Loading...
June 8, 2026, Agenda FRANK LONERGAN,MAYOR CITY OF WOODBURN ORLANDO BRAVO,COUNCILOR WARD I MARK WILK,COUNCILOR WARD II CITY COUNCIL AGENDA JEN CANTU,COUNCILOR WARD III SHARON SCHAUB,COUNCILOR WARD IV MARY BETH CORNWELL,COUNCILOR WARD V JUNE 8, 2026- 7:00 P.M. ALMA GRIJALVA,COUNCILOR WARD VI CITY HALL COUNCIL CHAMBERS-270 MONTGOMERY STREET 1. CALL TO ORDER AND FLAG SALUTE 2. ROLL CALL 3. ANNOUNCEMENTS AND APPOINTMENTS Announcements: A. City Hall and the Library will be closed on June 19, 2026, in observance of Juneteenth. Transit hours will be 9:00 a.m. to 3:00 p.m. B. The City Council Meeting /Community BBQ is scheduled to take place on Tuesday, July 14, 2026, at 6:00 p.m. to coincide with Music in the Park. Appointments: None. 4. COMMUNITY/GOVERNMENT ORGANIZATIONS None. 5. PROCLAMATIONS/PRESENTATIONS Proclamations: None. Presentations: None. This facility is ADA accessible. If you need special accommodation, please contact the City Recorder at 503-980-6318 or Statewide Toll Free Relay (800) 735-1232, at least 48 hours prior to this meeting. Si usted necesita asistencia especial, comuniquese al 503-980-6322 o a la linea telefonica gratuita, (800) 735-1232, con un minimo de 48 horas, antes de la reunion. **Habra interpretes disponibles para aquellas personas que no hablan Ingles, previo acuerdo. Comuniquese al (503) 980-6322.** June 8, 2026 Council Agenda Page i 6. COMMUNICATIONS None. 7. BUSINESS FROM THE PUBLIC - This allows the public to introduce items for Council consideration not already scheduled on the agenda. 8. CONSENT AGENDA -Items listed on the consent agenda are considered routine and may be adopted by one motion. Any item may be removed for discussion at the request of a Council member. A. Woodburn City Council minutes of May 11, 2026 1 Recommended Action: Approve the minutes. B. Traffic Enforcement Report -February through April, 2026 6 Recommended Action: Receive the report. C. Acceptance of a Dedication Deed (Right-of-Way) at S Boones Ferry 7 Road (Tax Lots 052W130001201 & 052W130001202) Recommended Action: Authorize the acceptance of a grant of right-of-way from Burlingham Farms Inc., from real property identified as Tax Lots 052W 1 3000 1 20 1 & 052W130001202. 9. TABLED BUSINESS None. 10. PUBLIC HEARINGS A. Appeal of a Planning Commission approval involving a Design 14 Review, Property Line Adjustment, Street Adjustment, and Variance application package for the "WinCo Grocery Store" (DR 25-14, PLA 25-04, SA 26-01, & VAR 25-06) Recommendation: Conduct a public hearing and make a motion to affirm the Planning Commission approval with conditions (Attachment 1 ) and directing staff to prepare a final land use decision for consideration at the next available Council meeting. B. Fiscal Year (FY) 2026-27 City Budget Adoption 191 Recommendation: Conduct a public hearing to consider the budget as approved by the Budget Committee C. Fiscal Year 2026-27 Resolution Regarding State Revenue Sharing 193 Recommendation: Conduct a public hearing to receive comment on the possible uses/distributions of state revenue sharing funds June 8, 2026 Council Agenda Page ii D. Public Hearing for a Legislative Amendment to the Woodburn 194 Development Ordinance Regarding SWIR Zone Uses and Standards (LA 26-04) Recommendation: Conduct a public hearing for a proposed legislative amendment to the Woodburn Development Ordinance (WDO) regarding development regulations and standards for the Southwest Industrial Reserve zoning district. 11. GENERAL BUSINESS - Members of the public wishing to comment on items of general business must complete and submit a speaker's card to the City Recorder prior to commencing this portion of the Council's agenda. Comment time may be limited by Mayoral prerogative. A. Council Bill No. 3302 - An Ordinance Adopting Amendments to the 227 Woodburn Development Ordinance Regarding SWIR Zone Uses and Standards (LA 26-04) Recommended Action: Adopt the Ordinance implementing Legislative Amendment LA 26-04, based on the Analyses and Findings presented. B. Council Bill No. 3303 - A Resolution Authorizing the Transfer of 248 Appropriations Within the Insurance Fund for the Fiscal Year 2025- 2026 Recommended Action: Adopt the Resolution authorizing up to $10,000 transfer from the Insurance Fund's Contingency to Materials and Services category. C. Council Bill No. 3304 - A Resolution Adopting the Fiscal Year (FY) 252 2026-27 Budget; Making Budget Appropriations; and Categorizing Taxes Recommended Action: Adopt the resolution adopting the budget and capital improvements plan, making appropriations, and declaring and categorizing taxes for FY 2026-27. D. Council Bill No. 3305 - A Resolution Declaring the City of Woodburn's 254 Eligibility and Election to Receive State Revenue Sharing Recommended Action: Adopt a resolution declaring the City's eligibility and election to receive these funds. E. Award of Construction Contract for the Settlemier Park Construction 257 Project Recommended Action: Award a construction contract for the Settlemier Park Construction Project to the lowest responsible and responsive bidder, First Cascade Corp. in the amount of June 8, 2026 Council Agenda Page iii $2,055,469.32 with an additional $125,000.00 for contingency, and authorize the City Manager to sign the Agreement. 12. OTHER BUSINESS None. 13. PLANNING COMMISSION OR ADMINISTRATIVE LAND USE ACTIONS - These are Planning Commission or Administrative Land Use actions that may be called up by the City Council. None. 14. CITY MANAGER'S REPORT 15. MAYOR AND COUNCIL REPORTS 16. EXECUTIVE SESSION None. 17. ADJOURNMENT June 8, 2026 Council Agenda Page iv COUNCIL MEETING MINUTES May 11, 2026 DATE COUNCIL CHAMBERS, CITY HALL, CITY OF WOODBURN, COUNTY OF MARION, STATE OF OREGON, May 11, 2026 CONVENED The meeting convened at 7:00 p.m. with Mayor Lonergan presiding. ROLL CALL Mayor Lonergan Present Councilor Cantu Present Councilor Cornwell Present Councilor Schaub Present Councilor Bravo Present Councilor Grijalva Present Councilor Wilk Present Staff Present: City Manager Derickson, City Attorney Granum, Assistant City Manager Row, Community Development Director Kerr, Special Projects Director Wakeley,Human Resources Director Gregg, Police Chief Millican, Finance Director Turley, Public Works Director Stultz, Economic Development Director Johnk, Public Affairs and Communications Manager Guerrero, Community Relations Manager Herrera, City Recorder Pierson ANNOUNCEMENTS Councilor Cantu made the following announcements: • The Mayor's State of the City Address can be viewed on the City's YouTube channel. • Recognized May as Building Safety Month, Wildfire Awareness Month, Public Service Appreciation Week, National Public Works Week, and National Police Week. She shared remarks honoring law enforcement officers for their service and sacrifice, including remembrance of Captain Tom Tennant. • Announced upcoming Woodburn School District events: — Woodburn High School Spring Arts Show and Sale—May 14 at the Glenn House Art Center. — Woodburn High School and Success High School Seal of Biliteracy and Multiliteracy Ceremony —May 21 at 6:30 p.m. — Woodburn High School Graduation—June 4 at 6:00 p.m. and is a ticketed event. • City Hall, the Library, and Transit Services will be closed on May 25 in observance of Memorial Day, and the May 25 City Council meeting is canceled. • Announced that the filing period for Mayor and City Council positions opens June 3, 2026, for seats to be elected at the November 3, 2026, General Election. Candidate filing forms and information are available from the City Recorder and on the City website. MOMENT OF REFLECTION Mayor Lonergan reflected on the following: • Expressed condolences on the passing of former Planning Commissioner and City Councilor Jim Cox, recognizing his many years of service and contributions to the City. Page 1 - Council Meeting Minutes, May 11, 2026 1 COUNCIL MEETING MINUTES May 11, 2026 • Recognized National Municipal Clerks Week and thanked City Recorder Heather Pierson for her work in her role as City Recorder. • Congratulated City staff and volunteers for their work in hosting the Oregon Heritage Conference and noted the event's success. Economic Development Director Johnk discussed the success of the Conference, which was hosted in Woodburn and drew 356 registered attendees from across the state. She noted that the conference utilized multiple local venues and featured tours, workshops, and community events highlighting Woodburn's history, culture, businesses, and hospitality. She added that feedback from attendees was overwhelmingly positive. PRESENTATIONS Quarterly Investment Report — Finance Director Tony Turley introduced Ryan Kacher of PFM Asset Management, who presented the quarterly investment report. BUSINESS FROM THE PUBLIC Nancy Kellar,Executive Director of the Woodburn Senior Center/North Marion Adult Center, expressed concern that the City does not provide financial support to the Senior Center. She noted the center serves approximately 100-120 active attendees each month and encouraged Council members to visit the facility and learn more about its services. Pat Peterson, 155 Evergreen Rd., spoke in support of the Senior Center, praising its positive impact on seniors and encouraging the City to provide funding for its programs and services. She provided a petition of signatures in support of the City allocating funding to the Senior Center to the City Recorder. CONSENT AGENDA A. Woodburn City Council minutes of April 13, 2026, B. Monthly Financial Report for March 2026, C. Traffic Enforcement Report—January through March 2026, D. Liquor License Application for Los Del Puerto Marisqueria LLC., E. New Development Activity for April 2026, F. Letter of Support for MWVCAA's Position on HUD Funding Opportunities, G. Updated Firearms Range Use Agreement with Hubbard Police Department, H. Updated Firearms Range Use Agreement with Silverton Police Department. Motion: Schaub/Cornwell... approve the consent agenda as presented. The Motion passed with the following vote: Councilors Grijalva, Cantu, Schaub, Bravo, Cornwell, and Wilk voting "aye." [6-0] COUNCIL BILL NO. 3301 - AN ORDINANCE REGULATING SOLID WASTE MANAGEMENT INCLUDING, WITHOUT LIMITATION, GRANTING AN EXCLUSIVE SOLID WASTE FRANCHISE TO UNITED DISPOSAL SERVICE, INC., AN OREGON CORPORATION, DBA REPUBLIC SERVICES OF MARION COUNTY - WOODBURN; ESTABLISHING SERVICE STANDARDS AND ESTABLISHING PUBLIC RESPONSIBILITY; REPEALING ORDINANCE 2554 AS AMENDED BY ORDINANCE 2635; PRESCRIBING PENALTIES; AND STATING AN EFFECTIVE DATE Mayor Lonergan recused himself from this agenda item, and Council President Schaub presided over the discussion and vote. Wilk introduced Council Bill No. 3301. City Recorder Pierson read the bill Page 2 - Council Meeting Minutes, May 11, 2026 2 COUNCIL MEETING MINUTES May 11, 2026 twice by title only since there were no objections. Assistant City Manager Row and Assistant City Attorney Killmer provided a staff report. Representatives from Republic Services, Cindy Rogers and Josh Harvey, provided an overview of the essential services delivered to the City of Woodburn in 2025. They also expressed their appreciation for the City's collaboration and partnership in developing the franchise agreement. Council President Schaub asked if there were any public comments on the franchise agreement. No one from the public wished to speak. On roll call vote for final passage,the bill passed unanimously with: Councilors Grij alva, Cantu, Schaub, Bravo, Cornwell, and Wilk voting"aye." [6-0] AMENDMENT TO THE CONSTRUCTION CONTRACT FOR THE ROOF REPLACEMENT PROJECT FOR THE WOODBURN LIBRARY Community Services Director Cuomo provided a staff report. Motion: Schaub/Wilk... authorize an amendment to the construction contract for the Roof Replacement Project for the Woodburn Library with Roof Toppers Inc. from its previously awarded $548,184.00 to an amount of up to $603,000.00. The Motion passed with the following vote: Councilors Grijalva, Cantu, Schaub, Bravo, Cornwell, and Wilk voting "aye." [6-0] CONTRACT CHANGE ORDER FOR ADDITIONAL PRELIMINARY DESIGN SERVICES FOR THE STORM DRAINAGE MASTER PLAN AND WASTEWATER FACILITIES PLAN UPDATES, AND A TECHNICAL WATER FACILITIES PLAN MEMORANDUM TO CONSOR INC. Public Works Director Stultz provided a staff report. Motion: Schaub/Cantu... award a contract change order for additional preliminary design work for the Storm Drainage Master Plan (SDMP) and Wastewater Facilities Plan (WWFP) projects, to include the proposed new one-time Urban Growth Boundary (UGB) expansion area under House Bill 4035, to Consor Inc. in the amount of$25,000 for the SDMP and $25,000 for the WWFP and authorize the City Manager to sign the contracts and award a contract for preliminary design services (technical memorandum)to update the Water Facilities Plan to include the proposed new one-time UGB expansion area under House Bill 4035, to Consor Inc. in the amount of$40,000 and authorize the City Manager to sign the contract. The Motion passed with the following vote: Councilors Grijalva, Cantu, Schaub, Bravo, Cornwell, and Wilk voting "aye." [6-0] CONTRACT CHANGE ORDER FOR ADDITIONAL DESIGN& BID PACKAGE WORK FOR THE WOODBURN HIGH SCHOOL FRONT STREET SAFE ROUTES TO SCHOOL PROJECT TO HARPER HOUF PETERSON RIGHELLIS INC (HHPR) Public Works Director Stultz and Special Projects Director Wakely provided a staff report. Motion: Schaub/Cantu... award a contract change order for design and bid package work for the High School Front Street Safe Routes to School project to Harper Houf Peterson Righellis Inc. (HHPR)in the amount of$114,221.97 and authorize the City Manager to sign the contract. Page 3 - Council Meeting Minutes, May 11, 2026 3 COUNCIL MEETING MINUTES May 11, 2026 The Motion passed with the following vote: Councilors Grijalva, Cantu, Schaub, Bravo, Cornwell, and Wilk voting "aye." [6-0] Mayor Lonergan noted that agenda item 13. A. has been appealed and will be coming to the Council for a public hearing. CITY MANAGER'S REPORT The City Manager reported the following: • Thanked Council members for their participation in the Budget Committee meeting and recognized Budget Committee Chair John Reinhardt for his 21 years of service on the committee. • The Cinco de Mayo celebration at Chemeketa Community College had the largest attendance since the event began. • Approximately 100 residents participated in the annual Community Cleanup Day. • Butteville Road Speed Zone Request- ODOT recommended reducing the speed limit on Butteville Road from 55 mph to 50 mph. Staff presented a draft letter requesting ODOT reconsider the analysis and reduce the speed limit to 35 mph based on additional crash and traffic data. Motion: Schaub/Cornwell... have the City of Woodburn respond to the ODOT speed zone investigation with the new criteria that we're supplying. The Motion passed with the following vote: Councilors Grijalva, Cantu, Schaub, Bravo, Cornwell, and Wilk voting"aye." [6-0] MAYOR AND COUNCIL REPORTS Councilor Cornwell mentioned that the Oregon Heritage Conference was well attended and a nice time was had by all. She thanked staff for all their hard work in making the event run smoothly. She also praised Valley Pacific Florals new building and the recent improvements and redevelopment along Oregon Way and Highway 214, which are looking clean and revitalized. Councilor Wilk reminded voters that we have an election in process at this time, including a measure that the City has put on the ballot to give an advisory opinion on reducing speeds in residential areas. Councilor Cantu reported that she and Councilor Wilk attended the Mayor's Prayer Breakfast hosted by the French Prairie Kiwanis Club and Kiwanis Club of Woodburn and thanked those involved in organizing the event. She also commended Public Works staff for their quick response in resolving a water service issue that occurred over the weekend. City Manager Derickson explained that the issue was caused by a software glitch that affected pressure monitoring equipment. He noted there was no health risk associated with the event and that steps are being taken to reduce the likelihood of a similar occurrence in the future. Page 4 - Council Meeting Minutes, May 11, 2026 4 COUNCIL MEETING MINUTES May 11, 2026 Councilor Grijalva stated that she viewed the State of the Union address online and also viewed the recently produced City videos, which are well done and engaging. She suggested continuing similar short videos in the future to highlight the community center project and updates as they progress. Mayor Lonergan noted that several recent community and City events have taken place since the last Council meeting, including: The Governor's bill signing event held at City Hall, The State of the City event, Cinco de Mayo celebration at Chemeketa, the Mayor's Prayer Breakfast, Oregon Heritage Conference and Budget Committee meeting. The Mayor thanked Councilors and staff for the continued work and engagement across City operations and events. ADJOURNMENT Motion: Schaub/Cornwell... move to adjourn. The Motion passed with the following vote: Councilors Cornwell, Bravo, Cantu, Schaub, Wilk, and Grijalva voting"aye." [6-0] Mayor Lonergan adjourned the meeting at 8:48 p.m. APPROVED FRANK LONERGAN, MAYOR ATTEST Heather Pierson, City Recorder City of Woodburn, Oregon Page 5 - Council Meeting Minutes, May 11, 2026 5 v v Lo 0o Lo 00 N i N i fl j O N CN1 0 0 Q Ln M M N LL G LL C C � , C^ WL Y Q C q U v $5 OO LO LO C.j •p N W M 00 ri Ln N Ln u1 u1 Ln 0 0000 ri O ri N _ O U) O ri C1 G • 'i W M r-I u rl 'i M ri ri q� o a a 4 O L3 q U �R q a G v 3 * LU b.O c CL c v n O O M t M O 1 t C N moo ri N N O C1 11 1 Ln M o0 ri u ri N N LA ri F a co co a q Y o o (O Z qi U +0 Lo Lo 0 a N N O O Cr- v as ai Q3 U61 ri W 3 M �n cyo N -I l0 O C1 M t0 M M c I O q N N ri 3 r-I ri v \ O cz Q3 L LL QCL 3 LL E N N v _ W U N i C N 0 V N N v U is > > fo f0 fB fB 4i w q \ \ L O 0 0 D 0 0 D \ O vi O vi q c; o LL z o o v z o o v o m U U u UUU G f+ G q S Q O 3 Q DO 3 0 o d c6 u ( c6 U q V ate+ Oj N O a - 0 = a LU 4a LU 4a G a q F O H Q U � U � WOODBURN In ite / 188 June 8, 2026 TO: Honorable Mayor and City Council through City Manager FROM: Curtis Stultz, Public Works Director SUBJECT: Acceptance of a Dedication Deed (Right-of-Way) at S Boones Ferry Road (Tax Lots 052W130001201 & 052W130001202) RECOMMENDATION: Authorize the acceptance of a grant of right-of-way from Burlingham Farms Inc., from real property identified as Tax Lots 052W 130001201 & 052W 130001202. BACKGROUND: Per the conditions of the City Council's Final Decision for the Mill Creek III Project, dated January 26, 2026, the developer is required to grant certain right-of-way for a planned future South Arterial street to the City as part of the annexation agreement. DISCUSSION: The right-of-way under consideration is summarized in the table below: DEDICATED USE LOCATION APPROX AREA Right of Way S Boones Ferry Road Frontage & 62,744 sq. ft. Future Street or 1 .44 acres, more or less FINANCIAL IMPACT: There is no cost to the City for this right-of-way grant. Agenda Item Review: City Manager X_ City Attorney_X Finance_X_ 7 After Recording Return to: City Recorder City of Woodburn 270 Montgomery Street Woodburn, Oregon 97071 Send Tax Statements to: City Recorder City of Woodburn 270 Montgomery Street Woodburn, Oregon 97O71 DEDICATION DEED (RIGHT OF WAY) Burlingham Farms, Inc. , 610Glatt Cir, Woodburn, OR 97071 , Grantor, does hereby grant to the CITY OF WOODBURN, a municipal corporation of the State of Oregon, Grantee,the following real property situated in the county of Marion, State of Oregon, to be used and held by the City of Woodburn for public street, road,right-o way, and utility purposes,bounded and described as follows: See attached EXHIBIT A Legal.Description; and See attached EXHIBIT B Drawing for Legal Description. The true consideration for this conveyance is: 0 the receipt and sufficiency of which is hereby acknowledged by GRANTOR GRANTOR hereby covenants to GRANTEE that GRANTOR is the fee title owner of the above described real property, free from all encumbrances,that GRANTOR has the right to convey the property to GRANTEE, and that GRANTOR and their heirs and personal representatives shall warrant and forever defend the title to the property against all lawful claims and demands whatsoever. Dated this s day of , 2 -' . GRANTOR _-- r By: Title: City of Woodburn_DEED OF DEDICATION Page I of 2 8 State of Oregon ) ss. County of mm �. ) This instrument was acknowledged before me on this )_day of (year) ,y (m6 nth) (yeas° byata ft �O '.i' C:- , as (Signer's Name) (Title;write N/A if not applicable) (Name of Entity of whose ehalf record is executed;write N/A if not aspplicable) _ b A OFFICIALSTAMP tC_ �`.�,�•"t.... °�.....,�,-� "" Carol J Miller Notary Public for Of go NOTARY NOTARY iON C-OREGON Commission Expires ( ,,y p l_ CC7MMl5SIQN Nf}.1054O50 My CommissionT'A A-C..v MY CpM IJS510N EXPRE5 DECEMBER 4,2028 GRANTEES ACCEPTANCE By Signature below, the City of Woodburn, Oregon, hereby accepts this dedication pursuant to ORS 92.014, By: Title: State of Oregon ) ss. County of Marion ) This instrument was acknowledged before me on ,by Scott Derickson, City Administrator of the City of Woodburn, acting under authority granted to him by the Woodburn City Council. Notary Public for Oregon My Commission Expires City of Woodburn-DEED OF DEDICATION Page 2 of 2 9 EXHIBIT A DESCRIPTION OF LAND TO BE DEDICATION FOR RIGHT-OF-WAY 10 CENTERLINE CONCEPTS LAND SURVEYING, INC. 19376 Molalla Avenue, Ste. 120, Oregon City, OR 97014.5 P.503-650-0188 F. 503-650-0189 Exhibit "A" Dedication Legal Description A tract of land being a portion of that tract of land described as Tract 2 in deed recorded as Document. No. 2025-13764, Marion County Deed Records, and a portion of that tract of land conveyed by deed recorded as Reel 299, Page 301 (12/20/1982), Marion County Deed Records, located in the southeast one-quarter of Section 13 and the southwest one-quarter of Section 18, Township 5 South, Range 2 West of the Willamette Meridian, City of Woodburn, County of Marion, State of Oregon, being more particularly described as follows: BEGINNING at the intersection of the, northwest right of way line of Boones Ferry Road, aka Market Road No. 38 (a variable width right of way) and the southeast '.right of way line of Union Pacific Railroad (a 60.00 foot wide right of way), also being North 49°21'36" East 921.34 feet from a found iron rod at the most southerly corner of Lot 9, "Flora Meadows", Marion County Plat Records; thence, along said northwest right of way, South 26°11'58" West, 1925.20 feet to an angle point; thence continuing along said northwest right of way line, South 2348'36" West, 115.62 feet to the south line of Tract 2 of said deed Document No. 2025-13764; thence, along said south line, North 87°39'28°' West, 780.64 feet to said southeast right of way line of said Southern Pacific Railroad; thence, along said southeast right of way line of said Southern Pacific Railroad, North 42°56'51" East, 84.30 feet; thence leaving said southeast right of way line of said Southern Pacific Railroad, parallel with the south line of said Tract 2, South 87°39'28" East, 743.42 feet to a point that is 7.00 feet northwesterly of said northwest right of way line when measured at right angles; thence parallel with and 7.00 feet northwesterly of said northwest right of way line, North 23°48'36" East, 49.75 feet to an angle point; thence continuing parallel with and 7.00 feet northwesterly of said northwest right of way line, North 26°11'58" East, 1902.08 feet to said southeast right of way line; thence along said southeast right of way line, North 42°56'51" East, 24.29 feet to the POINT OF BEGINNING. Contains 62,744 square feet or 1.44 acres, more or less. e:.rrrE L^�.,'m."✓�.� �' d�#� -0i � "r . ,tv -puss+mnuaa.. JULY 13, 2004 C:`wMYFIZOJECTSIICCN-BOONE FERRY RD-1505-MILL CREEK 3\ADMIN\DOCUMENT \O FSITE DEDICATION.doc 11 EXHIBIT B DRAWING FOR LEGAL DESCRIPTION OF LAND TO BE DEDICATION FOR RIGHT-OF-WAY 12 A TRACT OF LAND LOC'A TED IN THE S. W 1/4 SEC 18, T 5S,, R.2W, W M. MARION COUNTY OREGON MAY 4, 2026 SCALE 1`-300' , N426'51"E 229 ?L/ POINT OF RIGHT-OF-WAY BEGINNING DED'CA T70N tLI 62,744± SF N49 21'36°E 921.34' OO,. f /:-Q 5,+`S" II? (a'y M OS T SLY CORNER C7 'FLORA MEADOWS" ,e. '`0)) i ' A A� 4 0 N REGISTEREDN23° '.36�E" .7 ' PROFESSIONAL �`.�9E 74,� LAND SURVEYOR N8'7°39'28 " `3 780.64' / S ` 3t2W' 11,E 62' REEL 4115 I OREGON PAGE 199 CI JULY 13, 2004 (812612018) TGBY G. OLDEN 0 77LS RENEWS: DECEMBER 31, 2027 CLIENT ICON EXHIBIT 'B' ORIG. DATE' 5-4-2026 DEDICATION CENTERLINE CONCEPTS DRAWN BY RLC LAND SURVEYING, INC. CITY OF WOODBURN, MARION COUNTY, OREGON 19378 MOLALLA AVE., SUITE 120 SHEET No, I OF 7 OREGON 0 FAX 5©3.550.4189 SCALE: 1'=3lll? Plotted.` 511812026 — 6:34pm, C.'\M\PROJECTSVrCON—SOON,ES FERRY RD-1505 — M41LL, CREEK 3\DW \OFFS1 E RW OEOlG`A7TON.dwg. Layout. EXHIBIT 8.5/RI — 11x; 13 WOODBURN Inc orpornte / 1889 June 8, 2026 TO: Honorable Mayor and City Council through City Manager FROM: Chris Kerr, Community Development Director ', Fernando Torres, Associate Planner SUBJECT: Appeal of a Planning Commission approval involving a Design Review, Property Line Adjustment, Street Adjustment, and Variance application package for the "WinCo Grocery Store" (DR 25-14, PLA 25-04, SA 26-01, & VAR 25-06) RECOMMENDATION: Conduct a public hearing and make a motion to affirm the Planning Commission approval with conditions (Attachment 1 ) and directing staff to prepare a final land use decision for consideration at the next available Council meeting. Project Background: The item before the Council is an appeal of the Planning Commission's April 23, 2026, approval with conditions of WinCo's consolidated application package which includes a Design Review, Property Line Adjustment, Street Adjustment and Variances (3). The Winco development site is approximately 10.6 acres. It is within the Commercial General (CG) zoning district. The proposal is an 84,073 square foot retail grocery store that is anticipated to be open 24 hours a day, seven days a week. Front (N/W) elevation facing Stacy Allison Agenda Item Review: City Manager_x_ City Attorney_x Finance_x_ 14 Honorable Mayor and City Council June 8, 2026 (WinCo Grocery Appeal) Page 2 �� tr � Illp „�IiI N,fl 2l "' IIIIIII I� �Q. �1� u / IFFY. JONAH Pk.. iLl Project Site (outlined in red) The front of the building faces west towards 1-5. Access will be from two driveways on Stacy Allison Way, one on Evergreen Rd. and another through a future, currently undeveloped lot along Center St. Parking spaces for 504 vehicles will wrap around the west and south side of the building. An existing block wall at the Cascade Meadow Apartments and 30-foot-high trees screen this development from the apartment complex. Stacy Allison W y a11IlIV IJ IIIDIJll�1�,Ill,I�IIIII�IIINu1U1�l llll II11p11� — ���Nl1NIIIIU1111101UU����111 1�9 __— -- -_ W9JEMID P,YG%AN) INMAN, 91IId4V bUVEY/m a /D/v W!AUD SIN/ONIE IIaPRA,I (6 I IY@ I tll@IYWO INNI M iPAm11D" uNIM111N 4922 7 I0.J/ ,911 !JIIIIMA ✓Op/m//Ih ul�ltillN I MINNE IYdNNIIIAIIflt Rlf MIA INNIIIINING >NlilAafiSUD IWL!�OINiY VAI1NIlGi OfIkYlaz �MllfilITY, E°NI FIB�IVd6 vdall�nl NoluF�np�t groi uu i�li�lWG�I 47Ul�pUll+b 71�,+u Y' UIVV ... ,v HumiNlrIDJ r�ti�ammu f��Dli .. °s peps 6WdIIIIIIIUk ! % fi4W f „�+ � ' � A r + � i Evergreen Rd. Illustrative Site Plan 15 Honorable Mayor and City Council June 8, 2026 (WinCo Grocery Appeal) Page 3 As part of the Commission's approval, the applicant is conditioned to install a Rectangular Rapid Flashing Beacon (RRFB) at the intersection of Oxford St and Evergreen Rd and a bus stop shelter along the site frontage on Evergreen Rd. The applicant will pay System Development Charges (SDC) that will be used to mitigate capacity and safety issues at three nearby intersections: (1) New traffic signal at Evergreen Rd & Stacy Allison Way (2) New Traffic signal at Evergreen Rd & Hayes St; and (3) New roundabout at the intersection of Evergreen Rd & Harvard St. Additionally, based on a recommendation from ODOT, the applicant offered (and has been conditioned) to install traffic lights at the Evergreen Road & OR 214 intersection; specifically, the southbound right-turn onto Evergreen Rd. and the eastbound right-turn lane onto OR 214. The approval also included a Street Adjustment request , which is the process for applicants to request modified street improvement requirements for abutting street rights-of-way. The Adjustment will allow for a street cross-section consistent with the recent approval to the south along Stacy Allison Way. This modified cross- section was previously supported by the Council. The applicant requested three variances: 1 . Reducing the number of Electric Vehicle (EV) parking spaces: The WDO requires 5 percent of the required parking stalls to be minimum Level 2 EV charging spaces, which for this project would be 17 EV stalls. The applicant is requesting to reduce this requirement to provide eight Level 3 chargers. The Commission approved this variance based on a letter in the record from Tesla which indicated that, based on their data for similar sites, fewer level 3 charges will more efficiently serve the site than a greater number of level 2 chargers. Staff support the Commission's approval. 2. Increasing the allowable signage area on front elevation: Adherence to the WDO would allow 300 square feet of signage on the front elevation. The request is to increase the front elevation signage by 153 square feet to 453 square feet. Staff did not support this variance request, but the Commission approved it. 3. Increasing parking area light pole height: The WDO limits parking light poles to 14.5 feet above grade. The applicant is proposing 24.5-foot-tall light fixtures, stating that taller pole height results in fewer light poles needed, which in turn frees up space for customer parking. The Commission approved this variance request with a condition that the light poles in the south/southeast of the property (closest to the residential neighbors) meet 16 Honorable Mayor and City Council June 8, 2026 (WinCo Grocery Appeal) Page 4 the 14.5 feet height requirement to reduce light spillage into adjacent residential lands. Staff recommended approval based on the following factors: • Conformance with all WDO standards (ROW, architectural, utilities, etc.) • Transportation Demand Management requirements (on-site manager, annual reporting , etc.) • New transit stop and shelter along Evergreen Rd. • Elevated landscaping beyond the minimum code requirements • Bioretention facilities within parking lot islands to mitigate stormwater overflow • Payment of the IMA Transportation fee (approximately $2 million) • Public mid-block pedestrian corridor provided from east to west • New Rectangular Rapid Flashing Beacon (RRFP) and pedestrian crossing at Evergreen and Oxford St. • Magnetic cart locking system to prevent theft/off-site spillage; and, • Restriction on light pole heights adjacent to residential. Summary of Planning Commission Hearincis: The Planning Commission held a public hearing on March 12, 2026, for this Type III application package. During the hearing, five people testified in favor of the project, stating that the project would bring much needed affordable groceries, eliminate the need to travel to WinCo in Tigard or Salem and generate new jobs. Proponents also mentioned that Woodburn's economy would benefit by having visitors and residents spend money in Woodburn, and the savings would increase their purchasing power. Opponents raised concerns about increased traffic, construction noises, diminishing property values and potential light and noise encroachment from the WinCo signs and the proposed bus stop. Additionally, staff received 34 written comments in favor of the project and 11 against it. The applicant also presented a social media post by WinCo that obtained 427 comments, the overwhelming majority in favor of the proposal. Based on the volume of testimony received, the applicant requested to keep the record open for 28 days until April 9 and the Planning Commission unanimously granted the extension. In accordance with ORS 197.797(6)(c), (7) from April 10 to April 16 all parties had an opportunity to provide rebuttal testimony. From April 17 to April 23, the applicant had 7 days to provide final argument. On April 21 , a procedural objection was raised by a group known as the Protect Our Valley 17 Honorable Mayor and City Council June 8, 2026 (WinCo Grocery Appeal) Page 5 Alliance ("POVA"). The applicant submitted a response to the objection on April 23. At their April 23, 2026, Planning Commission meeting, after review and discussion of the objection by City staff, the Commission did not find any procedural issues and proceeded with their hearing. The Commission deliberated and unanimously approved the application package. The Commission considered all oral and written arguments presented; including those submitted by both an opposition attorney/engineer as well as the applicant's attorney/engineer. The approval included the Design Review, the Property Line Adjustment, the three Variance requests and Street Adjustment with the conditions recommended by staff through the staff report published on March 5, as well as a new Finding reflecting the Planning Commission's conclusion that no procedural issues occurred and two additional conditions via motion. The additional conditions were: • Applicant shall provide for the signalization of the eastbound and northbound right-turn lanes at the Evergreen Road and OR 214 intersections. The Applicant shall conduct a traffic analysis justifying the signal modifications and preliminary design layouts to gain ODOT approval. Prior to certificate of occupancy issuance, the applicant shall provide to the City a copy of an executed ODOT permit for the completion of both signal modifications. Installation and final inspection of the signal modifications shall be completed within three years of the date of the certificate of occupancy. • Prior to Certificate of Occupancy, the developer shall install an electronic cart containment system to prevent shopping carts from being removed from the premises, in a manner acceptable to the Community Development Director. This is to minimize any nuisance from abandoned shopping carts in neighboring properties. Regarding the sign variance, at a Commissioner's request, WinCo provided a visual representation of the front elevation sign with and without the variance allowance. The Planning Commission concurred with the applicant's justification for the sign variance and determined that the impacts of permitting the variance were negligible. The Planning Commission also approved the lighting and EV charging variance requests. Appeal of Planning Commission Decision: On May 11 , 2026, the appellant, POVA, submitted a Notice of Intent to Appeal the Commission's (Type III) decision pursuant to WDO 4.02.01 . The appeal was 18 Honorable Mayor and City Council June 8, 2026 (WinCo Grocery Appeal) Page 6 filed within 12 days of mailing the notice of final decision and the appellant established their legal standing to appeal by participating in the Commission hearing. Staff scheduled this public hearing before the City Council to consider the appeal in accordance with WDO 4.01 .15. POVA's notice of appeal letter sets out the basis or grounds for its appeal (Attachment 2). Generally, these grounds include procedural errors, inadequate findings, and objections to the approved traffic analysis. Appellant also includes as grounds for their appeal any issue raised by commenters during the prior hearings. During the Council's hearing process, the Applicant and other parties will have the opportunity to present testimony, arguments and evidence on all applicable criteria, not just those issues raised in the appeal. Staff recommends affirming the Planning Commission's approval (thereby denying appellant's request) with no additional changes to the conditions of approval and directing Staff to include additional findings or modify prior findings as needed to further address Appellant's raised objections. Staff's position is that the arguments raised by the appellant are the same as those raised during the Planning Commission's public hearing and were duly considered by the Planning Commission in their deliberation and approval. With regard to objections related to the TIA - these are counter to the stated opinions of city staff, our contracted traffic engineer, and ODOT's engineers. Staff concurs with the Planning commission and finds the application meets or exceeds all of the criteria of the WDO and in fact, provides on and off-site amenities that will benefit the public and alleviate any adverse impacts. Next Steps Following the public hearing, the Council may: 1 . Affirm the Planning Commission decision and approve the project with conditions; 2. Approve with modified conditions; or 3. Deny, based on objections raised by the appellant or other WDO criteria. Staff will prepare the Final Decision based on the action taken by the City Council and return with a written decision document at a future meeting. 19 Honorable Mayor and City Council June 8, 2026 (WinCo Grocery Appeal) Page 7 Attachment(s): 1 . Planning Commission Final Decision and attachments: a. Conditions of Approval b. Approved Site Plans c. Planning Commission Staff Report with Analysis and Findings 2. Appellant (POVA) Notice of Intent to Appeal (May 11 , 2026) 3. Project Webpage with all application materials and correspondence: Iro L: ,✓✓,✓✓,✓✓.,,vood uirin or. OV 774 Wiun1,.,.o.C.::xir er'.. ire 20 u WgQR414E% Final Decision Planning Commission File number(s)M 25-14, PLA 25-04, SA 2E-01, VAR 25-06 6w Project name: Win Co Grocery Store Date of decision: April 2 , 2026 Date of mailing: April 29,, 2026 ,pplicant: Ryan Barnett, .hills architecture, PC. Landowner: p6 it Development Company Project location, Tai lots 052W12C00210u and 0S2W12C002200(no assigned address) Staff Reviewers; Chris Kerr, Community Development Director Fernando Torres, Associate planner Decision: Approved with Conditions Summary The project site is east of Interstate and comprises two vacant lots totaling 106 acres in the Commercial General , ) zonin district.The proposal is for an approximately 84073 square foot retail grocery store, which is a permitted use in the CG zone, This proposal is consistent with the purpose of the CG zone and the economic goals,of the Woodburn Comprehensive plain. The proposed building is approximately 42 ft tall at its highest point and located on the east side of the property. Landscaping and parking facilities wrap around it, including parking for 504 vehicles and a loading dock. The applicant anticipates the store open 24 hours 2 days a week. Four driveways are proposed, two on Stacy Allison, Way, one off of Center St and one on Evergreen d. Delivery trucks will use the southernmost driveway on Stacy Allison, As part of the proposal, the applicant will install a Rectangular Rapid Flashing Beacon ( RFB) at the intersection of Oxford St and Evergreen Rd and a bus stop shelter along the site frontage on Evergreen Rd. "The applicant will pay System Development Charges (MC) that will be used to mitigate capacity and safety issues at three nearby intersections: to complete the design andl 21 construction, of new traffic: sign,a�ls at both Evergreen Rd & Stacy Allison Way and Evergreen Rd Hayes St; and a, roundabout at the intersection of Evergreen Rd & Harvard St. Additionally, the applicant has agreed to install traffic lights at the eastbound and northbound right turn lanes at the Evergreen Road : OR 214 intersections in coordination with 0D0T. There were three Variance,, requests: t. Reducing the number of Electric Vehicle (EV) parking spaces: The WD0 requires percent of the required parking stalls to be minimum Level ;2 EV charging spaces, which for this project mould) be 17EV stalls, The applicant is requesting to reduce this requirement to provide eight Level) 3 chargers. To support this, the applicant included a letter from Tesla staitiin that Level 3 chargers are 20x faster than, Level 2 chargers n,d can, be used by all EV brands, The applicant indicated that eight EV stalls would meet the charging demand for this site. 2, Increasing Allowable Signage Area on Front Elevation Adherence to the WDO would allow 300 square feet of signage on the front elevation.The request is to increase the front elevation sngnage by 153 square feet to 453 square feet. The applicant states that this extra sign allowance would ensure the sign is visible and recognizable from l5 and Stacy Allison Way. Staff did not support this variance and recommended denial,. 3. Increasing parking area light pole height: The WD0 limits parking light poles to 14.5 feet above grade. The applicant proposed 24.5-foot-tall light fixtures, stating that taller pole height results in fewer light poles needed, which in turn frees up space for customer parking. Staff supported this variance with the compromise that light poles in the southwest of the property meet the 14.5 feet height requirement to reduce light encroachment into adjacent residential properties. The applicant has agreed to this, modified their plains accordingly and provided a phot nnmet-ric,plan demonstrating there would not be light spill over with the approved variance. Additionally, the applicant requested a Street Adjustment to deviate from, street improvement requirements for Stacy Allison Way. The applicant's request is to provide a street cross-section consistent with the recent approval to the south along Stacy Allison Way AIlison Way Apartments DR 2019-OS) This modified cross-section was previously supported by the Council, Di, 544„ PLA 25.04,SA 2 -cU., VAR 25.86,Final Decision Page 2of 7 22 u pr Arf view of the subject property outiire fr ed(202S) Iii 1jjJJIT____ xw G � if Proposed site pion' R 25 14, PL .25 04 54 26- 1, VAP 25 mm06 PM III Ded don Page c f 7 23 Summary of Public Hearing The Planning Commission held a public hearing on March 12, 2026 for this Type III application package. The applicant requested to keep the record open for 28 days until April 9 and the Planning Commission unanimously granted the extension. In accordance with ORS 197.797(6)(c), (7) from April 10 to April 16 all parties had an opportunity to provide rebuttal testimony. From April 17 to April 23, the applicant had 7 days to provide final argument.The parties that testified are listed in the table labeled "Testifiers". On April 21, a procedural objection was raised by Protect Our Valley Alliance.The applicant submitted a response to the objection on April 23.After review of the objection by City staff,the Planning Commission did not find any procedural issues. On April 23, 2026, the Planning Commission deliberated and approved the application package. The approval includes the Design Review, the Property Line Adjustment, the three Variance requests and Street Adjustment with the conditions recommended by staff through the staff report published on March 5, as well as a new finding reflecting the Planning Commission's conclusion that no procedural issues occurred and two additional conditions as discussed during deliberation. The applicant presented visual representation of the front elevation sign with and without the variance allowance. The Planning Commission concurred with the applicant's justification for the sign variance and determined that the impacts of permitting the variance were negligible. The additional conditions are listed below: • Applicant shall provide for the signalization of the eastbound and northbound right-turn lanes at the Evergreen Road and OR 214 intersections. The Applicant shall conduct a traffic analysis justifying the signal modifications and preliminary design layouts to gain ODOT approval. Prior to certificate of occupancy issuance, the applicant shall provide to the City a copy of an executed ODOT permit for the completion of both signal modifications. Installation and final inspection of the signal modifications shall be completed within three years of the date of the certificate of occupancy. • Prior to Certificate of Occupancy, the developer shall install an electronic cart containment system to prevent shopping carts from being removed from the premises, in a manner acceptable to the Community Development Director. This is to minimize any nuisance from abandoned shopping carts in neighboring properties. Testifiers Name Address Verbal Written Ryan Barnett (Applicant) 3156 South Bown Way, X X Boise, ID 83706 Byron Hills (Applicant) 3156 South Bown Way, X X Boise, ID 83706 Mark Lavin (WinCo) 650 N Armstrong PL., Boise, X X ID 83704 Deirdre Rickard 3234 Jonah Place, X X Woodburn, OR 97071 DR 25-14, PLA 25-04,SA 26-01,VAR 25-06 Final Decision Page 4 of 7 24 Matthew Rickard 3234 Jonah Place, X X Woodburn, OR 97071 Ruben Vazquez 581 Paradise Street, X Woodburn, OR 97071 Alejandro Chavez 2100 Arney LN, Apt#J104, X Woodburn, OR 97071 Melissa Vazquez 581 Paradise Street, X Woodburn, OR 97071 Charlynn Chambers 360 Hawley Street, X Woodburn, OR 97071 Gina Freeland 615 Fir Street,Woodburn, X OR 97071 Devon Freeland 615 Fir Street,Woodburn, X OR 97071 Foma I. Kraskov 7433 Keene RD NE,Gervais X OR, 97025 Esmeralda Negrete 2100 Arney LN, Apt#J104, X Woodburn, OR 97071 Rachel Small 311 S Evergreen Rd,Apt X A100 Woodburn, OR 97301 Heather King(Willamette 8940 N Bradford St., X River Keeper) Portland, OR 97203 or 454 Willamette St. #218 Eugene, OR 97401 Chris Propeck Keizer,OR (no street X address) Miles Eshaia (United Food 7095 SW Sandburg St X and Commercial Workers Tigard, OR 97223 UFCW Local 555) Kay Eichsteadt McEwen 54 Smith Drive Woodburn X OR 97071 Protect our Valley Alliance PO Box 66562 Portland,OR X 97290 Adria Young No address provided X Carla Arriaga 703 Evergreen Road I X Woodburn, Oregon 97071 Naomi Zwerdling on behalf 455 Airport Road SE X of ODOT Building B Salem, Oregon 97301 Les Poole No address provided X Monica Ovalle No address provided X Maria Torres Lara No address provided X Debera Knox 1960 Santiam Dr X Woodburn, OR DR 25-14, PLA 25-04,SA 26-01,VAR 25-06 Final Decision Page 5 of 7 25 .Den Reded 267 N Settdernie e, X Woodhurn, OR 9707 CarhCI Xt ruG. r�raus no street add. .. ._ . ..... .... Russ No......_ �. . address provided �� .. .... .... Diane Nelson Cooper .. ................. 298 Akseno st, Wood urn, ........... I OR ' 70x71. Larry Staff No address provided Wnona ... ......... �... ....., No Kevin address pr vided ................ Rakestraw. �a r Jansen ase n way 420 Woodburn, OR 97071 James Briar . �....._. ,,,,,.. .. �_ ..... — .......� ...... ar Smith 1390 rrnde enderce Ave, Wood burn, OR 97071 — --..... Eva Gurney No address provided Paul Powers 1526 Astor Way, Woodburn, OR 97071 Anne Made Rovers 1527 Astor Way, Woodburn, OR 97071 ChnsUne Johnson No address provided ....__... __ ......._ ........ De i Hamilton No address_provided Debra Gravftl 1. () Country Club Circle.._._ p elight Cohurn No address provided James rAudrr tsh �..No address provided.. .._ ....... .... ....... Jerry 0. Prorc�e No address prravpded Linda,. Metz......... 1330 Independence Ave, X ....... �... Woodburn 97071 Christian (ooper 298 Aksenia St Wood urn, ; OR 9701 Mary!3xby No address provkJed Tamniy Coleman o address provided Pennie Mannin8 16263 french Prairie'Rd NE, Woodburn, OR 97071 Susan Montano— d E Clackamas, rr, Woodburn, t ,917071 Salem Audubo nSociety:_ __.. ....._ .........._ - ........ BOX 2084 Salem OR 97308 DR 25•.4, PA 25O4, SA 2C1,,VAR 2S06 Fin�il i ecisian, Page 6 of 7 26 Appeas Per WOO 4, 1 11E, the decision is final unless appalled pursuant to Oregon Revised Statutes (ORS , state administrative rules, and WOO 4,02,01.The appeal to City Councill due date, is twelve (12) days from the mailing date of this final decision notice per 4,02.01131. A valid appeal must meet the requirements of 4.02.01. copy of the decision is available for inspection at no cost, and the City wouki provide a copy at. reasonable cost at the Community Development Department, City Mall, 270 Montgomery Street, Woodburn, OR 97071. For questions or additional information, contact the Panning Di ision ait (503) 9,8 5246 or i �i iiu�i �� � n ��r� +��iil4 expiration Per Woodburn Development nrdinanc; (WD O) 4.0204B,, a final decision expires within three years of the date of the final decision unless: 1 A buildiin, permit to e*ercise the right granted by the decision has been issued; 2. The activity approved in the decision hias commenced; or 3, A time extension, Section 4.. u2. 5, has been approved. ..J Sincerely,, � N i Chris Kerr, Community Development Director Date ,ffirred, �_.. Lisa Ellsworfl, Chair, Planning Commission Date _. Attachments: 1. Conditions ofApproval 2 Approved site purrs 3. Staff report with analysis and findings DR 25.14, P'L4 25-04,54 2E-0l,VAR 2 -06 kiar Derisio n Page of 7 27 Recommended Conditions of Approval Staff recommends the following conditions of approval. Section references throughout the conditions are to the Woodburn Development Ordinance (WDO). General Conditions 1. Substantial conformance: The applicant or successor shall develop the property in substantial conformance with the final plans submitted and approved with this application, except as modified by these conditions of approval. 2. Grading Permit: Prior to beginning any grading work on-site,the developer shall apply for and obtain a Grading Permit per WDO 5.01.04. 3. Fence Permits: To demonstrate conformance with 2.06.02 and 5.01.03, the developer shall submit application for and obtain approval of a Fence Permit for any new or modified fencing. 4. Sign Permits: To demonstrate conformance with 3.10 and 5.01.10, the developer shall submit application for and obtain approval of a Sign Permit for any new or modified signage that is required by 3.10.05 to obtain such permit. 5. Addressing: Prior to receiving Final Plat approval from the City,the developer shall submit an _d..p,ess Assi&!2ii fii t I!:Ieg t:,, with accompanying fee payment and materials, to the Community Development Department to begin the address assignment process. 6. Public Works Department:The developer shall comply with the Public Works Department conditions in Attachment 101B. Design Review DR 25-14 7. Mid-block bike/ped corridor:To meet 3.01.05C and consistent with the approved plans, the developer shall build a 6-foot pedestrian and bikeway corridor to provide midblock connection between Stacy Allison Way and Evergreen Rd. 8. Easements:The developer shall grant or obtain the following easements prior to building permit issuance: a. Cross access: i. Pursuant to 3.04.01A.2., 3.04.03C.4.a., and 3.04.03D.2., the developer shall grant an access easement over the proposed vehicular drive aisle on the subject property to benefit Tax Lot 052W130001600. The easement shall be a minimum of 20 feet wide. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 101a Page 1 of 4 28 ii. Pursuant to 3.04.01A.2., the developer shall grant an access easement through Tax Lot 052W12C002200, connecting the subject property(tax lot 052W12C002100) to Center St. The easement shall be at least 20 feet wide. b. Mid-block bike/ped corridor access: Pursuant to 3.01.05C., 3.01.07E., and 3.02.01E., the developer shall grant a public access easement over the mid-block bicycle/pedestrian corridor path. 9. Cross access: To meet 3.04.03 D2, the developer shall provide a cross access to tax lot 052W130001600 paved to the edge of the property line. 10. Driveway width:To demonstrate conformance with Table 3.04A, prior to building permit issuance, revise the northernmost driveway on Stacy Allison Way to meet the driveway width requirements (either 24 ft or 36 ft if adding a turn pocket). 11. Parking: Include a parking, signage, and striping plan addressing the following: a. Accessible parking: Pursuant to 3.05.03B, accessible parking shall be provided to meet applicable state statutes and building code requirements. b. Carpool/vanpool parking: Carpool/vanpool parking stalls shall meet the signage and striping requirements in 3.05.03H. c. Electric vehicle parking: Electric vehicle parking stalls shall meet the charging level, striping, and signage requirements in 3.05.031. 12. Storm drainage: Per 3.05.02G, revise plans to incorporate rain gardens or similar storm water management systems into at least 50% of the required parking islands to provide stormwater management and pollution mitigation for the parking lot. 13. Traffic mitigation: a. Truck access: In the future, when the City designates Stacy Allison as a truck route the owner will be required to post signage limiting trucks from entering at the Evergreen Rd driveway. Additionally, exiting trucks will only be allowed on Stacy Allison Way. 14. Transportation Demand Management (TDM): a. Pursuant to 2.05.02 G3,the developer shall include within six months of Certificate of Occupancy a document entitled, "Transportation Demand Management (TDM) Strategies". b. The Plan shall include a list of enforceable, programmatic TDM strategies and measures intended to reduce peak hour vehicle trips generated by the proposed development. At a minimum, the Plan shall include: DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 101a Page 2 of 4 29 i. An information board for employees that will have the city transit schedule posted ii. Potential employee rewards for use of transit and/or bike/walk iii. Identify a TDM manager on site, who will be a point of contact for City staff iv. Potential carpool-only parking spaces v. Providing employees with bus passes vi. Periodic updates to the posted information, based on feedback from City staff or changes to travel options. vii. Provisions for an annual report for five years to be provided to the City to the attention of the Community Development Director that references this condition of approval, includes a summary of what the targets were, review of how well targets were met, performance measures, comparison with the prior report, and the effectiveness of the TDM program elements implemented. c. Transit: Pursuant to 3.01.09, prior to Certificate of Occupancy the developer shall install a bus stop shelter on Evergreen Rd and grant an easement that meets the Woodburn Transit System and Public Works requirements. d. Prior to final inspection, the developer shall construct a pedestrian crossing on Evergreen Road, south of Oxford Drive. The pedestrian crossing shall include the installation of rectangular rapid flashing beacon (RRFB) in accordance with the Oregon Department of Transportation (ODOT) guidelines and approved equipment, curb ramps complying with current federal and ODOT accessibility requirements, continental crosswalk striping, concrete refuge island, and street lighting. 15. Applicant shall provide for the signalization of the eastbound and northbound right-turn lanes at the Evergreen Road and OR 214 intersections. The Applicant shall conduct a traffic analysis justifying the signal modifications and preliminary design layouts to gain ODOT approval. Prior to certificate of occupancy issuance, the applicant shall provide to the City a copy of an executed ODOT permit for the completion of both signal modifications. Installation and final inspection of the signal modifications shall be completed within three years of the date of the certificate of occupancy. 16. Prior to Certificate of Occupancy, the developer shall install an electronic cart containment system to prevent shopping carts from being removed from the premises, in a manner acceptable to the Community Development Director. This is to minimize any nuisance from abandoned shopping carts in neighboring properties. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 101a Page 3 of 4 30 Property line adjustment PLA 25-04 17. Recordation:The applicant shall record the property line adjustment with Marion County in a manner acceptable to the County Surveyor. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 101a Page 4 of 4 31 fry WooDBuRN n c o r a r e i e f / 889 WINCO GROCERY STORE DR 25-14, PLA 25-04, SA 26-01, VAR 25-06 Public Works Conditions March 5, 2026 CONDITIONS OF LAND USE APPROVAL: 1. The Applicant, not the City, is responsible for obtaining any necessary permits from the State, Marion County, Oregon Division of State Lands, US Army Corps of Engineering, and/or federal agencies that may require such permits or approval for the construction of this development. All work within the Oregon Department of Transportation (ODOT) right-of-way requires the applicant to obtain approval and permits from ODOT. 2. Department of Environmental Quality Erosion Control 1200C permit will need to be obtained for this development prior to City issuing approval of civil plans. 3. Applicant shall prepare and record the following right-of-way dedication and public utility easements in accordance with the requirements of the City of Woodburn and the Marion County Surveyor's Office. a. Applicant shall dedicate 5 feet of right-of-way along Stacy Allison Way. b. Applicant shall grant a 5-foot-wide public utility easement along all abutting street frontages. 4. Applicant to provide a performance bond for City right-of-way improvements, in the amount of 120% of the construction cost prior to permits being issued for the Civil Plans approval. 5. Applicant to pay all public improvements (right-of-way) fees for all public improvements which are to be maintained by the City as per Ordinance#1795. 6. Applicant to provide street lighting in accordance with street lighting plan approved by the City and conforming to Portland General Electric installation and plan under option B, if required. 7. All City-maintained facilities located on private property require a minimum of 16-foot- wide utility easement conveyed to the City by the property owner. This is the applicant's responsibility to provide, not the City's. Utilities of unusual depth, size or location may require a larger width. 8. The Applicant, by this Development, shall not cause storm water runoff to be impounded on adjacent properties. Engineering&Project Delivery 190 Vaamfielld Same.A a, ✓a odbunrr ,4 Dre o n°7p71 >� 5030.982.57 0 a u aana.50 982.."242 At�t..���IIIh ixii at 1��� 1 III 32 9. All sanitary sewer laterals serving the proposed developments are private up to the main line. 10. The water mains serving this development shall be a looped system, shall be sized in accordance with flow and fire protection requirements. 11. Fire hydrants locations and fire protection requirements shall be as per the Woodburn Fire Districts and City of Woodburn requirements. Actual fire hydrant locations fire department connections (FDC) and in-line valving locations shall be determined during the final Civil Plans approval and building permit issuance. 12. All sanitary sewer and storm drainage laterals serving the proposed developments are private up to the main public line. 13. All onsite private storm systems and sewer lateral lines shall comply with Marion County plumbing permit and requirements. 14. Final review of the Civil Plans will be done during the permit application for public improvements. Public infrastructure will be designed and constructed in accordance with plans approved by Public Works and complying with City, State and Federal requirements/guidelines current at the time of the development application. 15. All public improvements shall be deemed complete prior to final building permit inspection. 16. System Development charges shall be paid prior to building permit issuance. Engineering&Project Delivery 190(aarfielld Street \7Jauarllunm,4)regon 97071 M 5030-982..524t3V aa)a )3••982••5242 � � aUxO o � _ = ::> S 0- 9 N ZiIOIMON aw — - 4 -\- - . � U II _ ,o- ot : 7 p N 6,9AUflu 6 N p II Q � 1 I O p N p N Wccj )� 1D �6tititi41�tib�5y a rzHo oho O0O �o �W� 1 aH_ 0E0 o 0 o NQ� �wN w�P HO HO H a�w pi qao x� r N z Sao � in �o woo ww¢ F 0 o a a�0 0 ti w°dP vaz0 x xa o m o o q I3 IH 000 md�u d�liiiuuum ' Wuumi ;r, ' a�uuuur try II �iVuuu Y � � iu�i�lllllll , f �i�i�llllllll! l dil� fi ILlluuuur;� ab,:...;adwuuw ------------------ - - --------------- --------------------------- — SIf LL VIEW 3 JiLLLLLU U U H U LU4WLULW_ Ti lhl/ ---------------- - ------------------------ ----------------------------- L - J O � w ee H JJA 0-S d1I,L..0-.£ NUN.,0-S --I H NI ..0,Z W HHI w aaa � a o qli .a � z � aq > wo w z ID O ~ ° woz > u LHc4 O � O F 00 O r O w H z M W CA z CA U a O III O a / O IIIIIIIII" p O V v N 3 v co v ._ w w m o a II�III co :.�+ :TiIi . : � : : + : 4 : : + + + + + + + + + + + + ov � I III "+ "+ "+ "+ "4 "4 "4 "+ + + rep:+ + + + + + + + + + + + + + + + + + + + + + m � . , " " _ o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 "t + �+ "+ "+ "+ "+ "+ '+ '+ + + + "+ �+ "+ "+ "+ "+ "+ "+ "+ "+ "+ �IWIIIIIIIIIIIIIIIIIIIIII�I �+ "+ "+ "+ "+ "+ "+ � °� � Illllf VIII + + + + + +.:::: I� uuuuuuuum uuuuuuuuuuum + + + + + + + + + + + + ,gym° + + + + + + + + + + + + + + + + 'r mr "r "r "r "r "r "r or "r or.. n :' n :::,'+ * �r �r �r �r �r �r �r �r �r uiuuuuuuuuuuuuuuuu�lllluuu �r �r �r �r �r �r �r n " o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r r "r "r "r "r "r r r r r r r r r r r r r r r Ill r r r "r "r "r "r 'r "r "r "r "r "r r r r °r w "r r r r r r r r r r r r Illllllll4 r r r r r r r i 'r " "r "r "r r r ? `4 '4 ,+ `r r r r r r r r r r r II IIII r + + + + + + �1IIVIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ' ' ' *::::::: * r r r r r r r r r r r r 'r 'r 'r 'r 'r 'r "+ + + '1 n _ , 0 0 tm I Ifr I «, r WF '. r r r r r r r r rllulull r r r r or r �r �,,,, " " d"::::::...::::' ry o 0 0 0 0 0 0 0 0 0 0 r "r 0 0 0 0 0 0"r "r � r r r "WF r r � + r' " r� �r �r �r �r �r �r �r �r r �r �r "r "r "r "r "r "r m x' +, wu w^ u�4 `�' " o 0 0 0 IIIIIIIIIIIIIII IIIIIIIIIIIIII"IIIIII " n n r,.. ,u� 4� r r r r r r r r r r r aw r r " "r "r 'r °'4r "r r 'r r:::/°fir rfi `•°r, v "r "r "r "r "r "r "r "r "r "r "r "r "r "r "r IIN I III " III II :� .�— "r r "r r "r r r r 'r 'r ter„ �r �r �r �r �r �r �r �r �r �r �r �r �r �: : : r "r "r r "r "r "r "r �r r "r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0" " r "r "r "r "r "r "r "r "r Illllllllillmlllllllllllllillllll �lll "r "r "r "r " n � IIII illlllllllllllllll r r "r "r r r r '4 r r r r r r `r r r r r r r r r r III uuuuuuuuuuuuuuumMu r + + + + + + IIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIII 'r °r "r "r "r r r "r r r1 r r ? r r t r r r r "r "r �r p fit$ �r �rt r + + + + + + 0 0 0 0 0 0 0 �:.r 'r 'r "r "r "r "r "r "r r '....:� ? ? ? r r r r r r r r r r r r r r r r r r r '4 '4 "r "r "r r "r "r r r r `r `r r r r r r r r r r r r r r r + + + + + + "r "r "r "r "r "r "r "r r r r r `r ;r /.',. L �r �r �r �r �r �r �r �r + r mr r r r 4 4 4 r r 14 r r' `ter a r r �r �r r 4 r 4 r 4 i H___ ___ ___ CO CO w m N M N N J co O CO CO - - - - - - — CEIt) CELT) COQ O � Op wIt) N J :It) L� Zer L Q L pQ S N CO C7 � � Q = N L- U Z Q I>_ � 00 3 0 � O OZO I Jo o o oI() o 91() o Joo LJ �ZZo x Q x o o x Q 3 x x w x L < b0 0 0 L, L, 0 W Z M I..I- CDZpr) Z l �i o i w O F N O C, 0 I E Q .2 0 > /) 0U) ic < OZ DaaU v� 3tcooFdU 111 0 Li 0 000 0 < z a moo ca I cD CD cn l 0 0 hb 2 N 2 �cc _ mp m WEZ � U �_ N MQ Q � m0LJJ \ \ 0 WN O \ _JO 0 \wE \ w t \ N Q Z \ h O w 0 N O a \ O d c J \ W W oM V N= \\\ M a U \ \ w m \\ U W Of D \ Z > o_� 4 0� • — 0_J_J b o o) \ CL \ N N \ W N O �1 M M \\ X w� W W m ,t�,� �' \\ hY M M \\ O ZO to tnim�n Z O N w W N) � W N ) ZQ Q WN M \ \ U \\\tiJ .2�s 9os \ \ o° z c sus? NN o�' \ \'< a W u) N N Q w zap `YOA\ 0 \\ w ci x \ \ wwm Oro coo \ a N O J\ \0S N N \ \ 00 2\\ 2�9 ^ � // NQS+ /// \ o / / o \\ O / " OF - N\ J / / /\ // aw N N \ / W}W \ // Z F- Z W F \ F U J \ d Z D W \\ \\\\ \ W r 0] \ oa U U S aLU !:! \I N r.. r l,le'SBt Wo / • U F W �e ¢ ° !ee`• "a aB \ kS88'#8l a • •s. U• P ■ 1- <sa 9est w � ��° 2 •ate` � C$`� ' p � aae ■ R • za� � ee�LU Q ® • II II$ xro ! o .a t �`■ ^v �G F^• �a / . Z O 592.'18 • ■ .eY .a. ' as 'M e! L . O _ , ,;wry - \ `�`• O 'am < a o a W`rte r / / /e � •eg P� �,�0 ®era` � 2 ea •<�`® ae°® 5�/��� �y� a� • e A! ° / I / • xaa■ / / •a W ■ °nOochvoor w oco� <.e <e!® // 'e Ico�tnv O II a!° / •e. ii ? .wap--- •as •< ° m z z z z ado>a->> e`• --- --------"'/� e a aw. ,/ c�� m / off / Y `` / u, oxy a• V . / 0y// / \ e Y< Ja �® ,� // Sol f f ■ / d's P" r •, I / / yJW® ! � 'ab •e• e!® V p f/ / SN/ / iI! 63 •s. •A• •�Wv .s. • /yv /� • U a .s. • ig ` / h Q •r�A 2 •9� •r. sr r6 �s, I e, • dam!® \ FA • I • sue!■ �!• sd°'( �z �� er s�lr .�,. mss, r. ' �• sFA, dr .•nda \ \ • LI„t'w X98. _wj i !• r � • 3 s. A �n �mm. fG J\ NOU • a0> M B ` 4yn,G .l`.,�r r.h G\\\., \\ U 6:W m W ! !r •s nro `N a+$0 N\ as • •off a • • •r. ss, \ a � •�.* sir `9OS •�'� $ oar® 02,[2 • •s. •r. `„-,. 'SE'S` xsr® xsr® 98` •r. .oi r® Sg sr • a Av s�®•g`a e ' • • ® ssk • �, sb i • • ' aDr w Obi N .os� V) xr• o °n ° _ �� II V fir® U \\\ ¢ II II L,, Q \ 185 3wu z Io b x \ rn L6 sy, z ao U \ Qdad ® sak, mov ham° . \ va�www O��o �\ \ SSr W "S' \N o saA m w \ ® s N r r r�4'r�CaS/y,• �. ✓,„ \ S� w111/N. zV` c0 ., \ zqoo O ski SAr '.' ;T " ® z0 Q (j �'' H 0 o z o 0 > z oW 0 w o ¢ o O z o w ° o z i = O O pj m O Z ¢ 0 w U Z U) m Z D Z 0 $ Q Ow 0 U 0O = Q 0 d Z O m Z � H _ w z 300 O O X O = O O z 0 Li Li W w X d Z m O N H 0 N W Q O Z 3 OJ J 2 0 N li Z z pJ Ll"Iw 5 (n 0 W O z 0 0 U) W0 m U) Z U z z N Z m Ow w p N O 0 0 I O Z 0- a: " = = H 0 uiP = L a a o w 41 0 H Z o H D O W Z 2 U U O K i Z U7 ¢ N W m w Z N OH O= h W N Z Z g m 0 0 ¢ p N U) Z U O 0 d j V m ~ 0 m of C ¢ J z Vi r U U w W < W Z J m o z W U o0 o < w o z a z 3 H J g ON z a > o 00 V) W ¢ • Z U v m 3 m H J H H 0 ¢ 41 CU)) O W Z K W Y w ' W Q Z m' U 50 I 0 0 CC N O p O U W p m 0 a p Q O N N H a: < W' U) i H } J } Q O W w H J 0 ¢ X W = p U O H Uj W O Z Z J Z H H H < Z O W D Z H Z Z U > d n- H z Ni O U)0 .i v p S Z W 0 0 N W Z U 0 Z CC O O > U I a CC N aa N w S H U S U O W O m N H N w a CC) 0 z w W J W U) Z W Z O W O U CC H J W 0 d' d' W Z < U) z W U 0 ?. U) _ ¢ = o ¢ m Z ¢ W N W z CC CD O Z U- o Q o o U) m o a > o �g a Q z U o 0 Z (MD W Q QNQ O i O D W 1= Z z U ~ m J = P H W 0 W m U7 QH -ml Z = w W W H o g j N W Q U- 0 W g N 0U. H o O H H p d z UI ¢ p W g > Z Z O w w N ¢ z p z Z W d0 0 o Q w0 DO < H W w So = z 0 I Of O> J Z O Z0 UU 0 0220U)O W U) W W -0 H >> > O W Q tj ¢ < m ww O NN m Mm pF H W .t.i PO W ¢ w m X 0 =U- m w x O O ZO ¢ N 0 0 W C H .. W Z HO U > ¢ W U) Z O� z Z Z 0 d Z - O� _ g , Li W W .- .M- - (0 N 0) )ywj W m H Q of of j0 m H a U) a a W as a 000 as s ca °r Li- Li W p m W d m m ¢ N w U) N p Q w F O 0 0 �O U O a� 0 0 o 0 U Ui 0 x W Li N Uj= Q 0 m J 0 0 ' �¢ U = a U 0 0 N W¢ U- U U Iwi_ w 0 m J W �J 0 U- W O cr m m J J W U 0 0 )y J J 0 O V1 00 L` O O U) o O O U U W O ly m o m m twi p 0 W 0 O 0 0 00 N tb 0 0 0 0 {. a 0 W W W W O)p ¢ w Of w W Q O o Of n. W 0: J 0 0 d 0 I.0 - 0 O U J ¢ a < 0) 0 W cNi w 0 a w W U I.� N 0D 0 of a vi o 0 LL w 0) w CC) cwt 0- H m z m U 00) U- W WO 0 m m W a w w O U U� 0 0 J J 0 w 0 W Wo O a W )yj W 0 W m O 0 W W (0 0) W F LC > m o N O a: a: < 00) J 00 0 p} Q Q U) W W N (0 < < J W ¢ W J U ¢ 0 0 W W V) m W O w (n U- 0_ < Q Q W 0 0) m m U) J Z o0 w Wo ° 0) co a a LU 0 °) _ m < w ¢ K00. x W N d- d- 0 } m < 0) 0 0 H N W 0 N m m m m Cl 0) U) K K z p z O w W ^ ^ J w a: m 00) ¢ 0 0 Q d' O¢ U) d' > > W ¢ O CL m m O 0) W W O CC d W V) W U m O O J J U- d LU d C J J z 0 ) W >> > 0 0 U 0 H CL N W _ Q ¢ < J /� Il flrn . __LILU HEEL fl uIi _ _ _ 1b1Lt1'H U) O iq \ O � fl : / w I LO c_) Li J � w � CC Y tp l m t w l O O J U w Q l O Or cn X w m w J LU LU 0 0 0 0 0 0 CJ III Ui I W C) w l C, o O J O . w l O O CC Y cd l m i U- W Ui1 d" it it it dl i� dI -�:,W S� N J � W U UT fl Z / � p Ln O cfl 00 ... Ildllo W W W W W— 0 O Ott) O cfl L _ 00 U w - u 3= a) O w 00 � N- O n I 00 U n cr W WI- = 0) Cn 0O vi vi C10 N-03C_) O N- N- w 3 zcn22 w w " I- N N Cn M 0' N- � N `iv — — — � O O — — — — — — 00200 n 2 Z U W W L '0 ® 9L J0 Jl L9Z N - O) : 0 O O O O 00 MZ 00 C) � N � O 00 U W U - O c,..i N N Z Z 0 D L� C!J LC00 00 00 0 Z O W O .__. I O Q CCJ O N- Z n n Z zN � w w w wo z m 0a .91JoJl LL2 ovw w N ^ v) O F- O 03 0 z LL. 00 O Co O OO U ® cfl U ' ` LU � O _�� Q N- F- w N Z N ? O z L.L. wcn cn � rnQw LL. CO CC) F Q N 6U 4J C Z 2 00 CT N- U D L9 N- ^ Oi Z_ O W L i l W O C V F- m i O O Z U N- 1 0_ r7 C-) Z O p W Z 03 I Q N Z_ 2 , C-, °, U) O N m Z v- O co U W w N 00 N co 4- u) 00 I CY) R LO W C) W Z Q U W of m W D F- m rn CCD — — — — — — — — — — L 00 00 " I I F W W W W— ,, a �0 il 98Z > � P LO oo Qm W Z W Cn .Q _ (0 �` rn p - I = of } iti n = n 000 W u T 0o 0 0 O �3 O � I U- Oo U w CD J O 3 `o W `n cG Oo rn o W Q W QY C-D Q ma O pZ (.nom � WJ 00 WT cD CC D F- m � = � fl = m C n W N Z Z F Z W ~ z _ O Q o N p ��.................................. n • W W Q 0 U W o C2 — o W C-j ..... ............ .............................................................................................. 0 O Q LC) 0o LL 00 U w Z LL LL o o 0 8 o J 11 uI A JR •i m _ m I . I ___ IgOO ? 9 , Cl) ..._ 7 i 1 r ■ +r,,w f • nn _ # A4 % ff e f f (HFJH) f4 rf r s�� C5 4 ZO-S1 J 1HS ]S NIl-HO±VW S 3 > 3 3 3 3 3 3 3 d , 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 > 3 3 3 3 3 > <3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 > 3 3 3 3 3 5 3 3.. 3 3 > 3 3 > 3 3 ) ) -) > 3 3 > 3 3 > > 3 3 > -) 3 3 3 3 > 3 3 > 5 3 3 3 3 3 3 7 ) 3 5 5 5 5 > 3 5 3 2 3 3 3 > 3 5 > ) 3 3 3 3 3 3 3 5 3 3 3 3 3 > 3 3 5 ) -) 3 3 > 3 5 > 3 ) > ) -3 -) -) 5 7 ) ) -) 3 ) 3 > ) 3 ) > 3 > ) 3 3 -D -> D 3 > A ) -) > 5 > > > 3 .3 ) ) 5 3 3 -) 3 > ) 3 -) > 3 -) > 3 > > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 > > 3 3 3 3 -) 3 3 -) 3 3 3 > 3 > > 3 > 3 3 > 3 3 3 3 3 > 3 > 3 -) 3 > 3 3 3 > 3 3 3 3 3 > 3 3 3 3 ) -). .) 3 3 3 3 3 3 3 3 3 -) ) > > 3 3 > 3 3 > > > > > 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 > > 3 > 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 > 3 > > 3 3 3 3 3 > 3 ) 3 > 3 3 > 3 3 > 3 3 > 3 3 > 3 3 3 3 3 3 > > 3 > 3 -) > 3 > 3 3 > 3 3 > 3 3 > 3 3 3 3 3 > 3 3 3 3 3 > > 3 > ) > > 3 3 3 5 3 > 3 3 > 3 3 3 > 3 3 3 3 > 3 > > 3 3 3 3 3 3 > > > 3 3 3 > 3 > 3 > 3 3 3 > 3 3 > D 3 3 d 3 3 3 3 3 > 3 3 3 j 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 > 3 3 3 ) 3 3 3 3 3 ? > > 3 3 3 3 > > ) 3 5 ) > ) 3 3 3 3 3 3 3 3 > 3 > 3 3 3 3 3 3 3 3 3 3 3 > 3 > > 3 3 > 3 3 3 3 > > 3 3 > 3 3 > 3 3 > 3 3 > > > 3 > 3 > 3 3 > 3 3 3 3 D 3 > 3 3 ) > 3 -D -> 3 > 3 3 > > 3 3 .7 7 > > 3 3 > 3 3 -3 > D -3 3 > > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > > 3 3 3 3 3 > 3 3 3 > 3 > > 3 3 > 3 > > 3 3 > 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 > 3 > 3 3 3 > 3 > > 3 3 > 3 3 3 > 3 3 > 3 > 3 3 > 3 3 3 3 3 > 3 -) 3 3 > 3 3 3 > 3 > 3 > -) 3 3 > d 3 > 3 3 > ) ) ) > > > -D 3 3 > ) > 3 3 > .3 3 > 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 > 3 3 3 3 > > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 > > > 3 > > 3 3 3 > > 3 3 > 3 3 > > 3 > > 3 > > 3 > > ) 3 > > > 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 ) 3 > -3 > 3 3 > 3 3 ) 3 3 3 3 > 3 > 3 3 > > 3 ) > > > > 3 3 3 > 3 3 > 3 3 3 3 3 > 3 3 3 3 3 3 3 3 > 3 3 3 > 3 3 > 3 3 > 3 3 3 > 3. 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3.,, 3 3 3 3 3 3 3 3 3 > 3 3 3 3 > 3 3 > 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 > 3 3 3 3 3 > > 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 > 3 3 3 3 > 3 3 3 3 3 3 3 3 > 3 3 3 > 3 3 > 3 3 3 3 3 > 3 > 3 3 3 3 3 3 3 3 3 > 3 3 3 3 > 3 3 > 3 3 3 3 3 > 3 3 3 3 3 3 3 3 > > 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 > 3 3 3 3 3 3 3 3 3 3 3 > 3 3 > 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 > 3 3 > 3 3 > 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 > 3 3 3 3 3 > 3 > 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 > > 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 > > 3 3 3 3 3 3 > 3 3 > 3 3 > 3 3 > 3 3 > > 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 > 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 ) 3 > ) 3 > ) 3 3 ) 3 > 3 3 3 ) 3 3 3 3 > 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 > 3 3 > 3 3 3 3 3 > 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 > 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 > 3 3 3 3 3 > 3 3 3 > 3 > > 3 > 3 3 3 3 3 > 3 3 > > > 3 > 3 3 3 3 D 3 3 3 3 3 3 3 > 3 > 3 3 > 3 3 3 3 > 3 3 3 3 > > > 3 > 3 3 3 3 3 3 3 3 > 3 3 > > 3 > 3 3 3 > > -D -D 3 > > > 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 > 3 > > 3 3 3 3 3 > 3 3 3 3 3 > > 3 3 3 3 3 3 3 3 3 3 > 3 3 3 > 3 3 3 > 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 > > 3 3 3 3 > > 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 > 9 3 3 3 3 > 3 3 3 > 3 3 3 3 3 > 3 > 3 3 3 > 3 > > 4 3 3 > 3 3 3 > 3 > 3 £O-S1 l]�HS ] S 3N1l-HO±VW co 0 J .}moo Fr o U Y r ud" d 00 I (1Q01) I 1LDQi ii . a • F / / / // O// w _ oH W C] a I- 0 Z W W o v v Z W W OilIi W 2iIi >-Ii c0-S-1 11�HS ] S NIi-HO±VW 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 > 3 3 3 3 3 3 3 3 9 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 313 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 ) ) > 3 3 3 > > 3 ) > > 3 -3 > ) > -3 3 3 > ) 3 3 ) ) ) 3 3 3 > 3 ) 3 3 > > 3 > > > > > 3 3 > > > 3 > > > > -3 3 ) > 3 - >>>3>>>3 3 3 3 3 3 3>>>>> 3 3 3 3 3 3 3 3 > -D 3 3 3 3 3 3 > 3 3 3 > 3 3 > 3 3 3 3 3 3 3 d 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3,.... 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 N3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 > 3 3 3 3 3 3 > 3 3 3 3 3 3 > 3 3 > 3 > > 3 3 3 > ) ) 3. 3 > > > 3 > 3 ) > 3 3 > 3 ) ) 3 3 3 3 > 3 > 3 3 D 3 3 ) 3 3 3 > > 3 3 3 3 3 ) ) 3 3 3 3 3 3 > 3 3 3 3 3 3 -3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 > 3 3 > 3 > > > > 3 3 3 3 ) > ) 3 > 3 > 3 > 3 > 3 3 > > > 3.. 3 3 3 ) 3 3 3 3 3 3 > 3 -3 3 3 -3 -3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3D d 3 3 ) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3DD 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 ) ) > > > > 3 > > 3 3 > 3 > 3 > 3 3 > > > > 3 3 > > 3 > 3 3 3 3 3 > 3 > > > 3 -> 3 3 3 3 3 3 3 3 3 3D 3 3 3 > > > 3 3 3 3 > 3 3 3 d 3 3 ) > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 33 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > > 9 3 3 > > > 3 3 > 3 3 3 ) 3 > 3 3 > ) 3 > > > > 3 > > 3 3 3 ) > > > 3 3 > 3 3 3 3 3 > 3 > 3 > 3 > 3 3 > 3 3 3 3 3 > > > > 3 3 3 3 3 3 ) > 3 > > > 3 3 3 > > > > 9 > 3 3 3 3 3 > > > 3 3 > > > > 3 3 3 3 > 9 > > > 3 3 > 3 > > > 3 > > 3 3 d 3 3 3 3 3 d 3 3 3 3 3 3 3 3 3 3 3 > 3 3 3 3 ) 3 3 - 3 3 d 3 3 3 3 3 d 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3" 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > > 3 3 3 > > > 3 3 3 ) > > ) 3 3 > > 3 3 3 3 > > > > 3 3 > > 3 3 3 3 > > 3 > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 D -> 3 3 3 3 3 3 3 3 ).: 3 > 3 > > 3 > 3 3 3 3 3 ) 3 3 3 3 ) -3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 -3 3 3 3 3 3 3 3 D 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 90-Si i�DHS 1S DNIl-H3±VW o m O w o 6 j0 Q c o U 0 OLL z m O m O có a z w ww o O � Uto d z w - C10 _j < O QON UJZ - O O co (- U- Z � Zw i - Q � � w U) U' Z O J OESm t-R, <Ui( � i}iQ > w z O ww > O > 0cow o wU J Z Z o0 OOOO Z ZZ Z / OJ LL LL C/) o / J <C < w J O Z m °°o H wZ z Li � < a nw 2S Z ogooVAVA/ z TWO U a m wz O > 0 J cL Q W Q / UQ J < > � Qw I— CU D i— w � � ~ Z W ow v � � Q � 7 z ry W () r- \A w w m O J < I z Z z oo Z L I- H goo w w cn w oo c� wU) Q U z o8 Q Q O J �n / w ,R p WOODBURN Inc c rpa rated / 889 Staff Report Project Title: WinCo Grocery Store Project Location: Tax lots 052W12C002100 and 052W12C002200 (no assigned address) File Numbers: Design Review DR 25-14 Property Line Adjustment 25-04 Street Adjustment SA 26-01 Variance VAR 25-06 Property Owner: Capital Development Company Applicant: Ryan Barnett, b.hills architecture, P.C. Public Hearing Date: March 12, 2026 Date of Report: March 5, 2026 Staff Reviewer: Chris Kerr, Community Development Director Fernando Torres, Associate Planner Staff Recommendation: Approval with Conditions Executive Summary Action on a Type III land use application package consisting of: Design Review; Property Line Adjustment; Street Adjustment; Variances (three requests). The project site includes two vacant properties near the I-5 interchange, south of Center St., and totals approximately 10.6 acres. It is within the Commercial General (CG) zoning district. The proposal is an 84,073 square foot retail grocery store that is anticipated to be open 24 hours a day, seven days a week. 60 y4 JONAH P1 N II!�1111�1'u. Project Site (outlined in red) 111 IL LI l .. °" "CU9NC"d'N 1"CbC:aC���rl)RF� rr , u,i � I ui�rm Illustrative Site Plan The front of the building faces west towards 1-5. Access will be from two driveways on Stacy Allison Way,one on Evergreen Rd.and another through a future,currently undeveloped lot along Center St. Parking spaces for 504 vehicles will wrap around the west and south side of the building. Trucks will enter through the southernmost driveway on Stacy Allison Way. A truck dock is proposed on the south side of the building with loading bay doors facing the freeway to minimize any impacts of trucks on the adjacent residential properties. An existing block wall at the Cascade Meadow Apartments and 30-foot-high trees screen this development from the apartment complex. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Grocery Store Staff Report Page 2 of 4 61 Several public improvements are proposed to alleviate traffic concerns and to promote pedestrian/transit users. To facilitate pedestrian access, wide walkways are provided from Stacy Allison Way and Evergreen Rd to the building entrance. The applicant will also build a pedestrian crossing at the intersection of Evergreen Rd and Oxford Dr featuring a rectangular rapid flashing beacon (RRFB). The developer will install a bus stop shelter on Evergreen Rd to serve a recently implemented bus route. In accordance with the adopted Transportation System Plan, the City will also be using the fees paid by the applicant to complete the design and construction of new traffic signals at both Evergreen Rd & Stacy Allison and Evergreen Rd & Hayes St; additionally, a roundabout will be completed at the intersection of Evergreen Rd and Harvard St. + V Front Elevation Rendering Discretionary Reviews The applicant submitted Variance applications, which is the process for applicants to request to to deviate from certain code provisions. In this case, the applicant is requesting to deviate from three requirements in the WDO summarized below (these are discussed in greater detail in the attahed Analyses and Findings): 1. Reducing the number of Electric Vehicle (EV) parking spaces: The WDO requires 5 percent of the required parking stalls to be minimum Level 2 EV charging spaces, which for this project would be 17 EV stalls.The applicant is requesting to reduce this requirement to provide eight Level 3 chargers. To support this, the applicant included a letter from Tesla stating that Level 3 chargers are 20x faster than Level 2 chargers and can be used by all EV brands. The applicant indicated that eight EV stalls would meet the charging demand for this site. Staff supports this variance. 2. Increasing Allowable Signage Area on Front Elevation: Adherence to the WDO would allow 300 square feet of signage on the front elevation.The request is to increase the front elevation signage by 153 square feet to 453 square feet.The applicant states that this extra sign allowance would ensure the sign is visible and recognizable from I-5 and Stacy Allison Way. Staff does not support this variance because there are already provisons in the sign code that allow them taller and larger signage which provides them with greater visibility from I-5. Additionally, other similar properties (e.g. WalMart) operate succcessfully without having received sign code variances. 3. Increasing parking area light pole height: The WDO limits parking light poles to 14.5 feet above grade.The applicant is proposing 24.5-foot-tall light fixtures, stating that taller DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Grocery Store Staff Report Page 3 of 4 62 pole height results in fewer light poles needed, which in turn frees up space for customer parking. Staff supports this variance with the compromise that light poles in the southwest of the property will meet the 14.5 feet height requirement to reduce light encroachment into adjacent residential properties.The applicant has agreed to this and modified their plans accordingly. The applicant also submitted a Street Adjustment application, which is the process for applicants to request modified street improvement requirements for abutting street rights-of-way. The applicant's request is to provide a street cross-section consistent with the recent approval to the south along Stacy Allison Way. This modified cross-section was previously supported by the Council. Recommendation Approval with conditions of all but the sign code variances: Staff recommends the Planning Commission consider the staff report and its attachments and approve the application package with the recommended conditions in Attachment 101. Staff recommends approval of the Street Adjustment and light poles and EV parking variances but does not recommend approval of the sign variance. Actions The Planning Commission may act on the land use application to: 1. Approve per staff recommendations, 2. Approve with modified conditions, or 3. Deny, based on WDO criteria or other City provisions. If the Planning Commission were to act upon the recommendation, staff would prepare a final decision for approval with any Conditions or Findings recommended by the Commission. Attachment List 101a. Conditions of Approval 101b. Public Works Conditions of Approval 102. Notes to the Applicant 103. Analyses & Findings 104. Traffic Impact Analysis 105. ODOT Letter 106. Tesla Letter of Justification for variance 107. Public Testimony from Matthew and Deirdre Rickard (3234 Jonah Place) 108. Site Plans The entire application is available on-line on the City's Current Project page here: I�ntt .s: wwwowoodbuirirn-oiro ov '7'74 WiiirnCo-Ciroceir -Stoire DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Grocery Store Staff Report Page 4 of 4 63 Analyses & Findings This attachment to the staff report analyzes the application materials and finds through statements how the application materials relate to and meet applicable provisions such as criteria, requirements, and standards. They confirm that a given standard is met or if not met, they call attention to it, suggest a remedy, and have a corresponding recommended condition of approval. Symbols aid locating and understanding categories of findings: Symbol Category Indication Requirement (or guideline) met No action needed Requirement (or guideline) not met Correction needed Requirement (or guideline) not applicable No action needed • Requirement (or guideline) met with condition of Modification or approval condition of • Other special circumstance benefitting from approval required attention Deviation from code: Street Adjustment or Variance Request to modify, adjust, or vary from a requirement Location & Legal Lot Status Address No formal address—vacant Tax Lot 052W12C002100 & portion of 052W12C002200 (Lot 11 and portion of Lot 12,Town Center at Woodburn) Nearest intersection Stacey Allison/Evergreen &Center St. The subject property is lots 11 and 12 of the Town Center at Woodburn Plat. It is a legal lot of record. Land Use & Zoning Comprehensive Plan Land Use Commercial Designation Zoning District Commercial General (CG) Overlay Districts Interchange Management Area (IMA) Overlay District Existing Use Vacant—with minimal street improvements DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 1 of 57 64 For context, the subject property and adjacent zoning are illustrated and tabulated on the following page. � I I �( Pa'IL kf P ✓n'1'lf Y �T . II 1 //III f Ir dPFV r Zoning map excerpt Cardinal Direction Adjacent Zoning and use North Commercial General (CG)—Vacant East Residential Medium Nodal (RMN)— Evergreen Rd. /Single family homes South CG & RMN — partially vacant and apartment buildings West Stacey Allison Way/ 1-5 Section references throughout this staff report are to the W Statutory Dates The application package was submitted on December 12, 2025 and deemed complete on February 18, 2026 making the 120-day decision deadline June 18, 2026. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 2 of 57 65 Applicable WDO Provisions 2.03 Commercial Zones A.The City of Woodburn is divided into the following commercial zones: 2. The Commercial General (CG) zone is the community's primary commercial area, providing for businesses requiring extensive land intensive outdoor storage and display of merchandise, equipment, or inventory. B.Approval Types(Table 2.03A) 3. Permitted Uses (P) are allowed outright, subject to the general development standards of this Ordinance. Uses Allowed in Commercial Zones Table 2.03A Use Zone Accessory Uses(A) Conditional Uses(CU) Permitted Uses(P) DDC CG CO MUV NNC S ecial Permitted Uses(S) Specific Conditional Uses(SCU) B Commercial Retail and Services 3 Bakeries, delicatessens,grocery and convenience stores P P P P 1. Not allowed in the Gateway Overlay District 2. Only allowed in the Gateway Overlay District 3. Allowed outright if not within 200 feet of residentially zoned properties 4. Within a building, no outdoor storage or repair 5. All outdoor storage and display shall be enclosed by a seven foot masonry wall. 6. Existing uses are allowed as a permitted use, new uses are not allowed in the MUV 7. Drive-throughs are not allowed 8. Child care facility for 13 or more children,group home for six or more persons 9. Except allowed as a permitted use in the Gateway Overlay District and prohibited in the Interchange Management Area Overlay District(Amended by Ordinance 2573, passed June 24, 2019) Staff Finding: The proposed supermarket is permitted outright as a "Grocery" store within the CG zone. The store will not have a drive-through. It has been reviewed (traffic, parking, landscaping, etc.) to meet the standards of the proposed use which is permitted outright in the CG zone; subject to a Design Review approval. C. Development Standards(Tables 2.03C) DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 3 of 57 66 Commercial General (CG) - Site Development Standards Table 2.03C Lot Area, Minimum (square feet) No minimum Lot Width, Minimum (feet) No minimum Lot Depth, Minimum (feet) No minimum Street Frontage, Minimum (feet) No minimum Front Setback and Setback Abutting a Street, Minimum (feet) 5 1 Side or Rear Setback, Abutting RS, R1S, or RM zone 10 Minimum (feet) butting CO, CG, DDC, NNC, P/SP, IP, SWIR, or 0 or 5 4,5 IL zone Setback to a Private Access Easement, Minimum (feet) 1 Lot Coverage, Maximum Not specified 2 Townhouse 12 Child care facility, group home, or 12 Minimum nursing home riplex, Stand-alone 12 Residential Density uad lex development p , In mixed use develo ment No minimum (units per net acre) multiple- family dwelling Row house 24 Child care facility, group home, or 32 Maximum nursing home riplex, Stand-alone 32 quadplex, In mixed use development 32 multiple- family dwelling Primary or Outside Gateway subarea 70 Building Height, accessory Western Gateway subarea 50 Maximum (feet) structure Eastern Gateway subarea 10 Features not used for habitation 100 DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 4 of 57 67 1. Measured from the Street Widening Setback (Section 3.03.02), if any 2. Lot coverage is limited by setbacks, off-street parking, and landscaping requirements. 3. Only allowed in the Gateway Overlay District 4. A house of worship shall be set back at least 20 feet from a property line abutting a residential zone or use. 5. A building may be constructed at the property line, or shall be set back at least five feet. Staff Findings: '' The site plan demonstrates the proposed building will meet or exceed the minimum front, side, and rear setbacks. There is no maximum lot coverage. No residential dwellings are proposed therefore the density standards do not apply. A setback in excess of 10-feet is proposed adjacent to the RMN - Nodal Medium Density Residential zone (Cascade Meadow Apartments) to the south. The allowable building height is 70-feet and the proposed building height is 42-feet. No residential is proposed. The Development Standards of the CG zone are met. 2.05 Overlay Districts 2.05.01 Interchange Management Area Overlay District A. Purpose The purpose of the Interchange Management Area Overlay District(IMA) is to preserve the long-term capacity of the 1-5/Highway 214 Interchange. Preserving the capacity of the interchange is essential for the City's future. Continued access to I-5 is critical for existing businesses and for attracting new businesses and development to the community. The IMA complements the provisions of the Southwest Industrial Reserve (SWIR)Zoning District by ensuring that industrial land is retained for the development envisioned in the Woodburn Comprehensive Plan.The IMA also ensures that needed industrial, commercial and residential lands within the IMA are protected from incompatible development generating excessive vehicle trips. The vehicle trip budget(Table 2.05A)identifies by parcel the maximum amount of peak hour trips for each parcel within the IMA and is intended to be high enough to accommodate peak hour trips anticipated by the Woodburn Comprehensive Plan and the Transportation Systems Plan (TSP), but low enough to restrict unplanned vehicle trips that could adversely affect the 1-5/Hwy 214 Interchange. B. Applicability The provisions of this Section apply to all Type II—V land use applications that propose to allow development that will generate more than 20 peak hour vehicle trips(based on the latest Institute of Transportation Engineers Trip Generation Manual) on parcels identified in Table 2.05A.The provisions of Section 2.05.02F apply to all properties within the boundary of the IMA. C. Vehicle Trip Budgets This Section establishes a total peak hour trip generation budget for planned employment (commercial and industrial) land uses within the IMA. 1. The IMA vehicle trip budget is allocated to parcels identified in Table 2.05A on a first- developed,first-served basis. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 5 of 57 68 2. Parcel budgets are based on 11 peak hour trips per developed industrial acre, and 33 peak hour trips per developed commercial acre. 3. The parcel budget for each parcel will be reduced in proportion to actual peak hour vehicle trips generated by new development on any portion of the parcel. 4. The City may allow development that exceeds the parcel budget for any parcel in accordance with this Section. Site ,iZ /JrnuriJ 16 : =111 Figure 2.05B — Interchange Management Area Boundary and Subareas DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 6 of 57 69 Vehicle Trip Budget by Parcel (Parcel Budget)Table 2.05A Subarea ssessor's Tax Lot Comprehensive Plan Buildable Acres Maximum Peak Hour Number Designation Vehicle Trips 52W12C 02100 7 23 52W12C 02200 6 198 K .........� .........�........aCommercial 52W13 01600 5 165 52W14 02300 6 198 D. Administration This Section delineates responsibilities of the City and ODOT to monitor and evaluate vehicle trip generation impacts on the I-5 interchange from development approved under this Section. TIA: In addition to Section 3.04.05,the following applies: A Transportation Impact Analysis(TIA)is required for all land use applications subject to the provisions of this Section.The TIA must meet City and ODOT administrative rule(OAR Chapter 734, Division 51) requirements and shall include an evaluation and recommendation of feasible Transportation Demand Management(TDM) measures that will minimize peak hour vehicle trips generated by the proposed development. 1. For a land use application subject to the provisions of this Section: a. The City shall not deem the land use application complete unless it includes a TIA prepared in accordance with TIA Requirements; b. The City shall provide written notification to ODOT when the application is deemed complete.This notice shall include an invitation to ODOT to participate in the City's review process; c. ODOT shall have at least 20 days to provide written comments to the City, measured from the date the completion notice was mailed. If ODOT does not provide written comments during this 20-day period,the City's decision may be issued without consideration of ODOT comments. 2. The details of City and ODOT monitoring and coordination responsibilities are found in the Woodburn—ODOT Intergovernmental Agreement(IGA). a. The City shall be responsible for maintaining a current ledger documenting the cumulative peak hour trip generation impact from development approved under this Section, compared with the IMA trip budget. b. The City may adjust the ledger based on actual development and employment data, subject to review and concurrence by ODOT. c. The City will provide written notification to ODOT when land use applications approved under this Section, combined with approved building permits, result in traffic generation estimates that exceed 33%and 67%of the IMA trip budget. 3. This Section recognizes that vehicle trip allocations may become scarce towards the end of the planning period, as the I-5 Interchange nears capacity.The following rules apply to allocations of vehicle trips against the IMA trip budget: a. Vehicle trip allocations are vested at the time of design review approval. b. Vehicle trips shall not be allocated based solely on approval of a comprehensive plan amendment or zone change, unless consolidated with a subdivision or design review application. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 7 of 57 70 c. Vesting of vehicle trip allocations shall expire at the same time as the development decision expires. E. Allowed Uses Uses allowed in the underlying zoning district are allowed, subject to other applicable provisions of the Woodburn Development Ordinance and this Section. F. Comprehensive Plan and Zoning Map Amendments 1. The provisions of this Section (2.05.02.F) apply to all Comprehensive Plan Map amendments within the IMA. This Section does not apply to Zoning Map amendments that result in conformance with the applicable Comprehensive Plan Map designation, such as Zoning Map amendments that occur when land is annexed to the City. 2. Applications for Comprehensive Plan Map amendments and for Zoning Map amendments shall determine whether the proposed change will significantly affect a collector or arterial transportation facility. 3. To ensure that the remaining capacity of the I-5 Interchange is reserved for targeted employment opportunities and needed housing, this section imposes the following prohibitions on Comprehensive Plan Map amendments within the IMA: a. Comprehensive Plan Map amendments that will increase the net commercial land area within the IMA shall be prohibited. b. Comprehensive Plan Map amendments that allow land uses that will generate traffic in excess of the IMA trip budget shall be prohibited. G. Interchange Capacity Preservation Standards Land use applications subject to the provisions of this Section shall comply with the following: 1. Peak hour vehicle trips generated by the proposed development shall not exceed the maximum peak hour vehicle trips specified in Table 2.05A for the subject parcel, except: a. Development may be allowed to exceed the maximum, if the development will contribute substantially to the economic objectives found in the Comprehensive Plan. b. Residential development on a parcel zoned Commercial shall be allowed to exceed the maximum. Transportation Demand Management(TDM) measures shall be required to minimize peak hour vehicle trips and shall be subject to annual review by the City. Staff Finding: This proposal is for Type III review that will generate more than 20 peak hour vehicle trips for a property in the City's IMA Overlay District. The proposed development site occupies part of the northeast portion of Subarea K of the IMA District. A TIA was provided meeting all ODOT, OAR 737, Division 51 and City requirements (see ODOT correspondence). City Staff and applicant worked together to determine TDM measures to minimize peak hour vehicle trips for the development. These are included in Condition of Approval 14. Staff provided the required notices when the application was deemed complete (as well as at the time of submittal) and 20 days prior to the public hearing. ODOT provided comments to the City and applicant on the TIA, which was been DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 8 of 57 71 revised to their satisfaction. Based on the ODOT approved TIA, no additional traffic mitigations were warranted. Although ODOT agreed that no additional traffic mitigations were warranted for the applicant's current proposal, they nevertheless offered recommendations for potential improvements to address future (2040) issues at the intersection for 214 and Evergreen. Specifically, ODOT recommended adding signals at the eastbound (from Evergreen) and southbound (from 214) movements. These mitigations would not be directly attributable to the applicant's proposal, which, as noted above, meets ODOT standards. Additionally, because the recommended mitigations address future (2040) issues, it is not possible to proportionally allocate a share of these future mitigations to the applicant's current proposal. However, these recommended future mitigations will be considered as alternatives in future TSP's completed by the City. The applicant is proposing a number of TDM measures that will facilitate transit usage as well as pedestrian and cycling opportunities for employees and visitors. These are tailored to working directly with the future tenants and enhancing the City's transit system in this area. These include: i. An information board for employees that shows the city transit schedule ii. Potential employee rewards for use of transit and/or bike/walk iii. Identify a TDM manager on site, who will be a point of contact for City staff iv. Potential carpool-only parking spaces v. Providing employees with bus passes vi. Periodic updates to the posted information, based on feedback from City staff or changes to travel options. vii. An annual report referencing how the TDM measures and targets are met viii. Installation of a bus stop shelter on Evergreen Rd to serve a future bus route ix. Construction of a pedestrian crossing with a flashing beacon at the intersection of Evergreen Rd and Oxford St DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 9 of 57 72 1 11111\11111\1\\1\\111111111111111111111111111\I\\1\I\ll\I\111\1\1N111\\\111\\11111111\1101111111181\\\lll\VIll1\11RIN1VIIIIIIIIll11g11111111111811111\1111111\\\111\ll➢\\\11\111111118111111111111111811111111\\\111\11\\111111U1\1A1\1ll1\1ll1\1ll1\1ll1\1ll1\1ll1\1ll1\1ll1\1ll1\1ll1\1ll1\1ll1\1ll1\111\1111111111111\11\\Ol\1111\1111\1111\1111\1111\1111\1111\1111\1111\1111\1111\1111\1111\1111\11\\Ol\1111\1111\1111\1111\1111\1111\1111\111111A\11111111111\\V11116NN1111\V1111\YIIIC611�111A1\1A1\111\1111111111111\1111\11\\V1111611611111\\1VA11611111\\\\\\11111111111111111)\111111\\\\\\1\1\V111111p1R' rIlllf� � lJ � /rr iv�,1v11v1v ��u�9��)Vy�m1�11Vyy) �vp�9emo�n��y���y)�Ugmllluu111�i1�mlymlvmlvmlvmlvmlvmlvmlvmlvmlvmlvmlvmlvmlvmlvmlvmlvmlvmlvmlvllB oulluu111�i1�mlvmlvmlvmlvmlvmlvmlvmlvmlvmlvo �e°°��°��� rJ I " uu � n"mow I II I� 14 NY�� �i�d kH oyi Iwlv<iudldlV >ti lo) I �116iS�o�1vA1�(G11o�i1vG11v01\� vv i11vv111�11h�l�mlt fi��vA�Vv�11d�'11f11VA��111�61\GR�'Ylo11to1�ivlqlv11�1�11m111'�l�S�t�1�ll6Sl�n111'1�6�v1�1���11v1'��l`iXn�l��vtllfiiv 1n1n1�v�'1An��V'v1�1X����tillw�Iif�l Approximate location of PROPPSED FLASHING RRFB crossing (looking west from eastside of Evergreen St., with Oxford St. on the left.) DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 10 of 57 73 With the proposed conditions of approval related to those TDM requirements, this criterion can be met. See Section 3.04.05 for a detailed review of the TIA The proposed development is expected to generate 511 new peak hour trips and encumbers two lots. Pursuant to the table 2.05A, these two lots have a maximum peak "allocation" of 429 peak hour trips. Pursuant to 2.05.02G.2(a) a development may exceed the allocated parcel budget if the development will contribute substantially to the economic objectives found in the Comprehensive Plan. In their TIA, the applicant provided the following justification for exceeding the parcel peak hour trip allotment: "While the proposed development does exceed the 429 peak hour trips allocated per Table 2.05A, this should be allowed per 2.05(G) because the project will contribute substantially to the economic objectives found in the Woodburn Comprehensive Plan as outlined below. Part F of the Comprehensive Plan states in part, "The third large area of commercial development in the City is the 1-5 Interchange. This contains one small shopping center, a large retail use (WalMart), a premium outlet mall, restaurants, and other highway related uses. In general, commercial uses in West Woodburn, which is the west side of the freeway, should be limited to highway related interchange type uses, while on the east side, a more general commercial nature should be encouraged. Land available for development located west and southwest of Evergreen Road should be developed as a large commercial retail node when Woodburn's population makes it economically feasible. Access management in the 1-5 interchange area is extremely important because the traffic capacity limit of the improved interchange in turn limits commercial growth in West Woodburn. This issue is addressed further in the 2019 Woodburn Transportation System Plan." The Plan anticipates and promotes different types of commercial uses on either side of 1-5. The proposed project is for general commercial retail on the east side of the freeway, which is specifically encouraged at this location. It is not a highway-related interchange use (e.g. regional mall, gas station). Allowing the parcel budget to be exceeded is necessary to allow this development to occur. Without this allowance, the site will remain vacant and the city's goals of having general commercial/retail uses in the commercial area east of 1-5 will not be realized. In addition, the City of Woodburn Economic Opportunities Analysis (EOA) adopted by the city in January 2024 indicates that Woodburn faces a deficit of 107 gross Commercial acres, and 273 gross Industrial acres,for a total employment land deficit of 380 gross acres. The 2025 Urban Growth Boundary (UGB) expansion into the Urban Reserve Area (URA) did not address any of this commercial land need as the 237 URA acres are strictly zoned Southwest Industrial Reserve. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 11 of 57 74 The proposed project contributes to the following adopted economic need and goal of the City of Woodburn as concluded in the EOA: • The EOA concludes that "The projected 20-year need for Commercial land trails the supply significantly, with an estimated 65 acres of commercial land remaining to meet a projected need for 171 gross acres."It goes on to state "The largest remaining contiguous development sites in Woodburn are under 20 acres in size, with most being five acres or less. In addition, roughly one third of the remaining buildable land is found in partially vacant parcels where the decision to add further development is subject to the desires of current property owners and/or tenants. The land for large-lot industrial or large commercial employers is very limited." The proposed project makes use of one such vacant parcel to provide a needed and desirable large commercial employer." Staff concurs with this analysis and justification and finds with Condition of Approval 14 the provisions of this Section are met. 2.06 Accessory Structures 2.06.02 Fences and Walls A. Location and Height Abutting a Street in Residential Zones 1. The height shall comply with the vision clearance area standards,Section 3.03.06. 2. The height shall not exceed 42 inches (3%feet) above the ground elevation under the fence or wall located at the lot line abutting the street. 3. The height may increase one foot for each 6 feet of setback from the lot line abutting the street. Fences may increase to their maximum height (7 ft) when flush with the house or garage. 4. For corner lots, one frontage shall not exceed the standards in #2 above. The alternative frontages are treated as interior lot line(s), allowing fencing in excess of 42 inches up to, and equal with, the house frontage. The remaining frontage shall not exceed the 42 inch limitation. 5. For through lots, abutting streets and/or alleys on two opposite frontages,the rear frontage opposite the front is be treated as an interior lot line, allowing a maximum height of 7 ft. 6. Fences and free-standing walls may be constructed in the Street Widening Setback, provided the property owner agrees to removal at such time as street improvements are made; however, free-standing walls within this setback also require Public Works Director written authorization. B. Height in Yards Not Abutting a Street 1. In residential zones, the maximum height of a fence or wall other than for corner and/or through lots, shall be seven feet, relative to the ground elevation under the fence or wall. C. Height in Non-Residential Zones DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 12 of 57 75 1. In commercial, industrial, or public zones, the maximum height of a fence or wall located in a yard abutting a street shall be 6 feet, relative to the ground elevation under the fence or wall. Fence height may increase to 9 feet once flush with the building face, or 20 feet from street right-of-way. 2. Fences and walls may be constructed in the Street Widening Setback provided the property owner agrees to removal at such time as street improvements are made. D. Fence Materials 1. Materials: Fences and walls shall be constructed of any materials commonly used in the construction of fences and walls, such as wood, stone, rock, or brick, or other durable materials. 2. Coating and slats: Chain link fences are acceptable as long as the fence is coated and includes slats made of vinyl, wood or other durable material. Chain link fence in a residential zone, except where part of refuse and recycling collection facility gates, is exempt from the slats requirement. Slats may not be required when visibility into features such as open space, natural areas, parks and similar areas is needed to assure visual security,or into on-site areas in industrial zones that require visual surveillance. 3. Industrial: For manufacturing, assembly, fabricating, processing, packing, storage and wholesale and distribution activities which are the principle use of a building in industrial districts, the preceding standards apply when visible from, and within 20 feet of, a public street. Prohibition: A fence constructed of materials that could cause bodily harm, including, but not limited to, those conveying electric current, barbed wire, razor wire, spikes and broken glass, is prohibited2.06.02 Fences and Walls Staff Finding: The fencing and walls included with the site plan appear to meet all of the fencing requirements of the WDO. The proposed project includes coated chain link fencing with vinyl slats in the following three locations: 1. A 42-inch-high fence at the southwest side of the Truck Dock for fall protection along the top of the dock retaining wall. 2. A 72-inch-high (6-feet) fence at the Covered Deck on the southwest side of the building connected to the Truck Dock to provide security and screening. This fence is flush with the building face. 3. A 42-inch-high fence along the southeast and northeast sides of the Compactor Dock also for fall protection. These fences are all well over 20-feet from the street rights-of-way and the proposed heights and materials are allowed per WDO 2.06.02. The Generator Enclosure walls are 12-feet, 6-inches high and are attached to the building. These walls as well as the Covered Deck roof structure meet the requirements of WDO 2.06.03 as accessory structures. See the Architectural Site Plan for locations of the proposed fencing, Generator Enclosure and Covered Deck. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 13 of 57 76 A Any new fencing is reviewed separately via a Fence Permit, staff adds Condition of Approval 3 to obtain a Fence Permit for any new fencing. 3.01 Streets, Greenways&Other Off-Street Bicycle/Pedestrian Corridors, and Bus Transit 3.01.01 Applicability A. Right-of-way standards apply to all public streets and public alleys. B. Improvement standards apply to all public and private streets, public alleys, sidewalks, landscape strips, and on and off-street public bicycle pedestrian corridors.Standards do not exclude conformance with the public works construction code that the Public Works Department administers. C.The Woodburn Transportation System Plan (TSP)designates the functional class of major thoroughfares and local streets. D.This applies to all development as Section 1.02 defines, and is not limited to partitions, subdivisions, multi-family,commercial or industrial construction, or establishment of a manufactured dwelling or recreational vehicle park; however, a lesser set of standards applies to infill residential development of 4 or fewer dwellings and where no land division or Planned Unit Development is applicable, including construction of a single-family dwelling or placement of a manufactured dwelling on an infill lot.See Section 3.01.03C.2. 3.01.02 General Provisions A. No development shall be approved, or access permit issued, unless the internal streets, boundary streets and connecting streets are constructed to at least the minimum standards set forth in this Section, or are required to be so constructed as a condition of approval. C. Materials and construction shall comply with specifications of the City of Woodburn. D.The standards of this Section may be modified, subject to approval of a Street Adjustment, Planned Unit Development,Zoning Adjustment, or Variance. Other sections restrict where and how these application types apply. E. When all public improvements are due:The construction of all public improvements, their passing City inspections, and acceptance by the City are due no later than by either 5.01.06B in the context of land division final plat application to the City or by building permit issuance, except if(1)the developer applies to the City through the Public Works Department for deferral and (2)the City Administrator or designee issues a document approving and describing a bond or performance guarantee pursuant to Section 4.02.08.Administration of bonding and performance guarantees for improvements that are public defaults to the Public Works Department, and the department shall notify the Community Development Director of deferral applications and any approvals and conditions of approval. F. Fees in-lieu: Per Section 4.02.12. 3.01.03 Improvements Required for Development A. With development, the Internal, Boundary, and Connecting streets shall be constructed to at least the minimum standards set forth below. C. Boundary Streets 1.The minimum improvements for a Boundary Street may be termed "half-street"improvements and shall be as follows, except per subsection 2: a. One paved 11-foot travel lane in each direction, even though this results in required improvements being slightly more than half-street by exceeding what the applicable cross section figure would require for a half-street; DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 14 of 57 77 b. On-street parking on the side of the street abutting the development, if the required cross section includes on-street parking; c. Curb on the side of the street abutting the development; d. Drainage facilities on the side of the street abutting the development; e. Landscape strip with street trees and lawn grass on the side of the street abutting the development; and f. Sidewalk on the side of the street abutting the development. G. ADA: The minimum standards of this Section 3.01 apply to development such that implementation includes constructing new or upgrading existing public improvements to be ADA- compliant. K. Signage:A developer shall remove prohibited signage that Section 3.10.08R identifies. 3.01.04 Street Cross-Sections A.These standards are based on the functional classification of each street as shown in the Woodburn TSP.The street right-of-way and improvement standards minimize the amount of pavement and right-of-way required for each street classification, consistent with the operational needs of each facility, including requirements for pedestrians, bicycles, and public facilities. B.All public streets under the jurisdiction of the City of Woodburn shall comply with the cross- sections depicted in this Section, unless the developer obtains approval of Street Adjustment, modification through Planned Unit Development,Zoning Adjustment, or Variance as the WDO allows them to be applicable. 1. For local residential streets,the standard cross section is Figure 3.01G.Another among local cross section figures, or a custom cross section, may apply through Street Adjustment or Planned Unit Development. Landscape or planter strips shall have area remaining after street tree plantings landscaped with lawn grass or, if the Public Works Director in writing allows, a species of groundcover. Cobblestones, gravel, pebbles, and rocks are prohibited. Bark dust, mulch, or wood chips are permissible only within the immediate vicinity of a street tree trunk.The developer shall install landscape strip irrigation, and shall provide temporary irrigation during construction, per the public works construction code. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 15 of 57 78 w Figure 3.01C WOODLAND AV �N �y T5P: Fi ure 3 Roadway Plan elements (Note: R43 is a requirement to make upgrades to Stacey Allison consistent with the future truckway. R35- R37 are intersection improvements that are funded in the city's Urban Redevelopment Area and which the City has already started design &engineering.) Staff Findings: The proposal is a commercial development therefore the provisions within 3.01 are applicable. The proposed project fronts both Stacey Allison Way and Evergreen Road. Note that no improvements are justified along Center Street at this time since that will remain undeveloped. When future development occurs on the northern property, all DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 16 of 57 79 street frontage improvements along that frontage will be required at that time. Evergreen Road is a minor arterial street therefore improvements must match WDO Figure 3.01C. A new 6-foot-wide sidewalk is proposed to allow for a 6-foot-wide planter strip with new landscaping to meet WDO 3.01.03C.1.e, 3.01.04 and 3.06.03A. This will bring the Evergreen frontage improvements up to the requirements shown in Figure 3.01C. As directed by City staff(and consistent with the City's Council's previous determination), Stacey Allison Way frontage improvements include a new 6-foot-wide detached sidewalk and 5-foot planter strip to match the modified cross-section that was approved for the Allison Way Apartments Phase 1. OFF-SITE TYPICAL SECT/0N.° APPROVED TYPICAL SECTION STACY ALLISON WAY PHASE 1 NOT TO SCALED .Y v. ..._ r�,PKbU!Y ....... ,. .. fRpµ6B H1 J fi' . . . ............. . ... . . ..... . .... ..— n pl l�J-0 p 'T f IY V .•. h ,✓I ,,.._m _ .e 1_mw._ d,IYP! rv�U'L11Mi8' S K�uF INdly0.pol�:UA AeVttYd N°'hfifJ �AkJPPd d6V J�'Jd P)�' 'llr ra QM1X 1FJ`f`dluy�pgy� . ... ................... RM SfMM �,tp tiPl lWdF' ,"fCM4l rP7✓i>d'Kd! AU M%Prtf UYddJer 7.MLP. y AJV 4VNAupb�,u YV d^J'Pdd 1dG�fM;lydl�'.fl'd An additional 5 foot ROW is required along Stacy Allison; which is indicated on the Plan. No additional ROW dedication is required along Evergreen or Center St. at this time. ADA compliant sidewalk curb ramps will be installed at all driveway access points from the subject site onto Stacey Allison and Evergreen. 3.01.05 Street Layout B.Termination of Streets and Off-Street Bicycle/Pedestrian Facilities 3. Continuity of Off-Street Bicycle/Pedestrian Facilities Public bikeway and pedestrian facilities, other than those incorporated in a street right- of-way, shall either: a. Provide for a continuous system, with each segment originating and terminating with a connection to a public street, a public alley, a shared rear lane, a greenway, a public park, or to a designated activity center;or b. Provide stubbed facilities to not preclude subsection(a.)and that may extend beyond the limits of an approved development, when such a public facility has been required by the decision- maker. C. Block Standards DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 17 of 57 80 1. Block length shall not be less than 200 feet and not more than 600 feet, except where street location is precluded by any of the following; b. Blocks adjacent to arterial streets, limited-access highways, collectors or railroads; 2. In any block that is longer than 600 feet, as measured from the right-of-way line of the street to the right-of-way line of the adjacent street,a bikeway/pedestrian facility shall be required through and near the middle of the block. 3. On any block longer than 1,200 feet, corridors per Section 3.01.07 and 3.01.08 may be required through the block at 600 foot intervals. 4. In a proposed development including partition and subdivision, or where redevelopment potential exists and a street connection is not proposed, one or more off-street bicycle/pedestrian facilities may be required as partition or subdivision connection paths or shortcut paths to connect a cul-de-sac or other public street to other public streets, to other bicycle/pedestrian facilities, or to adjoining land to allow for future connections. Staff Finding: The distance along Stacey Allison between Hooper Street to the south and Center Street to the north is more than 2,000 feet. Additional public streets between Hooper and Center are not feasible given the existing development. The proposed project includes 717 feet of property frontage along Stacey Allison. An ADA compliant bikeway/pedestrian sidewalk is proposed along the south property line to provide a pedestrian connection roughly mid-block from Stacey Allison to Evergreen. An additional ADA compliant pedestrian pathway is proposed roughly 420 feet further north to connect Stacey Allison to the main entrance and front walkway of the building. This pedestrian route will continue around the northeast side of the building and connect to Evergreen. See Condition of Approval 7. 3.01.09 Bus Transit Improvements A. Purpose: The purpose of this section is to provide for apparent, attractive, and dignified regional and City bus transit facilities, to improve service, especially to include and be equitable toward Woodburn residents who cannot or do not own private vehicles or drive,to extend the reach of those walking and cycling, to implement Woodburn Comprehensive Plan policies, to implement the Transportation System Plan (TSP), to implement the Transit Plan Update that supplements the TSP, to guide City capital improvement projects, and to have developers improve bus transit stops that have few or no improvements. The provision of bus transit improvements is guided also by the Highway 99E Corridor Plan and other WDO sections. B. Applicability: The standards apply along a frontage for which development causes street improvements and either where a bus stop exists that lacks conforming improvements or the City has adopted a long-range transit plan identifying a new bus stop. The standards apply also to off-site bus stop improvements where and as conditioned. D. Improvements: Per the Director. E. Fees in-lieu: Per Section 4.02.12. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 18 of 57 81 Staff Finding: Considering the adopted Transit Development Plan, approved by City Council via Resolution No. 2213 on June 12, 2023, the preferred service plan illustrates the Highway 214 Express route within a quarter of a mile from the subject property. The City recently implemented the preferred public transit service plan outlined in the Transit Development Plan. The plan identifies a new route ("B") running along Evergreen Road which aligns perfectly with a new bus stop shelter for southbound buses along the proposed project frontage. The City is expected to start operation this new route on May 1St of this year. .................................................................................................................................................................................................................................................................................................................................................................................................................. REEERReEI RVICE Figure 59 Preferred Fixed Route Service Plan Overview Preferred Scenario Based on input from Cie TOP Steering Route A Commiittee,the cammunityr survey results,and the focus group conducted iin Spanish,a Plan eras developed that i � ,/',.. indudea modified versions of tie carucefrtual /r6 routes rrtpvpJluped in the'Serrvice Scenarlvs prese+ntcd above- The Preferred Service Plaer includes three rau.rtesr. •Route A Direct.This route provides bidlrecGonal service connecting the major desibnaion�s in Woodburn. tie v n DL o wmyiP da" The focus of this route is toy provide the most direct a rri., routing possible while also serving these major ° destinations. c Coy 4 •Route B—Local.Thwe route provides service to foe major a v destinations him ttre community as wall as to several ✓ rev•a i residential neighborhoods that are not Served by Route k 0 •RouteC—Highway 214 Express.This nevu route ��n f,.,,, ,,. ,,F ,.,,,,,,J' I T- rri r,r;,x nautos Ctserrve major empl yersi thecom unityand• rwlw reM eannact nn between ma Pater than other i o are in tie cammunutq and gional transit servuces, I.•....... _ �; More detail about tie three routes included)jar the Preferred Service Plan are provided belcow. u A ( .wttln I.r� J.�iy CM srn+ao b E.Dnrrnry F•.an 0MyHI {^t, ' O Consistent with that plan as well as the applicant's requirements under the IMA provisions related to reducing vehicular trips, the applicant will install a bus stop shelter consistent with the City's transit and public works standards. Pursuant to the C above, the applicant is conditioned to provide an easement over the transit shelter as well. 3.02 Utilities and Easements 3.02.01 Public Utility Easements&Public Access Easements A.The Director shall require dedication of specific easements for the construction and maintenance of municipal water, sewerage and storm drainage facilities located on private property. B.Streetside: A streetside public utility easement(PUE)shall be dedicated along each lot line abutting a public street at minimum width 5 feet. Partial exemption for townhouse corner lot: DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 19 of 57 82 Where such lot is 18 to less than 20 feet wide, along the longer frontage, streetside PUE minimum width shall be 3 feet; or,where the lot is narrower than 18 feet,the longer side frontage is exempt from streetside PUE. C. Off-street: The presumptive minimum width of an off-street PUE shall be 16 feet, and the Public Works Director in writing may establish a different width as a standard. D. City& public access: The minimum width of a public access easement along either a bicycle/pedestrian corridor or sidewalk overlap of property,where the easement serves instead of dedication of either land or ROW to the City, shall be per Section 3.01.07C. E. As a condition of approval for development, including property line adjustments, partitions, subdivisions, design reviews, Planned Unit Developments(PUDs),Street Adjustments,Zoning Adjustments, or Variances,the Director may require dedication of additional public easements, including off-street public utility easements and other easement types such as those that grant access termed any of bicycle/pedestrian access, cross access, ingress/egress, public access, or shared access, as well as those that identify, memorialize, and reserve future street corridors in place of ROW dedication. F. Streetside PUE maximum width: 2.Standards: Exempting any lot or tract subject to Figure 3.01B"Major Arterial",the following standards are applicable to a lot or tract with: a. No alley or shared rear lane: 8 feet streetside. Nothing in this section precludes a streetside PUE from variable width where necessary such as to expand around public fire hydrants. Staff Findings: . The applicant will be conditioned (Public Works Condition 3) on dedicating a 5- foot ROW along Stacey Allison as well as a 5 foot PUE along all street frontages. This is based on the recommendations of both PGE and the city's Public Works Dept. 3.02.03 Street Lighting A. Public Streets: Public streets abutting a development shall be illuminated with street lights installed to the standards of the City and the electric utility. A developer shall provide documentation to the attention of the Public Works Director indicating that any needed illumination complies with the standards. A developer is to refer to Illuminating Engineering Society (IES) of North America Recommended Practice 8, Roadway Lighting(RP-8) or other source as the public works construction code specifies. Staff Finding: A Staff adds Public Works Condition 6 to either provide documentation that existing street lighting meets the requirement, or, if it doesn't, install new lighting to meet this requirement. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 20 of 57 83 3.02.04 Underground Utilities C. Off-street: All permanent utility service to and within a development shall be underground,except where overhead high-voltage (35,000 volts or more)electric facilities exist. Staff Finding: " Regarding subsection C., site plans illustrate underground utility connections for the proposed building. 3.03 Setbacks and Open Space Staff Finding: " As analyzed for 2.03, the development complies with setback requirements. Site plans demonstrate the proposal complies with setbacks, projections, and vision clearance area standards. 3.04 Vehicular& Bicycle/Pedestrian Access 3.04.01 Applicability and Permit A.Street Access Every lot and tract shall have minimum access per subsection 1. or 2.: 1. Direct access to an abutting public street, alley, or shared rear lane; or 2.Access to a public street by means of a public access easement and private maintenance agreement to the satisfaction of the Director, revocable only with the concurrence of the Director, and that is recorded.The easement shall contain text that pursuant to Woodburn Development Ordinance(WDO)3.04.03B.3,the public shared access(ingress and egress) right of this easement is revocable only with the written concurrence of the Community Development Director. 3.04.03 Access Management: Driveway Guidelines and Standards B. Number of Driveways 3. For nonresidential uses,the number of driveways should be minimized based on overall site design, including consideration of: a.The function classification of abutting streets; b.The on-site access pattern, including parking and circulation,joint access, turnarounds and building orientation; c.The access needs of the use in terms of volume, intensity and duration characteristics of trip generation. 4. Unused driveways shall be closed. 5. For all development and uses,the number of driveways shall be further limited through access management per subsections C&D below. C. Joint Access 3. Every joint driveway or access between separate lots shall be per the same means as in Section 3.04.01A.2. 4.Standards: a. Easement: Per Section 3.04.01A.2 and minimum width 20 feet. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 21 of 57 84 b. Improvements:The easement and the drive aisle or aisles it follows shall align along centerline. Each shared access drive aisle shall extend to the property line with no terminating curb and no fixed barrier mounted to the drive aisle.The drive aisle minimum width is 20 feet if without side curbs and 21 feet inclusive of side curbs. D. Access management: 2. Commercial: Any development within a commercial zoning district that Section 2.03A lists shall grant shared access to adjacent lots and tracts partly or wholly within any of the same districts. An alley or shared rear lane may substitute for meeting this standard if the alley provides equivalent public access. Zoning Adjustment is permissible. E. Interconnected Parking Facilities 1.All uses on a lot shall have common or interconnected off-street parking and circulation facilities. 2.Similar or compatible uses on abutting lots shall have interconnected access and parking facilities. Access Requirements Table 3.04A 1 to 4 Dwellings, 5 or More Dwelling or Commercial or Living Units or Living Units,School, or Industrial Use 6 6 Individual Lots House of Worship 1-way 8 minimum 10 minimum 10 minimum 20 maximum 20 maximum Paved Width 20 minimum Commercial/Mixed- of Driveway 2-way 14 minimum 24 maximum* Use: 3,4,7,8 (feet) 16 maximum 7 *(Add 6 ft maximum if 20 minimum a turn pocket is added) 24 maximum* *(Add 12 ft maximum if a turn pocket is added) Industrial: 22 minimum 36 maximum* *(Add 8' if a turn pocket is added) Manufactured 10 minimum n/a n/a Dwelling Park Major Arterial, Commercial Minor Arterial, n/a 36 minimum 36 minimum, Throat Service Collector Industrial: Length (feet) 50 minimum Access or Local n/a 18 minimum 18 minimum Street DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 22 of 57 85 Corner Access or Local 30 minimum 30 minimum 30 minimum Clearance Street (feet) Guidelines 1 Service Collector 50 minimum 50 minimum 50 minimum (See Figure Minor Arterial 245 minimum 245 minimum 245 minimum 3.04B) Major Arterial 300 minimum 300 minimum 300 minimum Driveway on the 22 minimum 50 minimum 50 minimum Driveway same parcel Separation Access or Local none none none Guidelines Street 1,2 (feet) Service Collector 50 minimum 50 minimum 50 minimum (See Figure 3.04B) Minor Arterial 245 minimum 245 minimum 245 minimum Major arterial 300 minimum 300 minimum 300 minimum Access to a Major or Minor Required RequiredRequired Arterial Turnarounds Required if the 9 driveway length to Requirements Access to any the lot located Requirements per the per the other street furthest from the Woodburn Fire District Woodburn Fire street exceeds 150 District feet 1. The separation should be maximized. 2. Driveways on abutting lots need not be separated from each other, and may be combined into a single shared driveway. 3. Driveways over 40 feet long and serving one dwelling unit may have a paved surface minimum 8 feet wide. 4. Notwithstanding the widths listed in this table,the minimum clearance around a fire hydrant shall be provided (See Figure 3.04D). 5. Throat length is measured from the closest off-street parking or loading space to the right-of-way. A throat applies only at entrances(See Figure 3.058). 6. Maximum of 4 individual lots can be served from single shared driveway(See Figure 3.04A)except where and as Section 3.04.03D.3 "Flag Lots"supersedes. 7. It is permissible that the Oregon Fire Code (OFC) as administered by the independent Woodburn Fire District may cause driveway widths to exceed minimums and maximums. It is a developer's responsibility to comply with the OFC. 8. Width measurement excludes throat side curbing, if any. 9. Refer to OFC Appendix D, Figure D103.1. Staff Findings: A As a minor arterial street, only one driveway access is allowed along Evergreen Road pursuant to WDO 3.04.03B.3. The driveway is proposed to be roughly 150 DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 23 of 57 86 feet from the existing driveway into the Cascade Meadow Apartments to the south. The 245-foot separation shown in Table 3.04A is a guideline rather than a required standard. Staff can support this driveway location. The Applicant is proposing this driveway location to allow easier (less circuitous) vehicle access into the site as well as more direct fire access to the Fire Department Connection (FDC) which will be located southwest of the building. Per the project Traffic Impact Analysis (TIA), traffic volumes at the Hooper Street/Evergreen Road intersection just south of the Oxford intersection are exceptionally low during peak hours. Hooper serves a similar function to Oxford and therefore would also have low traffic volumes at the intersection with Evergreen. The apartment access may be slightly busier than the Oxford intersection but traffic from both would be minimally impacted by the new, proposed access point to Evergreen. All driveways meet the width requirements of Table 3.04A, except for the northern driveway on Stacy Allison, which needs to be modified in the final engineering drawings. This is addressed through Condition of Approval 10. The two driveways accessing Stacey Allison are separated by more than 400 feet, meeting the minimum separation distance required by Table 3.04A. To meet 3.04.03D.2 and 3.04.03C.4, a driveway will be installed to connect the subject property to the commercial properties and Center Street to the north. As indicated on the Architectural Site Plan, a future driveway will connect to commercial properties to the south. 3.04.05 Traffic Impact Analysis B. A transportation study known as a transportation impact analysis (TIA) is required for any of the following: 1. Comprehensive Plan Map Change or Zone Change or rezoning that is quasi-judicial, excepting upon annexation designation of zoning consistent with the Comprehensive Plan. 2. A development would increase vehicle trip generation by 50 peak hour trips or more or 500 average daily trips(ADT) or more. 3.A development would raise the volume-to-capacity(V/C) ratio of an intersection to 0.96 or more during the PM peak hour. 4. Operational or safety concerns documented by the City or an agency with jurisdiction, such as ODOT or the County, and submitted no earlier than a pre-application conference and no later than as written testimony entered into the record before the City makes a land use decision. 5. A development involves or affects streets and intersections documented by ODOT as having a high crash rate, having a high injury rate of persons walking or cycling, having any cyclist and pedestrian deaths, or that partly or wholly pass through school zones that ODOT recognizes. 6. Where ODOT has jurisdiction and ORS or OAR, including OAR 734-051, compels the agency to require. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 24 of 57 87 A developer shall submit a traffic impact letter or memo when the City or an agency with jurisdiction does not require a TIA. A development within the Downtown Development and Conservation (DDC) zoning district is exempt from TIA submittal. Staff Finding: A The applicant provided a traffic impact analysis (attachment 104) from a registered professional engineer and which has been reviewed and deemed in conformance with all of the above requirements by City Staff, the City's contract traffic engineer, as well as ODOT(see attachment 105).The analysis indicates that all 16 intersections included in the study will operate within the identified standards with the exception of three intersections along Evergreen Rd., specifically: • Stacy Allison Way/Evergreen Rd. • Hayes Street/Evergreen Rd. • Harvard Drive/Evergreen Rd. These three intersections are projected to exceed there operating standards even without this project being approved. The City had identified these projects in the recently adopted TSP for updates and the engineering work has already begun on designing new signal improvements at Stacy Allison/Evergreen and Hayes and Evergreen. Harvard/Evergreen is being designed with roundabout. Construction on these important public projects is expected to be underway later this year. The TIA includes an analysis of these intersections after these improvements are completed (and the store is open)and it indicates that all three will operate within the mobility standards. The cost of these three projects is expected to be approximately the same as the transportation SDC's that will be collected at time of building permit issuance. Owing to the impacts this project will have on these intersections, and the desire to have development pay its "own way" to the greatest degree possible, staff anticipates using all of the transportation SDC's collected for the project to go paying for these three nearby intersections. 3.04.06 Bicycle/Pedestrian Access between Sidewalk and Building Entrances B. Wide walkway: Excluding residential development other than multiple-family dwellings, 1 wide walkway minimum or with each of two frontages for sites of two or more frontages. Where a development includes or abuts a public off-street bicycle/pedestrian facility, a wide walkway shall also connect to the facility. Minimum width 8 feet,ADA-compliant, and not gated. Gating is allowed only if the development driveway throat or throats are gated. C. Walkway: Minimum 1 per frontage except where a wide walkway supersedes. Minimum width 6 feet and may have stairs. For residential development of other than multiple-family dwellings, each lot shall have a walkway minimum 2 feet wide of minimum length such that it connects sidewalk with an entrance to each DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 25 of 57 88 and every dwelling on a given lot. The walkway shall not overlap a driveway, and where a walkway is flush with a driveway, it shall either(1) be raised minimum 3 inches, have curbing which may be mountable, and be minimum 3 feet and 3 inches wide, or(2) be dyed, patterned, stamped or otherwise treated or of a different paving material than the driveway to visually distinguish it from the adjacent driveway. D. Walkway and wide walkway crossings: A development with crossings of drive aisles shall have one or more crossings made visually distinct from adjacent vehicular pavement and minimum width equal to that of the walkway. 1. Wide walkways: Minimum width 8 ft each. Every crossing along a wide walkway shall be either an extension of wide walkway poured concrete at the same grade as adjacent vehicular area or in the form of a speed table, also known as a raised walkway crossing, minimum 4 inches high and with vehicular side ramps maximum slope ten percent and with striped warning triangles. ADA-compliant transitions or ramps shall be minimum 5 feet wide. For multiple-family dwelling development,the speed table option shall be a requirement. 2. Walkways: Where there are walkways and any of them cross drive aisles, all of the crossings along minimum 1 walkway shall be either an extension of walkway poured concrete at the same grade as adjacent vehicular area and same width as the walkway or in the form of a speed table, also known as a raised walkway crossing, minimum 4 inches high. A developer shall stripe remaining walkway crossings with any of hatch or ladder pattern or three or more bars perpendicular to the crossing. 3. See Section 3.05.02N regarding crossings within multiple-aisle parking areas. Staff Finding: The proposal is new commercial development therefore the provisions apply.The plans illustrate a six-foot-wide public sidewalk connection along the south side of the property between Stacey Allison and Evergreen Rd. Separately, wide walkways eight feet in width meeting WDO 3.04.06 are proposed from the building to both Stacey Allison Way and Evergreen Road. Where these wide walkways cross drive aisles, they will be poured concrete to provide visual cues further delineating the walking space from the vehicular drives. These walkways also connect to the privately owned on- site bicycle parking. The walkways will be ADA compliant and not gated. 3.05 Off-Street Parking and Loading 3.05.01 Applicability 3.05.02 General Provisions A. All required parking and loading spaces shall be retained and maintained in accordance with the standards of the WDO. B.The land for off-street parking and loading areas shall either be: 1. Owned in fee title by the owner of the structure or site being served by the parking area, or D. Location 4. In non-residential districts, off-street parking and storage shall be prohibited within a setback adjacent to a street,except if screened per Section 3.06.05B.Vehicle parking within the public right- of-way shall not be eligible for fulfilling any required off-street parking requirement. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 26 of 57 89 E. Setback 1. In commercial and industrial zones, the parking, loading, and circulation areas shall be set back from a street a minimum of five feet. 2. Parking, loading, and circulation areas shall be set back from a property line a minimum of five feet, excepting any of (a) interior lot lines of lots in a development that have the same owner or that have outbuildings as part of a complex of buildings sited amid parking, such as in an office or industrial park or strip mall, (b)a shared access and use agreement between or among landowners per Section 3.04, and (c) shared access in the specific context of residential development of other than multiple-family dwellings. F. All vehicle parking and loading areas shall be paved to the standards of this ordinance (Section 3.04.04), except that in the IP, IL, SWIR, and P/SP zones, storage areas used for equipment that may damage pavement may be stored on a gravel-surface storage area. A gravel storage area shall be constructed to a minimum of surfacing of: six inches of one inch minus to three inch minus gravel. If three inch minus is used, the top two inches shall be one inch minus. The property owner shall maintain a gravel storage area to ensure continued drainage and dust control. A paved access apron to any paved access road is required, regardless of the storage area surface. G.All vehicle parking, loading,and storage areas shall be graded and provide storm drainage facilities approved by the Director. H.All parking spaces, except those for residential development other than multiple-family dwellings, shall be constructed with concrete or rubber bumper guards or wheel barriers maximum 4 inches high that prevent vehicles from damaging structures, projecting over walkways so as to leave less than 4.5 feet of unobstructed passage, or projecting over wide walkways, abutting properties, or rights-of- way. I. Maneuvering areas shall be designed in compliance with this Section (Table 3.05B). Off- street parking areas shall be designed so that no backing or maneuvering within a public right-of-way is required.These provisions do not apply to dwellings other than multiple-family. J. All uses required to provide 20 or more off-street parking spaces shall have directional markings or signs to control vehicle movement, and any dead-end drive aisle 50 feet or longer shall have an MUTCD-compliant"no outlet"sign. K. Except for dwellings other than multiple-family, off-street parking spaces shall be delineated by double parallel lines on each side of a space, except a side adjacent to any of curb or ADA parking accessible aisle. The total width of the lines shall delineate a separation of two feet. The lines shall be four inches wide (See Figure 3.05C). L. Parking area lighting for all developments shall conform to Chapter 3.11. M. Required parking spaces shall be available for parking of operable vehicles of residents,customers, patrons and employees and shall not be used for the storage of vehicles or materials or for the parking of fleet vehicles, except for those fleet vehicles: 1. Driven by an employee to the site each work day from home, or 2.Stored during periods other than normal business hours. N. Walkway crossings: Parking areas with multiple aisles shall have minimum 1 walkway or wide walkway that passes through the parking area to the aisle farthest from the building. Each walkway crossing shall conform to Section 3.04.06D. 3.05.03 Off-Street Parking A. Number of Required Off-Street Parking Spaces 1. Off-street vehicle parking spaces shall be provided in amounts not less than those set forth in this Section (Table 3.05A). DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 27 of 57 90 2. Off-street vehicle parking spaces shall not exceed two times the amount required in this Section (Table 3.05A). B.ADA:Accessible parking shall be provided in amounts not less than those that ORS 447.233 requires.The number of accessible spaces shall be included as part of total required vehicle parking spaces. C. A maximum of 20 percent of the required vehicle parking spaces may be satisfied by compact vehicle parking spaces. D. Off-street vehicle parking spaces and drive aisles shall not be smaller than specified in this Section (Table 3.05C). E. A developer shall provide off-street bicycle parking per the minimums and standards in Tables 3.05D&G and the additional standards in Section 3.05.06. Off-Street Parking Ratio Standards Table 3.05A Use 1,2 Parking Ratio-spaces per activity unit or square feet of gross floor area 7. General retail sales(such as food and beverages, clothing, sporting goods, health and personal care 1/ square feet items, and motor vehicle parts) 1.The Director may authorize parking for any use not specifically listed in this table.The applicant shall submit an analysis that identifies the parking needs, and a description of how the proposed use is similar to other uses permitted in the zone.The Director may require additional information, as needed,to document the parking needs of the proposed use. 2.There is no required parking ratio for non-residential uses and residential units above first floor commercial uses in the DDC zone (See Section 3.07.07.C.12). 3.See Tables 3.05C&E for minimum carpool/vanpool and electric vehicle parking and Table 3.05D for minimum bicycle parking. 4. In compliance with OAR 660-046-0220(2)(e). Parking Space and Drive Aisle Dimensions Table 3.058 Stall Curb Stripe Stall to Drive Aisle Width Parking Type of Space Width Length Length Curb (feet) Angle feet (feet) (feet) (feet)) ( ) 1-way 2-way A B C D E F G Standard 9.0 9.0 18.0 18.0 24.0 90° Compact 7.5 7.5 15.0 15.0 22.0 (Perpend- 24.0 icular) Car Accessible Aisle 6.0 6.0 18.0 18.0 24.0 Van Accessible Aisle 8.0 8.0 18.0 18.0 DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 28 of 57 91 Parking Space and Drive Aisle Dimensions Table 3.05B Stall Curb Stripe Stall to Drive Aisle Width Parking Angle Type of Space Width Length Length Curb (feet) (feet) (feet) (feet) (feet) 1-way 2-way A B C D E F G 1. A parking space other than compact may occupy up to 1.5 feet of a landscaped area or walkway as measured from face of curb. Compact may occupy up to six inches. At least 4.5 feet clear width of a walkway must be maintained. 2. Space width is measured from the midpoint of the double stripe. 3. Curb or wheel stops shall be utilized to prevent vehicles from encroaching on abutting properties, rights-of-way, or wide walkways. 4. The access aisle must be located on the passenger side of the parking space, except that two adjacent parking spaces may share a common access aisle. 5. Where the angle of parking stalls differ across a drive aisle,the greater drive aisle width shall be provided. 6. In the context of residential development of other than multiple-family dwellings, parking space minimum dimensions shall be 8 feet wide by 18 feet long, including within a carport or garage. See also Section 3.05.03F.1. 7. The Oregon Fire Code(OFC) as administered by the independent Woodburn Fire District may cause drive aisle widths to exceed the minimum and maximums in this table. 8. Zoning Adjustment permissible. Staff Findings: " Pursuant to WDO 3.05.02D.1, off-street vehicle parking is proposed on the same lot as the proposed building. Per Table 3.05A, a minimum of 336 off-street parking stalls must be provided as part of the proposed development.The number of stalls proposed (i.e., 504 stalls) exceeds that required by Table 3.05A, however, is less than double that required in order to stay under the limit imposed by WDO 3.05.03A.2. As required by WDO 3.05.02D.4 and 3.05.02E, no parking is proposed within the setbacks, and all parking and circulation areas are setback a minimum of 5-feet from boundary streets as well as interior property lines. All parking and circulation areas are paved, graded, and include storm drainage facilities in compliance with WDO 3.05.02F and G. Concrete curbs, wheel stops and steel pipe bumpers are proposed as necessary to meet the requirements of 3.05.02H. Stall width and length, accessible aisles and drive aisles meet or exceed the minimum dimensions shown in Table 3.05B and are in compliance with WDO 3.05.021. Directional markings and double stall delineation lines are proposed pursuant to 3.05.02J and K. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 29 of 57 92 A wide walkway meeting WDO 3.04.06D is proposed to pass through the parking area and extend all the way to Stacey Allison way to meet 3.05.02NThe proposal is a new commercial office building totaling 14,052 square feet. Pursuant to Table 3.05A row 12, the minimum parking requirement for the proposal is 40 stalls. Site plans illustrate 41 new parking stalls proposed, 7 of which are compact size and the remainder are standard size. Parking stalls and drive aisles are noted to conform with the dimension requirements in Table 3.05B. Bicycle parking is analyzed further under Section 3.05.06. A Staff adds Condition of Approval 11a to memorialize the accessible parking requirement. Carpool/Vanpool Parking Table 3.05C Development or Use Description Stall Minimum Number or Percent 1. Non-residential Zero to 19 total minimum required off- n/a development within street parking spaces commercial zoning 20 to 33 total 1 stall districts 34 to 65 total 2 stalls 66 or more total 2 stalls or 3%,whichever is greater 1. Standard applies even if the site is not zoned P/SP. 2. See Section 3.05.03H for carpool/vanpool (C/V)development standards. H. Carpool/vanpool (C/V)stalls shall meet the following standards: 1. Convenient locations: The distance from a stall, in whole or in part, shall be maximum 50 feet to a building perimeter walkway or,where there is no perimeter walkway, a building main or staff-only entrance. 2.Striping: Stripe each stall in lettering 1 ft high min"CARPOOL/VANPOOL"or similar. 3.Signage: Post at each stall a wall-mounted or pole-mounted sign for"Carpool/Vanpool"or similar. Each sign 1% by 1 foot minimum with top of a posted sign between 5%and 7 feet high max above vehicular grade. Staff Findings: ,°The proposal is a new commercial office building within the Commercial Office zone. As analyzed for Table 3.05A, the minimum parking requirement for the DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 30 of 57 93 proposal is 40 stalls. The carpool/vanpool parking requirement is therefore 2 stalls. Plans illustrate 2 carpool/vanpool parking stalls provided. . Staff adds Condition of Approval 11b to memorialize the striping and signage requirements for carpool/vanpool parking. Electric Vehicle Parking Table 3.05E i' ii . V Development or Use Description Stall Minimum Number or Percent 2. Non-residential Zero to 19 total minimum required spaces n/a development within 20 to 39 total 2 stalls commercial zoning 40 or more total 2 stalls,or 5%of total districts minimum required spaces, whichever is greater 1. Standard applies even if the site is not zoned P/SP. 2. The Director may authorize EV parking for any use that the Development or Use column does not clearly include. 3. See Section 3.05.031 below for EV development standards. 4. Administrative note: As of January 2022, electrical permitting remains through the County instead of the City by agreement between the City and County. 1. Electric vehicle(EV) includes both electric vehicle and plug-in hybrid vehicle, and EV parking stalls shall meet the following standards: 1. Convenient locations: The distance from a stall, in whole or in part, shall be maximum 50 feet to a building perimeter walkway or,where there is no walkway, a building main or staff-only entrance. 2. Charging level: minimum Level 2 (240 volt alternating current [AC] charging), or faster charging. 3.Striping: Stripe each stall in lettering 1 ft high min"ELECTRIC VEHICLE CHARGING"or similar and stencil of an EV image or logo. 4.Signage: Post at each stall a wall-mounted or pole-mounted sign for"Electric Vehicle Charging" or similar and include an EV image or logo. Each sign 1% by 1 foot minimum with top of a posted sign between 5%and 7 feet high max above vehicular grade. 5. Management/operations: The landowner or property manager shall keep EV stalls available for EVs and plug-in hybrid vehicles and keep conventional gasoline vehicles from parking in them, and in the context of multiple-family dwelling development: a. Priority users shall be tenants, and guests/visitors would be secondary. b. May charge EV stall users for the costs of charging an EV through a charging station, but shall not(1)charge users for either simply parking an EV or plug-in hybrid vehicle in an EV stall or for leaving such a vehicle parked without actively charging, and (2)shall charge to recoup costs to DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 31 of 57 94 the landowner or property manager and not generate profit for the landowner or property manager. (This does not preclude the landowner or property manager contracting with a for- profit company to manage EV charging stations). c. Shall not charge any fee that discriminates among particular EV parking stalls based on the perception of some stalls being more convenient or otherwise desirable than others. It is anticipated but not required that the layout would be that each charging station would serve a pair of stalls. Staff Findings: The proposal is a new retail building within the CG zone. The minimum electric vehicle charging stall requirement is to provide 17 (Level 2) EV stalls. The plans propose eight Type 3 Tesla chargers; hence the need for a variance. The variance criteria are outlined in Section 5.03.12 of the WDO and reviewed later in this report. A Regardless of the result of the variance request,Staff adds Condition of Approval 11cto memorialize the charging level, striping, and signage requirements. 3.05.04 Off-Street Loading& Unloading A.Standard: Loading and unloading for all multiple-family dwelling and non-residential development shall not encroach within the ROW of a street with a functional class designation higher than local. B.Administration:The Director may require a developer to submit a site plan sheet or sheets illustrating where and how loading and unloading would occur such that a development would meet subsection A above. Staff Finding: " The site plan demonstrates that no loading will encroach into street right-of- way. 3.05.05 Shared Parking Staff Finding: The applicant's narrative states no shared parking is proposed therefore the provisions do not apply. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 32 of 57 95 Off-Street Bicycle Parking Table 3.05D IIIIIIIIII. Development or Use Description Stall Minimum Number, Percent, or Ratio 2. Non-residential Whichever of the two rates,it greater: development within (1)2 stalls or,15%of total minimum commercial zoning required parking spaces,whichever is districts greater;or, (2)2 stalls or equal to 0.6/1,000 square feet GFA,whichever is greater. 1. Standard applies even if the site is not zoned P/SP. 2. Each modular classroom counts as a classroom. 3. The Director may authorize off-street bicycle parking for any use that the Development or Use column does not clearly include. 4. See Section 3.05.06 for bicycle parking development standards. 3.05.06 Bicycle Parking Standards B.Applicability:Applies to total minimum required bicycle parking per Table 3.05D and any excess. C. Standards: Developers shall install parking in lockers or racks that meet the following: 1.Surface:The area devoted to bicycle parking shall be paved if outdoors or otherwise hard surfaced if enclosed or indoors. Outdoor pavement shall be asphalt, bricks, cobblestone rectangular pavers, concrete pavers, poured concrete, structurally supported fiber cement or wood planking, or combination. 2. Facility:Where bicycle parking is provided with racks,they shall meet the following: a.The rack shall be designed so that the bicycle frame and one wheel can be locked to a rigid portion of the rack with a U-shaped shackle lock,when both wheels are left on the bicycle; b. If the rack is a horizontal rack, it shall support the bicycle at two points, including the frame; and c.The rack must be securely anchored with tamper-resistant hardware. 3. Dimensions: Bicycle parking spaces, aisles and clearances shall be per Table 3.05G,which Figures 3.05E, F, &G illustrate. 4.Signage: If bicycle parking is not visible from sidewalk,wide walkway, or the main entrance of the building(s), a developer must install a permanent sign, minimum 1 by 1.5 feet, at the main entrance of each primary building indicating the location of bicycle parking. Figure 3.05H illustrates examples. 5. Proximity:A developer shall construct or install bicycle parking within maximum 50 feet of the main entrance and per Figures 3.05J-L. 6. Covered/sheltered:A developer shall cover or shelter from precipitation among the total required bicycle parking minimum 50 percent of any and all parking that is outdoors. 7. Multiple-family dwellings: In multiple-family dwelling development where buildings have no elevators, some of the bicycle parking that a developer may provide in stairwells and patio and DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 33 of 57 96 balcony outdoor closets may count towards the total minimum required bicycle parking stalls. Specifically, all stall facilities in stairwells and patio outdoor closets may count,while 50 percent of stall facilities in balcony outdoor closets may count. A developer may provide a stall in an indoor closet or alcove of a dwelling if the space meets the minimum dimensions per Table 3.05G and includes a hook or rack meets the locking standards of above subsection 2 and is foldable or retractable. All patio physical separations from common area shall have a gate minimum 2 feet,4 inches wide. 8. Plan review:The developer or contractor shall submit the following information with applications for any of land use or building permit review: a. Location;where not obvious, access route(s)to; and number of bicycle parking stalls; b. Notated dimensions of all stalls, aisles, maneuvering areas, and clearances; and c. If applicable, information adequate to illustrate the racks and stalls that meet a particular set of standards. Bicycle Parking Stall Minimum Dimensions Table 3.05G ................................................................................................................ Z I ii Dimension Conventional Alternative(feet) 2 Horizontal 1 Horizontal as Wall- Vertical or Wall-Mounted 1,4,5 (feet) Attached 3 Length 6 6 3 ft,4 inches Width 2 2 1 ft, 5 inches Height 3 ft,4 inches 3 ft,4 inches 6 Maneuvering width 7 5 5 5 Clearance 0.5 8 1 9 n/a 1. See Figure 3.05E. 2.The purpose of alternatives primarily is to allow multiple-family dwelling developments to include more easily a number of stalls through any of communal storage rooms and sheds and on building, freestanding, and trash and recycling enclosure walls. 3.See Figure 3.05F. 4. See Figure 3.05G. 5. Vertical or wall-mounted maximums: a. Where the total minimum required bicycle parking is fewer than 4 stalls,vertical and wall- mounted stalls are prohibited. b. Where the total minimum required bicycle parking is 4 or more stalls, of the subtotal that is outside a building, maximum 50 percent may be vertical stalls. 6.See Figure 3.05H. 7.Sidewalk:Where a bicycle parking stall is adjacent to a sidewalk, off-street bicycle/pedestrian facility,walkway, or access way,the maneuvering area may overlap it. 8. Measured to stall length or width boundary. 9. Measured to centerline of outermost bar of facility. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 34 of 57 97 Main entrance Landscaping 7J Walk -rr L rnrg than ," STREET Figure 3.05J—Bicycle Parking Proximity: One Building, One Entrance Staff Finding: '"The proposal is for a new 84,073 SF retail use within the Commercial General zone. As analyzed forTable 3.05A,the minimum parking bike parking requirement is 50 stalls. All stalls are provided on a paved surface and of the 50 stalls provided, 66% are covered. The plans illustrate 50 spaces meeting all of the size and signage location requirements; however, it may not be apparent that the requirement to have bike parking within 50 feet of the entrance (per 3.05J) is being met. Therefore, the Director has made an interpretation that pursuant to the Figure, not all of the required bike stalls must be within 50 feet of the door. Staff interprets this Figure to indicate that short term parking spaces need to be within 50 feet of an entrance. The proposed plans provide for 12 spaces within the 50 of the entry,the remaining DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 35 of 57 98 are under a shelter approximately 100' feet away. It is the Director's interpretation that this meets the letter, and intent, of the provided within 50 feet of the entrance as is required per 3.05.06. 3.06 Landscaping 3.06.01 Applicability The provisions of this Section shall apply: A.To the site area for all new or expanded multiple-family dwelling and non-residential development, parking and storage areas for equipment, materials and vehicles. 3.06.02 General Requirements A. Building plans for all uses subject to landscaping requirements shall be accompanied by landscaping and irrigation plans. B.All required landscaped areas shall be irrigated unless it is documented that the proposed landscaping does not require irrigation. C. All shrubs and ground cover shall be of a size upon installation so as to attain 80%of ground coverage within 3 years. D. Installation of plant materials and irrigation specified in an approved landscaping plan shall occur at the time of development and shall be a condition of final occupancy.Should site conditions make installation impractical, an acceptable performance guarantee may be approved, subject the requirements of this Ordinance (Section 4.02.08). E.The property owner shall be responsible for maintaining all landscaping, fences, and walls in good condition, so as to present a healthy and orderly appearance. Unhealthy and dead plants shall be removed and replaced, in conformance with the original landscape plan. F.The required number of plant units shall be met by a combination of plant materials listed in this Ordinance(Table 3.06B). G. Required plant units need not be allocated uniformly throughout specified landscaping areas, but may be grouped for visual effect. H. Landscaped areas that are not covered by plant materials shall be covered by a layer of bark mulch or decorative rock, a minimum of two inches in depth. I. A minimum 4 inch high and wide concrete curb shall be provided between landscaped areas and parking and circulation areas. J. Plant materials shall be appropriate to the climate and environment of Woodburn. Inclusion of plants identified in "Suggested Plant Lists for Required Landscaping", published by the Portland Bureau of Development Services, can be used to meet this standard.A landscape architect, certified arborist or nursery person may also attest to plant appropriateness. 3.06.03 Landscaping Standards A.Street Trees The purpose of the street tree provisions is to get and preserve street trees, to shade those walking and provide them psychological protection from passing vehicles,to calm those driving, to help spatially define streets through canopy, to absorb stormwater and pollutants,to reduce the urban heat island effect, and to raise value of adjacent property. Within the public street right-of-way abutting a development, street trees shall be planted to City standards, prior to final occupancy or earlier if conditioned. 1.A number of trees equal to one tree per every 30 feet of street frontage within a block face, shall be planted within the right-of-way. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 36 of 57 99 2.Street trees shall be planted according to the Boundary Street classification per the Transportation System Plan: c. Small trees shall be planted along all other streets. Refer to Table 3.06B below for the definition of size categories at maturity. 3. Root barriers: The developer shall install root barriers per the public works construction code. 4. Fee in-lieu: Per Section 4.02.12. B.Site landscaping shall comply with Table 3.06A. Planting Requirements Table 3.06A Location Planting Density, Minimum Area to be Landscaped, Minimum 1.Setbacks abutting a street 1 PU/15 square feet Entire setback excluding driveways 2. Buffer yards 1 PU/20 square feet Entire yard excluding off-street parking and loading areas abutting a wall 3. Other yards 1 PU/50 square feet Entire yard, excluding areas subject to more intensive landscaping requirements and off-street parking and loading areas 4. Off-street parking and • 1 small tree per 10 parking • RS, R1S, RSN, RM, RMN, P/SP, CO, loading areas spaces; or1 CG and MUV zones: 20%of the paved surface area for off-street • 1 medium tree per 15 1 parking, loading and circulation parking spaces; or • DDC, NNC, IP, IL, and SWIR zones: • 1 large tree per 25 parking 10%of the paved surface area for spaces 1 off-street parking, loading and and circulation 1 PU/20 square feet excluding • Landscaping shall be within or required trees 2 immediately adjacent to paved areas 5. Common areas, except 3 PU/50 square feet Entire common area those approved as natural common areas in a PUD 1. Trees shall be located within off-street parking facilities, in proportion to the distribution of the parking spaces. 2. Required landscaping within a setback abutting a street or an interior lot line that is within 20 feet of parking, loading and circulation facilities may also be counted in calculating landscaping for off-street parking, loading and circulation areas. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 37 of 57 100 Plant Unit(PU)Value Table 3.06B Material Plant Unit(PU)Value Minimum Size 1. Significant tree 1 15 PU each 24" Diameter 2. Large tree (60-120 feet high at 10 PU each 10' Height or 2"Caliper maturity) 1 3. Medium tree(40-60 feet high at 8 PU each 10' Height or 2"Caliper maturity 1 4. Small tree(18-40 feet high at maturity)1 4 PU each 10' Height or 2"Caliper 5. Large shrub(at maturity over 4'wide x 2 PU each 3 gallon or balled 4' high) 1 6. Small to medium shrub(at maturity 1 PU each 1 gallon maximum 4'wide x 4' high) 1 7. Lawn or other living ground cover 1 1 PU/50 square feet 8. Berm 2 1 PU/20 lineal feet Minimum 2 feet high 9. Ornamental fence 2 1 PU/20 lineal feet 2%-4 feet high 10. Boulder 2 1 PU each Minimum 2 feet high 11. Sundial, obelisk, gnomon, or gazing ball2 2 PU each Minimum 3 feet high 12. Fountain 2 3 PU each Minimum 3 feet high 13. Bench or chair 2 0.5 PU/lineal foot 14. Raised planting bed constructed of 0.5 PU/lineal foot of Minimum 1 foot high, brick,2stone or similar material except greatest dimension minimum 1 foot wide in CMU least interior dimension 15. Water feature incorporating i 2 2 per 50 square feet None stormwater detention 1. Existing vegetation that is retained has the same plant unit value as planted vegetation. 2. No more than twenty percent(20%)of the required plant units may be satisfied by items in lines 8 through 15. Staff Findings: The landscaping plans illustrate conformance with the requirements in 3.06.02 and the planting requirements in Table 3.06A. For clarity in determining the exact planting requirements (measured in "Plan Units"), Staff requested that the applicant provide a separate landscaping sheet (LS-01) below, which depicts in color each of the three planting areas (Buffer, Off-Street, and Setback). The plan provides landscaping that far DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 38 of 57 101 exceeds the requirements of the WDO. At Staff's request the applicant enhanced the landscaping buffers and plantings along the both frontages. A'double layer' of street tree plantings are provided and the depth of the landscaped buffers are approximately 30 feet and 45 feet in depth along both Evergreen and Stacy Allison Way, respectively. PhANT SENFIW114P ---_ .. . SIACYALLISON V AY L � p n�QL LS-02 w LS-03 • LS-04 ! f „ y III �y M ,✓>>nea iy A 11 11 L -05 1 LS-06 LS-07 TUTA&I.AWR&GAYF ANAA PI.AMT YMR4 PM4}YI�tFP C ii IT AI[I]YIIARMEMT9+� AYI.AYATUVI w�' 1.5, Landscaping Sheet 01 (LS-01) C. Parking area landscape island standards: Landscape islands or peninsulas shall cap each aisle end to protect parked vehicles from moving vehicles, emphasize vehicular circulation patterns, and shade vehicles and pedestrians. Structured parking is exempted. 1. Each south, southwest, and west island or peninsula cap of a parking aisle shall be minimum 84 square feet within back of curbing, narrowest dimension 6 feet within back of curbing, and contain a tree. 2. Remaining islands and peninsulas shall be minimum 28 square feet within back of curbing and narrowest 2 feet within back of curbing, except where subsection 3 below supersedes. 3.There shall be no more than 10 consecutive parking spaces in a parking aisle without a mid-aisle landscape island or peninsula. For consecutive parking spaces that include one or more accessible/ADA spaces and their aisles,the maximum shall be 9 consecutive parking spaces. Mid- aisle landscape islands or peninsulas shall be to the same standards as subsection 1 above. 4.At drive aisle crossings of walkways and wide walkways that respectively Sections 3.04.06D and 3.05.02N describe, each south, southwest, and west side shall have a landscape island or peninsula to the same standards as subsection 1 above. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 39 of 57 102 Staff Finding: " The plans indicate parking lot landscape islands that meet all of the requirements of this section in terms of number, size, and dimension. Importantly, during their review of the preliminary stormwater plans for this site, the City's Public Works Department raised concerns about the long-term viability of the public storm facility to the west of Stacy Allison Way. This facility was originally sized over 30 years ago to accommodate development activity along Stacy Allison Way (including this property) however, since that time, the stormwater requirements relating to retention, quality and treatment have become much more stringent. With new, more extensive requirements being placed on the City DEQ related to our stormwater treatment —the City Engineer has requested that additional on-site storm detention areas be included on this property. While there are no immediate issues related to accepting the stormwater from this particular site, the City Engineer has expressed concerns about the compounding impacts of future developments in this area. In an effort to minimize the impacts on the site plan and minimizing the costs to the developer. Staff is recommending Condition of Approval 12 that requires at least 50% of the parking landscape islands to be modified to incorporate rain gardens or similar storm water management systems. 3.06.05 Screening A.Screening between zones and uses shall comply with Table 3.06D. Screening Requirements Table 3.06D N = No screening required F=Sight-obscuring fence required W=Architectural wall required D=Architectural wall, fence, or hedge may be required in the Design Review process Adjacent properties—zone or use that receives the benefit of a N screening no c a' a; = 3 ao c Q v N aJ o a1 a1 a>, s N a1 aJ N fa n T ._ 3 N N N - > ø E E ° •L +• P a1 Property being Developed- c Z z > s s must provide screening if no Z a, D c ,M " 3 comparable screening exists on c ° c N ° 3 E Y abutting protected property 16C o O3 w - a in -3a o u so 5. CG or MUV zone WZ D D D D D W2 W2 D w2 DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 40 of 57 103 1. Screening is only required from the view of abutting streets, parking lots, and residentially zoned property. Storage shall not exceed the height of the screening. 2. Six to seven feet in height 3. Six to nine feet in height 4. Abutting streets must also be screened. 5. Screening is required abutting multiple-family dwellings, commercial or industrial usesonly. 6. In industrial zones, screening is required only where the refuse collection facility is in a yard abutting a public street, parking lot, or residentially zoned property. 7. Child care facility for 12 or fewer children,group home for five or fewer persons. 8. Child care facility for 13 or more children,group home for six or more persons. General notes: 9. Screening is subject to height limitations for Vision Clearance Areas(Section 3.03.06) and adjacent to streets(Section 2.01.02). 10. No screening is required where a building wall abuts a property line. 11. Where a wall is required and is located more than two feet from the property line, the yard areas on the exterior of the wall shall be landscaped to a density of one plant unit per 20 square feet. Staff Findings: "The proposal is a permitted use. It is for a new retail grocery store within the Commercial General zone. Most of the adjacent properties are also within the Commercial General zone and therefore no perimeter screening on the majority of the perimeter. However, a portion of the southern property line abuts a three story multi-family development with RMN (Medium Residential Nodal) zoning. For these uses,Table 3.06D provides the Planning Commission the option of determining the appropriate screening. The options listed are, "Architectural wall,fence, or hedge may be required in the Design Review process". Presently, the property line between the apartment property and the proposed grocery store includes a six-foot CMU wall with a solid row of mature trees approximately 30 feet in height. 4 I: goy DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 41 of 57 104 The Applicant is proposing, and Staff concurs to leave this wall and landscaping in place since it meets the screen wall height and texture/pattern requirements of WDO Table 3.06D and section 3.06.06B.7. While it doesn't meet some of the specific architectural requirements (horizontal and vertical articulation), replacing the wall with a similar wall that meets these articulation requirements would result in an almost identical wall in appearance and be a bothersome and intrusive process to the existing Cascade Meadows Apartments residents. The Applicant proposes to clean and paint the wall to meet sections 3.06.06B.5 and 6. B.All parking areas, except those for single-family dwellings and dwellings other than multiple- family, abutting a street shall provide a 42-inch (3.5-foot)vertical visual screen from the abutting street grade.Acceptable design techniques to provide the screening include plant materials, berms, architectural walls, and depressed grade for the parking area.All screening shall comply with the clear vision standards of this ordinance(Section 3.03.06). Staff Findings: V As outlined in the Landscaping Section above, the plans include an enhanced buffer with landscaping in excess of the requirements of the WDO. This includes double-rows of trees as well dense shrubs and groundcover which will provide screening for parking spaces along both streets. 3.07 Architectural Design 3.07.01 Applicability of Architectural Design Standards and Guidelines A. For a Type I review, the criteria of this Section shall be read as"shall"and shall be applied as standards. For a Type II or III review,the criteria of this Section shall be read as"should"and shall be applied as guidelines. 3.07.06 Standards for Non-Residential Structures in Residential, Commercial and Public/Semi Public Zones A.The following design guidelines shall be applicable to all non-residential structures and buildings in the RS, RSN, R1S, RM, RMN, CO, CG, and P/SP zones. B.Architectural Design Guidelines 1. Mass and Bulk Articulation Guidelines a. Building facades visible from streets and public parking areas should be articulated, in order to avoid the appearance of box-like structures with unbroken wall surfaces. b.The appearance of exterior walls should be enhanced by incorporating three-dimensional design features, including the following: (1) Public doorways or passage ways through the building (2)Wall offsets or projections (3)Variation in building materials or textures (4)Arcades,awnings, canopies or porches 2. Materials and Texture Guidelines DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 42 of 57 105 a. Building exteriors should exhibit finishes and textures that reduce the visual monotony of bulky structures and large structural spaces. Building exteriors should enhance visual interest of wall surfaces and harmonize with the structural design. b.The appearance of exterior surfaces should be enhanced by incorporating the following: (1)At least 30%of the wall surface abutting a street should be glass. (2)All walls visible from a street or public parking area should be surfaced with wood, brick, stone, designer block, or stucco, or with siding that has the appearance of wood lap siding. (3)The use of plain concrete, plain concrete block, corrugated metal, plywood, T-111 and sheet composite siding as exterior finish materials for walls visible from a street or parking area should be avoided. (4)The color of at least 90 percent of the wall, roof and awning surface visible from a street or public parking area should be an "earth tone"color containing 10 parts, or more of brown or a "tinted"color, containing 10 parts or more white. (5) Fluorescent, "day-glo,"or any similar bright color shall not be used on the building exterior. 3. Multi-Planed Roof Guidelines a.The roof line at the top of a structure should establish a distinctive top to the building. b.The roof line should not be flat or hold the same roof line over extended distances. Rather, the roof line should incorporate variations, such as: (1)Offsets or jogs in the plane of the roof; (2)Changes in the height of the exterior wall for flat roof buildings,including parapet walls with variations in elevation or cornices 4. Roof-Mounted Equipment Guidelines All roof-mounted equipment, except solar collectors, should be screened from view by: a. Locating roof-mounted equipment below the highest vertical element of the building, or b. Screening roof-mounted equipment using materials of the same character as the structure's basic materials 5. Weather Protection Guidelines All building faces abutting a street or a public parking area should provide weather protection for pedestrians. Features to provide this protection should include: a. A continuous walkway at least eight feet wide along the face of the building utilizing a roof overhang, arcade, awnings or canopies b. Awnings and canopies that incorporate the following design features: (1)Angled or curved surfaces facing a street or parking area (2)A covering of fabric, or matte finish vinyl (3)A constant color and pattern scheme for all buildings within the same development (4) No internal back lighting 6.Solar Access Protection Obstruction of existing solar collectors on abutting properties by site development should be minimized. C. Building Location Guidelines 1. Within the prescribed setbacks, building location and orientation should complement abutting uses and development patterns. 2.The maximum setback from each street should/shall be 80 feet. Minimum 80 percent of the width of a street-facing facade should/shall meet the setback maximum. Staff Finding: DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 43 of 57 106 The proposal is a Type III review therefore the applicable criteria are guidelines. All roof mounted equipment is proposed to be screened with materials of the same character as the structure. elevation drawings demonstrate conformance with the provisions. While the proposed building follows many of these guidelines, it does not strictly adhere to all of them. The exterior building walls are proposed as composite precast sandwich wall panels. The exterior of the panels is textured with four-inch on center horizontal scores along the bottom, a random vertical scoring at the dark colored pilasters and an exposed aggregate finish throughout the remainder of the panels. The panels will be painted in earthtones as indicated on the Exterior Building Elevations. The proposed design does has horizontal rooftop articulation on the west (front) and south facades but not as much on the north or east (rear) walls. and the building (as with all WinCo's) has minimal glazing. According the applicant, "the addition of horizontal offsets would not benefit the project, and we believe that faux architectural elements do not add to the overall architectural quality or aesthetics of the building. The building offers an attractive, inviting main entry point. The remainder of the design mimics the same quality of materials and is designed with functionality and material efficiency in mind." Staff finds the minimalist and generic architecture acceptable and consistent with the guidelines of the Code, particularly considering the proposed use (big box/discount grocery) and styles of similar buildings in the vicinity. Its worth noting that, early in the review process, the applicant involved staff in discussions and reviews of different architectural options— particularly for the entry feature. Staff's comments were considered and incorporated into the final plans submitted. 3.10 Signs 3.10.05 Sign Permit Required A. A sign permit is required to erect, replace, construct, relocate, or alter a sign, unless such sign is exempt under Section 3.10.07.To initiate consideration of a sign permit, a complete City application, accompanying information,and a filing fee must be submitted to the Director.The Director shall issue a sign permit if the applicant demonstrates compliance with all provisions of Section 3.10. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 44 of 57 107 Staff Findings: Because new signage is reviewed separately through the Sign Permit process, staff adds Condition of Approval 4 to apply for and obtain approved Sign Permits for any new signage. However, it should be noted that the applicant, as part of this Design Review application, is requesting a variance to exceed the maximum square footage of a wall sign. That application and Staff's findings are found later in this report. 3.11 Lighting 3.11.02 Standards A. Full cut-off: All exterior lighting shall be full cut-off or fully shielded. Figure 3.11A illustrates examples of both unacceptable and acceptable fixtures. B. Heights: Mounting height limits as measured to light fixture underside shall be: 1.Wall:8 feet above finished grade within 5 feet. a. Within a commercial or industrial zoning district and above a loading bay, berth, or dock, the height limit shall instead be 14.5 feet above vehicular grade. b. For all developments and uses,ground floor wall-mounted fixtures are exempt if: (1) placed under a canopy,fixed awning, roof overhang, secondary roof, or building recess; (2)a ground floor canopy or fixed awning is minimum 96 square feet and 8 feet narrowest dimension; (3)a roof overhang or secondary roof is minimum 72 square feet and 8 feet narrowest dimension; (4)a building recess is minimum 72 square feet and 8 narrowest dimension; (5)an adjacent combination of building recess and, projecting from the main wall plane, either(a)a ground floor canopy or fixed awning or(b) a roof overhang or secondary roof,total minimum 72 square feet and 8 narrowest dimension; (6)a ground floor canopy,fixed awning, roof overhang, secondary roof, or building recess is with maximum 14 feet height clearance above grade; and (7)the fixture is mounted no lower than at the same level as the underside of the ground floor canopy or fixed awning or within and flush with the building recess ceiling. 2. Poles within parking areas: 14.5 feet above vehicular grade within 5 feet of any parking or vehicular circulation area or its curbing. Parking area poles within 24 feet of ROW, greenways, or off-street public bicycle/pedestrian facilities, shall have the public-facing perimeter of the fixture underside with housing or a shield minimum 6 inches high. 3. Other poles: 10 feet above finished grade. Includes poles along walkways,wide walkways, and off-street bicycle/pedestrian facilities where they do not pass through or along parking areas. Within an industrial zoning district operations or storage yard, minimum 20 feet from a lot line the height limit shall instead rise to 20 feet. C. Hue/color temperature: Excepting industrial development, if a fixture uses light emitting diode (LED)technology, it shall emit a warm,yellowish white light instead of cool, bluish white light. A color temperature within the range of 2,700 to 4,000 degrees Kelvin presumptively meets the requirement. D. Property line: Lighting shall not shine or reflect onto(1) ROW, (2)greenways, (3) off-street public bicycle/pedestrian corridors, or(4)adjacent residentially zoned property. Pole-mounted fixtures DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 45 of 57 108 other than those in parking areas, and wall-mounted fixtures, that abut any of(1)-(3) are exempt if they are sited within 20 feet of any of(1)-(3), and conform to subsection B.1 or 3 above. Staff Finding: A photometric study was provided with the plans all exterior lighting is via full cut-off (shielded) building wall and pole mounted fixtures. The wall mounted fixtures are proposed to meet the height requirements of WDO3.11.02B.1. However, the applicant is requesting a variance to the height of the parking lot lighting this is described in detail under the variance section 4.01 Decision-Making Procedures 4.01.07 Consolidated Applications An applicant may request, in writing, to consolidate applications needed for a single development project. Under a consolidated review, all applications shall be processed following the procedures applicable for the highest type decision requested. It is the express policy of the City that development review not be segmented into discrete parts in a manner that precludes a comprehensive review of the entire development and its cumulative impacts. Staff Finding: The application package includes a Type III Design Review, Type III Street Adjustment, Type I Property Line Adjustment and Type III Variances. Per 4.01.07, they have been consolidated into a single package for review at the Type III level. 4.01.16 Request of Continuance and to Keep the Record Open Staff Finding: The Planning Commission has reviewed all the evidence, testimony, and argument in the record, including the April 21, 2026, letter submitted on behalf of Protect Our Valley Alliance and the April 23, 2026, final argument submitted on behalf of the applicant. The Planning Commission disagrees with the objections stated in the April 21 letter and hereby finds that the post-hearing process has not denied any substantial right provided by statute to Protect Our Valley Alliance and that the applicant has not submitted evidence in violation of applicable statute. 5.01.01 Property Line Adjustment: Consolidation of Lots A. Purpose: The purpose of this review is to ensure that adjustments to property lines or the consolidation of existing lots and parcels, complies with the standards of this ordinance (Section 2),and State Statutes(ORS Chapters 92 and 209). Property line adjustments and consolidation of lots are allowed in all zones. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 46 of 57 109 B. Criteria: 1. Lot area,depth,width,frontage, building setbacks,vehicular access and lot coverage comply with the standards of this ordinance(Sections 2 and 3); 2. Existing easements are accurately reflected; 3. Existing land use and development on the subject property comply with the requirements of prior land use actions; and 4. Buildings and structures abutting the adjusted property lines comply with State building codes and with respect to current occupancy. 5. Property line adjustments are surveyed and monumented to the requirements set forth in State statutes(ORS Chapters 92 and 209) and recorded by the County Surveyor. C. Procedure:The Director shall review and approve the application when it is found that it meets this Ordinance and the State Building Codes. D. Building permit application: A developer may apply for building permit or permits for the adjusted or consolidated property upon completion of: (1) recordation with the County of the final plat, including public easements and any separate conveyance documents, (2) submittal to both the Director and the Public Works Department no later than through building permit application of electronic copies of required documents per Section 2.01.05, unless regarding as- builts specifically the Public Works Director in writing defers to a specific set of later circumstances or date. This section does not abrogate additional requirements elsewhere in the WDO or in land use conditions of approval necessary for a developer to meet before building permit application. Staff Finding: The proposed property line adjustment meets all of the lot criteria of this Section (lot area, depth, width, frontage, etc.). The site is vacant so there are no setback or lot coverage considerations. However, Staff is including Public Works Condition of Approval 3 requiring recordation of easements and right-of-way in accordance with the requirements of the Marion County Surveyor. To meet subsection B5, staff added Condition of Approval 15 to record the property line adjustment in a manner acceptable to the Marion County Surveyor. 5.03 Type III (Quasi-Judicial) Decisions 5.03.02 Design Review,Type III B.Type III Design Review is required for the following: 5. For sites with existing buildings in the CO,CG, MUV,DDC, NNC, IP, IL,and SWIR zones;expansions or new buildings that increase lot coverage by more 25%. Staff Finding: " The proposal is for a new non-residential structure on a vacant lot in the CG zone. Therefore, the Design Review is a Type III. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 47 of 57 110 5.03.03 Adjustment to Street Improvement Requirements("Street Adjustment") Same as Section 5.02.04 except that land use review is Type Ill. 5.02.04 Adjustment to Street Improvement Requirements("Street Adjustment") A. Purpose:The purpose of a Type II Street Adjustment is to allow deviation from the street standards required by Section 3.01 for the functional classification of streets identified in the Woodburn Transportation System Plan.The Street Adjustment review process provides a mechanism by which the regulations in the WDO may be adjusted if the proposed development continues to meet the intended purposes of Section 3.01. Street Adjustment reviews provide discretionary flexibility for unusual situations.They also allow for alternative ways to meet the purposes of Section 3.01.They do not serve to except or exempt from or to lessen or lower minimum standards for ROW improvements,with exceptions of subsections B& H.A Street Adjustment is for providing customized public improvements that substitutes for what standards require,while a Variance is for excepting or exempting from, lessening, or lowering standards,with exceptions of subsections B& H.A Street Adjustment for a development reviewed as a Type I or II application shall be considered as a Type II application,while development reviewed as a Type Ill application shall be considered a Type Ill application. B.Applicability: Per the Purpose subsection above about improvements, and regarding ROW Street Adjustment may be used to narrow minimum width. Regarding alleys or off-street bicycle/pedestrian corridor or facility standards, see instead Zoning Adjustment. C. Criteria: 1.The estimated extent, on a quantitative basis, to which the rights-of-way and improvements will be used by persons served by the building or development, and whether the use is for safety or convenience; 2.The estimated level, on a quantitative basis, of rights-of-way and improvements needed to meet the estimated extent of use by persons served by the building or development; 3.The estimated impact, on a quantitative basis, of the building or development on the public infrastructure system of which the rights-of-way and improvements will be a part; 4.The estimated level, on a quantitative basis, of rights-of-way and improvements needed to mitigate the estimated impact on the public infrastructure system. 5.The application is not based primarily on convenience for a developer or reducing civil engineering or public improvements construction costs to a developer. 6.The application is not based primarily on the existence of adjacent or nearby nonconforming Boundary Street frontages. 7. Narrowing of ROW minimum width, if proposed, is not to a degree more than necessary to meet other criteria. In no case shall ROW total fewer than 35 feet,whether or not the total is allocated across centerline or to its side,except that this base requirement would not apply if subsection H below applies. 8.A Street Adjustment would provide a customized cross section alternative to the standard or standards and that meets the relevant purposes of Section 3.01, or the City reasonably can condition approval to achieve such. D. Minimum Standards:To ensure a safe and functional street with capacity to meet current demands and to ensure safety for vehicles, bicyclists and pedestrians, as well as other forms of non- vehicular traffic,the minimum standards for rights-of-way and improvements for Boundary and Connecting Streets per Sections 3.01.03C& D continue to apply. Exempting from or lessening or lowering those standards shall require a Variance. Deviation from applicable public works DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 48 of 57 111 construction code specifications would be separate from the WDO through process that the Public Works Department might establish. E. Factors:Street Adjustment applications,where and if approved, shall have conditions that customize improvements and secure accommodations for persons walking and cycling, not only driving,that meet the purposes of Section 3.01.The City may through approval with conditions require wider additional ROW dedication along the part or the whole of an extent of the subject frontage to accommodate either adjusted improvements or improvements that vary from standards. F. Bicycle/pedestrian facility: If and where a Street Adjustment application requests to substitute or omit one or more required bicycle facilities, such as bicycle lanes, and the City approves the application,then the following should apply: For each substitute or omitted facility,the developer would construct a minimum width 8 feet bicycle/pedestrian facility on the same side of street centerline as the substituted or omitted facility.The City may condition wider. G. Landscape strip: If and where a Street Adjustment application requests to adjust one or more required landscape strips from between curb and sidewalk, and the City approves the application, then the list below should apply.This subsection is not applicable to bridge/culvert crossing. 1.Sidewalk: Construction of sidewalk minimum width 8 feet on the same side of street centerline as the adjusted landscape strip.The City may condition wider. 2. Planting corridor: For each landscape strip that is relocated, delineation and establishment of a street tree planting corridor along the back of sidewalk in such a way as to allow newly planted trees to not conflict with any required streetside PUE to the extent that the Public Works Department Engineering Division in writing defines what constitutes a conflict.To give enough room for root growth,the corridor minimum width would be either 6 feet where along open yard or 7 ft where it would be flush with a building foundation. This would include installation of root barriers between the trees and street centerline to public works construction code specification. 3. ROW:Where necessary to meet the above standards, dedication of additional ROW even if the additional is more than the minimum additional dedication that Section 3.01 requires. 4. Planting in ROW required:Street trees would not be planted in the yard outside ROW. H. If the applicable Boundary Street minimums are the lesser minimums for residential development of 4 or fewer dwellings and where no land division is applicable, as Section 3.01.03C.2 allows, then allowed adjustment is: 1. ROW: Relating to Section 3.01.03C.2a,to lower ROW minimum dedication either(a)from a number greater than 5 feet to no fewer than 5 feet or(b)from a number equal to or fewer than 5 feet to no dedication. Greater deviation requires Variance. 2. PUE, streetside: Relating to Section 3.01.03C.2b,to lower streetside PUE minimum dedication to no fewer than 3 feet. Greater deviation requires Variance. This subsection is not relevant to deviation from improvements. I. Plan review:An applicant shall submit among other administratively required application materials scaled drawings, including plan and cross section views, of proposed street improvement widths, extents, and details as well as existing conditions and proposed development site plans that include property and easement lines and physical features some distance beyond the boundaries of the subject property for fuller context. Staff Finding: DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 49 of 57 112 Stacy Allison Way is unique in that the City Council previously approved a modified 'preferred' cross-section for this roadway when the apartments (Allison Way apartments) just south of this proposal were previously approved. Therefore, when the current applicant (WinCo) initially discussed developing this site, City Staff directed them to use the 'modified' cross-section. The classification of Stacy Allison Way is Service Collector with a specific cross-section that is required per the City's TSP. Unfortunately, the only way to use a cross-section that doesn't align with the TSP (even if requested to do so by Staff) is through the Street Exception process. Needless to say,staff strongly supports the proposed modified cross section and recommends its approval. The application provided a detailed description of the request, as well as the differences between the TSP cross-section and modified one: wiz f NCry &. -:1eY*� J„�„rP� f/k✓o-' i;f�%';%v f,6J2, ,i.;!/a. Ed,r� F;, dory P�'eozS r Figure 1—C of Woodburn Service Collector "We are requesting to maintain the current street section for Stacy Allison Way across the entirety of the project frontage. This request is consistent with guidance from City Engineering staff. The project proposes mitigating frontage improvements, including a 5-foot ROW dedication, removal and replacement of the existing sidewalk with a new 6-foot detached sidewalk, and a 5.5 foot landscape strip located between the detached sidewalk and the existing 6-foot bike lane. The proposed improvements have been designed to meet the City's current Service CollectorStandard to the maximum extent practicable and improve pedestrian safety through the installation of a detached sidewalk, while maintaining the alignment of Stacy Allison Way and preserving the 6-foot bike lane and underground utilities along the east side of the road." DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 50 of 57 113 n rya C rInt nxa mrrs _ i�� eau ,,,, w"o ° n nJV'r6TV'Y Ntw-4"w4� " 4l NN 5wIPW errr r r,a resrv. F gore X-3Yacy A ""da niprayvne n1k Proposed Stacey Allison Way cross-section "In summary, we are proposing a 0.5 foot reduction of the planter strip as a reasonable deviation from the City's current Service Collector standard. This deviation will maintain the current constructed section of Stacy Allison Way, including the 6-foot northbound bike lane, which is 1 foot wider than the City's current Service Collector standard. It is our belief that the combination of the existing 6-foot bike lane, 5-foot ROW dedication, new 5.5 foot planter strip, and a 6-foot detached sidewalk provides safety enhancements for pedestrians, cyclists, and vehicles along WinCo's frontage, while limiting impacts to the existing stormwater, water, power, and natural gas utility infrastructure." "Staff recommends approval of the Street Adjustment request. 5.03.12 Variance A. Purpose: The purpose of this Type III Variance is to allow use of a property in a way that would otherwise be prohibited by this Ordinance. Uses not allowed in a particular zone are not subject to the variance process. Standards set by statute relating to siting of manufactured homes on individual lots; siding and roof of manufactured homes; and manufactured home and dwelling park improvements are non-variable. B. Criteria: A variance may be granted to allow a deviation from development standard of this ordinance where the following criteria are met: 1.Strict adherence to the standards of this ordinance is not possible or imposes an excessive burden on the property owner, and 2.Variance to the standards will not unreasonably impact existing or potential uses or development on the subject property or adjacent properties. C. Factors to Consider: A determination of whether the criteria are satisfied involves balancing competing and conflicting interests.The factors that are listed below are not criteria and are not intended to be an exclusive list and are used as a guide in determining whether the criteria are met. 1.The variance is necessary to prevent unnecessary hardship relating to the land or structure, which would cause the property to be unbuildable by application of this Ordinance. Factors to consider in determining whether hardship exists, include: DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 51 of 57 114 a. Physical circumstances over which the applicant has no control related to the piece of property involved that distinguish it from other land in the zone, including but not limited to, lot size, shape, and topography. b. Whether reasonable use similar to other properties can be made of the property without the variance. c. Whether the hardship was created by the person requesting the variance. 2. Development consistent with the request will not be materially injurious to adjacent properties. Factors to be considered in determining whether development consistent with the variance materially injurious include, but are not limited to: a. Physical impacts such development will have because of the variance, such as visual, noise, traffic and drainage, erosion and landslide hazards. b. Incremental impacts occurring as a result of the proposed variance. 3. Existing physical and natural systems, such as but not limited to traffic, drainage, dramatic land forms or parks will not be adversely affected because of the variance. 4.Whether the variance is the minimum deviation necessary to make reasonable economic use of the property; 5.Whether the variance conflicts with the Woodburn Comprehensive Plan. 6. If and where a variance includes a request to vary from minimum public improvements per Section 3.01,from Section 5.02.04E about Street Adjustment factors,those factors are applicable as Variance additional factors. Staff Findings: The applicant submitted three Variance applications: Variance Request 1: Number of Electric Vehicle ("EV") parking spaces Per WDO Table 3.05E, for commercial developments at least 5% of the total number of parking stalls must be allocated for EV charging with a minimum Level 2 charger. This means that 17 spaces with chargers are required for the proposed WinCo. The applicant asserts that this is an excessive number and creates an unnecessary burden. They are proposing instead to provide eight spaces with Tesla's Level 3 superchargers. Quoting from their application narrative: "Installation of eight Level 3 charges in lieu of 17 Level 2 chargers provides more charging power, would not unreasonably impact the subject property or adjacent properties and should be considered an upgrade to the WDO EV parking requirement. Tesla, one of the nation's largest EV charging manufacturers and providers, has recommended eight Level 3 charging spaces for this site and has described and justified this recommendation in the attached letter. If EV charging demand increases, additional stalls would be added later as warranted. Level 3 charging provides up to two hundred miles of range in 15 minutes vs. 7-10 miles per 15 minutes of charge time with Level 2 chargers (20x faster charging)." (p. 45) DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 52 of 57 115 At the City's request,the applicant provided a letter from the manufacturer(Tesla) outlining their anticipated EV charging needs for this site (Attachment 106) . They agree that eight Level 3 Superchargers are adequate and state that their technology can "serve more vehicles with fewer stalls". EV charging is still a relatively new and evolving technology. The EV parking provisions were adopted as part of the City's WDO just four years ago. Staff believes that it's important that the Code be able to provide flexibility to allow for reasonable modifications to the code in response to shifting market and technological forces. Staff gives broad deference to the manufacturer's recommendations on the number of EV stations that will be required. It's reasonable to assume that the manufacturer's goal would be provide as many EV stations as are necessary to serve their customers. Based on the type of chargers proposed, and the use being considered, Staff agrees that eight Level 3 Superchargers will adequately address the needs of the public. It is also fair to note that the WDO's metric for measuring the required number of EV stalls is based on the zoning district; all "non-residential development within commercial zoning districts". In essence, this means that the required number of EV stalls is based on the parking requirements of a zone as opposed to the EV charging needs for an individual use. This fails to take into account that different uses may have different needs for EV chargers. For example, an office or warehouse may have more employees staying in their spaces for a longer period; whereas a fast food restaurant or florist has much faster turnover and would likely have less need for EV chargers. Yet the WDO has the same minimum requirements for both. It also doesn't consider that different chargers (speed) impact the number of spaces required. Level 3 chargers charge much faster than Level 2 chargers, so it is reasonable to assume that there will be more turnover of these spaces and the need for less. The request would have no negative impact on adjacent properties and in any case, the applicant can always add to the number of EV chargers in the future. In fact, it would be financially advantageous for them (Tesla) to do so if demand increases. "Staff recommends approval of Variance #1: EV parking space variance. Variance Request 2: Wall signage area DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 53 of 57 116 The applicable sign requirements are found in WDO Table 3.10.10B. For this proposal,the Code allows wall signage on the front of the building to be up to 300 SF in area. The applicant is requesting that this be increased by 143 SF which allow them to have wall signage on the front of their building that would be 453 SF in area. Their elevations depict the front elevation with the proposed increased signage: The Applicant submitted the following justification for this variance request: "Strict adherence to WDO Table 3.10.108 and section 3.10 would allow 300 square feet of signage on the front and left(facing Center St.) building elevations because those facades are more than 200 feet from the public right-of-way. It would allow 200 square feet of signage on the rear elevation. The Applicant is meeting this standard on the left and rear elevations but is requesting a variance to increase the front elevation signage by 153 square feet to 453 square feet to ensure readability from both Stacey Allison Way and Interstate 5. The front of the proposed building is approximately 380 feet from the center of Stacey Allison, 560- feet from the center of northbound 1-5 and 660 feet from the center of southbound 1-5. Strict compliance with the front elevation signage limit imposes an excessive burden on the Applicant because it forces signage to be reduced to the point that it will not be legible from 1-5 and likely even difficult to identify from Stacey Allison for some customers. The proposed increase in signage area would not unreasonably impact the subject property or adjacent properties. The front of the building and associated signage face directly toward both Stacey Allison Way and 1-5. It will be visible only from those public roadways and will not be visible from any neighboring residential properties. The signage is proposed in just two locations of the front elevation as shown on the Front Elevation drawing. The largest letters of the primary, 'WinCo Foods' sign are proposed as 66-inches in height. While this may seem large, the general rule of thumb for optimal readability is 1-inch of letter height for every 10- feet of distance. This means that letters need to be 38-inches high at minimum to DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 54 of 57 117 ensure recognition from Stacey Allison and 66-inches in height to be legible from southbound 1-5. The proposed 66-inch-high letters ensure the building signage can be read from 1-5 allowing customers and passersby to quickly and safely identify and locate the building. This benefits both the development and surrounding community."(Pg. 46) There are several unique circumstances specific to this property and use that need to be discussed. It's true that this property is located along 1-5 and therefore the signage (visibility) requirements for uses in this area may be different from those of rest of the community. However, the City WDO specifically makes an accommodation (exception) for uses along 1-5. The sign provisions of the WDO include an overlay ("Freeway Overlay") that permits users in this area (including WinCo)to have pole signs that are both larger in area and taller in height that the rest of the City. Specifically, WinCo will be permitted a pole sign that is 45 feet tall with a maximum sign area of 300 feet. In all other locations in the City, WinCo would be limited to a 20 foot high pole sign that is 100 SF in area. Staff believes that the "Freeway Overlay" provisions of the WDO serve to adequately address the unique locational dynamics of this site. I� m.mm ro � r _._. .. Mari n Figure 3.1 0L — Freeway Overlay It's also important to note that other similar properties in the area have operated successfully without the need for a variance from the sign code requirements. The WalMart supercenter along Stacey Allison is operating under the same sign code provisions that will be applied to WinCo and it did not receive any variances. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 55 of 57 118 Allowing larger signage would be unfair to other properties in the area, and would have a deleterious effect on the aesthetics of the area, hence the need for detailed signage requirements in the first place. X Based on the above findings, Staff recommends denial of Variance #2: to increase the allowable wall signage. Variance Request#3: Parking Light pole height increase Per WDO 3.11.02, parking area light poles are restricted to 14.5 feet in height. During the pre-application conference, the applicant indicated that they wanted to install parking lot lighting poles that were 24.5 feet in height. Staff indicated that we would be amenable to allowing some of the lighting to exceed the code maximum, but that under no circumstances should the lighting along the south property (adjacent to the apartments) exceed the code. The applicant modified plans to include this restriction; as described in their justification for the variance request: "Strict adherence to WDO 3.11.02 would require the Applicant to restrict parking area light poles to 14.5 feet above grade. Doing so imposes an excessive burden because it would necessitate nearly double the number of site lighting poles and fixtures. The additional poles would encroach into parking stalls necessary to meet customer parking demand. The Applicant proposes 24.5-foot-tall light fixtures (to underside of fixture) throughout the main parking area west (in front of) the building. Shorter poles meeting the 14.5 foot restriction are proposed in the parking area southwest of the building, adjacent to the Cascade Meadow Apartments."(p. 46) Several variances to the City's parking lot lighting height requirements have been granted since these code provisions were adopted three years ago. In fact, Staff has identified this Section of the Code as one that the City should consider modifying to allow for more flexibility to developers. Staff contends that lower light poles near residential properties can be an appropriate mitigation and that allowing higher poles within a large parking lot has few, if any negative impacts. In fact, requiring lower lights, means more light poles need to be installed, resulting in higher costs and more potential conflicts for little benefit. V Staff concurs with the applicants arguments and, with the limitations on the pole heights near the apartments as shown in the plans, recommends approval of Variance #3: Parking light pole height. DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 56 of 57 119 DR 25-14, PLA 25-04,SA 26-01&VAR 25-06 WinCo Staff Report Attachment 103 Page 57 of 57 120 Andrew Mulkey Attorney at Law PO Box 66562, Portland, OR 97290 • (503) 334-9899 • andrew@mulkeylegal.com May 11, 2026 Via Email Chris Kerr, Community Development Director 270 Montgomery Street Woodburn, OR 97071 Chris.Kerr@ci.woodburn.or.us Re: Notice of Intent to Appeal DR 25-14, PLA 25-04, SA 26-01, VAR 25-06 Proposed WinCo Foods Grocery Store Tax Lots 052W12C002100 and 052W12C002200 Dear Director Kerr: This letter provides notice of an appeal of the planning commission's recent decision to approve the WinCo Foods Grocery Store application. The information required by WDO 4.02.01 is provided below. Department File Number: DR 25-14, PLA 25-04, SA 26-01, VAR 25-06 Appellant Name, Mailing Address, and Phone Number: Andrew Mulkey obo POVA and members: PO Box 66562, Portland OR, 97290; (503) 334-9899 Protect Our Valley Alliance (POVA) PO Box 66562, Portland OR, 97290; (503) 334-9899 Statement of standing: Appellant Mulkey on behalf of POVA submitted comment letters during the proceedings before the planning commission. See Attached. Notice of Appeal - Woodburn WinCo 11gf95 Appellant POVA submitted comments through its attorney during the proceedings before the planning commission. See Attached. Statement of Grounds for Appeal: The following contains the grounds for appeal as well as the grounds for appeals/errors raised in the attached comment letters. Appellants incorporate those letters and attachments by reference. Appellants also include as grounds for appeal, any issue raised by commenters during the prior hearings on this matter and incorporate those recordings by reference. In addition to the issues raised in the attached letters and testimony incorporated by reference, appellants provide the following additional grounds for appeal. First, the planning commission erred by failing to extend the open record period as requested by PVOA in its April 21, 2026 objection letter. For the reasons explained in the objection letter, that error requires the City Council to allow appellants the opportunity to respond to the objected material by submitting additional evidence. PVOA's objection letter explained that the applicant submitted evidence during the response period (or second open record period) that was directed at responding to evidence submitted by opponents prior to the hearing. Pursuant to ORS 197.797, the applicant's evidence needed to have been submitted during the first open record period. By submitting that evidence late, the applicant deprived participants of their statutory right to respond during the response open record period. The planning commission erred when it determined that it was not required to strike the applicant's evidence or reopen the record to allow PVOA and other members of the public the opportunity to respond. To that end, appellants have attached a response to the applicant's GVC Technical Memo prepared by Greenlight Engineering. Next, the findings adopted by the planning commission are inadequate and fail to address the issues raised by appellants and others. See Heiller v. Josephine County, 23 Or LUBA 551, 556 (1992). Specifically, findings for 2.05.01 fail to address issues raised in the March 12, 2026 Greenlight Engineering letter that the exceedance of the required trip budget fails to account for the remaining vacant commercial and industrial properties in the Interchange Management Area Overlay District. The decision fails to ensure that remaining vacant lands in the IMA—such Notice of Appeal - Woodburn WinCo 2i 9f�5 as other vacant commercial lands and industrial lands—"are protected from incompatible development generating excessive vehicle trips." In addition, the decision misconstrues the WDO 2.05.02(G) criteria that requires a development that exceeds the maximum peak hour vehicle trips to "contribute substantially to the economic objectives found in the Comprehensive Plan." The findings provided in the decision are simply inadequate. Heiller, 23 Or LUBA at 556. POVA addressed this issue in its comment letters attached. The decision fails to connect the proposal to the specific "economic objectives" of the comprehensive plan or demonstrate how the proposed development will "contribute substantially" to those economic objectives. The findings' general reference to the need for commercial land stated in the EOA or the fact that land on the east side of I-5 has been designated for commercial retail, fails to identify or address the "economic objectives" of the comprehensive plan, much less how that applicant's proposal contributes substantially to those objectives. Appellants and other commenters have argued that the decision and staff report misconstrue and misapply the requirements of the comprehensive plan. For that reason, the planning commission has misconstrued applicable law, and the findings in the planning commission's decision and staff report are inadequate. The findings also fail to address the impacts to the City's economic objectives that the project will have on remaining traffic allocation for currently vacant commercial and industrial land. The decision and findings fail to address the issues raised by appellants and others. Finally, the planning commission and planning staff are wrong to conclude that the TIA meets ODOT and City requirements pursuant to WDO 2.05.01/.02(D) and 3.04.05. Notably, "[a] TIA shall evaluate the transportation impacts projected of a development proposal, and where a development would fail to meet a transportation standard or would hinder public safety, [the TIA] shall list and describe mitigation to the satisfaction of the City." Opponents identified numerous instances in which the TIA failed to provide the information required to adequately determine the projected transportation impacts. Opponents also identified numerous instances in which (1) the development would fail to meet a Notice of Appeal - Woodburn WinCo 319f 5 transportation standard or would hinder public safety, and/or (2) the applicant failed to demonstrate, due to inadequate analysis, that transportation and safety standards could be met. Notably, the planning commission's decision and staff report also failed to adequately respond to the issues raised by opponents in the context of the requirements in WDO 2.05.01/.02 and 3.04.05. The TIA addressed the ODOT and City intersection standards (including those found in 3.04.05) in its section 6, and Greenlight Engineering responded. Yet the planning commission did not address the inadequacies of the applicant's analysis in the context of the requirements of WDO 3.04.05 or propose mitigation measures required by WDO 3.04.05. Heiller, 23 Or LUBA at 556 (requiring decision maker to "identify the relevant approval standards," explain how the facts lead to a decision of compliance, and "address and respond to specific issues relevant to compliance with applicable approval standards that were raised in the proceedings below."). Greenlight has identified the following errors or inadequacies with the applicant's TIA. • Improper application of pass-by trip reductions; • Lack of queue analysis despite corridor conditions triggering such analysis under ODOT requirements; • Failure to substantiate that proposed mitigation measures will restore acceptable operations; • Incomplete documentation regarding pipeline developments and background growth assumptions; • Use of an opening year inconsistent with the application materials; and • Lack of substantial evidence demonstrating compliance with the Interchange Management Area (IMA) trip budgeting framework. To that end the record fails to demonstrate that: • OR 214 corridor operations will comply with applicable ODOT mobility standards; Notice of Appeal - Woodburn WinCo 41 5 • Queue spillback and storage issues have been adequately evaluated; • Proposed mitigation measures are feasible and effective; • The project complies with the IMA trip budgeting framework; and • Transportation impacts have been fully identified and mitigated concurrent with development. Without correcting those deficiencies, the applicant has failed to demonstrate that it complies with the requirements for identifying and mitigating traffic impacts in WDO 2.05.01 (Interchange Management Area Overlay District (also listed as WDO 2.05.02) and 3.04.05 (Transportation Impact Analysis). These include the requirements in WDO 2.05.01/.02(A) through (G) and 3.04.05(A) through (F). Respectfully, Andrew Mulkey (OSB No. 171237) PO Box 66562 Portland, OR 97290 (503) 334-9989 adrew@mulkeylegal.com On behalf of Protect Our Valley Alliance Notice of Appeal - Woodburn WinCo 51915 / iiiI GREEN LIGHT ENGINEERING May 11, 2026 Andrew Mulkey Attorney at Law PO Box 66562 Portland, OR 97290 RE: Response to GVC Transportation Solutions March 19, 2026 Technical Memo— Proposed WinCo Foods Development Mr. Mulkey: Greenlight Engineering has reviewed the March 19, 2026 memorandum prepared by GVC Transportation Solutions ("GVC") responding to concerns previously raised regarding the Transportation Impact Analysis (TIA) for the proposed WinCo Foods development. The GVC memorandum does not resolve the principal concerns identified in March 12, 2026 review. Instead, the response largely relies on unsupported assertions, introduces new claims and calculations that do not appear elsewhere in the record, and continues to rely on assumptions that are inconsistent with accepted transportation engineering practice, ODOT guidance, and the Woodburn Development Ordinance (WDO). WDO 3.04.05(F) requires: "The methodology for a TIA shall be consistent with City standards...Vehicular level of service (LOS) and volume-to-capacity (V/C) ratio shall be as follows: 1. For a signalized and all-way stop-control intersection,the minimum LOS shall be either "E" or if pre-development already operating at lower LOS,then at no lower LOS. 2. For a signalized intersection,the minimum V/C ratio shall be either less than L0U regardless of LOS or if pre-development already operating at 1.00 or higher V/C,then at no higher V/C. 3. For an unsignalized intersection,the minimum V/C shall be 0.95 or lower for minimum the major movement through the intersection, or, if pre-development already operating at higher V/C,then at no higher V/C..." The WinCo TIA itself acknowledges that "OR 214/219 is a district highway which has a v/c target of 0.95," consistent with ODOT requirements. 13554 Rogers Road • Lake Oswego, OR 97035 WWW.grk II„iig.1 ..eng.ii„ir irii..! .g. air „ • 503.317.4559 126 Despite these standards, the GVC response does not adequately explain why multiple prior traffic studies identified operational deficiencies along the OR 214 corridor, while the WinCo TIA now concludes that the same intersections would operate acceptably under near-term conditions despite additional development traffic and no identified operational improvements sufficient to account for those differences. The GVC response also relies on the assumption that the City of Woodburn will address operational deficiencies at three intersections along Evergreen Road. However, the record does not contain substantial evidence demonstrating that any future improvements will restore those intersections to acceptable operating conditions either with or without WinCo-generated traffic. Reliance on undefined future mitigation measures cannot substitute for demonstrating present compliance with applicable approval criteria. The response also fails to cure deficiencies associated with: • Improper application of pass-by trip reductions; • Lack of queue analysis despite corridor conditions triggering such analysis under ODOT requirements; • Incomplete documentation regarding pipeline developments and background growth assumptions; • Use of an opening year inconsistent with the application materials; and • Lack of substantial evidence demonstrating compliance with the Interchange Management Area (IMA) trip budgeting framework. Reliance on staff-level coordination, future design work, or future agency approvals does not substitute for substantial evidence in the record. Although the GVC memorandum repeatedly states that the TIA "received approval from City and ODOT staff," City staff and ODOT staff are not the land use decision-makers, and staff-level concurrence does not relieve the applicant of the obligation to provide substantial evidence demonstrating compliance with applicable standards. TIA Results Discrepancies and Requirements The GVC memorandum acknowledges that prior studies for the same corridor projected failing or near-failing operations at the OR 214/Evergreen Road and OR 214/Settlemier Road intersections, while the WinCo TIA reports compliant near-term operations. However, the response still does not adequately reconcile these materially different results. The GVC response introduces several new factual assertions and calculations that do not appear to have been included in the original TIA or supporting materials, including: • Assertions regarding use of"existing ODOT signal timings"; • Comparisons of seasonally adjusted 2022 and 2025 count volumes; • Newly asserted background growth assumptions; 2 127 • Newly asserted explanations regarding reduced pipeline development traffic; • Calculations regarding projected opening year traffic increases; and • Assertions regarding limitations on adjacent-road pass-by capture percentages. These factual assertions appear to constitute new evidence because they rely on technical calculations, comparative analyses, or assumptions not included in the record. Importantly, even with these new explanations, the response still does not adequately explain the central issue: • The WinCo TIA reports higher existing entering volumes at OR 214/Evergreen Road than some prior studies; • The corridor has experienced additional approved development since the earlier studies; • No operational improvements are identified as having been implemented; yet • The WinCo TIA nevertheless reports materially improved operational performance. The GVC memorandum claims the discrepancy "...is due to some combination of the previously included pipeline development projects having been completed since then, and/or having lost city approval...Overall, the minimal growth observed in the comparison of existing volume data, combined with a lower annual growth rate and fewer pipeline development traffic volumes combine to produce lower short term horizon volume forecasts for the WinCo Foods study than what was previously forecasted in the earlier studies." However, the GVC memorandum fails to provide substantial evidence that supports this claim. This inconsistency is significant because, all else being equal, higher traffic volumes should not produce lower volume-to-capacity ratios. If the WinCo TIA uses higher traffic volumes than the prior studies, then the reported lower v/c ratios necessarily imply that other analytical assumptions are different than several previous analyses that illustrated the opposite result of GVC's analysis. The GVC memorandum states that "the WinCo Foods study used existing ODOT signal timings" and further states that "the same channelization was used in each of the previous studies and the WinCo Foods study, leaving analysis volumes as the only differing variable." However, if the WinCo study truly used the same channelization and higher traffic volumes, then lower v/c ratios would not ordinarily result unless additional operational assumptions were modified, such as signal timing assumptions, saturation flow assumptions, lane utilization assumptions, peak hour factors, heavy vehicle assumptions, or other capacity inputs. The memorandum does not provide the detailed Synchro operational parameters, signal timing comparisons, or side-by-side capacity calculations necessary to independently verify why the WinCo study reports improved operational performance despite higher reported traffic volumes and additional approved development. 3 128 For example: • The Specht Industrial TIA identified the OR 214/Settlemier intersection operating above the ODOT mobility standard at a v/c ratio of 0.97. • The Brighton Pointe TIA similarly identified near-failing or failing conditions. • The WinCo TIA now reports substantially lower baseline conditions despite no substantial evidence as to why. The GVC memorandum attempts to explain these differences by asserting that the WinCo study used a lower annual background growth rate and lower pipeline development traffic assumptions. Specifically, the memorandum states: "The two studies from 2022 both identified an annual growth rate of 1.0% per year. The WinCo Foods study, based on historic volume growth trends, identified an annual growth rate of 0.50% per year." The memorandum further states "The overall pipeline volumes used in the WinCo Foods study, which included both of the 2022 projects, is less than the pipeline volumes from the other studies." The issue is not simply that the numbers are "slightly lower." The issue is that previous studies identified deficient or failing operations while the WinCo study reports compliant operations under substantially similar conditions. Signal timing assumptions materially affect capacity calculations and v/c ratios. If differing signal timing assumptions were used between studies, that alone could significantly alter operational outcomes. However, no signal timing sheets that illustrate how the signals are operating in the field are provided in the record. Without detailed operational inputs and comparative analysis, the City cannot independently verify why the WinCo TIA reaches substantially different conclusions than multiple prior studies evaluating the same corridor. Queue Analysis Remains Necessary Under ODOT Guidance The GVC memorandum states that 95th percentile queue analysis "is not a requirement of the City of Woodburn or ODOT" and that "neither agency has requested this analysis."This assertion is inconsistent with the ODOT Analysis Procedures Manual (APM) and ODOT Development Review Guidelines (DRG), both of which were previously cited. The ODOT APM states that simulation should be used to evaluate queues when v/c ratios exceed 0.70 and shall be used when v/c ratios equal or exceed 0.90 or where congested conditions exist. Several intersections analyzed in the TIA meet or exceed these thresholds. The WinCo TIA itself reports: • OR 214/Evergreen Road operating at a v/c ratio of 0.94; and • OR 214/Oregon Way/Settlemier operating at a v/c ratio of 0.94. 4 129 Under ODOT guidance, these conditions warrant queue analysis and simulation. The absence of queue analysis is significant because: • Closely spaced intersections and interchange facilities are present; • Queue spillback may materially affect upstream operations; • Turn lane storage adequacy cannot be verified; • Average delay and v/c ratio alone do not adequately evaluate system performance; and • Other traffic studies in the area provided queue analysis. The GVC memorandum does not address these ODOT requirements. Condition of Approval 15 Does Not Cure the Analytical Deficiency A recently proposed condition of approval states that the "Applicant shall provide for the signalization of the eastbound and northbound right-turn lanes at the Evergreen Road and OR 214 intersections. The Applicant shall conduct a traffic analysis justifying the signal modifications and preliminary design layouts to gain ODOT approval. Prior to certificate of occupancy issuance, the applicant shall provide to the City a copy of an executed ODOT permit for the completion of both signal modifications. Installation and final inspection of the signal modifications shall be completed within three years of the date of the certificate of occupancy." While this condition appears intended to address ODOT's concerns, it also demonstrates that the current record remains incomplete. The condition effectively acknowledges that: • Additional traffic analysis is still required; • Signal modifications are not yet justified through completed engineering analysis; • Preliminary designs do not yet exist; • ODOT approval has not yet been obtained; and • The operational effectiveness of the mitigation has not yet been demonstrated. Importantly, the condition defers the core operational analysis until after land use approval. The TIA currently contains no completed operational modeling demonstrating that the proposed modification: • Restores the intersection to compliance with ODOT mobility standards; • Avoids queue spillback impacts; • Functions acceptably within the broader OR 214 coordinated corridor; or • Can be physically implemented within the existing corridor constraints. 5 130 The condition therefore does not supply the substantial evidence presently missing from the record. Instead, it effectively postpones required transportation analysis and mitigation design until after approval. Pass-By Trip Assumptions Remain Inconsistent with ITE Methodology The GVC memorandum attempts to justify assigning pass-by trips to OR 214 by arguing that "It is typical to expect an adjacent roadway to support no more than 20%of a proposed project's potential pass-by volume." The memorandum further states that "In cases like this it is a common technique to limit the pass-by impact on lower volume roads. By assigning the pass-by trips to the nearest high- volume roadway, Highway 214." However, these explanations remain inconsistent with the ITE Trip Generation Handbook definitions previously cited. By definition: • Pass-by trips are drawn from traffic already traveling on a roadway directly adjacent to the site; and • Pass-by trips do not divert from non-adjacent roadways. OR 214 is not directly adjacent to the site. The methodology described in the GVC memorandum instead resembles diverted linked trips, not pass-by trips. ITE specifically distinguishes these concepts. The memorandum states that it is a "common technique" to shift pass-by trip reductions to higher-volume roadways such as OR 214. However, no supporting methodology, empirical data, or industry guidance is provided establishing that this approach is consistent with accepted ITE methodology. In fact, it is in direct opposition to the methodology. The memorandum's suggestion that pass-by trips may be reassigned away from adjacent roadways because adjacent volumes are relatively low directly conflicts with the ITE definition of pass-by trips. Pass-by trips are limited to traffic already traveling on adjacent roadways. If the adjacent roadway volumes are insufficient to support the assumed pass-by capture, then the assumed pass-by percentage itself should be reduced rather than reassigned to a non-adjacent corridor. If pass-by reductions are improperly applied: • Project-generated traffic volumes are understated; • v/c ratios are understated; 6 131 • Queue estimates are understated; and • Operational conclusions become unreliable. This issue is particularly significant because the OR 214/Evergreen intersection is reported to operate at a v/c ratio of 0.94, only 0.01 below the ODOT mobility threshold and as noted, previous traffic impact studies illustrate operations above the threshold. Relatively small traffic adjustments could materially alter the reported operational conclusions. Opening Year Assumptions Remain Inconsistent The GVC memorandum now acknowledges that the opening year "may in fact slide to 2027." However, the application materials themselves identify a 2027 construction and opening timeframe, so this is not merely speculative, but proposed by the applicant. The TIA nevertheless modeled a 2026 opening year. The memorandum further introduces new calculations asserting that an additional year of growth would result in "fewer than 5 trips for each turning movement."These calculations do not appear in the original TIA and constitute additional technical analysis not previously included in the record. The OR 214 corridor intersections are already reported to operate very near the ODOT mobility threshold. Previous analyses illustrated operations above the threshold. Where intersections are operating near capacity: • Small traffic increases can materially affect v/c ratios; and • Queue lengths can increase. Accordingly, use of an incorrect opening year undermines the reliability of the opening-year operational analysis. Intersection Failures and Proposed Improvements Remain Unsubstantiated The GVC memorandum states that it was unnecessary for improvements at three Evergreen Road intersections to be "justified or validated" by the TIA because City staff had already identified those improvements. However, the existence of conceptual future improvements does not establish that the intersections will actually operate acceptably. The TIA still does not provide: • Information about the design; • Operational modeling outputs; 7 132 • Signal phasing and timing assumptions; • Queuing analysis; or • Evidence demonstrating compliance after improvement implementation either with or without WinCo traffic. The memorandum further acknowledges that: • "The exact design and channelization planned for each location is unknown"; and • "It is anticipated that final design will include operational analysis to verify sufficient capacity is provided." Again, this confirms that the present record lacks completed operational evidence. Traffic Signal Warrant Analysis Remains Absent The TIA and response memorandum continue to rely on assumed future signalization at multiple intersections without providing warrant analyses. The MUTCD requires an engineering study to determine whether traffic signal installation is justified. No warrant worksheets, analyses, or engineering studies have been provided. Without this information: • The feasibility of the proposed mitigation cannot be verified; • Operational assumptions cannot be independently reviewed; and • The City cannot conclude that the proposed mitigation is compliant with the MUTCD. Pipeline Development Assumptions Remain Insufficiently Documented The GVC memorandum states that City staff provided pipeline development assumptions and completion percentages. However, the applicant retains the burden of demonstrating that the TIA is accurate and complete. The memorandum states that "The pipeline development list was provided by City staff and all specific study information was provided by city staff for use in the traffic volume forecasts." However, the TIA still does not provide sufficient documentation allowing independent verification of: • Pipeline development trip generation; • Development sizes and land uses; • Completion assumptions; • Distribution assumptions; or • Individual project traffic assignments. 8 133 The memorandum's explanation therefore does not cure the transparency and reproducibility concerns previously identified. Driveway Spacing and RRFB Issues Remain Unresolved The GVC memorandum states that the proposed driveway location "was evaluated by city staff, the fire department, and the applicant" and that these parties "collectively agreed that the proposed access point is the desired location." However, staff-level agreement does not substitute for compliance with the WDO variance criteria. Additionally, these parties are not the decision-makers. The record still does not demonstrate: • That compliance with the spacing standards is infeasible; • That strict application imposes an excessive burden; or • That the variance criteria under WDO 5.03.12 are satisfied. Similarly, the memorandum's explanation regarding the RRFB does not provide any engineering analysis supporting the installation of the device. Additional Intersections Potentially Operating Outside Standards The record continues to indicate that additional intersections along the OR 214 corridor may operate near or beyond applicable standards.The most notable examples remain: • OR 214/Evergreen Road; and • OR 214/Settlemier/Oregon Way. Prior studies identified these intersections operating at or above ODOT mobility thresholds.The WinCo TIA reports operations only marginally below the threshold, with reported v/c ratios of 0.94. The following other major issues remain in the operational analyses: • The unresolved pass-by trip methodology issues; • The absence of queue analysis; • The opening year discrepancy; • Unresolved differences with prior studies; and • Lack of completed mitigation analysis, As a result, there remains substantial uncertainty regarding whether these intersections would in fact comply with ODOT and City of Woodburn standards. 9 134 Moreover, without queue simulation and corridor-level analysis, it is not possible to determine whether additional operational deficiencies may occur due to spillback or coordinated signal effects. Conclusion The March 19, 2026 GVC Transportation Solutions memorandum does not resolve the core deficiencies identified in my prior review. Instead, the response: • Relies heavily on new technical assertions and calculations not included in the record; • Fails to adequately reconcile materially different operational conclusions from prior corridor studies; • Continues to rely on pass-by methodologies inconsistent with ITE definitions; • Does not provide queue analysis under ODOT requirements; • Defers critical operational analysis and mitigation design until after approval; • Fails to demonstrate that proposed mitigation measures will restore acceptable operations; and • Continues to rely on incomplete and insufficiently documented assumptions. Most importantly, the current record still does not provide substantial evidence demonstrating that: • OR 214 corridor operations will comply with applicable ODOT mobility standards; • Queue spillback and storage issues have been adequately evaluated; • Proposed mitigation measures are feasible and effective; • The project complies with the IMA trip budgeting framework; and • Transportation impacts have been fully identified and mitigated concurrent with development. Until these issues are addressed through completed engineering analysis and substantial evidence in the record, the City cannot make defensible findings that the transportation impacts of the proposal have been adequately analyzed or mitigated. Sincerely, G N 4 61474 Rick Nys, P.E. c Digitally Date: Principal Traffic Engineer 2026.05.10 Signed 16:51:03-07'00' OREGON RD RENEWS: 12/31/2026 10 135 UJtWJ3 3 March 11, 2026 Woodburn Planning Commission City of Woodburn 270 Montgomery Street Woodburn, OR 97071 Re: DR 25-14 /VAR 25-06/PLA 25-04 /SA 26-01 —Proposed WinCo Foods Grocery Store Dear Planning Commissioners: UFCW Local 555 represents more than 35,000 grocery, retail, and food-processing workers across Oregon, and the Pacific NW, including many who live and work in Woodburn. We appreciate the opportunity to provide comments on the proposed 84,087-square-foot WinCo Foods development currently under Design Review. Our union supports responsible economic development that strengthens local employment, protects public infrastructure, and enhances community well-being. Based on our review of the application materials, we believe the record does not yet demonstrate that this project meets those standards. Labor and Economic Impacts WinCo is a non-union employer whose business model relies on low wages, unpredictable scheduling, and minimal staffing levels. In communities where large, non-union big-box grocers open, existing union and independent grocers often experience reduced sales, cuts to worker hours, and long-term job instability. These impacts are well-documented and will directly affect the livelihoods of hundreds of Woodburn-area grocery workers. The City should not approve a project of this scale without fully considering its effect on job quality, economic stability, and the long-term viability of existing employers who provide family-sustaining union jobs. Transportation and Safety Concerns The City's February 18, 2026, completeness letter confirms that this project requires a Type III public hearing because of its scale and potential impacts. While the applicant has submitted a Traffic Impact Analysis (TIA), the document raises several unresolved issues that should be addressed before any approval is granted. Among the concerns are: • Unclear traffic assumptions. The TIA relies on assumptions about trip generation, distribution, and timing that may not reflect actual conditions once the store opens. • Potential underestimation of congestion. Key corridors such as Evergreen Road, Stacy Allison Way, and Highway 214 already experience heavy traffic. A store of this size will add significant new vehicle trips, and the TIA does not clearly demonstrate that nearby intersections and roadways can absorb this increase without degrading safety or mobility. • Lack of clear mitigation.The TIA identifies areas where traffic conditions may worsen but does not provide specific, enforceable mitigation measures or demonstrate that improvements would be in place before the store opens. 136 • Pedestrian and neighborhood safety. The project will increase turning movements, truck activity, and pedestrian crossings near residential areas. The TIA does not fully evaluate how these changes will affect safety for nearby residents, workers, and school-related traffic. These issues are significant because transportation impacts directly affect emergency response, commute times, neighborhood livability, and the overall functioning of the city's transportation system. Before approving a project of this size, the City should require a clearer, more complete analysis and ensure that any necessary improvements are identified, funded, and timed appropriately. Neighborhood and Community Impacts The site is adjacent to homes, apartments, and senior housing. A store of this size will introduce late-night noise and lighting, increased truck activity, hundreds of new daily vehicle trips, and additional turning movements near residential driveways. The proposed pedestrian improvements on Evergreen Road also require further evaluation to ensure they are appropriate and safe for the surrounding neighborhood. Need for Additional Review Before Approval Given the scale of the project, the gaps in the current traffic analysis, and the potential economic and community impacts, UFCW Local 555 respectfully urges the Planning Commission to require: • A more complete and transparent TIA that fully evaluates traffic, safety, and neighborhood impacts; • Clear, enforceable mitigation measures that are concurrent with development; • Evaluation of job quality, economic displacement, and impacts on existing employers; and • Additional public review once corrected materials are submitted. Until these issues are resolved, approval of the application is not supported by substantial evidence in the record. Thank you for your consideration and for your service to the residents and workers of Woodburn. Sincerely, Miles Eshaia Communications Director UFCW Local 555 137 Andrew Mulkey Attorney at Law PO Box 66562, Portland, OR 97290 • (503) 334-9899 • andrew@mulkeylegal.com March 11, 2026 Via Email City of Woodburn Planning Commission c/o Chris Kerr, Community Development Director 270 Montgomery Street Woodburn, OR 97071 Chris.Kerr@ci.woodburn.or.us Re: Protect Our Valley Alliance, Planning Commission Comment Letter for Land Use Application for Proposed WinCo Foods Transportation, Environmental, and Neighborhood Impacts Dear Chair and Members of the Planning Commission: I represent Protect Our Valley Alliance, a coalition of Woodburn residents, workers, and community stakeholders concerned about the transportation, environmental, and neighborhood impacts of the proposed WinCo Foods development. The Alliance supports growth that is consistent with the Woodburn Comprehensive Plan, protects public safety, and ensures that development does not impose disproportionate burdens on surrounding neighborhoods. At the Alliance's request, Greenlight Engineering conducted an independent technical review of the applicant's Traffic Impact Analysis ("TIA"), revised January 21, 2026. The engineering review is attached as Exhibit A and incorporated herein. The review identifies multiple substantive deficiencies that prevent the City from making the findings required under the Woodburn Development Ordinance ("WDO"), the Interchange Management Area ("IMA") Overlay District, and applicable transportation standards. In addition to the technical transportation issues, the Alliance has identified significant concerns related to emergency access, neighborhood livability, noise and light pollution, pedestrian safety, environmental impacts, and compatibility Planning Commission Comment Letter: Protect Our Valley Alliance 1 ;812 with adjacent residential uses. These issues are supported by evidence in the record, by the City's own adopted policies, and by the applicant's materials. Based on the current record, the application does not demonstrate compliance with mandatory approval criteria and does not provide substantial evidence supporting approval. The Alliance respectfully requests that the Commission deny the application or, at minimum, require the applicant to submit corrected materials and return for further public review. A summary of the basis for denial or additional materials is included at the end of this letter. I. Summary of Findings The independent engineering review concludes that the TIA contains four fundamental deficiencies that materially undermine its conclusions: • Impacts are understated • IMA trip cap compliance is not demonstrated • Intersection failures are identified but not mitigated • Required engineering analyses are missing These deficiencies affect the core assumptions that drive all operational modeling, trip generation, and compliance findings. Until corrected, the City cannot make defensible findings that the project meets WDO transportation standards or that public safety will not be hindered. II. The Application Fails to Demonstrate Compliance with the IMA Trip Budget The subject property lies within Subarea K of the IMA Overlay District. Compliance with the PM peak-hour trip budget is mandatory, and exceedance is allowed only if the City makes explicit, evidence-based findings that the development "contributes substantially to the economic objectives" of the Comprehensive Plan. The TIA does not provide: • The parcel's remaining PM peak-hour trip allocation • A comparison between project trips and remaining capacity Planning Commission Comment Letter: Protect Our Valley Alliance 2; 12 • Any accounting of prior approvals that may have consumed Subarea K's allocation As the engineering review states: "The proposed WinCo would consume and vastly exceed whatever remaining capacity exists within Subarea K... Table 5 of the TIA illustrates that the WinCo itself will generate 672 weekday PM peak hour trips, substantially in excess of the 429-trip allocation." Without a transparent trip-cap analysis, the City cannot determine whether the project complies with WDO 2.05.02 or whether an exception is justified.' See WDO 2.05.02(A), (B), (C), (D), and (G). As explained below, even if the City assumes that the peak hour vehicle trips generated will exceed the maximum peak hour trips allowed in Table 2.05A, the applicant fails to demonstrate that the development will "contribute substantially to the economic objectives found in the Comprehensive Plan." WDO 2.05.02(G)(2)(a). III. The TIA Applies Improper Pass-By Trip Reductions The TIA assigns 80 pass-by trips on Highway 214, even though the site has no driveway access on that roadway. As the engineering review explains: "Pass-by trips are not diverted from another roadway not adjacent to the site." The TIA conflates diverted trips with pass-by trips, contrary to ITE methodology. Because trip generation is the foundation for all subsequent modeling, improper pass-by assumptions propagate errors throughout the entire analysis. IV. The TIA Uses an Incorrect Opening Year The TIA models a 2026 opening year, while the applicant's narrative states the store will not open until mid-to-late 2027. The engineering review notes: 1 2.05.02(D)(1)requires that the TIA meet OAR 734-051 requirements. The OAR requires that TIAs "assess peak hour and average daily trips," "for the year of the analysis, the year of each phase opening, and future years beyond project completion or buildout." OAR 734-051-3030(5) The applicant's failure to provide an adequate analysis of peak hour trips (or as described below, a correct analysis of the opening year)violates these provisions as well. Planning Commission Comment Letter: Protect Our Valley Alliance 312 "Even a one-year difference can meaningfully affect intersection performance.., particularly at locations already operating near capacity." This discrepancy results in understated background volumes and artificially improved operational results. V. The Study Area and Trip Distribution Are Incomplete The TIA assumes no project traffic will use Lawson Avenue, despite the likelihood that navigation apps will route drivers through that corridor during peak congestion. The review states: "It is likely that a meaningful share of eastbound drivers on Highway 214 would be routed via Lawson Avenue rather than Evergreen Road." The TIA also omits several foreseeable intersections, including: • Highway 214 / Lawson Avenue • Lawson Avenue / Stacy Allison Road • Evergreen Road / Center Street A defensible TIA must include all intersections where project traffic is reasonably expected to cause operational change. VI. Required Queueing and Simulation Analyses Are Missing The TIA does not include 95th-percentile queue analysis, despite ODOT requirements that simulation be used when v/c ratios exceed 0.70 and must be used when they exceed 0.90. The engineering review explains: "Without 95th percentile queue estimates, it is not possible to determine whether turn lane storage is adequate, whether ramp terminals could experience spillback, or whether signals may queue into adjacent intersections." Planning Commission Comment Letter: Protect Our Valley Alliance 4 V� 112 Given the proximity of Highway 214 ramp terminals and closely spaced signals, queue spillback is a critical safety issue. VII. Intersection Failures Are Identified but Not Mitigated The TIA acknowledges that multiple intersections will operate below mobility standards yet provides no enforceable mitigation. Instead, it relies on: • Speculative future signal timing changes • Assumed future signals not supported by warrant analysis • Improvements not identified as funded capital projects The engineering review highlights the internal inconsistency: "It is unclear how 'All study locations will operate within the identified performance standard' while simultaneously acknowledging that `Three City of Woodburn intersections are projected to operate below the LOS threshold." WDO 3.04.05 requires that mitigation be identified, effective, and concurrent with development. The applicant has not met this requirement. WDO 3.04.05(C), (D), (E). VIII. No Traffic Signal Warrant Analysis Is Provided The MUTCD requires an engineering study demonstrating that a signal is justified under one or more warrants. The TIA provides no warrant worksheets, no crash analysis, and no supporting data. As the review states: "Without a warrant analysis, there is no evidence that signal installation is justified, appropriate, or feasible." The City cannot rely on unsubstantiated assumptions about future signals to meet mobility standards. IX. Access Management Standards Are Not Met Planning Commission Comment Letter: Protect Our Valley Alliance 5; 12 The proposed driveway on Evergreen Road is only 162 feet from the Evergreen/Oxford intersection, far short of the 245-foot minimum in WDO Table 3.04A. The engineering review notes: "Meeting the 245-foot separation standard appears feasible, yet the applicant is choosing not to meet it." The TIA also proposes a mid-block RRFB crossing without any engineering study of spacing, warrants, or safety implications. X. Pipeline Development and School Adjustments Are Not Documented The TIA lists numerous nearby developments but provides no trip tables, no distribution assumptions, and no documentation of how these projects were incorporated. Similarly, the TIA applies school-related adjustment factors (2.0 AM and 1.1 PM) without providing the underlying data. The review states: "No supporting documentation is provided to verify the methodology.., a reviewer cannot independently confirm that the factors are appropriate." Without transparency, the City cannot verify the accuracy of background volumes. XI. Additional Community, Environmental, and Neighborhood Impacts Beyond the technical transportation deficiencies, the Alliance has identified several additional concerns that independently prevent approval. A. Emergency Access and Response Times Residents in nearby apartments and senior communities rely on rapid emergency response. Increased congestion can slow ambulances, fire response, and police access to: • Cascade Meadow Apartments • Silver Creek Senior Living • Country Meadows Village Planning Commission Comment Letter: Protect Our Valley Alliance 6 44'312 • Barclay Square Apartments • Evergreen Estates The TIA does not evaluate: • Emergency vehicle delay • Queue spillback affecting access to residential driveways • Impacts on senior housing and high-needs populations WDO 3.04.05(C) requires evaluation of impacts that "hinder public safety." The applicant has not met this requirement. B. Noise, Light, and Late-Night Operations The proposed store will operate 24 hours, with continuous truck activity, refrigeration units, and parking-lot lighting. Residents report concerns about: • Sleep disruption • Vibration from truck unloading • Light trespass into homes • Increased nighttime noise The applicant has not submitted: • A noise study • A lighting photometric plan • Any analysis of nighttime operations near residential uses C. Pedestrian and Senior Safety The project is adjacent to multiple senior and multifamily housing communities. More turning movements near driveways and parking lots increase the risk of accidents involving seniors, mobility-device users, and pedestrians. The TIA does not evaluate: • Pedestrian crossing delay Planning Commission Comment Letter: Protect Our Valley Alliance 7 44412 • Senior mobility impacts • Safe routes to transit • Conflicts at the proposed RRFB These are required components of a complete transportation analysis. WDO 3.04.05(C) D. Neighborhood Compatibility and Residential Character The surrounding area is a quiet residential corridor. Big-box stores often bring increased traffic, noise, and late-night activity, which can reduce the appeal of nearby residential communities. The applicant has not demonstrated: • That the scale and intensity of the use is compatible with adjacent housing • That residential quality of life will not be degraded • That the project meets Comprehensive Plan policies on neighborhood protection E. Impacts on Local Businesses and Economic Stability The Alliance is also concerned about economic displacement and the long-term viability of existing businesses. A new WinCo threatens the visibility, foot traffic, and long-term viability of Woodburn's independent businesses. The applicant has not provided: • An economic impact analysis • A retail leakage study • Any evidence that the project will not displace existing employers These impacts are relevant to Comprehensive Plan economic policies and to the City's findings on public welfare. See Policy F-1.3 (discouraging strip development, and encouraging developments to constitute urban districts that allow one-stop dining, shopping, and recreation opportunities). Planning Commission Comment Letter: Protect Our Valley Alliance 8 44512 The applicant also fails to demonstrate compliance with the "economic objectives found in the Comprehensive Plan," which is required if the proposed project exceeds the maximum peak hour vehicle trips specified in Table 2.05A. WDO 2.05.02(G)(2). The record fails to adequately address this requirement. At most, the applicant quotes the City's Economic Opportunity Analysis, which states that "land.., for large commercial employers is very limited." However, the fact that land for such commercial uses is limited, or that the applicant proposes to use some of that limited land for a commercial use, does not in and of itself address any "economic objectives" of the comprehensive plan. The sections of the Economic Opportunity Analysis ("EOA") quoted by the applicant in the staff report identify a deficit of land available for commercial uses. Those deficits do not identify an economic objective, much less one that the applicant could meet. At best, the EOA identifies the need for more land for commercial uses. Yet the applicant's project does create more commercially zoned land. Therefore, the applicant's project does not address that specific need, much less demonstrate that the development "will contribute substantially to the economic objectives found in the Comprehensive Plan." Moreover, the applicant fails to demonstrate how a project that merely uses commercially zoned land for a commercial purpose "will contribute substantially" to any of the City's economic objectives. Rather than identify an economic objective of the comprehensive plan or explain how the proposed project would substantially contribute to the City's goal of meeting that objective, the applicant simply points to an identified need for more commercially zoned land. Although the City identified this need in its EOA, the City has made a clear policy choice to promote more important economic goals. As the applicant points out, the City's recent 2025 UGB expansion the City made a policy choice not to expand the number of acres for commercial land (at least not in this region of the City). Instead, the City chose to expand the UGB for the purpose of increasing the amount of land zoned as part of the Southwest Industrial Reserve. The City's comprehensive plan map and zoning map demonstrates that a large portion of this Urban Reserve Area and protected industrial land occurs south of the subject property on the east side of Interstate 5. Planning Commission Comment Letter: Protect Our Valley Alliance 9;412 In this case, the applicant's proposal to exceed the maximum peak hour vehicle trip limit for this part of the City demonstrates that the project presents a direct conflict with the comprehensive plan's economic objectives. Specifically, the project's traffic will impair the City's economic objective to maintain and preserve land and infrastructure for industrial uses. For that reason, the applicant fails to demonstrate compliance with WDO 2.05.02(G)(2). The Comprehensive Plan explains that maintaining industrial land and that land's access to Interstate 5 "is critical to the economic development efforts of the City." The City's EOA and the City's Economic Development Strategy "provide[s] the basis and policy direction for Woodburn's economic development efforts." Comp. Plan at 17. To that end, the comprehensive plan explains that industrial land "requires good transportation access, served preferably, but not necessarily, by both railroad and highway facilities." Id. at 17-18. The comprehensive plan continues, explaining that "[r]eserving industrial sites with direct access to Interstate 5 is critical to the economic development efforts of the City."Id. By increasing non-industrial traffic beyond the limit allowed by WDO 2.05.02, the applicant's proposal fails to comply with the provisions of the WDO and the City's comprehensive plan. The plan explains that "lands for high traffic generating uses (shopping centers, malls, restaurants, etc.) should be located on well improved arterials." Policy F-1.2 The plan goes on to explain that such "uses should provide the necessary access management and traffic control devices needed to ameliorate their traffic impact on the arterial streets." Id. The applicant admits that the proposal will make traffic worse, not better. Here, the applicant falls far short of meeting the threshold needed to show that its project would contribute substantially to the economic objectives outlined in the comprehensive plan. WDO 2.05.02(G)(2). Here, by exceeding the maximum peak hour vehicle trip limit, the applicant's proposal would threaten rather than serve the City's economic objective of maintaining direct access for industrial lands to Interstate 5. The applicant's project would increase non-industrial traffic on the arterials that the newly reserved industrial land south of the subject property would ultimately use to access the highway. As part of its industrial lands policies, the City has identified numerous economic objectives. These include Policy E-1.8, which protects industrial lands Planning Commission Comment Letter: Protect Our Valley Alliance 10.i� 12 "from encroachment by commercial or other uses that will either increase the price of industrial land or generate traffic that will interfere with normal industrial practices." The Comprehensive Plan explains that the City's objective in protecting industrial land includes attracting industries that "should generate jobs that would upgrade the skills of the local labor pool." Policy E-1.9. The applicant's proposal runs counter to both of those economic objectives. For that reason, the proposal violates WDO 2.05.02(G)(2). XII. Conclusion The record does not contain substantial evidence demonstrating that the proposed WinCo complies with the Woodburn Development Ordinance, the IMA Overlay District, or applicable transportation, environmental, and neighborhood standards. The TIA contains significant methodological errors, omits required analyses, and fails to identify enforceable mitigation. Additional concerns related to emergency access, noise, light, pedestrian safety, neighborhood compatibility, and economic displacement further prevent approval. Protect Our Valley Alliance respectfully requests that the Planning Commission: • Deny the application, or • Require the applicant to submit a corrected, complete TIA and additional studies, including: • A full IMA trip-cap accounting • Corrected trip generation and distribution • Queueing and simulation analyses • Signal warrant studies • Documented pipeline development assumptions • Access spacing compliance • Noise and lighting studies • Pedestrian and senior safety analysis • Emergency access evaluation Planning Commission Comment Letter: Protect Our Valley Alliance 111�t12 • Identified, funded, and concurrent mitigation The Alliance appreciates the Commission's careful review and its commitment to ensuring that development proceeds responsibly and in accordance with adopted standards. Respectfully, Andrew Mulkey (OSB No. 171237) PO Box 66562 Portland, OR 97290 (503) 334-9989 andrew@mulkeylegal.coin On behalf of Protect Our Valley Alliance Attachments: Exhibit A Greenlight Engineering Review of TIA Planning Commission Comment Letter: Protect Our Valley Alliance 12112 Protect Our Valley Alliance Exhibit A Greenlight Engineering Review of TIA 150 ( i GREEN LIGHT HT iI) ENGINEERING March 12, 2026 City of Woodburn Planning Commission 270 Montgomery St Woodburn, OR 97071 RE: Transportation Impacts of Proposed WinCo Planning Commissioners: Greenlight Engineering was retained by Protect Our Valley Alliance to conduct a technical review of the proposed WinCo Foods development and associated land use application. This review evaluated the Traffic Impact Analysis (TIA), revised January 21, 2026, the Design Review Project Narrative, submitted site plans, the City of Woodburn staff report, and supporting materials in the public record. The purpose of this review is to evaluate whether the methods, assumptions, and conclusions of the TIA comply with the Woodburn Development Ordinance (WDO), the Interchange Management Area (IMA) Overlay District requirements, the Woodburn Comprehensive Plan, applicable ODOT requirements, and generally accepted traffic engineering practice. Based on this review, the current record does not demonstrate that the proposed development complies with applicable transportation standards or that the project's transportation impacts have been adequately identified or mitigated. The analysis supporting the application contains significant analytical omissions, unsupported assumptions, and inconsistencies with prior traffic studies prepared for nearby developments. Because transportation impacts form a central component of the City's development review framework, particularly within the IMA Overlay District,the deficiencies identified in the TIA prevent the City from making defensible findings that the proposal complies with adopted standards or that required mitigation has been adequately identified. 13554 Rogers Road • Lake Oswego, OR 97035 ww. ,irk, '„! „II„!!, ,;, '„! ,g,ii„ir, , ,„!rii„! , ,, ,onn • 503.317.4559 151 Executive Summary This review identifies several fundamental deficiencies in the TIA and the supporting record: Intersection failures are identified but not mitigated Multiple intersections are projected to operate below adopted mobility standards under both opening-year and future conditions. In previous applications,two intersections were identified to fail ODOT mobility standards. However, this TIA illustrates those intersections to now to operate adequately without apparent improvements. Where the TIA identifies intersection failures, the TIA does not demonstrate that improvements are funded, or provide operational modeling showing that proposed improvements would restore acceptable operations. Instead, the analysis relies on speculative future signal installations and corridor signal timing adjustments that are not supported by engineering analysis, funding commitments, or traffic signal warrant studies. Project impacts are materially understated Several methodological issues result in an understatement of project traffic and operational impacts.These include the improper application of pass-by trip reductions on Highway 214,the omission of study intersections that should have been included,the use of an incorrect opening year, and the absence of 95th percentile queue analysis. Because trip generation and distribution form the foundation for all operational modeling, these errors propagate throughout the analysis and materially affect the reported intersection performance. Compliance with the Interchange Management Area (IMA) trip cap is not demonstrated. The site is located within the Interchange Management Area Overlay District, which establishes a cumulative PM peak hour trip budget intended to preserve the operational integrity of the I-5 interchange and surrounding arterial network. The TIA does not provide a clear accounting of remaining trip capacity within Subarea K or demonstrate how the project's forecast PM peak hour trips compare to the available allocation. Moreover, the project's trip generation appears to substantially exceed the parcel's allocated trip budget. Additionally, the TIA relies on improper pass-by trip assumptions that artificially reduce the reported trip impact in the IMA. Without a transparent accounting of remaining trip capacity and a quantitative comparison to project demand, the City cannot determine whether the proposal complies with WDO 2.05 or whether an exception to the trip cap is justified. 2 152 Important engineering analyses is missing Several analyses typically required in transportation impact studies are absent from the TIA, including 95th percentile queue analysis and transparent documentation of how approved pipeline developments were incorporated into the forecast traffic volumes. Without these elements, the City and the public cannot independently verify the study's assumptions or conclusions. These deficiencies are not minor technical disagreements. They affect foundational elements of the transportation analysis. Because trip generation and distribution drive all subsequent modeling of intersection operations, queuing, and mobility compliance, unsupported assumptions at the front end of the analysis undermine the reliability of the entire study. Until these issues are addressed, the City cannot make defensible findings that: • The proposal complies with the IMA Overlay District trip budgeting framework; • Adopted mobility standards will be met; or • Required mitigation measures are identified, feasible, and concurrent with development. For these reasons, approval of the application in its current form is not supported by substantial evidence in the record. TIS Results Discrepancies and Requirements Interestingly, a recent TIA prepared for the Specht Industrial Development application, which predates the WinCo TIA, illustrated that the intersections of Highway 214/Evergreen Road and Highway 214/Boones Ferry/Settlemier Road exceed the ODOT mobility standard. However,the subsequent WinCo TIA indicates there are not near-term congestion issues at the intersections even though it does not appear improvements are planned or constructed. Supposedly, the WinCo incorporates the Specht Industrial impacts, but the traffic studies present very different results. Table 10 of the WinCo TIA reports that the intersections of Highway 214/Evergreen Road and Highway 214/Oregon Way (& Settlemier Road) will both operate with volume-to- capacity (v/c) ratios of 0.94 with the development in place. These values are both just 0.01 below the ODOT mobility standard of 0.95. Table 10 also shows that without the proposed project, the Evergreen intersection would operate at a v/c ratio of 0.84 and the Settlemier intersection at 0.89. These baseline conditions already include the traffic associated with the Specht Industrial Development, yet the intersection operations in the WinCo TIA are significantly better than the Specht TIA despite no planned or constructed improvements that improve operations. 3 153 The TIA prepared for the Specht Industrial Development in 2022 concluded that, with that development in place,the intersection of Highway 214/Evergreen Road would operate at a v/c ratio of 0.93 and the intersection of Highway 214/Settlemier/Boones Ferry Road would operate at a v/c ratio of 0.97, well above the ODOT mobility standard. In other words, the Specht TIA projected failing conditions at one of these intersections, whereas the WinCo TIA reports substantially lower v/c ratios and compliant operations. uju� "iui uui uuu u li fu VV a II W- f Po �III Ifw�- r u v . i it ill it m u a 1110 a r h"a'�. Ewer,r "i Rr �DD. .... a ... IC 9, ? fir, D R� 7 -- '_) I "I D5 b 55 D.94-E-58. DI 9r E .Ea f,'' I-"9 R 2 1 reg ay TAl U : IPM 043-0-1951 -E+-i r I " ': 4 OR 2Il k,�RPtth',mjgr Av ��uie'R a rories DODO- A wtl 0.,Rt- .2 t'o,95-E-E .E p 96-E-5D. 9'5 E-59.6 Ferry Road p 9 F,3""IUD-.R2."2 .9 .E-57.91 0D y. ..ca", .R d92 E R R Excerpt of Specht Industrial Development TIA These analyses therefore report significantly different capacity outcomes for the same intersections under similar development assumptions. The basis for these differences is unclear from the materials provided and warrants clarification. It is notable that the Specht Industrial Development TIA recommended that the project provide proportionate-share contributions at several intersections based on PM peak- hour volumes, including: • 0.99% at OR 214/Settlemier • 0.28% at OR 214/Highway 99E • 4.19% at Evergreen Road/Hayes Street That TIA further noted that the City has commonly collected proportionate-share or mitigation fees from developments to address corridor capacity issues and recommended that the Specht project contribute similarly. It is unclear whether these deficiencies still exist. Similar inconsistencies appear in other referenced studies. For example, Table 8 of the Brighton Pointe Subdivision TIA (also referenced in the WinCo TIA) projected that the Highway 214/Settlemier intersection would operate above the ODOT mobility standard at a v/c ratio of 0.96, while the Highway 214/Evergreen intersection was projected to operate at 0.93. In contrast, the WinCo TIA establishes baseline operations at both 4 154 intersections below 0.90 v/c, substantially lower than the values projected in earlier studies. r uV ,f, G,� ew�IV° A Illizsl�r ma3 S�uwrLII if,y � ��� �I Vo�oil h ll�llil�il"u��iluouil0000 o9uluoil loil ������������������^II ill�!I IjVI iunli16��l�liilti i�� . ���r�o �r �� ,u u�� VI � i��!! �, I illy ����II� I I�IV II GU II II Igll��llll�llllll�l � � � � ��� � �� D II VIV IV IV IV VIV I!III 1a 116V2V 11 o��� �� �o u u IO U019V Iu'u III 11V1001� 0� ..0 111 1111 0111 III@ .,Y 0\O�OIU (111 1 1�IIl.. II 2020 Ex'ti�ng Corndlitldn 0.56 E tS OI0 O i CIOCO Ickground Corddtocrn 095 077 C CS OIw9C C SC OOC'S Eulilld uit CondlitiN a 078 C Cd 0OS. C S9 i»>w1u� 1 iti I,U�1IUY\1U\\1\111 >11�I�� �01�11�11D1111�1 u LOCO I xisting Condition 0.73 C SC 013 D 4C COOS Background C; nditlion 0.95 0.55 0 46 0 E t 8 2040 I ul dl lut Condition 085 FD 4b 0,90 E 09 Excerpt of Brighton Pointe TIA (2022) The Smith Creek Subdivision TIA likewise identified operational deficiencies at the Highway 214/Settlemier intersection. OM 7a"T: I fl UbOUT M4 MmI U4 HOUR M MOOWk VIM YC!OiATOMH w.. ................. 4M Pa*Hour PM] ak M auwuur tllin !�r� Nw�Ma�wn mdM!�,� TraMe IV g ci. of a Kfc w 2>I4rEvwgr n M d a,5 V0CI, C 31 •G 615 O 43S 3,78 4 II4 4i •.R'3mgMJ Y 14 WC B 10 7O C 20.9 0..65 3 ]I4C P v, l fl iy4t4 a33,Vn B '0H 0.56 C 20.3 a$a 6 w ¢ 4' �4"hwal Mw: a,9..WC F 31'.2 0 9C F '2.O..8V Nu"fl Excerpt of Smith Creek Subdivision TIA (2018) All of these reports can be reviewed here: JIB„tiff ?„ aaaa,aa.,aa, , ,ll ,!u,pFlii „li. ov " S,SCI�uiiFl!!Fl ,!! ,ti Accordingly, the record indicates that the City of Woodburn has previously been notified several times of capacity issues at these intersections, yet the current TIA identifies no capacity issues at these intersections in the near term. The WinCo TIA does not explain whether any improvements have been implemented with those funds or how previously identified deficiencies have been resolved. Nevertheless, years later, and with substantially more development proposed or underway, the intersections are now reported to operate within acceptable mobility standards. This apparent discrepancy should be clarified, and a consistent analytical approach between applications should be ensured. 5 155 In addition to these discrepancies, the WinCo TIA omits critical analysis that was included in prior studies such as the Specht Industrial TIA, Brighton Point TIA, and Hermanson Preserve TIA. Most notably, the WinCo TIA provides no estimate of intersection or corridor queuing. Queue analysis is a common requirement in ODOT traffic impact analyses because, without it, it is not possible to determine whether vehicle queues can be accommodated within available storage or whether they may spill back and affect upstream intersections. The absence of queue analysis is particularly unusual given that this corridor is approaching or at the ODOT mobility threshold. Additional discussion of this item is provided herein under "Queuing Analysis and Simulation Is Absent". Highway 214/Evergreen Intersection ODOT Concerns ODOT's February 6, 2026 letter states: "No mitigation measures to any state facility have been proposed. However, the study shows the development impacting the OR 214 at Evergreen Road intersection, projecting the intersection operating above mobility target in the future PM peak hour condition. Region 2 Traffic recommends mitigation at the intersection by signalizing the eastbound and northbound right-turn lanes which are currently yield and stop controlled, respectively... No further analysis work should be required. However,ODOT recommends mitigation measures, as noted above in comment #2, to mitigate traffic effects of the proposed development. Additional work may be required to accompany approval requests for proposed mitigation measures (i.e. preliminary design layout, preliminary signal operations design, etc.). In contrast, the staff report states: "... ODOT provided comments to the City and applicant on the TIA, which was been revised to their satisfaction. Based on the ODOT approved TIA, no additional traffic mitigations were warranted. Although ODOT agreed that no additional traffic mitigations were warranted for the applicant's current proposal, they nevertheless offered recommendations for potential improvements to address future (2040) issues at the intersection for 214 and Evergreen. Specifically, ODOT recommended adding signals at the eastbound (from Evergreen) and southbound (from 214) movements.These mitigations would not be directly attributable to the applicant's proposal, which, as noted above, meets ODOT standards. Additionally, because the recommended mitigations address future (2040) issues, it is not possible to proportionally allocate a share of these future mitigations to the applicant's current proposal..." ODOT's letter clearly states that the analysis shows the development affecting operations at the Highway 214/Evergreen Road intersection and recommends mitigation in the form of signalizing specific movements. The City's staff report, however, characterizes ODOT's opinion as indicating that no mitigation is warranted. 6 156 These interpretations conflict. ODOT identifies an operational deficiency associated with the development and recommends mitigation, while the staff report concludes that the recommended improvements are unrelated to the applicant's proposal and therefore need not be addressed. The record does not provide a clear explanation reconciling these differing interpretations or explaining why mitigation recommended by ODOT cannot be proportionally attributed to the project. As discussed earlier in this review, multiple prior traffic studies have already identified operational deficiencies along the Highway 214 corridor, including at the Evergreen Road and Settlemier/Boones Ferry Road intersections. The WinCo development is projected to add traffic to this corridor, yet the application does not include any mitigation for impacts to these state highway intersections. Given the documented congestion conditions and the recommendations provided by ODOT, the absence of identified mitigation for project impacts to Highway 214 raises significant questions regarding whether the proposal satisfies applicable transportation performance standards. Interchange Management Area(IMA) Trip Cap Compliance The subject property is located within the Interchange Management Area (IMA) Overlay District (WDO 2.05), which establishes a cumulative PM peak hour trip budget intended to preserve the long-term operational integrity of the 1-5 interchange and the surrounding arterial network. Compliance with the PM peak hour trip cap is mandatory. Exceedance is permitted only if a development "contributes substantially to the economic objectives found in the Comprehensive Plan," and only after the City makes explicit policy findings supporting such an exception. This exception is not automatic. It is a discretionary mechanism that must be supported by substantial evidence and reasoned findings demonstrating that overriding economic objectives justify additional transportation demand within a capacity-constrained system. The proposed WinCo development would consume, and substantially exceed, whatever remaining capacity exists within Subarea K. As a result, it would constrain or preclude other properties within the subarea from developing under the adopted trip allocation and would shift the burden onto future applicants to demonstrate extraordinary economic justification for additional exceptions. In practical terms, approval would allocate more than Subarea K's limited transportation capacity to a single use, thereby undermining the cumulative trip-budgeting framework established by the overlay district and impact the ability of other developments in other areas from developing. At the very least, ignoring the adopted cap will burden the interchange and transportation network. Although the Traffic Impact Analysis(TIA) references the IMA overlay, it omits critical information necessary to evaluate compliance. Specifically, the report does not identify the parcel's remaining PM peak hour trip allocation or provide a comparison between the project's forecast PM peak hour trips and the remaining allocation. No accounting is provided demonstrating 7 157 whether the 429 PM peak hour trip allocation identified in Table 2.05A has already been partially consumed by prior development approvals. The TIA also fails to address the policy implications of approving a high trip-generating development that could preclude other future development within the subarea due to exhaustion of the trip cap. The City staff report states: "The proposed development is expected to generate 511 new peak hour trips and encumbers two lots. Pursuant to Table 2.05A, these two lots have a maximum peak 'allocation' of 429 peak hour trips. Pursuant to 2.05.02(G)(2)(a), a development may exceed the allocated parcel budget if the development will contribute substantially to the economic objectives found in the Comprehensive Plan." The TIA assumes a reduction of 161 pass-by trips to the total 672 trips generated by the WinCo, as shown in Table 5 of the TIA. As discussed in the section of this report titled "Pass-By Trip Assumptions Are Inappropriate,"these pass-by trips were not properly accounted for as pass-by trips were applied to Highway 214. Pass-by trips cannot be applied to Highway 214 by definition. Correcting this error, and applying the methodology used in Figure 7 of the TIA, results in a revised estimated 672 PM peak hour trips, rather than the 511 trips reported in the staff report. 5 PROJECT TRIP GEN E R TO:°yl flew-to- petwolrlk Tulips Peak Period Si e Total,Trips Pass-k Tota. Enter i.. ter AM Peak Hou° 84.10 2•41 0 241 1:42 99 PM(Peak Hour 94. 12 672 161 511 255 255 alillN 8410 7,'552 1611 7,391 9,596 ,1,695 I. TN ms its equal to the PM pack hour psby volumes.'The total)d OV pasby vo1 uuna is,exIpected to be hiii her, Table 5 of the TIA The site has a maximum peak hour vehicle trip budget of 429 trips under Table 2.05A of the WDO. The TIA notes that "pursuant to WDO section 2.05.02(G)(2)(a), development may exceed the identified Parcel Budget." However, this is not merely a theoretical possibility. Table 5 demonstrates that the WinCo store alone would generate approximately 672 weekday PM peak hour trips, substantially exceeding the 429-trip allocation for Subarea K, while land within the subarea remains available for future development but without any corresponding IMA capacity and eroding the capacity for the entire IMA. Because the IMA overlay functions primarily as a transportation capacity preservation mechanism, the failure to provide a quantitative comparison between the project's trip generation and the remaining trip allocation represents a substantive deficiency in the TIA. In 8 158 addition, both the City and the applicant have miscalculated the project's trip generation by improperly accounting for pass-by trips, which understates the project's actual PM peak hour trip generation. Without an accurate trip calculation and a clear accounting of the remaining trip capacity within Subarea K, the City cannot meaningfully evaluate how the proposed development affects the cumulative trip budget established under WDO 2.05. As a result, the record does not provide a sufficient basis for defensible findings that the proposal complies with WDO 2.05 or that an exception to the trip cap is warranted consistent with the Comprehensive Plan's transportation policies and adopted system management framework. Pass-By Trip Assumptions Are Inappropriate The TIA applies pass-by trip credits at the Highway 214/Evergreen Road intersection where such credits are not permissible under accepted traffic engineering methodology. Figure 7 of the TIA incorrectly assigns 80 pass-by trips at the intersection, when by definition there can be zero pass- by trips on Highway 214 associated with this development.411 IH dlI�, m , sit , 1 'ii, �.iaO � w wM w �I yrybrmm � /6/ mm i dip agamrnrAw ws �wp,,ww�w,ur'a /�i1 r, "u�V a e 1g »tiq �e rE �r, p i wk R �rom.(tlr �5�»cf Vex �meantilf , Ifl iFrmvrpm�rm Wdd 5mmimFnmm JHnm � �r 7 i;,, 'II d I are a %l ' �i / 1I CtimlriJri� e �'m '� 11111//ll I'bnourrC tJoIY4.C i"i4,dk X'bi— Irrmn/PreFEo{..lYFrou°A / h aria j �fil n ail 7i 9IX n tl t 1 f Jk p M%,n�iKn^„� , „ „„ ,�... .,.�� �. »r o. ., Figure 7 from the TIA Illustrating Where Pass-By Trips Were Applied The TIA correctly defines "Pass-by trips are trips made as an intermediate stop from an origin to a primary destination (i.e., stopping to shop on the way home from work) by vehicles passing directly by the project driveway." 9 159 According to the Institute of Transportation Engineers (ITE) Trip Generation Handbook, "A pass- by trip is made as an intermediate stop on the way from an origin to a primary trip destination without a route diversion. Pass-by trips are attracted from traffic passing the site on an adjacent street or roadway that offers direct access to the generator. Pass-by trips are not diverted from another roadway not adjacent to the site." The method in which pass-by trips were estimated in the TIA is what the Trip Generation Handbook cautions against. This definition is clear and restrictive. Pass-by trips must (1) originate from traffic already traveling on a roadway adjacent to the site and (2) access the site directly without diverting from another roadway. Table 10 of the TIA establishes that with the project, the volume to capacity (v/c) ratio of this intersection will be 0.94. With the pass-by trip error, the TIA incorrectly reports the projected traffic volume at the intersection. A higher traffic volume may result in a different v/c at the intersection that may push against ODOT's adopted mobility standard. And as noted previously, previous analysis found this intersection operating above the mobility standard. It appears the TIA is conflating diverted trips with pass-by trips, but the two are not interchangeable. The Trip Generation Handbook defines a diverted trip as: "A diverted trip is attracted from the traffic volume on roadways within the vicinity of the generator but without direct access to the site. A diverted trip requires a diversion from a roadway not adjacent to the site to another roadway to gain direct access to the site. A diverted trip adds traffic to streets adjacent to a site and could remove a trip on streets from which it diverted." ITE further cautions: "Diverted trips are often difficult to identify. Consequently, diverted trips should be estimated in a traffic impact study only if • Reliable data reporting the percentage distribution of the three types of trips (primary, pass-by, and diverted trips) are available for the land use(s) being considered; and • The travel routes for diverted trips can be clearly established." The TIA does not provide reliable empirical data establishing the percentage of diverted trips, nor does it clearly establish the travel routes of such trips. Instead, it attempts to apply pass-by trip reductions in circumstances that meet the ITE definition of diverted trips, not pass-by trips. Pass- by estimates cannot be used as a proxy for diverted trips, as has been done here. Because trip generation forms the foundation for all subsequent capacity, queuing, and v/c ratio modeling, improper application of pass-by credits propagates throughout the entire analysis.The result is an understatement of projected traffic volumes at a critical study intersection and a corresponding overstatement of operational performance. In order to provide an accurate traffic analysis, elements of the traffic analysis will need to be redone. 10 160 TIA Opening Year Is Not Accurate The TIA models a 2026 opening year, while the Design Review Project Narrative states that the store will not open until mid to late 2027. This discrepancy directly affects background traffic volumes, applied growth rates, and cumulative impact assumptions, resulting in an inconsistent analysis. The study year must align with the reasonably anticipated opening year in order to produce defensible operational conclusions. Even a one-year difference can meaningfully affect intersection performance particularly at locations already operating near capacity if assumed growth rates approach the 0.5% maximum. At near-capacity intersections, relatively small increases in background volume can shift level of service and increase v/c ratios. By modeling an earlier opening year than what is represented in the applicant's own narrative, the TIA has understated actual opening-year conditions and associated impacts. As previously established, the Highway 214/Evergreen and Highway 214/Boones Ferry/Settlemier intersections are either over the mobility standard or very close to it. Intersection Failures Are Identified but Not Mitigated or Substantiated The TIA identifies multiple intersections projected to fail City mobility standards, yet it does not propose specific mitigation measures, evaluate feasible improvements, or demonstrate that any referenced improvements are funded or effective. The TIA states: "Based on the analysis described in this report, the following key findings have been identified: • All study locations will operate within the identified performance standard for the 2026 opening year, after completion of the project. • Two ODOT intersections are projected to operate below the LOS threshold during the 2040 PM peak hour: Highway 214 at Evergreen Road and Highway 214 at Boones Ferry Road... • Three City of Woodburn intersections are projected to operate below the LOS threshold during the 2026 opening year: Stacy Allison Way at Evergreen Road, Hayes Street at Evergreen Road, and Harvard Drive at Evergreen Road..." These statements are internally inconsistent. It is unclear how "All study locations will operate within the identified performance standard for the 2026 opening year" while simultaneously acknowledging that "Three City of Woodburn intersections are projected to operate below the LOS threshold during the 2026 opening year." 11 161 Highway 214 Intersections: Speculative Timing Adjustments Regarding deficiencies along Highway 214, the TIA relies on corridor signal timing adjustments identified as Project R10 in the City's TSP. The TIA states "Preliminary analysis suggests that with a longer cycle length this location would operate within the LOS standard." However: • There is no evidence that the signal timing project is funded. • No corridor-level operational modeling is provided. • No documentation is included demonstrating that longer cycle lengths would achieve compliance. • No evaluation is provided of trade-offs (e.g., increased delay or queue spillback at adjacent signals). It is acknowledged in the TIA that "the entire corridor should be analyzed." That analysis is not provided in the TIA. Signal timing changes that improve one intersection can degrade operations at another, particularly on coordinated corridors. Without modeling evidence, there is not substantial evidence that Highway 214/Evergreen Road or Highway 214/Boones Ferry Road will operate adequately. City Intersections:Assumed Future Signals Without Evidence Regarding the failing intersections of "Stacy Allison Way at Evergreen Road, Hayes Street at Evergreen Road, and Harvard Drive at Evergreen Road", the TIA states: "An analysis of traffic signal control at each location indicates that each will operate within the identified performance standard with the improvement." The City staff report states: "The City had identified these projects in the recently adopted TSP for updates and the engineering work has already begun on designing new signal improvements at Stacy Allison/Evergreen and Hayes and Evergreen. Harvard/Evergreen is being designed with roundabout. Construction on these important public projects is expected to be underway later this year. The TIA includes an analysis of these intersections after these improvements are completed (and the store is open) and it indicates that all three will operate within the mobility standards." However, no such analysis is provided in the TIA.There are no signalized intersection models, no phasing assumptions, no timing parameters, and no documentation of operational results with signals in place. Additionally, it is unclear whether these improvements are fully funded. No Traffic Signal Warrant Analysis The TIA also fails to provide any traffic signal warrant analysis. 12 162 The Manual on Uniform Traffic Control Devices(MUTCD) requires "An engineering study of traffic conditions, pedestrian characteristics, and physical characteristics of the location shall be performed to determine whether installation of a traffic control signal is justified at a particular location." The MUTCD further requires evaluation under the following warrants: • Warrant 1 — Eight-Hour Vehicular Volume • Warrant 2 — Four-Hour Vehicular Volume • Warrant 3 — Peak Hour • Warrant 4 — Pedestrian Volume • Warrant 5 — School Crossing • Warrant 6 — Coordinated Signal System • Warrant 7 — Crash Experience • Warrant 8 — Roadway Network • Warrant 9 — Intersection Near a Grade Crossing No warrant worksheets, traffic counts, crash evaluations, or engineering study findings are provided. Without a warrant analysis, there is no evidence that signal installation is justified, appropriate, or feasible. Driveway Access to Evergreen Road The TIA states: "According to the access requirements identified within the WDO Table 3.04A, Evergreen Road, which is a minor arterial, has a minimum driveway separation of 245 feet. The proposed driveway location provides more than 245 feet to the north (Stacy Allison Way). To the south, it provides approximately 162 feet measured from edge to edge.The project will work with City staff to provide the necessary variance documentation for the proposed driveway location." Note 1 of Table 3.04A specifies that for corner clearance and driveway spacing, "the separation should be maximized." Meeting the 245-foot separation standard appears feasible and it is unclear why the standard cannot be met. The applicant's narrative states that "Per City staff the 245-foot separation... is a guideline rather than a required standard." The City staff report similarly states, "The 245-foot separation shown in Table 3.04A is a guideline rather than a required standard. Staff can support this driveway location." This conclusion conflicts with the WDO section title, 3.04.03 Access Management: Driveway Guidelines and Standards, and with the title of Table 3.04A as "Access Requirements", with the table title quite clear that access spacing is a standard rather than a discretionary guideline. Regardless of interpretation, the spacing standard could reasonably be met in this case, yet the applicant has chosen not to meet it. 13 163 WDO Section 5.03.12 establishes the criteria for granting a variance and states: "A variance may be granted to allow a deviation from a development standard of this ordinance where the following criteria are met... (1) Strict adherence to the standards of this ordinance is not possible or imposes an excessive burden on the property owner..." It does not appear that the City has processed this deviation from the code through the variance procedures required by the WDO and it is unclear why. In addressing this criterion, the applicant's checklist states: "The Applicant is proposing this driveway location to allow easier(less circuitous)vehicle access into the site as well as more direct fire access to the building Fire Department Connection (FDC)that is on the southwest side of the building..." There is no evidence that the Fire District has requested this deviation. Neither the applicant's narrative nor the City staff report demonstrates that the access spacing standard cannot be met or that compliance would impose an excessive burden on the property owner. Rather, the minimal justification provided reflects a preference for a more convenient driveway location. The purpose of access spacing standards is safety. Convenience alone does not appear to satisfy the variance criteria established in WDO 5.03.12. RRFB and Proximity to Evergreen Driveway The site plan shows a proposed "Mid-Block Crossing with RRFB @ Intersection of Oxford St. & Evergreen Rd." An RRFB (Rectangular Rapid Flashing Beacon) is intended to enhance pedestrian safety at uncontrolled crossings by providing a high-visibility, active warning to motorists. It is unclear whether the crossing would be mid-block or at the Oxford Street intersection. In either case, its proximity to the proposed driveway may affect RRFB operations, which should be studied to ensure there are not conflicts. The TIA notes that "...WinCo will be installing RFFB's (or similar) at an existing crosswalk on Evergreen Road to provide a safe crossing of Evergreen Road to/from the project site and the existing residential properties to the east." However, no similar treatment nor marked crosswalk is evaluated or proposed at Evergreen Road/Center Street, which would provide a more direct pedestrian connection from the northeast. The TIA does not evaluate whether the proposed crossing location, treatment type, or spacing from adjacent intersections is appropriate. On pedestrian hybrid beacons (including RRFBs), the Manual on Uniform Traffic Control Devices states: 14 164 "A pedestrian hybrid beacon may be considered for installation to facilitate pedestrian crossings at a location that does not meet traffic signal warrants (see Chapter 4C), or at a location that meets traffic signal warrants under Sections 4C.05 and/or 4C.06 but a decision is made to not install a traffic control signal... If a traffic control signal is not justified under the signal warrants of Chapter 4C and if gaps in traffic are not adequate to permit pedestrians to cross, or if the speed for vehicles approaching on the major street is too high to permit pedestrians to cross, or if pedestrian delay is excessive, the need for a pedestrian hybrid beacon should be considered on the basis of an engineering study that considers major- street volumes, speeds, widths, and gaps in conjunction with pedestrian volumes, walking speeds, and delay." The TIA provides no evidence of traffic signal warrants or any study of the proposed pedestrian crossing location. Without such an analysis, it is not possible to determine whether the proposed crossing adequately addresses pedestrian safety or operational concerns. Approved Developments Not Clearly Accounted For The TIA states: "In addition to the background traffic growth, the following pipeline development projects have been identified near the study area and have been included in the forecast: • Allison Way Apartments (Phases 1 & 2) • Specht Industrial Development • Brighton Pointe Subdivision (Phases 1 & 2) • 9008 Parr Rd Subdivision (assumed 75%complete) • Smith Creek Development (assumed 75% complete) • Unitus Community Credit Union • US Market Gas Station (Newberg Hwy location) • Mill Creek Meadows subdivision • Mill Creek Meadows II subdivision • Dove Landing subdivision (assumed 50% complete) • Marion Pointe subdivision (assumed 50% complete) • Commerce Way Industrial Park • Boones Crossing Townhouses • Parr Rd Cottages" However, the TIA does not provide sufficient detail to verify how these developments were incorporated into the analysis. No information is provided regarding land use type, size, approved trip generation, assumed build-out year, trip distribution, or the methodology used to determine partial completion percentages(e.g., 50%or 75%).There 15 165 are no trip tables, volume adjustments, or modeling summaries that isolate the contribution of each development. Without this documentation, a reviewer cannot confirm whether the correct trip generation rates were used, whether the assumed completion percentages are accurate, or whether traffic was distributed logically within the network. The absence of this supporting data prevents independent verification and limits the transparency and reproducibility of the forecast assumptions. Intersection Study Area Incomplete The TIA omits at the intersection of Evergreen Road/Center Street which could reasonably be expected to receive project-generated traffic based on logical distribution patterns and existing roadway connectivity. A defensible traffic study area should encompass all intersections where project traffic is reasonably anticipated to cause measurable operational change. Queuing Analysis and Simulation Is Absent As noted previously, the TIA does not evaluate vehicle queuing at study despite other similar traffic studies in the area having included that analysis. This omission is particularly significant given the documented congestion on Highway 214 and the proximity of ramp terminals, and closely spaced intersections. Capacity metrics such as v/c ratio or level of service alone do not capture 95th percentile queues, spillback probability, blocked intersections, or the potential to impede upstream intersections. These operational effects are often the primary concern at facilities operating near capacity. The ODOT Analysis Procedures Manual (APM) states that "Simulation to determine queues or other measures of effectiveness should be used if v/c's exceed 0.70 and simulation shall be used if v/c's are equal to or exceed 0.90. Simulation shall also be used if existing conditions show congested conditions, (i.e. intersection queuing backs into adjacent intersections/connections) or if Agency requires it." The Highway 214 corridor certainly has several intersections that fall into this category. Similarly, the ODOT Development Review Guidelines (DRG) states: "Intersection operations analysis needs to include the effects of queuing and blocking... If traffic from the proposed development adds to or creates an overflowing storage lane and/or spills back into another intersection or rail crossing, the TIA should explore whether there are potential mitigation measures to fix overflow or spillback problems. The same goes for storage blocking queues. In cases where a TIA includes a queue analysis for an Interstate or Expressway 16 166 offramp, vehicles should have enough stopping sight distance (determined from the recent AASHTO A Policy on Geometric Design of Highways and Streets) to decelerate from the beginning of the off-ramp to stop at the end of the 95th- percentile queue. If the total traffic does not allow reasonable stopping sight distance,the TIA should state what if any mitigation measure(s) would reduce the queue on the off-ramp." Along corridors such as Highway 214 where signal spacing, ramp proximity, and high peak-hour demand are present,queue spillback can materially degrade system performance even if average delay metrics appear acceptable. Without 95th percentile queue estimates, it is not possible to determine whether turn lane storage is adequate, whether ramp terminals could experience spillback, or whether signals may queue into adjacent intersections. Failure to estimate and compare projected queues to available storage lengths is therefore a substantial analytical omission. Because queuing directly affects safety, access management, and interchange performance, its absence materially limits the City's ability to assess compliance with ODOT operational standards and adopted system management policies. Conclusion Based on this review, the Transportation Impact Analysis does not provide substantial evidence that the proposed development complies with the Woodburn Development Ordinance, the Interchange Management Area (IMA) Overlay requirements, or applicable ODOT transportation analysis requirements. The record, as currently constituted, contains material analytical gaps, internal inconsistencies, and unsupported assumptions that prevent the City from making defensible findings of compliance. The deficiencies identified in this review are not minor technical issues.They affect foundational components of the transportation analysis, including trip generation,trip distribution, study area definition, queuing evaluation, safety analysis, mitigation feasibility, and IMA trip cap compliance. Because trip generation and distribution form the basis for all subsequent operational modeling, errors or unsupported assumptions in these areas propagate throughout the analysis and undermine the reliability of the study's conclusions. Specifically: • Previous traffic analysis illustrates that the Highway 214/Evergreen and Highway 214/Boones Ferry/Settlemier failed to meet ODOT mobility standards with no evidence that these intersections have been mitigated. The WinCo TIA illustrates no near-term issues. • Multiple intersections are projected to fail mobility standards without identified, funded, or technically supported mitigation. • The application does not demonstrate compliance with the Subarea K PM peak hour trip allocation or provide sufficient accounting to support an exception under WDO 2.05. 17 167 • Pass-by trip credits are applied inappropriately, materially understating net new traffic on Highway 214 and for the project as a whole. • The opening-year analysis does not align with the applicant's stated construction timeline. • No analysis, including traffic signal warrant analysis, is provided to justify assumed signalization. • Safety, pedestrian crossing, and access management issues are not evaluated. • Adjustments to background traffic and pipeline development assumptions are not documented in a manner that allows independent verification. Under WDO 3.04.05, where a development would fail to meet a transportation performance standard or could hinder public safety, mitigation must be clearly identified and demonstrated to be effective and concurrent with development. The current TIA instead relies on speculative future improvements, unverified signal timing adjustments and fails to consider previous results that illustrated failed intersections. These elements do not provide the evidentiary basis necessary for the City to conclude that transportation impacts have been adequately mitigated. Until these deficiencies are corrected, the City cannot make defensible findings that: • The proposal complies with the IMA Overlay District trip budgeting framework; • Adopted mobility standards will be met; or • Required mitigation is identified, feasible, and concurrent with development. For these reasons, approval of the application in its current form is not supported by substantial evidence in the record. Sincerely, p P R o,� GINS Rick Nys, P.E. 61474 Principal Traffic Engineer Digitally signed by Rick Nys pat N2026.03.09 2111.58-0-00' OREGON) f RENEWS:: 12/31/2026 18 168 �� bt A - � � lJregon Department of Transportation Delivery&Operations Division-Region 2 Tina Kotek, Governor Headquarters &Tech Center 455 Airport Road SE Building B Salem, Oregon 97301-5395 Telephone (503) 986-2600 Fax (503) 986-2630 March 12,2026 Chris Kerr,Director Woodburn Community Development Department 270 Montgomery Street Woodburn,Oregon 97071 Dear Chris, This letter is in response to a public hearing notice received by ODOT Development Review staff,Brion Scott,via the US Postal Service for a WinCo supermarket with access taken from Center Street and Stacy Allison Way. Comments concerning transportation impacts related to the WinCo development proposal were provided by Brion in February 2026 (Attached). This correspondence ties those comments to overall transportation planning considerations in the identified interchange management area(IMA)for Woodburn.Mitigation measures addressing transportation impacts at the intersection of Evergreen Road and OR214 were recommended in Brion's comment letter to protect the safety and operations of local state highways. Those recommendations have not been reflected in the conditions of approval found in a March 5'2026, staff report articulating the Winco proposal. ODOT requests that the mitigation measures detailed in the attached comment letter be included in the conditions of approval to protect the safety and operations of local state highways. The proposed WinCo development applies to a parcel within the IMA(see Table 2.05A in the currently adopted WDO). As you are aware,local ordinance provisions implementing the Woodburn Interchange Area Management Plan(IAMP), and governing the IMA,are the mechanism that assures compliance with Transportation Planning Rule(TPR)provisions addressing highway capacity,particularly where development proposals could significantly affect highway operations. A significant effect determination(per OAR 660-012-0060)is triggered when planned traffic generation,measured by volume to capacity (v/c),exceeds the mobility target for a facility identified in the Oregon Highway Plan. ODOT also recommends the City and ODOT work together to update and amend the local IAMP. An amendment to the IAMP could focus on the peak hour vehicle trips and could be expedited via a refinement or update to the established IAMP process. Amending the Woodburn IAMP to address current capacity issues would be in the best interest of ODOT Region 2 and the City. Doing so could benefit Woodburn by addressing constraints on economic development while ensuring that ODOT protects the safety and function of roads in the vicinity of the Woodburn I-5 interchange. This is particularly important when considering potential safety impacts related to ramp congestion and queue spillage onto the travel lanes of I-5. Having recurring back-ups from the ramp terminal intersections onto I-5 is a major safety concern. Please include this correspondence in the record of proceedings for DR 25-14,PLA 25-04, SA 26-01 & VAR 25-06 and send the final decision to Naomi.ZWERDLING( odot.oregon.goy and ODOTR2PLANMGR(a(odot.oregon.goy. Thank you. Sincerely yours, M,wmi Zweuding Naomi Zwerdling Region 2 Planning and Development Review Manager Oregon Department of Transportation 169 March 12, 2026 I have over 3 decades of experience with land use and transportation in Oregon, including 8 years as a Planning Commissioner in Clackamas County. There is considerable concern and opposition to the proposed Winco store because of the unacceptable impacts that include safety concerns for pedestrians, bicyclists and drivers. The opposition is well founded and is not an outright rejection of a store at the site. Woodburn is one of the fasted growing cities in Oregon. The ability to accommodate rapid growth creates undue strain on the transportation system and other critical needs. The need for commercial stores is in the mix, but that does not justify an approval. The 84,000 sq ft facility is best described as a warehouse store. The scale of the project raises questions that have not been adequately considered by the applicant. A major concern is the traffic impacts that have already been expressed by many in the community. The plan and traffic analysis fail to ensure that safety and mobility will not be compromised. The volume of large trucks and their interaction with other transportation modes fails to provide adequate separation. The risk of crashes is inherent. Previous crash history and projections do not provide compelling evidence the design is not flawed. The access/egress on Evergreen is a problematic design due to the curved design and limited width. Additionally, the location of a bus shelter on Evergreen creates safety issues for transit riders. Another concern is that a single business should not be allowed to capture an unreasonable number of "trips" that are reserved for future growth in the Comprehensive Plan. The application indicates that traffic analysis was revised to include schools, however the statistics presented are from September 2024 and are out of date and not applicable. Peak 3:00-6:OOPM hour traffic is growing and includes an increasing number of large trucks. Woodburn's emergence as a distribution center is good for the economy but brings commercial traffic that is already choking the area during peak hours from 3:00-6:OOPM. 170 The Staff recommendation includes options to approve or deny the application. It fails to consider the possibility of delaying the decision until a future meeting, an option that would be prudent. Based on the current design, I am requesting the application be denied. Les Poole 171 • Outlook Fw: Winco objections From Fernando Torres <Fernando.Torres@ci.woodburn.or.us> Date Fri 3/13/2026 4:32 PM To deirdre.totten@gmail.com <deirdre.totten@gmail.com> Thanks, Deirdre. I have entered it into the record and will provide it to the Planning Commission. Fernando rr Associate Planner (503) 982-5242 City Website I Community Development Department 270 Montgomery St, Woodburn, OR 97071 From: Deirdre Totten <deirdre.totten@gmail.com> Sent: Friday, March 13, 2026 9:39 AM To: Chris Kerr<Chris.Kerr@ci.woodburn.or.us> Subject: Winco objections m�;ndc.r. E.Ncr�.� c cau C (.1rCh irons frmn uunhnow To Whom It May Concern, We are writing as follow-up to the public testimony we provided at the recent Planning Commission meeting regarding the proposed WinCo development at the intersection of Evergreen Road and Center Street in Woodburn, Oregon. First and foremost, we want to reiterate that we strongly oppose the construction of a WinCo at this location. As stated in our testimony, we believe the project, as proposed, would significantly and negatively impact the surrounding residential neighborhood in terms of traffic, lighting, security, and overall neighborhood character. 172 However, if the City and the developer ultimately decide to proceed with the project despite the concerns raised by nearby residents, we respectfully request that several important modifications be required in order to protect the quality of life, safety, and property values of those who live directly adjacent to the site. 1. No Signage on the Evergreen-Facing Rear of the Building The rear of the building, which faces Evergreen Road and the nearby homes, should have no signage whatsoever. In particular, illuminated signage—such as WinCo's typical red glowing letters—would shine directly into neighboring homes and create an unnecessary light intrusion for residents. This is especially unnecessary given that the store will already have extensive signage on the opposite side of the building facing Interstate 5, where it is most visible to the traveling public. As a point of comparison, the neighboring Walmart building does not display signage on the rear of its building. Maintaining consistency with that approach would be appropriate and would demonstrate consideration for the residential community that directly borders the commercial area. 2. Relocation of the Bus Stop to Center Street We strongly request that any planned bus stop be located on Center Street rather than Evergreen Road. Placing a bus stop on Evergreen would raise both privacy and safety concerns for nearby homes, as people waiting for the bus would have a direct view into neighboring residences. Additionally, Evergreen Road carries heavier traffic, and buses stopping there would create traffic backups as vehicles wait behind a stopped bus. Center Street is significantly less traveled and would provide a safer and more appropriate location for a bus stop. It would also place riders closer to the primary entrance of the store. 3. Installation of Tall, Mature Trees Along the Rear of the Property The rear portion of the development that faces Evergreen should include the planting of tall trees that will mature to effectively screen the large brick facade of the building from nearby homes. Without this landscaping, the building will create a substantial visual impact and become an ongoing eyesore for the surrounding neighborhood. 4. Construction of a Solid Wall Along the Evergreen / Jonah Place Side We also request that a brick or cinder block wall be constructed along the Evergreen side of the development near the Jonah Place cul-de-sac. To avoid any 173 misunderstanding, this wall should be built on the side of the road where the existing homes are located, rather than on the WinCo development side of the street. This wall should be built at the developer's expense and would serve several important purposes: it would provide privacy and security for nearby residents, reduce the ability for individuals to look directly into front yards and into the windows at the front of nearby homes, and help shield the neighborhood from the visual and activity impacts of a 24-hour commercial operation. Such a barrier would also help protect neighborhood property values by providing a clear separation between the residential area and the commercial development. We respectfully ask that these modifications be seriously considered if the project moves forward. These measures would help mitigate the most significant impacts on the surrounding neighborhood and demonstrate a commitment to balancing commercial development with the rights and well-being of nearby residents. Finally, if possible, we would appreciate being informed about the current status of the review process and any opportunities for further public input as decisions regarding this development are made. Thank you for your time and consideration of these concerns Deirdre Rickard and Matt Rickard Real Estate Broker MORE Realty 503 750-6296 deirdre.totten@gmail.com Licensed in the state of Oregon 174 Outlook Objection to Winco building- revised From Deirdre Totten <deirdre.totten@gmail.com> Date Sat 4/4/2026 10:25 AM To Planning <Planning@ci.woodburn.or.us>; Chris Kerr <Chris.Kerr@ci.woodburn.or.us>; Fernando Torres <Fernando.Torres@ci.woodburn.or.us> , , , 11ris(nnnafl k frm a n EX ll R N �L se n�'.r, .Ncr�k c'au t1 o n �1�n�,un op(nri n 1 uu1 ����nunn run�.m or�� rcI fuunhs frmnn unnrh now n s un��;rs ern"unun�; be�t1 d noafll , , , , Dear Mr. Kerr, Members of the Planning Commission, and City Council, I am writing to resubmit and supplement my prior letter regarding the proposed construction of the WinCo grocery store planned near my residence. Since submitting my original correspondence, we have identified additional concerns that we believe warrant your consideration. My husband and I reside directly across the street from the proposed development at 3234 Jonah Place, Woodburn, Oregon 97071. Due to the immediate proximity of this project, we will be directly and significantly impacted. Our objections are based on the following concerns: First, the proposed construction period—anticipated to last approximately one and a half years—will create sustained and excessive noise, disruption, and disturbance. This will substantially interfere with our ability to enjoy our home, our property, and our overall quality of life. Second, once construction is complete, the building and associated lighting will have permanent impacts. Bright exterior and security lighting will shine directly into our bedroom and living areas, disrupting both privacy and nighttime living conditions. In addition, increased noise from deliveries, traffic, and general commercial operations will create an ongoing disturbance. 175 Third, the development will result in a substantial increase in traffic in the immediate residential area, leading to greater congestion, noise, and heightened safety concerns for nearby homeowners and pedestrians. This impact is likely to be significantly greater than originally anticipated, particularly due to the recent construction of a large apartment complex directly adjacent to the proposed WinCo site. As those residential units become occupied, the additional traffic generated— combined with that of a major grocery store—will place an excessive burden on an already impacted area. Further, the intersection at Evergreen Road and Stacy Allison Way presents a serious concern. Large delivery trucks already struggle to safely navigate this corner, often blocking traffic while turning. The addition of regular semi-truck deliveries to the proposed site will exacerbate this issue and create an ongoing safety hazard. It is evident that this intersection would require substantial redesign to safely accommodate the increased volume and size of traffic. Fourth, the structure itself will block our existing view. Instead of open space, we will be faced with the rear of a large commercial building appearing as a solid wall, fundamentally altering the character and livability of our property. From our front porch, we currently enjoy unobstructed sunset views, which will be completely eliminated by this development. Additionally, we have concerns regarding the proposed bus stop location associated with this development. The current proposal places the bus stop directly across from a children's park. This raises significant safety concerns, as it introduces a gathering point immediately adjacent to an area where children are regularly present. We are concerned about the implications of increased foot traffic and unknown individuals in close proximity to the park. Furthermore, we believe the addition of a bus stop in this location could increase the potential for theft and other criminal activity within the neighborhood. There are known concerns at other WinCo locations, including in the Clackamas area, where similar gathering points have been associated with increased crime and drug-related activity. We are concerned that similar patterns could emerge here. In addition, we are deeply concerned about the environmental impact of this development. The open field where the project is proposed currently supports a significant amount of natural wildlife, including a community of Kestrel falcons, 176 and other species. Development of this land will displace these animals and permanently eliminate an existing natural habitat. Additionally, we believe this development will significantly diminish surrounding residential property values. As a licensed real estate broker with over 26 years of experience, I can state that this is not merely an opinion, but a professional assessment based on market behavior and the impact that large-scale commercial developments have on adjacent residential properties. Finally, if the project were to move forward despite these concerns, we strongly request the installation of a substantial barrier wall between the development and neighboring homes. There is already an example of this type of construction just one block away along Evergreen Road, where a cinderblock wall runs along the rear of residential properties and provides an effective visual and sound barrier. Implementing a similar structure here would be consistent with the existing neighborhood design and would help mitigate some of the negative impacts. Taken together, these impacts will negatively affect surrounding residential properties and diminish the overall character, safety, and livability of the neighborhood. For these reasons, we respectfully request that the City reconsider and not move forward with this development at the proposed location. The impact on nearby homeowners is substantial and long-lasting, and we believe these concerns warrant careful and serious consideration by the Planning Commission and City Council. Thank you for your time and attention to this matter. We appreciate your consideration. Sincerely, Deirdre Rickard Matthew Rickard 3234 Jonah Place Woodburn, OR 97071 177 • Outlook Concerns about proposed Winco site From Matthew rickard <shakrmakr@gmail.com> Date Sat 4/4/2026 11:39 AM To Planning <Planning@ci.woodburn.or.us> Cc Cassandra Bassich <Cassandra.Bassich@ci.woodburn.or.us>; Chris Kerr <Chris.Kerr@ci.woodburn.or.us>; Cassandra Bassich <Cassandra.Bassich@ci.woodburn.or.us> Wi 1 attachment(2 MB) Kestrel Falcon along Evergreen.png; , Yh m e nnad k frorn anon H.X ll R ,r1.se na'l.a r, �,aara�aama a;anurflarun r�1�na�,un arlbarnlanl a n��aa�.�nunnarun�.�m or aa�la�alr:iuunhs frarunn uuurlrrnarr un s and rim or uuunc,aNp a.1ad a�,annaul. , , , To the Woodburn Planning Commission: My name is Matt Rickard, and I live at 3234 Jonah PI, Woodburn, OR 97071. I have heard, read and reviewed the proposal to build a Winco store in Woodburn between Stacy Allison Way and Evergreen Rd. I attended and testified at the March 12 Planning Commission meeting, but I have some additional concerns that have come to light which I would like to share with you as the Commission evaluates the decision to approve or disapprove this proposal. • As I stated at the March 12 meeting, there is a serious traffic concern for this development. But I have since read reports suggesting the traffic impact analysis referenced in the meeting likely significantly understated the estimated traffic burden this development would cause. I also believe that the existing apartment development on Stacy Allison Way has not been factored into this traffic assessment. This apartment development is nearly complete, and will add hundreds of vehicles every day to Stacy Allison and Evergreen, even before any work on this Winco project would commence. Adding the Winco will create a huge traffic mess, regardless of the proposed road improvements. • Complicating this traffic situation is the intersection at Evergreen Rd. and Stacy Allison Way. This is the proposed truck route for deliveries to the Winco. Currently, some trucks already use this route to park at Walmart or on Center St. Huge delays and bottlenecks occur at this intersection when trucks turn either way. Adding Winco will severely worsen this situation. • With the proposed bus stop on Evergreen Rd, there are a number of serious concerns. The current proposal places the bus stop on the back side of the Winco, on Evergreen Rd, with no pullout for the bus. With the aforementioned increased traffic on Evergreen Rd, this would block up traffic on an already busy street. Additionally, this proposed site is directly across from a neighborhood playground, on the corner of Evergreen Rd. and Skyler Dr. This would potentially 178 expose the children playing there to predators who may be riding the buses. This would give potential predators direct access to children who regularly use this playground. The increased traffic from the proposed bus stop could endanger children playing in this playground if they need to cross the street or if balls enter the roadway. • This proposed bus stop would also increase the potential for theft in our adjacent neighborhood, as bus riders would be brought directly to the entrance of our neighborhood. If there absolutely must be a bus stop, a different location must be considered. • Our opportunity to view the beautiful sunsets to the West would be completely eliminated. Currently we can sit on our front porch and see the sky lit up in color during beautiful sunsets. The proposed Winco would obliterate this view, completely blocking our ability to see it at all. • The additional lighting in this proposal will be a huge eyesore for neighbors. With light shining directly into our homes all night, this would significantly and negatively impact our quality of life. • I am very concerned about the negative impact this project will have on the property values of my home and others in the surrounding areas. Specifically, my Evergreen Meadows neighborhood will be most impacted. Because potential homebuyers might hesitate to purchase a home directly across from a concrete structure, I will have to lower my asking price significantly to attract buyers. My wife has been a real estate broker for over 2 decades, and has seen this exact situation occur many times. • First and foremost, we are strongly opposed to this Winco proposal. But if it were approved, we strongly urge the council and builders to erect a wall along Evergreen Rd. adjacent to our neighborhood. This same kind of structure was erected along Evergreen Rd.just a block or so to to the North, to protect the adjacent neighborhoods across the street from the Country Meadows Village Retirement facilities. Erecting the same kind of wall next to the Evergeeen Meadows neighborhood across from Winco would at least be consistent with the others on Evergreen Rd., and provide some shielding and protection for our adjacent neighborhood. • I have serious concerns about the wildlife in the area. There are natural wildlife like birds, Owls and birds of prey, call this area home. Specifically, I have watched a community of Kestrel Falcons that perch and roost in the exact location of this proposed Winco site. I see them almost daily on the lampposts around that field, and I believe they would be displaced by this project. I am including a picture I took of a juvenile Kestrel that landed on a fence adjacent to this proposed building site for reference. 179 I ask that the Planning Commission seriously consider these additional concerns as they weigh the decision of approving or disapproving this Winco project. I thank you for your time and consideration, Matt & Deirdre Rickard 3234 Jonah PI Woodburn, OR 97071 sarmarC�?gmail.com 180 ALEM AU DU BO N rl , VIIIIIIII' Illll r PO BOX 2084 Salem OR 9.7308 wwwsaLeriauduboain. org. ............................................................................................................................... April 9, 2026 City of Woodburn Planning Commission 270 Montgomery Street, Woodburn Oregon Re: Winco proposal, Case Files: DR 25-14, VAR 25-06, PLA 25-04, & SA 26-01 Dear Commissioners: The Salem Audubon Society works within Marion, Polk and Yamhill Counties to connect people with nature and promote conservation of wildlife and its habitat. In keeping with that mission, I am writing to encourage the Commission to carefully consider the potential environmental impacts presented by the Winco proposal. Several issues in the record raise clear environmental concerns that fall within Salem Audubon's ambit. The site of proposed development is about the last substantial area of habitat in the general area for grassland birds and associated wildlife, such as the American kestrels that are regularly observed by residents. The parcel has been identified as one of the last undeveloped grass/field areas in this corridor; paving it would be a grievous loss of habitat. The cumulative habitat fragmentation this proposal presents would further the area's steady loss of open space; additional fragmentation further reduces available territory for myriad species. The proposal for 24-hour lighting would further degrade whatever habitat values might remain, such as for migrating birds whose navigation abilities are severely hampered by excessive artificial light. For resident birds, continuous lighting can disrupt hunting behavior and displace sensitive raptors that rely on darker, open edges. This could subject the area to an increase in undesirable rodents. There are also water quality concerns. As is well-noted in other testimony, the natural infiltration currently present would be lost and runoff would carry pollutants to downstream waters and habitats. Finally, I must note that it is not just wildlife that would be adversely impacted. It is well known that people need natural areas; without the stimulus of natural variability children are deprived of essential means of cognitive development. Although the site is not large, it is about all there is in the immediate area. Destroying or unduly compromising its natural value would be a disproportionate loss to residents and workers. I urge you to prevent this habitat destruction, or at least, if the project must go forward, to do your utmost to fully consider the impacts and to protect whatever habitat values can be protected. Sincerely, Michael Babbitt, President, Salem Audubon Society ,Icy,fq„ sallei� �audulloi .oir 181 Andrew Mulkey Attorney at Law PO Box 66562, Portland, OR 97290 • (503) 334-9899 • andrew@mulkeylegal.com April 9, 2026 Via Email City of Woodburn Planning Commission c/o Chris Kerr, Community Development Director 270 Montgomery Street Woodburn, OR 97071 Chris.Kerr@ci.woodburn.or.us Re: Protect Our Valley Alliance, Planning Commission Comment Letter for Land Use Application for Proposed WinCo Foods Transportation, Environmental, and Neighborhood Impacts Dear Chair and Members of the Planning Commission: I represent Protect Our Valley Alliance, a coalition of Woodburn residents, workers, and community stakeholders concerned about the transportation, environmental, and neighborhood impacts of the proposed WinCo Foods development. The Alliance supports growth that is consistent with the Woodburn Comprehensive Plan, protects public safety, and ensures that development does not impose disproportionate burdens on surrounding neighborhoods. First, I write to make a correction to the prior letter I submitted. In that letter, I cited to WDP 2.05.02(G)(2) as the requirement that a proposal that exceeds the maximum peak hour vehicle trip limit must "contribute substantially to the economic objectives found in the Comprehensive Plan." The citation to subsection (G)(2) or (G)(2)(a) for that requirement is wrong. The correct citation is WDP 2.05.02(G)(1), specifically WDP 2.05.02(G)(1)(a): Land use applications subject to the provisions of this Section shall comply with the following: Planning Commission Open Record Comment Letter: Protect Our Valley Alliance 11g�3 1. Peak hour vehicle trips generated by the proposed development shall not exceed the maximum peak hour vehicle trips specified in Table 2.05A for the subject parcel, except: a. Development may be allowed to exceed the maximum, if the development will contribute substantially to the economic objectives found in the Comprehensive Plan. WDP 2.05.02(G). I ask that you please review my prior comment letter with that correction in mind. The applicant has failed to comply with WDO 2.05.02(G) because it has failed to demonstrate that the development will contribute substantially to the economic objectives found in the Comprehensive Plan. In particular, the comprehensive plan explains its objectives include "[u]pgrad[ing] the skills of the local labor pool." Policy E-1.9. The letter submitted by UFCW Local 555 demonstrates exactly why the proposed WinCo does NOT contribute substantially to the economic objectives described in the comprehensive plan. The Planning Commission should review the letter from UFCW Local 555 with the requirements of WDO 2.05.02(G) in mind. As UFCW Local 555 explained, WinCo does not support union jobs, and its "business model relies on low wages, unpredictable scheduling, and minimal staffing levels." UFCW Local 555 also describes that when large, non-union stores like WinCo open, "existing union and independent grocers often experience reduced sales, cuts to worker hours, and long-term job instability." That impact results in the opposite outcome of the economic objectives described in the comprehensive plan. Rather that substantially contributing to upgrading the skills of the local labor pool, a store like WinCo will degrade the stability of the labor pool and will not upgrade worker's skills. Other economic objectives include F-2, the goal of"enhance[ing] the quality of the city workforce..." and the policy to "support the development of a skilled, versatile workforce...." Approval of WinCo's low-wage commercial use with unpredictable staffing runs counter to the City's objective. For that reason as well, I ask that you deny the applicant's proposal. For those reasons, the planning commission has an adequate basis to deny the applicant's proposal. In addition to the traffic impacts and other impacts described Planning Commission Open Record Comment Letter: Protect Our Valley Alliance 2i3 by numerous commenters, the applicant has failed to demonstrate that it will "contribute substantially" the City's "economic objectives." There is no reason to approve a use that undercuts the objective of developing a skilled labor pool and good jobs within the City. Respectfully, Andrew Mulkey (OSB No. 171237) PO Box 66562 Portland, OR 97290 (503) 334-9989 andrew@mulkeylegal.com On behalf of Protect Our Valley Alliance Planning Commission Open Record Comment Letter: Protect Our Valley Alliance 31g�3 Andrew Mulkey Attorney at Law PO Box 66562, Portland, OR 97290 • (503) 334-9899 • andrew@mulkeylegal.com April 21, 2026 Via Email City of Woodburn Planning Commission c/o Chris Kerr, Community Development Director 270 Montgomery Street Woodburn, OR 97071 Chris.Kerr@ci.woodburn.or.us Re: Objection to Applicant's Final Rebuttal DR 25-14, PLA 25-04, SA 26-01, VAR 25-06 Proposed WinCo Foods Grocery Store Tax Lots 052W12C002100 and 052W12C002200 Dear Chair and Members of the Planning Commission: I write to object to the applicant's submission of its April 16, 2026 letter and attachments A and B. Because the applicant's April 16 submissions violate the requirements of ORS 197.797(6), I ask that the planning commission reject or otherwise strike the applicant's April 16th letter and attachments from the record. The applicant's submission unfairly and improperly deprived the applicant's opponents of their statutory right to respond to the applicant's submissions during the response period provided by ORS 197.797(6)(c). For those reasons, the planning commission must reject the applicant's letters, or allow participants the opportunity to respond.' Failure to take either of those options violates the public's substantial right to respond, and provides the basis for remand on appeal. Id. ' In response to evidence that exceeds the scope of what ORS 197.797(6)(c) allows, LUBA has determined that a hearings authority "either should have rejected that additional evidence.., or given petitioner an opportunity to rebut that additional evidence." Grahn v. City of Yamhill, 76 Or LUBA 258 (LUBA No 2017-070, Oct 26, 2017) (slip op at 17) (citing Dept. of 11ansportation v City of Eugene 38 Or LUBA 814, 838 (2000); Brome a City of Corvallis, 36 Or LUBA 225, 234-35 (1999)); Woodstock Neigh. Ass'11 a City ofPortland, 28 Or LUBA 146 (1994) (citing Fasano v. Washington County, 264 Or 574 (1973)). Planning Commission Objection Letter: Protect Our Valley Alliance 11gt6 A. The Applicant's April 16, 2026 Submissions Violate ORS 197.797. ORS 197.797 allows for two distinct comment periods after an initial hearing during which the record may be held open for additional evidence and testimony. The first comment period must be "at least seven days" and is commonly referred to as the first open record period or the open record period. ORS 197.797(6)(a), (c). During the open record period, any participant may "present additional evidence, arguments or testimony regarding the application."Id. (6)(a). This allows participants to comment on any information submitted at, or prior to, the hearing. Here, the planning commission opened the record pursuant to ORS 197.797(6)(a), (c) for 28 days, until April 9, 2026. Thereafter, statute allows the hearings authority to "reopen the record." ORS 197.797(6)(c). This second open record period must also be "at least seven days," but the statute limits the information that a person may submit. Id. When the hearings authority reopens the record pursuant to ORS 197.797(6)(c) it does so only to provide "an opportunity to respond to new evidence during the period the record was left open."Id. (6)(c). For that reason, this period is commonly referred to as the "response"period. Unlike the first open record period, the response period only allows participants to respond to new evidence submitted during the first open record period. See Grahn v. City of Yamhill, 76 Or LUBA 258 (LUBA No 2017-070, Oct 26, 2017) (slip op 15-16) (citing Freedman v. City of Grants Pass, 57 Or LUBA 385, 393 (2008) and Brome v. City of Corvallis, 36 Or LUBA at 234). Any evidence included in the applicant's April 16 letter, "must be limited to evidence to `respond to new evidence submitted during the period the record was left open." Grahn, (slip op at 16) (quoting ORS 197.797(6)(c) (former ORS 197.763)). In this case, the response period ran from April 10 to April 16. During the response period, the applicant could only respond to new evidence submitted by participants after the hearing between March 13 and April 9. ORS 197.797(6)(c). The applicant violated the statute and the planning commission must strike or otherwise reject the letters. Planning Commission Objection Letter: Protect Our Valley Alliance 2�gg6 B. The Applicant's Letter and Attachments Contain New Evidence, and The Public Has a Right to Respond. The applicant's April 16 letter referenced attachments inappropriately respond to evidence and testimony submitted prior to the March 12, 2026 planning commission hearing. The applicant's April 16, 2026 letter explains that it responds with Attachment A (an unsigned Technical Memo by a planner at GVC Transportation Solutions), to evidence and testimony submitted prior to the hearing. The GVC planner's memo responds to a letter by Greenlight Engineering, submitted on March 11, 2026. Attachment B also states that it responds to PO VA's letter submitted on March 11, 2026 and the issues that POVA raised in that letter. Both the GVC technical memo and Attachment B include new evidence that the public and POVA have a right to respond to. Although GVC's memo was drafted by a planner and not an engineer, it still seeks to provide technical evidence and professional opinion. LUBA has determined that such expert submissions "frequently, if not inevitably, introduce 'new' technical evidence or professional opinion, even if the expert is simply commenting on evidence already in the record." Rogue Advocates v. Josephine County, (LUBA 2014-095/96, October 15, 2025) (slip op at 8). Here, the expert letter clearly contains or meets the definition of"evidence," defined as "facts, documents, data or other information offered to demonstrate compliance with the standards believed by the proponent to be relevant to the decision."Haugen v. City of Scappoose, (LUBA 2023-001, April 20, 2024) (slip op at 5) (quoting ORS 197.797(9)). The GVC letter makes statements and provides professional opinions about evidence that is not currently in the record. The letter makes numerous assertions about the opinions and actions of third-parties like the city or ODOT apparently based on conversations or review of evidence that is not in the record. Those professional opinions all constitute new "evidence" within the meaning of ORS 197.797(9). The public has a right to respond to that evidence because the applicant was required to submit those comments during the open record period. ORS 197.797(6). The letter includes opinions and conclusions, prefaced by phrases like "[w]e would expect ...," "[i]t is typical to expect...," and "this is a common technique...," as well as references to analysis, studies, events, and conversations Planning Commission Objection Letter: Protect Our Valley Alliance 31g�6 that are not in the record. The author provides numerous assertions and opinions about extra-record evidence. These opinions and references to extra-record conversations and studies are in and of themselves a form of"evidence;" the document seeks to present information in the form of asserted facts and professional opinion in an attempt to not only respond to Greenlight's analysis but also demonstrate compliance with standards that the applicant believes are relevant. ORS 197.797(9). For those reasons, it is clear that the entire memo constitutes evidence in the form of the author's professional opinion about various topics. The letter also demonstrates that it was drafted specifically to respond to evidence submitted prior to the open record period. All of those reasons support PO VA's motion to strike. The Applicant's Attachment B does not fare any better. The letter provides multiple opinions and assertions of fact by the applicant. Attachment B cites Newsweek articles, explains details about stock ownership plans, insurance benefits, and provides details about its broader business plans and operations. None of that information appears to be in the record. Moreover, the letter contains numerous characterizations and personal opinions about the facts on the ground, such as opinions about what the project may or may not "enhance" or improve, statements about how various "fees" will be used, opinions about how customers would use the proposed improvements, and statements about what laws the applicant proposes to "abide by." Those too, meet the definition of new evidence under ORS 197.797(9). These are all opinions and statements of fact that constitute information that the applicant has presented for the purpose of demonstrating compliance with the approval criteria that the applicant believes is relevant. Finally, the letter walks through numerous criteria that the applicant asserts are relevant to the decision. Yet those criteria do not appear to have been included in the initial public notice as required by ORS 197.797(3)(b) and (5)(a). The City's failure to provide that notice provides an alternative basis for remand. For those reasons, the planning commission should strike or reject the applicant's April 16 submissions. Planning Commission Objection Letter: Protect Our Valley Alliance 41gfi6 C. Conclusion and Remedy: Reject the Applicant's April 16 Submissions. By responding out of turn, the applicant deprived opponents and members of the public, such as POVA, of the ability to respond to the applicant's evidence during the response period. Had the applicant complied with ORS 197.797(6)(a) and (c) and submitted its response to PO VA's pre-hearing materials during the first open record period that ended on April 9, POVA would have had the opportunity to respond during the response period pursuant to ORS 197.797(6)(c). Now that time has passed, and the planning commission is scheduled for deliberations on Thursday, April 23, 2026. It is also important to note that the applicant appears to have purposefully delayed submitting its response to PO VA's pre-hearing materials. The GVC letter is dated March 19, 2026. The applicant's second letter, Exhibit B, includes a combined response to PO VA's pre-hearing March 11, 2026 letter as well as its April 9, 2026 letter that address similar topics. That makes it difficult for the planning commission to separate the legitimately submitted material from the improperly submitted material. For that reason, the appropriate remedy is to strike or reject the applicant's April 16, 2026 letters. In the alternative, POVA requests that the record be held open an additional two weeks, from April 23 to May 7, 2026, to provide opponents an adequate opportunity to respond to the evidence improperly submitted by the applicant. POVA was not expecting the applicant to flagrantly violate the procedural rules by submitting a response to its engineer's analysis on April 16, 2026. For that reason, POVA was not ready to provide a response by the April 23, 2026 hearing. In addition, prior to filing this objection, POVA also has no ability to determine whether or not the planning commission will accept any letter or evidence that responds to the applicant's late submitted evidence. The procedural rules for land use hearings do not require participants to needlessly waste time or resources. Without a ruling on this objection, POVA and members of the public cannot be expected to guess at what the planning commission's response to the applicant's procedural violation will be. POVA also asks that the planning commission not provide the applicant any further opportunity to respond, other than to provide final written rebuttal that contains argument only. ORS 197.797(6)(e), (9). Pursuant to ORS 197.797(6)(c), Planning Commission Objection Letter: Protect Our Valley Alliance 51866 the applicant does not have a right to respond with additional evidence to evidence submitted during the response period. The framework provided by ORS 197.797 does not allow parties an "endless" opportunity to rebut new evidence. Friends of Hood River Waterfront v. City of Hood River, 67 Or LUBA 179 (2013) (describing how ORS 197.797(6)(c) applies). Finally, please note that POVA alternatively requests two weeks for the public to respond, not the one week minimum required by statute. This is because the applicant requested four weeks to respond to Greenlight's engineering analysis and ultimately used five weeks for its response. Given the need for expert analysis and review of the applicant's technical submissions, POVA asks that the planning commission provide the public a reasonable and comparable amount of time to respond. Two weeks should meet that requirement. The applicant's procedural violation now provides the planning commission the opportunity to consider providing the public an adequate response period, and such time does not impose any burden on the planning commission or the applicant. Anything less violates the public's right to a fair and impartial hearing in accordance with the rights to due process. Respectfully, Andrew Mulkey (OSB No. 171237) PO Box 66562 Portland, OR 97290 (503) 334-9989 adrew@mulkeylegal.com On behalf of Protect Our Valley Alliance Planning Commission Objection Letter: Protect Our Valley Alliance 6166 rr_ � A�z� t:-ife�• WTOO __ Inc orpornreA 1889 June 8, 2026 TO: Honorable Mayor and City Council through City Manager FROM: Tony Turley, Finance Director SUBJECT: Fiscal Year (FY) 2026-27 City Budget Adoption RECOMMENDATION: Conduct a public hearing to consider the budget as approved by the Budget Committee, and upon completion of the hearing, adopt the resolution adopting the budget and capital improvements plan, making appropriations, and declaring and categorizing taxes for FY 2026-27. BACKGROUND: The Budget Committee of the City of Woodburn met and approved the budget of $253,740,180 on April 25, 2026. On May 27, 2026, the Woodburn Independent published the financial summary of the Budget Committee's approved budget and a notice of the budget hearing before the City Council, in accordance with Oregon Local Budget Law (ORS 294.438). DISCUSSION: Under Oregon Local Budget Law (ORS 294.456) the City Council may modify the Budget Committee's approved budget by an amount not to exceed $5,000 or 10 percent of a fund's expenditures, whichever is greater, without publishing a notice of a second budget hearing. The Finance Department proposes adoption of the budget as approved by the Budget Committee with corrections and updates shown in Attachment 1. FINANCIAL IMPACT: The resolution adopts the FY 2026-27 annual budget of $253,740,180. Agenda Item Review: City Manager_X_ City Attorney_X_ Finance_X_ 191 Honorable Mayor and City Council June 8, 2026 Page 2 Attachment 1 City of Woodburn Budget Committee Approved FY 2026-27 Budget Following the Budget Committee's FY 2026-27 budget approval, the following corrections and updates have been made to the budget document: • Any identified issues with spelling, grammar, and formatting have been updated throughout the document. 192 rr_ � A�z� t:-ife�• WTOO __ Inc orpornreA 1889 June 8, 2026 TO: Mayor and City Council through City Manager FROM: Tony Turley, Finance Director SUBJECT: Fiscal Year 2026-27 Resolution Regarding State Revenue Sharing RECOMMENDATION: Conduct a public hearing to receive comment on the possible uses/distributions of state revenue sharing funds and adopt a resolution declaring the City's eligibility and election to receive these funds. BACKGROUND: For the City of Woodburn to receive a share of state revenues apportioned and distributed to Oregon cities during fiscal year (FY) 2026-27, the City Council must enact an ordinance or resolution certifying: 1 . Eligibility to receive state shared revenue per ORS 221 .760; and 2. Elect to receive state shared revenue per ORS 221 .770. The ordinance or resolution must be filed with the Oregon Department of Administrative Services no later than July 31 . Notice of the hearing was published on May 27, 2026 in the Woodburn Independent. DISCUSSION: Upon completion of the public hearing, consider adopting a resolution to receive state shared revenue, $350,000, in the FY 2026-27 Approved Budget. FINANCIAL IMPACT: The resolution declares the City's eligibility and qualification to receive state shared revenue, budgeted at $350,000 in the FY 2026-27 Approved Budget. Agenda Item Review: City Manager X_ City Attorney_X_ Finance_X_ 193 WTOODBURN Inc orpornreA 1889 June 8, 2026 (Prepared June 1 , 2026) To: Honorable Mayor and City Council through City Manager From: Chris Kerr, Community Development Director 'r Dan Handel, Senior Planner Subject: Public Hearing for a Legislative Amendment to the Woodburn Development Ordinance Regarding SWIR Zone Uses and Standards (LA 26-04) RECOMMENDATION: Conduct a public hearing to consider a proposed legislative amendment to the Woodburn Development Ordinance (WDO) regarding development regulations and standards for the Southwest Industrial Reserve zoning district; and following the hearing, adopt the Ordinance implementing Legislative Amendment LA 26- 04, based on the Analyses and Findings presented. BACKGROUND: In January 2024, the City Council adopted an Economic Opportunities Analysis (EOA) report as part of a broader effort to expand the urban growth boundary to include the southwest industrial urban reserve area. The EOA provided an overview of economic trends locally, statewide, and nationally, and analyzed key industries that the City should target based on those economic trends. Alongside the EOA adoption in January 2024, the City Council adopted correlated amendments to the Comprehensive Plan. The urban growth boundary expansion was completed in April 2025. Agenda Item Review: City Manager_x_ City Attorney_x 194 On March 23, 2026, the City Council passed Resolution No. 2261 initiating a broad- ranging list of WDO amendments to consider. Included in this list was the consideration of allowed uses in industrial zones and the SWIR zone development standards. Because of the broad range of topics identified in the initiating Resolution, staff has broken them out into multiple Legislative Amendment case files. LA 26-04 is one of those case files. The Planning Commission held a public hearing on May 14, 2026, and unanimously recommended approval of the attached WDO amendment package. DISCUSSION: The EOA identified high-technology manufacturing, transportation equipment manufacturing, food and beverage processing and manufacturing, and data centers as key industries for the City to pursue for industrial land. The intent of the proposed legislative amendment is to ensure these industries have a pathway for development within the City's industrial zoning districts. Proposed WDO amendments are included in a trikethrough-and-underline format (Attachment 102) and can be summarized as: • Allowing high-technology manufacturing, transportation equipment manufacturing, and food and beverage processing and manufacturing in all industrial zones; • Defining data centers and allowing them as a Conditional Use only within the Southwest Industrial Reserve (SWIR) zone; and • Updating the SWIR zone development standards to be consistent with the Comprehensive Plan. During their deliberation, the Planning Commission suggested allowing uses that are not expressly identified within any WDO uses table to be considered a Conditional Use. This would provide a means of review without necessitating WDO updates for emerging technologies and industries. Because of the limited scope of LA 26-04, staff recommends this suggestion be considered as part of a broader WDO amendment package anticipated later this year. FINANCIAL IMPACT: There is no financial impact identified with the recommended action. 195 Attachments: Planning Commission Staff Report Attachment 101 : Analyses & Findings Attachment 102: Proposed WDO Amendments Attachment 103: 2024 Economic Opportunities Analysis excerpt (highlighted by staff) 196 WOODBURN Incorporated 4889 Staff Report File Number: Legislative Amendment (LA) 26-04 Initial Hearing Date: May 14, 2026 Date of Report: May 7, 2026 Staff Reviewer: Dan Handel, Senior Planner Staff Recommendation: Approval Issue before the Planning Commission Proposed amendments to the Woodburn Development Ordinance (WDO). Executive Summary On March 23, 2026, the City Council passed Resolution No. 2261 initiating legislative amendments to the WDO. Because of the broad scope of amendments initiated by this resolution, staff has broken them out into several Legislative Amendment case files. LA 26-04 is one of those case files. The proposed amendments update the allowed uses within industrial zones to include uses identified as priorities in the 2024 Economic Opportunities Analysis (EOA) report. These include high-technology manufacturing, transportation equipment manufacturing, food and beverage processing and manufacturing, and data centers. Data centers have quickly become a hot topic nationwide — private investment in data center development has skyrocketed throughout the country to support the booming growth of artificial intelligence. There has also been substantial and growing study of their energy, environmental, and economic impacts on the communities they are built within. For these reasons, the proposed amendments recommend allowing data centers as a Conditional Use and only within the Southwest Industrial Reserve (SWIR) zone. 197 Separately, the proposed amendments update the SWIR zone development standards to be consistent with the Comprehensive Plan. The proposed amendments are included in a trikethMugh-and-underline format (Attachment 102). The Planning Commission is tasked with making a recommendation on the proposed amendments for the City Council to consider. As a legislative amendment, commissioners may contact staff directly with questions any time before the hearing at (503) 980-2431 or<dan.handel@ci.woodburn.or.us>. Recommendation and Action Approval: Staff recommends that the Planning Commission consider the staff report and attachments and recommend the City Council adopt the legislative amendment, based on the Analyses and Findings (Attachment 101) in the staff report. Alternatively, the Planning Commission may instead: • Recommend approval with revisions; or • Postpone the recommendation and return at a later meeting for further deliberation. Attachment List 101. Analyses & Findings 102. Proposed WDO Amendments 103. 2024 Economic Opportunities Analysis excerpt (highlighted by staff) LA 26-04 Staff Report Page 2 of 2 198 Analyses & Findings IIiretiroduC oire The findings within this document demonstrate how the proposed legislative amendment is consistent with: • Statewide Planning Goals • Woodburn Comprehensive Plan goals and policies • Woodburn Development Ordinance (WDO) • Oregon Revised Statute (ORS) 227.186 Statewde Pannng Goats There are a total of 19 Statewide Planning Goals. Staff finds Goals 1, 2, and 9 are applicable Statewide Planning Goals to the adoption of the proposed WDO amendments. Goad I -- Citizen Involvement Statewide Planning Goal 1 requires cities to involve community members in planning processes and decisions. To meet this goal, the WDO specifies requirements for the initiation, processing, and public notification of any legislative amendment. A legislative amendment must be initiated by the City Council, who are the elected representatives of the community. Once initiated, the Planning Commission holds a public hearing to consider the legislative amendment and make a formal recommendation. The City Council then holds a second public hearing to consider the amendment and the recommendation from the Planning Commission, and make a final decision. A notice of each public hearing is sent to all affected governmental agencies and recognized neighborhood associations and also published within the local newspaper. The Planning Commission hearing is scheduled for May 14, 2026, and the City Council hearing is tentatively scheduled forJune 8, 2026, pending a recommendation to the Council by the Planning Commission. On April 9, 2026, staff sent a Post-Acknowledgement Plan Amendment (PAPA) notice to the Department of Land Conversation and Development (DLCD) in compliance with OAR 660-018- 0020. The City mailed notice to affected government agencies in conformance with WDO 4.01.14.D. on April 24, 2026, and published notice of both the Planning Commission and City Council hearings in the Herald-Independent newspaper on May 6, 2026. Staff finds that the proposed legislative amendment is consistent with Statewide Planning Goal 1. LA 26-04 Planning Commission Staff Report Attachment 101: Analyses& Findings Page 1 of 4 199 Goa 2 -- Land Use Pannng Goal 2 requires each local government in Oregon to establish a land use planning process and policy framework as a basis for all decisions and actions related to use of land and to assure an adequate factual base for such decisions and actions. Goal 2 also includes requirements for coordination with other jurisdictions and government agencies. The proposed legislative amendment to the WDO comes in response to the 2024 Economic Opportunities Analysis (EOA). The principal purpose of the EOA is to ensure the City has an adequate land supply for economic development and employment growth. It provides an overview of economic trends locally, statewide, and nationally, and analyzes key industries that the City should target based on those economic trends. The intent of the proposed legislative amendment is to ensure those key industries identified within the EOA have a pathway for development within the City's industrial zoning districts. As analyzed under Goal 1, affected governmental agencies have been provided notice of the proposed legislative amendment. Staff finds that the proposed legislative amendment is consistent with Statewide Planning Goal 2. Goad 9 -- Economic Development Goal 2 requires each local government in Oregon to plan for economic growth opportunities and ensure enough land is available for them. As analyzed under Goal 2, the proposed legislative amendment to the WDO comes in response to the 2024 EOA. The principal purpose of the EOA is to ensure the City has an adequate land supply for economic development and employment growth. It provides an overview of economic trends locally, statewide, and nationally, and analyzes key industries that the City should target based on those economic trends. The intent of the proposed legislative amendment is to ensure those key industries identified within the EOA have a pathway for development within the City's industrial zoning districts. Staff finds that the proposed legislative amendment is consistent with Statewide Planning Goal 9. Consistency with Woodbuim Coimp ireIheiresiive Pan Goals and PoIHiiciies The City's Comprehensive Plan already contains goals and policies that help the City achieve its economic development and industrial lands planning objectives.These existing goals and policies, specifically Goal E-2 and Policy E-2.1, provide a strong policy basis and framework to support adoption of the proposed legislative amendment. No amendments are proposed to the goals and policies found within the Comprehensive Plan. LA 26-04 Planning Commission Staff Report Attachment 101: Analyses& Findings Page 2 of 4 200 Conformance With theWoodburn D eve IIo p meint. OrOrdinance 4.01 Decision-Making Procedures 4.01.02 Assignment of Decision-Makers: The following City entity or official shall decide the following types of decisions: E. Type V Decisions (Legislative): Type V decisions involve legislative actions where the City Council enacts or amends the City's land use regulations, comprehensive plan, Official Zoning Map or some component of these documents. Type V decisions may only be initiated by the City Council. The Planning Commission holds an initial public hearing on the proposal before making a recommendation to the City Council. The City Council then holds a final public hearing and renders a decision. Public notice is provided for all public hearings (Section 4.01.14). The City Council's decision is the City's final decision and is appealable to LUBA within 21 days after it becomes final. 4.01.09 Initiation of a Legislative Proposal A.The City Council may initiate the consideration of a legislative decision by resolution. B. Actions initiated by the Council shall be referred to the Planning Commission for a public hearing and recommendation to the Council. C. The City Council shall hold the final public hearing on a proposed legislative decision. Staff Finding: The Planning Commission hearing is scheduled for May 14, 2026, and the City Council hearing is tentatively scheduled for June 8, 2026, pending a recommendation to the Council by the Planning Commission. On April 9, 2026, staff sent a Post-Acknowledgement Plan Amendment (PAPA) notice to the Department of Land Conversation and Development (DLCD) in compliance with OAR 660-018- 0020. The City mailed notice to affected government agencies in conformance with WD0 4.01.14.D. on April 24, 2026, and published notice of both the Planning Commission and City Council hearings in the Herald-Independent newspaper on May 6, 2026. The provisions are met. Cc in'c r rn ante WiL:Ih 0 RS 22.7.1. 6 Notice to property owners of hearing on certain zone change;form of notice; ... (2) All legislative acts relating to comprehensive plans, land use planning or zoning adopted by a city shall be by ordinance. Staff Finding: Pending a decision from the City Council following its public hearing, the Council would adopt an ordinance enacting the approved amendment. LA 26-04 Planning Commission Staff Report Attachment 101: Analyses& Findings Page 3 of 4 201 (3) ... at least 20 days but not more than 40 days before the date of the first hearing on an ordinance that proposes to amend an existing comprehensive plan or any element thereof, or to adopt a new comprehensive plan, a city shall cause a written individual notice of a land use change to be mailed to each owner whose property would have to be rezoned in order to comply with the amended or new comprehensive plan if the ordinance becomes effective. (4) At least 20 days but not more than 40 days before the date of the first hearing on an ordinance that proposes to rezone property, a city shall cause a written individual notice of a land use change to be mailed to the owner of each lot or parcel of property that the ordinance proposes to rezone. (5) An additional individual notice of land use change required by subsection (3) or (4) of this section shall be approved by the city and shall describe in detail how the proposed ordinance would affect the use of the property.The notice shall: . . . (6) At least 30 days prior to the adoption or amendment of a comprehensive plan or land use regulation by a city pursuant to a requirement of periodic review of the comprehensive plan under ORS 197.628, 197.633 and 197.636,the city shall cause a written individual notice of the land use change to be mailed to the owner of each lot or parcel that will be rezoned as a result of the adoption or enactment. (7) Notice provided under this section may be included with the tax statement required under ORS 311.250. (8) Notwithstanding subsection (7) of this section, a city may provide notice of a hearing at any time provided notice is mailed by first class mail or bulk mail to all persons for whom notice is required under subsections (3) and (4) of this section. (9) For purposes of this section, property is rezoned when the city... Staff Finding: This legislative amendment does not propose any changes to the Woodburn Comprehensive Plan nor any rezoning of property. Because the City is not changing the base zoning classification of property, in other words neither rezoning nor making a zone change, Sections (3), (4) and (5) above are not applicable. Because the proposed amendment is not pursuant to a requirement of periodic review, Sections (6) & (7) & (8) are not applicable. (10) The provisions of this section do not apply to legislative acts of the governing body of the city resulting from action of the Legislative Assembly or the Land Conservation and Development Commission for which notice is provided under ORS 197.047 or resulting from an order of a court of competent jurisdiction. Staff Finding: The proposed legislative amendment does not result from actions of the Legislative Assembly or the Land Conservation and Development Commission (LCDC). ORS 197.047 is not applicable. As a result, the City of Woodburn is not required for LA 26-04 to do a "Measure 56" notice, the phrase referring to Ballot Measure 56 (1998) that the legislature codified in ORS 227.186, which the legislature later revised via Senate Bill 516 (2003). The provisions are met. LA 26-04 Planning Commission Staff Report Attachment 101: Analyses& Findings Page 4 of 4 202 1.02 Definitions Note: Terms not defined in this Section have the meaning set forth in the New Oxford American Dictionary, 2010 edition (see Section 4.02.06.B.6.) Abutting: Touching on the edge or on the line, including at a corner. It shall include the terms adjacent, adjoining and contiguous. Access: The place, means or way by which pedestrians or vehicles have ingress and egress to and/or from a lot or use. Accessory Building, Structure or Use: A detached building, structure or use which is incidental and subordinate to, and supports the primary use on, the same premises. Accommodations: • Bed and Breakfast Inn: A single-family dwelling with at least one room offered to the general public for lodging on an overnight or weekly basis, with a meal provided. • Hotel: A building in which rooms are offered to the general public for lodging on an overnight or weekly basis, where the primary entrance is through a lobby or foyer with internal circulation to the rooms. • Living Unit: A room or suite of rooms, providing living and sleeping facilities for one or more persons where either cooking or eating and/or sanitation facilities are shared. In a rooming and boarding house, each bed rented for compensation is a"Living Unit."Note: Living unit is not synonymous with"dwelling unit." • Motel: a group of attached or detached buildings, in which more than five rooms are offered to the general public for lodging on an overnight or weekly basis, where the rooms have direct access to the outside without the necessity of passing through the main lobby of a building. • Rooming and Boarding House: A residential building or portion thereof with guest rooms, providing lodging or lodging and meals, for three or more persons for compensation. ADA: The acronym refers to the federal Americans with Disabilities Act(1992) and in the context of WDO standards means compliance with contemporary federal provisions with which developers are bound to comply as standards and compliance with any contemporary supplemental state of Oregon provisions with which developers are bound to comply as standards. Adjacent: Near, close or bordering but not necessarily contiguous with; adjoining but separated by a right-of-way. Administrative Body: The City Council, Planning Commission, Design Review Board, or staff member having the jurisdiction to hear and decide proceedings on land use actions. Alley: A public right-of-way not more than 20 feet wide and not less than 10 feet in width that provides vehicular access to property instead of or in addition to a public street, that intersects with a public street, and that can serve as a utility corridor. Distinct from "Shared Rear Lane". Woodburn Development Ordinance Chapter 1.02 Page 7 203 • Group Care Facility: A facility that provides residential care, treatment, or training for six or more socially dependent individuals or individuals with physical disabilities or mental retardation or other developmental disabilities or mental, emotional or behavioral disturbances or alcohol or drug dependence. Note: See "Residential Care," Residential Care Facility," "Residential Training Facility," "Residential Treatment Facility," "Training," and "Treatment" in ORS 443.400. Group Care Facility includes what is commonly called an"assisted living facility." • Group Home: A facility that provides residential care, treatment, or training for five or fewer socially dependent individuals or individuals with physical disabilities or mental retardation or other developmental disabilities or mental, emotional or behavioral disturbances or alcohol or drug dependence. Note: See"Residential Care,"Residential Care Home," "Residential Training Home," "Residential Treatment Home," "Training," and "Treatment" in ORS 443.400. Group Home includes what is commonly called an "assisted living facility" or"adult foster home." • Nursing Home: A building or portion of a building containing living units and providing inpatient nursing and rehabilitative services. Nursing Home includes "hospice" but does not include "Group Care Facility," "Group Home," or"Hospital." Carport: A permanent structure consisting of a roof and supports for covering a parking space which is not completely enclosed. Cemetery: Land used or intended to be used for the burial of the dead and dedicated for cemetery purposes, including a columbarium, crematory, mausoleum, or mortuary, when operated in conjunction with, and within the boundary of, such cemetery. u 11 r aill gill � � vi ay lE uu r.^ iuul�o ai!Iwi�o ail lvl��... uu ulrulruo avu on 1 ^;rlllluwl�� llll ,i ul�ll� uli �a� ��� a � ......... gpqu pp wMIh urn pU9 lug g nd rn IIwu k nl a...sy�vlg!psv for sI tinf p ,..,u mn ng dfig�I Change of Use: A change from one type of use of a building or land to another type of use for uses as defined by the Woodburn Development Ordinance. Church: See "House of Worship." CIP: The acronym refers to both the City Capital Improvement Program and the five-year Capital Improvement Plan that implements the program. Community Building: A facility available for public use for meetings, recreation, education. Common courtyard: A common area for use by residents of a cottage cluster. A common courtyard may function as a community yard. Hard and soft landscape features may be included in a common courtyard, such as lawn grass, vegetative groundcover, trees, shrubbery, benches, picnic benches, bicycle/pedestrian paths, bicycle parking, bollards, dog waste stations, drinking or ornamental fountains, playgrounds, plazas, gazebos, pavilions, or other outdoor shelters, signage, or trash and recycling receptacles (excluding receptacles as dumpsters, bins, and cans within enclosures). Condominium: A building or group of buildings, in which separate buildings or portions of buildings are separately owned, while the land on which the building(s)is located is held in a common ownership. Conforming: In compliance with the current regulations of the Woodburn Development Ordinance. Woodburn Development Ordinance Chapter 1.02 Page 11 204 2.04 Industrial and Public Zones A. The City of Woodburn is divided into the following industrial and public zones: 1. The Light Industrial (IL) zone, which is intended for industrial activities that include land-intensive activities; 2. The Industrial Park(IP) zone, which is intended for light industrial activities in a park- like setting; 3. The Public and Semi-Public (P/SP) zone, which is intended for public uses,parks, schools and cemeteries. 4. The Southwest Industrial Reserve (SWIR), which is intended for employment and industries identified in the 2016 Target Industry Analysis; B. Approval Types (Table 2.04A) 1. Accessory Uses (A) are allowed outright, subject to the general standards of this Ordinance. 2. Conditional Uses (CU) may be allowed, subject to the general development standards of this Ordinance and conditions of Conditional Use approval. 3. Permitted Uses (P) are allowed outright, subject to the general development standards of this Ordinance. 4. Special Permitted Uses (S) are allowed outright, subject to the general development standards and the special development standards of Section 2.07. 5. Specific Conditional Uses (SCU) may be allowed, subject to the general development standards of this Ordinance, the specific standards of Section 2.08, and conditions of Conditional Use approval. Uses Allowed in Industrial Zones Table 2.04A Use Zone Accessory Uses(A) Conditional Uses(CU) Permitted Uses(P) IL Ip P/SP SWIR Special Permitted Uses(S) Specific Conditional Uses(SCU) A Civic Uses 1 Golf driving range P P CU 2 Parks, play grounds and associated activities, golf courses P without a driving range 3 Public administration, aquatic facilities, fire protection, P P CU P government and public utility buildings and storage yards Woodburn Development Ordinance Chapter 2.04 Page 79 205 Uses Allowed in Industrial Zones Table 2.04A Use Zone Accessory Uses(A) Conditional Uses(CU) Permitted Uses(P) m IP P/SP SWIR Special Permitted Uses(S) Specific Conditional Uses(SCU) 4 Rights-of-way, easements and improvements for streets, water, sanitary sewer, gas, oil, electric and communication lines, P P P P stormwater facilities and pump stations. 5 Trade schools P P CU CU B Commercial Retail and Services 1 Ambulance service P P 2 Automotive maintenance and gasoline stations, including P P repair services 3 Business services P P 4 Contractors: f Flooring and roofing g. Equipment and machinery P P P h. Glass and glazing i. Masonry, drywall, insulation and tile contractors j. Other types of contractors 5 Delivery services S S S S 6 Fitness and recreational sports P P P 7 Food carts and food cart pods S S S S 8 Hospitals and ancillary uses P CU P 9 Mobile food services S S S S 10 Restaurants and drinking places P P P 11 Marijuana dispensaries S S C Industrial 1 Auction houses, except livestock and poultry sales CU 2 Automotive wrecking yards CU 3 Charter buses, special needs transportation, transit system, P P school transportation, limousine service and taxi service 4 Chemical manufacturing CU CU CU 5 Distribution and E-commerce including; wholesale trade, farm P P P supplies and merchant wholesalers, packaging and labeling services. 6 Recycling center CU CU CU 7 Asphalt or Portland cement concrete batch plant CU CU 8 Commercial and industrial equipment repair, transit and p CU CU ground transportation Woodburn Development Ordinance Section 2.04 Page 80 206 Uses Allowed in Industrial Zones Table 2.04A Use Zone Accessory Uses(A) Conditional Uses(CU) Permitted Uses(P) m IP P/SP SWM Special Permitted Uses(S) Specific Conditional Uses(SCU) 9 Electronic and other electrical equipment and components, including manufacturing machinery, apparatus, and supplies for the generation, storage, transmission, transformation, and utilization of electrical energy; electricity distribution equipment; electrical industrial apparatus; household P P P appliances; electrical lighting and wiring equipment; radio and television receiving equipment; communications equipment; electronic components and accessories; and other electrical equipment and supplies 10 Fabricated metal products, including fabricating ferrous and non-ferrous metal products such as metal cans, tin ware, hand tools, cutlery, general hardware, non-electric heating CU CU P apparatus, fabricated structural metal products, metal forgings, metal stampings, and metal and wire products 11 Industrial and commercial machinery and computer equipment, including engines and turbines; farm and garden machinery; construction, mining, and oil field machinery; elevators and conveying equipment; hoists, cranes, monorails, trucks and tractors; metalworking machinery; special industry P P P machinery; general industrial machinery; computer and peripheral equipment, computer, semiconductor, laboratory instrument, and office machinery, manufacturing; refrigeration and service industry machinery u u rpm ni rru nu L (ri.uunn ", rn(:A ldr a ", y h pg a-k nd ins , 12 Heavy equipment and motor vehicle sales: e. Manufactured home dealers f. Motor vehicle and parts dealers, including new cars, used cars, recreational vehicles, motorcycles, boats, parts and tire dealers S S g. Truck dealers, including new trucks, used trucks, parts and tire dealers h. Tractor and farm machinery and equipment dealers i. Farm, garden and landscaping supplies Woodburn Development Ordinance Section 2.04 Page 81 207 Uses Allowed in Industrial Zones Table 2.04A Use Zone Accessory Uses(A) Conditional Uses(CU) Permitted Uses(P) IL IP P/SP SWIR Special Permitted Uses(S) Specific Conditional Uses(SCU) 13 Manufacturing: a. Apparel manufacturing b. Beverage, food,,and tobacco a �a�'����u a ", g uai rrugi uul a c art ug c. Furniture and related products d. Leather and allied products P P P e. Paper, limited to assembly f. Metal product manufacturing g. Miscellaneous manufacturing h. Plastics and rubber i. Textile products 14 Motor freight transportation and warehousing, including local or long-distance trucking or transfer services, storage of farm P P P products, furniture and other household goods, commercial goods, and mini-storage 15 Non-depository credit institutions engaged in extending credit P P in the form of loans, but not engaged in deposit banking 16 Paper manufacturing CU 17 Parking lots and garages P P 18 Petroleum and coal products manufacturing with all storage CU underground 19 Printing, publishing, and allied industries P P P 20 Professional services including software publishers P P 21 Stone, clay, glass, and concrete products including manufacturing flat glass, other glass products, cement, structural clay products, pottery, concrete and gypsum P products, cut stone, abrasive and asbestos products, and other products from materials taken principally from the earth in the form of stone, clay, and sand 22 Telecommunication facilities subject to Section 2.08.03 SCU SCU SCU 23 Wholesale trade in durable and non-durable goods P P P 24 Wood product manufacturing P P P D Miscellaneous 1 Facilities during construction S S S S 2 Fence or free-standing wall A A A A Woodburn Development Ordinance Section 2.04 Page 82 208 Public/Semi-Public (P/SP) - Site Development Standards Table 2.04D 1. Measured from the Street Widening Setback(Section 3.03.02), if any. 2. A building may be constructed at the property line, or shall be set back at least five feet. 3. Lot coverage is limited by setbacks, off-street parking, and landscaping requirements. Southwest Industrial Reserve (SWIR) - Site Development Standards Table 2.04E ( e �n. acres Lot Area, Minimum (��,, u����.��;�������i������.���� Lot Width, Minimum (feet) No minimum Lot Depth, Minimum (feet) No minimum Street Frontage, Minimum (feet) No minimum Front Setback and Setback Abutting a Street, Minimum (feet) 10 1 Side or Rear Setback, Abutting P/SP zone or a residential zone or use 30 Minimum (feet) Abutting a commercial or industrial zone 0 or 5 2 Setback to a Private Access Easement, Minimum (feet) 5 Lot Coverage, Maximum Not specified 3 Building Height, Primary or accessory structure 45 Maximum (feet) Features not used for habitation 70 1. Measured from the Street Widening Setback(Section 3.03.02), if any. 2. A building may be constructed at the property line, or shall be set back at least five feet. :1. Lot coverage is limited by setbacks, off-street parking, and landscaping requirements. 1..1.. auk r au may b r du e d h( tau th mrnmum u1 the d v prn ni a u1 c ontribul u. 1 u uulru k u 1k � �y tot .1 ��auu lu ��a u11r1��a 1y�u 11uu1 uu1 � u ipuu °u1 1uu�u .1 u��^.� �k u... 111;o fi i:ndustF i t..: fi (G NVi) : .. of G tandauu.fi. . 1: n r u�u .wu a uu3� u. uwuu° ';u luuau iuu wuuwu i.uuululuu r1 u. 11 uuluuuue uul ,u P 1m�u uuwu ;u 3 ,ulr uuuu� 17(4u iN(aF su AE Fes 1 u 052W1.10100:111 1 111 98" 1.-...1.11 11._..x. 4. 45x11 :.:1 x1;1 1 u1. 111 x11,. 1. Woodburn Development Ordinance Section 2.04 Page 85 209 "Nx W 14,0 60 1,m a 7 Woodburn Development Ordinance Section 2.04 Page 86 210 I)evel(Trn n,nt s ie ,uk ,'.wu Bx FOISu°,wu I.�Udd, 4e eEjHiFe 17 "wi,�°; n.S '(° ep a � 17( si:*[ ,n er 1,.a . �ww�a"aV:aa~II "F :°aaFes aFes (,UFea)u Si S (,IN6Fe) xW14 it s 25 X .... i,n,nd divi,ikm is nu b.petu ittedi. Woodburn Development Ordinance Section 2.04 Page 87 211 Woodburn Development Ordinance Section 2.04 Page 88 212 2.05 Overlay Districts There are six land use Overlay Districts within the City. Overlay districts include development standards for historic preservation, natural resource conservation, traffic generation, etc, which are in addition to the land use regulations of the underlying zones. 2.05.01 Gateway Commercial General Overlay District 2.05.02 Interchange Management Area Overlay District 2.05.03 Neighborhood Conservation Overlay District 2.05.04 Nodal Overlay Districts 2.05.05 Riparian Corridor and Wetlands Overlay District 2.05.06 Southwest Industrial Reserve 2.05.01 Gateway Commercial General Overlay District A. Purpose The Gateway Commercial General Overlay District is the Commercial General (CG) area immediately adjacent to the downtown. Special use provisions within the Gateway Overlay District allow multi-family residential development, either as a stand-alone use, or as part of a vertical mixed-use project. Specific uses are prohibited, while other uses are limited, allowed only within enclosed buildings or behind masonry walls. Additionally, specific height limitations apply within this Overlay District. The district allows multi-family residential to provide more consumers living within an area of commercial development and to provide 24-hour a day life in the eastern entrance to the downtown. B. Applicable Provisions The Gateway Commercial General Overlay District includes special-use provisions limiting outside storage and land-intensive uses, while allowing multi-family residential development, either as a stand-alone use or as part of a vertical mixed use project. The land use and development standards are contained in this ordinance. The Overlay District is noted on the Official Zoning Map. Woodburn Development Ordinance Chapter 2.05 Page 90 213 H. Coordination with the Department of State Lands The Oregon Department of State Lands shall be notified in writing of all applications to the City for development activities, including applications for plan and/or zone amendments, development or building permits, as well as any development proposals by the City that may affect any wetlands, creeks or waterways. 2.05.06 Southwest Industrial Reserve A. Purpose The Southwest Industrial Reserve (SWIR)is intended to protect suitable industrial sites in Southwest Woodburn, near Interstate 5, for the exclusive use of targeted industries identified pis �k�hed by~master planning, 1n t 21 ne �ruk�k �"�1�1 ���u�����k��s: k� This bad ob�������1�� rou � j ctive is accom l� d� retention of large industrial parcels, and restricting non-industrial land uses. B. Application of the SWIR Zone Land designated on the Comprehensive Land Use Plan Map as Southwest Industrial Reserve shall only be zoned SWIR. C. Dimensional Standards: The following dimensional standards shall be the minimum requirements for all development within the SWIR zone: 1. Land divisions may only be approved following approval of a master plan, as required in this ordinance. 2. Lots in a SWIR zone shall comply with the standards of Table 2.041 dvi'i kkkk, al 'vhafl p I.k:k 6" kk"I°°eax:k h kk1 the rkkkiu6 €kd kv6°ik" Hffl el Aed 1n 2 4AI 1 k eh . , k e 1 .I i 'ini .11 F F E d k4S, fln l'ii f d I D. Master Planning Requirement 1. A master development plan shall be approved by the City Council for the entire area designated SWIR on the Comprehensive Land Use Plan Map, prior to annexation of any property within the SWIR Comprehensive Plan Map designation. The master plan shall be conceptual and non-binding in nature, but may be used as a general guide for development within the SWIR. 2. The required master plan shall show: a. The location and rights-of-way for existing and planned streets, which shall provide access to all existing and proposed parcels, consistent with the Transportation System Plan; b. The location and size of existing and planned sanitary sewer, storm water and water facilities, at adequate levels to serve existing and proposed industrial development; c. The location and area of the Riparian Corridor and Wetlands Overlay District (RCWOD) as it affects existing and proposed industrial parcels. Planned streets and public facilities that cannot reasonably avoid the RCWOD shall be indicated; Woodburn Development Ordinance Section 2.05 Page 214 d. Parcels consistent with the �������a ���a;�� �(� siz i indi ,x tea in Table 2.0�@i e. Pedestrian and bicycle connections consistent with the TSP. E. Removal of the SWIR Zone Removal of the SWIR zone from any area or parcel shall require the following: 1. A revised Economic Opportunities Analysis and Industrial Site Suitability Analysis, consistent with the Goal 9 Rule (OAR Chapter 660, Division 9); 2. A new Statewide Planning Goal 2 Exception that explains why other land within or adjacent to the UGB, that does not require an exception, cannot meet the purported need; 3. A Comprehensive Plan Amendment that demonstrates compliance with all applicable Statewide Planning Goals, applicable goals and policies of the Marion County Framework Plan, and applicable goals and policies of the Comprehensive Plan; 4. A Zoning Map amendment that demonstrates consistency with the Comprehensive Plan. Woodburn Development Ordinance Section 2.05 Page 215 V II I II CITY OF WOODBURN, OREGON ECONOMIC OPPORTUNITIES ANALYSIS Prepared For: City of Woodburn, Oregon [Adopted January 2024] 216 The preceding analysis provides a basis for narrowing of target industries for the City of Woodburn.These indicators point to sectors of past and potential growth, as well as locally expressed economic development vision for the community. The following is a summary of targeted sectors and indicators for Woodburn, and the broader mid- Willamette Valley region. Woodburn Targets and Indicators It1ti Manufacturing Retail Trade Machineryand Production Equipment Health Care Plastics Manufacturing Agriculture Metal Products Tourism Food Products Manufacturing Apparel Transportation and Distribution Auto Transport Equipment Construction Warehousing and Distribution Wholesale Information Technology Educational Services Agriculture and Forestry Agriculture and Forestry Educational Services Manufacturing Wood Products Construction Food Products Health Care and Social Services Retail Trade Accommodation and Food Service Wholesale Trade Construction Regional and Statewide Targets Outdoor Gear and Apparel Forestry&Wood Products Advanced Manufacturing Advanced Manufacturing Agricultural and Food Processing Business Services Wood Products and Forestry Food & Beverage Transportation and Distribution Bioscience Government (Salem-focused) Metals & Machinery High Technology ° r ® ® Transport, Warehousing, Distribution NW Agriculture Innovation Hub Manufacturing STEM Workforce in Ag and Food Ind. Health Care Regional Recruitment Construction CITY OF WOODBURN I ECONOMIC OPPORTUNITIES ANALYSIS(JANUARY 2024) 20 217 These broader analyses arrived at similar conclusions of the advantageous industries for Woodburn and the Marion County region in general, including wood product, food product and other manufacturing, transportation and distribution, agriculture,and support industries including health care, education,and construction. CITY OF WOODBURN TARGET INDUSTRIES The preceding analysis of industry strengths and regional priorities provided a foundation for the discussion of local target industries for the City of Woodburn. Through the EOA planning process, the advisory committee of local stakeholders reviewed the economic goals,priorities,and target industries from the prior adopted plans,and agreed upon the following list of priority sectors to help meet the community's economic development goals. The selected industries reflect the community's historical strengths and advantages, regional trends,and local goals and objectives. These are discussed in more detail in the following pages: • Manufacturing • Transportation,Warehousing, Utilities • Health Care and Social Assistance • Construction • Tourism (Accommodation and Dining) • Agricultural Support Businesses • Education Note:The following discussion of target sectors relies on the most recent QCEW data from the Oregon Employment Department,dating to 2021. Total employment figures are updated to an estimate for 2023 in the following section of this report. A. MANUFACTURING Manufacturing has been a long-standing target sector for the City of Woodburn, and the sector is well represented among current businesses. Local employers manufacture products from wood, metals, plastics and food inputs, at all levels of complexity from basic supply inputs to other industries, to manufactured housing. Targets are high- technology manufacturing, including in support of the region's semiconductor and data center clusters, machinery and automation tech for other industries, and transportation equipment manufacturing, including emergin electric vehicle tech and infrastructure. SHARE OF EMPLOYMENT 2021 EMPLOYMENT 1,025 9.9% AVERAGE ANNUAL WAGE $57,702 GROWTH 2011-2021 416 FLEETWOOD HOMES INC FJORD LLC UFP WOODBURN LLC SPECIALTY POLYMERS INC UNITED PACIFIC FOREST PRODUCTS 2021 Growth'11-'21 Average NAICS Description Employment Total % Wage 311 Food Manufacturing 138 61 44.2% $49,474 321 Wood Product Manufacturing 444 206 46.4% $55,734 325 Chemical Manufacturing 78 48 61.5% $111,036 326 Plastics&Rubber Manufacturing 43 5 11.6% $41,757 332 Fabricated Metal Manufacturing 97 2 2.1% $74,952 333 Machinery Manufacturing 62 -27 -43.5% $58,296 Other 163 121 74.2% $38,221 Total 1,025 416 40.6% $57,702 CITY OF WOODBURN I ECONOMIC OPPORTUNITIES ANALYSIS(JANUARY 2024) 21 218 This sector has good location quotient and shift share indicators in Woodburn. Manufacturing provides good average incomes and skill building opportunities to blue-collar workers. The covered employment level in this sector was 1,025 in 2021, representing roughly 10%of the local employment base. Employment levels in the sector increased by 40%from 2011 through 2021.The average annual wage was approximately$57,700 per year in 2021. Cluster Strengths °°'° • Good foundation of existing manufacturing businesses and recent growth. • Diversified inputs and product types. • Experienced manufacturing work force, and training opportunities. • Solid wages in many manufacturing subsectors. Cluster Challenges • Scaling up the skilled workforce quickly. • Increasing shortage of appropriate industrial land. While manufacturing has experienced secular decline nationwide over many decades, there are still many opportunities for producers that benefit from proximity to inputs and the intended market, advanced production techniques and skills.Woodburn has demonstrated the ability to foster and grow this sector. B. TRANSPORTATION,WAREHOUSING,&UTILITIES Increasingly, Woodburn will be a major location of warehousing and distribution employment in the region. With the imminent completion of the Amazon distribution facility, along with other planned distribution developments, this sector is poised to become one of the largest employers, if not the largest, in Woodburn in the very near future. The benefits of Woodburn for the distribution industry are clear, given industrial lands available near a freeway interchange, and between the Portland and Salem markets. Other opportunities include additional "last mile" distribution facilities,which are smaller in scale. Other targets in this broad sector are new utility infrastructure, including build out of power and water capacity to serve new industry. Support for trucking terminals and charging stations will be increasingly important as the shipping industry shifts to electric vehicles. Data centers and related telecom infrastructure have been one of the fastest growing needs nationwide to support online activity, and this growth is expected to be sustained into the foreseeable future. Innovation in the data center industry allows for the use of smaller sites and facilities in more locations. Cluster Strengths • Freeway and rail access and exposure. ■ Central location to Oregon's largest population centers and markets. ■ Large new employers in this sector will bolster the cluster. Cluster Challenges ■ Finding sufficient workforce regionally,given the size of the new facility. May face temporary shortage of affordable workforce housing. uvuwuuu ■ Eventual potential to overburden freeway interchange capacity. 's CITY OF WOODBURN I ECONOMIC OPPORTUNITIES ANALYSIS(JANUARY 2024) 22 219 SHARE OF EMPLOYMENT 2021 EMPLOYMENT 747 IIIIIIIIIIIIII 7.2% AVERAGE ANNUAL WAGE $63,571 GROWTH 2011-2021 148 WINCO FOODS DARIGOLD INC FIRST STUDENT MANAGEMENT LLC RYDER SYSTEM ROADLINK WORKFORCE SOLUTIONS 2021 Growth'11-'21 Average NAICS Description Employment Total % Wage 484 Truck Transportation 88 71 417.6% $87,231 488 Transportation Support Activities 30 27 900.0% $59,966 493 Warehousing&Storage 564 58 11.5% $62,694 Other 65 -8 -11.0% $40,809 Total 747 148 24.7% $63,571 The overall employment level in this sector was 750 in 2021,representing roughly 7%of the local employment base, but this is set to increase substantially in the next year. The average annual wage was approximately $63,500 per year in 2021. Employment levels in the sector increased by 25%from 2011 through 2021. This sector will have a major impact on the local economy and is likely to grow. Additional businesses in this sector are likely to be smaller in size,with many supporting"last mile" logistics. C. HEALTH CARE AND SOCIAL SERVICES Like most communities, Woodburn will increasingly face growing health care needs from a growing and aging population.The health care needs of the Baby Boom generation, the oldest of which are approaching 80 years old and the youngest approaching 60, are expected to increase the need for health care facilities and workforce over the next 20 years. The community has expressed an economic development goal of attracting a medical center or hospital to Woodburn to meet local needs as the city continues to grow quickly. Currently, residents must travel to the Salem area to access more advanced health care and specialists. The overall employment level in this sector was 1,280 in 2021, representing roughly 12%of the local employment base.The average annual wage was approximately$44,200 per year in 2021,with a significant range between wages for social workers and health care workers. Employment levels in the sector increased by 28%from 2011 to 2021. Cluster Strengths ■ Growing and aging population base. ■ Low local competition for many specialties and more advanced healthcare. ■ Ability to serve larger market of north Marion County and rural Clackamas County. Cluster Challenges ■ Attracting a major medical group. ■ Potential competition with Keizer/Salem market. CITY OF WOODBURN I ECONOMIC OPPORTUNITIES ANALYSIS(JANUARY 2024) 23 220 KNOWN EMPLOYMENT SITES IN ADDITION TO THE BUILDABLE LAND INVENTORY Two known sites are currently permitted or under construction for new industrial space that will house future employment. Because of the advanced development status of these sites, they were not counted among the inventory of remaining buildable land. However,these sites do not yet house their future employment and therefore are counted with the BLI as providing estimated capacity to hold a share of the projected jobs over the next 20 years. These sites are the Amazon distribution facility (81.3 acres), near completion at the time of this analysis.The other site is a planned and permitted multi-tenant industrial development (29.6 acres) also located in the Southwest Industrial Reserve. In total these two known sites are 110.8 acres of industrial land as shown in Figure 7.04,which is added to the BLI as additional effective employment land capacity. COMPARING RECONCILIATION OF 20-YEAR LAND SUPPLY AND DEMAND Comparing the Buildable Land Inventory (including known sites under development) to the 20-year forecast of employment land need indicates that the City of Woodburn faces a deficit of employment land over the planning period in both the Commercial and Industrial categories. A summary of the comparison of land supply and demand is presented below. FIGURE 7.04: RECONCILIATION OF LAND SUPPLY AND 20-YEAR DEMAND(WOODBURN) 20 YR. BUILDABLE Plus Known TOTAL BLI+ SURPLUS OR EMPLOYMENT ZON ING DESIGNATION DEMAND LAND Future Emp. Known Sites (DEFBE ii (Gross Acres) (Acres), Sites(Acres)1 , (Acres); (Gross Acres) COMMERCIAL(RETAIL AND OFFICE) 171.4 64.8 0.0 64.8 Commercial General (CG) 38.2 Commercial Office(CO) 4.4 Downtown Dev.&Conservation(DDC) 0.8 Mixed Use Village(MUV) 0.5 UGB Commercial 21.0 INDUSTRIAL(INDUSTRIAL AND OFFICE) 460.7 77.3 110.8 188.1 (232.6) Light Industrial (IL) 36.6 110.8 147.4 Industrial Park(IP) 20.4 0 UGB Industrial 20.2 0 TOTAL: 632.1 142.1 110.8 252.9 (339.2) 1Two known sites are currently permitted or under construction for new industrial space that will house future employment.Because of the development status of these sites,theywere not counted among the inventory of remaining buildable land. However,these sites do not yet house theirfuture employment and therefore are counted here as providing estimated capacityto hold a share of projected jobs over the next 20 years.These sites are the Amazon distribution facility(81.3acres),near completion at the time of this analysis.The othersite is a planned and permitted multi-tenant industrial development(29.6 acres) also located in the Southwest Industrial Reserve. Source: Johnson Economics,MIG • This analysis indicates that Woodburn faces a deficit of 107 gross Commercial acres, and 273 gross Industrial acres,for a total employment land deficit of 380 gross acres. • It is important to note that some of the forecasted growth will include employers who may have specific site needs and preferences that are not reflected in the available buildable inventory. (See Appendix A for more details on site preferences for certain key industries.)In particular,there is forecasted demand for more suitable large-lot industrial sites while relatively few of these sites were found in the inventory that are unconstrained. CITY OF WOODBURN I ECONOMIC OPPORTUNITIES ANALYSIS(JANUARY 2024) 38 221 a) V, U L L L a CC C > C v a) p O o to L C fa J a tlA O ~ u a1 a) a) N C C Ui, i a s v Q t'Ja o o ) in p a=+ bl > C tlA o a)+ O a J a) v a) Q •Q -0 a) tip C n3 U a) o a) O C u a) O O a) C L C C 4-+ p CC N +`M > U p ca y • C C0 s 4— aJ aJ a) w C U, a) _ O tlA 2i i O - E U, aJ y f6 O v v i n3 _ v a) n3 _ a) t a C > a) nn p '• > U a) a) a) +., w T a) u E J f6 p v, O E Y > CU O rp n3 n3 ��., r= N -0 — C N N n3 n3 U) C C a) '3 C U E _0 a) a a a) Q w v v a I _0 E 3 u > a) N > L C (6 a) t C u a) O a=+ p ca C - ° v E C y., U C a ca v, O a)i. C .N a) a C o_ vi O a) C L E E f6 O ) U 0 3 v U U U C p a) O a) > u U n v Q- L v, i U a) E a) tlA in a) o o a +_. N C +.+ a) - - a a) O L t ° 'A a) ` u 4— +�.+ O C Lnn tlA .- •E yam., O n3 'o C •h0 bA 7 n3 C > to v a) in O N a) ° +� ° a) ° C a) O fa - a) '• L nn v m u O w c�a o a) t n3 L7 - a) oo C o" N N Q a)I. C +� ca u E t c a o C w .E o '• o nn CC: > 3 vI. v E n T 3 C > a a) C - E E — N b U c v a) o U, E E v .E v _0 +` Q- ca a _0 a u a a) N a) N a) u ca v oN E a) t m O (A " - E +� a a) a) a a) I. - — a) C a) a N a)C t > p o a) o v N °� - m o v •'v o E Q v c m ° }>> o v, v, � U t a) `- o tlA N N > I.v n3 v > a a) nn a O a) C +, ca } a) �C - 4- -9 a ?� -0 - - - v �C o v O = a) O Q i _ t - a) v to v I. _ '• O C i '• L a) E v _0 (a (a N T 3 n3 r= v a) o v z _0 u C U L Z — C C ° —' f i I. f6 O o T n3 n3 n3 S E U O C + > v v n3 z n3 a v E v o U p C E > 2 - T ( a) C E U, ° x a) O o t v E +� a ° v v Z ° z + v v, ns E > > Y —no Q O `° - p •� 4J U C C U ° a_+ � E +� +� is a v a; O a v •, C n3 +. v a) tlA v 3 a) t — o N E In +� v O D C vbfl C _0 4- ca u - p p O - - o a) C > C C j t O a) O a ° o tlA a) p U O �' C C O a) u i' 4a) 3 tlA vii t i a) tlA O a) a) U vii > �-� - = ca ujI C ca C v v O C z v z n3 N v u U E c'a x W C .C a) u a) u iif j C -D •— yam, a •i 2 O �_ •F v, •v, C > aJ z z H aJ ' Z v v +� v v v v v v Z +_' « O ° a) t E t t t J y� t - W H C) b a E v ^ bo _ v O H H ca H ca of H H O O C U C W OC N O +-+ p v, E u p C W _ WI (A N c-I CL �O _0 W c-I N a] Q a) a) n3 a) a) WI H v a) a) a) m a) a) *� m m m c C D D D > E p a c L J 7 N C m m v E C E c v — c u a) c u v O } _0 ° U' o m ° O -0 0 m O a) " -0 E v n°o > v m a) o v v v o c v a) 4_ (a 0 ° 3 Q 4- a E t m o +° 3 T m v _ �° v o no � -D m Q F •� - C m 0 ?� "' 'm c a jm E b a) C a) a > c `° E t nn > n v u, v v = u co -0 a) (a v c v v o Q > ° ai ai a; O x o E v v ° m v Q r - a) 0U' CO nn u +J E v 1° v E Q a) ^ C = •- O a. >. v U' a) 4- •� C: •- a_+ N v ++ 4-+ : " tlA 'in '� a) E 2i in - c •X i a) O > to 0 m a) in a a) C 4—O ate-+ a) O • - m 7 .E in t 2 i 3 .v p O 0 C +� — m a. a) U — O ? a) a) a) > nn m m 3 c ° , v c v N t bflC C v t -a N o u v a) (a C t -0 (° v U t o ° v E v u N v > O C +, O m m nn v _ OE I. U' 0 a) > o +�v +, E t m o U tlA a) +, t c N O Q .c 4- ( .— U a) m v 'C v v a) C m o t c N >i p v 3 Q > v (° a) m I. _ > v m O t v v t o o a) 3 E m 1° m O E 0 0 ° > ° - 0 o E o > c T v o U a) O a) U - m m (a dJ OU Q 0 U v Eo tl0 - yam_, Etw 3 v a) t .E +� 0 3 c aa) E m N E 3 E CC +� a) '_ O O v +J 3 = - CL E — O c c 3 a m o o = o v m E O _ m E a) v o a) *= 0 z o 0 t a) O E (° v U N m C Q ° O O O v 0 0 3 v O E v v 3 � E U' E a) v u t :: c v O a) v O m O c m y a N a)+� v o m u O t E E m E o a)) .N C Q m Uj " C O O N — C Q tlA E E U +� _0 '� N 3 3 E E ° ti +J o N o Q N (La °,-' v s U E o a) p > O u — u c Q) c > a u ° ai u + o + U Q c a) E O � m ate- O p •c a) C --+ OQ Y — E ++ a) i �— tla).a tlA O c y v +� > 3 - v Z •i 4 E i C N a) U N O U w(o e v p E a) cn E v v >a > E E v ON N t x a) v o a m c +� U' ° (ua ° • E v nn u v O a) c +, a. a) E ° Q 4— m m m O w O +-+ - a) a) m CE CE ca > L — a) 0 v v • t u O v + ° t +; o n 7 + C Q 7 a) > .E >' b.a t O • in N O u v ° U v f° m '� 4a) v z C n a+ m o + E tiu a) a) U a) a) (� _ EC —^ ° 3 u Q u t Q •C U O m m C ≥ O E m ~ t T C > > a) 7 o N C aT+ a) 4J 4-O v a) ? O C C C 0 U >j v Z •i L a) i r C a) C a) f; f0 Q Q N ( tl0 E ' E i co O >• m .C `n O LL '_' `� C of > C "a O 7 Q `n C +� v •v v u a1 v +, E a. - g (o m a) a) a ++ C v y C O > N N n.oa) M y aJ v Q r m u a n.o s o u C O0 C N 4- •� N U a) a+ ≥ a)-+ m tlA O O r +�+ m a) Z iii •(0 f�,, a) �j t H U `^ a v Z X O v C i ,C n 3 v `^ a) C Q m ,� m >, - a) 0 a) a) v « +� +� aJ a) •� a Q v a) O Q- O o u tlA a`+ H U O oE Q L1 aO+ aO+ A a—>+ O dJ r U w w v a. a) E " ° v - u u - O m r c z v no O E O 'a m e r r C c m a, a) w C aJ c^ p a+ a) r m m s m a) C v (o V ., C :3U'O c^ a) 7 i +�-+ 4) p �_ ` •X i •X •� a) •� +m-+ U « m V O O 7 •C N '� v N C (0 O 0- cn Oy m co m > OO E v +� a 0 a u Q u a Q u -0 Z w O U + O L a N N N O O 3 O Z v Z Z Z f6 a) a (6 a 3 f0 a a + O v _ v c c y •2L co s o O N a s E o c z — � A > 3 a a 'ca) o v v CO 10 N N n N an 0 C N •� O = an o 00 v 1= 1 ii •n G1O N 3 a a S c v _ a) O N )n U C C Z d Y O o a + a a +, O £ v c O e an an v v w f0 ++ o U .^ u ON N c ci d d '� c .� LL \ o m O C O 3 y a U y oy N a .L •� C d E U a A o pq C c c o a 0)+ O W S O p� an an c N + d d d 4 O f an o O = m a F an +J N A U (N C ? y a a O a) a) N N c O N Gl • N a `o — an an o O . v a v v a ' a m A a a +' 00 C7 « N C 7 u o O v `o Ln L C m v v 7 t y O an . .� O V F , N N N C on O' O' d d L N O 3 0 '^ O N ? S S ._ U z Z a (p O a U v N '++ U a L 0 d d a an "a N Q m y N N c .n v v ' ++ o 7 O O on In 0 C a + z z > an U o C y .z < ++ . N C 3 + p O d d t O c Z 7 i C Q y o .n t° c N O a Ti 3 F c o O v v °- . L1 ≥ c w s a 3 a a Z � • �n = s D 0 z o c ~ ' v v v v o o ≥ C C C O > I-+ 0 ¢ ' D v v v v a V_ C Wd y D D D A 0 0 QQ W l7 F a a W LL W zQ m a p `o m as a) a a v v v v � roi c o v v v v v v a o � z v 5 `o o °, a o o a o 6 z z z z z C ry d d , te-+ d d d d _ • N O y n7 al O 00 O N j al d d d K in d N N a K 00 00 00 a o'-. 3 a a a a a •m N N •� o � o io - � v v v v v a• o o v a) a� 9 a) a) 00 00 0 N a v v y v o c a00 z a a z m a a a v m o o s o o v 3 > > v v 17 a+ v roi o v v v v v °' •2L .O O z z z ar o. a « « « a a a OE N N v O N 3 v v v LL O U al V 0 ip •C. 00 C. . a) •� •� 00 00 G N N O O O K 4' 4' 0 C s N s s 00 o a ay a v O a v a v a o o •9 v •9 5 9 v W L t0 d V a N d .S d N O C i0 00 C 8 O d p K p d Z Z Z 00 N N " N " 3 v viii p 9 N s v v a, aa) aa) a, LL o v m o ri 00 0 v 0 o0 K 0 G N s s O. G O z z z O LL CO __ _ v 2 3 a a a a a c o •9 O o O « v v v v v V H d al al S S S 'J O00 00 c .+ 00 N E '1 °' °' v v v z N N N an a v m - ` - o 3 v v v v 0 9 O m 3 Ol ' d N ' 0 V w N •C w a' ' a' Z c `° S `° a` N c ` in Z V N 3 o ' er N No o 000 O v v v v z Ey O • N N'I as �N'I 2 2 00 v as as as w o v a` 2 Z W al al al T ?� T^y al J -- E -- E m y LL 0 LL O in in = = 'A o c [ `—' c a c 0 a v t v c v u ` v u u o in v ) as [ as as as c c — c °a 0 o in c o y . c a` 000 E D [ 0 LL Q c? N t? n o V p � � u z � z w �. _ z 4 4 V Z m a 3 G n o a 3 ¢ W O OC z LL u }LO rl c-I c-I rl U o = O a E ........................................................................................................................a........................................................................................................................ o a c a v m o Y ° 3 ° 3 a m V o .Y a 0 > 0 Y 0 a o 0 0 0 l7 v o c o a n p � L � .v �• m Q N a o 9 o v a 3 o ar r=o u c w 3 x o a t a 9 a O y o a >• Y a1 T a a v o t v �u 8 = 8c ro v NN V H = o o — " O s o 's o o E o r w _ ar o t a o °_ } 0 t w .• v CC Y o a a t Q @l 3 a — NJ a v' MJ'. v v Y Y Z 5v a v 3 Q o , = E ¢ Y o w >• a s v v = y a F = F m o a - ai m E in o CuH o a o N ¢ O uo 9 �YN o I - L1 - v > o a wow o w '•_ = o v S v Z v a H Q O L ` E ° a " a z v = ° v ar_ ° o m t m > = z v o v N d w E 3 N a W m vii C ry v N 1 C U v co O Z p� Y u z o a O iii CO W uc CI) Z o5 O a j o v u V! C O ^ O W I W u O 0 Ln U COUNCIL BILL NO. 3302 ORDINANCE NO. 2648 AN ORDINANCE ADOPTING AMENDMENTS TO THE WOODBURN DEVELOPMENT ORDINANCE REGARDING SWIR ZONE USES AND STANDARDS (LA 26-04) WHEREAS, the Woodburn Development Ordinance (WDO) establishes the standards that development is required to meet and that clarity of those standards is critical as the community continues to grow and prosper; and WHEREAS, periodic revisions and updates to the WDO are necessary and expected to comply with statutes and administrative rules, administer new and revised long-range plans, and address current issues; and WHEREAS, Section 4.10.09 of the WDO requires the City Council to initiate the consideration of any potential legislative amendments to the WDO by resolution; and WHEREAS, on March 23, 2026, the Council, in conformance with WDO 4.01 .09A, initiated Legislative Amendment LA 26-04 via Resolution No. 2261; and WHEREAS, the Woodburn Planning Commission held a public hearing on May 14, 2026 and unanimously recommended approval of the amendment to the City Council; and WHEREAS, the Woodburn City Council held a public hearing on June 8, 2026, to consider approval and adoption of this legislative amendment;NOW, THEREFORE, THE CITY OF WOODBURN ORDAINS AS FOLLOWS: Section 1. For purposes of this ordinance amendment, all new text is shown as underlined (i.e. new text) and all deleted text is shown as stricken (i.e. deleted text). After this ordinance amendment is adopted, the Community Development Director shall correct the WDO to incorporate all revisions contained herein. Section 2. The WDO is amended as specified in Exhibit A which is attached hereto and incorporated herein. Page - 1 - Council Bill No. 3302 Ordinance No. 2648 227 Section 3. The legislative action taken by the Ordinance is explained and justified by the Staff Report and Analyses & Findings documents attached hereto and incorporated herein as Exhibits B and C, respectively. Approved as to form: City Attorney Date Approved: Frank Lonergan, Mayor Passed by the Council Submitted to the Mayor Approved by the Mayor Filed in the Office of the Recorder ATTEST: Heather Pierson, City Recorder City of Woodburn, Oregon Page - 2 - Council Bill No. 3302 Ordinance No. 2648 228 Exhibit A - Amendments 1.02 Definitions Note: Terms not defined in this Section have the meaning set forth in the New Oxford American Dictionary, 2010 edition (see Section 4.02.06.B.6.) Abutting: Touching on the edge or on the line, including at a corner. It shall include the terms adjacent, adjoining and contiguous. Access: The place, means or way by which pedestrians or vehicles have ingress and egress to and/or from a lot or use. Accessory Building, Structure or Use: A detached building, structure or use which is incidental and subordinate to, and supports the primary use on, the same premises. Accommodations: • Bed and Breakfast Inn: A single-family dwelling with at least one room offered to the general public for lodging on an overnight or weekly basis, with a meal provided. • Hotel: A building in which rooms are offered to the general public for lodging on an overnight or weekly basis, where the primary entrance is through a lobby or foyer with internal circulation to the rooms. • Living Unit: A room or suite of rooms, providing living and sleeping facilities for one or more persons where either cooking or eating and/or sanitation facilities are shared. In a rooming and boarding house, each bed rented for compensation is a"Living Unit."Note: Living unit is not synonymous with"dwelling unit." • Motel: a group of attached or detached buildings, in which more than five rooms are offered to the general public for lodging on an overnight or weekly basis, where the rooms have direct access to the outside without the necessity of passing through the main lobby of a building. • Rooming and Boarding House: A residential building or portion thereof with guest rooms, providing lodging or lodging and meals, for three or more persons for compensation. ADA: The acronym refers to the federal Americans with Disabilities Act(1992) and in the context of WDO standards means compliance with contemporary federal provisions with which developers are bound to comply as standards and compliance with any contemporary supplemental state of Oregon provisions with which developers are bound to comply as standards. Adjacent: Near, close or bordering but not necessarily contiguous with; adjoining but separated by a right-of-way. Administrative Body: The City Council, Planning Commission, Design Review Board, or staff member having the jurisdiction to hear and decide proceedings on land use actions. Alley: A public right-of-way not more than 20 feet wide and not less than 10 feet in width that provides vehicular access to property instead of or in addition to a public street, that intersects with a public street, and that can serve as a utility corridor. Distinct from "Shared Rear Lane". Woodburn Development Ordinance Chapter 1.02 Page 7 229 Exhibit A - Amendments • Group Care Facility: A facility that provides residential care, treatment, or training for six or more socially dependent individuals or individuals with physical disabilities or mental retardation or other developmental disabilities or mental, emotional or behavioral disturbances or alcohol or drug dependence. Note: See "Residential Care," Residential Care Facility," "Residential Training Facility," "Residential Treatment Facility," "Training," and "Treatment" in ORS 443.400. Group Care Facility includes what is commonly called an"assisted living facility." • Group Home: A facility that provides residential care, treatment, or training for five or fewer socially dependent individuals or individuals with physical disabilities or mental retardation or other developmental disabilities or mental, emotional or behavioral disturbances or alcohol or drug dependence. Note: See"Residential Care,"Residential Care Home," "Residential Training Home," "Residential Treatment Home," "Training," and "Treatment" in ORS 443.400. Group Home includes what is commonly called an "assisted living facility" or"adult foster home." • Nursing Home: A building or portion of a building containing living units and providing inpatient nursing and rehabilitative services. Nursing Home includes "hospice" but does not include "Group Care Facility," "Group Home," or"Hospital." Carport: A permanent structure consisting of a roof and supports for covering a parking space which is not completely enclosed. Cemetery: Land used or intended to be used for the burial of the dead and dedicated for cemetery purposes, including a columbarium, crematory, mausoleum, or mortuary, when operated in conjunction with, and within the boundary of, such cemetery. u 11 r aill gill � � vi ay lE uu r.^ iuul�o ai!Iwi�o ail lvl��... uu ulrulruo avu on 1 ^;rlllluwl�� llll ,i ul�ll� uli �a� ��� a � ......... gpqu pp wMIh urn pU9 lug g nd rn IIwu k nl a...sy�vlg!psv for sI tinf p ,..,u mn ng dfig�I Change of Use: A change from one type of use of a building or land to another type of use for uses as defined by the Woodburn Development Ordinance. Church: See "House of Worship." CIP: The acronym refers to both the City Capital Improvement Program and the five-year Capital Improvement Plan that implements the program. Community Building: A facility available for public use for meetings, recreation, education. Common courtyard: A common area for use by residents of a cottage cluster. A common courtyard may function as a community yard. Hard and soft landscape features may be included in a common courtyard, such as lawn grass, vegetative groundcover, trees, shrubbery, benches, picnic benches, bicycle/pedestrian paths, bicycle parking, bollards, dog waste stations, drinking or ornamental fountains, playgrounds, plazas, gazebos, pavilions, or other outdoor shelters, signage, or trash and recycling receptacles (excluding receptacles as dumpsters, bins, and cans within enclosures). Condominium: A building or group of buildings, in which separate buildings or portions of buildings are separately owned, while the land on which the building(s)is located is held in a common ownership. Conforming: In compliance with the current regulations of the Woodburn Development Ordinance. Woodburn Development Ordinance Chapter 1.02 Page 11 230 Exhibit A - Amendments 2.04 Industrial and Public Zones A. The City of Woodburn is divided into the following industrial and public zones: 1. The Light Industrial (IL) zone, which is intended for industrial activities that include land-intensive activities; 2. The Industrial Park(IP) zone, which is intended for light industrial activities in a park- like setting; 3. The Public and Semi-Public (P/SP) zone, which is intended for public uses,parks, schools and cemeteries. 4. The Southwest Industrial Reserve (SWIR), which is intended for employment and industries identified in the 2016 Target Industry Analysis; B. Approval Types (Table 2.04A) 1. Accessory Uses (A) are allowed outright, subject to the general standards of this Ordinance. 2. Conditional Uses (CU) may be allowed, subject to the general development standards of this Ordinance and conditions of Conditional Use approval. 3. Permitted Uses (P) are allowed outright, subject to the general development standards of this Ordinance. 4. Special Permitted Uses (S) are allowed outright, subject to the general development standards and the special development standards of Section 2.07. 5. Specific Conditional Uses (SCU) may be allowed, subject to the general development standards of this Ordinance, the specific standards of Section 2.08, and conditions of Conditional Use approval. Uses Allowed in Industrial Zones Table 2.04A Use Zone Accessory Uses(A) Conditional Uses(CU) Permitted Uses(P) IL Ip P/SP SWIR Special Permitted Uses(S) Specific Conditional Uses(SCU) A Civic Uses 1 Golf driving range P P CU 2 Parks, play grounds and associated activities, golf courses P without a driving range 3 Public administration, aquatic facilities, fire protection, P P CU P government and public utility buildings and storage yards Woodburn Development Ordinance Chapter 2.04 Page 79 231 Exhibit A - Amendments Uses Allowed in Industrial Zones Table 2.04A Use Zone Accessory Uses(A) Conditional Uses(CU) Permitted Uses(P) m IP P/SP SWIR Special Permitted Uses(S) Specific Conditional Uses(SCU) 4 Rights-of-way, easements and improvements for streets, water, sanitary sewer, gas, oil, electric and communication lines, P P P P stormwater facilities and pump stations. 5 Trade schools P P CU CU B Commercial Retail and Services 1 Ambulance service P P 2 Automotive maintenance and gasoline stations, including P P repair services 3 Business services P P 4 Contractors: f Flooring and roofing g. Equipment and machinery P P P h. Glass and glazing i. Masonry, drywall, insulation and tile contractors j. Other types of contractors 5 Delivery services S S S S 6 Fitness and recreational sports P P P 7 Food carts and food cart pods S S S S 8 Hospitals and ancillary uses P CU P 9 Mobile food services S S S S 10 Restaurants and drinking places P P P 11 Marijuana dispensaries S S C Industrial 1 Auction houses, except livestock and poultry sales CU 2 Automotive wrecking yards CU 3 Charter buses, special needs transportation, transit system, P P school transportation, limousine service and taxi service 4 Chemical manufacturing CU CU CU 5 Distribution and E-commerce including; wholesale trade, farm P P P supplies and merchant wholesalers, packaging and labeling services. 6 Recycling center CU CU CU 7 Asphalt or Portland cement concrete batch plant CU CU 8 Commercial and industrial equipment repair, transit and p CU CU ground transportation Woodburn Development Ordinance Section 2.04 Page 80 232 Exhibit A - Amendments Uses Allowed in Industrial Zones Table 2.04A Use Zone Accessory Uses(A) Conditional Uses(CU) Permitted Uses(P) m IP P/SP SWM Special Permitted Uses(S) Specific Conditional Uses(SCU) 9 Electronic and other electrical equipment and components, including manufacturing machinery, apparatus, and supplies for the generation, storage, transmission, transformation, and utilization of electrical energy; electricity distribution equipment; electrical industrial apparatus; household P P P appliances; electrical lighting and wiring equipment; radio and television receiving equipment; communications equipment; electronic components and accessories; and other electrical equipment and supplies 10 Fabricated metal products, including fabricating ferrous and non-ferrous metal products such as metal cans, tin ware, hand tools, cutlery, general hardware, non-electric heating CU CU P apparatus, fabricated structural metal products, metal forgings, metal stampings, and metal and wire products 11 Industrial and commercial machinery and computer equipment, including engines and turbines; farm and garden machinery; construction, mining, and oil field machinery; elevators and conveying equipment; hoists, cranes, monorails, trucks and tractors; metalworking machinery; special industry P P P machinery; general industrial machinery; computer and peripheral equipment, computer, semiconductor, laboratory instrument, and office machinery, manufacturing; refrigeration and service industry machinery u u rpm ni rru nu L (ri.uunn ", rn(:A ldr a ", y h pg a-k nd ins , 12 Heavy equipment and motor vehicle sales: e. Manufactured home dealers f. Motor vehicle and parts dealers, including new cars, used cars, recreational vehicles, motorcycles, boats, parts and tire dealers S S g. Truck dealers, including new trucks, used trucks, parts and tire dealers h. Tractor and farm machinery and equipment dealers i. Farm, garden and landscaping supplies Woodburn Development Ordinance Section 2.04 Page 81 233 Exhibit A - Amendments Uses Allowed in Industrial Zones Table 2.04A Use Zone Accessory Uses(A) Conditional Uses(CU) Permitted Uses(P) IL IP P/SP SWIR Special Permitted Uses(S) Specific Conditional Uses(SCU) 13 Manufacturing: a. Apparel manufacturing b. Beverage, food,,and tobacco a �a�'�st a ", g uai rrugi uul a e a ug c. Furniture and related products d. Leather and allied products P P P e. Paper, limited to assembly f. Metal product manufacturing g. Miscellaneous manufacturing h. Plastics and rubber i. Textile products 14 Motor freight transportation and warehousing, including local or long-distance trucking or transfer services, storage of farm P P P products, furniture and other household goods, commercial goods, and mini-storage 15 Non-depository credit institutions engaged in extending credit P P in the form of loans, but not engaged in deposit banking 16 Paper manufacturing CU 17 Parking lots and garages P P 18 Petroleum and coal products manufacturing with all storage CU underground 19 Printing, publishing, and allied industries P P P 20 Professional services including software publishers P P 21 Stone, clay, glass, and concrete products including manufacturing flat glass, other glass products, cement, structural clay products, pottery, concrete and gypsum P products, cut stone, abrasive and asbestos products, and other products from materials taken principally from the earth in the form of stone, clay, and sand 22 Telecommunication facilities subject to Section 2.08.03 SCU SCU SCU 23 Wholesale trade in durable and non-durable goods P P P 24 Wood product manufacturing P P P D Miscellaneous 1 Facilities during construction S S S S 2 Fence or free-standing wall A A A A Woodburn Development Ordinance Section 2.04 Page 82 234 Exhibit A - Amendments Public/Semi-Public (P/SP) - Site Development Standards Table 2.04D 1. Measured from the Street Widening Setback(Section 3.03.02), if any. 2. A building may be constructed at the property line, or shall be set back at least five feet. 3. Lot coverage is limited by setbacks, off-street parking, and landscaping requirements. Southwest Industrial Reserve (SWIR) - Site Development Standards Table 2.04E ( e �n. acres Lot Area, Minimum (��,, u����.��;�������i������.���� Lot Width, Minimum (feet) No minimum Lot Depth, Minimum (feet) No minimum Street Frontage, Minimum (feet) No minimum Front Setback and Setback Abutting a Street, Minimum (feet) 10 1 Side or Rear Setback, Abutting P/SP zone or a residential zone or use 30 Minimum (feet) Abutting a commercial or industrial zone 0 or 5 2 Setback to a Private Access Easement, Minimum (feet) 5 Lot Coverage, Maximum Not specified 3 Building Height, Primary or accessory structure 45 Maximum (feet) Features not used for habitation 70 1. Measured from the Street Widening Setback(Section 3.03.02), if any. 2. A building may be constructed at the property line, or shall be set back at least five feet. :1. Lot coverage is limited by setbacks, off-street parking, and landscaping requirements. 1..1.. auk r au may b u1 du e d h( tau th mrnmum u1 the d v prn ni a u1 c ontribul u. 1 u uulru k u 1k � �y tot .1 ��auu lu ��a u11r1��a 1y�u 11uu1 uu1 � u ipuu °u1 1uu�u .1 u��^.� �k u... 111;o fi i:ndustF i t..: fi (G NVi) : .. of G tandauu.fi. . 1: n r u�u .wu a uu3� u. uwuu° ';u luuau iuu wuuwu i.uuululuu r1 u. 11 uuluuuue uul ,u P 1m�u uuwu ;u 3 ,ulr uuuu� 17(4u iN(aF su AE Fes 1 u 0x1 1.10100300 1 111 11"11 1.-...1.11 11._..x. 4. 45x11 :.:1 x1;1 1 u1. 111 x11,. 1. Woodburn Development Ordinance Section 2.04 Page 85 235 Exhibit A - Amendments Woodburn Development Ordinance Section 2.04 Page 86 236 Exhibit A - Proposed Amendments I)ev l(Trnent si nuiWS riN j"f0l'"u°S I'IHi�(1, � . e(rjHi f� 17 "wi,�°; n.S '(° a W.�,,fl 17 Woodburn Development Ordinance Section 2.04 Page 87 237 Exhibit A - Amendments B ?ø Woodburn Development Ordinance Section 2.04 Page 88 238 Exhibit A - Amendments 2.05 Overlay Districts There are six land use Overlay Districts within the City. Overlay districts include development standards for historic preservation, natural resource conservation, traffic generation, etc, which are in addition to the land use regulations of the underlying zones. 2.05.01 Gateway Commercial General Overlay District 2.05.02 Interchange Management Area Overlay District 2.05.03 Neighborhood Conservation Overlay District 2.05.04 Nodal Overlay Districts 2.05.05 Riparian Corridor and Wetlands Overlay District 2.05.06 Southwest Industrial Reserve 2.05.01 Gateway Commercial General Overlay District A. Purpose The Gateway Commercial General Overlay District is the Commercial General (CG) area immediately adjacent to the downtown. Special use provisions within the Gateway Overlay District allow multi-family residential development, either as a stand-alone use, or as part of a vertical mixed-use project. Specific uses are prohibited, while other uses are limited, allowed only within enclosed buildings or behind masonry walls. Additionally, specific height limitations apply within this Overlay District. The district allows multi-family residential to provide more consumers living within an area of commercial development and to provide 24-hour a day life in the eastern entrance to the downtown. B. Applicable Provisions The Gateway Commercial General Overlay District includes special-use provisions limiting outside storage and land-intensive uses, while allowing multi-family residential development, either as a stand-alone use or as part of a vertical mixed use project. The land use and development standards are contained in this ordinance. The Overlay District is noted on the Official Zoning Map. Woodburn Development Ordinance Chapter 2.05 Page 90 239 Exhibit A - Amendments H. Coordination with the Department of State Lands The Oregon Department of State Lands shall be notified in writing of all applications to the City for development activities, including applications for plan and/or zone amendments, development or building permits, as well as any development proposals by the City that may affect any wetlands, creeks or waterways. 2.05.06 Southwest Industrial Reserve A. Purpose The Southwest Industrial Reserve (SWIR)is intended to protect suitable industrial sites in Southwest Woodburn, near Interstate 5, for the exclusive use of targeted industries identified pis �k�hed by~master planning, 1n t 21 ne �ruk�k �"�1�1 ���u�����k��s: k� This bad ob�������1�� rou � j ctive is accom l� d� retention of large industrial parcels, and restricting non-industrial land uses. B. Application of the SWIR Zone Land designated on the Comprehensive Land Use Plan Map as Southwest Industrial Reserve shall only be zoned SWIR. C. Dimensional Standards: The following dimensional standards shall be the minimum requirements for all development within the SWIR zone: 1. Land divisions may only be approved following approval of a master plan, as required in this ordinance. 2. Lots in a SWIR zone shall comply with the standards of Table 2.041 dvi'i kkkk, al 'vhafl p I.k:k 6" kk"I°°eax:k h kk1 the rkkkiu6 €kd kv6°ik" Hffl el Aed 1n 2 4AI 1 k eh . , k e 1 .I i 'ini .11 F F E d k4S, fln l'ii f d I D. Master Planning Requirement 1. A master development plan shall be approved by the City Council for the entire area designated SWIR on the Comprehensive Land Use Plan Map, prior to annexation of any property within the SWIR Comprehensive Plan Map designation. The master plan shall be conceptual and non-binding in nature, but may be used as a general guide for development within the SWIR. 2. The required master plan shall show: a. The location and rights-of-way for existing and planned streets, which shall provide access to all existing and proposed parcels, consistent with the Transportation System Plan; b. The location and size of existing and planned sanitary sewer, storm water and water facilities, at adequate levels to serve existing and proposed industrial development; c. The location and area of the Riparian Corridor and Wetlands Overlay District (RCWOD) as it affects existing and proposed industrial parcels. Planned streets and public facilities that cannot reasonably avoid the RCWOD shall be indicated; Woodburn Development Ordinance Section 2.05 Page 240 Exhibit A - Amendments d. Parcels consistent with the �������a ���a;�� �(� siz i indi ,x tea in Table 2.0�@i e. Pedestrian and bicycle connections consistent with the TSP. E. Removal of the SWIR Zone Removal of the SWIR zone from any area or parcel shall require the following: 1. A revised Economic Opportunities Analysis and Industrial Site Suitability Analysis, consistent with the Goal 9 Rule (OAR Chapter 660, Division 9); 2. A new Statewide Planning Goal 2 Exception that explains why other land within or adjacent to the UGB, that does not require an exception, cannot meet the purported need; 3. A Comprehensive Plan Amendment that demonstrates compliance with all applicable Statewide Planning Goals, applicable goals and policies of the Marion County Framework Plan, and applicable goals and policies of the Comprehensive Plan; 4. A Zoning Map amendment that demonstrates consistency with the Comprehensive Plan. Woodburn Development Ordinance Section 2.05 Page 241 Exhibit B WOODBURN r d Incorporated 4889 Staff Report File Number: Legislative Amendment (LA) 26-04 Initial Hearing Date: May 14, 2026 Date of Report: May 7, 2026 Staff Reviewer: Dan Handel, Senior Planner Staff Recommendation: Approval Issue before the Planning Commission Proposed amendments to the Woodburn Development Ordinance (WDO). Executive Summary On March 23, 2026, the City Council passed Resolution No. 2261 initiating legislative amendments to the WDO. Because of the broad scope of amendments initiated by this resolution, staff has broken them out into several Legislative Amendment case files. LA 26-04 is one of those case files. The proposed amendments update the allowed uses within industrial zones to include uses identified as priorities in the 2024 Economic Opportunities Analysis (EOA) report. These include high-technology manufacturing, transportation equipment manufacturing, food and beverage processing and manufacturing, and data centers. Data centers have quickly become a hot topic nationwide — private investment in data center development has skyrocketed throughout the country to support the booming growth of artificial intelligence. There has also been substantial and growing study of their energy, environmental, and economic impacts on the communities they are built within. For these reasons, the proposed amendments recommend allowing data centers as a Conditional Use and only within the Southwest Industrial Reserve (SWIR) zone. 242 Exhibit B Separately, the proposed amendments update the SWIR zone development standards to be consistent with the Comprehensive Plan. The proposed amendments are included in a trikethMugh-and-underline format (Attachment 102). The Planning Commission is tasked with making a recommendation on the proposed amendments for the City Council to consider. As a legislative amendment, commissioners may contact staff directly with questions any time before the hearing at (503) 980-2431 or<dan.handel@ci.woodburn.or.us>. Recommendation and Action Approval: Staff recommends that the Planning Commission consider the staff report and attachments and recommend the City Council adopt the legislative amendment, based on the Analyses and Findings (Attachment 101) in the staff report. Alternatively, the Planning Commission may instead: • Recommend approval with revisions; or • Postpone the recommendation and return at a later meeting for further deliberation. Attachment List 101. Analyses & Findings 102. Proposed WDO Amendments 103. 2024 Economic Opportunities Analysis excerpt (highlighted by staff) LA 26-04 Staff Report Page 2 of 2 243 Exhibit C Analyses & Findings IIiretiroduC oire The findings within this document demonstrate how the proposed legislative amendment is consistent with: • Statewide Planning Goals • Woodburn Comprehensive Plan goals and policies • Woodburn Development Ordinance (WDO) • Oregon Revised Statute (ORS) 227.186 Statewde Pannng Goats There are a total of 19 Statewide Planning Goals. Staff finds Goals 1, 2, and 9 are applicable Statewide Planning Goals to the adoption of the proposed WDO amendments. Goad I -- Citizen Involvement Statewide Planning Goal 1 requires cities to involve community members in planning processes and decisions. To meet this goal, the WDO specifies requirements for the initiation, processing, and public notification of any legislative amendment. A legislative amendment must be initiated by the City Council, who are the elected representatives of the community. Once initiated, the Planning Commission holds a public hearing to consider the legislative amendment and make a formal recommendation. The City Council then holds a second public hearing to consider the amendment and the recommendation from the Planning Commission, and make a final decision. A notice of each public hearing is sent to all affected governmental agencies and recognized neighborhood associations and also published within the local newspaper. The Planning Commission hearing is scheduled for May 14, 2026, and the City Council hearing is tentatively scheduled forJune 8, 2026, pending a recommendation to the Council by the Planning Commission. On April 9, 2026, staff sent a Post-Acknowledgement Plan Amendment (PAPA) notice to the Department of Land Conversation and Development (DLCD) in compliance with OAR 660-018- 0020. The City mailed notice to affected government agencies in conformance with WDO 4.01.14.D. on April 24, 2026, and published notice of both the Planning Commission and City Council hearings in the Herald-Independent newspaper on May 6, 2026. Staff finds that the proposed legislative amendment is consistent with Statewide Planning Goal 1. LA 26-04 Planning Commission Staff Report Attachment 101: Analyses& Findings Page 1 of 4 244 Exhibit C Goa 2 -- Land Use Pannng Goal 2 requires each local government in Oregon to establish a land use planning process and policy framework as a basis for all decisions and actions related to use of land and to assure an adequate factual base for such decisions and actions. Goal 2 also includes requirements for coordination with other jurisdictions and government agencies. The proposed legislative amendment to the WDO comes in response to the 2024 Economic Opportunities Analysis (EOA). The principal purpose of the EOA is to ensure the City has an adequate land supply for economic development and employment growth. It provides an overview of economic trends locally, statewide, and nationally, and analyzes key industries that the City should target based on those economic trends. The intent of the proposed legislative amendment is to ensure those key industries identified within the EOA have a pathway for development within the City's industrial zoning districts. As analyzed under Goal 1, affected governmental agencies have been provided notice of the proposed legislative amendment. Staff finds that the proposed legislative amendment is consistent with Statewide Planning Goal 2. Goad 9 -- Economic Development Goal 2 requires each local government in Oregon to plan for economic growth opportunities and ensure enough land is available for them. As analyzed under Goal 2, the proposed legislative amendment to the WDO comes in response to the 2024 EOA. The principal purpose of the EOA is to ensure the City has an adequate land supply for economic development and employment growth. It provides an overview of economic trends locally, statewide, and nationally, and analyzes key industries that the City should target based on those economic trends. The intent of the proposed legislative amendment is to ensure those key industries identified within the EOA have a pathway for development within the City's industrial zoning districts. Staff finds that the proposed legislative amendment is consistent with Statewide Planning Goal 9. Consistency with Woodbuim Coimp ireIheiresiive Pan Goals and PoIHiiciies The City's Comprehensive Plan already contains goals and policies that help the City achieve its economic development and industrial lands planning objectives.These existing goals and policies, specifically Goal E-2 and Policy E-2.1, provide a strong policy basis and framework to support adoption of the proposed legislative amendment. No amendments are proposed to the goals and policies found within the Comprehensive Plan. LA 26-04 Planning Commission Staff Report Attachment 101: Analyses& Findings Page 2 of 4 245 Exhibit C Conformance With theWoodburn D eve IIo p meint. OrOrdinance 4.01 Decision-Making Procedures 4.01.02 Assignment of Decision-Makers: The following City entity or official shall decide the following types of decisions: E. Type V Decisions (Legislative): Type V decisions involve legislative actions where the City Council enacts or amends the City's land use regulations, comprehensive plan, Official Zoning Map or some component of these documents. Type V decisions may only be initiated by the City Council. The Planning Commission holds an initial public hearing on the proposal before making a recommendation to the City Council. The City Council then holds a final public hearing and renders a decision. Public notice is provided for all public hearings (Section 4.01.14). The City Council's decision is the City's final decision and is appealable to LUBA within 21 days after it becomes final. 4.01.09 Initiation of a Legislative Proposal A.The City Council may initiate the consideration of a legislative decision by resolution. B. Actions initiated by the Council shall be referred to the Planning Commission for a public hearing and recommendation to the Council. C. The City Council shall hold the final public hearing on a proposed legislative decision. Staff Finding: The Planning Commission hearing is scheduled for May 14, 2026, and the City Council hearing is tentatively scheduled for June 8, 2026, pending a recommendation to the Council by the Planning Commission. On April 9, 2026, staff sent a Post-Acknowledgement Plan Amendment (PAPA) notice to the Department of Land Conversation and Development (DLCD) in compliance with OAR 660-018- 0020. The City mailed notice to affected government agencies in conformance with WD0 4.01.14.D. on April 24, 2026, and published notice of both the Planning Commission and City Council hearings in the Herald-Independent newspaper on May 6, 2026. The provisions are met. Cc in'c r rn ante WiL:Ih 0 RS 2 2 7. il 86 Notice to property owners of hearing on certain zone change;form of notice; ... (2) All legislative acts relating to comprehensive plans, land use planning or zoning adopted by a city shall be by ordinance. Staff Finding: Pending a decision from the City Council following its public hearing, the Council would adopt an ordinance enacting the approved amendment. LA 26-04 Planning Commission Staff Report Attachment 101: Analyses& Findings Page 3 of 4 246 Exhibit C (3) ... at least 20 days but not more than 40 days before the date of the first hearing on an ordinance that proposes to amend an existing comprehensive plan or any element thereof, or to adopt a new comprehensive plan, a city shall cause a written individual notice of a land use change to be mailed to each owner whose property would have to be rezoned in order to comply with the amended or new comprehensive plan if the ordinance becomes effective. (4) At least 20 days but not more than 40 days before the date of the first hearing on an ordinance that proposes to rezone property, a city shall cause a written individual notice of a land use change to be mailed to the owner of each lot or parcel of property that the ordinance proposes to rezone. (5) An additional individual notice of land use change required by subsection (3) or (4) of this section shall be approved by the city and shall describe in detail how the proposed ordinance would affect the use of the property.The notice shall: . . . (6) At least 30 days prior to the adoption or amendment of a comprehensive plan or land use regulation by a city pursuant to a requirement of periodic review of the comprehensive plan under ORS 197.628, 197.633 and 197.636,the city shall cause a written individual notice of the land use change to be mailed to the owner of each lot or parcel that will be rezoned as a result of the adoption or enactment. (7) Notice provided under this section may be included with the tax statement required under ORS 311.250. (8) Notwithstanding subsection (7) of this section, a city may provide notice of a hearing at any time provided notice is mailed by first class mail or bulk mail to all persons for whom notice is required under subsections (3) and (4) of this section. (9) For purposes of this section, property is rezoned when the city... Staff Finding: This legislative amendment does not propose any changes to the Woodburn Comprehensive Plan nor any rezoning of property. Because the City is not changing the base zoning classification of property, in other words neither rezoning nor making a zone change, Sections (3), (4) and (5) above are not applicable. Because the proposed amendment is not pursuant to a requirement of periodic review, Sections (6) & (7) & (8) are not applicable. (10) The provisions of this section do not apply to legislative acts of the governing body of the city resulting from action of the Legislative Assembly or the Land Conservation and Development Commission for which notice is provided under ORS 197.047 or resulting from an order of a court of competent jurisdiction. Staff Finding: The proposed legislative amendment does not result from actions of the Legislative Assembly or the Land Conservation and Development Commission (LCDC). ORS 197.047 is not applicable. As a result, the City of Woodburn is not required for LA 26-04 to do a "Measure 56" notice, the phrase referring to Ballot Measure 56 (1998) that the legislature codified in ORS 227.186, which the legislature later revised via Senate Bill 516 (2003). The provisions are met. LA 26-04 Planning Commission Staff Report Attachment 101: Analyses& Findings Page 4 of 4 247 rr_ � A�z� t:-ife�• WTOO __ Inc orpornreA 1889 June 8, 2026 TO: Honorable Mayor and City Council through City Manager FROM: Heather Pierson, City Recorder & Insurance Fund Manager SUBJECT: FY 2025-26 Transfer of Appropriations Request within the Insurance Fund RECOMMENDATION: Adopt the Resolution authorizing up to $10,000 transfer from the Insurance Fund's Contingency to Materials and Services category. BACKGROUND: Every year, after Council budget adoption, circumstances arise that were either unforeseen, unquantifiable, or discovered as errors. Oregon Budget Law, ORS 294.471 (1) provides for changes to adopted budgets through a transfer resolution orsupplemental budget process that notices the proposed changes. Transfers not in excess of 15 percent of any fund's total expenditures may be made through a resolution without adoption of a supplemental budget. The proposed transfer of Insurance Fund appropriations is 0.6 percent of the Fund's total budgeted expenditures. DISCUSSION: Insurance Fund (581 ): Contingency $10,000 Authority is requested to move $10,000 from Contingency to the Materials and Services category. Insurance Fund (581 ): Materials and Services $10,000 The increase represents additional funds needed as a precautionary measure in consideration of limited remaining expenditure authorization and the potential need to expend funds for unforeseen insurance costs which may arise before the end of the fiscal year. Agenda Item Review: City Manager_X_ City Attorney_X_ Finance_X_ 248 Honorable Mayor and City Council June 8, 2026 Page 2 FINANCIAL IMPACT: If the resolution is approved, $10,000 will be transferred from the Insurance Fund's Contingency to Materials and Services expenditure category. This transfer will not change the Fund's total budgeted expenditures. Insurance Fund(581) Budget Appropriation Transfers In(Out) Revised Appropriation Expenditures Materials &Sevices $ 1,032,960 $ 10,000 $ 1,042,960 Contingencies &Reserve $ 427,400 $ (10,000) $ 417,400 249 COUNCIL BILL NO. 3303 RESOLUTION NO. 2262 A RESOLUTION AUTHORIZING THE TRANSFER OF APPROPRIATIONS WITHIN THE INSURANCE FUND FOR THE FISCAL YEAR 2025-2026 WHEREAS, on June 9, 2025, the Woodburn City Council approved a Resolution adopting a budget for the fiscal year 2025-2026, wherein funds were appropriated; and WHEREAS, ORS 294.463 provides that transfers of appropriations may be made within a given fund when authorized by Resolution of the City Council; and WHEREAS, the City routinely budgets certain amounts and contingencies to provide budget resources to fund appropriations not anticipated at the time of budget adoption; and WHEREAS, Transfers may be made from an operating contingency appropriation to the appropriation category from which it will be expended; and WHEREAS, Contingency transfers that in aggregate during a fiscal year do not exceed fifteen percent (15%) of the total appropriations of the fund contained in the original budget may be made through a resolution without adoption of a supplemental budget; and WHEREAS, Changes to previously budgeted appropriations in the Insurance Fund are needed in consideration of limited remaining expenditure authorization and the potential need to expend funds for unforeseen insurance costs which may arise before the end of the fiscal year. NOW, THEREFORE, THE CITY OF WOODBURN RESOLVES AS FOLLOWS: Section 1. Transfer of Appropriations. The following Transfer of Appropriations within the Insurance Fund for the 2025-2026 fiscal year is hereby approved: Insurance Fund(581) Budget Appropriation Transfers In(Out) Revised Appropriation Expenditures Materials &Sevices $ 1,032,960 $ 10,000 $ 1,042,960 Contingencies &Reserve $ 427,400 $ (10,000) $ 417,400 Page 1- Council Bill No. 3303 Resolution No. 2262 250 Approved as to form: City Attorney Date Approved: Frank Lonergan, Mayor Passed by the Council Submitted to the Mayor Approved by the Mayor Filed in the Office of the Recorder ATTEST: Heather Pierson City Recorder City of Woodburn, Oregon Page 2- Council Bill No. 3303 Resolution No. 2262 251 COUNCIL BILL NO. 3304 RESOLUTION NO. 2263 A RESOLUTION ADOPTING THE FISCAL YEAR (FY) 2026-27 BUDGET; MAKING BUDGET APPROPRIATIONS; AND CATEGORIZING TAXES WHEREAS, the City Manager, as Budget Officer for the City of Woodburn, Oregon, prepared and submitted the FY 2026-27 budget to the Budget Committee at its April 25, 2026 meeting; and WHEREAS, the April 25, 2026 Budget Committee meeting was noticed by publication in the Woodburn Independent newspaper on April 15, 2026; and WHEREAS, a public hearing was held at the April 25, 2026 Budget Committee meeting after which time the budget was approved; and WHEREAS, the Notice of Budget Hearing and Financial Summary were published in the Woodburn Independent newspaper on May 27, 2026 as required by ORS 294.438; and WHEREAS, a second public hearing was held before the City Council at its meeting on June 8, 2026; NOW, THEREFORE THE CITY OF WOODBURN RESOLVES AS FOLLOWS: Section 1. The City Council adopts the budget for FY 2026-27 in the sum of $253,740,180. A copy of the budget document is now on file at City Hall, 270 Montgomery Street, Woodburn, Oregon. Section 2. The City Council imposes the taxes provided for in the adopted budget at a permanent rate of $6.0534 per $1 ,000 of assessed value for operations. These taxes are hereby imposed and categorized for tax year 2026-27 based upon assessed value of all taxable property within the City. General Government Excluded from Limitation Permanent Rate Limit $6.0534/$1,000 - Page 1 -COUNCIL BILL NO. 3304 RESOLUTION NO. 2263 252 Section 3. FY 2026-27 budgets are appropriated at the fund levels shown: Organization Operating* Transfers Debt Contingency Total Reserves Total Administration 2,384,880 - - - 2,384,880 - 2,384,880 Economic Development 517,630 - - - 517,630 - 517,630 Police 13,410,300 - - - 13,410,300 - 13,410,300 Community Services 3,981,750 - - - 3,981,750 - 3,981,750 Planning 1,040,580 - - - 1,040,580 - 1,040,580 Engineering 478,500 - - - 478,500 - 478,500 Non-Departmental 1,763,940 996,000 - - 2,759,940 - 2,759,940 General Fund 5,894,400 5,894,400 7,952,940 13,847,340 Total General Fund 23,577,580 996,000 - 5,894,400 30,467,980 7,952,940 38,420,920 Transit 3,348,900 - - 1,331,220 4,680,120 - 4,680,120 Community Center 482,900 - - 1,057,100 1,540,000 - 1,540,000 Building 3,086,140 - - 11,256,360 14,342,500 - 14,342,500 Asset Forfeiture 34,590 - - - 34,590 - 34,590 National Opioid Settlement 48,000 - - - 48,000 - 48,000 American Rescue Plan - - - - - - - Housing Rehab 76,260 - - - 76,260 - 76,260 Street 4,892,020 2,061,000 - 4,381,410 11,334,430 - 11,334,430 GO Debt Service - - - - - - - General Cap Const 3,875,390 500,000 - - 4,375,390 - 4,375,390 Community Ctr Cap Const 18,272,050 1,000,000 - - 19,272,050 - 19,272,050 Special Assessment 3,000 - - 56,230 59,230 - 59,230 Street/Storm Cap Const 11,375,000 200,000 - - 11,575,000 1,791,800 13,366,800 Parks SDC 21,400 5,361,890 - - 5,383,290 4,443,820 9,827,110 Transportation SDC - 5,406,890 - - 5,406,890 26,612,290 32,019,180 Storm SDC 90,000 35,000 - - 125,000 1,097,670 1,222,670 Sewer Cap Const 9,050,000 - - - 9,050,000 23,840 9,073,840 Water Cap Const 10,700,000 - - - 10,700,000 714,640 11,414,640 Water 4,256,490 6,006,000 - 425,650 10,688,140 3,278,120 13,966,260 Sewer 7,990,530 4,122,000 - 1,598,110 13,710,640 34,001,060 47,711,700 Water SDC 200,000 4,794,000 - - 4,994,000 2,940,240 7,934,240 Sewer SDC 100,000 5,168,000 - - 5,268,000 1,727,200 6,995,200 Information Technology 1,930,790 - - 233,390 2,164,180 170,000 2,334,180 Insurance 1,204,250 - - 297,130 1,501,380 - 1,501,380 Equipment Replacement 1,765,230 - - - 1,765,230 - 1,765,230 PERS Reserve - - - 391,120 391,120 - 391,120 Lavelle Black Trust 10,000 - - 23,140 33,140 - 33,140 TOTAL 106,390,520 35,650,780 - 26,945,260 168,986,560 84,753,620 253,740,180 *Operating Budget:Personnel,Materials and Services,and Capital Outlay Approved as to Form: City Attorney Date APPROVED: Frank Lonergan, Mayor Passed by the Council Submitted to the Mayor Approved by the Mayor Filed in the Office of the Recorder ATTEST: Heather Pierson, City Recorder City of Woodburn, Oregon Page 2-COUNCIL BILL NO. 3304 RESOLUTION NO. 2263 253 COUNCIL BILL NO. 3305 RESOLUTION NO. 2264 A RESOLUTION DECLARING THE CITY OF WOODBURN'S ELIGIBILITY AND ELECTION TO RECEIVE STATE REVENUE SHARING WHEREAS, the City of Woodburn desires to receive a share of state revenues apportioned and distributed to the cities of the state during Fiscal Year 2026-2027 as provided in ORS 221 .760 and ORS 221 .770; and WHEREAS, ORS 221 .760 provides as follows: The officer responsible for disbursing funds to cities under ORS 323.455, 366.785 to 366.820 and 471 .805 shall, in the case of a city located within a county having more than 100,000 inhabitants according to the most recent federal decennial census, disburse such funds only if the city provides four or more of the following services: (1 ) Police protection (2) Fire protection (3) Street construction, maintenance and lighting (4) Sanitary sewers (5) Storm sewers (6) Planning, zoning and subdivision control (7) One or more utility services WHEREAS, ORS 221 .770(1)(a) requires that any city electing to receive a distribution must enact an ordinance or resolution expressing that election and file the same with the Oregon Department of Administrative Services no later than July 31; and WHEREAS, ORS 221 .770(1 )(b) requires that any city electing to receive a distribution must hold at least one public hearing at which citizens have the opportunity to provide written or oral comment on the possible uses of the distributions. NOW, THEREFORE THE CITY OF WOODBURN RESOLVES AS FOLLOWS: Section 1. That the City Council of the City of Woodburn hereby certifies that it provides the following four or more municipal services enumerated in Section 1, ORS 221 .760: Page 1 - Council Bill No. 3305 Resolution No. 2264 254 Police protection Street construction, maintenance and lighting Sanitary sewer Storm sewers Planning, zoning and subdivision control One or more utility services Section 2. The City of Woodburn hereby elects to receive distributions of state revenues during FY 2026-2027 pursuant to ORS 221 .770(1)(a). Section 3. The City Council hereby certifies that it conducted a public hearing, after giving public notice, on April 25, 2026 during the City of Woodburn Budget Committee Meeting, and on June 8, 2026 during a City Council meeting to adopt the budget, and called for written and oral comment on the possible uses of the distributions and that the hearing complied with ORS 221 .770(1)(b) and (c). Section 4. The City Recorder is directed to certify compliance with the public hearing requirements and file this resolution with the Oregon Department of Administrative Services by July 31, 2026. Approved as to Form: City Attorney Date APPROVED: Frank Lonergan, Mayor Passed by the Council Submitted to the Mayor Approved by the Mayor Filed in the Office of the Recorder ATTEST: Heather Pierson, City Recorder City of Woodburn, Oregon Page 2- Council Bill No. 3305 Resolution No. 2264 255 Page 3- Council Bill No. 3305 Resolution No. 2264 256 WWODBURN In or� arn reA 188 ______ A June 8, 2026 TO: Honorable Mayor and City Council, acting in its capacity as the Local Contract Review Board, through City Manager FROM: Jesse Cuomo, Community Services Director SUBJECT: Award of Construction Contract for the Settlemier Park Construction Project RECOMMENDATION: Award a construction contract for the Settlemier Park Construction Project to the lowest responsible and responsive bidder, First Cascade Corp. in the amount of $2,055,469.32 with an additional $125,000.00 for contingency, and authorize the City Manager to sign the Agreement. BACKGROUND: Settlemier Park, encompassing ten acres, was donated to the city by the Settlemier Park Association in 1946 and the park continues to feature black walnut trees originating from the original Jesse Settlemier tree farm. Historically, Settlemier Park served as a central gathering spot for the Woodburn community, hosting numerous memorable softball games and various celebrations including Fiesta Mexicana. However, with the establishment of the Centennial Park Baseball/Softball complex and other enhancements across the park system, the park's role in organized programming has diminished over time. Identified in the 2024 adopted Park Master Plan and in the light of substantial investments through Lottery Bond Funds and Park System Development Charges (SDCs) aimed at transforming the Woodburn Aquatic Center into the Mill Creek Community Center, it was prudent to seek funding for a significant renovation of Historic Settlemier Park. Many of its amenities have reached the end of their useful life, while others, such as the baseball fields, have been underutilized. Funding for this project has been successfully secured from various sources, ensuring that no general fund dollars will be allocated for its completion. The funding sources at this time include the following: the Oregon State Parks Local Government Grant amounting to $1 ,000,000; a funding allocationthe $,000,000 from Oregon State Representative Lesly Munoz, which will also support Agenda Item Review: City Manager_X_ City Attorney_X_ Finance X_ 257 Honorable Mayor and City Council June 8, 2026 Page 2 improvements to the Mill Creek Community Center parking lot with $500,000 of the $2,000,000 designated for parking enhancements to support the park; a contribution of $250,000 from U.S. Representative Andrea Salinas; $39,040 from Moda Health/Portland Trailblazers; and $20,000 from the Woodburn Rotary. This project is included in the approved budgets for FY 25/26 and the purposed FY 26/27 budget. Planned amenities will feature a large inclusive playground, a full court basketball court, the replacement of tennis and pickleball courts, sports court lighting, a spacious picnic shelter, upgrades and remodeling of restrooms, landscaping, irrigation, and walking trails. Three alternates have been identified and accepted for this project: (1) the choice between concrete and asphalt paths to enhance connectivity with the Mill Creek Community Center, (2) the option of a concrete versus asphalt sports courts, and (3) the selection of the Musco Lighting system for the basketball and tennis courts. Bids for the project were opened on May 21, 2026. Ten responsible and responsive bids were received, including base bids along with the options for alternates 1 (Concrete Path), alternate 2 (Concrete Sports Courts), and alternate 3 (Musco Court Lighting System). Contractor Base Bid Base Bid + Alternates (1-3) Listed Lowest to Highest First Cascade Corp. $1,799,601 .32 $2,055,469.32 Creative Contracting, Inc. $1,976,770.97 $2,168,737.97 Triplett Wellman $1 ,990,920.26 $2,219,520.26 The Saunders Co. Inc. $2,026,251 .00 $2,273,651 .00 Par-Tech Construction, Inc. $1,932,982.00 $2,320,002.00 Woodburn Construction $2,048,733.48 $2,364,733.48 CM/GC LLC ATK Construction Inc. $2,020,197.00 $2,419,697.00 Brown Contracting Inc. $2,266,270.00 $2,496,270.00 T Edge Construction, Inc. $2,399,243.00 $2,750,243.00 Gallant Construction $2,657,298.85 $2,954,907.16 The Engineer's estimate for the projects base bid was $1,800,000 to $2,000,000. 258 Honorable Mayor and City Council June 8, 2026 Page 3 DISCUSSION: This project represents one of the final significant enhancements planned for park system in the coming years. It will deliver a cohesive update to the entire park site, incorporating improvements to both Settlemier Park and restoring a Downtown Community anchor. The contract award is in conformance with public contracting laws of the State of Oregon as outlined in ORS Chapter 279C for the construction of public improvements and the public contracting regulations of the City of Woodburn. Therefore, staff is recommending the contract be awarded. FINANCIAL IMPACT: The subject project is identified in the adopted fiscal year 2025/26 budget and the proposed fiscal year 2026/27 budget and funded by the Oregon State Parks Local Government Grant Funds, State Legislative Funds, Federal Legislative Funding, Woodburn Rotary and Moda Health Grants, with any additional funding needed being provided by Park SDC's. 259