CONVENED. The workshop convened at 6:00 p.m. with Council President McCallum
presiding.
0010
ROLL CALL.
Mayor Figley Present (5:39 pm)
Councilor Berkey Absent
Councilor Cox Present
Councilor Lonergan Present
Councilor McCallum Present
Councilor Nichols Present
Councilor Sifuentez Present
Staff Present: City Administrator Russell, Asst. City Attorney Stuart, Asstistant City
Administrator Stevens, Public Works Director Brown, Community Development
Director Hendryx, Finance Director Gillespie, Randy Scott, Curtis Stultz, Julie Moore,
Mike Ferguson, Robert Knorr, City Recorder Tennant
0150 WASTEWATER TREATMENT PLANT FACILITIES PLAN.
Public Works Director Brown stated that the goals of the Wastewater Treatment Facilities
Plan are to communicate the findings of the planning effort and will be presented in three
volumes: Volume 1 addresses the plan and the natural treatment system; Volume 2
addresses the collection system and the needs; and Volume 3 addresses the financial plan
to execute the capital improvement. Staff would like additional direction from Council in
how to proceed with the financial planning and obtaining public outreach associated with
the project.
Public Works Director Brown introduced the planning team which consisted of CH2M
Hill representatives, City staff, and Citizen Advisory Committee of which include John
Reinhardt and Willis Grafe.
Public Works Director Brown gave an overview of the projects background. He
explained that in 1995, the Facilities Plan was initiated and capital improvements were
completed. There were a number of requirements that the City needed to comply with
including permitting requirements and mutual agreements with DEQ. The 1995
Wastewater Facilities Plan developed atwo-phase approach to how Woodburn would
address its treatment plant. Phase II of the project required planning to accommodate the
new regulatory requirements. Public Works Director Brown explained that the 1995 new
wastewater rates were adopted and intended to be in place for a five year period.
However, there were no changes in the rate structure from 1995 to 2007. In 2007 new
wastewater rates were adopted that were intended to address an immediate capital
Page 1-Council Meeting Workshop Minutes, June S, 2008
COUNCIL WORKSHOP MINUTES
JUNE 8, 2009
TAPE
RF.an~r
improvement needs and were considered to be an interim rate increase. In 1995, the
SDC's were also adopted and no subsequent adjustments have been in place.
502 The Plan update addresses an adjust to the TMDL (Total Maximum Daily Loads) that
could be put into the Pudding River as part of the MolallalPudding sub-basin, and
because Woodburn is one of the primary point source dischargers in the Pudding River,
the City is the first required to improve TMDL.
598 Public Works Director Brown explained that the plan update also address growth, new
system information, available and needed funding, and public education and outreach. As
of now, public involvement included an open house on November 13, 2008 and a future
open house will be scheduled.
658 Existing conditions involve Volume 1: Wastewater Treatment "Loads and Flows",
Volume 2: Collection and Transmission, and Volume 3: Rate Study. He explained that
the Loads and Flows concept is used to anticipate future loads and is more accurate than
population based methods. The Collections and Transmission portion of the plan was
neglected in the past and includes infiltration of ground and storm water into the
wastewater system and lift stations. The plan update identifies both treatment plant needs
and commercial allocated versus actual flows and loads.
959 Capital improvements needed through 2030 total $94 million and are broken into phases:
project delivery based upon system need, regulatory requirements dictated initial capital
outlay, and growth dictates improvements after 2020. Public Works Director Brown
presented a Facility Plan Costs by Component graph which indicated that growth is
responsible for approximately $60 million of the total expected cost.
1069 The treatment plant will be upgraded to a type I facility which requires higher level of
redundancy in its processes. The City has been progressive in its use of the poplar tree
system and the Natural Treatment System Plan will continue to promote the concept of
land application of wastewater and include wetlands treatment of discharge to meet
TMDL requirements.
1238 Collection and transmission of wastewater is also included in the plan and consists of
eighty-seven miles of pipe and eight pump stations. A study is needed to guide system
improvements for the future growth and address wet weather flow management, system
repair, rehabilitation and replacement. Public Works Director Brown detailed the costs
involved and what resources will be used to pay for upgrades.
1437 Noted that it costs $390 million to replace eighty-seven miles of wastewater collection
and transmission lines.
Public Works Director Brown explained that current rates do not meet system
requirements and rate structure has led to backlog of deferred maintenance.
1648 The financial impacts identified include limitations on future funding eligibility and pass
through costs.
1870 Public Works Director Brown presented a Financial Impact graph that showed the
expenditures on an annual basis over then next twenty years and compared current rate
revenues to alternative rate revenues. He briefly reviewed other options available in
Page 2 -Council Meeting Workshop Minutes, June 8, 2008
COUNCIL WORKSHOP MINUTES
JUNE 8, 2009
TAPE
READING
making rate adjustments over the years and feels that it is important to set up a multi-year
financial plan to determine system-wide rate increases.
2170 Mayor in attendance at 5:39 p.m.
2175 Councilor Cox asked if the plant capacity needs to be 300% of the actual discharge
because of the infiltration that occurs and if the City could reduce the design requirement
for the capacity of the plant by implementing an aggressive program to upgrade the City's
collection system.
Public Works Director Brown explained that some of the improvements outlined for the
plant have been included in the plan and the plant was originally designed to handle a
large amount of infiltration. Less and less of the capacity of the plant will be consumed by
infiltration and it will be more tailored towards growth and the increase of the waste
stream. The City needs to show DEQ that they are actively working to reduce infiltration
and exploring options for reducing infiltration.
Randy Scott explained that the plan includes on-going replacement of transmission lines
that are seventy years or older.
2653 Public Works Director Brown stated that one of the proposals in the financial plan that
the City is considering is increasing SDC's significantly. It may seem like the increase is
drastic but only because SDC's have not indexed with the cost of living over the years.
There was discussion amongst the Councilors and staff in regards to population growth
and SDC's.
Councilor Lonergan asked if the poplar trees saved the City money.
Public Works Director Brown stated that the poplar trees have saved the City some
money in the design of the treatment plant. The market and technology associated with
the poplar trees is not a large benefit. The real benefit comes from applying the discharge
and receiving a carbon credit. He stated that the Citizen's Advisory Committee felt that
the plantation demonstrated a community value and commitment.
Councilor Lonergan asked about charges to food processors.
3297 Public Works Director Brown explained that food processors are allowed very large
allocated amounts, although they are operating far below capacity. The City needs to
decide whether it will allow for the same allocations or renegotiate.
3465 Councilor Lonergan asked about the economic impact to the food processors.
Public Works Director Brown stated that they have not had formal discussions with the
food processors but there was a representative in attendance at some of the Citizen
Advisory Committee meetings.
Staff will do whatever they can to reduce total estimated costs and numbers shown in his
presentation are maximum costs based on commercial bonding but other federal and state
financial sources could reduce the estimated cost.
3750 Councilor McCallum questioned the population estimate of 42,000.
Public Works Director Brown explained that the population estimate came from
Winterbrook Community Resource Planning study that ties into the City's and Marion
County's Comprehensive Plans. The twenty year plan uses a 2.8% growth rate per year
Page 3 -Council Meeting Workshop Minutes, June 8, 2008
COUNCIL WORKSHOP MINUTES
JUNE 8, 2009
TAPE
READING
through 2020 and a 1.9% growth rate until 2030. He explained that the plan contains solid
information on improvements to be made over the next ten years and Woodburn is a point
source and is targeted by DEQ to comply with standards. When upgrades to the plant are
in place, the potential reuse of the water will be very great and it can be used on parks and
golf courses.
There was discussion amongst the Councilors and staff in regards to the discharge in the
Pudding River.
4435 Public Works Director Brown stated that he would like Council's approval to complete
the plan and formalize the Citizen's Advisory Committee's advisement to Council. He
would also like Council to authorize an open house to allow for communication with the
public. He stated that he felt obligated to brief Council on the plan before the open house
since questions would most likely be directed towards them.
There was discussion amongst the Councilors and staff in regards to the presentation of
the plan.
4820 Public Works Director Brown stated that he feels that the City needs to be in a position to
move forward with the plan by the end of summer.
5000 There was consensus amongst the Council to allow Public Works Director Brown to
move forward with open house, etc.
5225 Mayor Figley closed the workshop at 6:18 p.n
APPRO
y~ ~-
ATTEST ~ ` l
Mary Te ant, City Recorder
City of Woodburn, Oregon
Page 4 -Council Meeting Workshop Minutes, May 12, 2008