Loading...
April 13, 2026 URA Agenda GAN,CHAIR CITY OF WOODBURN FRANK LONER ORLANDO BRAVO,BOARD MEMBER WARD� MARK WILK, BOARD MEMBER WARD II URBAN RENEWAL AGENCY JEN CANTU, BOARD MEMBER WARD III SHARON SCHAUB,BOARD MEMBER WARD IV MARY BETH CORNWELL,BOARD MEMBER WARD V AGENDA ALMA GRIJALVA, BOARD MEMBER WARD VI APRIL 13, 2026 - 6:30 P.M. City Hall Council Chambers - 270 Montgomery Street 1 . CALL TO ORDER 2. ROLL CALL 3. CONSENT AGENDA A. Urban Renewal meeting minutes of February 23, 2026 1 Recommended Action: Approve the minutes. 4. PRESENTATIONS None. 5. PUBLIC HEARINGS None. 6. GENERAL BUSINESS A. URG #2026.02 - 575 and 585 N. Front Street I Graciela's & 3 Jerusalem Recommended Action: Approve the Building Improvements Program Grant Application (Program) from the owner of the properties located at 575 and 585 N. Front Street, Graciela's Salon and Jerusalem, Turk Investments LLC (Applicant), for 50% of the lowest bid received ($26,348) in the amount of $13,174. Program funding is requested for repairs and replacement of the roof system on the buildings, per the proposal submitted. B. URG #2026.03 - 237 N. Front Street I K-Bron Brewing Co 18 Recommended Action: Approve the Building Improvements Program Grant Application (Program) from the owner of the property located at 237 N. Front Street, K-BRON Brewing Co., Salvador Gasca (Applicant), for 50% of the lowest bid received ($6,217) in the amount of $3,109. Program funding is requested for installation of fencing and gate around back patio of restaurant, per the proposal submitted. April 13, 2026 Urban Renewal Agency Page i C. URG #2026.04 - 253 N. Front Street I Costa Azul 27 Recommended Action: Approve the Building Improvements Program Grant Application (Program) from the owner of the property located at 253 N. Front Street, Multiservicios Costa Azul Corp., Griselda Escott Villa and Javier Toscano Hernandez (Applicants), for 50% of the lowest bid received ($27,500) in the amount of $13,750. Program funding is requested for storefront restoration and improvements to include window and door replacement and framing structure repairs as well as painting the exterior of the building upon completion. 7. PUBLIC COMMENT 8. ADJOURNMENT April 13, 2026 URBAN RENEWAL AGENCY BOARD MEETING MINUTES FEBRUARY 23, 2026 DATE COUNCIL CHAMBERS, CITY HALL, CITY OF WOODBURN, COUNTY OF MARION, STATE OF OREGON, FEBRUARY 23, 2026 CONVENED The meeting convened at 6:50 p.m. with Chair Lonergan presiding. ROLL CALL Chair Lonergan Present Member Cantu Absent Member Cornwell Present Member Schaub Present—6:51 Member Grijalva Present Member Wilk Present Member Bravo Present Staff Present: City Manager Derickson, City Attorney Granum, Community Development Director Kerr, Human Resources Director Gregg, Special Projects Director Wakeley, Deputy Police Chief Shadrin, Finance Director Turley, Community Services Director Cuomo, Assistant City Attorney Killmer, Public Affairs and Communications Manager Guerrero, Public Works Director Stultz, Library Manager Jansen, City Recorder Pierson CONSENT AGENDA A. Urban Renewal meeting minutes of September 22, 2025 Motion: Wilk/Cornwell... adopt the Consent Agenda. The Motion passed with the following vote: Members Schaub, Grijalva, Cornwell, Bravo, and Wilk. voting"aye." [5-0] URG#2026.01 —347 N. FRONT STREET I METROPOLIS (NOVERA LLC) City Attorney Granum provided a brief overview of the staff report. Motion: Schaub/Bravo... approve the Building Improvements Program Grant Application from the owner of the property located at 347 N. Front Street, Metropolis Building, Novera LLC, in the amount of$50,000, which is the maximum amount available through this program; and represents less than the program guidelines of 25% of the overall investment of$230,740. The Motion passed with the following vote: Members Schaub, Grijalva, Cornwell, Bravo, and Wilk. voting"aye." [5-0] ADJOURNMENT Motion: Cornwell/Schaub... move to adjourn. The Motion passed with the following vote: Members Schaub, Grijalva, Cornwell, Bravo, and Wilk. Page 1 —URA Board Minutes, February 23, 2026 1 URBAN RENEWAL AGENCY BOARD MEETING MINUTES FEBRUARY 23, 2026 voting"aye." [5-0] Chair Lonergan adjourned the meeting at 6:57 p.m. APPROVED FRANK LONERGAN, CHAIR ATTEST Heather Pierson, City Recorder City of Woodburn, Oregon Page 2 —URA Board Minutes, February 23, 2026 2 W2cBuRN Ttem April 13, 2026 TO: Urban Renewal Agency FROM: Downtown Advisory Review Subcommittee (DARS) Jamie Johnk, Economic Development Director SUBJECT: URG #2026.02—575 and585 N. FRONT STREET I GRACIELA'S &JERUSALEM RECOMMENDATION: Approve the Building Improvements Program Grant Application (Program)from the owner of the properties located at 575 and 585 N. Front Street, Graciela's Salon and Jerusalem, Turk Investments LLC (Applicant), for 50% of the lowest bid received ($26,348) in the amount of $13,174. Program funding is requested for repairs and replacement of the roof system on the buildings, per the proposal submitted. DARS reviewed this proposal at their April 8, 2026 meeting and recommended approval from the URA for funding. BACKGROUND: The 575 and 585 N Front Street has commercial tenants on the first floor of each building (Graciela's Salem and Jerusalem), and the second floor is used for residential living. The connecting roof on the buildings is in poor condition and in need of replacement—a detailed scope of work is included in the submitted proposals. PROPOSAL: The Applicant has provided four (4) estimates and is proposing to accept the estimate from Navarro Company LLC in the amount of$26,348. • Navarro Company LLC $26,348 • Vitan Construction LLC $40,420 • Jobin Roofing $69,374 • Interstate Roofing $44,650 3 FINANCIAL IMPACT: The FY 2025-2026 Urban Renewal Building Improvements Program budget has sufficient funds to approve this $13,174 grant request. Program Criteria: • The properties are located at 575 and 585 N. Front Street and within the Urban Renewal District. • The proposal complies with the Woodburn Development Ordinance. Any necessary permits will be obtained from the city. O« The project encourages greater marketability of the Urban Renewal District. • The proposal will complement the existing and surrounding community. The project will be complimentary to the existing building as well as the surrounding buildings. • The Urban Renewal Program specifically identifies interior improvements as an eligible improvement within Woodburn's Urban Renewal District. Summary and Conclusion: The Program is intended to encourage and assist business and property owners to invest in the Urban Renewal District. This Application reflects the intent of the program by making improvements to the property and maintaining the useful life of the building. Conditions of Approval: 1. Invoices must be submitted for reimbursement. No grant money will be disbursed until the project is completed and is approved by the Agency. 2. Grant funds may be used for materials and services provided by licensed contractors. 3. Projects shall be completed within one year of approval to be eligible for reimbursement. Grants provide for a single payment after receipts are provided and all completed work is accepted by the City. 4. Licensed contractors will complete all work. Attachments: • Building Improvements Application URG #2026.02—575-585 N. Front Street I Turk Investments LLC Page 2 4 E� m �Nueui �a ,m �,.11Cr✓�'��� �a� re�ry ir�i �a�'�a��rv"'ai"Vhwl"""°hda°�'`nxn' ° WRN Building Improvements Program APPLICATION M Exterior Grant M Interior Grant D Design Services APPUCANT INFORMATION It N FOR OFFICE USE ONLY Naue:Turk Investments LLC Application Date: Phone: 949-610-4125 Approval Date: Tax ID number: 46-5770101 Amount Awarded: PROPERTY OWNER INIOI MATI1 N Property Address: 575-585 N. Front Street, Name: Woodburn Turk Investments LLC Phone/Email: 949-610-4125/rudy@equitywestcapital.com Address: 3408 Via Oporto - Suite C205 City: Newport Beach 8t: CA Zip: 92663 Owner's Signature: i atme. , .L1-6- X66 Date: 04/06/2026 BUSINESS AND OR PROJECT INFORMATION Name of Business: Gracelia's Salon and Jerusalem Business Owner's Name: Address: 575-585 N. Front Street Phone: City: Woodburn tate: OR Zip: 97071 Type of Business. Retail Upper Floor Use: Residential PROPOSED IMPROVEMENTS Improvements Type: D Interior Improvements Exterior Improvements Other Description: Roof repair and installation of membrane roofing system. Navarro Company LLC $26,348 Vitan Construction LLC 40,420 Jobin Roofing $69,374 Interstate Roofing $44,650 Contractor/Bid Selected: Navarro Company LLC-$26,348 If not the lowest bidder, explain why this contractor/bid was selected: 5 CERTIFICATION I BY APPLICANT The Applicant certifies that all information provided in this application is true and complete to the best of the Applicant's knowledge and belief. The Applicant represents to the City that this Agreement has been dully authorized by all necessary action on the part of the Applicant and no other corporate or other action on the part of the Applicant is legally required. If the Applicant is not the owner of the property to be rehabilitated, the Applicant certifies that it has the legal authority to sign and enter into an agreement to perform the proposed work on the building. Evidence of this legal authority must be attached. Applicant acknowledges and agrees the Agency shall have no obligation to pay any persons providing materials or performing Ilabor or to cause the release of any mechanics or other liens that may be recorded against the above property in connection with the proposed improvements. %u caiu ¢dttrr¢yr�`¢ LL?. - 5'a - 04/06/2026 Applicant's Signature Date ACKNOWLEDGMENT ENT PROPERTY OWNER (if different than Applicant) The Property Owner hereby acknowledges all the above terms of this application and agrees that the Agency shall have no obligation to pay any persons providing materials or performing labor or to cause the release of any mechanics or other liens that may be recorded against the above property in connection with the proposed improvements. CJ1 L/C- 04/06/2026 Property Owner's Signature Date 6 Proposal 2316-1 „ Issue Date December 2,2025 Ali ll'II'�0"AIl'lll'II II If II�II'lll'11''," AIl'lll'II ll::: 11I'l Thomas Navarro Rudy Navarro Company,LLC Rudy (541)609-0829 (949)610-4125 cthomas.navarro@gmail.com rudy@equitywestcapital.com 3185 SE Hathaway Dr,Corvallis,OR 97333,USA 575 N Front St,Woodburn,OR 97071,USA X11''(,�II'�O t/6A11 II.II'IP/6,$o'i 11 n 575 North Front Street 575 N Front St,Woodburn,OR 97071,USA PVC overlay bid. PVC Roof 1 Each $26,348.00 $26,348.00 Scope of Work • Preparation • Inspect existing roof surface for suitability of PVC overlay • Clean and prepare roof area-Remove debris and ensure drainage pathways remain clear. • Installation • Supply and install premium PVC roofing membrane over existing roof system • Mechanically fasten and heat-weld seams for watertight integrity • Flashing installation around penetrations,edges,and parapet walls • Integrate with existing drainage system(gutters,scuppers,downspouts) • Finishing • Conduct quality assurance inspection of all seams and flashing • Ensure roof meets manufacturer specifications and local building codes • Provide warranty information on materials and workmanship Exclusions • Structural modifications to existing roof framing(if required,will be addressed separately) Notes • All permits will be obtained and provided by us • Work will be performed in compliance with OSHA safety standards. i`Oli`�11 $26,348.00 AYIVI IvISSIAl 1111IN a I'ftO 2611/month on Acorn IIII earurm Ill'711taurc 10-year craftsmanship warranty from us and 25 years from Membrane.We take pride in our top-notch craftsmanship!:[f you would like to see some of our recent work we can send pictures to look at, [f you have any questions you can call or text me anytime!Thank you for considering Navarro Company for your project! The above specifications,costs,and terms are hereby accepted. December 3, 2025 at 12:07 PM PST (ILDIII'(.Ill(,Tiimvllllif(II(IIIN111111i111 "II(5„IIII IIIl..C Ill'(.ILUIIII: "fi(Ill'":Ally :A11(Illli 1 of 1 7 December 3,2025 Rudy Fan Roof Replacement: 575-585 Front St Rudy Fan 575-585 Front St Woodburn, OR 97071 949.610.4125 rudy@equitywestcapital.com Thoughtfully prepared by: ,i ' fi Zac Lindemann (503) 893-9982 zac@jobinroofingcom Serving our community with honesty, integrity, and high-quality work. MItA air E5T0 1956 asp WA LAC:jOB➢:NR.➢:..,824MZ OR.CCiB:221810 1 8 December 3,2025 Rudy, Thank you for the opportunity to inspect your roof. Below is your estimate for a new commercial 60mi1 TPO membrane roofing system. Please let me know if you have any questions. Sincerely, Zac Lindemann WA➢:..A.C jOB➢:NR.➢:..,824MZ OR.CCB:221810 2 9 December 3,2025 Why Choose Jobin? Honesty. Integrity. Dependability. Peace of mind. Your roof is the first line of defense for your property. It is an investment, and you deserve to have the peace of mind knowing that it was done right by a company who will stand behind it. We: -are experienced, thorough, and detail-oriented -proactively communicate - use only products we believe in, installed with best practices -pursue continuous industry education -have a strong mission to do the right thing and be good stewards of the community we live and work in We believe we owe it to you to honor your trust by giving you our best before, during, and after the project. In addition to the manufacturer warranty, we give everyone our Jobin 15 Year Unlimitedly Transferable Workmanship Warranty, which means you're covered for anything that goes wrong for 15 years due to an installation issue (INCLUDES repair of any related incidentals). Please check out our Y"/L reviews. I hope you will see our dedication to our customers and passion for roofing. We love what we do and would love the chance to provide you an amazing project experience. WA➢A.C:jOB➢:NR.➢:.., 24MZ OR.CCB:221810 3 10 December 3,2025 ��! °° ° ° ° ��1 III IIII III VIII°1°1 I° °1 °°IIIIIIII VIII���IIlllllll IIIIIIIIII �� VIII Tear Off Existing and Install New TPO Membrane Roofing System $60,823 60-mil commercial grade TPO, mechanically fastened with heat weld seams, installed to manufacturer specs Manufacturer Limited Lifetime Warranty and Jobin 15 Year Workmanship Warranty Included Install Fanfold Protective TPO Underlayer $3,906 Provides barrier between decking fasteners and TPO to help prevent puncture from decking fasteners Replace Perimeter Cap Metal with New $3,178 Hemmed seams for optimal weather protection Replace/ Install Any Plywood Decking (1/2" CDX) $70/sheet Note: Full layer of plywood deck may need to be installed if existing decking is old/deteriorated shiplap or other unsuitable decking material. Full layer would be around 114 sheets. Replace 9 TPO RVO Exhaust Vents $1,467 .... Reflash Any Additional Penetrations (Electrical, Mechanical Vents, etc) $85/manhour + materials Estimate Total $69,374 --------------SCOPE OF WORK-------------- Remove existing layer one lay.. of adhered down to existing roof deck. Y roofing Note:Core sample can determine how many pre-existing layers may be present and whether additional removal/disposal costs would apply. Install/replace any plywood needed to provide clean and consistent roof deck (1/2" CDX plywood = $70/sheet installed) Install fanfold TPO protective underlayer Install new TPO roofing membrane, mechanically fastened with heat weld seams, install to manufacturer specs WA➢:..A.C jOB➢:NR.➢:..,324MZ OR.CCB:221310 4 11 December 3,2025 Install new perimeter cap metal Reflash plumbing vents with TPO flashing Reflash all other existing roof penetrations Replace roof vents with new TPO roof vents Protect sensitive landscaping. Clean gutters of roofing debris and magnet sweep ground for nails. Clean and haul away all debris. If any additional construction/ repair is needed it will be addressed at $85/manhr+ material /disposal costs. ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Jobin Roofing to provide portable restroom for crew Contact Jobin Roofing if you need assistance with the permitting process Please note: Code requires that all nails penetrate through the roof decking. Please note that in some scenarios this may cause some nails to poke through any exposed eaves (depending on age, paint, plywood thickness and condition). Any siding or eave and paint touch ups will be responsibility of property owner. **Estimate is valid for 30 days, unless a material price increase of 5%occurs, in which case Jobin will need to re-adjust estimate to reflect new material pricing.** WA➢A.C:jOB➢:NR.➢:.., 24MZ OR.CCB:221810 5 12 December 3,2025 Acceptance In signing this acceptance, I agree to enter into a legal and binding contract for the scope of work defined in this proposal. This contract is contingent upon the absence of strikes,accidents,or delays that are beyond Jobin Roofing LLC's control. As the owner of this property, I am to carry homeowner's insurance. Jobin Roofing LLC provides a 15-year labor guarantee on roof replacements only. By signing this document, I am agreeing to comply with the following terms: 1) 30%deposit due before work begins 2) The remaining balance, including any additionals due upon the completion of work Checks will be made out to Jobin Roofing LLC. Balances past 30 days will incur a compounding finance charge of 5%per month. I understand that if I do not make the timely payment of the remaining balance upon completion,Jobin Roofing LLC may exercise its right to file a mechanics lien against the property with the possibility of foreclosure and public sale. All other charges,taxes,assessments,and fees of any kind, required by any government body,telephone,or utility company shall be paid for by the owner unless stated otherwise in the contract. Unless the customer states otherwise, Jobin Roofing LLC has permission to use photos for business purposes. By signing below,you are also stating that you have received, read,and understand the following required legal disclosure forms as required by the state of Oregon or Washington. (Oregon 1: Consumer Protection Notice,2: Notice of Procedure and 3: Information Notice to Owner about Construction Liens. Washington 1:Model Disclosure Statement Notice to Customer) Customer Signature Customer Printed Name Date Shingle Color You have the right to cancel this transaction at any point before midnight on the third business day from the date of this transaction with written notice. Alterations or deviations from the proposed scope of work that involve additional materials and/or labor costs will only be addended by written notification. V'VA➢:..JC jOB➢:NR.➢:.., 24MZ OR.CCB:221810 6 13 INTERSTATE ROOFING 15065 SW 74th Ave Office 503-684-5611 Portland,OR 97224 Fax 503-639-3056 www.interstateroofing.com Date:December 2,2025 Proposal Submitted to:Equity West Capital Job Location:575 North Front Street Attn:Rudy Fan Woodburn,OR 97071 Phone:949-610-4125 Email:rudy@equitywestcapital.com We hereby submit specifications and Budget Estimates for:Recovering existing roofing material by installing TP0 single ply membrane—See roof report for scope of work details. SCOPE OF WORK Setup safety per OSHA standards Prepare roof for recover Cover over existing roof system Replace decking with similar material,where required(*additional cost,see below) Mechanically attach class A fire rated barrier board Mechanically attach GAF 60 mil TPO single ply membrane(white) Attach TPO membrane up and over parapet wall where possible Custom fabricate and install TPO clad metal perimeter edge flashings(white) Custom fabricate and install 26 gauge perimeter cap and wall metal(white) Replace existing static vents with new metal high neck RVO 38 vents(white) Reuse existing ventilation systems Flash all roof penetrations with TPO flashing membrane Reuse existing gutters and downspouts Provide outhouse for the duration of the project Clean up and properly dispose of all roofing related debris Any needed permits/sidewalk closures/street closures will be obtained and added to final invoice Crane pricing for loading and unloading material and equipment included Inspections daily and upon completion Manufacturer's inspection and grading upon completion 20 year Manufacturer's NDL"No Dollar Limit"Material,Labor,and Workmanship Warranty Included(Non-Prorated) Total investment for scope of work detailed above: $44,650 Recommendation 1: Install R30 Above Deck Insulation To Meet Current Energy Code Requirements Remove barrier board from scope of work above and mechanically attach 2 layers of Energy Guard polyisocyanurate insulation(for a total R-value of approximately 30). Raise perimeter edge to match insulation height as needed. Includes 20 year No Dollar Limit Warranty from manufacturer.This recommendation will also reduce the possibility of condensation. Because of the addition of insulation,some roof mounted equipment may need to be raised by others. Add $19,850 Accept: Decline: (see below for details) In the Pacific Northwest condensation is a major concern. GAF and other manufacturers recommend installing above deck rigid insulation to minimize the possibility of condensation beneath the single ply membrane. Recommendation/Option NOTE: If any recommendation is not signed in the"Accept or"Decline"section,it is considered Declined Assumptions: No overtime or weekend pricing is included with this roofing proposal.Any electrical must be removed and replaced by others as needed.Any HVAC curbs and ductwork should be replaced by others as needed.Scope of work is for roofing within highlighted area on cover page of roof detail report. No awnings,entries or other connected structures included in proposal. Any needed siding,painting or interior finish work must be done by others and is not included in this roofing proposal.Condensation may be an issue within the existing building and roof space.Above roofing deck insulation OREGON#: 244218 / WASHINGTON#: INTERRL776BC 14 may help slow further condensation damage but it is NOT the sole remedy. Other measures MUST be taken to cure the condensation problems within the building and roof cavity/roof area. These other measures may include,but are not limited to;dehumidifiers within the building,fans with humidistats,kitchen fans,air exchangers,etc. Interstate Roofing is not responsible for evaluation of overflow drainage systems. Any satellites on roof may need to be recalibrated by others after roofing project.Dust will fall through existing decking.Parking lot will be made available for roof restoration project. Estimate does not include any seismic upgrades that may be required on the building. The Owner realizes that fasteners through the roof deck may be visible from the interior in exposed locations. Interstate assumes that neither lead,nor asbestos containing roofing materials(ACRM)exist; if lead or ACRM are discovered it will be contained and/or abated in accordance with local,state and federal requirements at an additional cost. GAIu :W ill IIj1i; A I",y^'N+;Wartranty III:,tenstiii n 20 year extends to 25 years Well Roof Annual Preventative Maintenance,$750 per visit,for the first 3 visits. Accept: Decline: NOTE(1): All electrical and gas lines,HVAC and duct work preparation,removal,repair,and/or replacement is not included unless stated Damage to the above mentioned is not the responsibility of Interstate Roofing Inc. NOTE(2):Seismic upgrades are not included and it is the building owner's responsibility to notify us if one is required. WE PROPOSE HEREBY to furnish material and labor—complete in accordance with the above specifications for the contract amount stated above,taxes not included. Payment to be made as follows:30%due upon acceptance;balance due upon completion. If a job has phases;payments will be phased also.We accept Visa, Mastercard and Discover with an additional 2.5%processing fee. A late charge of 1%%per month will be applied to accounts unpaid for over 30 days. If any option is not initialed,it is assumed declined. The above scope of work and investment are based solely upon a visual observation. During the project other deficiencies may be discovered which require additional work,for example: dry rot,delaminated plywood,but not limited to these items. Additional work is billed at$95.00 per man-hour plus materials,disposal,mobilization and markup on such. To not slow the progress of the job or leave the roof open to the elements,this may be done as it occurs;written change orders are not required. Paint is not included. The above stated price is based upon one mobilization. If multiple mobilizations are required for such things such as working with other trades, or to respond to leaks prior to roof commencement,work will be billed at our stated time and material rates. ACCEPTANCE OF ESTIMATE: Customer accepts the above prices,specifications and conditions. Interstate Roofing("Interstate")is hereby authorized to do the work as specified. By signing this contract,Customer affirms that Customer has read,understands and agrees to the Terms,Conditions and Additional Information attached to this contract,including the documents listed. Customer also gives Interstate permission to use pictures taken of Customer's property in Interstate's advertising. You,the buyer,have the legal right to cancel this transaction at any time prior to midnight of the third business day after the date of this transaction.See the attached notice of buyer's right to cancel for an explanation of your right to cancel. Cody Nation 12-2-25 Customer Signature Date Interstate Representative Date TERMS,CONDITIONS AND ADDITIONAL INFORMATION: Interstate is a certified firm authorized to conduct lead-based paint activities and remove certain asbestos containing roofing materials,however,the above price and scope of work,unless specifically stated above,is based on not encountering lead,asbestos,or any other toxic material in,on or around the jobsite.If such materials are found,Interstate shall be entitled to additional time and compensation based upon our stated time and material rates.Customer is responsible for notifying Interstate of any asbestos containing,lead containing,or other toxic materials on site.It is the building owner's and/or owner's agent responsibility to:notify tenants of the presence of lead paint,asbestos,and/or any other toxic containing material,and notify tenants that lead containment work and/or other toxic containing material work may occur while the job is being performed,and to provide tenants with the Renovate Right pamphlet. Customer is aware that some roofing products emit fumes,vapors and odors during the application process. Customer shall be responsible for interior air quality, including controlling mechanical equipment,HVAC units,intake vents,wall vents,windows,doors and all other openings to prevent fumes and odors from entering the home/building and shall hold Interstate harmless from claims from third parties relating to fumes and odors that are emitted during the normal roofing process. Customer acknowledges that re-roofing of an existing building may cause disturbance and falling debris such as dust,debris,insulation,fireproofing,etc.to fall into the interior.Customer agrees to remove or protect property directly below the roof in order to minimize potential interior damage.Customer shall notify tenants of re- roofing and the need to provide protection underneath areas being reroofed.Interstate is not responsible for disturbance,damage,clean up or loss to interior property. Positively connecting ducts to vents and/or fans is not included in the scope of work and is not the responsibility of Interstate. This type of work should be completed by a licensed HVAC contractor after the roofing project is complete.Interstate strongly suggests a professional HVAC contractor inspect ducting and fans after the roofing project is completed. By signing this contract,Customer recognizes,acknowledges,and accepts that Interstate Roofing has informed Customer about the possibility or likelihood of condensation/moisture and possible resulting damage that may be caused by condensation/moisture within the roof system;and Customer will indemnify,defend and hold Interstate harmless for any and all condensation and/or ventilation issues and/or consequential damage,even if additional ventilation is installed.Customer agrees that Interstate is not responsible for moisture migration from the building interior or other building components into the roofing system.Interstate is not responsible for location or size of roof drains,adequacy of drainage or ponding on the roof due to deck or structural conditions. Although Interstate and most manufacturers recommend to always remove all layers of roofing,some customers would like the option of a recover. In the case of a recover,it is not possible to determine if rot is present.Therefore,if Customer requests a recover notwithstanding the foregoing risks,Customer waives any claims against Interstate for covering over rot,organic growth,or any other sort of microbial growth and Customer further agrees to indemnify,defend,and hold Interstate harmless from any claims for covering over rot,organic growth or any other sort of microbial growth following a recover. Interstate's price is based upon there not being electrical conduit,plumbing pipes,cables or other materials embedded within the roof assembly or attached directly to the bottom or topside of roof deck. Interstate is not responsible for repair or damages,including disruption of service,resulting from damage to undisclosed or concealed electrical or other utility lines. Customer will indemnify,defend and hold Interstate harmless from claims and expenses if Customer fails to notify Interstate of such electrical or turn-off power so as to avoid injury resulting from the presence of concealed electrical conduit and live electrical power. This roofing project is designed to protect the topside of the roof deck from the elements. Commencement of the roof work indicates only that the surface of the deck appears satisfactory to attach roofing materials.Customer warrants that the structure on which Interstate is to work is in sound condition and capable of withstanding roofing construction,equipment and operations. Interstate is not responsible for the construction,structural sufficiency,undulations,durability,fastening,moisture content,suitability,or physical properties of the roof deck or other trades'work or design,nor is Interstate responsible to test or assess moisture content of the deck or substrate. Interstate does not provide design,engineering,consulting,or architectural services. It is the Customer's responsibility to retain a licensed architect or engineer to determine proper design and code compliance,including a determination as to whether and what type of a vapor or air retarder is needed and calculation OREGON#: 244218 / WASHINGTON#: INTERRL776BC 15 or verification of wind-load design.Interstate cannot be held responsible for any pre-existing issues,or issues that may arise during or after the completion of the project that have to do with anything below the topside of the roof deck,for example:organic growth,mildew,or any other microbial growth anywhere in the building or attic space;ducting,and ducting connections,fans(bath fans,kitchen fans,dryer fans,etc.),firewall venting,structural sufficiency,insulation,blockage of or lack of intake and/or exhaust ventilation,but not limited to these items,are not the responsibility of Interstate. To the extent minimum wind loads or uplift pressures are required,Interstate's proposal is based solely on manufacturer's printed test results.Interstate makes no representation regarding wind uplift capacity and assumes no liability for wind uplift. It is Customer's and/or the building owner's and/or owner's agent's(collectively,"Customer")responsibility to notify Interstate if any federal and/or state money is being used to fund this project or if the building is insured by Factory Mutual,as additional work and/or costs are generally required. If this job requires certified payroll or the payment of Davis Bacon wages,it is the building owner's responsibility to notify Interstate of the wage prior to bid. Unless specifically stated above,the price and scope of work are based on standard Interstate wages. If not notified,Interstate cannot be held responsible for any additional fees/costs and Customer agrees that Customer will be responsible for any additional fees/costs. Interstate is not responsible for the safety of persons on the roof other than its own employees.Customer and/or Customer's Agent agree to indemnify,defend and hold Interstate harmless,including attorney's fees,from claims for personal injury by persons or entities whom Customer or Customer's Agent have allowed or authorized to be on the roof,including from use of Interstate's ladder. Customer shall shut down roof located electronic equipment that emits or receives radio frequency waves when Interstate is working on the roof so that roofing personnel will not be subject to radio frequency waves or electromagnetic radiation while working on the roof and Customer shall indemnify,defend and hold Interstate and its personnel harmless from any personal injury claims resulting from a failure by Customer to do so. Interstate is not responsible for loss,damage or delay caused by reasons or circumstances beyond our reasonable control,including but not limited to acts of God, weather,animals,insects,birds,accidents,fire,regulations,strikes,pandemic,failure or delay of transportation,and shortage of inability to obtain materials. If material supplier is unable to load roofing material due to overhanging trees,shrubs,power lines/cables,slope of driveway or any other access issue,and additional charge will be added for hand loading. If Customer delays construction,additional fees may be incurred. Interstate is not responsible for leakage through the existing roof or other areas of the roof that have not yet been reroofed by Interstate. Interstate and Customer are committed to acting promptly so that roof leaks are not a source of potential interior mold growth.Customer will make periodic inspections for signs of water intrusion and act promptly including prompt notice to Interstate if Customer believes there are roof leaks,to correct the condition.Upon receiving notice,Interstate will make roof repairs.Customer is responsible for monitoring any leak areas for indoor air quality.Interstate is not responsible for indoor air quality. Customer shall indemnify,defend,and hold Interstate harmless from claims due to indoor air quality and resulting from a failure by Owner to maintain the building in a manner to avoid growth of mold.Customer agrees to indemnify,defend,and hold Interstate harmless from claims brought by tenants and third parties arising from mold growth. Interstate's work will be warranted by Interstate in accordance with its standard warranty,which is made a part of this proposal and contract and incorporated by reference.A sample of Interstate's Limited Workmanship Warranty is attached or,if not,will be furnished upon request.Interstate SHALL NOT BE LIABLE FOR SPECIAL,INCIDENTAL OR CONSEQUENTIAL DAMAGES.The acceptance of this proposal by the Customer signifies agreement that this warranty shall be and is the exclusive remedy against Interstate. Interstate and the material supplier have no control over the quality of the product or the length of time the manufacturer claims the product will last. The manufacturer has sole liability for the product. Please see the manufacturer's warranty for coverage details,terms and conditions. Warranty lengths may differ for non-owner occupied buildings.Interstate is not responsible for the verification of technical specifications of product manufacturers,i.e.,R-value or ASTM or UL compliance,but rather the materials used are represented as such by the material manufacturer. LIMITATION ON ACTIONS:THE PARTIES HERETO AGREE THAT A LAWSUIT FILED TO ENFORCE THIS CONTRACT OR RESOLVE ANY DISPUTE RELATED TO THIS CONTRACT MUST BE COMMENCED WITHIN FIVE(5)YEARS FROM THE DATE OF BILLING FOR THE BALANCE OF THE COSTS UNDER THIS AGREEMENT OR FROM THE DATE INTERSTATE LAST PERFORMS WORK UNDER THIS AGREEMENT, WHICHEVER IS EARLIER,OR BE FOREVER BARRED.NOTWITHSTANDING THE ABOVE,ANY CLAIM ALLEGING NEGLIGENCE MUST BE COMMENCED WITHIN ONE(1)YEAR OF DISCOVERY OF THE NEGLIGENCE,BUT NOT MORE THAN FIVE(5)YEARS FROM THE DATE OF BILLING FOR THE BALANCE OF COSTS UNDER THIS AGREEMENT OR FROM THE DATE INTERSTATE LAST PERFORMED WORK UNDER THIS CONTRACT,WHICHEVER IS EARLIER,OR BE FOREVER BARRED.THIS PROVISION APPLIES INSTEAD OF ANY LIMITATIONS PERIOD OTHERWISE PROVIDED BY LAW. Substantial Completion.Interstate and Customer agree that the project has reached a state of"Substantial Completion,"as that phrase or iterations of that phrase are used by Oregon law governing timing for events affecting construction work,at the time that Interstate sends a billing for the balance of costs under this Agreement regardless of whether Interstate returns to complete additional or new work or if the Agreement is subsequently modified to create additional or new work. Arbitration Required/Mediation First Option.Any dispute or claim that arises out of or that relates to this agreement,or to the interpretation or breach thereof,shall be resolved by arbitration in accordance with the then effective arbitration rules of Arbitration Service of Portland,Inc.by filing a claim in accordance with the filing rules of ASP,and judgment upon the award rendered pursuant to such arbitration may be entered in any court having jurisdiction thereof.The owner,the contractor,and all subcontractors,material suppliers,engineers,architects,designers,construction lenders,bonding companies,and all other parties concerned with or involved in the performance of the contract are bound,each to the other,by this arbitration clause,provided such party has signed this contract,or has signed a contract that incorporates this contract by reference,or signs any other agreement to be bound by this arbitration clause.The arbitrator selected must be a construction law attorney with not less than ten years in practice,and the parties stipulate to only one arbitrator,regardless of size of the amount in controversy.This arbitration clause shall not preclude any party from filing a statutory construction lien or from commencing suit to foreclose such lien,but the foreclosure suit shall be stayed until the rendering of the arbitration award,which award shall be binding in such foreclosure suit as to all matters determined in arbitration,and the lien may then be foreclosed to the extent permitted by law.The parties acknowledge that mediation usually helps parties to themselves settle their dispute.Therefore,any party may propose mediation whenever appropriate through one of the above named organizations or any other mediation process or mediator as the parties may agree upon.The arbitration will be conducted in the tri-county area in or around Portland,Oregon.If Arbitration Service of Portland,Inc.ceases to exist and has no apparent successor,the parties will still resolve this dispute by binding arbitration. Attorney's Fees.In the event suit or action is brought,or an arbitration proceeding is initiated,to enforce or interpret any of the provisions of this agreement,or that is based thereon,the prevailing party shall be entitled to reasonable attorney's fees,costs,expert fees and costs,and consultants fees in connection therewith.The determination of who is the prevailing party and the amount of reasonable attorney's fees to be paid to the prevailing party shall be decided by the arbitrator(s)(with respect to attorney's fees incurred prior to and during the arbitration proceedings)and by the court or courts,including any appellate court,in which such matter is tried,heard,or decided,including a court that hears a request to compel or enjoin arbitration or that hears any exceptions or objections to,or requests to modify or vacate,an arbitration award submitted to it for confirmation as a judgment(with respect to attorney's fees incurred in such proceedings). All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will become an extra charge over and above the estimate. All agreements contingent upon strikes,accidents,weather or delays beyond our control. Our workers are fully covered by workers'compensation insurance. Where the terms and provisions of this agreement shall be in conflict with the terms of any separate contract,proposal or order;the parties agree that the terms and provisions of this agreement shall be controlling.This proposal may be withdrawn by us if not accepted within 30 days. All estimates are subject to review and cancelation by Interstate Management prior to starting the job. Interstate's maximum liability for any claim whatsoever arising under this agreement for any reason shall not exceed the contract amount. Attached Documents OREGON#: 244218 / WASHINGTON#: INTERRL776BC 16 ✓ Required Noticesfr rResidentiall Construct on V MNainufacturev's upgraded warranty brochure aind Projects expa ina tl on ✓ Consumer Protection Notice ✓ Defect Notification Req�uiireimeint. ✓ Notice of Procedure V Notice of Riiglht to Caincell ✓ information Notice to Owners albout Construction V Moisture Intrusion and Water Damage Liens V Interstate Roofing Maintenance Information V Notice of Right.to Liiein ✓ Interstate Roofing Disclaimer Notice ✓ Ventillatilon Fact Sheet V Reinocete Right cad Ipaimlphllet ✓ Manufacturers standard imeteiriiall warranty ✓ Interstate Roofing Workmanship Warranty June 2022 OREGON#: 244218 / WASHINGTON#: INTERRL776BC 17 W2cBuRN Ttem April 13, 2026 TO: Urban Renewal Agency FROM: Downtown Advisory Review Subcommittee (DARS) Jamie Johnk, Economic Development Director SUBJECT: URG #2026.03-237 N. FRONT STREET I K-BRON BREWING CO. RECOMMENDATION: Approve the Building Improvements Program Grant Application (Program)from the owner of the property located at 237 N. Front Street, K-BRON Brewing Co., Salvador Gasca (Applicant),for 50% of the lowest bid received ($6,217) in the amount of$3,109. Program funding is requested for installation of fencing and gate around back patio of restaurant, per the proposal submitted. DARS reviewed this proposal at their April 8, 2026 meeting and recommended approval from the URA for funding. BACKGROUND: The 237 N Front Street property has a commercial tenant (K-BRON Brewing Co.). K-BRON operates a restaurant in the building and has a food cart and outdoor patio area in the rear of the property. This proposed project includes installing a fence with an access gate around the patio area providing a more inviting and secure space for serving food and beverages. A detailed scope of work is included in the submitted proposals. PROPOSAL: The Applicant has provided three (3) estimates and is proposing to accept the estimate from Lemin Group LLC in the amount of$6,217. • Lemin Group LLC $6,217 • Rick's Fencing $5,225 —bid does not include benches and plate boxes • Noble Construction LLC $6,250 FINANCIAL IMPACT: The FY 2025-2026 Urban Renewal Building Improvements Program budget has sufficient funds to approve this $3,109 grant request. Program Criteria: 18 • The property is located at 237 N. Front Street and within the Urban Renewal District. • The proposal complies with the Woodburn Development Ordinance. Any necessary permits will be obtained from the city. • The project encourages greater marketability of the Urban Renewal District. • The proposal will complement the existing and surrounding community. The project will be complimentary to the existing building as well as the surrounding buildings. • The Urban Renewal Program specifically identifies interior improvements as an eligible improvement within Woodburn's Urban Renewal District. Summary and Conclusion: The Program is intended to encourage and assist business and property owners to invest in the Urban Renewal District. This Application reflects the intent of the program by making improvements to the property and maintaining the useful life of the building. Conditions of Approval: 1. Invoices must be submitted for reimbursement. No grant money will be disbursed until the project is completed and is approved by the Agency. 2. Grant funds may be used for materials and services provided by licensed contractors. 3. Projects shall be completed within one year of approval to be eligible for reimbursement. Grants provide for a single payment after receipts are provided and all completed work is accepted by the City. 4. Licensed contractors will complete all work. Attachments: • Building Improvements Application URG #2026.03 —237 N. Front Street I K-BRON Brewing Co. Page 2 19 WRN I Ir BuildingImprovements Program APPUCATION 0 Exterior Grant 0Interior Grant 0 Design Services APPLICANT INFORMATION FOR OFFICE USE ONLY Name °7/ 9/ Application Date: Phone° q9 .' Approval Date: Tax 1D number: Amount Awarded: PROPERTY OWNER INFORMATION Property Address: , 927/ Name: Phone/Email: / t Address: ignat city: fit: Zip: Corner's ure:: Date; RUSNES AND I OR PROJECT INFO M U N Name of Business: - Business Corner's Name: Addressf)7i/ a/' Phone ('J ) City: State: Zip: 772 7/ Type of Business: / ,/ / /Upper Floor Use: PROPOSED tMPROV M(N Improvements Type: D Interior Improvements xterior Improvements D Other Dese:iption: Estimated Cost of Improvements: 20 CERTWICATION BY APPLICANT The Applicant certifies that all information provided in this application is true and complete to the best of the Applicant's knowledge and belief. The Applicant represents to the City that this Agreement has been duly authorized by all necessary action on the part of the Applicant and no other corporate or other action on the part of the Applicant is legally required. If the Applicant is not the owner of the property to be rehabilitated, the Applicant certifies that it has the legal authority to sign and enter into an agreement to perform the proposed work on the building. Evidence of this legal authority must be attached. Applicant acknowledges and agrees the Agency shall have no obligation to pay any persons providing materials or performing labor or to cause the release of any mechanics or other liens that may be recorded against the abo e property in connection with the proposed improvements. pp rrt"s ug;rrature Date ACKNOWLEDGMENT BY PROPERTY OWNER 'if different thanApp/icant) The Property Owner hereby acknowledges all the above terms of this application and agrees that the Agency shall have no obligation to pay any persons providing materials or performing labor or to cause the release of any mechanics or other liens that may be recorded against the above property in connection with the proposed improvements. ii / h5 - roperty Owner's Signature Date 21 wmmmmmmm um mmmummimm m'm LF I N GAOL/P . imsawmmwmomu wumiwwumu m mmi UMMUNI GON' HI IC I . UC#250090 ESTIMATE:: 91181 K-BRON BREWING CO LLC 237 N FRONT ST, 494 45TH AVE SE, Salem WOODBURN OR 97071 OR 97317 Date: 3/30/2026 503-339-5952 CUSTOM FENCING AND RAISED GARDEN BEDS Invoice Number: 67890 / 1 .i Terms: 30 Days 6' custom fence with trellis package 25 If $148.65 $3,716.25 4' uni-gate 1 $340.84 I $340.84 4x4 PT post 6 $81.00 $486.00 Trellis kit installation 1 $743.21 $743.21 Planter boxes 4 $215 $860.00 Tax 8.25% - $70.95 Total $6,217.25 Thank you for your business. It's a pleasure to work with you on your project. Your next order will ship in 30 days. 1 22 RICK'S OR# 50,08 WAftJa•c•KSCF99KB K-bron Brewing company O3/23/2O26 237 N FRONT ST WOODBURN OR 97O71 Invoice No . (971) 349-O433 (971' 349-O433 EST : 5O9787 Email : kbronbrewing@gmaiI . com >>> ESTIMATE INFO COPY . . . Pricing subject to change . <<< Qty UN Description Price Amount - --- -- -- --- ---- ---- --- ---- --- ---- ---- - ---- -- ---- --- - 25 LF 6 ' solid style Fence Package 71 . 75 1793 . 75 Inland cedar 5/8 "x6" boards complete Installation 1 EA 48"SS Uni -Gate Installed 232 . 32 232 . 32 1 EA Vinyl Lokk-Latch LLAAB Black 65 . 82 65 . 82 2 EA Vinyl Handle LLHBG Black 7 . 60 15 . 20 2 EA 5/8"x4-1/2 " Lag Screw Hinge 6 . 87 13 . 74 4 EA 7 ' custom cedar Trellis Kit 199 . 99 799 . 96 4 EA Labor Cedar Trellis Kit Instal 129 . 00 516 . 00 6 6x6 PT POSTS 120 . 00 720 . 00 6 __ BRACKETS NEEDED 53 . 00 318 . 00 1 CUSTOM TRELLIS UPGRADE 750 . 00 750 . 00 • •• subtotal = $5224 . 79 QUOTE DOES NOT INCLUDE PLANTER BOXES OR BENCHES WOULD NEED PICTURE EXAMPLES OR MORE INFO ON THEM continued on next page . . 503-640-5434 503-669-0795 503-46 -8331 360-253- 509-736-3325 4543 SE TV Hwy 17855 NE Halsey St. 8755 Portland Rd. NE 13203 NE Fourth Plaln Blvd 9120 W Clearwater Ave. Hillsboro,OR r h m,OR l , OR Vancouver,WA Kennewick,WA 23 RICK'S O ,#OR#50088 WA# +C 99 B K-bron Brewing company 03/23/2026 237 N FRONT ST WOODBURN OR 97071 Invoice No . (971) 349-0433 (971) 349-0433 EST : 509787 Email : kbronbrewing@gmail . com >>> ESTIMATE INFO COPY . . . Pricing subject to change . <<< Qty UN Description Price Amount _ ___ _- -- --- ---- ---- --- ---- --- ---- --- - -- ---- -- -------- ESTIMATE TOTAL . . . . . . . . . . . . 5224 . 79 Monthy Payment o . A . c . . . . . . . . . . 62 . 41 wwwRw cksFencingcom 503-640-5434 503-463-8331 3- - - 53-3 92 509-736-332 4543 SE TV Hwy 17855 NE Halsey St. 8755 Portland Rd.NE 13203 NE Fourth Plain Blvd 9120 W Clearwater Ave. Hillsboro,OR Gresham,OR Salem,OR Vancouver,WA Kennewick,WA 24 ( / / ' /X / y h?/ )/ /iW ji// ( a/% 2/ 4 4/ / j /j // ' %2 /6,: a 2 '� ����"� '" //,/ 25 Noble Construction & Handyman Services, LLC CCB#241019 Omar Avina Trejo - Owner 1310 Madrona Ave SE Salem, OR 97302 (503) 931-2333 K-bron Brewing Company 237 North Front Street Woodburn, OR 97071 (971) 349-0433 kbronbrewing@gmail.com PROJECT ADDRESS: 237 North Front Street Woodburn, OR 97071 SCOPE OF WORK: Build fence with Trellis kit & Planter boxes Qty UN Description 25 LF 6' Solid Style Fence Package (Inland Cedar 5/8"x6"boards) 1 EA 48"SS Urn-Gate Installed 1 EA Vinyl Lokk-Latch LLAAB Black 2 EA Vinyl Handle LLHBG Black 2 EA 5/8"x4-1/2"Lag Screw Hinge 4 EA 7'Custom Cedar Trellis Kit 4 EA Labor Cedar Trellis Kit Instal 6 EA 6X6 PT POSTS 6 EA BRACKETS NEEDED 1 EA CUSTOM TRELLIS UPGRADE 2 EA PLANTER BOXES PROJECT QUOTE: Cost for this project is $6250 This quote is good for 30 days, if you would like to move forward with this project a contract will need to be signed. A 50% payment will need to be collected to pay for materials, the remainder will be due once work is completed. 26 W2cBuRN Ttem April 13, 2026 TO: Urban Renewal Agency FROM: Downtown Advisory Review Subcommittee (DARS) Jamie Johnk, Economic Development Director SUBJECT: URG #2026.04—253 N. FRONT STREET I COSTA AZUL RECOMMENDATION: Approve the Building Improvements Program Grant Application (Program)from the owner of the property located at 253 N. Front Street, Multiservicios Costa Azul Corp., Griselda Escott Villa and Javier Toscano Hernandez (Applicants), for 50% of the lowest bid received ($27,500) in the amount of$13,750. Program funding is requested for storefront restoration and improvements to include window and door replacement and framing structure repairs as well as painting the exterior of the building upon completion. DARS reviewed this proposal at their April 8, 2026 meeting and recommended approval from the URA for funding. BACKGROUND: The 253 N. Front Street property has a commercial tenant (Multiservicios Costa Azul Corp.). Costa Azul operates a retail establishment offering travel services, perfume and cellular sales. This project includes restoring and improving the exterior storefront and adding new windows, framing and exterior paint. A detailed scope of work is included in the submitted proposals. PROPOSAL: The Applicant has provided two (2) estimates and is proposing to accept the estimate from Franky's Construction LLC in the amount of$27,500. Note —the Applicant reached out to additional contractors however did not receive a response. • Franky's Construction LLC $27,500 • Natalys Construction LLC $34,870 FINANCIAL IMPACT: The FY 2025-2026 Urban Renewal Building Improvements Program budget has sufficient funds to approve this $13,750 grant request. 27 Program Criteria: • The property is located at 253 N. Front Street and within the Urban Renewal District. • The proposal complies with the Woodburn Development Ordinance. Any necessary permits will be obtained from the city. • The project encourages greater marketability of the Urban Renewal District. • The proposal will complement the existing and surrounding community. The project will be complimentary to the existing building as well as the surrounding buildings. • The Urban Renewal Program specifically identifies interior improvements as an eligible improvement within Woodburn's Urban Renewal District. Summary and Conclusion: The Program is intended to encourage and assist business and property owners to invest in the Urban Renewal District. This Application reflects the intent of the program by making improvements to the property and maintaining the useful life of the building. Conditions of Approval: 1. Invoices must be submitted for reimbursement. No grant money will be disbursed until the project is completed and is approved by the Agency. 2. Grant funds may be used for materials and services provided by licensed contractors. 3. Projects shall be completed within one year of approval to be eligible for reimbursement. Grants provide for a single payment after receipts are provided and all completed work is accepted by the City. 4. Licensed contractors will complete all work. Attachments: • Building Improvements Application URG #2026.04—253 N. Front Street I Multiservicios Costa Azul Corp. Page 2 28 Programa de Mejoras de Edificios SOLICITUD EJSubvenci6n para exteriores Subvenci6n para interiores Servicios de diseno INFORMACION DEL SOLICITANTE PARA USO EXCLUSIVO DE LA OFICINA Nombre: ' I I _ w, Fecha de Solicitud: Telefono: y-- Fecha de Aprobaci6n: Numero de identificaci6n fiscal: Cantidad Concedida: INFORMACION DEL PROPIETARIO Direcci6n de Ia Propiedad: Nombre: WSe ° `C' Telefono/Correo electronico: Direcci6n: Ciudad: Estado: . C6digo postal: Firma del propietario: .w Fecha: INFORMACION DEL NEGOCIO Y/O EL PROYECTO Nombre del Negocio: = Telefono: J d Nombre del propietario del Negocio: ( q Direcci6n: Ciudad: Estado: C6digo postal: Tipo de negoclo: Uso de la planta superior: f1i4A dc MEJORAS PROPUESTAS Tipos de mejora: Mejoras interiores Mejoras exteriores 13 Otros Description, \/ Je) d / (d C 1 °' e 29 Contratista/Oferta seleccionada: Si no es el licitador m rs bajo,explique por que se seleccionb a este contratista/oferta: CERTIFICACION DEL SOLICITANTE El Solicitante certifica que toda la informaci6n proporcionada en esta solicitud es verdadera y completa,segun su leal saber y entender. El solicitante declara ante el Ayuntamiento que este acuerdo ha sido debidamente autorizado por todas las medidas necesarias por parte del solicitante y que nose requiere legalmente ninguna otra medida corporativa o de otro tipo por parte del solicitante. Si el solicitante no es el propietario de la propiedad que se va a rehabilitar, el solicitante certifica que tiene la autoridad legal para firmar y formalizar un acuerdo para realizar las obras propuestas en el edificio. Se debe adjuntar prueba de esta autoridad legal. El solicitante reconoce y acepta que la Agencia no tendra ninguna obligaci6n de pagar a ninguna persona que proporcione materiales o realice trabajos, ni de provocar Ia liberation de ningun gravamen mecanico o de otro tipo que pueda estar registrado sobre Ia propiedad mencionada en relaci6n con las mejoras propuestas. Firma del solicitante Fecha RECONOCIMIENTO DEL PROPIET'ARIO DE LA PROPIEDAD (si es diferente al solicitante) El propietario reconoce por la presente todos los terminos anteriores de esta solicitud y acepta que la Agencia no tendra ninguna obligaci6n de pagar a ninguna persona que proporcione materiales o realice trabajos, ni de provocar Ia liberacion de ningun gravamen mecanico o de otro tipo que pueda estar registrado sobre la propiedad mencionada en relaci6n con las mejoras propuestas Firma del Propietano Fecha 30 N O1 z 0 F^ a z 0 u tD z E_ V) 1 nr err it r%/irrWWO „ 0 yr , � ��»,,; j ill k �11� x" p �1 1 4: 0V��loi I 1 , 44 �% kfi�l�wwammme�o � wuum i' � r ''i(niu(m6i1(im / / im�muwauvuirtygwu /_,__/ a( , JDflsf✓�f p �J , 44 rr„r,,,.444444/4/4Y /// It 1 � I I 1 r o LO ) N • O) G v i3 W � Q7 O p0 T3 G p A L N W C) N c O $ 58 N L V N Py M U 4 o o cn U Q H N C7 I , 4 d � I f II k z 'k From: Jamie Zamrin To: Jamie Johnk Subject: Costa Azul name of other contractors Date: Wednesday,April 8,2026 8:31:08 AM Attachments: outlook-ratdadle.Dng Out lookz32io2wwl. np Importance: High Hey Jamie, Here are names of two other contractors that Javier and Griselda of Costa Azul reached out to for the work to their building, but were unable to provide a bid for the job. Jamie Zamrin (she/her/ella) Economic Development Specialist Office (503) 980-6307 1 Cell(503) 951-1569 Economic Development I Woodburn. Oregon WooDBuRN 1 F7 C 0 1 p 0 1 a t e d it 8 8 9 From:javier toscano <javis3030@yahoo.com> Sent:Tuesday, April 7, 2026 4:58 PM To:Jamie Zamrin <Jamie.Zamrin@ci.woodburn.or.us> Subject: Re: Nombre de otro contratista **,d*This email is from an Q; 'V'LRNA Lsender. Exercise,caution when opru,mnng attachments or click links from unknown senders or unexpected ted email.. CON ESTA COMPANIA NO PUDIMOS PONERNOS DE ACUERDO. VA VILLEGAS LLC 541 870 2677 ESTE OTRO NO SUPE EL NUMERO DE LA COMPANIA JESSI CONTRUCCION 971 7194940 El martes, 7 de abril de 2026, 01:29:18 p.m. PDT, Jamie Zamrin <jamie.zamrin@ci.woodburn.or.us> escribio: Hey Javier, What are one to two names of additional contractors that you reached out to for Costa Azul? For our staff report, we just need to list a name of an additional contractor that you reached out to, even though they did not provide a bid. Thank you! 33 Hola, Javier, �,Podrias indicarnos uno o dos nombres de contratistas adicionales a los que contactaste para el proyecto Costa Azul? Para nuestro informe interno, solo necesitamos incluir el nombre de un contratista adicional al que hayas contactado, aunque no haya presentado ninguna propuesta. i Gracias! Jame Zamrn (she/her/ella) Economic Development Specialist Office (503) 980-6307 1 Cell(503) 951-1569 Economic Development I Woodburn. Oregon WooDBuRN Ihaco p01, aatc. d -P h' 9 PUBLIC RECORDS LAW DISCLOSURE This e-mail is a public record of the City of Woodburn and is subject to public disclosure unless exempt from disclosure under Oregon Public Records Law. This e-mail is subject to the State Retention Schedule 34 ABRIL 6 2026 A quien corresponda: Por medio de Ia presente yo Javier Tosacano y Griselda Escaott gerente de Multiservicios Costa Azul CORP. Quiero expresar que se me a hecho complicado obtener lo tres presupuestos y teniendo solo dos presupuestos, para la remodelacion de las ventanas del edificio ubicado en el centro de la ciudad 253 N Front St Woodburn OR. El motivo es que he hablado con muchas companias que solo vienen ven el trabajo que hay que hacer y me dice que luego se comunican conmigo y jamas se vuelven a contactar conmigo. Creo que es por el tipo de material que esta construido el edificio es que no es muy comun para las companias. Atentamente: &sue: . Griselda Escott V , { 5 p , JavierTosacno -'u 'i Gerente y duenos Multiservicios Costa Azul Travel CORP. 35 FRANKY'S CONSTRUCTION, LLC ESTIMATE FORM Licensed, registered &bonded CCB#205438 This ESTIMATE was created on this _18_day of March 2026, by and between: Name: Javier Toscano_Multiservicios Costa Azul Corp Address: 253 N Front ST City: Woodburn State: OR Zip: 97071 Name: Francisco Garcia Franky's Construction LLC CONTRACTOR Email address: fdgarcia05(acomcast net Contact: 503-851-0717 RECITALS: Remove all front windows, all exterior and interior trim around windows and Front door, remove existing entry door and replace with Exterior Fiberglass Single Prehung with Transom 3'0"x 6'8" 1-3/4" Smooth-Star S140-LE, Full Lite Flush, Clear- Low-E, Standard - Scroll Frame Profile Standard - Scroll Frame Profile Clear- Low-E Glass, Direct Set Transom Right Hand Inswing 4-9/16" Primed FrameSaver Wood Single Rabbet- Kerfed Bronze Compression Weatherstrip Double Bore, Primary Bore at 44", Secondary Bore Spacing of 5-1/2", 2-3/8" Backset, 1" x 2-1/4"with Radius Corners Edge Bore 2-1/4" Full Lip with Radius Corners Strike Prep, 1"x 2-1/4" No Lip with Radius Corners Deadbolt Strike 4", 1/4" Radius, Black Ball Bearing Hinges Bronze Kerfed Door Sweep Bronze Adjustable Composite - Dark Cap Sill with Gray Sill Cover No Brickmould Ship Unit Fully Assembled Rough Opening: 38"x 95 3/4" Room: front door 7 windows. FYI these are v250 which is 1 1/4" thick on vinyl frame. FRANKY'S CONSTRUCTION LLC CCB #205438 Page 1 of 1 36 The checkrail cross is 2 1/8" on the upper crosses. Let me know! Location: entrance V250 Style Line, 6340, PW, 13/8" Setback, Ext Black/ Int Black, U-Factor: .25, SHGC: .33,VT: .62 1/8" SunCoat (Low-E) Tempered over 1/8" 4th Surface HP Coating Tempered Ext Black/ Int Black Model = Picture Size = RO: 24"x 65" Net Frame: 23 1/2" x 64 1/2" Energy Star Zone(s) = North Central Glass = 1/8" SunCoat (Low-E) Tempered over 1/8" 4th Surface HP Coating Tempered with Gray EdgeGardMAX Spacer Glazing= 1" OA Dual Glaze Other Options = Lifetime Limited Warranty Ratings = STC: 27, OITC: 22, PG: CW-PG40 Calculations = Unit Area (Sq. Ft.): 11, Unit Perimeter (nominal in lineal ft): 15' Other Ratings = CPD: MIL-A-178-13023-00001 Viewed From Exterior Location: front lower V250 Style Line, 6340, PW, 13/8" Setback, Ext Black/ Int Black, U-Factor: .25, SHGC: .33,VT: .62 1/8" SunCoat (Low-E) over 1/8" 4th Surface HP Coating Ext Black/ Int Black Size = RO: 53" x 65" Net Frame: 52 1/2"x 64 1/2" Energy Star Zone(s) = North Central Glass = 1/8" SunCoat (Low-E) over 1/8" 4th Surface HP Coating with Gray EdgeGardMAX Spacer Glazing= 1" OA Dual Glaze Other Options = Lifetime Limited Warranty Ratings = STC: 27, OITC: 22, PG: DP-PG35 Calculations = Unit Area (Sq. Ft.): 24, Unit Perimeter (nominal in lineal ft): 20' Other Ratings = CPD: MIL-A-178-13023-00001 Location: front upper FRANKY'S CONSTRUCTION LLC CCB #205438 Page 1 of 1 37 V250 Style Line, 6340, PW, 13/8" Setback, Ext Black/ Int Black, U-Factor: .25, SHGC: .30,VT: 1/8" SunCoat (Low-E) over 1/8" 4th Surface HP Coating Ext Black/ Int Black Check Rail: 2 1/8" Two Wide Two High Tariff Model = Picture Size = RO: 53" x 48" Line Total: Net Frame: 52 1/2"x 47 1/2" Energy Star Zone(s) = North Central Glass = 1/8" SunCoat (Low-E) over 1/8" 4th Surface HP Coating with Gray EdgeGardMAX Spacer Glazing= 1" OA Dual Glaze Other Options = Lifetime Limited Warranty, 2 1/8"Two Wide Two High Checkrail 24" From Top, 261/2" From Left Ratings = STC: 27, OITC: 22, PG: CW-PG40 Calculations = Unit Area (Sq. Ft.): 18, Unit Perimeter (nominal in lineal ft): 18' Other Ratings = CPD: MIL-A-178-13023-00002 Install Mini split Systeml.5 ton indoor and outdoor electrical that requires doble 20 amp breaker Install self closure mechanism on front door Paint outside and inside front wall. Total amount.$ 27,500.00 Payment arrangement Will be made ones the owner accept the price for the project Agreements above are accepted by signing below: Owner: Date: Contractor: Francisco Garcia Date:__3/31/2026_ FRANKY'S CONSTRUCTION LLC CCB #205438 Page1of1 38 �� Prepared For Multiservicios Costa Azul 253 Front Street Woodburn , Oregon 97071 • iiiii /7( (503) 516-6687 Natalys Construction Lic Estimate # 65 Date 12/04/2025 Woodburn, Oregon 97352 Phone: (971) 21 6-1 289 Email: geramhdz@yahoo.com Description Multiservicios Costa Azul City of Woodburn Scope of work: Remolding the front face of building by removing the windows and installing tempered clear glass and new window framing Changing the door We are going to remove the old tile and install new tile Complete the finish carpenter from the inside Scrape the outside part of building Remove old metals Prepare and add stucco to damage spots Paint in two color tones The price including labor and materials is $34,870 The price for this is for the job to be completed from the inside and outside of the building Subtotal $34,870.00 Tota 1 $34,870.00 law, a of 2 39 By signing this document, the customer agrees to the services and conditions outlined in this document. Multiservicios Costa Azul law,2of2 40