03-28-2011 Presentation: City Hall Security UpgradeWOODBURN CITY HALL SECURITY UPGRADES
CITY COUNCIL PRESENTATION
March 28, 2011
1Z
PROJECT SCOPE
Building Upgrades:
New bullet resistant transaction windows
Relocate community relations office
Remove/alter walls in Finance Dept/Municipal Court
New carpet in Finance Dept/Municipal Court
Re -installed doors and new security mirrors at basement
Door Hardware:
Automatic locks at exterior doors to enable building lock down
ADA compliant door hardware at doors receiving card readers
Access Control System:
Card readers to prevent unauthorized access
Link access control to other security systems
Intrusion detection w/ glass break sensors, etc.
Other:
Exterior payment drop box
Improved exterior and interior signage
New generator
Bullet resistant lining for city council desk
New heavy glass doors for council chambers
:illimp
0
MAYOR ATTORNEY
CITY OFFICE OFFICE
ADMIN.
LEGAL
ASST.
ASST. STORAGE AREA
CITY (VAULT) L ELEV. COMMUNITY
ADMIN. SERVICES COMM.
DIRECTOR
OFFICE
- � o
FINANCE
DEPARTMENT
-� -CpPIER- 177
FILES-' CELL CELL
FINANCE -'`PRINTER _
DIRECTOR RM. COUNCIL
OFFICE
® CHAMBERS a
'�T. MUNICIPAL LUNCHICONF.
CITY COURT I� RM.
ATTORNEY
OFFICE r� - ' RMM A `l RSVP
COMM. �T
DEV SUPPLY! LUNCH RECO DERrD6-
ASST. T
DIRECTOR'S FILE OFFICE - - RM. OFFICEOFFICF T
OFFICE RM. CE Il
BUILDING UPGRADES
Create commur
Community Ser
Add new transa
and eliminate iA
and Municipal C
New heavy glas
chambers
Bullet resistant
Add new accesE
secondary escal
southeast cornE
New generator
PROPOSED GROUND LEVEL PLAN
FINANCE / MUNICIPAL COURT
Remove existing walls and offices
(3) new bullet resistant transaction
windows, (2) at standard height, (1) at
ADA height
New wall and doors
New walls lined with bullet resistant
fiberglass panels to 8 feet
Fill in existing municipal court window
opening
New carpet in open office area
Additional Benefits:
Added flexibility and improved workflow
Improved public access
Improved work environment
DEMO PLAN NEW CONSTRUCTION
COMMUNITY RELATIONS
Remove existing counter
Remove doors and walls at hall, and install new full
lite glass door and relite at Community Services to
open area to public access
Existing exterior door to remain exit only'
New glass wall at community relations office, with
new glass door
Additional Benefits:
Improved public access and transparency
Integrate Community Relations office into Community
Services area
ACCESS DOOR
Add new door to all
offices into conferer
Allows an additional
Not required by buil
BASEMENT SECURITY
Reinstall basement access doors
at both stairwells, control
access with card readers
Provide overhead parabolic
mirror to allow lower vestibules
to be checked from landings
when sweeping building
PARTIAL BASEMENT FLOOR PLAN
ACCESS CONTROL SYSTEM
FEATURES-, A
• Each employee will receive an access badge / ID
• Similar to the system in use at the Woodburn Police Station
• AMAG Symmetry Professional System with M2100 Control Module
• Can utilize existing LAN/WAN networks
• Cards can be activated or inactivated quickly and easily
• Can be integrated with intrusion alarm, camera or other systems
MAYOR ATTORNEY
CITY OFFICE OFFICE
ADMIN.
ASST. STORAGE LEGAL
CITY (VAULT) ASST. ELEV ❑ OOMM.
ADMIN. - AREA . DIRECTOR
g • •. • OFFICE
COMMUNITY
•� . � � • SERV7CE5
��yy FILES,%- CELL � LCELL
FINANCE • ® V
DIRECTOR COUNCIL
OFFICE
� � ® CHAMBERS
ASST. LUNCH/CONF.
CITY RM •
ATTORNEY
. r
-----------
OFFICE COPY RSVP
RM.
MUlQlly CONF, REC.
RM, MNGMT.
U LOPMENT
COMM. ` CITY HR
DEV sFIL Yl LUNCH RECORDER WEED ASST.
DIRECTOR'S RM OFFICE _�� RM. OFFICE SEED OFFICE
OFFICE
OFFICE
01011kale
CAGED CAGED
STORAGE STORAGE
ROOM ELEV.
ROOM
OPEN o w
OFFICE SERVER
CAGED ROOM
JANITORIAL
AREA [a
OPEN
OPEN AREA --
SPACE • o •
I.S. '
DEPT. ,
TRAINING I
AREA •
7�TOPAG�E
MNGR-
OFFICE
COMMUNITY
DEVELOPMENT
ARCHIVES
STORAGE 11 ROOM
STORAGElMECHANICAL
ROOM
PAYMENT DROP BOX
T—}," A— "�x at convenient
location
GENERATOR
y Replace existing emergency
y� backup generator with new
generator
• Capacity of existing generator is insufficient to power city hall
during an emergency
• Existing generator is in poor condition and leaking oil
• Existing generator is powered by natural gas, which is an
interruptible power source. NW Natural will not guarantee
availability of gas in an emergency. Some nearby
jurisdictions prohibit gas backup generators for public
buildings.
UPGRADE COSTS
Transaction windows and casework
44,500
New carpet in Finance and Municipal Court
6,400
Panic hardware for entry doors
9,750
New community relations office
121700
Improve access to Community Services
3,500
Escape door from Community Services
1,500
Doors and mirrors at basement vestibules
800
Card readers for (43) doors, intrusion detection
53,700
New hardware for (43) doors
28,200
Exterior payment drop box
3,900
Bullet resistant lining at council desk
13,500
New doors for council chambers
19,200
Public signage package
7,800
New generator
92,500
Construction contingency 29,795
Contractor overhead and profit 35,754
Premium for after hours/weekend construction 15,000
Construction Sub -total 378,499
Soft costs 421400
4% estimating contingency 16,836
Total Cost 4371735
Estimated cost for new systems furniture, per station 4,000
(includes desk, partitions, storage cab, chair, etc.)