the local Marion County CERT team. • Gates Rural Fire Protection District, 101 E. Sorbin St Strengths: • Gates possess community specific emergency services for fire enforcement. • The community possesses a trained CERT team. Page PA-20 November 2016 Gates N H M P Addenda 108 Weaknesses: • Lack of any police presence or services. • Emergency services do not have trained HAM radio operators. • Emergency services do not possess rescue rafts for North Santiam River access. Government Facilities Gates Hall contains the office space for the administration, finance, permits, planning, public works, municipal court.A Marion County owned antenna is located on top of the building.The building possess a backup propane generator with a capacity of 250 gallons. • Gates City Hall, 101 W. Sorbin St. Strengths: • Marion County owned antenna on top of City Hall. • Propane Generator with 250 gallons of storage capacity. Weaknesses: • Generator relies on propane instead of readily available diesel fuel. • Backup storage of propane does not exist. Environmental/Historical Preservation Sites Gates is surrounded by environmental preservation sites including state parks and designated wilderness areas.The housing stock in Gates was built between the 1940s-1950s and may contain some residential home sites of historical significance. Strengths: • Proximity to pristine state and federal land could attract residents or business. Weaknesses: • No major buildings of historical significance that could attract economic development/preservation dollars. Education Just like the remainder of the Santiam Canyon cities, Gates utilizes the Santiam School District. This district encompasses all cities in the Santiam Canyon including Gates, Detroit, and Idanha. This district includes the Santiam Elementary School, and the Santiam Jr/Sr High school located in Mill City. • Santiam School District o Santiam Elementary School, 450 SW Evergreen St. Mill City o Santiam Jr/Sr High School, 265 SW Evergreen St. Mill City Gates N H M P Addenda November 2016 Page PA-21 109 Strengths: • School facilities could be utilized to shelter a large amount of community residents including functional needs populations. • School facilities already possess needed infrastructure for a shelter which includes restrooms, showers and a kitchen. • School buses could be utilized for transportation after a hazard event. Weaknesses: • There are no current agreements or MOU's between the Gates, Mill City and school district to utilize facilities after a hazard event • School buildings exist outside of Gates city limits. Healthcare & Public Health Gates does not currently possess any health services.The nearest clinic is located in Mill City with limited services.The nearest hospital and full service health clinic is located in Stayton, Oregon. • Santiam Medical Clinic, 280 S 1St Ave. Strengths: • A clinic with minor services exists near Gates in Mill City. Weaknesses: • No facilities with major life-saving equipment currently exist within city limits. • Emergency health supplies are limited to what exists within the community. Access and Functional Needs Gates vulnerable population consists of the elderly and those that are medically dependent and require life safety equipment. About 50%of Gates population is characterized as being elderly, 15 children utilize school buses to Mill City, and 2 residents require life safety equipment. Strengths: • Over 60%of residents are over the age of 45, this older populous can volunteer and promote social cohesion in the community. Weaknesses: • Full medical services do not exist nearby for aging population. Page PA-22 November 2016 Gates N H M P Addenda 110 CITY OF IDANHA ADDENDUM Purpose This document serves as Idanha's Addendum to the Marion County Multi-Jurisdictional Natural Hazards Mitigation Plan (MNHMP, NHMP).This addendum seeks to supplement information contained in Volume I (Basic Plan) of this multi-jurisdictional NHMP which serves as the foundation for this jurisdiction's addendum and Volume III (Appendices)which provides additional information (particularly regarding participation and mitigation strategy).This addendum meets the following requirements: • Multi-jurisdictional Plan Adoption §201.6(c)(5), • Multi-jurisdictional Participation §201.6(a)(3), • Multi-jurisdictional Mitigation Strategy§201.6(c)(3)(iv), and • Multi-Jurisdictional Risk Assessment§201.6(c)(2)(iii). Plan Process, Participation, and Adoption This section of the NHMP addendum addresses 44 CFR 201.6(c)(5), Plan Adoption, and 44 CFR 201.6(a)(3), Participation. In the summer of 2016, the Oregon Partnership for Disaster Resilience (OPDR) at the University of Oregon's Community Service Center (CSC) partnered with Marion County and Santiam Canyon cities, including Idanha, to create the first region-specific NHMP. Part of the Santiam Canyon Regional Hazard Mitigation Plan (RHMP) required the creation of city addenda which would be adopted into the 2016 Marion County NHMP.This project is funded through the Federal Emergency Management Agency's (FEMA) FY14 Pre-Disaster Mitigation Competitive Grant Program (PDMC-PL-10-OR-2014-002). By developing this addendum to the Marion County NHMP, locally adopting it, and having it approved by FEMA, Idanha will gain eligibility for FEMA Hazard Mitigation, Pre-Disaster Mitigation, and Flood Mitigation Assistance grant program funds. The Marion County NHMP, and Idanha addendum, are the result of a collaborative effort between citizens, public agencies, non-profit organizations, the private sector, and regional organizations. A project steering committee guided the process of developing this addendum, and was composed of city staff, county representatives, and emergency service management. The Idanha city recorder is the designated convener of the NHMP and will take the lead in implementing, maintaining, and updating the addendum to the Marion NHMP in collaboration with the Santiam Canyon liaison for Marion County Emergency Management. Representatives from the City of Idanha steering committee met formally on one occasion: September 22, 2016, but communicated electronically throughout the creation of this Idanha NHMP Addenda November 2016 Page PA-1 111 document.The city's addendum reflects decisions decided upon at the plan update meeting and during subsequent work and communication with OPDR. The Idanha Steering Committee was comprised of the following representatives: • Karen Clark; Resident, Idanha • Mr. Clark; Resident, Idanha • Kathleen Silva; Santiam Canyon Liaison, Marion County • Idanha City Council Public participation was achieved with the establishment of the steering committee, which was comprised of city officials and county representatives. The Steering Committee was closely involved throughout the development of the plan and served as the local oversight body for the plan's development. In addition, community members outside of the steering committee were provided an opportunity for comment via the plan review process. The Marion County NHMP was approved by FEMA on [Month] [Day],2017 and the Idanha addendum was adopted via resolution on [Month] [Day],2017.This NHMP is effective through [Month] [Day],2022. Mitigation Strategy This section of the NHMP addendum addresses 44 CFR 201.6(c)(3(iv), Mitigation Strategy. During 2016, Marion County and OPDR evaluated the Action Items set by the county and their particular relevance to the Santiam Canyon region. Following the review, actions with relevance to the region were added into the RHMP, noting what accomplishments had been made, and whether the actions were still relevant; any new action items were identified at this time. Idanha developed a list of priority actions (Table A-1); any actions that were not prioritized were placed in the Action Item Pool (Table A-2) and will be considered during the semi-annual meetings. Priority Actions The city is listing a set of high priority actions in an effort to focus attention on an achievable set of high leverage activities over the next five-years.The city's priority actions are listed below in the following table. Detailed implementation information for each action is listed in within (Table A-1). Action Item Pool This expanded list of actions is available for local consideration as resources, capacity, technical expertise and/or political will become available. Many actions carry forward from prior versions of the Marion County NHMP and other local planning documents including the Community Wildfire Protection Plan, Drought Contingency Plan, and Mid-Willamette Economic Development study. Page PA-2 November 2016 Idanha NHMP Addenda 112 (Table A-1) Idanha Priority Action Items r� u r> > r r r r t , ll 1 11 f 1f 11>t 11 111 11 1 >t � 1 1 I 1 1 1 lrrllrrl lrl lill»I> 1��111111>' 111�� I rile � t 1 1 � ,:l I I I I��� � � I. Update planning documents Planning&City Staff (comprehensive plan,development code) General Fund September 2017 to reflect new hazard information. City staff should assess the amount of (e.g) KITH needed to run city facilities. City General Fund,MWCOG Multi-Hazard staff should_iurchase a diesel generator grants/loans, December 2017 with additional storage accordingly. Idanha NHMP Addenda November 2016 Page PA-3 113 -ONGOING- (Table A-2) Idanha Action Item Pool CZ 1 , , � � 1 r, O O CZ r � , 7. ti r r r r r CZ l u m I � � 1 0 1 1 o 1 J J 11�III11111111�1 J)JIJJJJ��11)')I)1JlJJ,J))))))1JJ)))J,JJJ�J�J1��rr�1111JJJJ11)J1IJJJJJJJ,J)))))1JJ)�IJ,�� 1 o s. N O U cC QCZ 7� .. r � U U N Sr N r � O U ✓� 1 CZ N GI Q x CZ r x �. Sr 7: r w a z Promote Great Oregon Shakeout Awareness month in October. Participate in activities for schools, Public Works, Safety Marion County Ongoing Earthquake business, and industry.Participating Committee,Marion #1 with the Mid-Willamette Emergency County Risk,Red every X X X Emergency Communications Management Cross,OEM and Media October Collective on initiatives that are focused on household preparedness. Collaborate with GROW EDC to Earthquake develop relevant public-private Idanha,Marion #2 partnerships with businesses that County Emergency GROW EDC Ongoing X X X X X X can contribute to response and Management recovery. (Multi-Hazard 4) Idanha,Marion Multi- Department of Energy, Ongoing Hazard#1 Develop an Energy Assurance Plan. County Emergency Whole Community revisions X X X X Management Source:City of Idanha NHMP Steering Committee,2015. Page PA-4 November 2016 Idanha NHMP Addenda 114 -SHORT TERM- CZ U CZO CZr U O U U S N U N C". CZr wCZ �C CZ � � r w a z Conduct an assessment of the short Marion County Public Multi- and long term needs for sheltering Idanha,Marion Health,Red Cross, Hazard#2 access and functional needs County Emergency Cities,NGO's,Oregon Short Term X X populations for all hazards. Management public Health Establish a strategic plan to utilize Multi- community resident amenities. Marion County Hazard#3 Idanha Emergency Short Term X X X X (Hill brothers)—Kubota Tractor, Management Skidder Marion County Multi- Establish an Idanha CERT team. Emergency CERT,Whole Short Term X X X Hazard#4 Management, Community Idanha Develop a community education Marion County Multi- program, such as an all hazard Emergency Public Works Whole Short Term X X X X Hazard#5 community outreach forum for Management, Community students and residents.* Idanha Idanha NHMP Addenda November 2016 Page PA-5 115 0 O O Z r U U :sS N C". �i Ct r r wCt a x U Q r a z Expand auxiliary radio capabilities Marion County ARES, CERT, Private Multi- by developing a team of HAM Emergency partners,Whole Short Term X X X X Hazard#6 Radio operators for EMS and Management, Community interested public. Idanha *Identified in Marion County Community Wildfire Protection Plan(Action Plan&Priorities) **Identified in North Santiam Watershed Drought Contingency Plan(Priority Drought Mitigation Actions) ***Identified in Mid-Willamette Valley Council of Governments Comprehensive Economic Development Study(Appendix C) Page PA-6 November 2016 Idanha NHMP Addenda 116 -LONG TERM- Cz ® � r 'iii` r r r � r � r r r r � iii` °« � � •,� a� o �' o •� o r r o ra o Cz U U � _ .� U � .U. 7 x 7? w Cz x Cz x ct r Cz a z Monitor economic impacts on Idanha,Marion County Drought#I recreation,tourism and Community Services Long Term X X X X X X agriculture communities. Emergency Management Collaborate with NSWC to complete WMCP's and North Santiam Drought#2 improve community NSWC,Idanha Watershed DCP Long Term X X X X understanding of water usage Partners and opportunities to increase efficiencies." Conduct leak detection surveys Drought#3 for the water system to increase Idanha,Marion County NSWC Long Term X X X efficiency and prevent further Public Works water loss.** Idanha NHMP Addenda November 2016 Page PA-7 117 0 O O r 7? v r r r a z Develop water storage tanks to Idanha,Marion County NSWC,Marion Drought#4 hold treated water for County Emergency Long Term X X X X municipal use. Public Works Management Collaborate with local residents USFS,FEMA,NRCS, Multi- and NSWC to mitigate risks Idanha,NSWC Marion County X X X X X Hazard#7 from the Idanha Emergency revetment/floodplain project. Management Conduct a fatigue test on Marion County Multi- Church St.bridge to ensure its Idanha,Marion County Emergency X X X Hazard#8 structural integrity in case of a Public Works Management hazard event Multi- Designate evacuation routes Idanha,Marion County RFPD Long Term X X Hazard#9 outside of Hwy 22 for EMS. Emergency Management Collaborate with Marion Marion County Marion County Multi- County to connect to a more Community Services Emergency Long Term X X X X Hazard#10 resilient regional water/sewer Department/Board of Management system. Commissioners,Idanha Gather community support for Marion County Multi- the installation of resilient fiber Community Services Hazard#I I communication infrastructure Idanha Department/Board of Long Term X X X X throughout the community.*** Commissioners Page PA-8 November 2016 Idanha NHMP Addenda 118 0 O O r 7? v r r r a z Collaborate with Detroit Ranger District, ODF, and ODF,BLM, Idanha Marion County Wildfire#I BLM to conduct fuel hazard Ranger District,Idanha Emergency Long Term X X X reduction along the Wildland RFD Management Urban interface and Hwy 22.* Collaborate with ODF and ODF,BLM, Idanha Marion County Wildfire#2 Idanha-Detroit RFD to develop Ranger District,Idanha- Emergency Long Term X X X strategic community fuel Detroit RFD Management breaks. Integrate new DOGAMI Environmental Landslide landslide hazard information #I into land use Idanha Services,Engineering, Long Term X X ODOT,DLCD zoning/development codes. Widen the North Santiam River and reassess the dike and Marion County Flood#I jetty to minimize flooding Idanha,NSWC Emergency Long Term X X X within the North Santiam River Management Project Idanha NHMP Addenda November 2016 Page PA-9 119 Plan Implementation and Maintenance The City Council will be responsible for adopting the City of Idanha addendum to the Marion County NHMP. This addendum designates a coordinating body and a convener to oversee the development and implementation of action items. Because the city addendum is part of the county's multi-jurisdictional NHMP, the city will look for opportunities to partner with the county.The city's steering committee will convene after re-adoption of the City of Idanha addendum on a semi-annual schedule; the county is also meeting on a semi-annual basis and will provide opportunities for the cities to report on NHMP implementation and maintenance during their meetings.The City Recorder will serve as the convener and will be responsible for assembling the steering committee (coordinating body).The steering committee will be responsible for identifying new risk assessment data, reviewing status of mitigation actions, identifying new actions, and seeking funding to implement the city's mitigation strategy (actions).The convener will also remain active in the county's implementation and maintenance process. Implementation through Existing Programs Many of the NHMP's recommendations are consistent with the goals and objectives of the city's existing plans and policies. Where possible, the City of Idanha will implement the NHMP's recommended actions through existing plans and policies. Plans and policies already in existence have support from local residents, businesses, and policy makers. Many land-use, comprehensive, and strategic plans get updated regularly, allowing them to adapt to changing conditions and needs. Implementing the NHMP's action items through such plans and policies increases their likelihood of being supported and implemented. Idanha 's acknowledged comprehensive plan is the Idanha Comprehensive Plan.The Oregon Land Conservation and Development Commission first acknowledged the plan in XXX. The City last completed a major update of the plan in XXX.The City implements the plan through regulatory ordinances. Idanha currently has the following plans that relate to natural hazard mitigation. For a complete list visit the city website for planning and Public works: • Comprehensive Plan • Development Code • Transportation System Plan Continued Public Participation Keeping the public informed of the city's efforts to reduce the city's risk to future natural hazards events is important for successful plan implementation and maintenance.The city is committed to involving the public in the plan review and updated process.This includes: • Annual briefings to city council • Articles and information in The Canyon Weekly • Postings and media on social media/website. Page PA-10 November 2016 Idanha NHMP Addenda 120 Plan Maintenance The Marion County Multi-Jurisdictional Natural Hazards Mitigation Plan and city addendum will be updated every five years in accordance with the update schedule outlined in the Disaster Mitigation Act of 2000. During the county plan update process, the city will also review and update its addendum.The convener will be responsible for convening the steering committee to address the questions outlined below. • Are there new partners that should be brought to the table? • Are there new local, regional, state, or federal policies influencing natural hazards that should be addressed? • Has the community successfully implemented any mitigation activities since the plan was last updated? • Have new issues or problems related to hazards been identified in the community? • Are the actions still appropriate given current resources? • Have there been any changes in development patterns that could influence the effects of hazards? • Have there been any significant changes in the community's demographics that could influence the effects of hazards? • Are there new studies or data available that would enhance the risk assessment? • Has the community been affected by any disasters? Did the plan accurately address the impacts of this event? These questions will help the steering committee determine what components of the mitigation plan need updating.The steering committee will be responsible for updating any deficiencies found in the plan. Risk Assessment This section of the NHMP addendum addresses 44 CFR 201.6(b)(2) - Risk Assessment. In addition, this chapter can serve as the factual basis for addressing Oregon Statewide Planning Goal 7—Areas Subject to Natural Hazards. Assessing natural hazard risk has three phases: • Phase 1: Identify hazards that can impact the jurisdiction.This includes an evaluation of potential hazard impacts—type, location, extent, etc. • Phase 2: Identify important community assets and system vulnerabilities. Example vulnerabilities include people, businesses, homes, roads, historic places and drinking water sources. • Phase 3: Evaluate the extent to which the identified hazards overlap with, or have an impact on, the important assets identified by the community. The local level rationale for the identified mitigation strategies (action items) is presented herein.The risk assessment process is graphically depicted in (Figure B-1) below. Ultimately, the goal of hazard mitigation is to reduce the area of risk, where hazards overlap vulnerable systems. Idanha NHMP Addenda November 2016 Page PA-11 121 (Figure B-1) Understanding Risk Z S G S1 Understanding Risk Natural ral IH r [nerable Sys-tem PtwtentiaTcatd,trophic F pr�dwswp,Senslflv""Y lk7iitJ N�Ca�p^rror,PI1ymcal Evetrl, �/O ��/ aft"7dl Re'sill nco of,; i .g'r�i�+tI�erMu�^r��nreN�Y.aNv�+a1� r"Uv un ii�rohoblhty ���p ��tuw�nrnis�twr a "$Peed of Oa so, r P I u io�Ntrurl� y ( r r r�d'",ueYC x�rNd e e �rN N%kArwfi�aon, Duration .S�Auq�i�a�r;u^nrt ���/�� �mrl"rua,Crct�cM1xuirur Ability„Resources iri l l ra � al I i�� essw -Wagate Res'polnd Prepare w Recover . $*vrcr,V$G5-[3e a a� rtlsra ,rdri�rrn r rwwCrr�usuCJ � t��arrharuPr�ab w�C�rr 2Pp Hazard Analysis Methodology This NHMP utilizes a Threat Hazard Identification and Risk Assessment methodology that is consistent with the Marion County Multi Jurisdictional Hazard Mitigation Plan. Mill City developed this assessment from historical data of events that have occurred in Marion County. The assessment uses the calculated priority risk index(CPRI) methodology to specifically examine: 1. Probability(frequency) of event 2. Magnitude of event 3. Expected warning time before event 4. Expected duration of event Table (A-3) below shows the scoring values for each ranking category. Table (A-3) Risk Assessment Hazard Ranking Scoring Values Score Probability Warning Time Magnitude/Severity Duration 4 Highly Likely Less than 6 hours Catastrophic More than 1 week 3 Likely 6-12 hours Critical Less than 1week 2 Possible 12-24 hours Limited Less than 1day 1 Unlikely 24+hours Negligible Less than 6hours Source: Marion County Emergency Management; BOLD Planning Hazard Analysis For emergency management planning purposes, this critical analysis is an assessment of the consequences of each hazard, including potential areas of impact, population exposed and impacted, duration of the hazard, and potential economic consequences.These rankings utilize the criteria laid out in THIRA to weigh them proportionally between historic data as well as future projections based on economic, demographic, the critical infrastructure information. Page PA-12 November 2016 Idanha NHMP Addenda 122 These rankings were reviewed and revised by steering committee members to reflect specific community attributes and risks. (Table A-4) Probability and Vulnerability Comparison Warning Planning Hazard Probability Magnitude Duration CPi Time Significance Earthquake 4 4 4 4 4.00 Hliig Severe Weather/Storm 4 4 2 3.5 3.65 Hliig Power Failure 3 4 3.5 3 3.38 Hliig Wildland Interface Fire 3.5 3.5 2 3 3.23 Hliig Transportation Accident/Train 3 3.5 1 3 2.85 Derailment " Drought 3.5 2 1 4 2.73 , Extreme Weather - High Temperature 3.5 2 1 4 2.73 School & Workplace Violence 1.5 4 4 2 2.68 Epidemic 2 4 1 4 2.65 , Pandemic 2 4 1 4 2.65 , Landslide 2 2.5 4 2.5 2.50 , Animal Disease Outbreak 2 3 2 4 2.50 Volcanic Eruption 1 4 1 4 2.20 Hazardous Materials Incident 1.5 3.5 1 3 2.18 Biological Chemical, Sabotage and Cyber Incident and Explosives 1 4 1 3 2.10 Radiological Attack-Terrorism Civil Disorder/Terrorism 1 2 4 3 1.95 1-ow Release 1 2 4 3 1.95 1-ow or Levee Failure 1 1 4 4 1.75 1-ow 1 1 2 2 2 1.55 1-ow 1 1 1 1 1.00 1-ow Gates NHMP Steering Committee and Marion County NHMP Steering Committee,2016. Idanha NHMP Addenda November 2016 Page PA-13 123 Hazard Characteristics Drought The steering committee determined that the city's probability for drought is moderate and their vulnerability to drought is moderate. Although dryer conditions in the summer months have impacted the North Santiam Canyon as a whole, Idanha has experienced major impacts from drought. Idanha's economy relies heavily upon the recreation provided by the water levels of Detroit Lake, which can experience low levels during years of major drought. Dry conditions throughout 2001 caused Detroit Lake water levels to recede below 1,546 feet (min. elev.for moorage), contributing to a Detroit area (including Idanha) economic loss of over $5 million dollars.1 Recently during the 2015 drought, similar economic impacts were experienced with additional damage caused by tree and vegetation die off which has created an increased risk of wildfire hazards. If dryer conditions become the new norm, Idanha could experience timber die-off, making them more susceptible to wildfires, as well as economic hardships if their current seasonal economy does not expand. Earthquake The steering committee determined that the city's probability for a Cascadia Subduction Zone (CSZ) Earthquake event is high and that their vulnerability to this event is moderate.The steering committee determined that the city's probability for a � Crustal Earthquake event is moderate and that their " vulnerability to this event is moderate. Historically, Idanha has experienced one crustal earthquake on August 19, 1961. A 4.5 magnitude earthquake struck 6 miles from Mill City, with shaking felt throughout the Santiam Canyon, up to Idanha. If another larger and more substantial earthquake occurs i (Cascadia), Idanha could experience damage to buildings, utility (electric power, communication, water, wastewater, and natural gas) and transportation systems (bridges and pipelines). Cascadia Earthquake Expededl Shaking Flood Violent ® Severe Very Strong... The steering committee determined that the city's ❑ Strong probability for flooding is low and that their vulnerability to flooding is low. 1 http://agsci.oregonstate.edu/sites/agsci.oregonstate.edu/files/ruralstudies/pub/pdf/detroitlake-srl07l.pdf (Table 5) Page PA-14 November 2016 Idanha NHMP Addenda 124 Historically, Idanha experienced one major flooding event in 2006. Heavy rains and high winds created a multitude of damage in the Detroit, Idanha, and Breitenbush area. g Impacts included roofing damage,flooding of public facilities sinkholes erosion and water facility intake- clogging due to turbidity. Landslide The steering committee determined that the city's probability for landslide is moderate and that their vulnerability to landslide is moderate. Historically, Idanha has not experienced major impacts from landslides within city limits. Areas in the east and northern portion of the city are susceptible because of steep mountainous terrain. Landslide Susceptibility Low-�La�ndsliiding UnlikelyPotential landslide-related impacts are adequately described F-1 Moderate-Landsil➢dng Possible within the county's plan, and include infrastructural damages, H„ _,Lands,;d„n Likely economic impacts (due to isolation and/or arterial road ® Very High-Existing Landslide closures), property damages, and obstruction to evacuation routes. Rain-induced landslides and debris flows can potentially occur during any winter in Marion County, with evacuation routes beyond city limits susceptible to obstruction as well. Volcano The steering committee determined that the city's probability for volcanic event is low and that their vulnerability to ��i volcanic event is moderate. Idanha has not been impacted previously by volcanic activity, however Mount Jefferson is located east of the city into the Cascade Mountains, and could produce problems if an eruption occurs.The city sits in the Mount Jefferson ��/ Moderate Hazard Zone and could experience ash fall, debris avalanches, pyroclastic flows, lahars and slow-moving lava flows. City residents should be evacuated before an eruption begins in case of impassible roads and dangerous conditions. Mq.h H82ard zone Wildfire Im oderarte Lazard Z'or The steering committee determined that the city's probability 11f for wildfire is high and that their vulnerability to wildfire is high. Idanha NHMP Addenda November 2016 Page PA-15 125 In 2001 the"Breitenbush fire" threatened city residents creating road closures and hazardous conditions. In 2002 and 2004, Idanha was impacted by wildfire's which caused closure of Hwy 22.This impacted local residents, restricting travel, and negatively impacting the local economy. In 2011,the "Nasty Fire" threatened the Opal Creek Wilderness, while the 2014"Bingham Complex Fire" restricted travel and required Detroit Ranger Station response. Idanha could experience more fires as dryer conditions occur in the North Santiam Canyon. Less rainfall and snowpack can kill of tree's dependent on large amounts of water,which could ultimately lead to an increase of fuels and wild fire ignition probability. Marion County updated the Community Wildfire Protection Plan (CWPP) in 2016, which mapped wild land urban interface areas and developed actions to mitigate wildfire risk.The city is a participant in the CWPP, and has included hazard mitigation action items directly in line with the CWPP actions. Windstorm The steering committee determined that the city's probability for windstorms is high and that their vulnerability to windstorms is high. In April of 1931, winds in the Santiam Canyon region felled hundreds of trees causing road closures between Mill City and Idanha.The winds also caused several devastating fires throughout the Santiam Canyon. On December of 1995, high wind gusts of up to 60mph downed tree's and disrupted power and communication services in the lower Santiam. In 2002, a windstorm caused similar damages, blowing down tree's onto roads and power lines. About once or twice per year the city will experience a windstorm event that can interrupt services, down trees, and cause power outages. Because windstorms typically occur during winter months, they are sometimes accompanied by ice, freezing rain, flooding, and very rarely, snow. Winter Storm (Snow/Ice) The steering committee determined that the city's probability for winter storm is moderate and that their vulnerability to winter storm is high. Major winter storms have occurred in the Idanha area; in January of 1937, heavy snowfall of over 2 feet caused property damage. Major roads were closed and residents of Detroit/Idanha area were stranded for five days as heavy snow and a landslide blocked Hwy 22. In 1950, a large snow event caused 54 inches of snow in Detroit/Idanha area, while 122 inches blanketed Detroit Dam. In January of 1957, Cold temperatures brought over half a foot of snow to Idanha, as well as icy roads throughout the Santiam Canyon. Cold temperatures also caused the Bonneville Power Authority to cut interruptible power to the regions' industrial customers because ice behind the dam slowed water flow and limited the ability to generate power.2 In January of 1963, Idanha recorded almost a foot, while cold temperatures created hazardous road 2 http://www.co.marion.or.us/PW/EmergencyManagement/Documents/14_severewinterstorm.pdf Page PA-16 November 2016 Idanha NHMP Addenda 126 conditions.3 In 1964, a flood impacted 21 houses, and 2 bridges,while a winter storm in 1990 resulted in downed tree's and a loss of power. During the last couple days of December 2003, the Detroit/Idanha area received an accumulation of 4-5 feet of snow. Both cities declared a State of Emergency as the City of Idanha lost power between December 291h and January 6th; Idanha lost power between January 1St and January 4th. In early 2008, Idanha received over 12 feet of snow in a two-month period.Three dozen Oregon National Guard personnel were called in to help with snow removal. Damage included collapsed roofs and cracked walls, mostly impacting homeowners.4 In 2012, a winter storm event accompanied by flooding, landslides, and mudslides left Santiam Canyon residents with no electricity for 3-5 days. Downed trees and power lines obstructed Hwy 22, requiring emergency vehicles to restore regular traffic flows.5 Winter storms are more frequent hazards and usually cause transportation issues and communication failures from downed trees and icy/snow filled roads. Community Asset Identification This section provides information on city specific assets. Many of these community characteristics can affect how natural hazards impact communities and how communities choose to plan for natural hazard mitigation. Considering the city specific assets during the planning process can assist in identifying appropriate measures for natural hazard mitigation. Community Characteristics Idanha is located approximately 57 miles east of Salem, bordering the North Santiam River. It is the smallest community in the North Santiam River Canyon with a population of 136. With an elevation of 1718 feet, the climate of Idanha is moderate;the average monthly temperatures range from 50—80 degrees in July and August, and 29-41 degrees in December and January. Idanha receives approximately 66 inches of rain and 35 inches of snow each year.The city's topography is relatively flat with steep slopes surrounding the area along Hwy 22. Economy Idanha benefits from its location along Hwy 22, a major east-to-west transportation route connecting Salem to Bend. But due to its small population size and lack of development,the city lacks many commercial amenities.The city has one retail storefront along Hwy 22, but most of the manufacturing and timber related employment has left the city. Historically, Idanha prospered from the development of the railroad and dam, which helped spur growth in 3 http://www.co.marion.or.us/PW/EmergencyManagement/Documents/14_severewinterstorm.pdf 4 http://www.co.marion.or.us/PW/EmergencyManagement/Documents/14_severewinterstorm.pdf 5 http://www.fema.gov/media-library-data/20130726-1831- 250457682/dhs_ocfo_pda_report_fema_4055 dr or.pdf Idanha NHMP Addenda November 2016 Page PA-17 127 manufacturing, logging, and fishing.Today,the economy relies upon the recreational opportunities available through state/federal lands, and the North Santiam River. Critical and Important Facilities/Infrastructure Communication/Information Technology There is currently one communication provider in Idanha. Frontier provides phone service, and various satellite businesses provide broadband speed internet. Strengths: • Most residents utilize scanners or citizen band (CB) radio's. • A phone substation is located in nearby Detroit. Weaknesses: • Limited internet speeds and provider access. • Poor phone services and reception. • Main communication line runs down highway 22, and is susceptible to from trees and wind. Water The City of Idanha has two water sources from the Chittum Creek, and Mud Puppy Creek fed by a natural spring named rainbow creek. This system currently utilizes a surface water intake to pull water from these sources.The city also contains dike and jetty infrastructure along the North Santiam River, however the town is still vulnerable due to the geographic topography of the river. Waste Water Idanha does not have any municipal waste-water infrastructure.The city's residents and business owners rely on individual septic tanks.These septic tanks can be up to 60-years old and could be leaching biohazardous waste into the ground water/ North Santiam River.The city recently conducted tests (10-15 years ago) and found no leaching or hazardous material issues. Dams Two dams sit below Idanha, Detroit Dam and Big Cliff Dam. Previous steering committees have concluded that the likelihood of Dam Failure is Lows. Current conditions still represent the previous decision. If Dam failure occurred in either dams, Idanha would most likely lose access to the western portion of Hwy 22. 6 http://www.co.marion.or.us/PW/EmergencyManagement/Documents/6_damfailure.pdf Page PA-18 November 2016 Idanha NHMP Addenda 128 Strengths: • (2)water intake sources (Chittum & Mud Puppy Creek). • (1) backup diesel generator on-site, near water intake sources. Weaknesses: • Limited diesel fuel available inside of city limits. • Water intake sources are susceptible to wildfire damage. • The city is losing large amounts of water distributed through leaky pipes. Transportation Systems Oregon Route 22 is the major transportation route for auto, public transit, and emergency vehicle access throughout the Santiam Canyon. Hwy 22 spans about 57 miles west, connecting Idanha to Salem and the remainder of the Willamette Valley.To the east, the highway connects Idanha to the Santiam Pass interchange. The Cherriots Canyon Connector is the only existing public transit service in the entire Santiam Canyon.This route has three total round trips with buses running approximately every (5) hours. Idanha residents are forced to drive to Gates to utilize these services, as the canyon connector does not reach Detroit or Idanha. In case of a major Oregon Route 22 closure, Idanha residents will have to rely on alternate routes to reach supplies or safety.The cities alternate routes are limited with NF-2231, NF-2233, and NF-2234. Depending on weather conditions, these roads may be unpassable. The city is home to one bridge that crosses over the North Santiam River. Water lines that serve the population in "New Idanha" are co-located on this bridge. Bridge failure could disrupt water services to these residents. Bridges Structure Name Year Built Structural Condition Church St. Bridge n/a Fair Strengths: • Proximity to ODOT facility may increase access to public works services. • The Idanha-Detroit RFD location is in city limits and could be utilized in a hazard event. • National Forest Roads exist outside of Idanha and could be utilized as emergency evacuation routes. Weaknesses: • Loss of Church St. bridge would isolate a large percentage of Idanha residents. • Loss of Church St. bridge could disrupt drinking water services. • Alternate routes are long, and most likely impassible in winter months. • Hwy 22 closures could make travel outside of North Santiam Canyon extremely difficult. • Public transportation options are limited and only reach to the city of Gates. • The lack of a pedestrian sidewalk along Hwy 22 created safety hazards for pedestrians. Idanha NHMP Addenda November 2016 Page PA-19 129 Energy & Utilities Idanha receives energy and utility services from Consumer Power Inc.There are no substations located in Idanha. One main power line runs along Hwy 22, connecting to Detroit, Gates and Mill City. Strengths: • Many residents have their own generators and are able to power basic home amenities during power outages. • Most residents utilize firewood as a heating source, making them more resilient in case of a power outage. Weaknesses: • No fueling stations exist within city limits. • Nearby gas stations in Detroit do not currently possess backup diesel generators to pump fuel from storage tanks. • No alternate sources of energy(wind, solar) exist to power basic services. • Downed power lines are a reoccurring issue around Hoover Campground (Santiam Park). • Power lines are co-located on the bridge • Residents rely on wood burning stoves for heat. Agriculture and Food Although Idanha possesses the "Idanha County Store"the closest large-scale grocery exists down Hwy 22 in Stayton, Oregon.The loss of Hwy 22 as a transportation route would cause serious concern for residents and food accessibility.The city is surrounded by steep slopes that are state and federal land.There is no agricultural capability other than small-scale "urban" farms within city limits. Strengths: • Country store within city limits provides limited amenities and food supplies. • Many residents have food storage already in place because of the lack of availability. Weaknesses: • No major(full service)grocery store inside of city limits. • Surrounding land not suitable for agricultural purposes. Banking and finance Idanha's nearest option for banking services is located in Mill City.This one-story structure sits along Hwy 22 and could be utilized for emergency financial services during a hazard event. Idanha does not have any financial services within city-limits. Strengths: Page PA-20 November 2016 Idanha NHMP Addenda 130 • Cash flow from nearby business and residents could possibly be utilized. Weaknesses: • Lack of banking/financing institutions within city limits. • Full "urban"financial services unavailable. Hazardous Materials The city's history of manufacturing and logging activities have created concerns around hazardous materials found on abandoned lots. Although only one lot has been identified as a brownfield, many lots contain underground storage tanks that most likely need to be removed for any further development to occur.These tanks could be leeching hazardous materials previously used by local businesses. Brownfields DEQ ID Facility Name Location 2479 Green Veneer& Lumber Mill 886 Hwy 22 (assessment recommended) Strengths: • There are currently not enough known hazardous materials to cause major concern. • Brownfield sites could be utilized and attract privates sector development. Weaknesses: • Current brownfields maybe susceptible to leaching of unknown materials. • Many lots still contain underground storage tanks that are even more susceptible to leaching of hazardous materials. Emergency Services Idanha receives emergency service support from the Idanha-Detroit Rural Fire Protection District. • Idanha-Idanha Rural Fire Protection District, 107 Hwy 22 NW Strengths: • Idanha possesses emergency services provided by the Idanha-Detroit RFD within city limits. Weaknesses: • Idanha lacks any police or medical services. • Ambulance services must travel from Lyons. • First responders are very limited to basic life monitoring services. • Emergency services do not have trained HAM radio operators. Idanha NHMP Addenda November 2016 Page PA-21 131 Government Facilities Idanha City Hall contains the office space for all city services. • Idanha City Hall, 111 Hwy 22 • Post Office, 103 Hwy 22 Strengths: • City Hall facility has bathrooms, and could be utilized in an emergency event. Weaknesses: • City Hall is small with space already utilized by other services. • The building lacks any backup generator to power the facility. Environmental/Historical Preservation Sites Idanha is surrounded by environmental preservation sites including federal land, state parks and designated wilderness areas.The city is also home to the beginning of the Oregon Pacific Railroad Linear Historic District. Designated in 1999 this 20-mile section of old railroad connects Idanha to the Cascade Range Summit. Strengths: • Proximity to pristine state and federal land could attract residents or business. • Oregon Pacific Railroad Linear Historic District could be utilized to as an emergency trail system. Weaknesses: • Idanha lacks any buildings with character that exemplify the historical "timber" identity in the community. Education Idanha is part of the Santiam School District.This district encompasses all cities in the Santiam Canyon including Mill City, Gates, and Detroit.This district includes the Santiam Elementary School, and the Santiam Jr/Sr High School. • Santiam School District o Santiam Elementary School, 450 SW Evergreen St. o Santiam Jr/Sr High School, 265 SW Evergreen St. Strengths: • School facilities could be utilized to shelter a large amount of community residents including functional needs populations. Page PA-22 November 2016 Idanha NHMP Addenda 132 • School facilities already possess needed infrastructure for a shelter which includes restrooms, showers and a kitchen. • School buses could be utilized for transportation after a hazard event. Weaknesses: • Idanha is over 25 miles from these school services. • There are no current agreements or MOU's between the city and school district to utilize facilities after a hazard event. Healthcare & Public Health Idanha's nearest medical services are located in Mill City which possesses one clinic with limited services.The nearest hospital and full service health clinic is located in Stayton, Oregon. • Santiam Medical Clinic, 280 S 1St Ave. Strengths: • A clinic with minor services exists within the North Santiam Canyon Weaknesses: • Closest health services are located over 20 miles. • No facilities with major life-saving equipment currently exist within city limits. • Emergency health supplies are limited to what exists within the community. Access and Functional Needs Idanha's vulnerable population consists of the elderly and those that are medically dependent and require life safety equipment. About 22%of Idanha's population is characterized as being elderly, and one legally blind resident resides within city limits. Strengths: • Over 55%of residents are over the age of 45, this older populous can volunteer and promote social cohesion in the community. Weaknesses: • Full medical services do not exist nearby for aging population. Idanha NHMP Addenda November 2016 Page PA-23 133 CITY OF KEIZER ADDENDUM Purpose This document serves as the City of Keizer's Addendum to the Marion County Multi- Jurisdictional Hazards Mitigation Plan (MHMP, HMP).This addendum supplements information contained in Volume I (Basic Plan) of this HMP.The Basic Plan serves as the foundation for this jurisdiction's addendum. Volume III (Appendices) provides additional information (particularly regarding participation and mitigation strategy).This addendum meets the following requirements: • Multi-jurisdictional Plan Adoption §201.6(c)(5), • Multi-jurisdictional Participation §201.6(a)(3), • Multi-jurisdictional Mitigation Strategy§201.6(c)(3)(iv), and • Multi-Jurisdictional Risk Assessment§201.6(c)(2)(iii). Plan Process, Participation, and Adoption This section of the HMP addendum addresses 44 CFR 201.6(c)(5), Plan Adoption, and 44 CFR 201.6(a)(3), Participation. In the summer and fall of 2016, the Oregon Partnership for Disaster Resilience (OPDR) at the University of Oregon's Community Service Center (CSC) partnered with the Oregon Military Department's Office of Emergency Management(OEM), and Marion County cities, including Keizer, to update their addendum to the Marion County HMP, which expired July 8, 2016. This project is funded through the Federal Emergency Management Agency's (FEMA) FY14 Pre-Disaster Mitigation Competitive Grant Program (PDMC-PL-10-OR-2014-002). By developing this addendum to the Marion County HMP, locally adopting it, and having it approved by FEMA, the City of Keizer will regain eligibility for FEMA Hazard Mitigation, Pre- Disaster Mitigation, and Flood Mitigation Assistance grant program funds. The Marion County HMP, and Keizer addendum, are the result of a collaborative effort between citizens, public agencies, non-profit organizations, the private sector, and regional organizations. A project steering committee guided the process of developing the plan. For more information on the composition of the steering committee see the Acknowledgements, Plan Summary, and Plan Process (Volume III, Appendix B). The Keizer Emergency Manager/Public Works Director is the designated local convener of this addendum.The Convener will take the lead in implementing, maintaining, and updating the addendum to the HMP in collaboration with Marion County Emergency Management. Representatives from the City of Keizer steering committee met formally on one occasion: September 29, 2016 (see Appendix B for more information). The city's addendum reflects decisions decided upon at the plan update meeting and during subsequent work and communication with OPDR. Marion County HMP March 2017 Page KZ-1 134 The City of Keizer Steering Committee is comprised of representatives from the following departments: • Convener, Keizer Emergency Manager/Public Works Director • Police • Planning/Community Development • Public Works: o Water Division o Project Manager o Public Works Technician o Environmental and Technical Division • Marion County Emergency Management (as needed) • Keizer Fire District • Marion County Fire District 1 • Salem-Keizer School District • Chamber of Commerce (as needed) Keizer used multiple approaches to engage the public. First,the City established steering committee representatives from across the city. Next, the City actively participated in countywide community engagement activities described in Volume I, Section 4 and in Appendix B. City staff also presented the draft plan to the City Council during an open public council session.The Steering Committee was closely involved throughout the development of the plan and served as the local oversight body for the plan's development. In addition, community members outside of the steering committee were provided an opportunity for comment via the plan review process (see Appendix B for more information). The Marion County HMP was approved by FEMA on [Month] [Day],2017 and the Keizer addendum was adopted via resolution on [Month] [Day],2017.This HMP is effective through [Month] [Day],2022. Mitigation Strategy This section of the HMP addendum addresses 44 CFR 201.6(c)(3(iv), Mitigation Strategy. During the 2016 Marion County and Keizer update process, OPDR and a representative from Marion County Emergency Management assisted the steering committee with developing mitigations that will meet Keizer's unique situation.The proposed actions were then re- reviewed by the steering committee to finalize. Keizer developed a list of priority actions (Appendix A-1), any actions that were not prioritized were placed in the Action Item Pool (Appendix A-2) and will be considered during the annual meetings. For a status update on each of Keizer's 2009 mitigation actions, see Appendix A-2. Priority Actions The City is listing a set of high priority actions in an effort to focus attention on an achievable set of high leverage activities over the next five-years.The City's priority actions are listed in Table KZ-1 on the following pages. Action Item Pool Page KZ-2 March 2017 Marion County HMP 135 Table KZ-2 on the following pages presents a pool of mitigation actions.This expanded list of actions is available for local consideration as resources, capacity, technical expertise and/or political will become available. Marion County HMP March 2017 Page KZ-3 136 Table KZ-1. Keizer Priority Action Items Action Coordinating Partner Hazard Action item 7imefine. Item ID Organization Organizations " ' M� FIIII1117111111171111IWMIII,, .,u,�b .,u,�b WO MM Work with Cities of Salem and Turner to perform siesmic evaluation City of Keizer Public City of Turner;City Short Term(1-2 P-1 Earthquake of wastewater transmission infrastructure and impact on drinking Works of Salem years) water supply. P-2 Earthquake Conduct seismic evaluation of Keizer's drinking water well field. City of Keizer Public Mid Term(3-5 Works years) P-3 Earthquake Conduct seismic evaluation of Chemawa,Dearborn,and Alder Street City of Keizer Public Short Term(1-2 bridges over Claggett Creek Works years) P-4 Earthquake Assess the feasibility and cost to seismically retrofit Keizer's public City of Keizer Public Long Term(5 works facilities(City shops). Works years) Source:City of Keizer HMP Steering Committee,2016. Page KZ-4 March 2017 Marion County HMP 137 Table KZ-2. Keizer Action Item Pool Action Hazard Action Item Coordinating Partner oelneTimItem iR Organization�� � OrganizationsMulti- Create an emergency preparedness section on the City's website.MH-1 Keizer Administration Marion Co. On Hazard Populate with resources and publicize. Maintain a regular presence at outreach events,especially Multi- Keizer Emergency MH-2 Hazard Management neighborhood association events,and provide the public with Marion Co.,CERT Ongoing preparedness resources. Multi- Make guest appearance on local radio shows to provide Keizer Emergency MH-3 Marion Co.,CERT Ongoing Hazard announcements and resources for preparedness. Management Multi- Add hazard awareness material into existing environmental MH-4 City of Keizer Marion Co.,CERT Ongoing Hazard education currently done in schools. Multi- City emergency Short Term(1-2 MH-5 Join Marion County's Everbridge communication system. Marion Co.,CERT Hazard responders years) Multi- Keizer Emergency Mid Term(3-5 MH-6 Encourage residents to participate in Everbridge. City Council Hazard Management years) Meet with the City of Salem to discuss the Willow Lake Waste Water Treatment Plant: Multi- City of Keizer Public Short Term(1-2 MH-7 *How it can be reinforced to minimize damage in a hazard event. City of Salem Hazard Works years) *How hazardous materials can be secured or removed to prevent groundwater contamination MH-8 Multi- Further develop risk assessment maps to show areas at risk for all FEMA Risk MAP DOGAMI,DLCD Short Term(1-2 Hazard hazards. years) Emergency Multi- Short Term(1-2 MH-9 Hazard Develop mutual aid agreements with surrounding counties. City Ad ministration Manager,Public ears Works years) Expand on the information gathered for the internal public works Multi- Emergency Mid Term(3-5 MH-10 operational manual to create a full registry of populations that may Public Works Hazard Manager years) need particular assistance in an emergency situation. Multi- Keizer Emergency Short Term(1-2 MH-11 Update the Continuity of Operations Plan. Marion Co. Hazard Management years) Multi- Participate in Marion County's post-disaster recovery planning Mid Term(3-5 MH-12 City Administration Marion Co. Hazard efforts. years) Multi- Continue development of CERT teams to ease the load on emergency Keizer Emergency MH-13 CERT Ongoing Hazard services following a disaster. Management Develop memoranda of understanding with appropriate facilities Multi- Keizer Emergency Short Term(1-2 MH-14 Hazard specifying that they will function as emergency shelters during Management Red Cross years) disruptive events with support from the City. Multi- Educate businesses and governmental organizations about the MH-15 Environmental Marion Co. Ongoing Hazard importance of developing continuity of operations plans. Multi- Update the Keizer Comprehensive Plan to reflect statewide land use Mid Term(3-5 MH-16 Hazard Goal 7 language surrounding natural hazards. Planning DLCD years) Source:City of Keizer HMP Steering Committee,2016. Marion County HMP March 2017 Page KZ-5 138 Table KZ-2. Keizer Action Item Pool (Continued) Action Coordinating Partner Hazard Action item Timeline Item ID Organization Organizations 1j')il�d", W1111 I1j EQ-1 Earthquake Participate in the Great Shakeout each year. City Administration OEM Ongoing EQ-2 Earthquake School seismic retrofitting action-need to talk to school district School District Business Oregon- Short Term(1-2 representative. IFA years) City EQ-3 Earthquake Send city employees to the County's ATC 20 training. Public Works Administration, Ongoing Emergency Management EQ-4 Earthquake Perform a seismic analysis of box culverts in Keizer and repair or City of Keizer Public Marion Co. DOT Mid Term(3-5 upgrade as resources become available. Works years) EQ-5 Earthquake Encourage residents to prepare and maintain 2-week survival kits. Keizer Emergency CERT Ongoing Management i I I Ill I Continue compliance with the National Flood Insurance Program through the enforcement of local floodplain ordinances. Update FL-1 Flood Planning DLCD Ongoing enforcement based on changes to the NFIP(such as flood elevation level changes). Salem-Keizer Improve water quality and water flow through wetland vegetation Urban Watershed FL-2 Flood Environmental Ongoing restoration and stream cleanup,especially along Claggett Creek. Councils, Association Salem-Keizer Educate residents and business owners near Labish and Clagget Urban Watershed FL-3 Flood Environmental Ongoing creeks about how to manage flood risks. Councils, Association b1 l 1111 ff f ,y1�/ l� ffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffflffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffflf ili'!^III� ��r�i >N,�)11)11)11)11)11)11)11)11)11)11)11)11)11)11)11)11)11)11)11)11)11)11)11)11)11)11)11)1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111.1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1)1 Educate the public about windstorm-resistant trees and landscaping WS-1 Wind Storm practices and the role of proper tree pruning and care in preventing Environmental OSU Extension Ongoing damage during windstorms. Ensure that all critical facilities have backup power and/or Emergency WS-2 Wind Storm City Administration Ongoing emergency operations plans to deal with power outages. Management Record instances of infrastructure failure and notify PGE of Emergency WS-3 Wind Storm PGE Ongoing infrastructure that regularly fails. Management Source:City of Keizer HMP Steering Committee,2016. Page KZ-6 March 2017 Marion County HMP 139 Plan Implementation and Maintenance The City Council will be responsible for adopting the City of Keizer addendum to the Marion County HMP.This addendum designates a convener and a coordinating body to oversee the development and implementation of action items. Because the city addendum is part of the county's multi-jurisdictional HMP, the City will look for opportunities to partner with the county.The City's steering committee will convene after re-adoption of the City of Keizer addendum on an annual schedule; the county meets on a semi-annual basis.The City of Keizer Convener will participate in the Marion County HMP meetings and will report on city specific activities as appropriate.The steering committee will be responsible for identifying new risk assessment data, reviewing status of mitigation actions, identifying new actions, and seeking funding to implement the City's mitigation strategy (actions).The convener will also remain active in the county's implementation and maintenance process (see Volume I, Section 4 for more information). The City will utilize the same prioritization process as the county (See Volume I, Section 4: Plan Implementation and Maintenance and Volume IV, Appendix D: Economic Analysis of Hazard Mitigation Projects for more information). Implementation through Existing Programs Many of the Hazard Mitigation Plan's recommendations are consistent with the goals and objectives of the City's existing plans and policies. Where possible, the City of Keizer will implement the HMP's recommended actions through existing plans and policies. Plans and policies already in existence have support from local residents, businesses, and policy makers. Many land-use, comprehensive, and strategic plans get updated regularly, allowing them to adapt to changing conditions and needs. Implementing the HMP's action items through such plans and policies increases their likelihood of being supported and implemented. Keizer's Comprehensive Plan was first acknowledged by the Oregon Land Conservation and Development Commission in 1987.1 The City most recently completed updates to the plan, including updates to the Natural Hazards section, in December of 2013 and August of 2014. The Keizer Comprehensive plan indicates that the flood and earthquake hazards are the "two major types of natural hazards"that are estimated to affect the city.There is no mention in the natural hazards section of landslide or wildfire (listed under Statewide Planning Goal 7).The plan does contain a general goal to "Protect life and property from natural disasters and hazards." In addition, the plan contains three specific policies related to the flood hazard.There are no other hazard-related policies listed.The City implements the plan through the Keizer Land Development Code, first adopted in 1998.The City has completed numerous updates since, with the most recent occurrence in November of 2016. Keizer currently lists the following as attachments to the Comprehensive Plan: • Master Sewer Plan Update 1992 1 Note, LCDC acknowledged the Salem Area Comprehensive Plan in 1982. Keizer prepared and adopted the Keizer Comprehensive plan in January of 1987 with LCDC acknowledging it as an Amendment to the Salem Area Comprehensive Plan in February of 1987. Marion County HMP March 2017 Page KZ-7 140 • Master Sewer Plan Update December 1993 • Dual Interest Area Agreement • Master Sewer Plan Update January 30, 2003 • Parks & Recreation Master Plan dated January 2008 • City of Keizer Transportation System Plan (April 2009) Part 1 • City of Keizer Transportation System Plan (April 2009) Part 2 For more information, refer to http://www.keizer.org/Adopted-Plans-Studies/. Continued Public Participation Keeping the public informed of the City's efforts to reduce the city's risk to future hazard events is important for successful plan implementation and maintenance.The City is committed to involving the public in the plan review and updated process. See Volume I, Section 4,for more information. Plan Maintenance The Marion County Multi-Jurisdictional Hazards Mitigation Plan and city addendum will be updated every five years in accordance with the update schedule outlined in the Disaster Mitigation Act of 2000. During the county plan update process,the City will also review and update its addendum.The convener will be responsible for convening the steering committee to address the questions outlined below. • Are there new partners that should be brought to the table? • Are there new local, regional, state, or federal policies influencing natural hazards that should be addressed? • Has the community successfully implemented any mitigation activities since the plan was last updated? • Have new issues or problems related to hazards been identified in the community? • Are the actions still appropriate given current resources? • Have there been any changes in development patterns that could influence the effects of hazards? • Have there been any significant changes in the community's demographics that could influence the effects of hazards? • Are there new studies or data available that would enhance the risk assessment? • Has the community been affected by any disasters? Did the plan accurately address the impacts of this event? These questions will help the steering committee determine what components of the mitigation plan need updating.The steering committee will be responsible for updating any deficiencies found in the plan. Risk Assessment This section of the HMP addendum addresses 44 CFR 201.6(b)(2) - Risk Assessment. In addition, this chapter can serve as the factual basis for addressing Oregon Statewide Planning Goal 7—Areas Subject to Natural Hazards.Assessing natural hazard risk has three phases: Page KZ-8 March 2017 Marion County HMP 141 • Phase 1: Identify hazards that can impact the jurisdiction.This includes an evaluation of potential hazard impacts—type, location, extent, etc. • Phase 2: Identify important community assets and system vulnerabilities. Example vulnerabilities include people, businesses, homes, roads, historic places and drinking water sources. • Phase 3: Evaluate the extent to which the identified hazards overlap with, or have an impact on, the important assets identified by the community. The local level rationale for the identified mitigation strategies (action items) is presented herein, and within Section 2, Risk Assessment, and Appendix C, Community Profile.The risk assessment process is graphically depicted in Figure KZ-1 below. Ultimately, the goal of hazard mitigation is to reduce the area of risk, where hazards overlap vulnerable systems. Figure KZ-I. Understanding Risk +� 1 aramri� Understandling Risk : I w°�' Htr 5 �6f1 100mv Fro n ehologw"All o,mra�P Natural, 13 1r ;% u1nerable, System Exposure,sef)SKNKY *f d Chroniik iF11hy*uil tvw�rga �� aodii RK4011ce ofi,, POM Hasa eur rr nce��lr�r +rl / /��� r" purbnjan *1�ulr)m r rr*"'J1b1W lr/� �/ t ckn a ruWis N r a t� r y%go(KI of(7rwst"t Ili //�� ���rRl4 P row IINi,�Nirp��y C G/e Abllllly,Resources � en-d WNltibrrsta. , Bagske-Re5and w Prep re •fteccwer Sro�sra�9 rl��S-�r��a�r r"n,rra�rr;dq�rrr�row�rcr��srur,��wrdFalr�r�rr�y�crrcRn�rrdd�d�auarr9�vr,.2�UJ:�6 Risk Assessment Approach A risk assessment is intended to provide the, "factual basis for activities proposed in the strategy to reduce loses from identified hazards."2 To complete the risk assessment, the HMP update team first updated the description, type, location and extent of each hazard. Next, the team updated the vulnerability information based on each hazard's potential impact on the community. The Marion County Basic Plan (Volume I, Section II) Risk Assessment describes in detail the methods used to assess risk. In summary, Marion County has prepared a Threat Hazard Identification and Risk Assessment as a formal annex to the Marion County Emergency Operation Plan.The assessment uses a method developed by BOLD Planning.s This city 2 44 CFR 201.6(2)(i) s BOLD Planning is a consulting firm specializing in the development of actionable emergency plans. For more information, visit: http://www.boldplanning.com/ Marion County HMP March 2017 Page KZ-9 142 addendum builds on the county level assessment to produce a similar assessment for the City of Keizer.The assessment specifically examines: 1. Probability(frequency) of event 2. Magnitude of event 3. Expected warning time before event 4. Expected duration of event Refer to Page 2-4 of the Marion County Basic HMP for a description of the scoring values for each ranking category. Hazard Analysis The assessment identifies three levels of risk: High, Moderate and Low. High - High probability of occurrence; at least 50 percent or more of population at risk from hazard; significant to catastrophic physical impacts to buildings and infrastructure; major loss or potential loss of functionality to all essential facilities (hospital, police, fire, EOC and shelters). Moderate - Less than 50 percent of population at risk from hazard; moderate physical impacts to buildings and infrastructure; moderate potential for loss of functionality to essential facilities. Low- Low probability of occurrence or low threat to population; minor physical impacts. A summary of the risk assessment findings and rankings is presented below. Table KZ-3. Hazard and Vulnerability Assessment Summary Warning Lo6itPlanning county Nanning Tim Natu rat Hazard Probability Magnitude' Duration CPRE' e signi Community Characteristics The City of Keizer is located in Marion County, Oregon, immediately north of the City of Salem.The City is bordered to the west by the Willamette River and to the east by Highway 99 and Interstate 5. Keizer is located in Oregon's Willamette Valley,which experiences a moderate climate. In August, the average high temperature is 82 degrees and the average low temperature is 51 degrees.Wintertime temperatures in January range from an average high of 46 degrees to an average low of 33 degrees.The average annual precipitation is 39.9 inches. In addition to the Willamette River, other bodies of water that run through the city include Staats Lake, Claggettt Creek, and Labish Ditch. Keizer is located on a relatively flat area, with a few steep slopes bordering the Willamette River. The US Census lists Keizer's 2015 population at 36,985.This represents a 13.2% increase from 2000. For more demographic information, refer to Appendix C. Economy Historically, Keizer was an agricultural community, but in the 1960s and 70s, the city grew rapidly into a residential suburb of Salem along North River Road.Today, Keizer's primary employment sectors are service, retail and public administration. Median household income in Keizer is$50, 897. For more economic information, refer to Appendix C. Critical and Important Facilities Critical and important facilities include the following: Transportation • Bridges and Culverts: o Three bridges over Claggettt Creek: Chemawa, Dearborn, and Alder ■ If damaged, evacuation of the eastern half of the community would be disrupted. ■ Alder Bridge is one of only two access points to Claggettt Creek Middle School and Weddle Elementary School. ■ Alder Bridge has water, and communications (maybe fiber). o Bridge over Labish Ditch at 35th (owned by Marion County) ■ If damaged, access to areas north of Keizer would be limited. o Keizer has two concrete box culverts located on River Road at Lockhaven Drive and at Wheatland Road ■ If they became non-functional, parts of town would be cut off. • Major roads: I-5, the Salem Parkway, River Road, and Lockhaven Drive. • Keizer Transit Center: 5860 Keizer Station Blvd. • While not within Keizer, earthquake damage to the Detroit, Parkersville, and Lookout Point Dams could have significant impacts in Keizer, such as widespread flooding or road blockages. Energy • Bonneville Power Administration (BPA)—Chemawa Substation (Tepper Lane NE) Water Marion County HMP March 2017 Page KZ-11 144 • Drinking Water: o Water comes from the Troutdale Aquifer, pumped through 14 or 15 wells o Three water storage facilities with a storage capacity of 2.75 million gallons Note: Currently built to withstand earthquakes, however the water distribution system may not withstand a significant earthquake. o Emergency water agreement with the City of Salem is in place. Note: Chemical spills could potentially contaminate drinking water. • Wastewater: o Willow Lake Wastewater Treatment Facility (5915 Windsor Island Rd. N) Note: The Willow Lake Wastewater Treatment Facility and main sewer lines are vulnerable to earthquakes and could potentially contaminate groundwater aquifers. Note: The Keizer Public Works building was built prior to earthquake standards. Communication • Qwest hub in the downtown area; several cell phone towers o One tower in Bear Park is leased out. • City Hall (the Civic Center) has a communication tower—includes a cell carrier and the police radio. o This tower has a diesel-fueled generator. Note: City of Salem is currently mapping communication system locations. Emergency services • Fire: o Keizer Fire District Station 350(661 Chemawa Rd. NE). o Marion County Fire District 1 (300 Cordon Rd. NE)—serves northern part of Keizer, starting at Centennial. • Police: o 930 Chemawa Rd. NE co-located with Keizer Civic Center, City Hall, Human resources, Community Center and Public Works. • Medical o Legacy Keizer Health Center (5685 Inland Shores Way N). ■ *Note: Might get cut off because it's across Claggettt Creek. o WVP Medical Group Keizer(5100 River Rd. N). o Kaiser Permanente (5940 Ulali Dr. NE)—Keizer Station. o Salem Clinic Center (5900 Inland Shores Way N). Cultural/historical resources • Keizer Heritage Community Center houses the Chamber of Commerce, the library, and the Keizer museum. Note:older building and may be vulnerable to earthquake. Vulnerable populations— Functional and Access Needs • Assisted living facilities: o Brookdale River Road (592 Bever Drive NE) o Avamere Court at Keizer(5210 River Road N) o Avamere—memory care (Claggettt Ct). Page KZ-12 March 2017 Marion County HMP 145 o The Village at Keizer Ridge (1165 Mcgee Court NE) o Willamette Lutheran Retirement (7693 Wheatland Road N) o Sweet Bye N Bye Adult Foster Care Home (4072 Brooks Ave. NE) o Sherwood Park Nursing & Rehabilitation Center (4062 Arleta Ave. NE) o Bonaventure Senior Living Facility(1615 Brush College Rd. NW) • Schools: o Keizer has 10 public schools: http://www.salkeiz.kl2.or.us/files/salkeiz/Keizer_14-15.pdf • Simonka Place (5119 River Rd. N)—women's shelter • Large Spanish speaking population— might be language barriers See hazard sections below and Section 2, Risk Assessment, for potential hazard vulnerabilities to these facilities. Hazard Characteristics Drought The characteristics of drought in Keizer are the same for the county as a whole. Table KZ-4. Drought Summary Hazard Drought Type Climatic Speed of Onset Slow Location Varies, County Wide Extent Moderate to Severe Drought* Prior Occurance Three>6 months duration since 1982 Probability —9% *Defined as between-2 and-4 on the National Resource Conservation Service (NRCS)Surface Water Supply Index(SWSI) Sources:Oregon NHMP;NRCS;analysis by OPDR The probability of drought in Keizer is likely, the same as for the county as a whole. Given that the City's water supply is primarily subsurface, the Keizer's vulnerability is moderate. Overall,the planning significance of drought is moderate, slightly lower than the county. Volume I, Section 2, Risk Assessment, adequately describes the characteristics of drought hazards, as well as the location and extent of a potential event. Due to a cool, wet climate, past and present weather conditions have generally spared Marion County communities from the effects of drought. Governor Kate Brown declared a drought emergency for all of Marion County in September 2015. Keizer's primary water supply comes from the Troutdale Aquifer. Raw water is treated for consumption at the Willow Lake Water Treatment Facility. The City has three (3) storage reservoirs with storage capacity for 2.75 million gallons of treated water. In addition, Keizer maintains an emergency water agreement with the City of Salem. Keizer recently completed the review and update Keizer's water management plan to include new information and revisit emergency water agreements with the City of Salem. Marion County HMP March 2017 Page KZ-13 146 This action was listed in the previous Keizer NHMP. Keizer adopted the revised agreements and ordinance language in 2016.The ordinance includes a water curtailment plan. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Earthquake The characteristics of a crustal earthquake are similar to the county as a whole. Table KZ-5. Earthquake Summary Crustal Hazard Earthquake-Crustal Type Geologic Location Multiple active faults;Willamette Valley Speed of Onset Rapid Extent Very Strong to Severe shaking—500 yrs* Prior Occurance One over Magnitude 5 last 100 yrs** Probability Approximately 1%annual *DOGAMI HazVu;**PNSN-1993 Scotts Mills just north of Marion County Sources: DOGAMI-Oregon HazVu;Oregon NHMP;Pacific Northwest Seismic Network The characteristics of a Cascadia Subduction Zone Earthquake (CSZ) are the same as the county. Table KZ-6. Earthquake Summary Subduction Hazard Earthquake-Subduction Type Geologic Location Primarily west of the Cascades;CA- BC Speed of Onset Rapid Extent Catastrophic Prior Occurance One over Magnitude 9 last 500 yrs Probability Magnitude 9+is 7%- 12%over 50 yrs** *DOGAMI HazVu;**Oregon Natural Hazard Mitigation Plan,anlysis by Oregon Department ofGeologyand Mineral Industries. Sources: DOGAMI-Oregon HazVu;Oregon NHMP;Pacific Northwest Seismic Network Keizer's probability for a Crustal Earthquake event is "possible" and that their vulnerability to a Crustal Earthquake event is "limited".The county steering committee determined that the probability for a CSZ Earthquake event is "highly likely' and that the vulnerability to a Cascadia Earthquake event is "catastrophic".This hazard was not rated as distinct CSZ and crustal events in the previous HMP.There are no locally active faults within the Keizer City Limit. Active faults do exist within five-miles to the west and south.The 1993 Scott Mills quake caused $28 million in damages to cities throughout Marion County. No damaging earthquake events occurred during the previous five years. Volume I, Section 2, Risk Assessment, adequately describes the characteristics of earthquake hazards, history, as well as the location and extent of a potential event. Generally, an event that affects the county is likely to affect Keizer as well. Previous occurrences are well- documented within the county's plan, and the community impacts described by the county would generally be the same for Keizer as well. Page KZ-14 March 2017 Marion County HMP 147 Earthquake-induced damages are difficult to predict, and depend on the size, type, and location of the earthquake, as well as site-specific building and soil characteristics. Presently, it is not possible to accurately forecast the location or size of earthquakes, but it is possible to predict the behavior of soil at any particular site. In many major earthquakes, damages have primarily been caused by the behavior of the soil. Figure KZ-2 shows that ground shaking in Keizer for both crustal and subduction earthquakes are expected to be very strong to severe. Figure KZ-2. Active Faults and Expected Shaking lP r ..u,u�«w y.cu Ax psw ss'a w / vac¢rriv w ha rwrvw Vl / f it pffl �,�/ 7� r/// g r J. Source: Oregon FlazVu:Statewide Geohazards Viewer(DOGAMI) The Keizer steering committee identified liquefaction as a primary concern related to the earthquake hazard.The committee suggested conducing analysis of the city's 16 wells and how they will be impacted by earthquake.Another concern identified is the potential impact to Claggett Creek from sanitary sewer infrastructure impacts. Broken wastewater infrastructure could result in contamination.The committee also noted that if culverts on River Road collapsed, significant portions of the City could be cut off from vehicle access. In 2007,the Department of Geology and Mineral Industries (DOGAMI) conducted a seismic needs assessment for public school buildings, acute inpatient care facilities, fire stations, police stations, sheriffs' offices, and other law enforcement agency buildings. Buildings were ranked for the "probability of collapse" due to the maximum possible earthquake for any given area. Within the City of Keizer, the following buildings were given a "moderate" or "high" probability of collapse: • Cummings Elementary School: high (>1016) • Gubser Elementary School: high (>1016) • Kennedy Elementary School: high (>1016) • McNary High School: high (>1016) Marion County HMP March 2017 Page KZ-15 148 • Whiteaker Middle School: moderate(>1%) Keizer participates in the Great Oregon Shakeout each year and posts "Living on Shaky Ground" education documents at city hall. In addition,the City's Community Emergency Response Team is actively engaged in the promotion of earthquake safety and community outreach actions.The City eliminated two actions from the previous HMP related to earthquake preparation due to these ongoing efforts. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Flood Table KZ-7. Flood Summary Hazard Flood Type Climatic Speed of Onset Slow to moderate Location Mapped flood zones,floodplain Extent Moderate to severe Prior Occurance Four significant events since 1964 Probability 1%annual within SFHA Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, describes the causes and characteristics of flooding hazards within the region.The city's probability for riverine flood is likely and their vulnerability to flood is critical. No new flood events have occurred since the 2010 HMP. Committee members noted that ongoing FEMA flood map updates may increase the base flood elevation by roughly three feet.This is primarily related to an existing earthen dike and flood wall constructed along the Willamette River after the 1996 flood event. If the flood elevation increases, the wall will no longer be certifiable. Any breaching of the dike or wall would result in the inundation of the western half of Keizer. Some minor flooding does occur on Claggett Creek. However,the flooding is generally isolated. A related mitigation success is the ongoing retrofit and upgrade of Dearborn Bridge over Claggett Creek. Portions of Keizer have areas of flood plains (special flood hazard areas).These include areas along the Marys River (see Figure KZ-3). Furthermore, other portions of Keizer, outside of the mapped floodplains, are also subject to significant, repetitive flooding from local storm water drainage. Page KZ-16 March 2017 Marion County HMP 149 Figure KZ-3. Special Flood Hazard Area . sm l pp I ( q f Layers Currently Shoown. � � yrHHtr'a1 i Oregon Caun$es Oregon Counties Dr N Rd- ! Ah Flood Hazard Type and Source of Flood Data Effective FEMA loo yr Flood loreiminary�FEMA 100 yr Fled rr state Digitized..Flood Data �4 F Q3 FEMA Flood'..data °� 1� {j a� rr - X11 d„nom �b� r,dNVr �«ww�,��n� wa• !Y ! Y r 1.4 Plk�;c4o' Nu wee✓ ,Y � '^� ! f4 nnnnnnnnn4yM ii { Source: _Oregon FlazVu:Statewide Geohazards Viewer(DOGAMI) Figure KZ-4. Keizer Flood Insurance Rate Map 'w h T`n�Ir NI UrT M (f IlAdl©dVAI RM INSOP4VfiCG PflRSRAMI I FIRM l XH 6LGAW INSURANCE Rh HH iYAP 4W AF n(OI ➢(ntdRx '�zonRx 54 "Y� � `v,^s. �' "�C-., .� � ICyIlMVIEn AH V v '`y RP}{VF�F4 PAYIfL 196 441 i13d � A, 41 _j dWH wuv�HHH 1Ip41.193 G I I i EFFECTIVE.WE wrew h r.rh Marion County HMP March 2017 Page KZ-17 150 Figure KZ-5. Keizer Flood Insurance Rate Map 11(2 ✓ / zsrnrr w , ,,;✓i✓ 1rn�:nw rltrnmv zowxj rvaamnow.reoomirswawGeaegcwnH,l :(bHMMAyTrru 4RI� � ky � � corm a�"'"' I� � � i✓✓/viii x '"; II FLOOD IYCSUPIpR[CE RATE MAP MARION COUNTT, ✓✓ ✓�i✓z w x i' DHFGO� AND ✓ eawx x %�a/� # zonae x 14x'';w� ✓i ✓/// � li� /✓�, ✓ ✓✓int, � rwcr RKWAurev AREAS PANCL 831 RF gsll ,. ✓ / Qq f r ✓r��✓ 5%14 - ✓ "/fie "' v,, �, ✓ ✓ n,e, ,I„ ° f J1 41 ®4NUMBER 1CU731 G s 8 a. s1­1owrusarep wa�+M �i?d"Y EFfEG7tl4E Op7F wG 3 M, W; iaxunRw eR 2oGo ao«�E a wEsr �✓ mh r✓a,�ir"t�,+.t I 'r)U, f ' National Flood Insurance Program (NFIP) FEMA modernized the Keizer Flood Insurance Rate Maps (FIRMS) in January of 2000.The table below shows that as of October 2016, Keizer has 440 National Flood Insurance Program (NFIP) policies in force. Of those, 215 are for properties that were developed before development of the initial FIRM.The last Community Assistance Visit (CAV)for Keizer was on July 17, 2006. Keizer is not a member of the Community Rating System (CRS).The table shows that the majority of flood insurance policies are for residential structures, primarily single-family homes.There have been 23 paid flood claims in Keizer totally $420,239. The Community Repetitive Loss record for Keizer identifies no Repetitive Loss Properties4 and no Severe Repetitive Loss Properties5. Notably, following flooding in 1996/1997, Keizer successfully used FEMA HMGP funds to relocate several homes out of the floodplain. 4A Repetitive Loss(RL)property is any insurable building for which two or more claims of more than $1,000 were paid by the National Flood Insurance Program(NFIP)within any rolling ten-year period, since 1978.A RL property may or may not be currently insured by the NFIP. 5A Severe Repetitive Loss(SRL)property is a single family property(consisting of 1 to 4 residences) that is covered under flood insurance by the NFIP and has incurred flood-related damage for which 4 or more separate claims payments have been paid under flood insurance coverage, with the amount of each claim payment exceeding $5,000 and with cumulative amount of such claims payments exceeding $20,000; or for which at least 2 separate claims payments have been made with the cumulative amount of such claims exceeding the reported value of the property. Page KZ-18 March 2017 Marion County HMP 151 Table KZ-8. Flood Insurance Detail Marion County 2,067 1,239 1,614 115 105 232 97 0 Keizer 1/19/2,000,,,,,,5/1/1985 440 215 398 14 - 11 17 - 10 0 /" 1 Marion County $ 514,268,700 298 226 16 $ 5,732,543 11 2 - - Keizer, ' ]31,321,30,0 , '23 11 1 $ " 00,239 0 0 N/A 7/19/7556 Source: Information compiled by Department of Land Conservation and Development,October,2016. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Landslide Table KZ-9. Landslide Summary Hazard Landslide Type Climatic/Geologic Speed of Onset Slow to rapid Location Waterways(banks)and transportation facilities Extent Minor Prior Occurance No major events Probability Low for minor events;less than 5%major events Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of landslides, and appropriately identifies previous landslide occurrences within the region. Keizer has a relatively flat topography. Keizer's probability for landslide is unlikely (which is lower than the county's rating) and their vulnerability to landslide is negligible (which is also lower than the county's rating). Figure KZ-6 shows that landslide risk in Keizer is virtually nonexistent. Marion County HMP March 2017 Page KZ-19 152 Figure KZ-6. Landslide SbUUity Exposure Oregm Cwnties .4 NE Landslide Suscentibility 1111011111, Lj M.derats,-Landslidi,c;P.sibl. Hy JV Source: Oregon_H azVu:_Statevvide Geohazards_Viewer_(DOGAMI Please review the Risk Assessment(Volume/, Section J1for additional information onthis hczcoi VD|CaOD Table KZ10Volcano Summary xas^m Volcano Type Geologic Speed mOnset Slow wrapid Location Cascade Mountains Extent Minor privroccurance One significant event since 1om(Mount St.Helens) mum| | source : onsAxx| Oregon Hazvu;Oregon mHxxp Volume |, Section Z, Risk Assessment, adequately describes Keizerrisk tovolcanic events. The steering committee determined that the city's probability for volcanic event is unlikely and their vulnerability to volcano is negligible. The causes and characteristics of a volcanic event are appropriately described within the county's plan, as well as the location and extent ofpotential hazards. Previous occurrences are well-documented within the county's plan. Keizer is very unlikely to experience anything more than volcanic ash during volcanic event.When Mt. Saint Helens erupted in 1980, the city was not impacted. Page KZ-20 March 2017 Marion County HMP 153 Please review the Risk Assessment(Volume/, Section 2)for additional information on this hazard. Wildfire Table KZ-1 I. Wildfire Summary Hazard Wildfire Type Climatic,Human Caused Speed of Onset Moderate to rapid Location Outside city limit Extent Minor to moderate Prior Occurance No history inside city limit Probability <1%annual Sources: Marion County HMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of wildfires, as well as the county and city's history of wildfire events.The city's probability for wildfire is unlikely and the vulnerability to wildfire is limited. Keizer is located on the far western side of Marion County, surrounded on all sides by open farmland,waterways, or urban development.There are no forests within the city limits, and the closest forested area is Keizer Rapids Park, located half a mile west of the city. Due to its location, Keizer faces minimal risk of experiencing wildfires.There is no history of wildfire events in Keizer. The County updated the Community Wildfire Protection Plan in 2016 and Keizer is not listed as a "Community at Risk." Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Severe Weather Table KZ-12. Severe Weather Summary Hazard Severe Weather/Storm Type Climatic Speed of Onset Slow to moderate Location Countywide Extent Minor to severe Minor events occur annually;—30 moderate to severe Prior Occurance events countywide over the past 130 years 100%for minor events,23%for moderte to severe Probability events Sources: Marion County HMP Windstorm Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of windstorms, as well as the location and extent of windstorm hazards.The City's probability for windstorm is highly likely and that their vulnerability to windstorm is critical. Significant wind events occur in Keizer each year. Damaging wind events are only slightly less common; once or twice per year the city will experience a windstorm event that will interrupt services, experience downed trees, and cause power outages. Marion County HMP March 2017 Page KZ-21 154 Because windstorms typically occur during winter months, they are sometimes accompanied by ice, freezing rain, flooding, and very rarely, snow. Winter Storm (Snow/ Ice) Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of winter storms, as well as the location and extent of winter storm hazards.The City's probability for windstorm is highly likely and that their vulnerability to windstorm is critical. Severe winter storms can consist of rain, freezing rain, ice, snow, cold temperatures, and wind.They originate from troughs of low pressure offshore that ride along the jet stream during fall,winter, and early spring months. Severe winter storms affecting the city typically originate in the Gulf of Alaska or in the central Pacific Ocean.These storms are most common from November through March. Major winter storms can and have occurred in the Keizer area, and while they typically do not cause significant damage, they are frequent and have the potential to impact economic activity.The most recent winter storms (December 2016—January 207) included snow and ice.Transportation and power interruptions combined with government office and school closures.A disaster declaration is currently pending. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Page KZ-22 March 2017 Marion County HMP 155 CITY OF MILL CITY ADDENDUM Purpose This document serves as Mill City's Addendum to the Marion County Multi-Jurisdictional Natural Hazards Mitigation Plan (MNHMP, NHMP).This addendum seeks to supplement information contained in Volume I (Basic Plan) of this multi-jurisdictional NHMP which serves as the foundation for this jurisdiction's addendum and Volume III (Appendices) which provides additional information (particularly regarding participation and mitigation strategy).This addendum meets the following requirements: • Multi-jurisdictional Plan Adoption §201.6(c)(5), • Multi-jurisdictional Participation §201.6(a)(3), • Multi-jurisdictional Mitigation Strategy§201.6(c)(3)(iv), and • Multi-Jurisdictional Risk Assessment§201.6(c)(2)(iii). Plan Process, Participation, and Adoption This section of the NHMP addendum addresses 44 CFR 201.6(c)(5), Plan Adoption, and 44 CFR 201.6(a)(3), Participation. In the summer of 2016, the Oregon Partnership for Disaster Resilience (OPDR) at the University of Oregon's Community Service Center (CSC) partnered with Marion County and Santiam Canyon cities, including Mill City, to create the first region-specific NHMP. Part of the Santiam Canyon Regional Hazard Mitigation Plan (RHMP) required the creation of city addenda which would be adopted into the 2016 Marion County NHMP.This project is funded through the Federal Emergency Management Agency's (FEMA) FY14 Pre-Disaster Mitigation Competitive Grant Program (PDMC-PL-10-OR-2014-002). By developing this addendum to the Marion County NHMP, locally adopting it, and having it approved by FEMA, Mill City will gain eligibility for FEMA Hazard Mitigation, Pre-Disaster Mitigation, and Flood Mitigation Assistance grant program funds. The Marion County NHMP, and Mill City addendum, are the result of a collaborative effort between citizens, public agencies, non-profit organizations, the private sector, and regional organizations. A project steering committee guided the process of developing this addendum, and was composed of city staff, county representatives, and emergency service management. The Mill City city recorder is the designated convener of the NHMP and will take the lead in implementing, maintaining, and updating the addendum to the Marion NHMP in collaboration with the Santiam Canyon liaison for Marion County Emergency Management. Potential representatives for the City of Mill City steering committee met formally on one occasion: September 22, 2016, but communicated electronically throughout the creation of this Mill City NHMP Addenda November 2016 Page PA-1 156 document.The city's addendum reflects decisions decided upon at the plan update meeting and during subsequent work and communication with stakeholder and steering committee members. The Mill City Steering Committee is currently comprised of the following representatives: • David Kinney; City Planner, Mill City • Stacie Cook; City Recorder, Mill City • Kathleen Silva; Santiam Canyon Liaison, Marion County • VACANT, MCRFPD representative • VACANT,City Hall Staff • VACANT,City Councilor • VACANT, Planning commissioner • VACANT, Marion County Public Works Staff • VACANT, Linn County Sheriffs rep (emergency mtg.) Public participation was achieved with the establishment of the steering committee, which was comprised of city officials and county representatives.The city is currently evaluating the following recommendation from the plan facilitator: I recommend the Marion County staff meet with representatives from the Mill City RFPD, Linn County Sheriff's office and city staff to discuss the draft. After that, I recommend Marion County rep attend a Mill City Planning Commission work session to discuss the DRAFT document before it is presented to the Mill City City Council. The Steering Committee was closely involved throughout the development of the plan and served as the local oversight body for the plan's development. In addition, community members outside of the steering committee were provided an opportunity for comment via the plan review process. The Marion County NHMP was approved by FEMA on [Month] [Day],2017 and the Mill City addendum was adopted via resolution on [Month] [Day],2017.This NHMP is effective through [Month] [Day],2022. Mitigation Strategy This section of the NHMP addendum addresses 44 CFR 201.6(c)(3(iv), Mitigation Strategy. During 2016, Marion County and OPDR evaluated the Action Items set by the county and their particular relevance to the Santiam Canyon region. Following the review, actions with relevance to the region were added into the RHMP, noting what accomplishments had been made, and whether the actions were still relevant; any new action items were identified at this time. Mill City developed a list of priority actions (Table A-1), any actions that were not prioritized were placed in the Action Item Pool (Table A-2) and will be considered during the semi-annual meetings. Priority Actions Mill City NHMP Addenda November 2016 Page PA-2 157 The city is listing a set of high priority actions in an effort to focus attention on an achievable set of high leverage activities over the next five-years.The city's priority actions are listed below in the following table. Detailed implementation information for each action is listed in within (Table A-1). Action Item Pool This expanded list of actions is available for local consideration as resources, capacity,technical expertise and/or political will become available.The action items are split into various categories including ongoing, short-term (>1 year), and long-term (<1 year) Many actions carry forward from prior versions of the Marion County NHMP and other local planning documents including the Community Wildfire Protection Plan, Drought Contingency Plan, and Mid-Willamette Economic Development study. Notably, given the location of Mill City, collaboration with both Marion County and Linn County will be required during the implementation process. (Table A-1) Mill City Priority Action Items 0 0 i u irrr r r r r , (Ir llr , r i t r .i f f 11 l 1 1 1 , , 111 rrrrrr rr1, 11 11>t 1� 111 11 >t >t 1 r 1 1 r r ,ii 1 r r , 11 r i 1 11 1 1 1 1111I1111I11r' 1111111111 111llllllllll>11>111111111 I� , 11 l 1 1 �r Review the Natural Resource Chapter of Planning&City Staff the Comprehensive plan document and General Fund Seiitember 2017 modifypolicies to reflect new hazard information.:roughly 20 hours] Before purchase,city staff should first e'g) assess the amount of KWH needed to General Fund,MWCOG Multi-Hazard run city facilities. (100 KWH)diesel grants/loans, December 2017 generators cost around$25,000. Mill City NHMP Addenda November 2016 Page PA-3 158 fj Mill City NHMP Addenda November 2016 Page PA-4 159 -ONGOING- (Table A-2) Mill City Action Item Pool CZ t , , i � � 1 0 0 r , r ll „ u 0 J J J JJ JJ , JJJ�J�JJJJJJJJ J�J»/JJIJJ»JJJJJJ»�JJJJIJIJ�IIII1,/ JJJJJJJ»»1JJIJJJJJ�� J JJJJI IJJ I � 1 1 0 r � r N cC U r Q.. r� bfJ U N C". Sr N r � O U GI Q x Ct r � x Sr � � r t a z Promote Great Oregon Shakeout Awareness month in October. Participate in activities for schools, Public Works, Safety Marion County Ongoing Earthquake business,and industry.Participating Committee,Marion #1 with the Mid-Willamette Emergency County Risk,Red every X X I X Emergency Communications Management Cross,OEM and Media October Collective on initiatives that are focused on household preparedness. Collaborate with GROW EDC to Earthquake develop relevant public-private Marion County #2 partnerships with businesses that Emergency Mill City, GROW EDC Ongoing X X X X X X can contribute to response and Management recovery. (Multi-Hazard 6-9) Department Multi- Develop an Energy Assurance Plan. Marion County Mill City, Ongoing Hazard#1 (Multi-Hazard 2-4) Emergency of Energy,Whole revisions X X X X Management Community Source:City of Mill City NHMP Steering Committee,2015. Mill City NHMP Addenda November 2016 Page PA-5 160 -SHORT TERM- •o •° o c CZO '� Q'• U OIJ � "S Sr N C". r r a z Evaluate the diesel generation power needed for critical city Marion County facilities.Acquire a backup diesel Multi- generator,capable of powering city Emergency Mill City Public Works Short Term X Hazard#2 facilities for a minimum of 3 days Management,Mill with private,state, and federal City, resources. Develop diesel storage near Marion County Multi- Kingwood Wells#I &#2 to Emergency Marion County Public Short Term X Hazard#3 support the generator for a Management,Mill Works minimum of 3 days. City, Incentivize and assist local fueling Multi- stations to purchase diesel Marion County Hazard#4 generators capable of pumping fuel Emergency Mill City, Short Term X X Management from in-ground storage tanks. Conduct an assessment of the short Marion County Public Multi- and long term needs for sheltering Mill City,Marion Health,Red Cross, Hazard#5 access and functional needs County Emergency Cities,NGO's, Oregon Short Term X X populations for all hazards. Management public Health Mill City NHMP Addenda November 2016 Page PA-6 161 •O •� O 7� CZ 7� _ s a v a � r � Ct s m a z Santiam Canyon School Develop a MOU with the Santiam �r,Marion District,Mill City Multi- RFPD,City of Mill City Hazard#6 and Linn County School District to utilize facilities County Emergency Short Term X X for sheltering residents. Management Sheriffs Office,Red Cross Santiam Canyon School Multi- Develop a MOU with First Student A441 Marion District,Linn County Hazard#7 to utilize buses during/after hazard County Emergency Sheriffs Office, City of Short Term X X events Management Mill City and First Student Develop a MOU with Frank Linn County Sheriffs Multi- Lumber Company&Freres Lumber A441 G­4�11 Marion Office,Frank Lumber Hazard#8 to share fuel resources after a County Emergency Co.,Freres Lumber, Short Term X X hazard event. Management Mill City RFPD, City of Mill City Develop a MOU with community Mill Gity,Marion Santiam Quick Mart, Multi- fuel stations to utilize fuel resources County Emergency Mill City RFPD,Linn Short Term X X Hazard#9 found in below-ground tanks after a Management County Sheriff's Office hazard event. and City of Mill City Mill City NHMP Addenda November 2016 Page PA-7 162 •O •� O C, C 7� CZ 7� _ s a v a � r � Ct s m CZ CZ Z z Multi- Marion County Mill City,Marion Hazard#10 Establish a Mill City CERT team. public Works County Emergency Short Term X X X Management,CERT, Develop a community education Marion County Linn County Sheriff's Multi- program-such as an all hazard Emergency Office,44'i ns Short Term X X X X Hazard#11 community outreach forum for Management,Mill Whole Community students and residents. City Expand auxiliary radio capabilities Marion County Multi- by developing a team of HAM Emergency ARES, CERT,Private Hazard#12 Radio operators for EMS and Management,Linn partners,Whole Short Term X X X X County Sheriffs Community interested public. Office A441 G4 *Identified in Marion County Community Wildfire Protection Plan(Action Plan&Priorities) **Identified in North Santiam Watershed Drought Contingency Plan(Priority Drought Mitigation Actions) ***Identified in Mid-Willamette Valley Council of Governments Comprehensive Economic Development Study(Appendix C) Mill City NHMP Addenda November 2016 Page PA-8 163 -LONG TERM- •o •° o 76 � �, � � �, � � o •� � � .�- •,sir '� � Q'• U OIJ � "S r 7� CZ s CZ Z z Monitor economic impacts on Mill City,Marion County GROW EDC, Drought#I recreation,tourism and Long Term X X X X X X agriculture communities. Emergency Management Community Services Create partnerships and strategic plans with NSWC to facilitate riparian habitat Mill City,Marion restoration projects in flooding Marion County County Parks Flood#I Environmental Services, Department,Oregon Long Term X X X X or erosion prone areas(e.g. NSWC Department of Fish Areas subject to reoccurring flood events—Elizabeth,Cedar, and Wildlife, DeFord,and Snake Creeks.)" Collaborate with NSWC to complete WMCP's and North Santiam Drought#2 improve community NSWC,Mill City Watershed DCP Long Term X X X X understanding of water usage and opportunities to increase Partners efficiencies." Mill City NHMP Addenda November 2016 Page PA-9 164 4 � O ® IIT ® jjj '?S r a x c Ct cC a z Repair retaining wall on North Mill City,Marion Marion County Board MultCountEmergency iSantiam River bank and of Commissioners, - y develop recreational access Marine Board,DSL, Long Term X X X X X Hazard#14 dock to leverage retaining wall Management/Community Oregon River repair costs.** Services Department Experiences, Marion County Public RFPD,Mill City, Multi- Designate evacuation routes Works,Linn County Marion County Long Term X X Hazard#15 outside of Hwy 22 for EMS. Emergency Public Works Management Collaborate with Marion Marion County Marion County Multi- County to connect to a more Community Services Emergency Long Term X X X X Hazard#16 resilient regional water/sewer Department/Board of Management system. Commissioners,Mill City Gather community support for Marion County Multi- the installation of resilient fiber Community Services Mill City, Long Term X X X X Hazard#17 communication infrastructure Department/Board of throughout the community.*** Commissioners Collaborate with Detroit Ranger District, ODF, and ODF,BLM,Detroit Marion County Wildfire#I BLM to conduct fuel hazard Ranger District Emergency Long Term X X X reduction along the Wildland Management Urban interface.* Mill City NHMP Addenda November 2016 Page PA-10 165 4 � O ® IIT ® jjj '?S r a x c Ct cC a z Collaborate with ODF and Mill City RFD to develop strategic ODF,BLM,Detroit Marion County Wildfire#2 community fuel breaks along Ranger District Emergency Long Term X X X Hwy 22,Sitcom road, and Bud Management Longa Integrate new DOGAMI Environmental Landslide landslide hazard information #1 into land use Mill City Services,Engineering, Long Term X X ODOT,DLCD zoning/development codes. Mill City NHMP Addenda November 2016 Page PA-11 166 Plan Implementation and Maintenance The City Council will be responsible for adopting the City of Mill City addendum to the Marion County NHMP. This addendum designates a coordinating body and a convener consisting of MCRFPD, City Hall staff, PW staff, LC Sheriff's rep (Emergency Mgt), Planning Commissioner and a City Councilor to oversee the development and implementation of action items. Because the city addendum is part of the county's multi-jurisdictional NHMP, the city will look for opportunities to partner with the county.The city's steering committee will convene after re- adoption of the City of Mill City addendum on an annual schedule; the county meets on a semi- annual basis and will provide opportunities for the cities to report on NHMP implementation and maintenance during their meetings.The City Recorder will serve as the convener and will collaborate with the Santiam Canyon liaison for assembling the steering committee (coordinating body).The steering committee will be responsible for identifying new risk assessment data, reviewing status of mitigation actions, identifying new actions, and seeking funding to implement the city's mitigation strategy(actions) and will include support from Marion County and Linn County Emergency Management when possible.The convener will also remain active in the county's implementation and maintenance process. Implementation through Existing Programs Many of the NHMP's recommendations are consistent with the goals and objectives of the city's existing plans and policies. Where possible, the City of Mill City will implement the NHMP's recommended actions through existing plans and policies. Plans and policies already in existence have support from local residents, businesses, and policy makers. Many land-use, comprehensive, and strategic plans get updated regularly, allowing them to adapt to changing conditions and needs. Implementing the NHMP's action items through such plans and policies increases their likelihood of being supported and implemented. Mill City's acknowledged comprehensive plan is the Mill City Comprehensive Plan.The Oregon Land Conservation and Development Commission first acknowledged the plan in 1982. The City last completed a major update of the plan in 2015.The City implements the plan through Mill City regulatory ordinances. Mill City currently has the following plans that relate to natural hazard mitigation. For a complete list visit the city website for pla_n_njng and public works: • Comprehensive Plan • Zoning Code • Mill City Access Management Plan • Water System Master Plan Continued Public Participation Keeping the public informed of the city's efforts to reduce the city's risk to future natural hazards events is important for successful plan implementation and maintenance.The city is committed to involving the public in the plan review and updated process. This includes: • Annual briefings to city council • Articles and information in The Canyon Weekly Mill City NHMP Addenda November 2016 Page PA-12 167 • Postings and media on social media/website. Plan Maintenance The Marion County Multi-Jurisdictional Natural Hazards Mitigation Plan and city addendum will be updated every five years in accordance with the update schedule outlined in the Disaster Mitigation Act of 2000. During the county plan update process, the city will also review and update its addendum.The convener will be responsible for convening the steering committee to address the questions outlined below. • Are there new partners that should be brought to the table? • Are there new local, regional, state, or federal policies influencing natural hazards that should be addressed? • Has the community successfully implemented any mitigation activities since the plan was last updated? • Have new issues or problems related to hazards been identified in the community? • Are the actions still appropriate given current resources? • Have there been any changes in development patterns that could influence the effects of hazards? • Have there been any significant changes in the community's demographics that could influence the effects of hazards? • Are there new studies or data available that would enhance the risk assessment? • Has the community been affected by any disasters? Did the plan accurately address the impacts of this event? These questions will help the steering committee determine what components of the mitigation plan need updating.The steering committee will be responsible for updating any deficiencies found in the plan. Risk Assessment This section of the NHMP addendum addresses 44 CFR 201.6(b)(2) - Risk Assessment. In addition, this chapter can serve as the factual basis for addressing Oregon Statewide Planning Goal 7—Areas Subject to Natural Hazards. Assessing natural hazard risk has three phases: • Phase 1: Identify hazards that can impact the jurisdiction.This includes an evaluation of potential hazard impacts—type, location, extent, etc. • Phase 2: Identify important community assets and system vulnerabilities. Example vulnerabilities include people, businesses, homes, roads, historic places and drinking water sources. • Phase 3: Evaluate the extent to which the identified hazards overlap with, or have an impact on, the important assets identified by the community. The local level rationale for the identified mitigation strategies (action items) is presented herein.The risk assessment process is graphically depicted in (Figure B-1) below. Ultimately, the goal of hazard mitigation is to reduce the area of risk, where hazards overlap vulnerable systems. Mill City NHMP Addenda November 2016 Page PA-13 168 (Figure B-1) Understanding Risk N uwv�iiP��olllwr�� ZUSGS Understanding Risk awAdr,�ce r�u reat+kvai�g�myy ww��rMP 9�;?u tl I �.�. �Q�� Irl Hazard % D l �^ �m� i-0owntl l �a'ba��c�phic �j, urt�,S nsf lvlty ��� , � e and�',l�roro°role l�yslcal.E�vra�a,L� �1�i �a and1 �191 �rr.�ai� *No Rero.�a vei�ua.w*biketvaJsasuq�&nraia Rroeaer�rawB.wall�hroyranwaiaule°turrauYatso Spe art aaf Onset l //II' !�/ ilro% iv+� �tnnw ptd�l�on"'6srilaw a " a�de�rnIcan lRegearuo9Hro�uau roillilroDuwraflo i / ilwi�w l aswlsSpaVai Ext enta�sar�ro�i�lre w Res urcesllhngness to,Ih'roe�p!aasp radd mre *;IrReco er .: cawaer�J"CnS Oregan trrcarewaadp too,DisastetWsihenaeResearch Wluabowa 2006 Hazard Analysis Methodology This NIHMP utilizes a Threat Hazard Identification and Risk Assessment (THIRA) methodology that is consistent with the Marion County Multi-Jurisdictional Hazard Mitigation Plan. Mill City developed this assessment from historical data of events that have occurred in Marion County. The assessment uses the calculated priority risk index (CPRI) methodology to specifically examine: 1. Probability(frequency) of event 2. Magnitude of event 3. Expected warning time before event 4. Expected duration of event Table (A-3) below shows the scoring values for each ranking category. Table (A-3) Risk Assessment Hazard Ranking Scoring Values Score Probability Warning Time Magnitude/Severity Duration 4 Highly Likely Less than 6 hours Catastrophic More than 1week 3 Likely 6-12 hours Critical Less than 1week 2 Possible 12-24 hours Limited Less than 1day 1 Unlikely 24+hours Negligible Less than 6hours Source: Marion County Emergency Management;BOLD Planning Hazard Analysis For emergency management planning purposes, this critical analysis is an assessment of the consequences of each hazard, including potential areas of impact, population exposed and impacted, duration of the hazard, and potential economic consequences.These rankings utilize the criteria laid out in THIRA to weigh them proportionally between historic data as well as future projections based on economic, demographic, the critical infrastructure information. Mill City NHMP Addenda November 2016 Page PA-14 169 These rankings were reviewed and revised by Marion County Emergency Management staff and the local steering committee members to reflect specific community attributes and risks. (Table A-4) Probability and Vulnerability Comparison Hazard Probability Magnitude Waming Duration CPRI Pianning Time Significance Earthquake 4 4 4 4 4.00 iliig Severe Weather/Storm 4 3 1.5 3.5 3.28 iliig Power Failure 2.5 4 4 3 3.23 iliig Landslide 3 3 4 3 3.15 iliig Wildland Interface Fire 3.5 3 2 3 3.08 iliig Drought 3 3 1 4 2.80 Extreme Weather - High 3.5 2 1 4 2.73 Temperature Transportation Accident/Train 2 3 4 3 2.70 Derailment School & Workplace Violence 1.5 4 4 2 2.68 Epidemic 2 4 1 4 2.65 Pandemic 2 4 1 4 2.65 Dam or Levee Failure 1 4 4 4 2.65 Animal Disease Outbreak 2 3 2 4 2.50 Hazardous Materials Incident 2.5 3 1 3 2.48 Biological Chemical, Sabotage and Cyber Incident and Explosives 1 4 1 3 2.10 Radiological Attack-Terrorism Civil Disorder/Terrorism 1 2 4 3 1.95 11-ow Release 1 2 4 3 1.95 11-ow Eruption 1 2.5 1 4 1.75 11-ow 1 1 2 3 1.35 11-ow 1 1.5 1 1 1.15 11-ow Mill City NHMP Steering Committee and Marion County NHMP Steering Committee,2016. Mill City NHMP Addenda November 2016 Page PA-15 170 Hazard Characteristics Drought The steering committee determined that the city's probability for drought is moderate and their vulnerability to drought is low. Although dryer conditions in the summer months have impacted the North Santiam Canyon as a whole, Mill City has not experienced major impacts from drought. Recently during the 2015 drought, many tree's and vegetation died off which has created increased risk of wildfire hazards. If dryer conditions become the new norm, Mill City could experience timber die-off, making the forest lands surrounding Mill City more susceptible to wildfires. Earthquake The steering committee determined that the city's probability for a Cascadia Subduction Zone (CSZ) Earthquake event is high and that their vulnerability to this event is moderate.The steering committee determined that the city's probability for a Crustal Earthquake event is moderate and that their vulnerability to this event is moderate. Historically, Mill City has experienced one crustal earthquake on August 19 1961. A 4.5 magnitude � 4 earthquake struck 6 miles from Mill City, with shaking felt throughout the Santiam Canyon up to Detroit. If another larger and more substantial earthquake occurs (Cascadia), Mill City is expected to �/�I;R�,/ l Ii�J� n , J)r� �l����t/�K S l if G,d L�✓ii l g experience damage to buildings, utility (electric p ���f i i// yr'�c�✓ t 1 f dr. i ower, communication, water, wastewater, natural gas) and transportation systems (roads, bridges, pipelines). m Flood The steering committee determined that the city'syy probability for flooding is low and that their vulnerability to flooding is low.The City of Mill Cityr� . w,ti�rr F is located approximately 10 miles downstream of r, the Big Cliff and Detroit dams.The U.S. Army Corps Cascadia Earthquake Expededl Shaking of Engineer regulates water levels behind the dams Violent and manages discharges to prevent downstream Severe flooding.Therefore, the N. Santiam River near Mill very Strong City rarely sees more than minor flooding. E] Strong Historically, Mill City experienced minor flooding events in 1964 and 1996.This was due to a specific weather pattern named "pineapple express", which blows warm, most air from the southwest into the pacific northwest. Most flooding is mitigated due to the Detroit and Big Cliff Dams that regulate the amount of cubic feet per second that flow out of Detroit Reservoir, into the North Santiam Mill City NHMP Addenda November 2016 Page PA-16 171 River. During the 1964 and 1996 storms, the small tributaries entering the North Santiam River near Mill City did have minor flooding caused by the rapid runoff from low elevation snow melt and the heavy rain events. However, the cities drinking water is pulled from an aquifer, and thus, high and dirty river levels do not impact those facilities. Landslide The steering committee determined that the city's probability for landslide is moderate and that their vulnerability to landslide is moderate. Historically, Mill City has not experienced major impacts from landslides within city limits. Areas '« ° pry near Hwy 22 and the northern edge of the city are more susceptible to this hazard because of � i iY�/lirtr�j /�i � (�fiil' l ���ia�r/�� ��1�"% ��i/�l/iii i�/ i ✓� I steep slopes. The developed areas of the City of Mill City south of the North Santiam River have a LOW susceptibility to landslides but debris flows can occur in the Snake/DeFord creek channels, as they did in the 1964 flood event. Potential landslide-related impacts are NIC a adequately described within the county's plan, and include infrastructural damages, economic impacts (due to isolation and/or arterial road closures), property damages, and obstruction to evacuation routes. Rain-induced landslides and debris flows Landslide Susceptibility can potentially occur during any winter in Marion ❑ Low-Landsliding Unlikely County, and thoroughfares beyond city limits are ❑ Moderate-Landsll;dling Possible susceptible to obstruction as well. F� Hugh-Landslidling Likely ® Very Higih-Existing Laindlslide Volcano The steering committee determined that the city's probability for volcanic event is low and that their vulnerability to volcanic event is moderate. Mill City has not been impacted previously by volcanic activity, however Mount Jefferson is located east of the city, further into the cascade mountains, and could produce problems if an eruption occurs. Wildfire The steering committee determined that the city's probability for wildfire is high and that their vulnerability to wildfire is moderate. In 2002 and 2004, Mill City was impacted by wildfire's which caused closure of Hwy 22 east of Detroit Lake.This impacted local residents, restricting travel, and negatively impacting the local economy due to the closure of Hwy 22 for an extended period of time. Mill City and the forest areas east and north of the City may experience more fires as dryer conditions occur in the Mill City NHMP Addenda November 2016 Page PA-17 172 North Santiam Canyon. Less rainfall and snowpack can kill of tree's dependent on large amounts of water, which could ultimately lead to an increase of fuels and wild fire ignition probability. Marion County updated the Community Wildfire Protection Plan (CWPP) in 2016, which mapped wild land urban interface areas and developed actions to mitigate wildfire risk.The city is a participant in the CWPP, and has included hazard mitigation action items directly in line with the CWPP actions. Windstorm The steering committee determined that the city's probability for windstorms is high and that their vulnerability to windstorms is high. In April of 1931, winds in the Santiam Canyon region felled hundreds of trees causing road closures between Mill City and Detroit.The winds also caused several devastating fires. On December 12, 1995, high wind gusts of up to 60mph downed trees and disrupted power and communication services in the lower Santiam. Mill City residents reported power and phone outages. In 2002, a windstorm caused similar damages, blowing down trees onto roads and power lines. About once or twice per year the city will experience a windstorm event that can interrupt services, down trees, and cause power outages. Because windstorms typically occur during winter months, they are sometimes accompanied by ice, freezing rain, flooding, and very rarely, snow. Winter Storm (Snow/Ice) The steering committee determined that the city's probability for winter storm is moderate and that their vulnerability to winter storm is high. Major winter storms have occurred in the Mill City area; in January of 1937, heavy snowfall of over 2 feet caused property damage. Major roads were closed and residents of Detroit and Mill City were stranded for five days as heavy snow and a landslide blocked Hwy 22. In the winter of 2006-07 ice storms caused the city to lose power for 2-3 days. In 2014, a similar storm knocked down tree's and caused hazardous road conditions.These types of storms are more frequent and usually cause transportation issues and communication failures from downed trees and icy/snow filled roads. Community Asset Identification This section provides information on city specific assets. Many of these community characteristics can affect how natural hazards impact communities and how communities choose to plan for natural hazard mitigation. Considering the city specific assets during the planning process can assist in identifying appropriate measures for natural hazard mitigation. Community Characteristics Mill City is nestled along the North Santiam River. The northern third of the City and the Hwy 22 corridor are located north of the river in Marion County. The remainder of the City, Mill City NHMP Addenda November 2016 Page PA-18 173 including the majority of the residential areas, schools, fire station and city offices are located south of the N. Santiam River in Linn County. Mill City is the largest community in the North Santiam River Canyon with a population of 1,855. With an elevation of 827 feet, the climate of Mill City is moderate; the average monthly temperatures range from 51—79 degrees in July and August, and 33-45 degrees in December and January. Mill city receives approximately 60-70 inches of rain, and 6-12 inches of snow each year.The city's topography is relatively flat, but does possess terrain attributed to the North Santiam River. Outside of city limits, steep slopes surround the city on the North and South sides. Economy Mill City benefits from its location along Oregon Hwy 22, a major east-to-west transportation route connecting Salem to Bend. The City serves as a local small business, education and service center for residents of the North Santiam Canyon and the traveling public along the Hwy 22 corridor.The existing businesses types include hospitality, restaurants, professional, financial, real estate, service stations, repair/service shops, and personal service businesses; primarily serving the daily needs of local residents. Critical and Important Facilities/Infrastructure Communication/Information Technology There are currently three communication providers in Mill City. Wave provides broadband internet and phone services, Stayton Cooperative Telephone Company provides phone service, and Frontier provides broadband internet with limited fiber infrastructure adjacent to Hwy 22. Strengths: • Fiber internet infrastructure already present along Hwy 22 • Cellular Tower(T-Mobile) near 155 NE Santiam Blvd Weaknesses: • Phone/Fiber lines may cross over 1St Ave. bridge • Currently limited certified HAM radio operators Water The City of Mill City has two municipal wells (Kingwood Wells 1 & 2) and a water pump station located at SE 4th and SE Kingwood Avenue.The two wells were drilled to a depth of 168 feet. Well 1 has the capacity to produce 800 gpm and Well 2 has the capacity to produce 450 gpm.1 Both of these wells are in close proximity to each other, pulling water from depths of 45-158 feet deep from the same aquifer. The city municipal water system currently depends on these wells to distribute water throughout the community. Unless other water facilities are created to pull water from the 1 City of Mill City Comprehensive Plan Page 56 Mill City NHMP Addenda November 2016 Page PA-19 174 North Santiam, Mill City must preserve the well head protection area from any possible pollution attributed to encroaching development. Waste Water Mill City's has a municipal wastewater treatment facility and collection system. Individual homes are served by a STEP (Septic Tank Effluent Pumping) system. The building sewer from a home or business drains to an interceptor tank located on the property. Solids are collected in the interceptor tanks and the liquids are discharged into the city's sewer collection system. The liquid effluent flows to the City's wastewater treatment facility where it goes through a rock filtration system and is discharged into a large drainfield. The City contracts with a private firm to pump out the interceptor tanks at each home or business. Residential interceptor tanks are pumped on a 7-10-year cycle, with tanks serving businesses or heavy water users pump on a more frequent basis. Dams Two dams sit above Mill City, Detroit Dam and Big Cliff Dam. Federal officials and Marion County's Emergency Managers have previously concluded that the likelihood of Dam Failure is Lowe. Current conditions still represent the previous decision. If Dam failure occurred in either dams, Mill City would experience catastrophic impacts from a surge of water expelled from either Detroit or Big Cliff lake. Strengths: • (2) Municipal wells (Kingwood 1 &2) • (1) Backup diesel generator on-site • (2)Above-ground water storage reservoirs at 155 NE Santiam Blvd (Marion County side of river) and SE 4t"Avenue (Linn County side of river)) o Equivalent to (1.5 million)gallons or 3-5 days of water storage • Municipal wastewater treatment system • (3) sewage pump stations Weaknesses: • No current storage supply of diesel fuel • Main water lines cross highway& pedestrian bridge • No backup generator at waste water pump stations • Main waste water line crosses 1St Ave. bridge Transportation Systems Oregon Hwy 22 is the major transportation route for auto, public transit, and emergency vehicle access throughout the Santiam Canyon. Mill City is located along Hwy 22, 30 miles east of the Interstate-5, the City of Salem and the remainder of the Willamette Valley. To the east, Hwy 22 connects to Gates, Detroit, Idanha, and ends at the Santiam Pass interchange with U.S. Route z http://www.co.marion.or.us/PW/EmergencyManagement/Documents/6 damfailure.pdf Mill City NHMP Addenda November 2016 Page PA-20 175 20/Oregon Hwy 126, which continue east to the Central Oregon cities of Sisters, Redmond and Bend The Cherriots Canyon Connector is the only existing public transit service serving communities in the North Santiam Canyon. The Canyon Connector route has three total round trips with buses running approximately every(5) hours. In case of the closure of Oregon Hwy 22, Mill City residents will have to rely on alternate routes to reach supplies or safety in the Willamette Valley. Lyons-Mill City Drive runs from Mill City to Lyons, where it connects to OR 226 and Hwy 22. Bridges Structure Name Location Year Built Structural Condition Little North Fork Santiam Is this on Hwy 1952 Fair River 22 in Lyons? North Santiam River Railroad Mill City 1919 Good (Pedestrian) Bridge Mill City Bridge- 1st Ave. Mill City 1960 Fair Gates Bridge (over N. Gates Santiam River) OR 226 Bridge (over N. Lyons Santiam River) Strengths: • Pedestrian Bridge owned by Mill City could be used by some light duty emergency vehicles • Lyons/Mill City Drive serves as an additional evacuation route to Lyons (west). • SE Kingwood Avenue serves as an additional evacuation route to Gates (east). • Bridges over the N. Santiam River in Gates and Lyons provide an alternative route for Mill City traffic if problems occur on the 1St Avenue bridge in Mill City. Weaknesses: • 1St Ave Bridge has weight restrictions (owned by ODOT). • Pedestrian Bridge needs restoration and contains more stringent weight restrictions. • Hwy 22 closures could make travel outside of North Santiam Canyon extremely difficult. • Bridges over N. San Energy & Utilities Mill City receives energy and utility services from Pacific Power and NW Natural Gas.The main power service line to Mill City comes from Lyons to Mill City, along Lyons-Mill City Drive. It was rebuilt in 2015-2016. Mill City NHMP Addenda November 2016 Page PA-21 176 BPA transmission lines runs south of Mill City from the Detroit Dam generating turbines connecting to the Lyons power station. Strengths: • Gas stations with fuel storage exist within Mill City. • Businesses including Freres Lumber and Frank Lumber Co. possess fuel storage. Weaknesses: • Gas stations possess below ground tanks which cannot be pumped without electricity • Gas stations do not currently possess backup diesel generators to pump fuel from storage tanks. • No alternate sources of energy(wind, solar) exist to power basic services Agriculture and Food Mill City has a small 10,000 sf grocery store, the Mill City Marketplace, convenience stores and several restaurants to provide groceries and food services. The closest full-service grocery exists 17 miles west in Stayton. the closure of Hwy 22 as a transportation route would cause serious concern for residents and food accessibility. Although farms exist in the southern part of Mill City, most are farmed for grass seed/pasture and would not be readily available for food use. Strengths: • Private sector entities which possess limited (1-2 days) food supplies. • Agricultural land availability near Mill City. Weaknesses: • No major(full service)grocery store inside of city limits. • Surrounding agriculture currently not used for food production. Banking and finance A U.S Bank exists on the north side of the North Santiam river in Mill City. The bank is located along Hwy 22 and could be utilized for emergency financial services during a hazard event. Strengths: • Presence of a banking/financing institution within city limits. Weaknesses: • Full "urban"financial services unavailable. Hazardous Materials Mill City does not possess any large manufacturing firms that possess hazardous materials.The city has identified current brownfields which may be susceptible to leaching including the Texaco gas station and Remine mill site. Mill City NHMP Addenda November 2016 Page PA-22 177 Brownfields DEQ Site ID Facility Name Location 1061 Forester Equipment, Inc SW 5t"Ave. Site Screening Recommended 2107 Fred A. Moore Logging Co. 27860 NE Santiam Blvd Site Screening Recommended 1128 Hoover's Shop SW 5t"Ave. & Linn Place Site Screening Recommended 345 North Santiam Plywood 47983 Lyons Mill City Dr. Site Screening Recommended 1844 Mill City Railroad Bridge At Hwy 22, N Santiam River, R.M. 47.2 State Expanded Preliminary Assessment recommended Strengths: • There are currently not enough known hazardous materials to cause major concern. • Brownfield sites could be utilized and attract privates sector development. Weaknesses: • Current brownfields maybe susceptible to leaching of unknown materials. Emergency Services Mill City receives emergency service support from Linn County Sheriffs and the Mill City Rural Fire Protection District. • Linn County Sheriffs Office substation at City Hall, 444 S. 1St Avenue • Mill City Rural Fire Protection District, Main Fire Station, 400 S. 1St Avenue Strengths: • Mill City possess community specific emergency services for fire and law enforcement. • The RFPD building possesses a backup generator. Weaknesses: • Emergency services do not have trained HAM radio operators. • Emergency services do not possess rescue rafts for North Santiam River access. Government Facilities Mill City Hall contains the office space for the administration,finance, permits, planning, public works, municipal court, and also serves as the Mill City Sherriff substation Mill City NHMP Addenda November 2016 Page PA-23 178 • Mill City City Hall,444 S. 1"Ave. • Mill City Post Office, 101 SE Kingwood Avenue Strengths: • New city hall facility could be utilized for a shelter or emergency response center. Weaknesses: • City Hall does not possess a backup diesel generator to power facility in the event of a power outage. Environmental/Historical Preservation Sites Mill City is surrounded by environmental preservation sites including state parks and designated wilderness areas. 50% of the housing stock in Mill City was built before 1950. The Hinkle-Reid house located at 525 NE Alder St. was built in 1916. It is the only structure in Mill City listed on the National Register of Historic Places. There are four other structures listed on the City's local historic resource inventory, including a wrought iron Phoenix column railroad bridge on timber trusses that crosses the North Santiam River at 1St Avenue in Mill City. The railroad bridge was originally constructed in 1888, and then moved up to Mill City in 1919. The bridge remained in railroad use until 1967 and was refurbished for pedestrian use in the mid-1990's. The City of Mill City has created a recreational trail on the abandoned railroad right of way through the City, with the refurbished railroad bridge as its focal point. The community plans to repaint and refurbish the bridge to celebrate its centennial in 2019. Strengths: • Proximity to pristine state and federal land could attract residents or business. • Buildings of historical significance located within city limits. • History and "timber" character provided by Mill City pedestrian bridge. Weaknesses: • Mill City bridge needs funding for restoration. Education Mill City is home to the Santiam Canyon School District.This district encompasses all cities in the Santiam Canyon including Mill City, Gates, Detroit and Idanha.This district includes the Santiam Elementary School, and the Santiam Jr/Sr High school. • Santiam School District o Santiam Elementary School,450 SW Evergreen St. o Santiam Jr/Sr High School, 265 SW Evergreen St. Strengths: • School facilities could be utilized to shelter a large amount of community residents including functional needs populations. Mill City NHMP Addenda November 2016 Page PA-24 179 • School facilities already possess needed infrastructure for a shelter which includes restrooms, showers and a kitchen. • School buses could be utilized for transportation after a hazard event. Weaknesses: • There are no current agreements or MOU's between the counties, city and school district to utilize facilities after a hazard event Healthcare & Public Health Santiam Memorial Hospital operates a satellite medical clinic in Mill City. The clinic provides outpatient services for local residents. The Mill City Pharmacy enables residents to fill prescriptions and purchase in-home medical supplies. The Santiam Memorial Hospital in Stayton and its adjacent medical clinics provide outpatient, surgery center, birthing services and in-patient medical care. • Santiam Medical Clinic, 280 S 1St Ave. Strengths: • A clinic with out-patient services exists within the community. Weaknesses: • No facilities with major life-saving equipment currently exist within city limits. • Emergency health supplies are limited to what exists within the community. Access and Functional Needs Mill City's vulnerable population consists of the elderly and those that are medically dependent and require life safety equipment. In 2010, 13.5%of Mill City's residents were elderly, 65 years of age or older. Strengths: • Over 39%of residents are over the age of 45,this older populous can volunteer and promote social cohesion in the community. Weaknesses: • There are no assisted living or full-service medical care facilities to serve the aging population. Mill City NHMP Addenda November 2016 Page PA-25 180 CITY OF SILVERTON ADDENDUM Purpose This document serves as the City of Silverton's Addendum to the Marion County Multi- Jurisdictional Hazards Mitigation Plan (MHMP, HMP). This addendum supplements information contained in Volume I (Basic Plan) of this HMP.The Basic Plan serves as the foundation for this jurisdiction's addendum. Volume III (Appendices) provides additional information (particularly regarding participation and mitigation strategy).This addendum meets the following requirements: • Multi-jurisdictional Plan Adoption §201.6(c)(5), • Multi-jurisdictional Participation §201.6(a)(3), • Multi-jurisdictional Mitigation Strategy§201.6(c)(3)(iv), and • Multi-Jurisdictional Risk Assessment§201.6(c)(2)(iii). Plan Process, Participation, and Adoption This section of the HMP addendum addresses 44 CFR 201.6(c)(5), Plan Adoption, and 44 CFR 201.6(a)(3), Participation. In the summer and fall of 2016, the Oregon Partnership for Disaster Resilience (OPDR) at the University of Oregon's Community Service Center (CSC) partnered with the Oregon Military Department's Office of Emergency Management(OEM), and Marion County cities, including Silverton, to update their addendum to the Marion County HMP, which expired July 8, 2016. This project is funded through the Federal Emergency Management Agency's (FEMA) FY14 Pre-Disaster Mitigation Competitive Grant Program (PDMC-PL-10-OR-2014-002). By developing this addendum to the Marion County HMP, locally adopting it, and having it approved by FEMA, the City of Silverton will regain eligibility for FEMA Hazard Mitigation, Pre-Disaster Mitigation, and Flood Mitigation Assistance grant program funds. The Marion County HMP, and Silverton addendum, are the result of a collaborative effort between citizens, public agencies, non-profit organizations, the private sector, and regional organizations. A project steering committee guided the process of developing the plan. For more information on the composition of the steering committee see the Acknowledgements, Plan Summary, and Plan Process (Volume III, Appendix B). The Silverton City Manager(who also serves as Silverton's Emergency Manager) is the designated local convener of this addendum.The Convener will take the lead in implementing, maintaining, and updating the addendum to the HMP in collaboration with Marion County Emergency Management. Representatives from the City of Silverton steering committee met formally on one occasion: October 11, 2016(see Appendix B for more information). Marion County HMP March 2017 Page SV-1 181 The city's addendum reflects decisions decided upon at the plan update meeting and during subsequent work and communication with OPDR. The City of Silverton Steering Committee is comprised of representatives from the following departments: • Convener, City Manager(Emergency Manager) • Police Department • Public Works Department • Community Development Department • Silverton Fire Department • Silverton Local Business Representative (2) • Community Nonprofit Representative Silverton used multiple approaches to engage the public. First, the City established steering committee representatives from across the city. Next, the City actively participated in countywide community engagement activities described in Volume I, Section 4 and in Appendix B. City staff also presented the draft plan to the City Council during an open public council session.The Steering Committee was closely involved throughout the development of the plan and served as the local oversight body for the plan's development. In addition, community members outside of the steering committee were provided an opportunity for comment via the plan review process (see Appendix B for more information). The Marion County HMP was approved by FEMA on [Month] [Day],2017 and the Silverton addendum was adopted via resolution on [Month] [Day],2017.This HMP is effective through [Month] [Day],2022. Mitigation Strategy This section of the HMP addendum addresses 44 CFR 201.6(c)(3(iv), Mitigation Strategy. During the 2016 Marion County and Silverton update process, OPDR and a representative from Marion County Emergency Management assisted the steering committee with developing mitigations that will meet Silverton's unique situation.The proposed actions were then re-reviewed by the steering committee to finalize. Silverton developed a list of priority actions (Appendix A-1), any actions that were not prioritized were placed in the Action Item Pool (Appendix A-2)and will be considered during the annual meetings. For a status update on each of Silverton's 2009 mitigation actions, see Appendix A-2. Priority Actions The City is listing a set of high priority actions in an effort to focus attention on an achievable set of high leverage activities over the next five-years.The City's priority actions are listed in Table SV-1 on the following page. Action Item Pool Table SV-2 on the following pages presents a pool of mitigation actions.This expanded list of actions is available for local consideration as resources, capacity, technical expertise and/or political will become available. Page SV-2 March 2017 Marion County HMP 182 Table SV-1. Silverton Priority Action Items Action ActionHazard Action Item Coordinating Organization Partner Organizations Timeline Item ID �b IUUN'Yl//�U%6ro lYl�Y gAl )G Muuane MuuuuvJ/2 MMIMMM111111MMM, Silverton Flood Plain Oregon Risk MAP; Mid Term (3-5 P-1 Flood Update Silverton Flood Insurance Rate Maps (FIRMS). Silver Jackets; Coordinator years) DOGAMI P-2 Dam Failure Update the dam breech inundation scenario map. Public works,Engineering Marion Co.; UASCE Short Term(1-2 years) USACE P-3 Dam Failure Conduct seismic evaluation of Silver Creek Dam and Public Works Director, Short Term (1-2 Silverton water supply reservoir. Water Quality Supervisor years) P-4 Dam Failure Develop evacuation strategy for both local and Silverton Emergency USACE Mid Term (3-5 regional dam failure scenarios. Management years) Conduct seismic evaluation of West C and Main Street Short Term (1-2 P-5 Earthquake Silverton Public Works Marion Co.,ODOT bridges over Silver Creek years) Source:City of Silverton HMP Steering Committee,2016. Marion County HMP March 2017 Page SV-3 183 Table SV-2. Silverton Action Item Pool Action ActionHazard Action Item Coordinating Organization Partner Organizations Timeline ItemID NEW,MH-1 Multi- Assess options for a new City Hall building a structure Administrative Services City Council Mid Term (3-5 Hazard that will withstand flood. Director years) Create a Facilities Master Plan that assesses the need for new or updated facilities,and incorporates natural Multi- Administrative Mid Term (3-5 MH-2 hazard vulnerabilities and mitigation measures for Public Works Hazard Services Director years) reducing vulnerability. Consider hazards in future facilities master plan updates. Create memoranda of understanding with fuel Multi- Administrative Short Term (1-2 MH-3 stations that allows emergency responders first access Public Works Hazard Services Director years) to fuel. Multi- Administrative Services Emergency Short Term(1-2 MH-4 Create mutual aid agreement with sister cities. Management; Marion Hazard Director years) Co. Educate businesses and governmental organizations Multi- Administrative Services Chamber of MH-5 about the importance of continuity of operations plans Ongoing Hazard Director Commerce to make them more resilient to natural hazards. Multi- MH-6 Participate in the COAD. Emergency Management Marion Co.;CERT Ongoing Hazard Improve coordination and evaluation of technical and MH-7 Multi- engineering gaps in communications capabilities for Emergency Management City Administration; Short Term (1-2 Hazard natural hazards event response. (METCOM is currently METCOM 911 years) doing an assessment.) Review,and if necessary,revise emergency management and business continuity plans,policies, Multi- City Administration; Short Term(1-2 MH-8 and ordinances to ensure effective response,business Emergency Management Hazard City Council years) continuity,and post-disaster recovery efforts.(Next update in 2018.) MH-9 Multi- Identify larger equipment that needs to be purchased Emergency Management City Administration; Short Term (1-2 Hazard that would support response during a disaster. City Council years) Secure memoranda of understanding for alternative Multi- Administrative Services Short Term(1-2 MH-10 sites that could be used for essential city functions if City Council Hazard Director years) city buildings are not usable. Source:City of Silverton HMP Steering Committee,2016. Page SV-4 March 2017 Marion County HMP 184 Table SV-2. Silverton Action Item Pool (Continued) Action ActioD Hazard Action Item Coordinating Organization Partner Organizations Timeline Itemo Marion County; North Participate in implementing the Marion County Water Quality Supervisor- Santiam Drought DR-1 Drought Ongoing Drought Contingency Plan Public Works Contingency Committee I 1 Il 1 I I, EQ-1 Earthquake Seek voter approval for construction of City of City Manager and Council Fire Marshal; Police Mid Term(3-5 Silverton Police Facility/Emergency Operations Center. Chief years) Following seismic evaluation of the West C and Main Mid Term (3-5 EQ-2 Earthquake Street over Silver Creek,seek funding to reinforce or Public Works Director Marion C.; ODOT replace as needed. years) Assess the seismic strength of Silverton's sewage City Council EQ-3 Earthquake treatment system and develop improvements Public Works Director, Short Term(1-2 accordingly as part of the sewage system's current Water Quality Supervisor years) update efforts. Coordinate with Silverton School District to seek Silverton School funding to assess and seismically retrofit school District; Business Administrative Services Mid Term (3-5 EQ-4 Earthquake buildings that are vulnerable to collapse,including Orgon IFA(seismic Director years) Mark Twain Middle School and the Robert Frost grant program);City Elementary School. Council Encourage reduction of nonstructural and structural EQ-5 Earthquake earthquake hazards in homes,schools,businesses, Administrative Services Marion Co. Short Term(1-2 and government offices through public education and Director years) the Map My Neighborhood program. EQ-6 Earthquake Update comprehensive plan to reflect the latest Community Development Planning Commission; Mid Term (3-5 information on seismic hazards. DLCD years) EQ-7 Earthquake Evaluate the installation of automatic shut-off valves in Engineering Northwest Natural Ongoing all city facilities that use natural gas. Administrative Services City/County EQ-8 Earthquake Send city employees to the County's ATC 20 training. Director Emergency Ongoing Management Earthquake/ Encourage residents to prepare and maintain at EQ-9 Multi- minimum two-week survival kits. Emergency Management CERT Ongoing Hazard Source:City of Silverton HMP Steering Committee,2016. Marion County HMP March 2017 Page SV-5 185 Table SV-2. Silverton Action Item Pool (Continued) Action ActionHazard Action item Coordinating Organization Partner Organizations Timeline Item ID I Mo i ii 3 111 iRffiffi=� =1 ME=, Educate residents and business owners near Silver DLCD; FEMA; Risk FL-1 Flood City floodplain coordinator Ongoing Creeks about how to manage flood risks. MAP Mitigate flood issues at the wastewater treatment Public Works Director, Short Term(1-2 FL-2 Flood facility though riverbank reconstruction and other City Council Water Quality Supervisor years) flood mitigation measures. Continue compliance with the National Flood Administrative FL-3 Flood Insurance Program (NFIP)through the enforcement of City floodplain coordinator Ongoing Services Director local floodplain ordinances. 1 I I I ! !J J I 1 JI Based on the new LIDAR information obtained from DOGAMI,create a list of at-risk infrastructure and Short Term(1-2 LS-1 Landslide Public Works Director DOGAM;Marion Co. develop a public infrastructure landslide mitigation years) program to address the landslide hazard. IJ I JJ J Implement the wildfire mitigation actions for Silverton found in the Marion County Community Wildfire WF-1 Wildfire Fire Marshall Marion Co. Ongoing Protection Plan when an updated plan becomes available. Review Marion County's development codes together Community Short Term (1-2 WF-2 Wildfire with the Marion County Planning Department to Fire Marshall Development years) develop ways to mitigate wildfires near Silverton. 11 !1!1 JJJ ! J ! 1 ! JJ JJ, J J I� � ������������������������������������1fffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffff1ff� ff1 �R�J r�i iNl (ffi�r ri >;N11111111111111111111111111111111111111111ffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffff�111111111111111111111111111111111111111111111111111111111111111111111111111Y1����������������������������������������������������������������111111111111111111111111111111111111111111111�1 Severe Continue to educate citizens about ways to weatherize SW-1 Winter their homes,as well as safe emergency heating Emergency Management PGE Ongoing Storm equipment. [This could be improved] Continue to support/encourage electrical utilities to SW-2 Windstorm use underground construction methods where Community Development PGE Ongoing possible to reduce power outages from windstorms. Regularly assess the health of trees in Coolidge Public Works SW-3 Windstorm McClaine Park to prevent damage to buildings and Parks and Recreation Ongoing utilities from falling trees. Maintenance Source:City of Silverton HMP Steering Committee,2016. Page SV-6 March 2017 Marion County HMP 186 Plan Implementation and Maintenance The City Council will be responsible for adopting the City of Silverton addendum to the Marion County HMP.This addendum designates a convener and a coordinating body to oversee the development and implementation of action items. Because the city addendum is part of the county's multi-jurisdictional HMP, the City will look for opportunities to partner with the county.The City's steering committee will convene after re-adoption of the City of Silverton addendum on an annual schedule; the county meets on a semi-annual basis.The City of Silverton Convener will participate in the Marion County HMP meetings and will report on city specific activities as appropriate.The steering committee will be responsible for identifying new risk assessment data, reviewing status of mitigation actions, identifying new actions, and seeking funding to implement the City's mitigation strategy (actions).The convener will also remain active in the county's implementation and maintenance process (see Volume I, Section 4 for more information). The City will utilize the same prioritization process as the county (See Volume I, Section 4: Plan Implementation and Maintenance and Volume IV, Appendix D: Economic Analysis of Hazard Mitigation Projects for more information). Implementation through Existing Programs Many of the Hazards Mitigation Plan's recommendations are consistent with the goals and objectives of the City's existing plans and policies. Where possible, the City of Silverton will implement the HMP's recommended actions through existing plans and policies. Plans and policies already in existence have support from local residents, businesses, and policy makers. Many land-use, comprehensive, and strategic plans get updated regularly, allowing them to adapt to changing conditions and needs. Implementing the HMP's action items through such plans and policies increases their likelihood of being supported and implemented. Silverton's Comprehensive Plan was first acknowledged by the Oregon Land Conservation and Development Commission in 1987.1 The City most recently completed updates to the plan, including updates to the Natural Hazards section, in December of 2013 and August of 2014.The Silverton Comprehensive plan indicates that the flood and earthquake hazards are the "two major types of natural hazards"that are estimated to affect the city.There is no mention in the natural hazards section of landslide or wildfire (listed under Statewide Planning Goal 7).The plan does contain a general goal to "Protect life and property from natural disasters and hazards." In addition,the plan contains three specific policies related to the flood hazard.There are no other hazard related policies listed.The City implements the plan through the Silverton Land Development Code, first adopted in 1998.The City has completed numerous updates since, with the most recent occurrence in November of 2016. Silverton currently lists the following as attachments to the Comprehensive Plan: • Master Sewer Plan Update 1992 1 Note, LCDC acknowledged the Salem Area Comprehensive Plan in 1982. Silverton prepared and adopted the Silverton Comprehensive plan in January of 1987 with LCDC acknowledging it as an Amendment to the Salem Area Comprehensive Plan in February of 1987. Marion County HMP March 2017 Page SV-7 187 • Master Sewer Plan Update December 1993 • Dual Interest Area Agreement • Master Sewer Plan Update January 30, 2003 • Parks & Recreation Master Plan dated January 2008 • City of Silverton Transportation System Plan (April 2009) Part 1 • City of Silverton Transportation System Plan (April 2009) Part 2 For more information, refer to http://www.Silverton.org/Adopted-Plans-Studies/. Continued Public Participation Keeping the public informed of the City's efforts to reduce the city's risk to future hazard events is important for successful plan implementation and maintenance.The City is committed to involving the public in the plan review and updated process. See Volume I, Section 4,for more information. Plan Maintenance The Marion County Multi-Jurisdictional Hazards Mitigation Plan and city addendum will be updated every five years in accordance with the update schedule outlined in the Disaster Mitigation Act of 2000. During the county plan update process,the City will also review and update its addendum.The convener will be responsible for convening the steering committee to address the questions outlined below. • Are there new partners that should be brought to the table? • Are there new local, regional, state, or federal policies influencing natural hazards that should be addressed? • Has the community successfully implemented any mitigation activities since the plan was last updated? • Have new issues or problems related to hazards been identified in the community? • Are the actions still appropriate given current resources? • Have there been any changes in development patterns that could influence the effects of hazards? • Have there been any significant changes in the community's demographics that could influence the effects of hazards? • Are there new studies or data available that would enhance the risk assessment? • Has the community been affected by any disasters? Did the plan accurately address the impacts of this event? These questions will help the steering committee determine what components of the mitigation plan need updating.The steering committee will be responsible for updating any deficiencies found in the plan. Risk Assessment This section of the HMP addendum addresses 44 CFR 201.6(b)(2) - Risk Assessment. In addition, this chapter can serve as the factual basis for addressing Oregon Statewide Planning Goal 7—Areas Subject to Natural Hazards.Assessing natural hazard risk has three phases: Page SV-8 March 2017 Marion County HMP 188 • Phase 1: Identify hazards that can impact the jurisdiction.This includes an evaluation of potential hazard impacts—type, location, extent, etc. • Phase 2: Identify important community assets and system vulnerabilities. Example vulnerabilities include people, businesses, homes, roads, historic places and drinking water sources. • Phase 3: Evaluate the extent to which the identified hazards overlap with, or have an impact on, the important assets identified by the community. The local level rationale for the identified mitigation strategies (action items) is presented herein, and within Section 2, Risk Assessment, and Appendix C, Community Profile.The risk assessment process is graphically depicted in Figure SV-1 below. Ultimately, the goal of hazard mitigation is to reduce the area of risk, where hazards overlap vulnerable systems. Figure SV-I. Understanding Risk +� 1 aramri� Understandling Risk : I w°�' Htr 5 �6f1 100mv Fro n ehologw"All o,mra�P Natural, 13 1r ;% u1nerable, System Exposure,sef)SKNKY *f d Chroniik iF11hy*uil tvw�rga �� aodii RK4011ce ofi,, POM Hasa eur rr nce��lr�r +rl / /��� r" purbnjan *1�ulr)m r rr*"'J1b1W lr/� �/ t ckn a ruWis N r a t� r y%go(KI of(7rwst"t Ili //�� ���rRl4 P row IINi,�Nirp��y C G/e Abllllly,Resources � en-d WNltibrrsta. , Bagske-Re5and w Prep re •fteccwer Sro�sra�9 rl��S-�r��a�r r"n,rra�rr;dq�rrr�row�rcr��srur,��wrdFalr�r�rr�y�crrcRn�rrdd�d�auarr9�vr,.2�UJ:�6 Risk Assessment Approach A risk assessment is intended to provide the, "factual basis for activities proposed in the strategy to reduce loses from identified hazards."2 To complete the risk assessment, the HMP update team first updated the description, type, location and extent of each hazard. Next, the team updated the vulnerability information based on each hazard's potential impact on the community. The Marion County Basic Plan (Volume I, Section II) Risk Assessment describes in detail the methods used to assess risk. In summary, Marion County has prepared a Threat Hazard Identification and Risk Assessment as a formal annex to the Marion County Emergency Operation Plan.The assessment uses a method developed by BOLD Planning.s This city 2 44 CFR 201.6(2)(i) s BOLD Planning is a consulting firm specializing in the development of actionable emergency plans. For more information, visit: http://www.boldplanning.com/ Marion County HMP March 2017 Page SV-9 189 addendum builds on the county level assessment to produce a similar assessment for the City of Silverton.The assessment specifically examines: 1. Probability(frequency) of event 2. Magnitude of event 3. Expected warning time before event 4. Expected duration of event Refer to Page 2-4 of the Marion County Basic HMP for a description of the scoring values for each ranking category. Hazard Analysis The assessment identifies three levels of risk: High, Moderate and Low. High - High probability of occurrence; at least 50 percent or more of population at risk from hazard; significant to catastrophic physical impacts to buildings and infrastructure; major loss or potential loss of functionality to all essential facilities (hospital, police, fire, ECIC and shelters). Moderate - Less than 50 percent of population at risk from hazard; moderate physical impacts to buildings and infrastructure; moderate potential for loss of functionality to essential facilities. Low- Low probability of occurrence or low threat to population; minor physical impacts. A summary of the risk assessment findings and rankings is presented below. Table SV-3. Hazard and Vulnerability Assessment Summary Warning Local Planning County Planning Natural Hazard Probability Maghitude' 6uni ion CPRE" Time� Signific'ance' Significance Weight Factor OA5 03 0.15 0A Earthquake* 4 4 4 4 4.00 HIB11 GC-Ilogh Severe Weather/Storm** 4 1 3 3 2.85 1 figh Flood 3 2 3 4 2.80 1 figh Drought 3 1 2 4 2.35 1figh Extreme Weather-High Temperature 3 1 2 4 2.35 Wildland Interface Fire 1 4 2 2 2.15 Dam or Levee Failure 1 2 4 4 2.05 Landslide 2 2 2 2 2.00 1 figh Volcanic Eruption 1 1 1 1 4 1.30 101 I i.ow *Note:Earthquake probability listed to match county level analysis.See below for more detailed probability assessment. **Note:Includes tornado hazard Source: BOLD Planning Risk Assessment Method;Analysis by UO Community Service Center. Community Asset Identification This section provides information on city-specific assets. For additional information on the characteristics of Silverton, in terms of geography, environment, population, demographics, employment and economics, as well as housing and transportation see Volume III, Appendix C, Community Profile. Many of these community characteristics can affect how hazards impact communities and how communities choose to plan for natural hazard mitigation. Considering the city-specific assets during the planning process can assist in identifying appropriate measures for natural hazard mitigation. Page SV-10 March 2017 Marion County HMP 190 Community Characteristics The City of Silverton is located in Marion County, Oregon, straddling the banks of Silver Creek.The city is bisected by Highway 214 running roughly north-south and Highway 213 running roughly northeast-southwest.The city is approximately 15-miles west of the Salem- Keizer metro area. Silverton is located in Oregon's Willamette Valley, which experiences a moderate climate. In August, the average high temperature is 82 degrees and the average low temperature is 51 degrees.Wintertime temperatures in January range from an average high of 46 degrees to an average low of 33 degrees.The average annual precipitation is 39.9 inches. The US Census lists Silverton's 2015 population at 9,590.This represents a 22.5% increase from 2000. For more demographic information, refer to Appendix C. Economy As with other early settlements throughout Marion County, proximity to water fueled early industry.Today, Silverton is home to the Oregon Garden, a private botanical wonderland attracting visitors from throughout the region.The city serves as a bedroom community to Salem and Portland. Its strong service economy caters to locals and tourists alike.Today, Silverton's primary employment sectors are health, manufacturing, retail, education and leisure, and hospitality. Median household income in Silverton is $53,929. For more economic information, refer to Appendix C. Critical and Important Facilities Critical and important facilities include the following: Transportation • Bridges: o Main St Bridge (ODOT bridge)—12"waterline, forced sewer main, gas line, phone lines (this is the main switch into the Frontier station), fiber o C St Bridge (ODOT)—nothing attached o James Ave (City owned)—8"waterline • Highway 213 is the main east-west highway that connects Silverton with Salem to the west, and Oregon City to the northeast. • Highway 214 is the major north-south highway that connects Silverton with Mount Angel and Woodburn to the north and Silver Creek Falls State Park and Highway 22 to the south. • Highways 213 and 214 intersect in Silverton's commercial downtown. Note:Every route into town requires crossing a bridge—how will they get to the Aurora airport if bridges are out? Note:Silver Creek earthen dam and spillway—there isn't great access to the earthen dam (easy to get therefrom SW, but not NE) Energy • Portland General Electric is the only power supplier Note: Only one substation, and if it goes down, the entire town is affected. Marion County HMP March 2017 Page SV-11 191 Note:It is unlikely PGE will immediately provide assistance to Silverton in the event of a large-scale disaster. • Fuel: o City Hall/Police—natural gas generator o Early warning dam building (monitoring building)—propane generator(150 gallons of propane stored, which will probably last 2 weeks) o City Shops—Generac propane generator(300 gallons of propane stored) o Edison pump station—propane generator o The City also has two very small emergency generators that run on gasoline Water • Drinking Water: o Abiqua Creek (primary) and Silver Creek are the main water supply sources for the city. o Abiqua diversion dam and 7-mile supply pipeline into town. Note:Pipeline was replaced in 1995, but there's a section that might fail in an earthquake. If water isn't available from Abiqua Creek(due to this issue), it would be possible to pull from Silver Creek. o Two water treatment plants on Ames Street, with a combined treatment capacity of 5.5 million gallons per day. (Need to find out about generators at each plant). o Three booster pump stations (Edison pump station, at the plant, Main St. pump station). o Three treated water storage tanks totaling 4.5 million gallons. o Reservoir(420 million gallons of storage) contained by the Silver Creek Dam (this is the earthen dam) southeast of the city. • Wastewater: o Schemmel Lane Wastewater Treatment Plant treats the entire city. Communication • Communication towers: o Eastview Lane—tower with a repeater owned by Verizon, backup propane generator o Tower on top of City Hall o Tower on water plant on Ames o Tower off of Commerce owned by Wave Broadband • Police, Fire, and Public Works can all communicate through radio. Note:All police cars connected to communication through cell towers—if cell towers aren't functional, police cars won't have computer access(just radio). Note:If Metcom goes down, 819 Railway Avenue becomes the dispatch center. Emergency services • Fire (Silverton Rural Fire District): o Station 1 (Main Station) (819 Rail Way NE, Silverton 97381) o Station 2 (13404 Riches Rd SE, Silverton 97381) o Station 3 (17447 Abiqua Rd NE, Silverton 97381) o Station 8 (490 3rd St., Scotts Mills 97375) o Station 9 (4724 Crooked Finger Rd NE, Scotts Mills 97375) Page SV-12 March 2017 Marion County HMP 192 • Police: o Silverton Police Department(306 S. Water St.) • Medical o Woodburn Ambulance substation (316 Phelps) o Silverton Hospital (342 Fairview St.)—48-bed medical facility Cultural/historical resources • On the National Register of Historic Places: o Calvary Lutheran Church and Parsonage "White Steeple Church" (314 Jersey St.) o Downtown Silverton Commercial Historic District o Seven or eight homes listed around town • Silverton Country Museum (428 South Water St.) • Oregon Garden, containing the Gordon House,the only house designed by Frank Lloyd Wright in Oregon (879 W Main St.) Functional and Access Needs (Vulnerable Populations • Silver Falls School District contains five public schools in the city. In 2010, 8.45% were in an ESL program. • Assisted living facilities: o Davenport House/Davenport Place (930 Oak St.) o Wisdom Keepers Senior Care Home (171, 173 Steelhammer Rd.) o Marquis Silver Gardens (115 S.James St.) o Lone Oaks Care Homes (331 Lone Oaks Loop) o Silverton Senior Center (115 Westfield St.) • Home for mentally challenged adults (1118 Florida Dr.) • Silvertown 1 &2 with senior and disabled adults (1—1000 N 2nd St.; 2— 1115 mills St.) • Silverton Mobile Estates (1307 S Water St.) • Twilight Ct. (811 S Water)—low-income housing Hazard Characteristics Drought The characteristics of drought in Silverton are the same for the county as a whole. Marion County HMP March 2017 Page SV-13 193 Table SV-4. Drought Summary Hazard Drought Type Climatic Speed of Onset Slow Location Varies, County Wide Extent Moderate to Severe Drought* Prior Occurance Three>6 months duration since 1982 Probability —9% *Defined as between-2 and-4 on the National Resource Conservation Service (NRCS)Surface Water Supply Index(SWSI) Sources:Oregon NHMP;NRCS;analysis by OPDR The probability of drought in Silverton is likely, the same as for the county as a whole. Silverton relies on surface water and reservoir storage for its water supply source and historically drought has not been an issue.The City has a water curtailment plan that they have tested in the past even though conditions did not require it.Therefore, Silverton's vulnerability is low. Overall,the planning significance of drought in Silverton is moderate. Volume I, Section 2, Risk Assessment, adequately describes the characteristics of drought hazards, as well as the location and extent of a potential event. Due to a cool, wet climate, past and present weather conditions have generally spared Marion County communities from the effects of drought. Governor Kate Brown declared a drought emergency for all of Marion County in September 2015. As noted above, Silverton's primary water supply comes from Abiqua Creek via the Abiqua diversion dam and transmission pipeline.The transmission line, replaced in 1995, runs seven miles into town.The Silverton steering committee noted that there is a section that could fail in an earthquake. However, the City has a secondary source of water in Silver Creek. Silver Creek supplies 420 million gallons of raw water storage capacity provided by the Silverton Reservoir. Raw water from these two sources is treated for consumption at two treatment facilities located on Ames Street.The City is capable of treating up to 5.5. million gallons of water per day and has 4.5 million gallons of treated water storage capacity.The City maintains three (3) pump stations (Edison pump station, Main Street pump station, and the treatment plant pump). Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Earthquake The characteristics of a crustal earthquake are similar to the county as a whole. Page SV-14 March 2017 Marion County HMP 194 Table SV-5. Earthquake Summary Crustal Hazard Earthquake-Crustal Type Geologic Location Multiple active faults;Willamette Valley Speed of Onset Rapid Extent Very Strong to Severe shaking—500 yrs* Prior Occurance One over Magnitude 5 last 100 yrs** Probability Approximately 1%annual *DOGAMI HazVu;**PNSN-1993 Scotts Mills just north of Marion County Sources: DOGAMI-Oregon HazVu;Oregon NHMP;Pacific Northwest Seismic Network The characteristics of a Cascadia subduction zone earthquake are the same as the county. Table SV-6. Earthquake Summary Subduction Hazard Earthquake-Subduction Type Geologic Location Primarily west of the Cascades;CA- BC Speed of Onset Rapid Extent Catastrophic Prior Occurance One over Magnitude 9 last 500 yrs Probability Magnitude 9+is 7%- 12%over 50 yrs** *DOGAMI HazVu;**Oregon Natural Hazard Mitigation Plan,anlysis by Oregon Department ofGeologyand Mineral Industries. Sources: DOGAMI-Oregon HazVu;Oregon NHMP;Pacific Northwest Seismic Network Silverton's probability for a Crustal Earthquake event is "possible" and their vulnerability to a Crustal Earthquake event is "limited".The county steering committee determined that the probability for a Cascadia Subduction Zone (CSZ) Earthquake event is "highly likely' and that the vulnerability to a Cascadia Earthquake event is "catastrophic".This hazard was not rated as distinct CSZ and crustal events in the previous HMP.An active earthquake fault located north of the city exists within two miles of the Silverton City Limit. Other active faults exist within five-miles to the northeast and southwest.The 1993 Scott Mills quake caused $28 million in damages to cities throughout Marion County. No damaging earthquake events occurred during the previous five years. Volume I, Section 2, Risk Assessment, adequately describes the characteristics of earthquake hazards, history, as well as the location and extent of a potential event. Generally, an event that affects the county is likely to affect Silverton as well. Previous occurrences are well- documented within the county's plan, and the community impacts described by the county would generally be the same for Silverton as well. Earthquake-induced damages are difficult to predict, and depend on the size, type, and location of the earthquake, as well as site-specific building and soil characteristics. Presently, it is not possible to accurately forecast the location or size of earthquakes, but it is possible to predict the behavior of soil at any particular site. In many major earthquakes, damages have primarily been caused by the behavior of the soil. Figure SV-2 shows that ground shaking in Silverton for both crustal and subduction earthquakes are expected to be strong and very strong, with some outlying areas experiencing severe shaking. Marion County HMP March 2017 Page SV-15 195 Figure SV-2. Active Faults and Expected Shaking ��a ti x<:�urrwn�uvsauarw (9 9 �� urn q�q�unu»e�nr.!amd �� Ad—f'awtl d mwo Nw.1.. f; Source: Oregon FlazVu:Statewide Geohazards Viewer(DOGAMI) The Silverton steering committee identified earthquake damage to bridges and nearby dams as a primary concern.Transportation isolation and inundation due to dam failure could both have significant impacts on the city.The City's priority actions reflect these concerns. In 2007,the Department of Geology and Mineral Industries (DOGAMI) conducted a seismic needs assessment for public school buildings, acute inpatient care facilities, fire stations, police stations, sheriffs' offices, and other law enforcement agency buildings. Buildings were ranked for the "probability of collapse" due to the maximum possible earthquake for any given area. Within the city of Silverton, the following buildings were given a "moderate" or "high" probability of collapse: • Mark Twain Middle School: high (>1016) • Robert Frost Elementary School: high (>1016) • Eugene Field Elementary School: high (>1016) • Silverton High School (Schlador St. Campus): very high (10016) The Silver Falls School District has completed several important school seismic mitigation projects since the last HMP. As a significant mitigation success, Silverton completed construction of the second phase of the Pine Street High School Campus in 2009. All high school students are now enrolled at the new high school. Further, in 2016, the district completed conversion of the Schlador Street Campus for use as a new middle school.The original multi-story(1938) portions of the old high school building remain intact, however they are no longer used for student instruction. Completion of the Silverton Middle School project resulted in the following school changes: • Robert Frost School (currently grades 4,5,6) now houses grades 3, 4 and 5 • Mark Twain School (currently grades 7,8) now houses grades K, 1 and 2 Page SV-16 March 2017 Marion County HMP 196 • Eugene Field Elementary School has been liquidated by the district Silverton is also in the process of seeking voter approval to construct a new police and emergency operations center. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Flood Table SV-7. Flood Summary Hazard Flood Type Climatic Speed of Onset Slow to moderate Location Mapped flood zones,floodplain Extent Moderate to severe Prior Occurance Four significant events since 1964 Probability 1%annual within SFHA Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, describes the causes and characteristics of flooding hazards within the region.The city's probability for riverine flood is likely and their vulnerability to flood is critical. In January of 2013 the City activated the Emergency Operations Center in response flood impacts. During the event the City activated its dam early warning system and monitored property impacts along Silver Creek.The adult care center on James Avenue sustained flooding impacts.Additionally, a tree the fell into the creek resulted in water backing up behind with localized flooding impacts as a result. Portions of Silverton have areas of flood plains (special flood hazard areas).These include areas along the Silver Creek. However,flood impacts are largely limited to the within the banks or Silver Creek where it passes through the city. Marion County HMP March 2017 Page SV-17 197 Figure SV-3. Special Flood Hazard Area a ,,,..Lawe.rs currently shin IMOM" u Type and source.I Flood D.a. Effed—FEMA 100 yr Flood � F I I. Prelim nary FEMA 1017 Ye Fiend State Digitized..Flood data '...,. ':. Q3 FEMA FCaad':D.L. A " r v 'A �SuVvee'kom CmaET,aWirdsf v t yrs 1 5,-LO, it h ,I rvr Source: Oregon FlazVu:Statewide Geohazards Viewer(DOGAMI) National Flood Insurance Program (NFIP) FEMA modernized the Silverton Flood Insurance Rate Maps (FIRMS) in January of 2000. Table SV-1 shows that as of October 2016, Silverton has 81 National Flood Insurance Program (NFIP) policies in force. Of those, 37 are for properties that were developed before development of the initial FIRM.The last Community Assistance Visit (CAV)for Silverton was on March 31, 1995. Silverton is not a member of the Community Rating System (CRS).The table shows that roughly two-thirds of the flood insurance policies are for single-family residential homes with the bulk of the other one-third being other residential.There have been 12 paid flood claims in Silverton totaling$70,080. The Community Repetitive Loss record for Silverton identifies no Repetitive Loss Properties4 and no Severe Repetitive Loss Properties. 4 A Repetitive Loss(RL)property is any insurable building for which two or more claims of more than $1,000 were paid by the National Flood Insurance Program(NFIP)within any rolling ten-year period, since 1978.A RL property may or may not be currently insured by the NFIP. s A Severe Repetitive Loss(SRL)property is a single family property(consisting of 1 to 4 residences) that is covered under flood insurance by the NFIP and has incurred flood-related damage for which 4 or more separate claims payments have been paid under flood insurance coverage, with the amount of each claim payment exceeding $5,000 and with cumulative amount of such claims payments exceeding Page SV-18 March 2017 Marion County HMP 198 Table SV-8. Flood Insurance Detail Marion County - - 2,067 1,239 1,614 115 105 232 97 0 11vertue 1/19/2000; 3/1/1979 '81; " 37 51 4 21� � , 5 - 22 0 j Marion County $ 514,268,700 298 226 16 $ 5,732,543 11 2 - - 511vertan $ ,19,421;300- '12 8 0 $ 70;080 0 0 1 N/A 3/31/1995 Source: Information compiled by Department of Land Conservation and Development,October,2016. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Landslide Table SV-9. Landslide Summary Hazard Landslide Type Climatic/Geologic Speed of Onset Slow to rapid Silver Creek Reservoir;west side Silver Creek south of Location Main St.;east of Water St.south of Main St. Extent Moderate to Very High Prior Occurance Evidence of old landslides;none in recent history Probability Possible Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of landslides, and appropriately identifies previous landslide occurrences within the region. Silverton has a relatively flat topography, except for the area along Silver Creek southeast of Main Street and near the Silver Creek Dam. Silverton's probability for landslide is possible and their vulnerability to landslide is limited. Figure SV-4 shows the inventory of known historical landslides. Figure SV-5 shows the susceptibility and exposure to future landslides in Silverton. $20,000; or for which at least 2 separate claims payments have been made with the cumulative amount of such claims exceeding the reported value of the property. Marion County HMP March 2017 Page SV-19 199 Figure SV-4. Landslide Inventory ��+ras uwrrw.rt�uw'�r wmr" � r i I E x „ " e m " „I Nle Source: Oregon FlazVu:Statewide Geohazards Viewer(DOGAMI) Figure SV-5. Landslide Susceptibility Exposure r Lm.�Y�Yanw-4.�u�duu�ry W4rvHYMy 4 [" P9ire&x�'% kamu�,dGKPciI�@Wwcr�LUN " „nl nam v Nov rsrrHM.94u�b1" F nne rraa.aq. r,TMar +r 'y,.i n � 9f 1%111/1", i ,, loom/ii� j Source: Oregon HazVu:Statewide Geohazards Viewer(DOGAMI) Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Page SV-20 March 2017 Marion County HMP 200 Volcano Table SV-10. Volcano Summary Hazard Volcano Type Geologic Speed of Onset Slow to rapid Location Cascade Mountains Extent Minor Prior Occurance One significant event since 1916(Mount St.Helens) Probability <1%annual Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, adequately describes Silverton risk to volcanic events. The steering committee determined that the city's probability for volcanic event is unlikely and their vulnerability to volcano is negligible. The causes and characteristics of a volcanic event are appropriately described within the county's plan, as well as the location and extent of potential hazards. Previous occurrences are well-documented within the county's plan. Silverton is very unlikely to experience anything more than volcanic ash during a volcanic event. When Mt. Saint Helens erupted in 1980, the city was not impacted. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Severe Weather Table SV-1 I. Severe Weather Summary Hazard Severe Weather/Storm Type Climatic Speed of Onset Slow to moderate Location Countywide Extent Minor to severe Minor events occur annually;—30 moderate to severe Prior Occurance events over the past 130 years 100%for minor events,23%for moderate to severe Probability events Sources: Marion County HMP Windstorm Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of windstorms, as well as the location and extent of windstorm hazards.The city's probability for windstorm is highly likely and their vulnerability to windstorm is critical. Significant wind events occur in Silverton each year. Damaging wind events are only slightly less common; once or twice per year the city will experience a windstorm event that will interrupt services, down trees, and cause power outages. Because windstorms typically occur during winter months, they are sometimes accompanied by ice, freezing rain, flooding, and very rarely, snow. Winter Storm (Snow/Ice) Marion County HMP March 2017 Page SV-21 201 Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of winter storms, as well as the location and extent of winter storm hazards.The City's probability for winter storms is highly likely and that their vulnerability to winter storms is critical. Severe winter storms can consist of rain, freezing rain, ice, snow, cold temperatures, and wind.They originate from troughs of low pressure offshore that ride along the jet stream during fall,winter, and early spring months. Severe winter storms affecting the city typically originate in the Gulf of Alaska or in the central Pacific Ocean.These storms are most common from November through March. Major winter storms can and have occurred in the Silverton area, and while they typically do not cause significant damage, they are frequent and have the potential to impact economic activity.The most recent winter storms (December 2016—January 207) included snow and ice, transportation and power interruptions, and government office and school closures. A disaster declaration is currently pending. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Wildfire Table SV-12. Wildfire Summary Hazard Wildfire Type Climatic,Human Caused Speed of Onset Moderate to rapid Location Outside city limit Extent Minor to moderate Prior Occurance No history inside city limit Probability <1%annual Sources: Marion County HMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of wildfires, as well as the county and city's history of wildfire events.The city's probability for wildfire is unlikely and the vulnerability to wildfire is limited. Silverton is located on the far western side of Marion County, surrounded on all sides by open farmland, waterways, or urban development.There are no forests within the city limits, and the closest forested area is Silverton Rapids Park, located half a mile west of the city. Due to its location, Silverton faces minimal risk of experiencing wildfires.There is no history of wildfire events in Silverton. The County updated the Community Wildfire Protection Plan (CWPP) in 2016 and portions of Silverton are listed as having wildland urban interface (WUI)with areas of concern. Figure SV-6 depicts the areas near Silverton that the CWPP identifies as areas of concern.These areas should be targeted for fire suppression activities. Page SV-22 March 2017 Marion County HMP 202 Figure SV-6. Areas of concern near Silverton. L.aeng�.ro1 � 1 d y r searr�s v Le Fore©ism—t. cf C-c.r CAI- rz d p ;, w�a.,, Y e �C-11tg SOLI xdery AL 1 ." y Mww - I ♦ w;nr b / ♦ 4 e y �4 �` � � �� M M V"k w t w.r ♦♦. y� Y P A 5 w W l r � 4♦4 1 1�....� . rpt n� ♦ Z/ 1,. rx ."Nmmimnm.wu " j �p +R ♦ I } c /d µ ' W ; N I i I wie - Source: Marion County Community Wildfire Protection Plan(2016). Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Marion County HMP March 2017 Page SV-23 203 CITY OF STAYTON ADDENDUM Purpose This document serves as the City of Stayton's Addendum to the Marion County Multi- Jurisdictional Hazards Mitigation Plan (MHMP, HMP).This addendum supplements information contained in Volume I (Basic Plan) of this HMP.The Basic Plan serves as the foundation for this jurisdiction's addendum. Volume III (Appendices) provides additional information (particularly regarding participation and mitigation strategy).This addendum meets the following requirements: • Multi-jurisdictional Plan Adoption §201.6(c)(5), • Multi-jurisdictional Participation §201.6(a)(3), • Multi-jurisdictional Mitigation Strategy§201.6(c)(3)(iv), and • Multi-Jurisdictional Risk Assessment§201.6(c)(2)(iii). Plan Process, Participation, and Adoption This section of the HMP addendum addresses 44 CFR 201.6(c)(5), Plan Adoption, and 44 CFR 201.6(a)(3), Participation. In the summer and fall of 2016, the Oregon Partnership for Disaster Resilience (OPDR) at the University of Oregon's Community Service Center (CSC) partnered with the Oregon Military Department's Office of Emergency Management(OEM), and Marion County cities, including Stayton,to develop an addendum to the Marion County HMP, which expired July 8, 2016. This project is funded through the Federal Emergency Management Agency's (FEMA) FY14 Pre-Disaster Mitigation Competitive Grant Program (PDMC-PL-10-OR-2014-002). By developing this addendum to the Marion County HMP, locally adopting it, and having it approved by FEMA, the City of Stayton will become eligible for FEMA Hazard Mitigation, Pre-Disaster Mitigation, and Flood Mitigation Assistance grant program funds. The Marion County HMP, and Stayton addendum, are the result of a collaborative effort between citizens, public agencies, non-profit organizations, the private sector, and regional organizations. A project steering committee guided the process of developing the plan. For more information on the composition of the steering committee see the Acknowledgements, Plan Summary, and Plan Process (Volume III, Appendix B). The Stayton Emergency Manager is the designated local convener of this addendum.The Convener will take the lead in implementing, maintaining, and updating the addendum to the HMP in collaboration with Marion County Emergency Management. Representatives from the City of Stayton steering committee met formally on one occasion: October 13, 2016(see Appendix B for more information). Marion County HMP March 2017 Page ST-1 204 The city's addendum reflects decisions agreed upon at the plan update meeting and during subsequent work and communication with OPDR. The City of Stayton Steering Committee is comprised of representatives from the following departments: • Convener, Emergency Manager • Public Works • Stayton Fire District • North Santiam School District • Santiam Hospital • Pacific Power and NW Natural • EMS • Norpac • Jeld-Wen Stayton used multiple approaches to engage the public. First,the City established steering committee representatives from across the city. Next, the City actively participated in countywide community engagement activities described in Volume I, Section 4 and in Appendix B. City staff also presented the draft plan to the City Council during an open public council session.The steering committee was closely involved throughout the development of the plan and served as the local oversight body for the plan's development. In addition, community members outside of the steering committee were provided an opportunity for comment via the plan review process (see Appendix B for more information). The Marion County HMP was approved by FEMA on [Month] [Day],2017 and the Stayton addendum was adopted via resolution on [Month] [Day],2017.This HMP is effective through [Month] [Day],2022. Mitigation Strategy This section of the HMP addendum addresses 44 CFR 201.6(c)(3(iv), Mitigation Strategy. During the 2016 Stayton HMP development process, OPDR evaluated the risk assessment and presented a set of potential action items. In addition,the Stayton Steering committee presented additional action items and assisted with project prioritization.The proposed actions were re-reviewed by the steering committee to finalize. Stayton developed a list of priority actions (Appendix A-1), any actions that were not prioritized were placed in the Action Item Pool (Appendix A-2)and will be considered during the annual meetings. Priority Actions The City is listing a set of high priority actions in an effort to focus attention on an achievable set of high advantage activities over the next five-years.The City's priority actions are listed in Table ST-1 on the following page. Action Item Pool Table ST-2 on the following pages presents a pool of mitigation actions.This expanded list of actions is available for local consideration as resources, capacity, technical expertise and/or political will become available. Page ST-2 March 2017 Marion County HMP 205 Table ST-1. Stayton Priority Action Items Action ActinHazard Action Item Coordinating Organization Partner Organizations Timeline Item ID �b IUUN'Yl//�U%6ro lYl�Y qAl�)G ,,..,uuuane ,,.,uuuuuvJ/2 ,,.,uuuuuvi//02 ,,.,uuuane Upsize stormwater pipes at 6th and Pine,north end of City Administrator; Short Term (1-2 P-1 Flood Silvan Springs,and other streeets with chronic Public Works Finance;City Council years) localized flooding issues. Assess the wastewater and water treatment plants' ability to function during different hazard scenarios P-2 Multi- and begin to mitigate issues.This could include Public Works City Administrator; Short Term (1-2 Hazard assessing and gathering supplies that will allow the Finance;City Council years) plants to operate under emergency conditions and upgrading the facilities so they are more resilient. Purchase two portable temporary bridges to facilitate P-3 Earthquake redundant transportion access to the wastewater Public Works City Administrator; Short Term (1-2 treatment plan (via Wilco Rd. and Jetters Way) and Finance;City Council years) downtown (via N. First Ave.). Acquire portable water filtration system(s)to improve Short Term (1-2 P-4 Earthquake Public Works City Administrator water redundancy. years) P-5 Multi- Purchase a satellite phone to improve communication Emergency Manager(Police City Administrator Short Term (1-2 Hazard redundancy. Chief) years) Source:City of Stayton HMP Steering Committee,2016. Marion County HMP March 2017 Page ST-3 206 Table ST-2. Stayton Action Item Pool Action Item n Hazard Action Item Coordinating Organization Partner Organizations Timeline Create memoranda of understanding with fuel stations that allows emergency City Administrator; MH-1 Multi Hazard Public Works,Police,Fire Short Term(1-2 years) responders first access to fuel. Finance;City Council Work with fuel stations to understand their storage capacity and backup power MH-2 Multi-Hazard Public Works,Police,Fire City Administrator Short Term(1-2 years) capabilities. Develop an agreement with the City's fuel distributor around providing fuel to City Administrator; MH-3 Multi-Hazard Public Works,Police,Fire Short Term(1-2 years) backup generators during a disaster event. Finance;City Council Implement 2006-2007 water,wastewater,and stormwater master plan facility improvement recommendations.Include hazard vulnerabilities and mitigation Administrative MH-4 Multi-Hazard Public Works Mid Term(3-5 years) measures for reducing infrastructure vulnerability.Consider hazards in all future Services Director facilities master plan updates. MH-5 Multi-Hazard Acquire multi-band radios for public works. Public Works City Administrator; Short Term(1-2 years) Finance Develop memoranda of understanding with a port-o-potty company to establish MH-6 Multi-Hazard City Administrator Finance;City Council Short Term(1-2 years) "relief stations"throughout town post-event. Update the City's Emergency Operations Plan.Invite more critical partners to participate in the plan update,including the hospital and private sector representatives.Update should cover: Marion Co.;City *Formalizing emergency shelter locations MH-7 Multi-Hazard Emergency Manager Administrator;City Mid-Term(3-5 years) *What supplies to acquire for shelters Council *How to acquire supplies for shelters *Stronger relationship with the Red Cross-more official shelters and a Red Cross wagon Marion Co.;City MH-8 Multi-Hazard Update the City's Continuity of Operations Plan. Emergency Manager Administrator;City Mid-Term(3-5 years) Council Provide mitigation and preparedness information and resources to residents via MH-9 Multi-Hazard Police Chief Marion Co.;CERT Ongoing schools,faith organizations,and utility billings. Educate businesses about the importance of continuity of operations plans to Chamber of MH-10 Multi-Hazard Emergency Manager Ongoing make them more resilient to hazards. Commerce;CERT Create a hazard resilience section on the City's website that provides mitigation MH-11 Multi-Hazard City Administrator Marion Co. Short Term(1-2 years) and preparedness resources. Outreach to residents to increase participation in the Everbridge communication MH-12 Multi-Hazard Emergency Manager City Council Ongoing system. Ambulance,, MH-13 Multi-Hazard Develop a list of medically dependent individuals. Policy, Marion Co. Ongoing Hospital Partner with Marion Co.to provide city staff with emergency management and MH-14 Multi-Hazard Emergency Manager Marion Co. Ongoing response training. MH-15 Multi-Hazard Host one emergency response exercize each year. Emergency Manager Marion Co. Ongoing Develop a list of individuals with medical training who could potentially assist City Administraanr; MH-16 Multi-Hazard Emergency Manager Ongoing during an event. City Council Source:City of Stayton HMP Steering Committee,2016. Page ST-4 March 2017 Marion County HMP 207 Table ST-2. Stayton Action Item Pool (Continued) Action ActinHazard Action Item Coordinating Organization Partner Organizations Timeline Item ID Participate in the Marion Co. Drought Contingency DR-1 Drought Public Works Marion Co. Ongoing Plan. ! I 1#110 I 1 1 II JJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ ))))))))))))))))))))))))))))))))))))»)»»») Host outreach events aimed at teaching residents how Northwest Natural EQ-1 Earthquake Fire Chief Gas; Emergency Ongoing to turn off their gas and water valves. Manager Following seismic evaluation of West C and Main Mid Term (3-5 EQ-2 Earthquake Street over Silver Creek,seek funding to reinforce or Public Works Director Marion C.;ODOT replace as needed. years) Earthquake/ EQ-3 Multi- Encourage residents to prepare and maintain two- Emergency Manager CERT Ongoing week(at minimum)survival kits. Hazard I + f f ++++++++++++++++++++++++++++++++++++++++++I ffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffff++I� I Work with Marion Co. public works to clear and Marion Co. Public FL-1 Flood Public Works Ongoing maintain ditches on county roads. Works FL-2 Flood Create a memorandum of understanding with Knife Floodplain Coordinator City Administrator; Short Term (1-2 River so they will supply sandbags during a flood. Finance;City Council years) Identify residents with pumps who might share their City Administrator; FL-3 Flood equipment during a flood. Create equipment-sharing Public Works Ongoing agreements with interested residents. Finance;City Council 11 !1!1 JJJ ! J ! 1 ! JJ JJ, J J I� � ������������������������������������1fffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffff1ff� ff1 �R�J r�i iNl (ffi�r ri >;N11111111111111111111111111111111111111111ffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffff�111111111111111111111111111111111111111111111111111111111111111111111111111Y1����������������������������������������������������������������111111111111111111111111111111111111111111111�1 Meet with utility companies to build relationships. Severe Outcome should be an understanding of where Short Term (1-2 SW-1 Storm/Wind infrastructure is located,who to contact in an Public Works,Police Marion Co. years) storm emergency,and strategies for doing more outreach to the community. Severe SW-2 Storm/Wind Work with Pacific Power to encourage them to Planning Pacific Power Short Term (1-2 storm upgrade old infrastucture. years) Source:City of Stayton HMP Steering Committee,2016. Marion County HMP March 2017 Page ST-5 208 Plan Implementation and Maintenance The City Council will be responsible for adopting the City of Stayton addendum to the Marion County Multi-Jurisdictional HMP.This addendum designates a convener and a coordinating body to oversee the development and implementation of action items. Because the city addendum is part of the county's multi-jurisdictional HMP, the City will look for opportunities to partner with the county.The City's steering committee will convene after re-adoption of the City of Stayton addendum on an annual schedule for plan maintenance purposes; the county meets on a semi-annual basis.The City of Stayton Convener will participate in the Marion County HMP meetings and will report on city- specific activities as appropriate.The steering committee will be responsible for identifying new risk assessment data, reviewing status of mitigation actions, identifying new actions, and seeking funding to implement the city's mitigation strategy (actions).The convener will also remain active in the county's implementation and maintenance process (see Volume I, Section 4 for more information). Regarding implementation, the City currently holds weekly management team meetings. Stayton intends to use those weekly meetings to perform ongoing work on mitigation action priorities. The City will utilize the same prioritization process as the county(See Volume I, Section 4: Plan Implementation and Maintenance and Volume IV, Appendix E: Economic Analysis of Hazard Mitigation Projects for more information). Implementation through Existing Programs Many of the Hazard Mitigation Plan's recommendations are consistent with the goals and objectives of the City's existing plans and policies. Where possible, the City of Stayton will implement the HMP's recommended actions through existing plans and policies. Plans and policies already in existence have support from local residents, businesses, and policy makers. Many land-use, comprehensive, and strategic plans get updated regularly, allowing them to adapt to changing conditions and needs. Implementing the HMP's action items through such plans and policies increases their likelihood of being supported and implemented. Stayton's acknowledged comprehensive plan is the City of Stayton Comprehensive Plan.The City most recently completed updates to the plan in 2013.The Stayton Comprehensive plan indicates that the flooding is the "significant natural hazard in the Stayton Area." Stayton plans for the flood hazard, including implementation of a flood plain overlay district.The City also acknowledges potential catastrophic flooding associated with failure of Detroit Dam.The plan also references steep slope and landslides as another potential threat.The Comp Plan includes maps for each of the referenced hazards. Notably, the only hazards related goal in the plan is related to development on steep slopes.There is one hazard related policy in the comprehensive plan related to development on steep slopes. Stayton currently lists the following documents related to the Comprehensive Plan: • Local Wetland and Riparian Inventory(1999) • Transportation System Plan (2004) Page ST-6 March 2017 Marion County HMP 209 • Park and Recreation Master Plan (2005) • Sublimity Interchange Area Management Plan (2006) • Water Master Plan (2006) • Wastewater Master Plan (2006) • Downtown Transportation and Revitalization Plan (2007, amended 2010) • Storm Water Master Plan (2009) For more information, refer to http;//www.staytonoregon.gov/page/planning master plans. Continued Public Participation Keeping the public informed of the City's efforts to reduce the city's risk to future hazards events is important for successful plan implementation and maintenance.The City is committed to involving the public in the plan review and updated process. See Volume I, Section 4,for more information. Plan Maintenance The Marion County Multi-Jurisdictional Hazards Mitigation Plan and city addendum will be updated every five years in accordance with the update schedule outlined in the Disaster Mitigation Act of 2000. During the county plan update process,the City will also review and update its addendum.The convener will be responsible for convening the steering committee to address the questions outlined below. • Are there new partners that should be brought to the table? • Are there new local, regional, state, or federal policies influencing natural hazards that should be addressed? • Has the community successfully implemented any mitigation activities since the plan was last updated? • Have new issues or problems related to hazards been identified in the community? • Are the actions still appropriate given current resources? • Have there been any changes in development patterns that could influence the effects of hazards? • Have there been any significant changes in the community's demographics that could influence the effects of hazards? • Are there new studies or data available that would enhance the risk assessment? • Has the community been affected by any disasters? Did the plan accurately address the impacts of this event? These questions will help the steering committee determine what components of the mitigation plan need updating.The steering committee will be responsible for updating any deficiencies found in the plan. Risk Assessment This section of the HMP addendum addresses 44 CFR 201.6(b)(2) - Risk Assessment. In addition, this chapter can serve as the factual basis for addressing Oregon Statewide Marion County HMP March 2017 Page ST-7 210 Planning Goal 7—Areas Subject to Natural Hazards.Assessing natural hazard risk has three phases: • Phase 1: Identify hazards that can impact the jurisdiction.This includes an evaluation of potential hazard impacts—type, location, extent, etc. • Phase 2: Identify important community assets and system vulnerabilities. Example vulnerabilities include people, businesses, homes, roads, historic places and drinking water sources. • Phase 3: Evaluate the extent to which the identified hazards overlap with, or have an impact on, the important assets identified by the community. The local level rationale for the identified mitigation strategies (action items) is presented herein, and within Section 2, Risk Assessment, and Appendix C, Community Profile.The risk assessment process is graphically depicted in Figure ST-1 below. Ultimately, the goal of hazard mitigation is to reduce the area of risk, where hazards overlap vulnerable systems. Figure ST-(.Understanding Risk U rrr��u ° n e rrstanding Risk fmi;51B flfn W�, �6fr�, gwdwraare Re m'nadalwrpp WwrWrr Natural Hazair« [inr1 Sise tm Potential 0i�Istrophic � j� Exposur , m� PIJWty aoril>I� �illmr >rrby " Past lflk0OerP"WY4"W"Nd"YY�Ixvyah � / �� � � Y^�Ykl,"WflNiwaWflL n Futoff,flnml rfl�Yliur� �Cgp"nri"1,cOrumr�r�miN�.n ,5pr�mAofOitscr /�%�� � �Wafidirrre�VarmiWu�WWria r Yadl;hflylGbfl{,9tlWi� ��' 4/� �/� r. ��a�CbY'",Wh'aY4,rYYWpWt rBNm�r�;�M9,rN d'4flW9m"tiW�WU".. Duration W/' i/� f�ilirruuaBvv .S�W�rfl�l��ce;urrat �//////,' ,flm°rM"ruu,CrWmcfxuirWr Ablllty„Resources Aria i lillin� "ra tai; 14rrluhiag ato r1r;POIld W Prepare w iftrzcov r 5asrrcr,CF�G�-[3e+��arrar"�rtlsra^�,rdriWWrnWirir�rwwCrr�rsWCJ�irn�rAa���,arrharsPrrab wrrCr�rr 2Pp� Risk Assessment Approach A risk assessment is intended to provide the, "factual basis for activities proposed in the strategy to reduce loses from identified hazards.", To complete the risk assessment, the HMP update team first updated the description, type, location and extent of each hazard. Next, the team updated the vulnerability information based on each hazard's potential impact on the community. The Marion County Basic Plan (Volume I, Section II) Risk Assessment describes in detail the methods used to assess risk. In summary, Marion County has prepared a Threat Hazard Identification and Risk Assessment as a formal annex to the Marion County Emergency 1 44 CFR 201.6(2)(i) Page ST-8 March 2017 Marion County HMP 211 Operation Plan.The assessment uses a method developed by BOLD Planning.2 This city addendum builds on the county level assessment to produce a similar assessment for the City of Stayton.The assessment specifically examines: 1. Probability(frequency) of event 2. Magnitude of event 3. Expected warning time before event 4. Expected duration of event Refer to Page 2-4 of the Marion County Basic HMP for a description of the scoring values for each ranking category. Hazard Analysis The assessment identifies three levels of risk: High, Moderate and Low. High - High probability of occurrence; at least 50 percent or more of population at risk from hazard; significant to catastrophic physical impacts to buildings and infrastructure; major loss or potential loss of functionality to all essential facilities (hospital, police, fire, EOC and shelters). Moderate - Less than 50 percent of population at risk from hazard; moderate physical impacts to buildings and infrastructure; moderate potential for loss of functionality to essential facilities. Low- Low probability of occurrence or low threat to population; minor physical impacts. A summary of the risk assessment findings and rankings is presented below. Table ST-3. Hazard and Vulnerability Assessment Summary Warning Local PEann@ng County Planning Natural Hazard Probabilixy Magnitude D Sration CP81' g- Tlme Significance" Significance," Weight Factor 0-45 0-3 0-15 0.1 Earthquake* 4 4 4 4 4.00 11 gh7 I I!!Eh Severe Weather/Storm** 4 1 3 3 2.85 11!!Eh Flood 3 2 3 4 2.80 11!!Eh Drought 3 1 3 1 4 2.50 11!!Eh Extreme Weather-High Temperature 3 1 2 4 2.35 Wildland Interface Fire 1 4 2 2 2.15 Dam or Levee Failure 1 2 4 4 2.05 Landslide 1 2 2 2 1.55 low IIIIII!!Eh Volcanic Eruption 1 1 1 4 1.30 low Iu,W *Note:Earthquake probability listed to match county level analysis.See below for more detailed probability assessment. **Note:Includes tornado hazard Source: BOLD Planning Risk Assessment Method;Analysis by UO Community Service Center. Community Asset Identification This section provides information on city-specific assets. For additional information on the characteristics of Stayton, in terms of geography, environment, population, demographics, 2 BOLD Planning is a consulting firm specializing in the development of actionable emergency plans. For more information, visit: http://www.boldplanning.com/ Marion County HMP March 2017 Page ST-9 212 employment and economics, as well as housing and transportation see Volume III, Appendix C, Community Profile. Many of these community characteristics can affect how natural hazards impact communities and how communities choose to plan for natural hazard mitigation. Considering the city-specific assets during the planning process can assist in identifying appropriate measures for hazard mitigation. Community Characteristics The City of Stayton is located in Marion County, Oregon, at the confluence of the Santiam Canyon and Willamette Valley. Located roughly 15-miles east of Salem, the city is bordered to the north and east by Highway 22, the south and east by the Santiam River, and the west by agricultural lands. Stayton is located in Oregon's Willamette Valley, which experiences a moderate climate. In August,the average high temperature is 82 degrees and the average low temperature is 51 degrees.Wintertime temperatures in January range from an average high of 46 degrees to an average low of 33 degrees.The average annual precipitation is 39.9 inches. Stayton is relatively flat, except at the terminus of Santiam canyon in the northeast portion of the city. The US Census lists Stayton's 2015 population at 7,725.This represents a 11.6% increase from 2000. For more demographic information, refer to Appendix C. Economy Stayton was founded as a mill city. Its location near a plentiful water source made it attractive for water-powered industry. Several mills, from timber to flour, operated in Stayton following its establishment. In the early part of the 20th century, Stayton transitioned to an emphasis on agricultural—the Norpac Foods, Inc. processing plant is currently the city's largest employer.Today, Stayton benefits from a relatively diverse local economy. Median household income in Stayton is $41,432. For more economic information, refer to Appendix C. Critical and Important Facilities Critical and important facilities include the following: Transportation • Bridges: Page ST-10 March 2017 Marion County HMP 213 Table ST-4.Stayton Bridge Inventory Water Body Street Owner Inspection Co-Located Utility Date Sewer Water Electricity Natural Gas Telecomm SALEM DITCH N FI RST AVE STAYTON 8/10/2016 YES YES YES NO YES SALEM DITCH N SECOND AVE STAYTON 8/10/2016 NO NO NO NO NO SALEM DITCH N THIRD AVE STAYTON 8/10/2016 NO YES NO NO NO SALEM DITCH W WASHINGTON ST STAYTON 8/10/2016 YES YES NO NO NO STAYTON DITCH N HOLLY AVE STAYTON 8/10/2016 NO YES NO NO NO STAYTON DITCH JETTERS WAY STAYTON 8/10/2016 YES YES NO NO NO STAYTON DITCH E WATER ST STAYTON 8/10/2016 NO NO NO NO NO STAYTON DITCH N FOURTH AVE STAYTON 8/10/2016 NO NO NO NO NO STAYTON DITCH N FI RST AVE MARION N/A NO YES NO NO NO SALEM DITCH N FOURTH AVE STAYTON N/A NO NO NO NO NO SALEM DITCH N EVERGREEN AVE STAYTON N/A YES YES NO NO NO SALEM DITCH WILCO RD MARION N/A YES YES NO NO NO SALEM DITCH UPRR UPRR N/A NO NO NO NO NO SALEM DITCH SHAFF RD MARION N/A NO NO NO NO NO MILL CREEK GOLF CLUB RD MARION N/A NO NO NO NO NO MI LL CREEK CASCADE HI GH WAY MARION N/A NO NO NO NO NO Source: City of Stayton Note: The water treatment plan lies across two bridges:1 over the N Santiam R, 1 over the Stayton Canal. This could cause problems in the event of an earthquake that disables the bridges. Note: The wastewater treatment plant lies across two bridges:1 bridge on Jetters Way and 1 bridge over Salem Ditch on Wilco Rd. This could cause problems in the event of an earthquake that disables the bridges. Note:Pacific Power employees would have to cross three bridges to reach the Pacific Power plant. • Main roads through town: o State Highway 22 (North Santiam Highway) o Golf Club Rd/Wilco Rd. o Stayton Rd. 0 1st St (Cascade Hwy)—leads to water treatment plant • Public Transit: Cherriots bus system Energy • Pacific Power • NW Natural • The City gets all its fuel from Pacific Pride • There are 3 commercial gas stations and one other fuel supplier(MNOP— Marc Nelson Oil Products) • Police have a natural gas generator that won't run on any other fuel • Public Works has several generators • The Fire District has a generator Water • Drinking Water: o Source: N Santiam River via the Stayton Power canal Marion County HMP March 2017 Page ST-11 214 o One shallow well—just supplemental o There are a very small number of residents on wells o Water treatment plant off of 1St Ave. o Water storage: ■ Pine St. = 1m gal ■ Regis St. = .5m gal ■ Old decommissioned storage tank on Holly Note:Stayton has access Salem's system and can buy from Salem if necessary, but there is no other water back-up source. Note: There are pump stations throughout the City, the pump station lines would likely not survive an earthquake. • Wastewater: o Wastewater treatment plant located on Jetters Way. o Most of the sewer system is 50-year-old concrete pipe o Very, very few residents are on septic systems (in theory everyone connected to the city sewer system when it was installed). o Norpac has its own wastewater treatment ponds—on Jetters Way Communication • Communications towers: o Regis St. Reservoir—Police, Sprint o Pine St. Reservoir has cell antennas—Fire,T-Mobile o High school athletic field cell tower—Verizon (with a generator) o Cell tower south of Shaff and west of Wilco o Backup tower on the Police Department • The City relies on cell phones to communicate • Auxiliary radio access for Police (portable) • Land line—SCTC (Stayton Cooperative Telephone Company) • CERT has a radio system Emergency services • Fire: o Stayton Fire District, 1988 W. Ida St. • Police: o Police Department, 386 N. 3rd Ave. • Medical o Santiam Memorial Hospital, 1401 N. 10th Ave. Cultural/historical resources • Properties on the National Registry of Historic Places: o Deitrich Building (3rd and Florence) o Gehlens-Sims Building (2nd) o The City has a preliminary listing of downtown buildings that would qualify for the national registry. • "The Brown House" Santiam Heritage Foundation (425 N. 1st Ave.) • Library(515 N 1st Ave.) • Community Center and City Swimming Pool (all next to library) Page ST-12 March 2017 Marion County HMP 215 • Events that may have large crowds: o June: Summerfest and Car show—maybe between 2,000-5,000 visitors (last Saturday of June) o July:4th of July—maybe 5,000 visitors o July: Stampede—at Sublimity fair grounds (slight impact to traffic in town) o September: Harvest Festival—at Sublimity fair grounds (slight impact to traffic in town) Vulnerable populations • Schools—enrollment 2,400: o Stayton High School (757 W. Locust St.) o Stayton Middle School (1021 Shaff Rd. SE) o St. Mary's Catholic School (1066 N. 6th Ave.) o Regis High School (550 W. Regis St.) o Stayton Elementary School (875 N. 3rd Ave.) • Daycares/preschools o Rise and Shine Day Care (2350 Martin Dr.) o Tree House Day Care (287 E Washington St.) o Tiny Hands Day Care (451 Hobson St.) o Highland Pre-school (1450 Fern Ridge Rd.)—First United Methodist Church o All Star Pre-school (975 Fern Ridge Rd.)—Foothills Church • Assisted living o Brookdale Senior Living Solutions (2201 3rd Ave.) • Santiam Senior Center(41818 Kingston Jordan Rd.) • Apartment complexes for seniors: o Elder Manor (900 W Ida) o Stayton Manor (3rd and Washington) o Oak Apartment (10th and Santiam) • Some Spanish-speaking residents, but most also speak English • Stayton has a small Somali population, but most also speak English • Low-income: o 47%of Stayton's housing stock is rental properties Marion County HMP March 2017 Page ST-13 216 Table ST-5. Government Subsidized Housing Developments from ,s Comprehensive Plan Narne I-Acatim #Of Llhl Hollister Apartments 315 W I 101fister St 20 family Northridge Apartments 1633 N,3rd Ave 24 firullily Oak Park Village 1011-1087N� 10dr Ave 32 elderly StaytomElder Manor 660 N Ida S« 32 elderly Stay,ton Manor 800 N 3rd Ave 16 elderly Westside Apartments 965 Gardner Ave 24 family W'olf Ridj;e 00 1 1,171 E�w*fiam,St 51 family m*wum� Ckegon mmp rfemusin.-mnd C*nimm ^ly ScrAcms Hazard Characteristics Drought ^~ �.. The characteristics of drought in 3tayton are roughly the same for the county as a whole. Table ST-6. Drought Summary Hazard Drought Type Climatic Speed ofOnset 3|mm Location Varies, County Wide Extent Moderate toSevere Drought* PrinrOccurance Three,6months duration since 198Z Probability ~9% .Defined",between'zand'*=the National Resource Conservation Service Sources:Oregon mHxxp;mncs;analysis bynpon The probability of drought in Stayton is likely, the same as for the county as a whole. Stayton relies on surface water from the North 3antiam River via the 3tayton Power canal. Raw water is directed into the City's slow sand filtration system. Once treated,finished potable water is delivered to residential, commercial, and industrial customers through 44 miles of water distribution pipes. 3tayton also maintains a shallow well for supplemental water supply. Finally, Stayton maintains an intertie with the City of Salem and can purchase water from Salem if needed.The City has a water curtailment plan that they never had to use. Volume 1, Section 2, Risk Assessment, adequately describes the characteristics of drought hazards, as well as the location and extent ofa potential event. Due to a cool, wet climate, past and present weather conditions have generally spared Marion County communities from the effects of drought. Governor Kate Brown declared a drought emergency for all of Marion County in September 2015. 3taytonwas close to local drought conditions during that event. Please review the RiskAssess/nent(Volume/, Sect/on J1ƒoradditional information on this hazard. Page3T'14 March 2017 Marion County HMP 217 Earthquake The characteristics of a crustal earthquake are similar to the county as a whole. Table ST-7. Earthquake Summary Crustal Hazard Earthquake-Crustal Type Geologic Location Multiple active faults;Willamette Valley Speed of Onset Rapid Extent Very Strong to Severe shaking—500 yrs* Prior Occurance One over Magnitude 5 last 100 yrs** Probability Approximately 1%annual *DOGAMI HazVu;**PNSN-1993 Scotts Mills just north of Marion County Sources: DOGAMI-Oregon HazVu;Oregon NHMP;Pacific Northwest Seismic Network The characteristics of a Cascadia subduction zone earthquake are the same as the county. Table ST-8. Earthquake Summary Subduction Hazard Earthquake-Subduction Type Geologic Location Primarily west of the Cascades;CA- BC Speed of Onset Rapid Extent Catastrophic Prior Occurance One over Magnitude 9 last 500 yrs Probability Magnitude 9+is 7%- 12%over 50 yrs** *DOGAMI HazVu;**Oregon Natural Hazard Mitigation Plan,anlysis by Oregon Department ofGeologyand Mineral Industries. Sources: DOGAMI-Oregon HazVu;Oregon NHMP;Pacific Northwest Seismic Network Stayton's probability for a Crustal Earthquake event is possible and their vulnerability to a Crustal Earthquake event is limited.The county steering committee determined that the probability for a Cascadia Subduction Zone (CSZ) Earthquake event is highly likely and that the vulnerability to a Cascadia Earthquake event is catastrophic. An active earthquake fault located northwest of the city exists within five miles of the Stayton City Limit. Other active faults exist within ten-miles to the west.The 1993 Scott Mills quake caused $28 million in damages to cities throughout Marion County. No damaging earthquake events occurred during the previous five years. The City is working with Marion County to complete a seismic retrofit project on the North First Avenue (Stayton-Scio Road) bridge over the Santiam River. Stayton expects that this project will increase transportation redundancy, allowing travel north and south post- earthquake. Volume I, Section 2, Risk Assessment, adequately describes the characteristics of earthquake hazards, history, as well as the location and extent of a potential event. Generally, an event that affects the county is likely to affect Stayton as well. Previous occurrences are well- documented within the county's plan, and the community impacts described by the county would generally be the same for Stayton as well. Marion County HMP March 2017 Page ST-15 218 Earthquake-induced damages are difficult to predict, and depend on the size, type, and location of the earthquake, as well as site-specific building and soil characteristics. Presently, it is not possible to accurately forecast the location or size of earthquakes, but it is possible to predict the behavior of soil at any particular site. In many major earthquakes, damages have primarily been caused by the behavior of the soil. Figure ST-2 shows that ground shaking in Stayton for both crustal and subduction earthquakes are expected to be very strong. According to DOGAMI HazVu maps, there is little to no liquefaction potential in Stayton. Figure ST-2. Active Faults and Expected Shaking !r1�nm;layees CuvrentlyShown Earthquake(Hazard Expected..Earthquake Shaki,ng. Vicfent / iri r o-7[fl t y ti uW,�N Sere t i%. "fiery Strong � �r/+✓� ❑ Strung ivy. ,p, f, iiv r 0 Al � ' GV%il01 //lig. 0,ir�amd,,,,i' Source: Oregon HazVu:Statewide Geohazards Viewer(DOGAMI) The Stayton steering committee identified earthquake damage to the downtown central business district as a primary concern. Most of the buildings are old and constructed of masonry.The City's police department is also at risk of collapse during an earthquake.The City's priority actions reflect these concerns. Additional local concerns include: o Questions about the hospital's seismic condition. Historically, the City and hospital have had limited communication or coordination related the earthquake vulnerability. o Police department is the highest priority critical facility for retrofit. Notably, it houses all of the city's computers. o Stayton Community Center is the primary EOC (400 Virginia); secondary location is at the old 911 dispatch center. o Pacific Power building will probably be standing (Wilco Rd. south end, across from Circle K)—this is their back up center for what operates the whole northwest. In 2007,the Department of Geology and Mineral Industries (DOGAMI) conducted a seismic needs assessment for public school buildings, acute inpatient care facilities, fire stations, police stations, sheriffs' offices, and other law enforcement agency buildings. Buildings were ranked for the "probability of collapse" due to the maximum possible earthquake for any Page ST-16 March 2017 Marion County HMP 219 given area. Within the City of Stayton, the following buildings received a "high" or"very high" probability of collapse: • Stayton Elementary: high (>1016) • Stayton Middle School: very high (10016) • Stayton High School: very high (10016) • Stayton Police Department: very high (10016) • Stayton Memorial Hospital: high (>1016) • Stayton Fire (west Ida): very high (10016) • Stayton Fire (Ferry): low(<1%) Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Flood Table ST-9. Flood Summary Hazard Flood Type Climatic Speed of Onset Slow to moderate Location Mapped flood zones,floodplain Extent Moderate to severe Prior Occurance Several minor events since 1964 Probability 1%annual within SFHA Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, describes the causes and characteristics of flooding hazards within the region.The city's probability for riverine flood is likely and their vulnerability to flood is limited. Portions of Stayton have areas of flood plains (special flood hazard areas).These include areas along the Santiam River in the south and Mill Creek in the north. Overall, Stayton has relatively limited development in the mapped 100-year flood plain. However, the City's water and wastewater treatment plants are located adjacent to the Santiam River. Past flood events have threatened those critical facilities. As an additional note, Stayton has two irrigation canals that go through town.Those canals have head gates that can be closed. However, those gates have been breached at least once during historical flood events (e.g. 1996). In 2006,the north portion of Santiam experienced significant flooding.The Santiam water treatment plant almost flooded during that event. In January of 2012, a warming trend corresponded with a rain on snow event that resulted in minor flooding in Stayton. The City has successfully worked with the county to clear ditches along Shaff Road.This mitigation effort has reduced localized nuisance flooding through that corridor. The Steering Committee specifically identified the following areas as subject to nuisance urban flooding: Marion County HMP March 2017 Page ST-17 220 • Silvan Springs subdivision has a small area of street that floods periodically, but the homes have not been impacted • Undersized storm pipes cause localized flooding issues throughout town o Intersection of 6th and Pine is notable Figure ST-3. Special Flood Hazard Area i 1 ,pp rid rr i �,Rd W. ,6ubh mite ql Layercs Currently Sfiourrn .,75 4 F""1niit1 � �ir�4raur Flood Hazard Fr Type and.Sorarce of Flmd Data Effecti v FEMA 100 yr Flood " n tri tad- r���„o o�F v a -Uron ,i Preliminary FEMA 100 yr Flood 7r ,,,, m Gaud Sete Digitized Flood data y v w:,tsrymr5 of,vi.J. tatmivinv NI .� - 43 FEMA Flood Data » � d f„ ;, t nu�tinl J E � „ F r k l daa Source: Oregon FlazVu:Statewide Geohazards Viewer(DOGAMI) National Flood Insurance Program (NFIP) FEMA modernized the Stayton Flood Insurance Rate Maps (FIRMS) in January of 2000.The table below shows that as of October 2016, Stayton has 27 National Flood Insurance Program (NFIP) policies in force. Of those, zero are for properties that were developed before development of the initial FIRM.The last Community Assistance Visit (CAV)for Stayton was on August 9, 2006. Stayton is not a member of the Community Rating System (CRS).The table shows that almost all of the flood insurance policies are for single-family residential homes,with two being for"other residential" uses.There has been 1 paid flood claims in Stayton totaling$8,200. The Community Repetitive Loss record for Stayton identifies no Repetitive Loss Properties and no Severe Repetitive Loss Properties4. 3A Repetitive Loss(RL)property is any insurable building for which two or more claims of more than $1,000 were paid by the National Flood Insurance Program(NFIP)within any rolling ten-year period, since 1978.A RL property may or may not be currently insured by the NFIP. 4A Severe Repetitive Loss(SRL)property is a single family property(consisting of 1 to 4 residences) that is covered under flood insurance by the NFIP and has incurred flood-related damage for which 4 or more separate claims payments have been paid under flood insurance coverage, with the amount of each claim payment exceeding $5,000 and with cumulative amount of such claims payments exceeding Page ST-18 March 2017 Marion County HMP 221 Table ST-10. Flood Insurance Detail Marion County 2,067 1,239 1,614 115 105 232 97 0 SYay n 1/10/2000 "3/1/10§,, '27 25 0 . 0 2 1 " " 0 Marion County $ 514,268,700 298 226 16 - stayton '8,510,304 1 4 4 S ' ; 8,240 0 4 N/A 8/9/2006 i Source: Information compiled by Department of Land Conservation and Development,October,2016. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Landslide Table ST-1 I. Landslide Summary Hazard Landslide Type Climatic/Geologic Speed of Onset Slow to rapid Location North of East Santiam Road Extent Minor to severe,but localized Prior Occurance Landslides occur annyally in Marion County Probability Possible to likely Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of landslides. DOGAMI does not currently identify existing landslides on the statewide inventory in Stayton. Stayton has a relatively flat topography, except for the area north of East Santiam Road at the terminus of Santiam Canyon. Figure ST-4 shows the susceptibility and exposure to future landslides in Stayton. $20,000; or for which at least 2 separate claims payments have been made with the cumulative amount of such claims exceeding the reported value of the property. Marion County HMP March 2017 Page ST-19 222 Figure ST-4. Susceptibility and Exposure "'�Fftip 4p �'tFF4l�r� ,... ,gyp u ir. �wtllinitg Ilr,, tt9F2 JU r� Layers Currently Shown i 2 a;F I'mVitandslide Hazard LandslideSusceptRblity v� ❑ Low Landsi Unlikely Moderate.-Landsliding F©ssi6le. I High Landslidng Likely ( �g StaV4an L^�,rrnnr,fii �bf,81 �, Vera High-Existing Landslide I I k,y,,"s._. ),l Ge P Source: _Oregon HazVu:Statewide Geohazards Viewer(DOGAMI) Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Volcano Table ST-12. Volcano Summary Hazard Volcano Type Geologic Speed of Onset Slow to rapid Location Lahar flow impacts possible throughout Stayton Extent Critical to catastrophic Prior Occurance One significant event since 1916(Mount St.Helens) Probability <1%annual Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, adequately describes Stayton risk to volcanic events. The steering committee determined that the city's probability for volcanic event is unlikely and their vulnerability to volcano is critical to catastrophic. The causes and characteristics of a volcanic event are appropriately described within the county's plan, as well as the location and extent of potential hazards. Previous occurrences are well-documented within the county's plan.When Mt. Saint Helens erupted in 1980, the city was not impacted. Notably, Stayton's location at the terminus of Santiam Canyon makes it susceptible to impacts from lahar flows originating at Mount Jefferson. Page ST-20 March 2017 Marion County HMP 223 Figure ST-5. Susceptibility and Exposure l k l*rr. t C Eubltnrty �/i �f alp 4b Lay—Currently 5h—n — 0 Hlgh,,Hazard Lorre PE moderateh°aaardZpne %%% ,. Source: Oregon HazVu:Statewide Geohazards Viewer(DOGAMI) Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Severe Weather Table ST-13. Severe Weather Summary Hazard Severe Weather/Storm Type Climatic Speed of Onset Slow to moderate Location Countywide Extent Minor to severe Minor events occur annually;—30 moderate to severe Prior Occurance events over the past 130 years 100%for minor events,23%for moderate to severe Probability events Sources: Marion County NHMP Windstorm Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of windstorms, as well as the location and extent of windstorm hazards.The City's probability for windstorm is highly likely and that their vulnerability to windstorm is critical. Significant wind events occur in Stayton each year. Damaging wind events are only slightly less common; once or twice per year the city will experience a windstorm event that will interrupt services, experience downed trees, or cause power outages. Because windstorms typically occur during winter months, they are sometimes accompanied by ice, freezing rain, flooding, and very rarely, snow. Marion County HMP March 2017 Page ST-21 224 Winter Storm (Snow/ Ice) Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of winter storms, as well as the location and extent of winter storm hazards.The City's probability for windstorm is highly likely and that their vulnerability to windstorm is critical. Severe winter storms can consist of rain, freezing rain, ice, snow, cold temperatures, and wind.They originate from troughs of low pressure offshore that ride along the jet stream during fall,winter, and early spring months. Severe winter storms affecting the city typically originate in the Gulf of Alaska or in the central Pacific Ocean.These storms are most common from November through March. Major winter storms can and have occurred in the Stayton area, most recently in 2006, 2013, and 2016. While these events do not typically cause significant damage, they are frequent and have the potential to impact economic activity.The most recent winter storms (December 2016—January 2017) included snow and ice.Transportation and power interruptions combined with government office and school closures.A disaster declaration is currently pending. Please review the Risk Assessment(Volume 1,Section 2)for additional information on this hazard. Wildfire Table ST-14. Wildfire Summary Hazard Wildfire Type Climatic,Human Caused Speed of Onset Moderate to rapid Location Outside city limit Extent Minor to moderate Prior Occurance No history inside city limit Probability <1%annual Sources: Marion County NHMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of wildfires, as well as the county and city's history of wildfire events.The city's probability for wildfire is unlikely and the vulnerability to wildfire is limited. Stayton has limited exposure to wildfire. Likely origination would be on agricultural lands outside the city limit or in wooded areas of Pioneer Park. Due to its location and limited fuels within the city, Stayton faces minimal risk of experiencing wildfires.There is no history of wildfire events in Stayton. The County updated the Community Wildfire Protection Plan (CWPP) in 2016 and portions of Stayton are listed as having wildland urban interface (WUI)with areas of concern. Figure ST-6 depicts the areas near Stayton that the CWPP identifies as areas of concern.These areas should be targeted for fire suppression activities. Page ST-22 March 2017 Marion County HMP 225 Figure ST-6. Areas of concern near Silverton. vuuifImd.) t f I� Fir.[,incl .""tl ...-- Areas of Co eern. r- ... �� •..-.. "w.«-...w � cit., -^- I'V C..,,qy Boi,d,,,y YTDN h. tl h,s, �w Maeuan County LinnCaanCy „„„..,„�� --- �N , 4w M r r Source:Marion County Community Wildfire Protection Plan (2016). Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Other Hazard or Concerns The Stayton Steering Committee identified the following hazard issues or concerns during their meeting on October 13, 2016. While these hazards are non-natural, we've listed them here for reference. • Cyber-attack in 2016 Ransom Ware/Bitcoinfiles were lost. • Water and Wastewater only have fences w/barbed wire (low security)—potential vulnerability to domestic terrorism • Industrial accident at Norpac • Wilco fertilizer plant • Pine Street reservoir: 1 million gallon reservoir could be a target • Helena Chemical (agricultural chemicals) • Migrant protesting (history of minor picketing in front of Norpac) • Spill on 1St Street that could get into the water supply—they have a spill response for this o In the 80's diesel fuel spilled into one of the canals o More recently, a punctured fuel tank spilled fuel all through town. Marion County HMP March 2017 Page ST-23 226 CITY OFTURNER ADDENDUM Purpose This document serves as the City of Turner's Addendum to the Marion County Multi- Jurisdictional Hazards Mitigation Plan (MHMP, HMP). This addendum supplements information contained in Volume I (Basic Plan) of this HMP.The Basic Plan serves as the foundation for this jurisdiction's addendum. Volume III (Appendices) provides additional information (particularly regarding participation and mitigation strategy).This addendum meets the following requirements: • Multi-jurisdictional Plan Adoption §201.6(c)(5), • Multi-jurisdictional Participation §201.6(a)(3), • Multi-jurisdictional Mitigation Strategy§201.6(c)(3)(iv), and • Multi-Jurisdictional Risk Assessment§201.6(c)(2)(iii). Plan Process, Participation, and Adoption This section of the HMP addendum addresses 44 CFR 201.6(c)(5), Plan Adoption, and 44 CFR 201.6(a)(3), Participation. In the summer and fall of 2016, the Oregon Partnership for Disaster Resilience (OPDR) at the University of Oregon's Community Service Center (CSC) partnered with the Oregon Military Department's Office of Emergency Management (OEM), Marion County and the City of Turner, to update the Turner MHMP and addend it to the Marion County HMP, which expired July 8, 2016.This project is funded through the Federal Emergency Management Agency's (FEMA) FY14 Pre-Disaster Mitigation Competitive Grant Program (PDMC-PL-10-OR- 2014-002). By developing this addendum to the Marion County HMP, locally adopting it, and having it approved by FEMA, the City of Turner will retain eligibility for FEMA Hazard Mitigation, Pre- Disaster Mitigation, and Flood Mitigation Assistance grant program funds. The Marion County HMP, and Turner addendum, are the result of a collaborative effort between citizens, public agencies, non-profit organizations, the private sector, and regional organizations. A project steering committee guided the process of developing the plan. For more information on the composition of the steering committee see the Acknowledgements, Plan Summary, and Plan Process (Volume III, Appendix B). The Turner City Administrator is the designated local convener of this addendum.The Convener will take the lead in implementing, maintaining, and updating the addendum to the HMP in collaboration with Marion County Emergency Management. Representatives from the City of Turner steering committee met formally on one occasion: March 9, 2017 (see Appendix B for more information). Marion County HMP April 2017 Page TR-1 227 The city's addendum reflects decisions decided upon at the plan update meeting and during subsequent work and communication with OPDR. The City of Turner Steering Committee is comprised of representatives from the following departments: • Convener, City Administrator • Mayor • Police Department • Turner Fire • Community Emergency Response Team (CERT) Members • Community Members Turner used multiple approaches to engage the public. First,the City established steering committee representatives from across the city. Next, the City actively participated in countywide community engagement activities described in Volume I, Section 4 and in Appendix B. City staff also presented the draft plan to the City Council during an open public council session.The Steering Committee was closely involved throughout the development of the plan and served as the local oversight body for the plan's development. In addition, community members outside of the steering committee were provided an opportunity for comment via the plan review process (see Appendix B for more information). The Marion County HMP was approved by FEMA on [Month] [Day],2017 and the Turner addendum was adopted via resolution on [Month] [Day],2017.This HMP is effective through [Month] [Day],2022. Mitigation Strategy This section of the HMP addendum addresses 44 CFR 201.6(c)(3(iv), Mitigation Strategy. During the 2016 Marion County and Turner update process, OPDR and a representative from Marion County Emergency Management assisted the steering committee with developing mitigation strategies that will meet Turner's unique situation.The proposed actions were then re-reviewed by the steering committee to finalize.Turner developed a list of priority actions (Appendix A-1); any actions that were not prioritized were placed in the Action Item Pool (Appendix A-2)and will be considered during the annual meetings. For a status update on each of Turner's 2012 mitigation actions, see Appendix A-2. Priority Actions The City is listing a set of high priority actions in an effort to focus attention on an achievable set of high leverage activities over the next five-years.The City's priority actions are listed in Table TR-1 on the following page. Action Item Pool Table TR-2 on the following pages presents a pool of mitigation actions.This expanded list of actions is available for local consideration as resources, capacity, technical expertise and/or political will become available. Page TR-2 April 2017 Marion County HMP 228 Table TR-I. Turner Priority Action Items Action Coordinating Hazard Action item Partner Organizations Timeline Priority Item ID Organization Add water level monitoring equipment to the Marion City CERT;Mill Creek Basin flood P-1 Flood Administrator Short Term Top Road Bridge,south of Mill Creek. management agencies (or designee) Meet with City of Salem flood and emergency Public Works,City of Salem, management staff on an annual basis to identify and City Marion Co.,OEM,City of P-2 Flood implement collaborative flood mitigation project Administrator Aumsville,Beaver Creek Ongoing Top opportunities. (or designee) Watershed Council,Santiam Watershed Council Multi- Turner Public P-3 Purchase a portable water filtration device. City Administrator Short Term Top Hazard Works Provide public outreach and education to vulnerable City Multi- populations(such as Turner Retirement Homes,the Turner Police,Turner Fire, P-4 Administrator Ongoing Top Hazard Christian Convention,Aldersgate,and others,as Marion Co. (or designee) identified in this plan)regarding hazards. Turner Police Department, Multi- Partner with existing community organizations to City Turner Fire Department, P-5 Administrator Turner Christian Church, Ongoing Top Hazard disseminate hazard preparedness information. (or designee) Cascade School District, Church of God,Turing Point Source:City of Turner HMP Steering Committee,2017. Marion County HMP April 2017 Page TR-3 229 Table TR-2. Turner Action Item Pool Action Coordinating Hazard Action item Partner Organizations Timeline Priority Item I© Organization City Administrator,Public Use existing city public engagement tools(such as Works;Turner Firejurner Multi- monthly utility bills,public reader boards,Facebook Christian Church,Portland MH-1 Turner Police Ongoing High Hazard pages,etc.) as means of disseminating information to General Electric;School residents regarding hazard preparedness. District;Marion County Emergency Management City Turner Police Department, Multi- Implement an automated notification system for Turner Fire,Community MH-2 Administrator Short Term High Hazard disaster alerts and preparedness. Emergency Response Team (or designee) (CERT) Encourage documentation of the vulnerable City Multi- populations listed in the Plan,including the creation Turner Police Department, MH-3 Administrator Ongoing Medium Hazard and maintenance of a list of residents with special (or designee) Turner Fire Department medical needs. Retrofit the fire station to withstand flood and City Administrator,OEM, Multi- earthquakes or construct a new,seismically-sound fire Oregon Emergency MH-4 Turner Fire Management Seismic Short Term Medium Hazard station outside the flood zone in a location at minimal Rehabilitation Grant Program risk to natural and man-made hazards. Coordinator Conduct annual emergency management table top Community Emergency Multi- Response Team,Marion MH-5 exercises that include hazardous material release Turner Fire Ongoing Low Hazard County Emergency scenarios(in addition to other hazard scenarios). Management;Union Pacific Source:City of Turner HMP Steering Committee,2017. Page TR-4 April 2017 Marion County HMP 230 Table TR-2. Turner Action Item Pool (Continued) Action Coordinating Hazard Action item Partner Organizations Timeline Priority Item I© Organization m r I I t Coordinate with Marion County Emergency City Turner Police,County DF-1 Dam Failure Management to develop an evacuation plan for the Administrator Emergency Management, Long Term Low County Transit,Army Corps, City of Turner the event of dam failure. (or designee) State Water Services Division Coordinate with Marion County Emergency City Turner Police,Marion County Management and the Army Corps of Engineers to Sheriff's Office,Army Corps, DF-2 Dam Failure Administrator Long Term Low develop a dam failure notification procedure for the Marion County Emergency (or designee) Management City of Turner. Mana g Meet with the City of Salem each year to receive City DF-3 Dam Failure updates on the Franzen Reservoir and notify the public Administrator City of Salem Ongoing Medium of any changes to safety. (or designee) Actively engage with the County's efforts to work with Turner Fire,City DF-4 Dam Failure the Army Corps of Engineers to assess dam failure Turner Police Administrator,Army Corps of Long Term Medium Engineers,Marion County likelihood and risks. Emergency Management 1#1i 1 1 1 City Oregon Emergency Perform seismic assessments of critical infrastructure Management Seismic EQ-1 Earthquake Administrator Long Term Low as resources become available. Rehabilitation Grant Program (or designee) Coordinator Send city staff and other to the County's ATC 20 City Turner Police,Turner Fire, EQ-2 Earthquake structural assessment training when the course is Administrator Marion Co. Ongoing Medium offered. (or designee) Source:City of Turner HMP Steering Committee,2017. Marion County HMP April 2017 Page TR-5 231 Table TR-2. Turner Action Item Pool (Continued) Action CoordinatingHazard � Action item Partner Organizations Timeline Priori#y, Item ID Organization Zi, i We Mimm Oregon Department of Land Conservation and City Development(DLCD),Oregon FL-1 Flood Provide more training on flood insurance. Administrator Office of Emergency Ongoing Medium (or designee) Management(OEM),Federal Emergency Management Agency(FEMA),FEMA trainers Identify and prioritize properties to be retrofitted City FL-2 Flood against flood damage. Administrator DLCD Short Term Low (or designee) Have City Council evaluate pursuing certifiaction in the City DLCD,FEMA,City of Salem, FL-3 Flood Administrator Ongoing Medium Community Rating System (CRS). Marion County Public Works (or designee) Implement annual flood vent inspection program for Planning/ FL-4 Flood all residential properties in areas at risk of chronic Building CERT,DLCD Ongoing Low flooding(inside and outside the mapped floodplain). Work with the owners of repetitive flood loss buildings City FL-5 Flood in the city to identify cost effective mitigation strategies Administrator DLCD,OEM Long Term Low including consideration of elevation or buy-out. (or designee) City FL-6 Flood Pursue and complete remapping of City floodplain. Administrator DLCD,OEM,FEMA Short Term High (or designee) Provide annual public information materials to Turner City FL-7 Flood residents regarding flood safety practices,including Administrator City of Turner,CERT Ongoing High detailed information about sandbagging. (or designee) Maintain and cultivate partnerships with other City Marion County,City of Salem, FL-8 Flood government agencies,both local and regional,to plan Administrator MWVCOG,Mill Creek Basin Ongoing High for flood hazard events. (or designee) flood management agencies Pursue hiring of a flood coordinator to address flood City FL-9 Flood related action items. Administrator MWVCOG Ongoing Medium (or designee) Source:City of Turner HMP Steering Committee,2017. Page TR-6 April 2017 Marion County HMP 232 Table TR-2. Turner Action Item Pool (Continued) Action Coordinating Hazard Action item Partner Organizations Timeline Priority Item ID Organization 7UMUN, mi, r Implement the Eastwood Drive Stabilization Plan and LS-1 Landslide Public Works City Administrator Ongoing Low continue ongoing monitoring of conditions. 1 Develop MOUS with private businesses and citizens Severe around equipment and resource sharing during severe City Marion County Public Works, SW-1 Weather weather events,particularly related to providing Administrator Turner Public Works,Police, Ongoing Medium resources to residents who might be stranded up the (or designee) Fire hill in the Eastwood area during icy weather. Severe Monitor the trees in the public right-of-way and Portland General Electric SW-2 Weather maintain to minimize damage during wind or winter Public Works (PGE),Turner Fire Ongoing Medium storms. Department Wf 2,22 Conduct wildfire prevention outreach,as outlined in the Marion County Community Wildfire Protection WF-1 Wildfire Plan (CWPP),to residents in areas where wildfire is a Turner Fire Ongoing Low potential concern (e.g. hillside neighborhoods in northeast Turner). Provide fire supression outreach throughout the Fire WF-2 Wildfire Turner Fire Ongoing Low District. Source:City of Turner HMP Steering Committee,2017. Marion County HMP April 2017 Page TR-7 233 Plan Implementation and Maintenance The City Council will be responsible for adopting the City of Turner addendum to the Marion County HMP.This addendum designates a convener and a coordinating body to oversee the development and implementation of action items. Because the city addendum is part of the county's multi-jurisdictional HMP, the City will look for opportunities to partner with the county.The City's steering committee will convene after adoption of the City of Turner addendum on an annual schedule (each October); the county meets on a semi-annual basis. The City of Turner Convener will participate in the Marion County HMP meetings and will report on city specific activities as appropriate.The steering committee will be responsible for identifying new risk assessment data, reviewing status of mitigation actions, identifying new actions, and seeking funding to implement the City's mitigation strategy (actions).The convener will also remain active in the county's implementation and maintenance process (see Volume I, Section 4 for more information). The City will utilize the same prioritization process as the county(See Volume I, Section 4: Plan Implementation and Maintenance and Volume IV, Appendix D: Economic Analysis of Hazard Mitigation Projects for more information). Implementation through Existing Programs Many of the Hazard Mitigation Plan's recommendations are consistent with the goals and objectives of the City's existing plans and policies. Where possible, the City of Turner will implement the HMP's recommended actions through existing plans and policies. Plans and policies already in existence have support from local residents, businesses, and policy makers. Many land-use, comprehensive, and strategic plans get updated regularly, allowing them to adapt to changing conditions and needs. Implementing the HMP's action items through such plans and policies increases their likelihood of being supported and implemented. Turner's Comprehensive Plan was first acknowledged by the Oregon Land Conservation and Development Commission in 1979.1 The City most recently completed updates to the plan, including updates to the Environmental section(which includes discussion of natural hazards), in 2011.The Turner Comprehensive plan identifies floods and landslides as key hazards that are anticipated to affect the city.The plan also mentions sever weather conditions (including high winds, freezing rain, and lightening) as posing a threat to the city. There is no mention earthquakes or wildfires. Under"Water Resources," the plan contains three policies related directly to mitigating the flood hazard.2 There are no other hazard related policies listed.The City implements the Comprehensive Plan through the Land Use Development Code. 1 City of Turner Comprehensive Plan (2011). hftp://www.cityofturner.org/index.asp?Type=B_BASIC&SEC={14CD4Fl 3-7 B F8-4260-8892- F5FD3284B384} 2 City of Turner Comprehensive Plan (2011). Section 9.200: Environment. Policies 7-9. P. 9.200-17 and 9.200-18 Page TR-8 April 2017 Marion County HMP 234 In addition to the Comprehensive Plan,Turner currently has the following plans that relate to hazard mitigation: * Water Systems Master Plan (updated in 2013) * Turner Transportation System Plan (updated in1999) * Floodplain Ordinance For more information, refer to and Continued Public Participation Keeping the public informed of the City's efforts to reduce the city's risk to future hazard events is important for successful plan implementation and maintenance.The City is committed to involving the public in the plan review and updated process. See Volume 1, Section 4,for more information. Plan Maintenance The Marion County Multi-Jurisdictional Hazards Mitigation Plan and city addendum will be updated every five years in accordance with the update schedule outlined in the Disaster Mitigation Act of 2000. During the county plan update process,the City will also review and update its addendum.The convener will be responsible for convening the steering committee toaddress the questions outlined below. * Are there new partners that should bebrought tothe table? * Are there new local, regional, state, or federal policies influencing natural hazards that should beaddressed? * Has the community successfully implemented any mitigation activities since the plan was last updated? * Have new issues orproblems related to hazards been identified in the community? * Are the actions still appropriate given current resources? * Have there been any changes in development patterns that could influence the effects of hazards? * Have there been any significant changes in the community's demographics that could influence the effects ofhazards? * Are there new studies or data available that would enhance the risk assessment? * Has the community been affected by any disasters? Did the plan accurately address the impacts of this event? These questions will help the steering committee determine what components of the mitigation plan need updating.The steering committee will be responsible for updating any deficiencies found inthe plan. Marion County HMP April 2017 PageTR'9 235 Risk Assessment This section of the HMP addendum addresses 44 CFR 201.6(b)(2) - Risk Assessment. In addition, this chapter can serve as the factual basis for addressing Oregon Statewide Planning Goal 7—Areas Subject to Natural Hazards.Assessing natural hazard risk has three phases: • Phase 1: Identify hazards that can impact the jurisdiction.This includes an evaluation of potential hazard impacts—type, location, extent, etc. • Phase 2: Identify important community assets and system vulnerabilities. Example vulnerabilities include people, businesses, homes, roads, historic places and drinking water sources. • Phase 3: Evaluate the extent to which the identified hazards overlap with, or have an impact on, the important assets identified by the community. The local level rationale for the identified mitigation strategies (action items) is presented herein, and within Section 2, Risk Assessment, and Appendix C, Community Profile.The risk assessment process is graphically depicted in Figure TR-1 below. Ultimately, the goal of hazard mitigation is to reduce the area of risk, where hazards overlap vulnerable systems. Figure TR-I. Understanding Risk U rrr��u �-° i S Understanding Risk r.Y.�ar� fm�;51B flfn W�, �6fr�, gwdwraare Re m'nadalwrpp WwrWrr Natural Hazair« [inr1 System Potential€' 4�stroptui�r° � j� Expa'sur , w tiivRy ril>I� �� �ilimr >rrby "Vast lflk0oerP"WY4"W"Nd"YY�Ixvyah � / �� � � Y^�Ykl,"WflN�waWflLn +bruWkWW!fluMt4W rflWYVur� �mgn0l"1,cGrumr�r�mlN�,n ,5pr�mAofOitscr /�%�� � �Wafidirrre�VarmiWu�WWria r Ya.+I;�flylrWfll,itlr)!r� ��� 4/� ���' r. ��a�CbY'",WraY4,rYYWpWt rBNm�r�;�M9,rN d'WflW9�"t�W�WUx.. Duration W/' i/� f�ilirruuaBvv .S�W�rfl�l��ce;urrat �//////,' ,flm°rM"ruu,CrWmcfxuirWr Abll ty+ Resources Aria gllin� "ra tai; 14rrluhiag ato IReSpamad W Prepare w iftrzcov r 5asrrcr,CF�G�-[3e+��arrar"�rtlsra^�,rdriWWrnWirir�rwwCrr�rsWCJ�irn�rAa���,arrharsPrrab wrrCr�rr 2Pp� Risk Assessment Approach A risk assessment is intended to provide the, "factual basis for activities proposed in the strategy to reduce loses from identified hazards."3 To complete the risk assessment, the HMP update team first updated the description, type, location and extent of each hazard. Next, the team updated the vulnerability information based on each hazard's potential impact on the community. 3 44 CFR 201.6(2)(i) Page TR-10 April 2017 Marion County HMP 236 The Marion County Basic Plan (Volume I, Section II) Risk Assessment describes in detail the methods used to assess risk. In summary, Marion County has prepared a Threat Hazard Identification and Risk Assessment as a formal annex to the Marion County Emergency Operation Plan.The assessment uses a method developed by BOLD Planning.a This city addendum builds on the county level assessment to produce a similar assessment for the City of Turner.The assessment specifically examines: 1. Probability(frequency) of event 2. Magnitude of event 3. Expected warning time before event 4. Expected duration of event Refer to Page 2-4 of the Marion County Basic HMP for a description of the scoring values for each ranking category. Hazard Identification The 2012 City of Turner HMP identified seven hazards that could have an impact on the city. These hazards include dam failure, earthquake,flood, hazardous materials, landslide, severe weather, and wildfire. Note that in this update of the HMP, the Turner steering committee decided to incorporate hazardous materials into its "multi-hazard" action items. The City completed a review of the hazards and hazard rankings in March of 2017.The committee made no changes to the list of hazards or rankings. Because Turner is electing to update its HMP as an addendum to the county HMP, the city specific risk assessment includes a more detailed hazard analysis below. Table TA-2 Previous Hazard Rankings Dam Failure Low High Earthquake Moderate Moderate Flood High High Landslide Low Low Wildfire Low Moderate Severe Weather High High Hazardous Material Moderate High Source:2012 HMP; Review completed March 2017 Hazard Analysis The assessment identifies three levels of risk: High, Moderate and Low. High - High probability of occurrence; at least 50 percent or more of population at risk from hazard; significant to catastrophic physical impacts to buildings and infrastructure; major loss or potential loss of functionality to all essential facilities (hospital, police, fire, EOC and shelters). a BOLD Planning is a consulting firm specializing in the development of actionable emergency plans. For more information, visit: http://www.boldplanning.com/ Marion County HMP April 2017 Page TR-11 237 Moderate - Less than 50 percent of population at risk from hazard; moderate physical impacts to buildings and infrastructure; moderate potential for loss of functionality to essential facilities. Low- Low probability of occurrence or low threat to population; minor physical impacts. A summary of the risk assessment findings and rankings is presented below. Table TA-2 Hazard and Vulnerability Assessment Summary Warning LocalPlanning County Planning Natural Hazard Probability Magnitude. 06ratlan CPRF' �Time Significance Significance' Weight Factor 0.45 0.3 0.15 0.1 Earthquake* 4 4 4 4 4.00 1 h8h 11Nigh Flood 4 2 3 4 3.25 1 high 11 igg Severe Weather/Storm** 4 1 3 3 2.85 11 igg Drought 3 1 2 4 2.35 11 igg Wildland Interface Fire 2 4 2 2 2.60 Dam or Levee Failure 1 2 4 4 2.05 Extreme Weather-High Temperature 2 1 1 2 4 1.90 1cnm Landslide 1 2 22 1.55 1cnm 11 igg Volcanic Eruption 1 1 1 4 1.30 1cnm f.€iv *Note:Earthquake probability listed to match county level analysis.See below for more detailed probability assessment. **Note:Includes tornado hazard Source: BOLD Planning Risk Assessment Method;Analysis by UO Community Service Center. Community Asset Identification This section provides information on city-specific assets. For additional information on the characteristics of Turner, in terms of geography, environment, population, demographics, employment and economics, as well as housing and transportation see Volume III, Appendix C, Community Profile. Many of these community characteristics can affect how hazards impact communities and how communities choose to plan for natural hazard mitigation. Considering the city-specific assets during the planning process can assist in identifying appropriate measures for natural hazard mitigation. Community Characteristics The City of Turner is located in Marion County, about six miles south of Salem, and approximately 54 miles inland from the Pacific Ocean.The topography within the city is characterized by a fairly flat landscape, with the exceptions of two hills to the east and west of the City, which reach a maximum elevation of about 600 feet above sea level. Turner is bisected by Mill Creek,which is the primary stream that runs through the city's limits. Mill Creek has an average annual flow rate of about 180 cubic feet per second and flows north through the city.The stream meanders through or adjacent to the city's limits for nearly three miles. Additional waterways within the city include the Mill Creek Bypass and the Perrin Lateral, both of which are significantly smaller than Mill Creek. Like most of the Willamette Valley,Turner experiences a modified marine climate with cool and wet winters and moderately warm and dry summers.The average annual precipitation is approximately 39.28 inches with the heaviest rainfall in late fall and winter. While major Page TR-12 April 2017 Marion County HMP 238 snow falls are rare,Turner experiences an average annual snowfall of approximately 7.1 inches. Economy Like the majority of cities in Oregon, industry in Turner has fluctuated greatly since the founding of the city in the mid-1800s. In the late 1800s the primary industries were a flour mill and granaries.s However,these industries eventually gave way to the more dominant lumber industry that arose in the late 1900s.These early industries owe their success in large part to the construction of the railroad, which runs through the middle of the city. Due to Turner's small population and the city's proximity to Salem, many of Turner's residents commute to work outside of the city.According to the American Community Survey, these commuters represent 88% of the workforces Therefore, a large majority of the city's residents depend on other jurisdictions, such as Salem,for employment purposes. The dominant industries in the City of Turner are retail trade and education and health services.7 The Turner Retirement Homes is the single largest employer in the city. However, the primary occupations of Turner residents (commuters included), are management, sales, and service occupations.a Critical and Important Facilities Critical facilities include buildings,their internal components and trained personnel, and may also include certain mobile units, such as those of first responders. For example, many vehicles of the police department, fire department (including ambulances), and public works department are key and essential components of the functions provided by these critical facilities.The interruption or destruction of any of these facilities would have a debilitating effect on incident management and long-term recovery. Not all critical facilities are of equal importance, and are therefore subject to prioritization of criticality.The steering committee identified key critical facilities, listed in Table TR-3. s City of Turner. "What would you like to know? History." http://www.cityofturner.o[g/index.asp?Type=B BASIC&SEC=f2E2C16BF-EEC7-4611-9DF4- 7F6DE25C90F2J 6 US Census Bureau. 2011-2015 American Community Survey 5-year Estimates.Table S0801: Commuting Characteristics by Sex. 2015. 7 US Census Bureau. 2011-2015 American Community Survey 5-year Estimates.Table DP03: Selected Economic Characteristics- Industry. 2015. a US Census Bureau. 2011-2015 American Community Survey 5-year Estimates.Table DP03: Selected Economic Characteristics-Occupation. 2015. Marion County HMP April 2017 Page TR-13 239 Table TR-3. Turner Critical Facilities Facility Name Type Fire Department Emergency Response Turner City Hall Governance Police Department Emergency Response Public Works Emergency Response Turner Retirement Homes Care Facility CARTS Bus—Santiam Route #30 Transportation Turner Christian Church Food Bank Food Services Turner Elementary School Miscellaneous Cascade School District Office Miscellaneous Post Office Communication Aldersgate Youth Camp Source:City of Turner.http://cityofturner.org/ This plan also documents important infrastructure and facilities by lifelines, including transportation, energy, water, communication, emergency services, and cultural/historical resources. We also include a preliminary list of populations/locations that may be particularly vulnerable to hazards. Transportation • Delaney Rd is the link to 1-5—this would be under water in a major flood. o This road is the most vulnerable link—water on the road in particular would be very destructive and block access. • Third St (Turner Rd.) is the link to Hwy 22—this would be under water in a major flood. • Witzle Rd. would become the exit if the other roads were blocked. • There are a few backroad exists that don't involve bridges. • CARTS Bus—Santiam Route#30 provides public transportation services for residents. • Bridges: Road Over Construction Owner Co-located Notes infrastructure Mill Creek Mill Cr. Concrete Marion NW Natural gas line Rebuilt in 2006 Rd./Denver continuous Co. Water and sewer Street Delaney Rd. Mill Cr. Prestressed Marion SE concrete Co. Wipper Rd. Bypass Prestressed Marion Rebuilt in 2014 canal concrete Co. 55th Ave.SE Bypass Wood nail Marion canal laminated Co. 3rd St.SE Mill Cr. Prestressed Marion NW Natural gas line This bridge has a concrete Co. 8"water line lower deck and debris collects on it during high water. 5th St. Mill Cr. Prestressed City of Water and sewer Rebuilt around 2001 concrete Turner or2002. Page TR-14 April 2017 Marion County HMP 240 Mitigation Success Story: Flood Monitoring Infrastructure After a'2012 storm caused a severe flood in Turner,the City partnered with State and Salem to implement a rain and stream gauge monitoring system to provide early warning for future floods.The jurisdictions used $200,000 from the Hazard Mitigation Grant Program to build the infrastructure and website that make up the early warning system. As pictured below, residents can visit the Mid-Willamette Valley High Water Watch website,and see real-time data about stream levels in and around Salem.The system also provides an alarm warning system for emergency managers, allowing them to alert residents to potential flood issues. 01 st Gao r rrYVd �l4 �' , d,tH itFa,,,, "44 .... ....,,,,, ..... ._., U Energy • PGE provides the city with power and has a sub-station on 5T"Street by Mill Creek. • NW Natural provides the city with natural gas and has distribution mains connected to the Third street and Denver Street bridges. • City gets fuel from Pacific Pride (by 1-5). o Fuel access could be difficult if Delaney Road were not passable. • Fuel storage: there are tanks at the gas station at 5235 Denver Street. • Back-up power and fuel storage: o Fire has two 6kw diesel generators on engines E955 and E957 and keeps 15 gallons of gas and diesel at the fire station o City has a 2kw, 3kw and 7.5kw gas portable generators and keeps 15 gallons of gas stored. Location Owner Fuel Type Capacity City Hall/Public Works— City Above ground diesel tank 55 gal Fuel Storage Generators:Top of the hill City Diesel 150 KW,200 gallons pump station Generator: Lower Pump City Diesel 100KW,150 gallons Marion County HMP April 2017 Page TR-15 241 Generator: main sewer Salem Diesel 35KW,50 gallon tank pump station in 5th St. Park Generator: 1952 station Fire Diesel 60 KW generator Mobile generator Fire Gas One 2000W portable on rescue965 Water and Wastewater • Water storage and distribution: o Water is contracted to Salem. o City has a storage and distribution system—100,000 gal water tank (redwood, but it's in great shape);400,000 gal water tank(only 6 years old, so built with modern technology). o The city currently does not have back-up water sources. o Val View pump station can be accessed in two different ways 0 3rd St pump station is on the main street so it should be accessible in an earthquake. • Wastewater: o Wastewater this contracted to Salem. o Lift stations bring sewage to a forced main station on Kuebler Rd. —lift stations have emergency generators. ■ There are 2.5 miles of forced main sewer pipe that take wastewater to the intersection of Kuebler and Turner Roads—this pipe would probably not withstand an earthquake. ■ If this pipe broke, it would get into Mill Creek. • Franzen Reservoir stores 100 million gallons of water for Salem.The reservoir is part natural, part constructed. o Salem was required by the Department of Water Resources to reevaluate the reservoir.As part of this, they had to do outreach about the inundation potential from the reservoir if it failed. Mitigation Success Story: Stormwater Infrastructure Upgrades Since Turner's 2012 Hazard Mitigation Plan,the City,has invested about$15,000 in building and upgrading storm water systems where rain water has historically damaged property and threatened roadway stability.These projects have helped minimize localized flooding, improving the city's ability to remain functional during storm and high water events. Communication • The redwood water tank on Val View has some police radio equipment to connect with the Woodburn Dispatch Center. • The police department has radio capabilities as a back-up if cell service is down. • The water distribution system has its own radio system. Page TR-16 April 2017 Marion County HMP 242 o This system only requires a minimal amount of power, and it is possible to run the system without the radios. • The City recently purchased a satellite phone (service provided by Global Star). • Fire station has base radio, mobile in the trucks—dispatch connection infrastructure is outside the City—all of this is backed up • Wave Broadband provides cable internet. • Turner Elementary School has fiber, and the new subdivision at Crawford Lake may have fiber provided by Viser, a fiber company based in Aumsville. • Fiber optic cable runs along the railroad (the Seattle to San Francisco line). • Cell towers: o AT&T Tower on private property—this has a generator. o Verizon and T-Mobile on the tower in 5t"Street Park—this has a generator. Mitigation Success Story: Flood Early Warning System To complement the flood monitoring system (see Mitigation Success Story: Flood Monitoring Infrastructure),Turner has also been actively working to improve communication with residents regarding floods and other hazard events.The City purchased a contract with Everbridge (an emergency mass communication tool) and has been collecting cell phone numbers for entire community.;This "reverse 911" system allows the City to send out notifications about hazards.. For example,the City can send a text alert about flood warnings when the flood monitoring systems indicates high water may be on the way. In addition to the Everbridge system,the City actively uses Facebook for weather- and flood-related notices and advisories. Residents actively engage with the City's Facebook page,sharing notifications with their networks and quickly spreading the word about potential hazards that may affect the community.Additionally,the Facebook page helps the City advertise for upcoming preparedness events (see post below.) j , �-11tV.11 - Gi¢y al V0.frav ar rmquur I v,, n. N,111r,,i r, 1 III t lPm PcItel l f0aodlll event in Tull A severe vonter stone arriving nest Monday and ralninq throuudh'Wednesday wilt deliver Meavy lawns aero 1 possible I,,,,/Ievel flooding to Turner In it!a I laroje tions sho,u venter levels si nIlar to those In the December 2015 1 sterm Please mentor Facebook for addlterrnal postnys as predictions become clearer and the stone gets dower duaw DIR U ff"4l Y.1 If I1r4Tf '.ihnl FSI lira Iris rrI rli:rl' PEED COMMUNITY PREPARE FAIR, It Pnnre. l ii I;niv Saturday,April 0, 20117 Plyrtiv Ot un ho&1'11'11 elf I}i 10—-2 E..udn., tr.nh S.R.r a Histh 1,kh.u9 +n 7155 14th$1.NE OR V301 '+w xIrlim40.Ve WiviLn k,tPPd19M.MlG!6,ny0tta •ji4Mrk Y ?nvyltir4�- erefnpG4.f(MfXlx tP q+xlwru+Yue'tw' a runX 4try uu 41icll ri pl'„7iNIc.r CJn bees inkier 7BtkL_Pdl5 the highv C rlereJ ai the en5nl'lad t 5 ` n 41 d+r:dP !Ei ,/k,hx yn4 h,� th.fire;r.tVfIry W0s a t 1137 ft S,gnu lz—pnq the ova ver Is r}ulny to lila tram arvA•h Main sYiw auaN ,..K,t gal lIt yJeuaan, it,CLll l eiri mai 1,W 5 s9 tt tQ aruuncl 11 fl gram the raintel l*me are ji,jr,q in(Ire Il y 1 A b h n,Ar"a din"',l l'l— 9,1,vlo", I r k E lV I r' 4l idl,t runizmif 9v u,.ri,eo rrriv LII, ReW, , U lRV of r lvier,s irrgi n It Iran ORrcu p[n aredi k v r I days our.where the—hpi st,slem will dump the in apilty of'th r7ii ih—In the ll..Ihlllt/that an -Int Ilks 1'1i5 Coil w9PII could Y Ihq 654flPdI inchesf;)I� W nllaintra the Tuenel nice.Ckaeh leveLa nraye he mel¢ni ed,naaa l7 mreal ^^"'Pi f W9(11nlermvouwrirx u Marion County HMP April 2017 Page TR-17 243 Emergency services • Fire: o Fire Department (7605 3rd St.)—they have a local ambulance dispatch. • Police: o Police Department/City Hall (5255 Chicago St.). • Public Works: o City shops (7250 3rd St.). • CERT/EOC: o 72503 rd St.;the backup location is Marion County Public Works • Medical: o Aumsville has a health clinic. o Stayton hospital. Cultural/historical resources • Turner Memorial Tabernacle and Camp Meeting Grounds; Pioneer Lodge • Masonic Hall • Ball Brothers Grange and Dance Hall (old) • Ball Brothers Grange (current) • Davis Hall (at Turner Retirement Home) • Events that may draw large crowds: o Lamb and Wool festival—1St Saturday in June.This includes a parade with maybe 1,500 people passing through town. Functional and Access Needs (Vulnerable Populations) • Schools: o Turner Elementary School o Aldersgate (youth camp) o Cradle to Crayons (Daycare) at 7920 2nd St.—this is in the floodplain • Assisted living: o Turner Retirement Homes • Non-English speaking: o There is still only a small non-English speaking community o Many Spanish speakers work at the mill • People who live up the hill (in the Eastwood area) might be hard to access in bad weather(for example, the roads were not passible during the last ice storm—too steep and slippery). • Flooding impacts people in the low lands. See hazard sections below and Section 2, Risk Assessment, for potential hazard vulnerabilities to these facilities. Hazard Characteristics Dam Failure The steering committee confirmed that the city's probability for dam failure is low and that their vulnerability is high. Dams are impervious structures that block the flow of water in a Page TR-18 April 2017 Marion County HMP 244 river or stream, capturing water behind the dam. Dams can fail for a variety of reasons, such as erosion, overtopping, structural failure, ground motion or unusual hydrodynamic forcing. The primary Army Corps of Engineers controlled dam threat to the City of Turner is Detroit Dam. Contact the local Army Corps office for more information about specific dam failure and inundation impacts that could result from a failure at Detroit Dam. In addition, the Franzen Reservoir poses a "high hazard" dam threat to the city of Turner.9 Franzen Reservoir is located within the Turner city limits on the east side of town.The reservoir is 31-feet high and stores 300-acre feet of water. According to the Oregon Dam Safety Engineer,there are several dwelling located directly below the reservoir inundation area. In addition, the area of Delaney Road SE and North 3rd Street would be impacted by a reservoir breach. Notably, there is no history of dam failure in the City of Turner. Figure TR-2. Franzen Reservoir Partial Inundation Map w r Source:City of Turner Drought The characteristics of drought in Turner are the same for the county as a whole. 9 In 2014, the Oregon Dam Safety Program Engineer reclassified Franzen Reservoir as a HIGH hazard dam following a review by a local hydraulic engineer and US Army Corps of Engineers. Marion County HMP April 2017 Page TR-19 245 Table TR-4. Drought Summary Hazard Drought Type Climatic Speed of Onset Slow Location Varies, County Wide Extent Moderate to Severe Drought* Prior Occurance Three>6 months duration since 1982 Probability _9% *Defined as between-2 and-4 on the National Resource Conservation Service (NRCS)Surface Water Supply Index(SWSI) Sources:Oregon NHMP;NRCS;analysis by OPDR Using the BOLD methodology,the Turner steering committee determined that the city's probability for drought is moderate (which is lower than the county's rating) and that their vulnerability to drought is low(which is the same as the county's rating). Notably, the City did not assess the drought hazard in the previous version of their HMP. Volume I, Section 2, Risk Assessment, adequately describes the characteristics of drought hazards, as well as the location and extent of a potential event. Due to a cool,wet climate, past and present weather conditions have generally spared Marion County communities from the effects of drought; however, Marion County was included in Presidential Drought Declarations in 1992 and 2015. Turner receives water from the City of Salem under contract.Turner maintains two water tanks for local storage,with 100,000 and 400,000 gallon capacities respectively.The larger tank was constructed in 2011 using modern engineering and construction methods.The City also maintains a water distribution system.The City does not have a secondary water source. Additional, drought-related community impacts are described within the county's Drought Hazard Annex. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Earthquake The characteristics of a crustal earthquake are similar to the county as a whole. Table TR-5. Earthquake Summary Crustal Hazard Earthquake-Crustal Type Geologic Location Multiple active faults;Willamette Valley Speed of Onset Rapid Extent Very Strong to Severe shaking—500 yrs* Prior Occurance One over Magnitude 5 last 100 yrs** Probability Approximately 1%annual *DOGAMI HazVu;**PNSN-1993 Scotts Mills just north of Marion County Sources: DOGAMI-Oregon HazVu;Oregon NHMP;Pacific Northwest Seismic Network The characteristics of a Cascadia subduction zone earthquake are the same as the county. Page TR-20 April 2017 Marion County HMP 246 Table TR-6. Earthquake Summary Subduction Hazard Earthquake-Subduction Type Geologic Location Primarily west of the Cascades;CA- BC Speed of Onset Rapid Extent Catastrophic Prior Occurance One over Magnitude 9 last 500 yrs Probability Magnitude 9+is 7%- 12%over 50 yrs** *DOGAMI HazVu;**Oregon Natural Hazard Mitigation Plan,anlysis by Oregon Department ofGeologyand Mineral Industries. Sources: DOGAMI-Oregon HazVu;Oregon NHMP;Pacific Northwest Seismic Network Turner's probability for a Crustal Earthquake event is "possible" and their vulnerability to a Crustal Earthquake event is "limited".The county steering committee determined that the probability for a Cascadia Subduction Zone (CSZ) Earthquake event is "highly likely' and that the vulnerability to a Cascadia Earthquake event is "catastrophic".This hazard was not rated as distinct CSZ and crustal events in the previous HMP.Turner is about one mile from several active faults: a string of faults run to both the north and south of Turner The 1993 Scott Mills quake caused $28 million in damages to cities throughout Marion County. No damaging earthquake events occurred during the previous five years. Figure TR-3. Active Faults and Expected Shaking I�J � Lavers c---ly Shv m _ 0 l a 1�' [1cC va IFatutka AN `. Film, Expected EarI:hWake Shaking J�1A4 (lr ® Seuere ffllll! .„i Vent'SCu'pm4 Skreing Z sh.v Source:CJregon HazVu:Statewide Geohazards Viewer(DOGAMI) Volume I, Section 2, Risk Assessment, adequately describes the characteristics of earthquake hazards, history, as well as the location and extent of a potential event. Generally, an event that affects the county is likely to affect Turner as well. Previous occurrences are well- documented within the county's plan, and the community impacts described by the county would generally be the same for Turner as well. Marion County HMP April 2017 Page TR-21 247 Earthquake-induced damages are difficult to predict, and depend on the size, type, and location of the earthquake, as well as site-specific building and soil characteristics. Presently, it is not possible to accurately forecast the location or size of earthquakes, but it is possible to predict the behavior of soil at any particular site. In many major earthquakes, damages have primarily been caused by the behavior of the soil. Figure TR-3 shows that ground shaking in Turner for both crustal and subduction earthquakes are expected to be very strong, with some nearby areas experiencing severe shaking. The Turner steering committee identified earthquake damage to bridges and nearby dams as a primary concern.Transportation isolation and inundation due to dam failure could both have significant impacts on the city.The City's priority actions reflect these concerns. In 2007,the Department of Geology and Mineral Industries (DOGAMI) conducted a seismic needs assessment for public school buildings, acute inpatient care facilities, fire stations, police stations, sheriffs' offices, and other law enforcement agency buildings. Buildings were ranked for the "probability of collapse" due to the maximum possible earthquake for any given area. Within the city of Turner, the following buildings were given a "high" or"very high" probability of collapse: • Turner Elementary School: very high (10016) • Turner Fire Department: high (>1016) Turner Elementary School is scheduled to receive$1.2 million for seismic retrofits from the State. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Flood Table TR-7. Flood Summary Hazard Flood Type Climatic Speed of Onset Slow to moderate Location Mapped flood zones,floodplain Extent Moderate to severe Prior Occurance Four significant events since 1964 Probability 1%annual within SFHA Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, describes the causes and characteristics of flooding hazards within the region.The city's probability for riverine flood is highly likely and their vulnerability to flood is critical. In January of 2012, heavy rains caused extensive flooding throughout the City,with an estimated $500,000 in overall damage.lo During a five-day period starting on January 16t", the city received as much as 9.01 inches of rain. Runoff from to Congressman Kurt Schrader. "Officials tour flood-damaged Turner to assess needs—Salem Statesman Journal, January". http://schrader.house.gov/schrader-in-the-news/officials-tour-flood- damages-turner-to-assess-needs-salem-statesman-jou rnal-jan uary-27-2012/ Page TR-22 April 2017 Marion County HMP 248 the heavy rainfall was intensified by the melting of three to six inches of snow that had fallen in higher elevations the previous week.11 On March 2, 2012, the President issued a major disaster declaration (DR-4055). The preliminary damage assessment from the January 2012 flood revealed 13 residences and three businesses with major damage, 14 residences and three businesses with minor damage, and two residences with other damage. Later, the City documented more than 80 homes that had suffered flood damage. In addition, damage from the sewer system resulted in more than 100 households using portable toilets set up in the street. The flood event stretched local resources well beyond capacity, putting the entire town at risk. Issues confronted included: fire hydrants and water valve box piping were destabilized by the flood and ready to break; structural damage to bridges and road shoulders making use of narrow road corridors dangerous; all of the roads in and out of Turner were closed at one point with 75% remaining closed for multiple days; hundreds of individual evacuations; heavy flood waters directly impacted two businesses forcing one to close permanently; all downtown businesses were closed off to customers due to road closures, including the major mill complex in town; shut-off and later re-activation of the natural gas system created risk for potential explosions and fires. Since the major flood in January 2012,Turner has experienced other near-floods and high water events. Mill Creek, which runs through the middle of town, presents the greatest flood risk to residents and travelers. Many residences and businesses are located within the 100-Year Floodplain. Figure TR-4. Special Flood Hazard Area LayC—fly Sn— ,s 0Y�gan C.-tl". v: Flwd Herd s� Type-d!S-rce.cf Fl-d Dake fl, tip.:: f �JEffective FFMA 1170 Fld yr .. i i Prdi1,1fl ry FEMA 100 Apr Fb.d I C SLA.Digiti-d Flulad Dka 1 TuY'ner Q3 FEVIIA N9 d[lata 1 !lP':.tiE r� I tt,0 5 s i �✓ n{r� 1 Y 1 "'Q "ml`nY Jp v ;4 Source:Oregon HazVu:Statewide Geohazards Viewer(DOGAMI) 11 Statesman Journal. "Salem Hosts Flood Meetings Starting Tonight". March 19, 2012. Marion County HMP April 2017 Page TR-23 249 Figure TR-5. Turner's Flood Vulnerability 17, zf if e nh ldM'Il M �I W �. ' . is ......] I 6 o u+ U 5 " n Fire St3fonf� lIw� 6I� . Is, Schold Grounds Pd,ice St3, IfGilly Hatm 101 � j TRfl Aid vy r I VA'o_dlE' w�ulnera L f I'If�inkr9li �: +ry N V �ulr�er �� Vulnerable Chficg Facillhie!5 Vulnerable P uta n.s � Vulnerable E=wiy MajorRoad Mill me* u Tuumar City Limits Fl oaf G 13.125 0.2 i0.5 We Source:City of Turner 2012 NHMP Steering Committee. Page TR-24 April 2017 Marion County HMP 250 Mitigation Success Story: Regional Flood Mitigation Initiative Starting with flood early warning system,the City of Turner has built a coalition of partners that are committed to implementing flood mitigationstrategies.These partners include Marion County,the City of Salem,Aumsville,the Beaver Creek Watershed Board,the Santiam Water Control District, and the State of Oregon. In December,this coalition applied for a$400,000 grant to study flood detention possibilities in Mill Creek. In the future,these partners will continue working together to find and implement flood mitigation projects in the Middle Willamette watershed. National Flood Insurance Program (NFIP FEMA modernized the Turner Flood Insurance Rate Maps (FIRMS) in January of 2003.Table TR-8 shows that as of October 2016,Turner has 71 National Flood Insurance Program (NFIP) policies in force. Of those, 26 are for properties that were developed before development of the initial FIRM.The last Community Assistance Visit (CAV)for Turner was on February 6, 2012.Turner is not a member of the Community Rating System (CRS).The table shows that the majority of the flood insurance policies are for single-family residential homes.There have been 21 paid flood claims in Turner totaling$588,084. The Community Repetitive Loss record for Turner identifies one Repetitive Loss Property12(a residential parcel near Mill Creek) and no Severe Repetitive Loss Properties13. Table TR-8. Flood Insurance Detail 50 f Marion County - - 2,067 1,239 1,614 115 105 232 97 0 Turner 1/2/2003 4/2/1979 '71 26 65 3 0 3 1 0 Marion County $ 514,268,700 298 226 16 $ 5,732,543 11 2 - - Turner $' 17,424;$QA "21 ;18 31 $ , 588,084 .I 0 N/A, ' 2/6/2Q12s Source: Information compiled by Department of Land Conservation and Development,October,2016. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. 12 A Repetitive Loss(RL)property is any insurable building for which two or more claims of more than $1,000 were paid by the National Flood Insurance Program(NFIP)within any rolling ten-year period, since 1978.A RL property may or may not be currently insured by the NFIP. 13 A Severe Repetitive Loss(SRL)property is a single family property(consisting of 1 to 4 residences) that is covered under flood insurance by the NFIP and has incurred flood-related damage for which 4 or more separate claims payments have been paid under flood insurance coverage, with the amount of each claim payment exceeding $5,000 and with cumulative amount of such claims payments exceeding $20,000; or for which at least 2 separate claims payments have been made with the cumulative amount of such claims exceeding the reported value of the property. Marion County HMP April 2017 Page TR-25 251 Mitigation Success Story: FEMA Flood Insurance Trainings As part of their continued effort to provide good communication and resources for residents,the City;of Turner hired professionally trained FEMA flood insurance experts to meet with residents interested in or concerned about flood insurance. The trainings were well-received and the City intends to continue offering this service regularly to ensure residents are well-educated about options for properties that are susceptible to floods. Landslide Table TR-9. Landslide Summary Hazard Landslide Type Climatic/Geologic Speed of Onset Slow to rapid Northeast Turner-Eastwood area;east of Turner city Location limits. Extent Moderate to High,but localized Prior Occurance Evidence of historic landslides;none in recent history Probability <1%annual Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of landslides, and appropriately identifies previous landslide occurrences within the region. Turner has a relatively flat topography, except for the Eastwood area in the northeastern part of the town, near the Franzen Reservoir, and directly to the east between Turner and I- 5.Turner's probability for landslide is unlikely and their vulnerability to landslide is limited. Figure TR-6 shows the inventory of known historical landslides. Figure TR-7 shows the susceptibility and exposure to future landslides in Turner. Page TR-26 April 2017 Marion County HMP 252 Figure TR-6. Landslide Inventory `Scarp ' Head Scarp f4M¢rraa 6 � � ,9 rti �v [Depusits Talus-Cobluvtluun Fain l T i i; LeondsBde U, s I s"t, Turrr'I`lAfl mr n f7rbE.rei w;p Rd 8 E MW ria Rnr Source: Oregon FlazVu:Statewide Geohazards Viewer(DOGAMI) Figure TR-7. Landslide Susceptibility Exposure Layers CunrmWyr SF omi q .. ,c,rvgwl cm]Nfiles a Gregiorn Counties y, I LantWW Hamrdi Landslide Susceptibility Low-Lardslidi ngi unlikely El Modeuatr LandMiding Possible L, -. Highs. Larnd�slydrrngi Likely EM Veiiv Fliah-Existiunu Landslide d ;,, rIRyI ljy IbIcV „u' h R, „tf Source: Oregon FlazVu:Statewide Geohazards Viewer(DOGAMI) Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Marion County HMP April 2017 Page TR-27 253 Volcano Table TR-10. Volcano Summary Hazard Volcano Type Geologic Speed of Onset Slow to rapid Location Cascade Mountains Extent Minor Prior Occurance One significant event since 1916(Mount St.Helens) Probability <1%annual Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, adequately describes Turner's risk to volcanic events. The steering committee determined that the city's probability for volcanic event is unlikely and their vulnerability to volcano is negligible. The causes and characteristics of a volcanic event are appropriately described within the county's plan, as well as the location and extent of potential hazards. Previous occurrences are well-documented within the county's plan. Turner is very unlikely to experience anything more than volcanic ash during a volcanic event. When Mt. Saint Helens erupted in 1980, the city was not impacted. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Severe Weather Table TR-1 I. Severe Weather Summary Hazard Severe Weather/Storm Type Climatic Speed of Onset Slow to moderate Location Countywide Extent Minor to severe Minor events occur annually;—30 moderate to severe Prior Occurance events over the past 130 years 100%for minor events,23%for moderate to severe Probability events Sources: Marion County HMP Windstorm Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of windstorms, as well as the location and extent of windstorm hazards.The city's probability for windstorm is highly likely and their vulnerability to windstorm is critical. Significant wind events occur in Turner each year, usually between October and March. Damaging wind events are only slightly less common; once or twice per year the city will experience a windstorm event that will interrupt services, experience downed trees, and cause power outages.The F-2 tornado that touched down in Aumsville in December 2010, only four miles from Turner, did not cause damage to Turner. Page TR-28 April 2017 Marion County HMP 254 Because windstorms typically occur during winter months, they are sometimes accompanied by ice, freezing rain, flooding, and very rarely, snow. Winter Storm (Snow/Ice) Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of winter storms, as well as the location and extent of winter storm hazards.The City's probability for winter storms is highly likely and that their vulnerability to winter storms is critical. Severe winter storms can consist of rain, freezing rain, ice, snow, cold temperatures, and wind.They originate from troughs of low pressure offshore that ride along the jet stream during fall,winter, and early spring months. Severe winter storms affecting the city typically originate in the Gulf of Alaska or in the central Pacific Ocean.These storms are most common from November through March. Major winter storms can and have occurred in the Turner area, and while they typically do not cause significant damage, they are frequent and have the potential to impact economic activity. In particular, it becomes difficult to access the Eastwood area in the northeast of the city because ice can make the steep roads impassable.The most recent winter storms (December 2016—January 207) included snow and ice, transportation and power interruptions, and government office and school closures.A disaster declaration is currently pending. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Wildfire Table TR-12. Wildfire Summary Hazard Wildfire Type Climatic,Human Caused Speed of Onset Moderate to rapid Location Outside city limit Extent Minor to moderate Prior Occurance No history inside city limit Probability <1%annual Sources: Marion County HMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of wildfires, as well as the county and city's history of wildfire events.The city's probability for wildfire is possible and the vulnerability to wildfire is limited.Turner is surrounded on all sides by open farmland, forests, or waterways.Although Turner has some forested areas within the city limits, there is no history of wildfire events in Turner. The County updated the Community Wildfire Protection Plan (CWPP) in 2016 and portions of Turner are listed as having wildland urban interface (WUI)with areas of concern. Figure TR-8 depicts the areas near Turner that the CWPP identifies as areas of concern.These areas should be targeted for fire suppression activities. Marion County HMP April 2017 Page TR-29 255 Figure TR-8. Areas of concern near Turner. pi � . m Legsirza IAIUI i w J TURNER A , A—tiff Cu--, n r W r �z�..,,...,,,, „�� � z��..rv. Omnly EOwmtlari ry x y 1 ma V w m Source: Marion County Community Wildfire Protection Plan(2016). Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Page TR-30 April 2017 Marion County HMP 256 CITY OF WOODBURN ADDENDUM Purpose This document serves as the City of Woodburn's Addendum to the Marion County Multi- Jurisdictional Hazards Mitigation Plan (MHMP, HMP).This addendum supplements information contained in Volume I (Basic Plan) of this HMP.The Basic Plan serves as the foundation for this jurisdiction's addendum. Volume III (Appendices) provides additional information (particularly regarding participation and mitigation strategy).This addendum meets the following requirements: • Multi-jurisdictional Plan Adoption §201.6(c)(5), • Multi-jurisdictional Participation §201.6(a)(3), • Multi-jurisdictional Mitigation Strategy§201.6(c)(3)(iv), and • Multi-Jurisdictional Risk Assessment§201.6(c)(2)(iii). Plan Process, Participation, and Adoption This section of the HMP addendum addresses 44 CFR 201.6(c)(5), Plan Adoption, and 44 CFR 201.6(a)(3), Participation. In the summer and fall of 2016, the Oregon Partnership for Disaster Resilience (OPDR) at the University of Oregon's Community Service Center (CSC) partnered with the Oregon Military Department's Office of Emergency Management(OEM), and Marion County cities, including Woodburn, to update their addendum to the Marion County HMP, which expired July 8, 2016.This project is funded through the Federal Emergency Management Agency's (FEMA) FY14 Pre-Disaster Mitigation Competitive Grant Program (PDMC-PL-10-OR-2014-002). By developing this addendum to the Marion County HMP, locally adopting it, and having it approved by FEMA, the City of Woodburn will gain eligibility for FEMA Hazard Mitigation, Pre-Disaster Mitigation, and Flood Mitigation Assistance grant program funds. The Marion County HMP, and Woodburn addendum, are the result of a collaborative effort between citizens, public agencies, non-profit organizations, the private sector, and regional organizations. A project steering committee guided the process of developing the plan. For more information on the composition of the steering committee see the Acknowledgements, Plan Summary, and Plan Process (Volume III, Appendix B). The City of Woodburn Public Works Director is the designated local convener of this addendum.The Convener will take the lead in implementing, maintaining, and updating the addendum to the HMP in collaboration with Marion County Emergency Management. Representatives from the City of Woodburn steering committee met formally on one occasion: September 7, 2016 (see Appendix B for more information). The city's addendum reflects decisions decided upon at the plan update meeting and during subsequent work and communication with OPDR. Marion County HMP:Aurora Marchl7 Page WB-1 The City of Woodburn Steering Committee is comprised of representatives from the following departments: • Convener, City of Woodburn Public Works Director • City of Woodburn Building Official • City of Woodburn Community Development Director • City of Woodburn Senior Planner • City of Woodburn Associate Planner • City of Woodburn Police Executive Assistant • Woodburn Police Department Patrol Division • Woodburn Fire District Fire Marshal Woodburn used multiple approaches to engage the public. First, the City established steering committee representatives from across the city. Next, the city actively participated in countywide community engagement activities described in Volume I, Section 4 and in Appendix B. City staff also presented the draft plan to the City Council during an open public council session.The Steering Committee was closely involved throughout the development of the plan and served as the local oversight body for the plan's development. In addition, community members outside of the steering committee were provided an opportunity for comment via the plan review process (see Appendix B for more information). The Marion County HMP was approved by FEMA on [Month] [Day],2017 and the Aurora addendum was adopted via resolution on [Month] [Day],2017.This HMP is effective through [Month] [Day],2022. Mitigation Strategy This section of the HMP addendum addresses 44 CFR 201.6(c)(3(iv), Mitigation Strategy. During the 2016 Marion County and Woodburn update process, OPDR and a representative from Marion County Emergency Management assisted the steering committee with developing mitigations that will meet Woodburn's unique situation.The proposed actions were then re-reviewed by the steering committee to finalize. Woodburn developed a list of priority actions (Appendix A-1), any actions that were not prioritized were placed in the Action Item Pool (Appendix A-2)and will be considered during the annual meetings. For a status update on each of Woodburn's 2010 mitigation actions, see Appendix A-2. Priority Actions The City is listing a set of high priority actions in an effort to focus attention on an achievable set of high leverage activities over the next five-years.The City's priority actions are listed in Table WB-1 on the following page. Action Item Pool Table WB-2 on the following pages presents a pool of mitigation actions.This expanded list of actions is available for local consideration as resources, capacity, technical expertise and/or political will become available. Page WB-2 Mpggh 2017 Marion County HMP Table WB-I. Woodburn Priority Action Items Action Coordinating Partner Hazard Action Item Timeline Item ID Organization Organizations Include culvert widening projects for Wyffel Park and Gatch Street P-1 Flood between Lincoln St.and Hardcastle Ave. in upcoming Capital Public Works Short Term Improvement Plans. P-2 Flood Update the Stormwater Master Plan to include importantflood Public Works Short Term mitigation projects. Improve communication equipment in City Hall and in city vehicles, P-3 Multi-Hazard and identify additional radio operators to serve as communication City,Police,Fire Short Term backup in an emergency. Work to streamline the communication systems between all P-4 Multi-Hazard emergency responders.This might include purchasing additional City,Police,Fire Short Term equipment for some units. Source:City of Woodburn HMP Steering Committee,2016. Marion County HMP March 2017 Page WB-3 259 Table WB-2. Woodburn Action Item Pool Action Coordinating Partner Hazard Action Item Timeline Item ID Organization Organizations J, NO� i Develop a voluntary registry of populations that may need particular Dispatch,Adult MH-1 Multi-Hazard assistance in an emergency situation. Emergency Manager Family Services, Short Term Hospitals MH-2 Multi-Hazard Provide periodic first-aid and CPR classes to members of the public. Marion County Red Cross,CERT Ongoing MH-3 Multi-Hazard Participate in Marion County's post-disaster recovery planning City Staff Marion County Short Term/ efforts. Ongoing Continue development of CERT teams to ease the load on emergency CERT Program MH-4 Multi-Hazard Coordinator(Marion Ongoing services following a disaster. County) Develop and equip emergency shelters to take care of residents and Red Cross,Marion City Staff County,School MH-5 Multi-Hazard vulnerable populations such as the elderly,the medically fragile, Short Term/ children,people who speak English as a second language,low Ongoing Districts income residents,etc. Educate businesses and governmental organizations aboutthe Emergency SEDCOR, MH-6 Multi-Hazard importance of continuity of operations plans to make them more Marion County Manager, Ongoing resilient to natural hazards. Chamber of Commerce Ensure that all critical facilities have backup power and emergency PIO and Emergency MH-7 Multi-Hazard Public Works Short Term operations plans to deal with power outages. Manager Evaluate the city computer system,network,and website for the MH-8 Multi-Hazard IT Department Long Term ability to function during an emergency. Develop a traffic management plan for redirecting traffic in the event MH-9 Multi-Hazard Public Works Planning Long Term of a major incident that cuts off roads. Work with Marion Co.to provide a series of trainings about dealing MH-10 Multi-Hazard Emergency Manager Marion County Short Term with hazardous material. 1 11 I Partner with Marion County to support local agencies'training on Environmental DT-1 Drought Emergency Manager Short Term water conservation measures. Services Source:City of Woodburn HMP Steering Committee,2016. Page WB-4 March 2017 Marion County HMP 260 Table W13-2. Woodburn Action Item Pool (Continued) Action Coordinating Partner Hazard Action Item Timeline Item ID Organization Organizations MW ,. l MR 01iffim!mwi� Encourage reduction of nonstructural and structural earthquake Emergency EQ-1 Earthquake hazards in homes,schools,businesses,and government offices PIO Ongoing through public education. Manager,CERT Complete and maintain an inventory of high-risk buildings,critical EQ-2 Earthquake facilities,and infrastructure that may be particularly vulnerable to Emergency Manager Marion County Short Term earthquake damage. EQ-3 Earthquake Send city employees to the County's ATC 20 training. Building and Short Term/ Engineering Ongoing Buildingand EQ-4 Earthquake Evaluate the structural integrity of city-owned buildings. Engineering(Building Long Term Official) Require new city facilities to exceed the minimum structural Building Inspection and EQ-5 Earthquake City Council Long Term requirements for seismic loading. Permitting Seek funding to further assess the"probability of collapse"for EQ-6 Earthquake Lincoln Elementary School,Washington Elementary School,French School District Long Term Prairie Middle School,Nellie Muir Elementary School,and Woodburn High School. Update the city's Comprehensive Plan to reflect the latest EQ-7 Earthquake Planning Short Term information on seismic hazards. EQ-8 Earthquake Encourage residents and commercial businesses to purchase Building and PIO Ongoing earthquake insurance. Engineering EQ-9 Earthquake Install automatic shut-off valves in all city facilities that use natural Building Official City Council Long Term gas. Marion County, EQ-10 Earthquake Encourage residents to prepare and maintain 2-week survival kits. PIO CERT,Statesman Ongoing Journal Source:City of Woodburn HMP Steering Committee,2016. Marion County HMP March 2017 Page WB-5 261 Table W13-2. Woodburn Action Item Pool (Continued) Action Coordinating Partner Hazard Action Item Timeline Item ID Organization Organizations WA I 1 FL-1 Flood Implement mitigation action items in the Public Facilities Plan Public Works Short Term/ Ongoing Partner with Marion County to conduct workshops for target audiences on National Flood Insurance Programs,mitigation Marion County FL-2 Flood Emergency Manager Ongoing activities,and potential assistance from FEMA's Flood Mitigation Public Works Assistance and Hazard Mitigation Grant Programs. FL-3 Flood Continue compliance with the National Flood Insurance Program City Engineer Ongoing through the enforcement of local floodplain ordinances. FL-4 Flood Update the City's Flood Insurance Rage Maps(FIRMS)-FEMA should FEMA Short Term be relseasing updates soon. l I � 1 Identify critical facilities and equipment that can be damaged by VC-1 Volcano ashfall,and develop mitigation activities to prevent damage to these Emergency Manager Public Works Long Term facilities. I i I1 1 I�I���y I���I�JJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJIJIJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ� 1�Ir fi �irr�Iiri�ilN1,H»�filDlllllllllllllllllllllllllllllllllllllll lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll���������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������� Educate the public about the benefits of proper tree pruning and SW-1 Wind Storm care in preventing damage during windstorms.Outreach outlets Emergency Manager PIO,CERT Ongoing include Arbor Day and passing out tree maintenance brochures. Educate the community about the risk of downed power lines,aerial SW-2 Wind Storm power lines in the vicinity of trees,and preparedness measures to PGE PIO,CERT Ongoing take in the event of a power outage. Require new city facilities to exceed the minimum structural SW-3 Wind Storm Building Department Long Term requirements for wind loading. Severe Educate homeowners about choosing ice and windstorm-resistant SW-4 Winter trees and landscaping practices to reduce tree-related hazards in Emergency Manager PIO,CERT Ongoing Storm future ice storms. Severe Educate citizens about ways to weatherize their homes,as well as Marion County, SW-5 Winter Emergency Manager Ongoing Storm safe emergency heating equipment. PGE,CERT Source:City of Woodburn HMP Steering Committee,2016. Page W13-6 March 2017 Marion County HMP 262 Plan Implementation and Maintenance The City Council will be responsible for adopting the City of Woodburn addendum to the Marion County HMP.This addendum designates a convener and a coordinating body to oversee the development and implementation of action items. Because the city addendum is part of the county's multi-jurisdictional HMP, the city will look for opportunities to partner with the county.The city's steering committee will convene after adoption of the City of Woodburn addendum on a semi-annual schedule; the county also meets on a semi-annual basis.The City of Woodburn convener will participate in the Marion County HMP meetings and will report on city specific activities as appropriate.The steering committee will be responsible for identifying new risk assessment data, reviewing status of mitigation actions, identifying new actions, and seeking funding to implement the city's mitigation strategy (actions).The convener will also remain active in the county's implementation and maintenance process (see Volume I, Section 4 for more information). The city will utilize the same prioritization process as the county(See Volume I, Section 4: Plan Implementation and Maintenance and Volume IV, Appendix D: Economic Analysis of Hazard Mitigation Projects for more information). Implementation through Existing Programs Many of the Hazards Mitigation Plan's recommendations are consistent with the goals and objectives of the city's existing plans and policies. Where possible, the City of Woodburn will implement the HMP's recommended actions through existing plans and policies. Plans and policies already in existence have support from local residents, businesses, and policy makers. Many land-use, comprehensive, and strategic plans get updated regularly, allowing them to adapt to changing conditions and needs. Implementing the HMP's action items through such plans and policies increases their likelihood of being supported and implemented. Woodburn's Comprehensive Plan was first acknowledged by the Oregon Land Conservation and Development Commission in 1978.The City most recently updated the entire plan, including updates to the Natural Hazards section, in October of 2005.1 While policies in the Woodburn Comprehensive Plan mention floodplain requirements,the plan does not specifically call out any natural hazards and contains no goals directly related to natural hazards. One plan policy prohibits development within the 100-year floodplain and another seeks to preserve trees in designated floodplains.The City implements the plan through regulatory controls found in the Woodburn Development Ordinance.2 Woodburn also implements elements of the Comprehensive Plan related to natural hazards through the following Plans: • Woodburn Transportation Systems Plan, updated 2005 • Woodburn Parks Master Plan, updated 2009 1 Woodburn Comprehensive Plan (2009). Section J: Natural and Cultural Resources p. 42-45. 2"Section 2.1: Land Use Zoning."&"Section 3.1"&"Section 5.104" http://www.ci.woodburn.or.us/sites/default/files/%2810-31%2909WDO.pdf Marion County HMP March 2017 Page WB-7 263 • Woodburn Public Facilities Plan, updated May 2005 • Woodburn Water Management and Conservation Plan,January 2010 Continued Public Participation Keeping the public informed of the City's efforts to reduce the risk associated with future hazards events is important for successful plan implementation and maintenance.The city is committed to involving the public in the plan review and updated process. See Volume I, Section 4,for more information. Plan Maintenance The Marion County Multi-Jurisdictional Hazards Mitigation Plan and city addendum will be updated every five years in accordance with the update schedule outlined in the Disaster Mitigation Act of 2000. During the county plan update process, the City will also review and update its addendum.The convener will be responsible for convening the steering committee to address the questions outlined below. • Are there new partners that should be brought to the table? • Are there new local, regional, state, or federal policies influencing natural hazards that should be addressed? • Has the community successfully implemented any mitigation activities since the plan was last updated? • Have new issues or problems related to hazards been identified in the community? • Are the actions still appropriate given current resources? • Have there been any changes in development patterns that could influence the effects of hazards? • Have there been any significant changes in the community's demographics that could influence the effects of hazards? • Are there new studies or data available that would enhance the risk assessment? • Has the community been affected by any disasters? Did the plan accurately address the impacts of this event? These questions will help the steering committee determine what components of the mitigation plan need updating.The steering committee will be responsible for updating any deficiencies found in the plan. Risk Assessment This section of the HMP addendum addresses 44 CFR 201.6(b)(2) - Risk Assessment. In addition, this chapter can serve as the factual basis for addressing Oregon Statewide Planning Goal 7—Areas Subject to Natural Hazards.Assessing hazard risk has three phases: • Phase 1: Identify hazards that can impact the jurisdiction.This includes an evaluation of potential hazard impacts—type, location, extent, etc. • Phase 2: Identify important community assets and system vulnerabilities. Example vulnerabilities include people, businesses, homes, roads, historic places and drinking water sources. Page WB-8 March 2017 Marion County HMP 264 • Phase 3: Evaluate the extent to which the identified hazards overlap with, or have an impact on, the important assets identified by the community. The local level rationale for the identified mitigation strategies (action items) is presented herein, and within Section 2, Risk Assessment, and Appendix C, Community Profile.The risk assessment process is graphically depicted in Figure WB-1 below. Ultimately, the goal of hazard mitigation is to reduce the area of risk, where hazards overlap vulnerable systems. Figure WB-I. Understanding Risk Understanding !Risk :��""�A ���� oU Mc �a:wswmarare cu�ruMNapp mr W. �,d M c rmrr f Natural Hazar " w INnelr lhle System rwtr °u iit � �r4r h9rc Exposure, w)Sit.NKY and Chrorrmr Phys& i�l Everit� �� � t�tt�dl i�+ttilwr ce of" N��N'SrolB�d"Ce01Y4UE�"�'k�gVk�'Yk�+4�� ���i%/i� ��N�k(�H,1b�r�C�Rk � trrrr r�rrr ,rdf pl, �� �i Ekxsiorrrlc taer7vat*i y�b�r?�:�N�rt�7ru�s�t' �'���/�%�� «�arkltlG-nwrhr'i,�Nirp�a�yrt ���rrbturr�u � '` �ruy��r��rrrw�dsr4r�t�fr��rKpra�u� G�uarr�rl�var ����/%i G.wll�aa�ua+l�5at Abillity;Resources and y"P 14ngn ss trm « ifigare.V��n d Prep re -it cover Savaxaea���,q,..�re�savar✓�vvira�rs���i�r�zev�"�v�MeadM�nmcv'rd'�zs�rarta��aWM�adarprraaBr�ava.�G7d Risk Assessment Approach A risk assessment is intended to provide the, "factual basis for activities proposed in the strategy to reduce loses from identified hazards."s To complete the risk assessment, the HMP update team first updated the description, type, location and extent of each hazard. Next, the team updated the vulnerability information based on each hazard's potential impact on the community. The Marion County Basic Plan (Volume I, Section II) Risk Assessment describes in detail the methods used to assess risk. In summary, Marion County has prepared a Threat Hazard Identification and Risk Assessment as a formal annex to the Marion County Emergency Operation Plan.The assessment uses a method developed by BOLD Planning4.This city addendum builds on the county level assessment to produce a similar assessment for the City of Woodburn.The assessment specifically examines: 1. Probability(frequency) of event 2. Magnitude of event 3. Expected warning time before event s 44 CFR 201.6(2)(i) 4 BOLD Planning is a consulting firm specializing in the development of actionable emergency plans. For more information, visit: http://www.boldplanning.com/ Marion County HMP March 2017 Page WB-9 265 4. Expected duration of event Refer to Page 2-4 of the Marion County Basic HMP for a description of the scoring values for each ranking category. Hazard Analysis The assessment identifies three levels of risk: High, Moderate and Low. High - High probability of occurrence; at least 50 percent or more of population at risk from hazard; significant to catastrophic physical impacts to buildings and infrastructure; major loss or potential loss of functionality to all essential facilities (hospital, police, fire, EOC and shelters). Moderate - Less than 50 percent of population at risk from hazard; moderate physical impacts to buildings and infrastructure; moderate potential for loss of functionality to essential facilities. Low- Low probability of occurrence or low threat to population; minor physical impacts. A summary of the risk assessment findings and rankings is presented in Table WB-3. Table W113-3. Hazard and Vulnerability Assessment Summary War ing Local Planning CountyPlanning , Natural Hazard Probability Magnitude 6ur3tiori CPRI , 7irne'. Significance Signif€cance Weight Factor 0.45 0.3 0.15 0.1 Earthquake* 4 4 4 4 4.00 1111 gh I I!!EIII Severe Weather/Storm** 4 1 3 3 2.85 11!!EIII Flood 3 2 2 4 2.65 I1!!EIII Drought 3 1 3 4 2.50 I1!!EIII Extreme Weather-High Temperature 3 1 2 4 2.35 Wildland Interface Fire 1 4 2 2 2.15 Dam or Levee Failure 1 2 4 4 2.05 Landslide 1 2 2 2 1.55 1 low IIIIII!!EIII Volcanic Eruption 1 1 1 4 1.30 1 low Iu,W *Note:Earthquake probability listed to match county level analysis.See below for more detailed probability assessment. **Note:Includes tornado hazard Source: BOLD Planning Risk Assessment Method;Analysis by UO Community Service Center. Community Asset Identification This section provides information on city specific assets. For additional information on the characteristics of Woodburn, in terms of geography, environment, population, demographics, employment and economics, as well as housing and transportation see Volume III, Appendix C, Community Profile. Many of these community characteristics can affect how hazards impact communities and how communities choose to plan for natural hazard mitigation. Considering the city specific assets during the planning process can assist in identifying appropriate measures for hazard mitigation. Community Characteristics The city of Woodburn is located in the Willamette Valley in Marion County, Oregon, approximately 31 miles south of the city of Portland. Woodburn experiences a moderate Page WB-10 March 2017 Marion County HMP 266 climate with an average high temperature of 82 degrees and low of 54 degrees in August, and an average high temperature of 47 and low of 35 in Januarys The city receives an average annual precipitation of 40.7 inches.6 Major bodies of water in Woodburn include Senecal Creek and Mill Creek. Woodburn is located on a flat area,with farmland surrounding the city on all sides. The Population Research Center at Portland State University lists Aurora's 2015 population at 24,670.This represents a 19.7% increase from 2000. For more demographic information, refer to Appendix C. Economy Historically, the city of Woodburn was a commercial, agricultural, and industrial community that grew around the railroad that currently runs through the center of town.7 Today, Woodburn's economy is still largely based on manufacturing, agriculture, construction and retail trade. Woodburn's proximity to 1-5 allows for an auto-oriented service economy to exist along the interstate corridor.The Woodburn Premium Outlets are a large shopping attraction for out-of-town visitors. Median household income in Woodburn in 2014 was $43,144. For more economic information, refer to Appendix C. Critical and Important Facilities Woodburn's critical and important facilities include the following: Transportation • Interstate-5 runs north-south through western Woodburn • Highway 99E runs parallel to 1-5 through eastern Woodburn • Highway 214 runs east-west through Woodburn (Highway 211 also runs east-west and merges with Highway 214 when it reaches Woodburn) • The Union Pacific Railroad runs parallel to 1-5 through the middle of Woodburn • The Burlington Northern Santa Fe railroad runs north-south just west of Woodburn • Woodburn Transit Service • Woodburn Amtrak Station Energy • PGE—electricity(2079 Progress Way) o PGE operates a maintenance facility and three sub-stations in or near Woodburn Water • Water: o Above-ground storage tank: 750,000 gallons s Weatherbase.com, "Aurora Oregon," http://www.weatherbase.com, accessed 2/21/17. (Note, the Aurora Airport is the closest weather station to Woodburn.) 6 Ibid. 7 Woodburn Comprehensive Plan (2009). "Woodburn's Historical Context." P. 4-6. Marion County HMP March 2017 Page WB-11 267 o Underground storage reservoir:4.7 million gallons o Seven active wells (according to the 2005 Public Facilities Plan) o Three water treatment plants (National Wy., Country Club Rd., and Parr Rd.) • Wastewater Treatment Plant and Collection System (located off of Highway 211) o Approximately 140 acres of land o Ten lift stations for sanitary sewer services Emergency Services • Police Department (1060 Mount Hood Ave.) • Fire: o Woodburn Fire District Station 21 (1776 Newberg Highway) o Woodburn Fire District Station 22 (1650 James Street) o (Waconda)Woodburn Fire District Station 24 (River Road, southwest of city) o (Broadacres)Woodburn Fire District Station 25 (Butteville Road, northwest of city) • Medical: o Legacy Health/Woodburn Specialist Center (1475 Mount Hood Ave.) o Salud Medical Center(1175 Mount Hood Ave.) o Woodburn Pediatric Clinic(2050 Progress Way) Note:Major hospitals are in Silverton and Salem • Woodburn City Hall (270 Montgomery St.)—contains the office space for the Administration, Finance and Community Development departments, and the Municipal Court. Cultural/Historical Resources • Buildings listed on the National Register of Historic Places: o Bank of Woodburn o Old Woodburn City Hall o Jesse H. Settlemier House • Woodburn also has an Historic Downtown district • Events/amenities that may have large crowds: o March and April:Woodburn Tulip Festival o Woodburn Premium Outlets (particularly around Black Friday and the holiday season) o Fiesta Mexicana in Legion Park o Relay for Life in July o Drag Racing NHRA(National Hot Rod Association) from March to November o Bauman's Fall Festival in Gervais (impacts traffic in Woodburn) o Oktober Fest in Mt. Angle (impacts traffic in Woodburn) o St. Paul Rodeo (impacts traffic in Woodburn) Functional and Access Needs (Vulnerable Populations] • Schools: o Heritage Elementary(440 Parr Rd.) o Lincoln Elementary(1041 N. Boones Ferry Rd.) o Nellie Muir Elementary(1800 W. Hayes St.) o Washington Elementary(777 E. Lincoln St.) o French Prairie Middle (1025 N. Boones Ferry Rd.) o Valor Middle (450 Parr Rd.) Page WB-12 March 2017 Marion County HMP 268 o Academy of International Studies (1785 N. Front St.)—high school o Success Alternative High School (610 Young Street) o Wellness, Business and Sports School (1785 N. Front Street)—high school o Woodburn Academy of Art, Science and Technology (1785 N. Front St.)— high school o Woodburn Arts and Communications Academy(1785 N. Front St.)—high school o St. Luke's Parochial School (529 Harrison St.) o Headstart(950 N. Boones Ferry Rd.) o Oregon Child Development Coalition (OCDC) (540 North Settlemier Avenue) —Infant services o Chemeketa Community College (120 E. Lincoln Street)—community college o Pacific University Campus (24 W Lincoln St)—college o Woodburn Arthur Academy(575 Gatch St.)—K-5th Grade See hazard sections below and Section 2, Risk Assessment, for potential hazard vulnerabilities to these facilities. Hazard Characteristics Drought The characteristics of drought in Woodburn are the same for the county as a whole. Table W113-4. Drought Summary Hazard Drought Type Climatic Speed of Onset Slow Location Varies, County Wide Extent Moderate to Severe Drought* Prior Occurance Three>6 months duration since 1982 Probability —9% *Defined as between-2 and-4 on the National Resource Conservation Service (NRCS)Surface Water Supply Index(SWSI) Sources:Oregon NHMP;NRCS;analysis by OPDR The probability of drought in Woodburn is likely, the same as for the county as a whole.The City's water supply comes exclusively from subsurface sources, making vulnerability to drought moderate. Overall,the planning significance of drought in Woodburn is moderate. Volume I, Section 2, Risk Assessment, adequately describes the characteristics of drought hazards, as well as the location and extent of a potential event. Due to a cool, wet climate, past and present weather conditions have generally spared Marion County communities from the effects of drought. Governor Kate Brown declared a drought emergency for all of Marion County in September 2015, but according to the steering committee,Woodburn has not implemented water curtailment measures. According to Woodburn's Public Facilities Plan, the City has seven active wells which pump water through three neighborhood treatment plants.This water is then pumped into two Marion County HMP March 2017 Page WB-13 269 storage facilities-an above ground tank and a larger underground storage reservoir. From here,water is distributed out to residential, commercial, and industrial customers. Woodburn has a Water Management and Conservation Plan, released in January 2010.The Plan contains a "Water Curtailment Element." Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Earthquake The characteristics of both a crustal earthquake and a Cascadia Subduction Zone (CSZ) earthquake are similar to the county as a whole. Table WB-5. Earthquake Summary Crustal Hazard Earthquake-Crustal Type Geologic Location Multiple active faults;Willamette Valley Speed of Onset Rapid Extent Very Strong to Severe shaking—500 yrs* Prior Occurance One over Magnitude 5 last 100 yrs** Probability Approximately 1%annual *DOGAMI HazVu;**PNSN-1993 Scotts Mills just north of Marion County Sources: DOGAMI-Oregon HazVu;Oregon NHMP;Pacific Northwest Seismic Network Table WB-6. Earthquake Summary Subduction Hazard Earthquake-Subduction Type Geologic Location Primarily west of the Cascades;CA-BC Speed of Onset Rapid Extent Catastrophic Prior Occurance One over Magnitude 9 last 500 yrs Probability Magnitude 9+is 7%-12%over 50 yrs** *DOGAMI HazVu;**Oregon Natural Hazard Mitigation Plan,anlysis by Oregon Department of Geology and Mineral Industries. Sources: DOGAMI-Oregon HazVu;Oregon NHMP;Pacific Northwest Seismic Network Woodburn's probability for a Crustal Earthquake event is "possible" and their vulnerability to a Crustal Earthquake event is "limited".The county steering committee determined that the probability for a Cascadia Subduction Zone (CSZ) Earthquake event is "highly likely' and that the vulnerability to a Cascadia Earthquake event is "catastrophic".This hazard was not rated as distinct CSZ and crustal events in the previous HMP.There are no locally active faults within the Woodburn city limits.The nearest active fault runs northwest to southeast just outside of Woodburn, ending just on the outskirts of the city.The 1993 Scott Mills quake caused $28 million in damages to cities throughout Marion County. In Woodburn, the 1993 quake caused damage to unreinforced masonry buildings in the downtown and the second story of Washington elementary school. Additionally, in a local store, pesticides, paints, and car batteries fell off shelves and mixed together causing hazardous fumes. No damaging earthquake events occurred during the previous five years. Page WB-14 March 2017 Marion County HMP 270 Volume I, Section 2, Risk Assessment, adequately describes the characteristics of earthquake hazards, history, as well as the location and extent of a potential event. Generally, an event that affects the county is likely to affect Woodburn as well. Previous occurrences are well- documented within the county's plan, and the community impacts described by the county would generally be the same for Woodburn as well. Earthquake-induced damages are difficult to predict, and depend on the size, type, and location of the earthquake, as well as site-specific building and soil characteristics. Presently, it is not possible to accurately forecast the location or size of earthquakes, but it is possible to predict the behavior of soil at any particular site. In many major earthquakes, damages have primarily been caused by the behavior of the soil. Figure WB-2 shows that ground shaking in Woodburn for both crustal and subduction earthquakes: ....L .„expected to be very strong. Figure WB-2. Active Faults and Expected Shaking Liga ivJlle iM1t•st Wore iL Nreadlaa n L.V—C—Itly 5lrm .19 G'EartYw4�aMe H.a�rd q [active N ults ExpeUedl Earthquake Shakingi 4ialenrt 1 ��f g /�v VARY st­g r �r❑ st—g .NO��xl�,.�, »rlat„'h !riiha/ 1 D'r j rI K” Source: Oregon HazVu:Statewide Geohazards Viewer(DOGAMI) The Woodburn steering committee identified several concerns related to the effects of an earthquake: • The city has a large non-English speaking population. In emergency situations, these groups may need particular attention and assistance. Likewise, outreach strategies that inform residents of shelters or preventative activities should be distributed in multiple languages. • The steering committee identified a need within the community to identify populations (i.e., senior or disabled populations)that may need particular assistance in pre-disaster evacuation protocols or after disaster events.This could be a voluntary registry or a preliminary assessment of current needs. Marion County HMP March 2017 Page WB-15 271 • The entire city may have disruptions in communication systems.This will be an issue for schools (i.e., contacting parents), businesses, and public services. Likewise, transportation systems are likely to be disrupted after a high-magnitude earthquake. • The city draws a large tourist population to the Woodburn Premium Outlets. Sheltering and caring for tourists post-event may be a difficult endeavor. Logistics for sheltering or providing food and basic care for the entire population will also be a challenging task. • The Maclaren Youth Facility may be seismically unstable. Additional assessment is required (although, this is a state facility and outside of the city's jurisdiction).The facility houses up to 500 people at a time. • Generally, older buildings may require seismic retrofit.This includes businesses in unreinforced masonry buildings, and older homes and buildings including the old City Hall, Library, and the historic Settlemeir House. Likewise, utility systems, communication systems,transportation corridors, and business or industrial centers may be vulnerable to seismic activity. Figure WB-3 identifies buildings in Woodburn that are 60 years or older. • The city's steering committee believes that there are fragile waterlines in downtown Woodburn. Seismic activity may disrupt the water lines and prevent distribution to residents. Emergency generators for the water system currently have only a 72-hour supply of fuel. • The city's water tower was built in 1962 and may be vulnerable to seismic activity. • The 1-5 overpass, if damaged, could isolate Woodburn from neighboring communities—especially if Highway 99E is damaged as well. • An important water main is supported by the Hazelnut Street Bridge,where foundation problems have been identified. If the bridge fails either by seismic action or storm erosion,this line will fail also. In 2007,the Department of Geology and Mineral Industries (DOGAMI) conducted a seismic needs assessment for public school buildings, acute inpatient care facilities, fire stations, police stations, sheriffs' offices, and other law enforcement agency buildings.a Buildings were ranked for the "probability of collapse" due to the maximum possible earthquake for any given area.This report assigned the following ratings to public facilities in Woodburn: Very High (100%) • Lincoln Elementary School • Washington Elementary School High ( > 10%) • French Prairie Middle School • Nellie Muir Elementary School • Woodburn Police Department a Lewis, Don (2007). "Statewide Seismic Needs Assessment: Implementation of Oregon 2005 Senate Bill 2 Relating to Public Safety, Earthquakes, and Seismic Rehabilitation of Public Buildings." Department of Geology and Mineral Industries, Open-File Report 0-07-02. Page WB-16 March 2017 Marion County HMP 272 Moderate ( > 1%) • Woodburn High School • Woodburn RFPD • Woodburn RFPD Station 21 Low( < 1%) • Branch-Woodburn Center • Heritage Elementary • Valor Middle School Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Marion County HMP March 2017 Page WB-17 273 Figure WB-3. Older Buildings. w. r n:nmmk.m 1 n / x s` y eF,w ne C � d /r l �r .� �^I\I�� N im r. yy Y N" /II 0 Yt Sl— too y 1 ` m r s-4 G, Vll u„ ✓ e � r �:o ''�a �r �,�W A P�w� ! �y NSW e � _ ,_ �p gg a II f11 lY �m N , t . ., � � •' eg qiox WoodburnCauWlralaraWc I Iaxzra�cEk 4'eal6ttn " r r °: w�i Li amal6ac aika k.i G:rvidk at � P � �, aero wa aG J Z.... rl �ll S �celedll trRr� �: F ,^ r .„y;^,.. p7p¢w,lurrWa'4!rotnl.al7araurey �° I•'1"".ht:k l tuf:y-a•raa q lc�,.ad.Nl.tiain li�" mYh �!mwe r'" � y, 'N�I,� rIIM I.i111K�W�bi'4�k�4YIK{.4'S� .. . r ",. A" [ eMralaih arraLx a l �� ,,,s l anmleriie mat sherotin o Wlarl agiwlgwmnt44coall& arri i. i"bw lalrcalion Su.4,v la!halplr, t..nc�rL ell high fapavre sgretiawnl tW L Parreary. — _ lamc�lGttaGlranr N Ft Year Coll R m ges a':p7+�laY .... ^3auti~Aarnr,ti l 04vof Woodber,m �/e ate` Tao' .,.. �,� r r,ail w5 1 h!?5 Nattmral Hazar(Is M1 figatutrn PlIan y c a'''��ul�rpt xaa�rM 79aaaY��n�,^�6060uaw rcelc&.k c�lcx;x �. �, t._._r„r.� hxx� l� 11ha�n¢A 7t�.%uaN.1 l.�arapra us>4,r 16 a n•tn9 q�anraa ---�,., — al 1924 khnor hrGernuan • 3CrvaU t arllc,caaer 193X 1949 Accwm.Silree r" x hmssc sG,r q;axlots �uurscv. - l.in:aA�MGr',cY e� 274 Flood Table WB-7. Flood Summary Hazard Flood Type Climatic Speed of Onset Slow to moderate Location Mapped flood zones,floodplain Extent Moderate to severe Prior Occurance Four significant events since 1964 Probability 1%annual within SFHA Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, describes the causes and characteristics of flooding hazards within the region. Woodburn's probability for riverine flood is likely and vulnerability to flood is limited. Portions of Woodburn have areas of flood plains (special flood hazard areas).These include areas along Mill Creek and Senecal Creek (see Figure WB-4).The Pudding River,just to the east of Woodburn, is also a major source of flooding. Historically, Woodburn has experienced major floods in 1986 and 1996 on the Pudding River. Since then, no major floods have affected the population, but Woodburn continues to experience regular localized flooding during the wet season. According to the steering committee, localized flooding occurred in 2013 along several drainages.The steering committee also indicated that Boones Ferry Rd. regularly experiences localized flooding issues. Figure WB-4. Special Flood Hazard Area .,_udUurn �y ➢ftLar/ens Cra—.tly Shaval 0X19 ,Flood M-rd I/ Typo and source of Flood E an Eff.&N,FEMA 1fJ t)yr Flood J odEarn P,.dm"ii"ary FE MA 10 0 Yr So.d _i State Digitized Flood Eoto Q]FEMA Flood Eata i j r Y f fr/ Source: Oregon HazVu:Statewide Geohazards Viewer(DOGAMI) National Flood Insurance Program (NFIPJ Marion County HMP March 2017 Page WB-19 275 FEMA modernized the Woodburn Flood Insurance Rate Maps (FIRMS) in January of 2000. The table below shows that as of October 2016,Woodburn had 53 National Flood Insurance Program (NFIP) policies in force. Of those, 16 were for properties that were developed before development of the initial FIRM. Woodburn's last Community Assistance Visit (CAV) occurred on June 24, 2004. Woodburn is not a member of the Community Rating System (CRS).Table WB-8 shows that 50 flood insurance policies are for single-family residential structures and with three serving non-residential structures.There have been two paid flood claims in Woodburn, totaling$14,781. The Community Repetitive Loss record for Woodburn identifies no Repetitive Loss Properties9 and no Severe Repetitive Loss Properties,o. Table WB-8. Flood Insurance Detail Marion County - - 2,067 1,239 1,614 115 105 232 97 0 Woodburn 1/19/2000 3/1/1979 53 16 50 0 0 3 6 0 1 Marion County $ 514,268,700 298 226 16 $ 5,732,543 11 2 - - Woodburn $ 12,711,100 2 2 0 $ 14,781 0 0 N/A 6/24/2004 Source: Information compiled by Department of Land Conservation and Development,October,2016. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Landslide Table WB-9: Landslide Summary Hazard Landslide Type Climatic/Geologic Speed of Onset Slow to rapid Location Waterways(banks)and transportation facilities Extent Minor Prior Occurance No major events Probability Low for minor events;less than 5%major events Sources: DOGAMI-Oregon HazVu;Oregon NHMP 9 A Repetitive Loss(RL)property is any insurable building for which two or more claims of more than $1,000 were paid by the National Flood Insurance Program(NFIP)within any rolling ten-year period, since 1978.A RL property may or may not be currently insured by the NFIP. to A Severe Repetitive Loss(SRL)property is a single family property(consisting of 1 to 4 residences) that is covered under flood insurance by the NFIP and has incurred flood-related damage for which 4 or more separate claims payments have been paid under flood insurance coverage,with the amount of each claim payment exceeding $5,000 and with cumulative amount of such claims payments exceeding $20,000; or for which at least 2 separate claims payments have been made with the cumulative amount of such claims exceeding the reported value of the property. Page WB-20 March 2017 Marion County HMP 276 Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of landslides, and appropriately identifies previous landslide occurrences within the region. Woodburn has a relatively flat topography. Woodburn's probability for landslide is possible (which is lower than the county's rating) and their vulnerability to landslide is limited (which is also lower than the county's rating). Figure WB-5 shows that landslide risk in Woodburn is low to moderate in most populated areas, with some small areas of high along Mill and Senecal Creeks. Figure WB-5. Landslide Susceptibility Exposure W eadburn .Layers C-tly 51— 0-, ,. t,Lamh•J�HaamA Lati,dslide Susceptibility ❑ L.I -Landsldng Unlikely 11 M.der'ate-L dsll'ddng P-11hi. HIghi-Landsl d ucy Lfkdy ® Vey'High-HA'fingL-Beide „ Source: _Oregon HazVu:Statewide Geohazards Viewer(DOGAMI) Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Volcano Table WB-10: Volcano Summary Hazard Volcano Type Geologic Speed of Onset Slow to rapid Location Cascade Mountains Extent Minor Prior Occurance One significant event since 1916(Mount St.Helens) Probability <1%annual Sources: DOGAMI-Oregon HazVu;Oregon NHMP Volume I, Section 2, Risk Assessment, adequately describes Woodburn's risk to volcanic events.The steering committee determined that the city's probability for volcanic event is unlikely and their vulnerability to volcano is negligible. Marion County HMP March 2017 Page WB-21 277 The causes and characteristics of a volcanic event are appropriately described within the county's plan, as well as the location and extent of potential hazards. Previous occurrences are well-documented within the county's plan.Woodburn is very unlikely to experience anything more than volcanic ash during a volcanic event. When Mt. Saint Helens erupted in 1980, the city was impacted only by ashfall. Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Severe Weather Table WB-1 I: Severe Weather Summary Hazard Severe Weather/Storm Type Climatic Speed of Onset Slow to moderate Location Countywide Extent Minor to severe Minor events occur annually;—30 moderate to severe Prior Occurance events countywide over the past 130 years 100%for minor events,23%for moderte to severe Probability events Sources: Marion County HMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of windstorms and severe winter storms, as well as the location and extent of these hazards. Woodburn's probability for windstorm and severe winter storms is highly likely(which is the same as the county's rating) and that their vulnerability is critical (which is lower than the county's rating). Significant wind events occur in Woodburn each year, sometimes interrupting services, downing trees, and causing power outages. Since 1957, five reported tornadoes have struck Marion County, however none have touched down near Woodburn. More recently, two windstorms in 2015 toppled trees,with one tree causing damage to a house. According to the Woodburn steering committee, Woodburn experiences at least one severe wind event each year, often resulting in power outages. Severe winter storms can consist of rain, freezing rain, ice, snow, cold temperatures, and wind.They originate from troughs of low pressure offshore that ride along the jet stream during fall,winter, and early spring months. Severe winter storms affecting Woodburn typically originate in the Gulf of Alaska or in the central Pacific Ocean.These storms are most common from November through March. Major winter storms can and have occurred in the Woodburn area, and while they typically do not cause significant damage, they are frequent and have the potential to impact economic activity. During a storm in May 2014, lightening caused an estimated $75,000 in damage to property, including a house.The most recent winter storms (December 2016— January 2017) included snow and ice and resulted in transportation and power interruptions combined with government office and school closures.A disaster declaration is currently pending. Page WB-22 March 2017 Marion County HMP 278 Please review the Risk Assessment(Volume/, Section 2)for additional information on this hazard. Wildfire Table WB-12: Wildfire Summary Hazard Wildfire Type Climatic,Human Caused Speed of Onset Moderate to rapid Location Outside city limit Extent Minor to moderate Prior Occurance No history inside city limit Probability <1%annual Sources: Marion County HMP Volume I, Section 2, Risk Assessment, adequately describes the causes and characteristics of wildfires, as well as the county and city's history of wildfire events.The City's probability for wildfire is unlikely and the vulnerability to wildfire is limited (lower probability and vulnerability ratings than for the county). Due to Woodburn's isolation from the majority of at-risk areas, Woodburn is unlikely to be affected directly by wildfires. Should they occur nearby, however,the city could be affected by smoke, impacting people with respiratory problems, and potentially the elderly or very young. The County updated the Community Wildfire Protection Plan in 2016 and Woodburn is not listed as a "Community at Risk." Please review the Risk Assessment(Volume 1, Section 2)for additional information on this hazard. Other Hazard or Concerns The Woodburn Steering Committee identified the following hazard issues or concerns during their meeting on September 7, 2016. While these hazards are non-natural, we've listed them here for reference. • Hazardous Material Spills • Transportation Accidents • Active Shooter • Cyber Terrorism • Eco/Ag Terrorism Marion County HMP March 2017 Page WB-23 279 Iii♦ 4 B V' June 26, 2017 TO: Mayor and City Council through City Administrator FROM: James C. Ferraris, Chief of Police SUBJECT: Intergovernmental Agreement for School Resource Officers RECOMMENDATION: It is recommended the City Council authorize the City Administrator to sign a new Intergovernmental Agreement (IGA) with the Woodburn School District for School Resource Officer services. BACKGROUND: On November 15, 1999, the City of Woodburn and the Woodburn School District first entered into an IGA for the purpose of establishing the duties and responsibilities of a School Resource Officer and established the financial obligation of each agency. In previous years, the City and the school district have renewed the School Resource Officer IGA several times with similar terms and conditions as set forth in the original agreement, with the exception of the financial obligation clause. The term of the current agreement will end on June 30, 2017. The Woodburn Police Department and the Woodburn School District both believe that the School Resource Officer Program has proven to be very beneficial and wish to continue the program within the school district. DISCUSSION: This new IGA would be effective between July 1 , 2017 and June 30, 2018. It would continue to provide the services of one School Resource Officer at Woodburn High School and one School Resource Officer at the District's two middle schools, maintaining the City's partnership with the school district. The broad spectrum of contacts, interactions, and duties conducted by the two School Resource Officers provide great benefits to both the police department and the school district alike. It is an equitable agreement in that the school district provides Agenda Item Review: City Administrator_x_ City Attorney_x Finance_x 280 Mayor and City Council June 26, 2017 Page 2 funding for part of the officers' time utilized at schools, and the City provides for the remainder of the officers' time. FINANCIAL IMPACT: Over the course of the new IGA, the Woodburn School District has agreed to be responsible for $70,000 toward salary and fringe benefits for the two school resource officers. The City of Woodburn will provide $220,821 .00 toward salary and fringe benefits for the officers. The City's portion of the funding for this position is identified within the Woodburn Police Department budget for fiscal year 2017- 2018. However, if the Oregon legislature adopts a State School Fund of $8.4 billion or higher for the 2017-2019 biennium, the School District contribution will be increased to $75,000 and the City's contribution decreased to $215,821 .00. 281 INTERGOVERNMENTAL AGREEMENT This agreement is entered into between the City of Woodburn and Woodburn School District 1.03 for the purpose of clarifying the duties and responsibilities of School Resource Officers (SRO) to be placed with the District and to define the responsibilities of each of the governmental bodies for the supervision, support, and financial obligation of that position. NOW, THEREFORE, THE PARTIES AGREE AS FOLLOWS: A. CITY'S RESPONSIBILITIES 1. The City will provide two sworn police officer employees for assignment to School Resource Officer positions during the term of this Agreement. The officers' primary duties willbe assignment to any one or more of the Woodburn School District schools during the time of year school is in session. The officers may, however, be used for other police duties outside of the school year. The City reserves the right to reassign these officers to other police duties, irrespective of school sessions, when an emergency exists and the officers are required elsewhere. The determination of emergency is at the sole discretion of the Chief of Police. 2. Over the agreement period, the City will provide $220,821.00 toward salary and fringe benefits of the two School Resource Officers. 3. The City will be mutually involved with School Administrators in the selection of any officer assigned to this position. 4. The Chief of Police will be solely responsible for the supervision and performance evaluation of the School Resource Officers but the City agrees that the Chief willseek and utilize information provided by school administrative personnel in the performance of those duties and the officers' suitability to continue in that position. B. SCHOOL'S RESPONSIBILITIES 1. Over the agreement period„ the School District will provide $70,000 toward salary and fringe benefits of the School Resource Officers. If the Oregon Legislature adopts a State School Fund of $8.4 billion or higher for the 2017- 2019 biennium, the School District contribution will be increased to $75,000. 2. The school agrees to make the SRO's part of the school's staff in regard to providing appropriate in-service training, inclusion in general staff activities, and the provision of facility office space for the officers to work from. Page 1-Agreement/School Resource Officer 282 3. The school will review and approve any curriculum to be presented to students, staff, or parents by the officers. 4. The school agrees to assist the Chief of Police in establishing annual goals for the School Resource Officer positions. C. SCHOOL RESOURCE OFFICER'S ACTIVITIES The following is not intended to be all-inclusive but to describe the principal activities in which the officers may be involved. These activities will not be performed each day but as the need dictates. 1. Be physically available at appropriate times for personal interaction with youth at school including informal talking with students, staff, or parents during breaks, lunch, and before and after school activities. 2. Identify youths at risk of becoming delinquent through referrals to the School Resource Officer from school personnel, student advisors, parents, and via interaction with students themselves. 3. Assist in the diversion of youths identified as at risk of becoming delinquent from entry into the juvenile justice system through crisis intervention and referral to other resources and outside agencies. 4. Provide prevention education on vandalism, shoplifting, substance abuse, child and sexual abuse, and issues of personal safety. 5. Perform as a resource center for youth needing referrals to the appropriate government or private service agency. 6. Perform as an information source for District personnel on issues or criminal trends involving youth. 7. Participate and support youth organizations designed to promote responsible behavior (i.e., Natural Helpers, Oregon Student Safety on the Move, Oregon Teen Leadership Institute, etc.). 8. Take appropriate corrective enforcement or referral action in the schools on behavior coming to the officer's attention which is criminal. 9. Promote a positive attitude of youth toward community, school, and local government, including police. 10. Develop and teach classes relevant to youth and crime issues (street law) which are germane to this community. Page 2-Agreement/School Resource Officer 283 11. Develop and teach classes regarding civic competence, rights and obligations of youth according to law, rights and responsibilities of citizenship, and the role of citizenship in society. 12. Develop and provide programs which produce peer conflict mediation. 13. Maintain records of calls for service provided to the school by the officer and the number of hours worked during the year relative to school issues. D. DESCRIPTION OF PARTNER ROLES AND RESPONSIBILITIES Each party agrees SRO's will not respond to or be responsible for requests to resolve routine discipline problems involving students. The administration of student discipline, including student code of conduct violations and student misbehavior, is the responsibility of school administrators, unless the violation or misbehavior involves criminal activity. E. INFORMATION SHARING The Woodburn School District (WSD) has given rights to Woodburn Police Department (WPD) officers serving as SRO's to view educational records for all students in the district as per Woodburn School District Policy JO/IGBAB (AR). WSD considers the SRO position as one of school official and as a contractor who assists in performing necessary institutional services on behalf of the school district and therefore with legitimate educational interest. As per policy, all district staff with rights to view educational records, including SRO's will abide by said policy and receive appropriate training and guidance in collaboration with WSD and WPD. The Woodburn Police Department agrees to share information with WSD officials having a need to know such information so long as sharing of said information is allowed by state or federal law and the Woodburn Police Department. F. MODIFICATION OF AGREEMENT Each party to this agreement will annually review the conditions of the agreement to determine if it is being properly administered, complied with, and to determine its sufficiency to meet program needs. Any modification of the terms of this Agreement shall be executed in writing with the mutual consent of both parties. G. TERM OF AGREEMENT The term of this Agreement shall commence July 1, 2017 and continue through June 30, 2018. This Agreement may be terminated prior to that date by mutual consent of both parties or by one party notifying the other of their intent to discontinue participation no later than 180 days prior to the end of the fiscal year. Page 3-Agreement/School Resource Officer 284 H. LEGAL CONTINGENCIES For the purpose of coverage under the Oregon Tort Claims Act against any losses, damages or liabilities arising out of the services and activities of any Woodburn Police personnel assigned to, the School District under the provisions of this agreement: I Each party shall protect their own employee with Worker's Compensation insurance which meets the requirements of Oregon law; 2. Each party shall maintain in full force and effect adequate public liability and property damage insurance or self-insurance to cover any claims which may arise by virtue of their actions; 3. Each party assumes sole responsibility for the torts of its own personnel and agrees, to the extent legally possible, to hold each other party to this agreement harmless from liability arising from the acts or omissions of personnel affiliated with such party. 1. RENEWAL OF AGREEMENT The parties may renew this Agreement on the same terms and conditions as contained herein by executing a mutual written renewal agreement before the end of the term of this Agreement. Approved as to form: City Attorney Da(e Approved as to form: Schbol Di& ict AttDate' City of Woodburn Woodburn School District 103 By: By: Scott C. Derickson, City Administrator Chuck Ransom, Superintendent Date. Date: Page: 4-Agreement/School Resource Officer 285 u � -,49M& Item 8U a 1,d f;'! 7 June 26, 2017 TO: Honorable Mayor and City Council FROM: Jim Row, Assistant City Administrator SUBJECT: Transit Vehicle Maintenance and Repair Acceptance of Proposal RECOMMENDATION: It is recommended that the City Council authorize the City Administrator to accept the proposal of Woodburn Carcraft for transit vehicle maintenance and repair services. BACKGROUND: In April, the City issued a Request for Proposals (RFP) seeking a qualified automotive repair facility to perform repair and maintenance services on the City's 10 vehicle transit fleet. The two proposals that were received by the May 19, 2017 deadline were evaluated and ranked by a City employee review panel consisting of the Assistant City Administrator, Transit Manager, and Street Maintenance Supervisor. The committee evaluated the proposals on the basis of the responding firms' qualifications, demonstrated accomplishments, proximity to the transit facility, demonstrated project understanding, and fee schedule. With a highest possible score of 100, the responding firms were ranked as follows: Firm Score 1 . Woodburn Carcraft 90 2. Woodburn Automotive Repair Center, Inc. 68 This contract award is in conformance with the public contracting provisions of the City of Woodburn, State of Oregon, and the Federal Transit Administration (FTA). If approved, the City will enter into a three-year agreement with Woodburn Carcraft, which would be effective on July 1, 2017. The agreement will include the option to renew for up to two subsequent one-year periods. DISCUSSION: Transit vehicle maintenance and repair services are currently provided through a contract with Woodburn Automotive Repair, Inc. The three-year contract was Agenda Item Review: City Administrator_x City Attorney_x Finance_x- 286 Honorable Mayor and City Council June 26, 2017 Page 2 approved by the City Council in June 2013 and extended for one-year In June 2016. Prior to 2016, transit vehicle maintenance was provided by the City's fleet maintenance program. Contracting out transit vehicle maintenance has proven to be more cost effective than providing this service internally. Additionally, the City's vehicle maintenance facility is inadequately equipped to manage the maintenance needs of the recently acquired heavy duty transit bus. While Woodburn Carcraft did not provide the lowest cost proposal (by hourly rate), their proposal demonstrated that they possess a complete understanding of the project's scope and that they have the personnel, equipment and experience to successfully provide the services required by the City. Woodburn Carcraft also has the ability to provide body and paint services at their facility. The City will continue to purchase most parts directly through suppliers at the government pricing, which is lower than the rate that commercial repair facilities pay. The scope of work to be provided by Woodburn Carcraft will include all preventive maintenance and repair services required to keep the City's transit fleet in a state of good repair and service readiness, including: • Transportation of vehicles to and from the shop for service • Regularly scheduled preventive maintenance services in accordance with manufacturers' recommendations • Annual vehicle inspections, as required by the Federal Transit Administration • Responsive, unscheduled repairs required to maintain a state of fleet readiness • Emergency roadside assistance and towing services • Managing and monitoring vehicle warranties and service agreements • Coordinating outsourced repairs that cannot be completed in-house, such as glass repair/ replacement, tire replacement, upholstery repairs, etc. • Providing the City with detailed work orders upon the completion of work that includes the time of repair, diagnosis, troubleshooting, corrective actions taken, and parts utilized. FINANCIAL IMPACT: Woodburn Carcraft proposes to provide repair and maintenance services at a labor rate of $85 per hour, which is consistent with industry averages. Exclusive of parts and tires, transit vehicle maintenance and repair costs were $19,236 in FY 15/16. 287