January 12, 2026 Agenda FRANK LONERGAN,MAYOR
CITY OF WOODBU RN ORLANDO BRAVO,COUNCILOR WARD 1
MARK WILK,COUNCILOR WARD II
CITY COUNCIL AMENDED JEN CANTU,COUNCILOR WARD III
SHARON SCHAUB,COUNCILOR WARD IV
MARY BETH CORNWELL,COUNCILOR WARD V
AGENDA ALMA GRIJALVA,COUNCILOR WARD VI
JANUARY 12, 2026- 7:00 P.M.
CITY HALL COUNCIL CHAMBERS-270 MONTGOMERY STREET
1. CALL TO ORDER AND FLAG SALUTE
2. ROLL CALL
3. ANNOUNCEMENTS AND APPOINTMENTS
Announcements:
A. City Hall and the Library will be closed on January 19, 2026, in
observance of the Martin Luther King Jr. holiday. Transit will operate
from 9am-3pm
A1212ointments:
None.
4. COMMUNITY/GOVERNMENT ORGANIZATIONS
None.
5. PROCLAMATIONS/PRESENTATIONS
Proclamations:
None.
Presentations:
A. Zoraya Uder- Community Outreach and Education Coordinator
This facility is ADA accessible. If you need special accommodation, please contact the City Recorder at
503-980-6318 or Statewide To//Free Relay (800) 735-1232, at least 48 hours prior to this meeting.
Si usted necesita asistencia especial, comuniquese al 503-980-6322 o a la linea telef6nica gratuita, (800)
735-1232, con un minimo de 48 horas, antes de la reuni6n.
**Habrd int6rpretes disponibles para aquellas personas que no hablan Ingl6s, previo acuerdo.
Comuniquese al (503) 980-6322.**
January 12, 2026 Council Agenda Page i
6. COMMUNICATIONS
None.
7. BUSINESS FROM THE PUBLIC - This allows the public to introduce items for Council
consideration not already scheduled on the agenda.
8. CONSENT AGENDA - Items listed on the consent agenda are considered routine
and may be adopted by one motion. Any item may be removed for discussion
at the request of a Council member.
A. Woodburn City Council minutes of December 8, 2025 1
Recommended Action: Approve the minutes.
B. Woodburn City Council Executive Session minutes of December 8, 7
2025
Recommended Action: Approve the minutes.
C. Traffic Enforcement Report for September through November 2025 8
Recommended Action: Receive the report.
D. New Development Activity for December 2025 9
Recommended Action: Receive the report.
E. IGA Marion County Radio Project 10
Recommended Action: Authorize the City Manager to sign the IGA
with Marion County to make modifications to the Woodburn Police
Department radio equipment.
9. TABLED BUSINESS
None.
10. PUBLIC HEARINGS
A. Annexation of Approximately 72.67 Acres of Territory at 1505 Boones 39
Ferry Rd NE and Approval of a Large Lot Subdivision (ANX 25-01, SUB
25-03, ZMC 25-01)
Recommendation: Conduct a public hearing and make a motion to
tentatively approve the land use applications, directing staff to
prepare and submit ordinances and a final land use decision for
consideration at the next City Council meeting.
January 12, 2026 Council Agenda Page ii
11. GENERAL BUSINESS - Members of the public wishing to comment on items of
general business must complete and submit a speaker's card to the City Recorder
prior to commencing this portion of the Council's agenda. Comment time may
be limited by Mayoral prerogative.
A. Council Bill No. 3293 - An Ordinance Revising the Transportation 83
System Plan ("TSP") to Account for the Recent Urban Growth
Boundary ("UGB") Expansion and Amending the Woodburn
Development Ordinance ("WDO") Related to the Interchange
Management Area (IMA) (LA 23-01)
Recommended Action: Adopt an ordinance revising the
Transportation System Plan, a component of the Woodburn
Comprehensive Plan, and making associated amendments to the
Woodburn Development Ordinance.
B. Council Bill No. 3294 - An Ordinance Providing for Administrative 205
Authority of the City to Vest in the City Manager Pursuant to the
Newly Enacted Amendments to the Woodburn City Charter; and
Declaring an Emergency.
Recommended Action: Adopt an ordinance affirming the vestiture
of the prior City Administrator duties and authorities in the newly
titled City Manager position pursuant to the enactment of the City
of Woodburn Charter of 2026.
C. Committee, Commission, and Board Member Appointment 209
Procedures
Recommended Action: Receive report and advise staff on any
desired future action.
12. OTHER BUSINESS
None.
13. PLANNING COMMISSION OR ADMINISTRATIVE LAND USE ACTIONS - These are
Planning Commission or Administrative Land Use actions that may be called up
by the City Council.
A. Council Briefing of Planning Commission partial approval of a 215
Modification of Conditions application (MOC 25-02) from Marion
County Housing Authority for "Farmdale Apartments" at 1219 & 1233
W Lincoln Street; Associated with DR 25-02, PAR 24-03, VAR 25-03
Approved December 11, 2025
Recommended Action: Staff recommends that the City Council take
no action on this item and provides this summary pursuant to
Wood[,)(. non )evelloL�Mg[ ll (:),Irjncj nc e ....(Y IQQJ, Section 4.02.02. The
January 12, 2026 Council Agenda Page iii
Council may call up this item if desired and, by majority vote, initiate
a review of the Planning Commission decision.
14. CITY MANAGER'S REPORT
15. MAYOR AND COUNCIL REPORTS
16. EXECUTIVE SESSION
None.
17. ADJOURNMENT
January 12, 2026 Council Agenda Page iv
COUNCIL MEETING MINUTES
DECEMBER 8, 2025
DATE COUNCIL CHAMBERS, CITY HALL, CITY OF WOODBURN, COUNTY OF
MARION, STATE OF OREGON, DECEMBER 8, 2025
CONVENED The meeting convened at 7:00 p.m. with Mayor Lonergan presiding.
ROLL CALL
Mayor Lonergan Present
Councilor Cantu Present
Councilor Cornwell Present
Councilor Schaub Present
Councilor Bravo Present
Councilor Grijalva Present
Councilor Wilk Present
Staff Present: City Administrator Derickson, City Attorney Granum, Assistant City Administrator
Row, Community Services Director Cuomo, Community Development Director Kerr, Police Chief
Millican, Finance Director Turley, Assistant City Attorney Killmer, Special Projects Director Wakely,
Public Works Director Stultz,Economic Development Director Johnk, Community Relations Manager
Herrera, City Recorder Pierson
ANNOUNCEMENTS
Mayor Lonergan stated that earlier that evening the police department held an award ceremony that
recognized the following: Lieutenant Adam Stewart was awarded an Achievement Medal for his work
on obtaining a grant to help combat organized retail theft; Officer Travis White was awarded a
Commendation Medal for identifying an overgrowth of 10-foot blackberries during a residence check
and coordinating their removal with local church groups; Officer Logan Baker received an
Achievement Medal for investigating a sexual assault case and helping secure the federal arrest and
sentencing of a multi-victim suspect; Corporal Darlyn Chester received the Captain Tom Tennant
Memorial Service Medal for her exceptional service to the Woodburn Police Department and the
community of Woodburn.
Councilor Cantu read the following announcements:
• Love Santa Wrapping & Distribution: Daily at Foursquare Church 9:30 AM-5:00 PM;
distribution Saturday at the high school; volunteers needed.
• Friday, Dec. 12, 2025, 5:00-7:00 p.m. —Fridays on First and Front: Holiday Game Night:
Loteria at Bungalow Theatre, holiday trivia at K-Bron Brewing, festive crafts at Cafe La Onda,
and special appearances by Santa.
• Saturday, Dec. 20, 2025, 3:00 p.m. —Polar Express Movie Showing: Bungalow Theatre; ticket
includes craft, cocoa, and popcorn.
Page 1 - Council Meeting Minutes, December 8, 2025
1
COUNCIL MEETING MINUTES
DECEMBER 8, 2025
• Holiday Hours:
— Christmas: City Hall will be closed beginning at noon on December 24 and will reopen
for regular business hours on December 26. The Library will be open 10:00 a.m.-1:00
p.m. on December 24 and reopen for regular business hours on December 26. Transit
Services will be running holiday hours 9:00 a.m.- 3:00 p.m. on December 24 and closed
December 25.
— New Year: City Hall, the Library, and Transit Services will be closed January 1.
APPOINTMENTS
Schaub/Cornwell... reappoint Katrina Lujan to Position 1, Cristal Ramos to position III and
Marilyn McCully to Position V of the Woodburn Library Board.
The Motion passed with the following vote: Councilors Schaub, Grijalva, Cantu, Cornwell, Wilk, and
Bravo voting "aye." [6-0]
Schaub/Cornwell... reappoint Angel Cruz and Colleen Vancil to the Public Arts and Mural
Committee.
The Motion passed with the following vote: Councilors Schaub, Grijalva, Cantu, Cornwell, Wilk, and
Bravo voting "aye." [6-0]
PRESENTATIONS
City Attorney Granum provided a presentation on Transportation System Development Charges
(SDCs) including how they are established, Woodburn's Transportation SDC structure, and policy
decisions regarding how to address prior property uses and refining the alternative rate review process.
BUSINESS FROM THE PUBLIC
Fred Muraviov, 1297 Greenview Drive, reported his concerns on repeated reckless speeding in his
neighborhood, including a recent incident near a school bus stop involving suspected federal agents.
He noted children's safety was at risk.
G., West Woodburn, stated that he is an immigrant and proud to be from Woodburn. He added that he
is grateful for the actions that have been taken but thinks more can be done. He asked that the City not
enter into any Section 287 agreements.
CONSENT AGENDA
A. Woodburn City Council minutes of November 10, 2025,
B. Woodburn City Council Executive Session minutes of November 10, 2025,
C. Woodburn City Council Special Meeting minutes of November 21, 2025,
D. Monthly financial report for October,
E. October Building Activity,
F. November Building Activity,
Page 2 - Council Meeting Minutes, December 8, 2025
2
COUNCIL MEETING MINUTES
DECEMBER 8, 2025
G. Election Results—November 4, 2025, Special Election,
H. Traffic Photo Enforcement Report(Aug - Oct 25),
L Traffic Photo Enforcement Quarterly Report(Jan - Sept 25) Amended.
Motion: Schaub/Bravo... approve the consent agenda as presented.
The Motion passed with the following vote: Councilors Schaub, Grijalva, Cantu, Cornwell, Wilk, and
Bravo voting "aye." [6-0]
PUBLIC HEARINGS
Legislative Amendments to update the Transportation System Plan ("TSP") and amend the Woodburn
Development Ordinance ("WDO") (LA 23-01)
Mayor Lonergan declared the hearing open at 7:55 p.m. for the purpose of hearing public input on
Legislative Amendments to update the Transportation System Plan ("TSP") and amend the Woodburn
Development Ordinance ("WDO") (LA 23-01). Community Development Director Kerr provided a
staff report.
Mayor Lonergan asked if any member of the public would like to speak in support of Legislative
Amendments to update the Transportation System Plan ("TSP") and amend the Woodburn
Development Ordinance ("WDO") (LA 23-01). No one wished to speak in support.
Mayor Lonergan asked if any member of the public would like to speak in opposition of Legislative
Amendments to update the Transportation System Plan ("TSP") and amend the Woodburn
Development Ordinance ("WDO") (LA 23-01). Naomi Zwerdling and Eric Havig with ODOT
provided comments in opposition to the amendments.Naomi Zwerdling stated that she provided a letter
in opposition to the amendments to the City Council for the record and stated that ODOTs desire would
be to delay the removal of the trip cap and update the IAMP and the IAMP process. Eric Havig stated
that the 20-year-old trip cap will be reviewed to assess current growth, economic opportunities, and
potential traffic impacts, including freeway ramp congestion. They requested that staff delay removing
the ordinance to allow updated analysis and proposals that balance safety, traffic flow, and community
and business needs.
Mayor Lonergan closed the hearing at 8:51 p.m.
Motion: Schaub/Cornwell... tentatively approve Legislative Amendment LA 23-01, directing staff
to prepare an ordinance for consideration at the January 12, 2026, City Council meeting.
On roll call vote the Motion passed with the following vote: Councilors Schaub, Grijalva, Cantu,
Cornwell, Wilk, and Bravo voting "aye." [6-0]
COUNCIL BILL NO. 3290 - AN ORDINANCE AMENDING ORDINANCE NO. 2315 TO
REPEAL AND REPLACE THE CITY OF WOODBURN EMERGENCY OPERATIONS PLAN
(PREVIOUSLY REFERRED TO AS THE EMERGENCY MANAGEMENT PLAN)
Council President Schaub introduced Council Bill No. 3290. City Recorder Pierson read the bill twice
by title only since there were no objections. Police Chief Millican provided a staff report. On roll call
vote for final passage, the bill passed unanimously with Councilors Grijalva, Wilk, Bravo, Cornwell,
Page 3 - Council Meeting Minutes, December 8, 2025
3
COUNCIL MEETING MINUTES
DECEMBER 8, 2025
Cantu and Schaub voting "aye" [6-0]. Mayor Lonergan declared Council Bill No. 3290 duly passed.
COUNCIL BILL NO. 3291 - AN ORDINANCE AMENDING ORDINANCE 2555 (ARTS &
MURALS PROGRAM) TO INCLUDE UPDATED COMMITTEE MEMBERSHIP
GUIDELINES, NOTICE REQUIREMENT UPDATES, MODERNIZATION OF LANGUAGE
AND HOUSEKEEPING UPDATES
Council President Schaub introduced Council Bill No. 3291. City Recorder Pierson read the bill twice
by title only since there were no objections. Economic Development Director Johnk and Assistant City
Attorney Killmer provided a staff report. On roll call vote for final passage,the bill passed unanimously
with Councilors Grijalva, Wilk, Bravo, Cornwell, Cantu and Schaub voting "aye" [6-0]. Mayor
Lonergan declared Council Bill No. 3291 duly passed.
COUNCIL BILL NO. 3292 -A RESOLUTION SETTING COUNCIL MEMBER AND MAYOR
COMPENSATION IN THE FORM OF A MONTHLY STIPEND
Council President Schaub introduced Council Bill No. 3292. City Recorder Pierson read the bill by
title only since there were no objections. City Administrator Derickson and City Attorney Granum
provided a staff report. City Councilors Grijalva, Cantu, Wilk, Bravo and Cornwell stated that they
have a potential conflict of interest. On roll call vote for final passage, the bill passed unanimously
with Councilors Grijalva, Wilk, Bravo, Cornwell, Cantu and Schaub voting "aye" [6-0]. Mayor
Lonergan declared Council Bill No. 3292 duly passed.
COUNCIL BRIEFING OF PLANNING COMMISSION APPROVAL OF A DESIGN REVIEW,
PLANNED UNIT DEVELOPMENT,AND PROPERTY LINE ADJUSTMENT APPLICATION
PACKAGE FOR THE MILL CREEK COMMUNITY CENTER PROJECT AT SETTLEMIER
PARK
The Council declined to call this item up.
CITY ADMINISTRATOR'S REPORT
The City Administrator reported the following:
• The City has reached out to various nonprofit and community organizations to explore potential
assistance for families impacted by immigration enforcement; however, no partner has been
identified yet, and outreach efforts are ongoing.
• The issue of Section 287(g) agreements was raised again during public comment; Oregon
Revised Statutes prohibit any local government or organization in Oregon from participating in
such agreements with federal immigration authorities. Accordingly, the City of Woodburn and
the police department will not enter into such agreements, as doing so would violate state law.
• The City has been invited to submit a full Community Development Block Grant (CDBG)
application to Marion County. We submitted a pre-application in October and were invited to
apply by the December 19th deadline. While no formal action is required by the City Council
to submit the application, we just want to note that the Mayor will be signing the application
and wanted to communicate to the City Council staff's intent to apply. We are applying for up
to $250,000 for furniture and fixtures to equip the commercial kitchen and event space.
• Renata was able to get a$10,865 grant for the Marion County Soil Water Conservation District
Page 4 - Council Meeting Minutes, December 8, 2025
4
COUNCIL MEETING MINUTES
DECEMBER 8, 2025
to help identify Emerald Ash Borer in the region,but also in the City and the city rights of way.
• Renata serves on the Oregon Legislature's Urban Growth Boundary Working Group and has
met with legislators to share the City of Woodburn's perspective on urban growth boundary
reform related to housing and economic needs.
• The holiday tree lighting experienced a temporary technical issue but has since been repaired
and is fully lit. The City hosted a sensory-friendly Santa event for children with sensory needs
and 12 kids attended, and there were approximately 300 attendees for the tree lighting event.
• Trillium Park, a three-acre park on the south side of town, has been completed and opened to
the public, funded through approximately $690,000 in grants and system development
charges.
MAYOR AND COUNCIL REPORTS
Council President Schaub wished everyone a happy holiday and added that the City is doing what it
can to protect its citizens.
Councilor Bravo wished everyone a happy holiday season.
Councilor Cornwell thanked those who spoke tonight, noting that Council shares their concern and
sense of uncertainty, while remaining hopeful for a better path forward.
Councilor Wilk expressed concern for residents and businesses impacted by immigration enforcement
and reaffirmed the Council's commitment to addressing these concerns and seeking lawful guidance.
Councilor Cantu concurred with Councilor Wilk. She added that she forgot to announce that the City
Council meeting scheduled for December 22, 2025, has been canceled. The next City Council meeting
will take place on January 12, 2026, at 7:00 p.m.
Councilor Schaub added that the golf cart parade at Senior Estates will take place at 4:30 p.m. on
Thursday and Friday.
Councilor Grijalva announced that she attended the Mid-Willamette Valley Area Commission on
Transportation meeting. She wished everyone a happy holiday and reaffirmed that Council and City
staff are working to support the community.
Mayor Lonergan stated that while 2025 had some challenges, overall it was a positive year, reflecting
a strong and collaborative community.
EXECUTIVE SESSION
Mayor Lonergan entertained a motion to adjourn into executive session under the authority of ORS
192.660 (2)(i).
Motion: Schaub/Cornwell... move into executive session under the authority of ORS 192.660 (2)(i).
The Motion passed with the following vote: Councilors Schaub, Grijalva, Cantu, Cornwell, Wilk, and
Bravo "aye." [6-0]
The Council adjourned into executive session at 9:29 p.m. and reconvened at 10:40 p.m. Mayor
Page 5 - Council Meeting Minutes, December 8, 2025
5
COUNCIL MEETING MINUTES
DECEMBER 8, 2025
Lonergan stated that no action was taken by the Council while in executive session.
Cantu/Schaub... for City Attorney, increase her deferred compensation by half a percent and to add
one month to her severance.
The Motion passed with the following vote: Councilors Schaub, Grijalva, Cantu, Cornwell, Wilk, and
Bravo "aye." [6-0]
Cantu/Cornwell... current City Administrator as of January 1, 2026, be titled City Manager, Scott
Derickson and proposes a 1% wage increase and two weeks additional vacation.
The Motion passed with the following vote: Councilors Schaub, Grijalva, Cantu, Cornwell, Wilk, and
Bravo "aye." [6-0]
ADJOURNMENT
Motion: Cornwell/Schaub... move to adjourn.
The Motion passed with the following vote: Councilors Schaub, Grijalva, Cantu, Cornwell, Wilk, and
Bravo "aye." [6-0]
Mayor Lonergan adjourned the meeting at 10:42 p.m.
APPROVED
FRANK LONERGAN, MAYOR
ATTEST
Heather Pierson, City Recorder
City of Woodburn, Oregon
Page 6 - Council Meeting Minutes, December 8, 2025
6
EXECUTIVE SESSION MINUTES
DECEMBER 8, 2025
DATE CITY HALL, CITY OF WOODBURN, COUNTY OF MARION, STATE OF
OREGON, DECEMBER 8, 2025
CONVENED The meeting convened at 9:29 p.m. with Mayor Lonergan presiding.
ROLL CALL
Mayor Lonergan Present
Councilor Cantu Present
Councilor Cornwell Present
Councilor Schaub Present
Councilor Bravo Present
Councilor Grijalva Present
Councilor Wilk Present
Mayor Lonergan reminded Councilors and staff that information discussed in executive session is not
to be discussed with the public.
Staff Present: City Administrator Derickson, City Attorney Granum, City Recorder Pierson
Others in attendance: None.
The executive session was called:
A. To review and evaluate, pursuant to standards, criteria and policy directives adopted by
the governing body, the employment-related performance of the chief executive officer
of any public body, a public officer, employee or staff member unless the person whose
performance is being reviewed and evaluated requests an open hearing pursuant to ORS
192.660 (2)(i).
ADJOURNMENT
The executive session adjourned at 10:40 p.m.
APPROVED
Frank Lonergan, Mayor
ATTEST
Heather Pierson, City Recorder
City of Woodburn, Oregon
Page 1 —Executive Session Minutes, December 8, 2025
7
CU CU
W to v to
M M M
w w >
0 ¢ 0
z Ln o
rn rn z rn
O N rn N M
N MoN�ko rn 00
0 u a
.0 0
E E
w w
Ln Ln
IN IN Qj
Ln IN Ln IN
z
4-
Ln Ln ol
IN IN
0 0 0
IN IN
0 m Qj
0 q Ln
tD oll
r rn m * rnram',, w 00
E r4 -1 rl E 1-4
> >
z
0 z 0 � z
4-J
Ln + Ln
0 N N-C
N
00 L.D N
0 0 m ko N E w 'LDn Ln I r4 m %mo
0) z 6
rl NE .0 .0
w 0
u
CID
E
z
I
u
Ln Ln Qj
4aN N >
L- O 0
IN IN
0 r_ LW
CL w Ln 0 (n uj w 0
-i L.D Ln r14 00 at
E m rl E r4 00 V,
4a CL w o
Lw
E
4� 4�
c -2 -2 U u
a tom_
cu *Ln
-0
> -0 ro -0 ro cu> -0 m m
W = = --
LU — —
0
o 4� 4�
LU z 0 0 z 0 0
U U u U U u
4� 0 4� 0
0 iJ 4-J 0 L iJ 0
7p CL 7p CL
0 C C
41 41
CL D .0 CL D 0 �t
M 41 In M E
41 41
w
0) 0
M > >
L I M M
L- 41 M LU 41 44
0 t! 0 15
F- M F-
41 41 i3
0 0
F-
tZ,
City of Woodburn New Development Activity
December-'25
New
Single
Family Residential New
Total Home Building Permit Commercial Building Housing
Month Permits IPermits Valuation Permit Valuation Total Permit Valuation Units
December'19 32 0 $ 49,847 $ 280,995 $ 447,057 0
December'20 64 31 $ 8,114,727 $ 1,002,784 $ 9,247,547 31
December'21 67 12 $ 3,264,580 $ 451,567,213 $ 465,909,920 12
December'22 68 0 $ 261,733 $ 6,930,990 $ 7,706,778 36
December'23 1 481 12 $ 4,315,911 $ 150,050 $ 4,778,979 12
December'24 69� 34 $12,622,317 $ 5,007,460 $ 18,491,304 34
December'25 45 5 $ 2,231,534 $ 461,000 $ 3,390,259 5
Fiscal Year Totals(July-December)
2019-2020 206 9 $ 2,310,283 $ 1,636,577 $ 5,826,839 9
2020-2021 279 46 $12,492,661 $ 4,498,366 $ 19,690,097 46
2021-2022 420 101 $27,928,761 $ 477,924,160 $ 519,492,510 281
2022-2023 430 22 $ 8,209,179 $ 57,729,880 $ 69,760,827 322
2023-2024 4141 33 $11,972,709 $ 57,159,783 $ 71,968,144 372
2024-2025 497 187 $63,448,669 $ 60,556,215 $ 128,720,444 367
2025-2026 3701 102 $33,525,969 $ 30,099,849 $ 66,281,222 102
*Mechanical,demolishion,alarm and sprinkler permits not included in this report
July-Deceirnnber New Housing Units
372 36
322
303 2 1
"fire
N13r
150
r¢r¢r
102
S rt 46
2019 'CClG'F ,a020-2021 20,.I 202,E 2Y2J 2023 20234 20:14 2024...2
Jiuly- De+cemlbeirTotall Permits
497
420 0 414
37
27
206
r
2019 2020 2020 2021 2 D2 A 20,22" 2022 2DZI 202 4 2,024 Ml...2025 20252026
9
4?4
�i �" Ag4,-.44 fun.-
WWODBURN
In orarn reA 188
January 12, 2026
TO: Mayor and City Council through City Manager
FROM: Jason Millican, Chief of Police
SUBJECT: IGA Marion County Radio Project
RECOMMENDATION:
Authorize the City Manager to sign the IGA with Marion County to make
modifications to the Woodburn Police Department radio equipment.
BACKGROUND:
Marion County Public Works, in partnership with multiple agencies throughout the
county, has agreed to build a new 7/800 digital radio system to meet the needs
of multiple agencies, including the Woodburn Police Department. To accomplish
this, Marion County is adding towers and upgrading existing structures to build a
countywide system.
DISCUSSION:
Marion County Public Works will upgrade the radio system at the Woodburn Police
Department. They will build a small structure next to the tower to add the
necessary radio equipment and modify the radio tower to accommodate the
new 7/800 system. Marion County is funding all changes, and the City of
Woodburn will incur no construction costs.
FINANCIAL IMPACT:
Due to increased radio equipment, Marion County has advised that the
additional electricity required to operate the equipment will cost the City of
Woodburn approximately $2,500 per year.
Agenda Item Review: City Manager_x_ City Attorney_x Finance_x_
10
Docusign Envelope ID:8EE77494-2007-4294-967D-9CCD93B90C5C
Contract Review Sheet Lease Agreement PW-6942-25
Title: Project Delivery Agreement for the METCOM 911 Radio Site
Contractor's Name: City of Woodburn
Department: PJublic Works Department Contact: Kathleen George
Analyst: Sabrina Hay Phone 4: (503)566-3974
Term-Date From: Execution Expires: When Terminated
Original Contract Amount: $ - Previous Amendments Amount:
Current Amendment: $ - New Contract Total: $ - Amd% 0%
Outgoing Funds Fj Federal Funds Fj Reinstatement 7 Retroactive 7 Amendment greater than 25%
Source Selection Method: 50-0010 General Exemptions(IGAs Grants QRFs)
Description of Services or Grant Award
Marion County proposes to construct radio system infrastructure on City-owned property consisting of a prefabricated,
climate-controlled radio equipment shelter,the installation of up to four(4)radio frequency and microwave antennas on
City's existing steel monopole radio tower, and related site improvements(the "Project"),to provide connectivity between
the proposed countywide radio system and METCOM 911.
City will not charge County for electrical power to the radio site.
Desired BOC Session Date: Contract should be in DocuSign by:
Agenda Planning Date Printed packets due in Finance:
Management Update BOC upload/Board Session email:
BOC Session Presenter(s) Code: G
REQUIRED APPROVALS
E
SignGocu$tgned by-
wG✓
E21BD5B5934B405... 12/17/2025
Finance -Contracts Date Contract Specialist Date
Signed by: GocuSigned by:
AM'S 12/17/2025 ��' Fvil� 12/17/2025
60C98A6F708240B... DC16351248DE4EC...
Legal Counsel Date Chief Administrative Officer Date
11
Docusign Envelope ID:8EE77494-2007-4294-967D-9CCD93B90C5C
PROJECT DELIVERY AGREEMENT
Forthe
METCOM 911 RADIO SITE
Between
MARION COUNTY and CITY OF WOODBURN
PW-6942-25
A. PARTIES TO AGREEMENT
This project delivery agreement ("Agreement") between Marion County, a political subdivision of the state
of Oregon, acting by and through its Public Works Department, herein called "County", and City of
Woodburn, Oregon, herein called "City', is executed under Oregon Revised Statute 190, Cooperation of
Governmental Units. Herein, County and City are jointly referred to as "Parties" and individually as "Party".
B. BACKGROUND
County has undertaken construction of the Marion County Radio Project, a countywide public safety radio
system designed to serve the communication needs of first responder agencies throughout Marion County.
County proposes to construct radio system infrastructure on City-owned property consisting of a
prefabricated, climate-controlled radio equipment shelter, the installation of up to four(4) radio frequency
and microwave antennas on City's existing steel monopole radio tower, and related site improvements (the
"Project"), to provide connectivity between the proposed countywide radio system and METCOM 911.
C. PROJECT LOCATION
The Project is located at 1060 Mt Hood Avenue in Woodburn, Oregon, and is further described as Tax Lot
Number 051W08CB04800 by the Marion County Assessor (the "Property').This location is referred to as the
"METCOM 911 Radio Site" by the Marion County Radio Project and is depicted on Sheet T-1 of Exhibit A.
D. TERM AND TERMINATION
This Agreement shall be effective when all required signatures have been obtained (the"Effective Date")
and shall remain in effect until terminated by the Parties, as provided herein.
This Agreement may be terminated at any time by mutual consent of both Parties and according to the
terms mutually agreed upon at the time of termination. Any such termination of this Agreement shall be
without prejudice to any obligations or liabilities of either party already accrued prior to such termination.
County may terminate this Agreement effective upon delivery of written notice to City or at such later date
as may be established following such written notice under any of the following conditions:
1. If funding from federal, state, or other sources is not obtained or continued at levels sufficient to allow
for completion of the Marion County Radio Project.This Agreement may be modified to accommodate a
reduction in funds.
2. If federal or state regulations or guidelines are modified, changed, or interpreted in such a way that the
Marion County Radio Project may not be completed as proposed.
3. If any license, certificate, or insurance required by law or regulation to be held by the Parties under this
Agreement is for any reason denied, revoked, or not renewed.
4. If City fails to provide services called for by this Agreement within the time specified herein or any
extension thereof.
PW-6942-25 -IGA WTCOM911 Radio Site Page 1 of 5
12
Docusign Envelope ID:8EE77494-2007-4294-967D-9CCD93B90C5C
5. If City fails to perform any of the provisions of this Agreement or so fails to pursue the work as to
endanger the performance of this Agreement in accordance with its terms and after written notice from
County,fails to correct such failure(s)within ten (10) days or such longer period as the County may
authorize.
E. CONSIDERATION
All costs associated with construction and maintenance of the METCOM 911 Radio Site shall be borne by
County. County shall not pay to City any fee or amount for use of the METCOM 911 Radio Site, including for
any costs associated with City's supply of electrical power as described in Section G.2.
F. COUNTY OBLIGATIONS UNDER THIS AGREEMENT
1. Construction. Refer to Exhibit A, Construction Plans. County shall, at County's sole expense, construct
the Project in accordance with the stamped Construction Plans, including the supply and installation of a
10'x 10' prefabricated radio equipment shelter, concrete slab-on-grade shelter foundation, site
grounding system, ice bridge, electrical feed from the existing 1060 Mt Hood Avenue electrical room to
the METCOM 911 Radio Site, tower-mounted radio frequency and microwave antennas, utility
trenching, underground conduits and backfill, gravel surfacing, signage, and ancillary related
construction activities. County shall restore all pavements, gravel surfacing, and vegetated surfaces
impacted by Project construction to pre-construction conditions.
2. Permits and Licenses.County is solely responsible for the acquisition of all permits necessary for the
construction and operation of the METCOM 911 Radio site, including but not limited to building permits
and Federal Communications Commission (FCC) licenses.
3. Maintenance. County shall maintain all site improvements constructed in association with the Project at
County's sole expense throughout the duration of this Agreement.
4. Radio Communication Equipment. County shall, at County's sole expense, install, operate, maintain and
periodically replace or upgrade, as needed, County's radio communications equipment. County shall
provide at no cost to City a structural analysis report stamped by a qualified engineer licensed in the
state of Oregon demonstrating the structural adequacy of City's steel monopole radio tower to
accommodate County's proposed tower-mounted antennas.
5. Construction Coordination. County shall coordinate construction activities with City and existing site
users to allow uninterrupted use of City's facilities during construction. In the event changes to the
Construction Plans are necessary for the construction and future operation of the METCOM 911 Radio
Site, County shall obtain City's written approval of such changes prior to implementation and/or
construction. County shall complete construction in conformance with City's construction noise
ordinance and City-issued building permits.
6. Site Access Security. County shall be solely responsible to secure and maintain 24-hour security of the
radio equipment shelter to prevent tampering and vandalism of County's public safety radio system
equipment and will provide escorted access into the radio equipment shelter to City upon request.
G. CITY OBLIGATIONS UNDER THIS AGREEMENT
1. Access. City shall provide to County and County's contractors and service providers 24-hour access to
the MECOM 911 Radio Site for construction, maintenance and operational purposes.
2. Electrical Power. City shall supply electrical power to the METCOM 911 Radio Site via an existing spare
200A fused disconnect located in the 1060 Mt. Hood Avenue main electrical load center.
PW-6942-25 -IGA WTCOM911 Radio Site Page 2 of 5
13
Docusign Envelope ID:8EE77494-2007-4294-967D-9CCD93B90C5C
Exception.County is solely responsible for the design, permitting and construction of the power
circuit from the existing load center to the METCOM 911 Radio Site and all costs associated
therewith.
3. Tower Space. City shall allot space on City's steel monopole radio tower for the installation of up to
four (4) County-owned radio frequency and microwave antennas.
H. OWNERSHIP OF SITE IMPROVEMENTS
County shall retain ownership of the radio equipment shelter as a County-owned furnishing upon the land
and such ownership shall survive the termination of this Agreement. Upon termination of this Agreement,
County shall do one of the following:
1. Remove the radio equipment shelter and County's tower-mounted antennas and leave the concrete
slab-on-grade shelter foundation in place, or
2. Remove County's tower-mounted antennas and transfer ownership of the radio equipment shelter to
City at no cost to City if City agrees to receive ownership of the shelter.
City shall retain ownership of all other site improvements constructed by County.
I. EXCLUSIVE USE
County shall have exclusive use of the radio equipment shelter for the purposes of operating and
maintaining the Marion County Radio Project and may permit the installation of equipment within the
shelter belonging to compatible radio communication operators,which may include but is not limited to
METCOM 911 and METCOM 911 member agencies. Furthermore, County may charge fees to such operators
for the use of the radio equipment shelter.
Exception.County recognizes that County has no right to permit the installation of 3rd party antennas on
City's steel monopole radio tower and that the tower space allocation described in Section G.3 applies
to County-owned antennas only.
J. COMPLIANCE WITH APPLICABLE LAWS
The Parties agree that both Parties shall comply with all federal, state, and local laws and ordinances
applicable to the work to be done under this Agreement.This Agreement shall be administered and
construed under the laws of the state of Oregon.
K. NONDISCRIMINATION
The Parties agree to comply with all applicable requirements of Federal and State civil rights and
rehabilitation statutes, rules and regulations in the performance of this Agreement.
L. HOLD HARMLESS
To the extent permitted by Article XI, Section 7 of the Oregon Constitution and by the Oregon Tort Claims
Act, each Party agrees to waive, forgive, and acquit any and all claims it may otherwise have against the
other and the officers, employees, and agents of the other, for or resulting from damage or loss, provided
that this discharge and waiver shall not apply to claims by one Party against any officer, employee, or agent
of the other arising from such person's malfeasance in office,willful or wanton neglect of duty, or actions
outside the course and scope of his or her official duties.
M. INSURANCE
Each Party shall insure or self-insure and be independently responsible for the risk of its own liability for
claims within the scope of the Oregon Tort Claims Act (ORS 30.260 TO 30.300).
PW-6942-25 -IGA WTCOM911 Radio Site Page 3 of 5
14
Docusign Envelope ID:8EE77494-2007-4294-967D-9CCD93B90C5C
N. MERGER CLAUSE
The Parties concur and agree that this Agreement constitutes the entire Agreement between the Parties.
No waiver, consent, modification or change to the terms of this Agreement shall bind either Party unless in
writing and signed by both Parties. This Agreement replaces all prior agreements between the Parties
regarding the Property and there are no understandings, agreements, or representations, oral or written,
not specified herein regarding this Agreement.
O. NOTICES
Any notice required to be given to County or City under this Agreement shall be sufficient if given in writing
by email, by first class mail or in person as follows:
For City of Woodburn: For Marion County:
Woodburn Police Department Marion County Public Works Department
Attn: Police Chief Attn: Director
1060 Mt. Hood Avenue 5155 Silverton Road NE
Woodburn, OR 97071 Salem, OR 97305
503.982.2345 503.588.5036
Polic:eD , p trn. irt"�c:i.v�e�e�r�La�ui ir.e�i.�u f VV ii r te�i �c:e�.rrn i ie�ir.e�i.�u
.......................................................I............................................................,,,,,...................................................................................................................... ............................................................................R......................................................................................................
This Agreement and any changes, alterations, modifications, or amendments will be effective when approved in
writing by the authorized representative of the parties hereto as of the effective date set forth herein.
In witness whereof,the Parties hereto have caused this Agreement to be executed on the date set forth below.
MARION COUNTY SIGNATURES
DocuSigned b!y::,�,
�&A&S 12/17/2025
E
Authorized Signature: szssBn7aco6D443...
Department Director or designee Date
DacuSigned by:
� Fvn 12/17/2025
Authorized Signature: Dc,sss,24aDe4ec...
Chief Administrative Officer Date
Signed by:
E60Cg8A6F708240B
ab Om's 12/17/2025
Reviewed by Signature: ...
Marion County Legal Counsel Date
DacuSigned by:
Reviewed by Signature: 12/17/2025
Marion County Contracts & Procurement Date
CITY OF WOODBURN SIGNATURE
Authorized Signature: Date:
Title: Chief of Police
PW-6942-25 -IGA WTCOM911 Radio Site Page 4 of 5
15
Docusign Envelope ID:8EE77494-2007-4294-967D-9CCD93B90C5C
EXHIBIT A
CONSTRUCTION PLANS
PW-6942-25 -IGA WTCOM911 Radio Site Page 5 of 5
16
o z -•
- 0 o d�lllllu a
U Q a w b W W
Z .0. who � � =- - �'•,,o o > LV H
0 n �� <� hio �� _ ° emu$" 0 2
_ W --o - `'� �� �IIIIIIIII m� 22 i V co
0� Iz
m �� ,.
o.o
o�ao a H H
o
0o
lo
0 0
O -
a o
LLo
o
Fto= _ _ _
Ro 'o
N 8LL
W oo �o a -
0 0- �
W oo i
0 o aw a
a. N M
w zo
w
o sJ
oo
z dha
I� O _
o
O - ,
I
w` w I
O
o o
=
z o zwm������zLL O
0 U
,", z
r
Z z
F O E
o Owz
O jK> 3 K-=o
o
rC� yoCD 0
o�
® z_
zQZW oa�_ o >z
Q U.a
W 0
cc o w
O
y Lu LL o y Q U�,� a.
W Z z z� a
Ow=o p.
U zoo �. H'o V��
W Uo �.. Uo a p'o.o.. mo
Q O zooms �® wy�® zz�wa=M.
ao��z 3� �� m® U
a. a �oow_-s aa_a npioo mot_ � '�•zr
5
0
Oz-,
75 Uo
3g
CCDI O Z w o
-
O o
xl w N Zm f/1 Qoa Zo�a
O w O�N� rc wos o pmol
Z o ae`s" z Oaw OLL�o aow"w�a a ti
o>> z + u--,o >>za � oo>
rco�� o� Q ol� z m o.o,,z
��o 0 0oz
U �oo� o ��> o a�> o�oz
LU w�zo rco? i
W -awe U.ao Ue�w - �� zz�wa<�
wow w000 wz ���
O pLL�o zz Uz w� wLLzo w,Noza
o00 rco 'O 'o z, o�wm��z
U d' rcoo
O� Oa ao rco rca F000000
d aoN� ���� U§ p�Nm U<<.,me��
m
0
U
U
z
5yo
00
d,U
O
Jz
go
o
N_
r ~ Qo5 w
jI I — — 0Oz �
c W z — — — LLOF
0 F -
o c� c� o 9 w z — — f
u - z z o o o o oo
w` F oo
w o o �m - - -
LW N w w w Arco w w w
2 z �wvi
N w w 3 w w w Hg
o
cl
co
C! z
o
z0�
O O oz z s H
— n hiolflli w_ �3 ". ,,.�o Z W
W 0 - �IIIIIIIII mN `i 2 3 W O
-
o aLL� a N N
��j Wynn"I f'I� !I III'Iill I�l it 5
f VVVV �,I IIIIIIIII � uuuuuuuuuuu
i w�
O
ram-
c
1 � r
Mv OD
p"
Ol
oo
/ ..... /
uouo�Jaw o e,
ll �j
CO
�-kw fj� �� ��s ill' � f o
>
W o=o=o Z
CO
o z /� LU
0
CJ � �O o co- � o _ tl�lllllu a g
U O �. Z H
O o o
W Z
W
w
_ �o �IIIIIIIIG �
0
LL
LL
a o aLL�oo
s N N
w -000 z w w� o
o 0o wo >owo ao y o o LLw o
awes �o� <z<z ����w o w �o�>o 000
�az� �za�o�o� �o»mawazw amo�ooww-LL w
a z w 000wa w�aaa =�000Iz wwzw
❑ � �n000000000momaIIIII�����wwwww.w. -Y0>'>>>����� oa<z
z � I �
w -
�wa c� 0000a V--
cn < o-o wo
�o
o
ww
_ �
�oo�-=-
oo � � w --
w--o
oo�
mo- �oow« om � » =o a s��� o = = z = a
lo
0
Qw<z
-
�oz�o
_
w
-
o
a � oIwa
0
o -
� - -
o - o'2 >�
000 o - wadO o _ a
o
- _ o
- d
o�J o� o > - � z -- o o 000 -
oaooa' w ao J z ww w w w o - zo Y z o�woo z Q�� zo o�op
7 '-i'6oazoo 0 00� o - 00000 w000too o' �� c�I J�ooc� o � g d
Z loo=c�ia - c� a W aa" owoa �w'�'wi'a wo`�" �aw
wo �� zz - 1
z - o o ono �� Ywo�� I�9 1.00 -6�o> o ❑
o woo-, o o zo o � zo w - - mo �a z _
U m'o- o - ow w -
w 000w'�' w <z <� w o o C9
p o�-oo<w w� boo O J
Z zmo_w - O zo O ❑ a
o mo Z z z a - to o I
p �000awo J m ow o � OJ o _ o O Y llo
rn
_ a zm oo � _ Z oo�_ z _ m w w w
3 _ALL- w - W J - c� o o w w g
W «< az « > a<� Hoz fn LL ,,(
- o - w o o QV
a o ' a
_ po o1 -
m -- 000 o> ow Y o° "mwo 0
sQ mm z o00000 �Jza
o
w lo-
wow o�- oo - . a w mo �Q zz <�<w z _ z 000
o - �? - J� 'w 00000 �w
oho w <� o
8� - 000 o wo �� oo zw ow <� woo >o - �o� <
- mho - �o - �� ow mwo
w _ ooQ J z o0 0LL _ w-po � - omo - -
a - w m000 �� �o IN o �wm�000 ��� -
w Y o -- - o ow _zooa w _ o o�s0000 «�w o - ow
ww _ � o zQ - m o �ogao - 00
_z o z o w ozc w a ww-5�os wLLoo -!2 w
z� - - mz� w 6w — « m �o�o - - ujz 000 �?
Z - o o a m o o J o w LLo o w o w w o z
wo w -os oo, `,n.n , Yoo�s 00 ow o==w�i�o woos =�o� -
w _ - F boo moo ',� -oo« w Jw W - zw oo mo z
of 4o ooa o�m �oozoo 'o`. �z
O _ w � Z �8 o 'w - - z sw� - o
J O 000 ���-�o O ?wo Q� o" oozs000 ?off wood -ow go
z w - w wo� o=ww �o�oz Y - - w� x - w
J �o F - _��- a ��oz� - z K "m om _ �oa� �� o ss���
o
- -E - owo �oQoo w� o �o wow - - - -N8 _
W "oa U oo �o=mw - � m�LL - i - IQo ��
z s o z _ woLL w� z LLow w LLo w< ow a <��wo�a <_ z wLL - zzzzz
w O < - o
o IT IT o-
w �o oT - ?�� - �o - �z �o o
_ oo «� - -- - -"wz
o .0 - - - w�� - - wo - �o -
m 000 - - - o � zoo who _wo ��000 - z `oo'o �Vo� - wo
o woo w <�< o - how _ - -wow oo�oo?��
U 000s - _ , o ���m _ _ w-�Jo -'I '= �a w
d - - -oo 0o wz - _ - o� Qo wo ��w�<oo ow - -
000 _ ����� _o�am ww� �- mo o `-' -w �o��� z�o �o�s -
- m=� - _ wQo u`,1
o o�w�«
moo"
��� oz - - -o z yooa - _ �ooso m zw5zwo -
�o� _ Qo -I 000 a�LLs woz� ����� o z �'o,jo o�ww`� m
-g�a.z - m� -moo oz w - =w =9oo�o"`w'" -
E� �o o - - w.� o�wo - 000Qo zwQo w =<� oJo�o - woffi
o _ �� woz -woo _ o omao�oo�i �o w�
osso�- o� - _ w sm o �ms�'s m��swo
_ oo�000> �a - ems
o W w� - w - �o� <"Q�w aw�w wow ��'< o�zmo� ��ao
- ~O oo o� w �z w?oo � 000 _ J - - -
Imo �o_ 0000�m �� �o �o��m �m' So m� oo �w - - - _o - _
w` K ono 00 0 -��om- �o z o 000 z8� - - < wa
w �o �Q0000Q Ion - - wzw woz�zoz11
m z ozLLza w aLLoo< YooYEE -ooLL «owoa o 0 0< oo wo- moo. -owo�mowomo <woozwww o
o
C� O oo
� �
v w o a Iio01l1Nii b �� Yti s w_a mra3dv'_m d."•,o u�'�. W
o c(a7 Ov dJ Wwo
oW s w
�111111116 � �� Z
0
LL
22tloH
aHillo a2�o s N O NTw
i
I �
A)ilj
- N
- _
'x
I
R Z
I
w I -
o
o
o- - ------------J �� o
0
w a o W
� I Q
z I +
w
LU
c�
V M N
�$o
a owz w
ow��oao - a o�
o
E� -
�LL
0� - -
�� o�oQ<� es _ - sowao
� �m�
m , � -� - - oho
M owz���� ��m�� z� -
wawmm wsm -
v Q-=o8 o-w ��zw�z -
d - o o w <o, m Qwam oo
oho -�zJo� �o�w�woaa >
o
woza m�o,wLLzm z Q��z"pz�wzaw-
wo
�zpQoo< - soa
ao J a � o0 0 0 olo
�w =mlo
-sws ooza�-oo_ w
EoQ z oz o- zzw w000ao< co
aoLL��LLo- �o��a oozo ��m`w'��ozao� -s _ o w
w ozoww-yob
boo=>mo woo - o _ -
aw
C, - gLLi2E_~.z=> ,~ owl �z�zaza�mo� ��� mV� O _ -
�wwo�o 'oLL<�LLzwLL�wo- ww�o z
0 oz�waw�z �, � o� 000
> was<mmco
o��wowwzowwoz�moYoawzw�� �o mho w
W LL���z�aa���� w 11 - LL 7
Z - - H
N m e m «< W - - a 7 O
"' C7 'ol LL LL a di U Z
0
¢ �o 0 CO
ya
V 0 oo �IIIIIII a g 'z w N
W
z � ww 0
_� J oo o. I011u� NNW— I`w J J
. - h10 o `"o��'�. 0 W
LJJ p o.
d d w
ju
ww
a oaLL�o s N C� V N
N V
�a U
z
0
oo
� w N
z=
w twi`
o
fl
HoN
8s.€
8o
e
Ql- o. I
�'o x °
E
o
o
a,O l O
azMloo
m�e
5 ¢ O w
k: FF
..� IF da _ o AIH
O w
� LL O
N
J & io Ja oo
o<
qs 'f as 8 o� �� ��
o� o
p G0
ow z a
o=
o-, wo z
zVX oo U
1 �e �`� w °J U
°S w zo z �m CO
UoLU
w< a oa 0
z Oj m=o o S =a s j i W
W
Zo~ o �� Q
�� moo— zz_
LU
w z o
a
., o
w�< �w z= LLa
U
d m
LU H
W W
H CO
o Cl)
e t.. � lid t xe Ss
g
g
,
jE
ZE
ov
Z.
55
a
G; a we a ¢ tltl
N$gp
,
k g
C,
mLU
fil
d
UH
m
w "k a t� c`w,w y�u'
wi y /a.`. s°fS� :ems ��"`" `�tk,,€ j.w
w � 'nra w'ot` �.. Y ° 0
m a s i ,w.,.,, �,, A z
o € s �'✓� x s ,.. I "Ille :; 'ter.. `� 1' $y w
G
d zLU
8 � i+ €s z r a � � CO
�t
g
LU
E CD
0
c� a
0
0 o tl�lllllu a 4 z J
� Irk U Q o
oZ
0000 � �u� W W V
d d a hioi `, w
o -0 o'er �IIIIIIIIG W— s"
0 W -o o m m` O N w
a w
o
a ogo, 5 1.H HTw
r
r„Sul
� r 1r'I II P �ff
a
N
oy
r eau � a
N � j� i itll
o �
f
or
s`
/
f
o
II ;,I %/ CO
> z 0 J
fr/ LU
w
0
o
0
LU
wZI oS o
a~
W � U LV N
o�ao a H H
�zr
s
o _
wo
�o
m x
w
I
I` I
� I
r
r
o rV
C
—IY]
J ,
see
m
0 1 -
M o �o
a, o
o w to
U _ o �.o �oo-o �x
_ o
o +ii "q a
o aw
_
IT
�w
x
o
LLx
m o x
a
o w
o ;
<>
d Cl)a ow o0
° -o
w
w`
�w �a a
Z
W
,
co
�
C O o o
U x dmoom `g ( .r�� O
O oz �w b Y ova Z 1.. M
z o 0 0 o � �u� "" •,,,o Ii0011i w_ '' °1� rc o V
o �m
S d d
- w
0
C7 o /93d,
LL `0 z
a ogo s H H
o w
R N
o o z
�Q
E - o �-
o
to > oo w z
o, s
w ���� Ix
moo« moo«
o� N
1'i � a. IIl 1 1 l�l
1 f
III o
J
W
H
NLU C
N
o w W
N
d
O
w
d
0
� o N
� � z
10
Im
z o f
x' �o x' 1 IIIII
I`IIII
p ,
11 ltil I'
U
U
0
m
v,
U
co '
m
v
r
O
W J
LU
co, > W
0 o w ?j
z
W
N
moi
w
0
C,
c J O o o ....lu 3 �y� C w,rg�� � � COr� U O .0.
LU
v w lNb Y ova Z 1.. 0 Q
o �m � �
w
w
W o �IIIIIIIIG 0
LL
Ho
o
a ooao s m m
M Ewa V
N 4^
6' bs�o m
W aaaladagf:s
uo
oo
Rini
o
sa.
a- yo oN
w
W-
" .0
.............................. c
0
2 8z
w r r �>
oo
w w <M
=w
to �R �3� ,00 1 J�wLL
o 0
m 9
o
o�ow
z
i wrY N
M N 011
w
w
z w
V o J
o o Voo? H
d wiz o'a fn -� Paz= z<a� N
_ m Y = J - o w Q a w w - 0
w�o �> W
-¢r m� W - w 10, aw _
.wi.wi.wwiiwiiwiiiwiiwiwmwwmwwwwwwmwi.wiw z
w _ N W
fn 0 U
N
- o 0
wo� wg
oI UPe e who coicoi� o - \
o III ii II =8 82
a 82
�� IT
0
a� �o
o
�qo z
Illll N _
N w
U IT
o Illli
a�
o .a� .tip .tip
mU o®_
AdVON003S IVOl"o",6Z a o
p Admidd Ivoldi0313"9£ a o o aw
..3.E Ol 3Z oNMa $w
J
2 F-
w U w
w z 0
w z
o O
W
U
o z W
j J N
cL
w W O
O 0
d coO
co
a �IIIIIII 3 sag �\ % \ H
r� (� Q o z v w lNb Y ova z 1 .� W
U U
o 0 4 0
,W 0 ~ w
W �o
N
ju
ti
N U
�l L
O
YTMA
s 21
3 m > c
_ >W
- D p 6 N a U
U� Z
O -
� G o o _ &
cL N ° m > a
C a
a,- a o'0o a
} C O o x°
U�°°8
20
O a �z
W �9 O V o-o m °
`oo mE
CO c 0-2 �¢
O U g= l E o
_ n z
0`tE° 3� O
a° O
m n
o ~
z
U E M
luett, U z_
Q vOi N
lu W
z
Z (O
O N
U
!, if
a 3
o a E
ral"
3 3 3
If f qQW M1
z Oio x o
rlr�l
cr-
ME
%
CL
- E E E E u s
XCL
W LL
14
21
M 9r ^ d �o M
o
(y mj IN //
m I I rr %1 /J�/ Vj E
yA titik�af/G%IwM',f r / -OF
F p
v // r � O o m0 E 3a ml
o LL
5 r
m _ M
Z t6 1 `" y 3Oc g ° 3 u o 0 0s a
O I" ��-��'" C E Q n E A
- � Y
Q
0
0
i�J � � ;s w ����� r 5�'�• .rb � z � a
0 o tl�lllllu�� Q7 `g �`'`...z �16 n Lu Lu z
r� U p
.0.
a w lNb Y o v« z 1, `�• H 0 tp
z � o 000� NNw_ V5,,,o o a ; a ci
rK O ¢ IIO v� J �.
w _ Lu s O - �' o �IIIIIIIII `� �� i = 0 w
z LL 01 a 'U/J3� LU y Z
a ova LLa�� a H H
- z
ao
LL
o
- -� o
o IT
ffiwhoIT �o
w _
�z z
mo a� off? w o
22 aw o�oo z� oQ - -
jo �oJo Jo o z x oz
o
wwC=
�o z oo w z�� - o E �a�ma
�w moo oGlz l< I ox
z<
owlz x=o w� filM - o�CaC
Qo >
4w wn _ 03 0� o,,, J -
wo owe a � w IT
«
LL� oz zoo 0 w - �< w� ~Qo- - �� moo=; - ��Ol
oho ow - - w - -
xo main �m c� oI ml m max coax �c�� > cam _o a
-
o
o
aLd
o
o� o o
oo
c~xia� -----
r
`p>> IT
L
o
o
�• �. _ --i__L..... -
® I
o�lll
o o 0
o
f�
wo <
U z N_-
o z ®o ®
m mom oa
m F
r� o ��- QF j Wpm w
U
m iLL z
c Q
� J
lik
z
O
m 0
z
O
W W
9' J
V ®LL W
_�m
coo z
o �YooFL
Z
Ng xw W
W d
7
Lu
mo o r- 0 CO
ull�l Z J
C Q O Oz v �� UIIIIIIIII a s ov= �ra' d."..zg = LU• �� U a`�
o'of I�I� m` ,,O LU
O LUca
`' �IIIIIIIG 22 i Z
Iz LU
ju
- s �IIIIIII� p alw
N
- s =
o _
_ a o
o _
O - z
5 - - - U V
O =wNzl �<
- O _
O o _
O O O
w O _
OIz
z - _
U' U' ¢ - �m v z to r r a 1 1 x LL w • • 0
Q �
H
W
0 �Zf
z
Z W
LU
a Z
F - U Z
= W
J
co
M o
Zb
S
00
N
W
0
0 -
U o LL
LU I
1 J w > a
W o I 19
- -
0 0 Pa
Z z
O
3 U .f - _
o o 0
aoa o
w O�z o F } -- m m
w
71 y
w
E�) -_ _
� � wo
Y z�w ,
0
w�� o z w
�w�
w
w
o o
w �
�z
a=w
LU
O w o 0 I I \\\ � jLU
�\
o�,
I I - ow
\�
0,z
— I
Ld a
z o - - a
o z
z
o O
Do Eo
o
< w 0
o Ld - Soz
o a
woz O
w` O
w LU
0
C,
o
z o Uo�lll y`y �b Z _
C D O o Z N o o UIIIIIIIII S o w U ��o z
,�, o LLJ
�mll"m
w w v
0 W o GIIIIIIIIG " m n22 ; 0 WD
a
_
w�
LL
zLL
ju
m (.0
o
om woz�
19
w w mo o o tlao
V
m� 8 lo
a mo
m� �m m
o o =
o I _
.� 1.
as e e I o
_ z� N
e ee ow
ee
co oow
a e
LU e e p a In a lJJ o m
p a
o a -
U w
W ® Y
Z ? o
11 AF O o
=0
loo.
- D='.'� I
9
o Sao D> o
~ xIa ¢ �Y waa V LU
'o� ?o
woz oE-
to xxm
J
U Iwo �x
d
}
H
o
N - w LD
o
z � ozwx z
zxzooz zo zc�
o w o ¢ o ��--j uuwn>n�uunoua00000000000000000000000000000000000 _-
z o o z z w J
LL10 - LU
o w- o H
J� z lolo p
zo
w o - m o'o
I
zao ?
aowos
ox J 0
oo�o I I
LLl a z-zo 0 w � a� wo zip' z I I
- � wz
o �oz moo
mm xo w�" owaw `� W i�LL aoa �o��>a m m�Y I I
00
�a�z�a zz�x ui ozzozo ozza,o� zoz �'� -
w z
z
LL mo ow ow xoz� LL -aomo coi LLa mwo�� ��wo� z�
ozo- 0 7 wwzo" �¢P - a
zmoom I I c>
I I
'o
o So
�
z���o I -
- azm
z zc�o
I I
w e w w z
o
c> � o N�
`�' omwxoz w c�i 1 I I c»ac�o
om oz z z z I
owoza o 00
W ocxz¢m , o- �\
z Glw=o' o oxw I
K o�z 0000` ��d Av'
o �m
m o� Qo��¢ ------
oo x
C7 m¢o��
w 111
oz z wo
w oo.a
zmzmw w ¢ Izo J o' ------ ♦
< I
z o w
a — ,am w�� w I> z w Q _
m �o LU zz�o
-m I w- oz `� p oaogo
`��z o
x zw z z zz>o - +
—41
z >ww -
p zoz a
_ozo¢_ o o o wm II I?�o �oQ o - �� z w two
W - z p �$o z� mJ x I i
�w� - Z - - z o.oz 1 P
zI z w w
Jw�m �� o 0o x x - _ \
z� wLL
a og o _______ ____may \
C7 ¢o xa p -
Ed _ om o o O =a I I
W oar oo 00 00 C�7 z ago \i -
z
N o i//n/lir/✓O/0 o
oll IT
s //� //ir
/ z I
Oo
oO _ Joo
w �� U
vi miO
=
0
e o O
v
L` z "1`. ioi i: � i I ¢ Cl)
o
0
w o Q o U Gi . 1 v �`� I O
w �� �� w ... I a
C, W /r////////r/r0/� % ••^
o
W /
ZJ .
6 ERU LU
Q
LLimr0/i/ eiT�rl�iayvar ¢ m m m ¢ c��- m
0
CO
C,
Q o��o QIII y��
JD o Z N o o �0111111111 a o v= � �..tg� N Z co M
J O LV
0 W s o S o �IIIIIIIG a m c 22
oO Q w 0
C7 �' (7
LL LL om m
a
Ao
a o
I 1
I I
- I I
wz
om ffi m
I I
o I I
' w
oow o
o
I I
I r-�
w
o m�mz I I
" I
T I -
-
----------------
IT
I I
I I
-�
---
CO
^
�iaoii/iooiio // i w z r 1 0
/ o wxw ~
m
� �o 1 s �
II � w
U
_______? I LL C7
I I Z
mwm� II I m �
z
�o�mz 11 z
f „/ i s �' ..... W Q
� i o m m A II Z
W
CO
%iuvo^rioc/e ovi oo/J%% a M
CL
J
�/i riir0/f "'�Jiar�r!✓irymaia Q
U
d
}
H
I I
I I
I 1
I I
I I
z I I
0
m
oz
o m
r\i
yIIII IIII-
—
I
Y I
I I
I I
m y
0i�r%%//fro%% 1 I z U
11 �
r Q
vU V -
U W
m �ovii�/ / iiedrs// J^I Co
mwo
M // % �wwo / 1
/ r//iFioi / m ffi Zom mom 1� m 0
m Z
...��; ,� �, %rirunr5rrrmrWl°"' - I O
/
�� liGi�6%i�rGvv I i z
% % I I W
v Q
m
a LU
>
/r////////r/rm,//% i i m 11
w � zo
w� z oaoiiioim
o
d
O
co
o aiinali W
w Q o
x wo LU
w OLL
O w o S d d w o maamu LL
s �IIIIIII� Tw
3� aww
o�aLL��r a H H
---------------
y
t
�I� ,
�a
--
z;A Al p g3
Vf
im
Al
e7
�I9 � 4
� c
i(llloi` it, c
(r't��f _'a 1, 4 r 9....
a
f f
oz
o zo M
--
lEr r �o o o
o
0
U a
U o
m —cl
g g
C) _ a
0
' o
z
o � o _
o
W p
� Z
p w
6.
rn _
W
— ¢ O p
o
cl
mo
w � antra co
C 0 o �� \ w Q
p o
U Z
z o o L o p f ,.,o'o Z O H LL
L'
a s oH
maaamm _ ms%� 1 _ a
a oLL
-'o-o s H Q H
E c N 0
c c z
c
CT ° O
o_ LL
o
CD LL
m ii'll,
co c O
_ 9 a
r—I c �O/ri/ii y� "✓ ` m � �
ro g r' E W
.f O y / , v a w E n Z N
J c o 3 U
_ c - ; # -
Q 6 N h LL N N 'S 0
U
LU
m
co
- Z
� m
a W
o �
s y_
0
c � x
O
v CO
N Qa W
Ey
duC) 0
= o 0
U
to H
m � N O
C, O _
U � �
d N a
C N o ti
C m a c o
o c ¢
—i �° u o
fall - U - _
+ VaIrl
n N_ m
X °' Ln m c nn _ p
n_ -oi5
la o
u rn rn E E r .E .E
d 'o
y c c e v
a` a` l7 ¢ a° y y ❑ W o' m° a m m > s 'w
w`
o
C,
z o umNl co
rn Z W Z
G O W O
7 (> O oz W H
0000
w m In II
0 4co
O o o m000u ," 3 W w
o �� � M16 � o 3 v'fy3� z w W J J 1.
n W W
- s
a o�aLL��o� a � N y wj
Z _o Y z
N ry Z
I Etc
/W 0 x N K
5 �` oO N g
E m O O N J
z r w
0 -M, Q� U N �/
w
'm w
W z H r
a rw— _re�a$�
w *v+-
0
t -
t=
rr
ut LI
o- - --
I III III 1I
0 Fx,
MI
p., ,
r
c.> w
J rA
-- -- --- I !.�errw
r
!
r_�r� C>
L... �.
______________________ JJ''lA1
N II Lll jy"C!Mj LII
e
n
m 4 0 ui Cd vl f'i
V
JII----------------------------------
0
da.
�0 II II II �.rrxn'.�au
m o t ,>;
LL o I 47 fl f li.l
v I a I
....... ..__....._ _.....-.... rf1 AI .
ry z �hi r ca iY
oa
Ini ua
If
C` ,
.................... G I ill LA(.S
61.1 II -r.. ry'C'J
N m'= Z. 'E Cry"S:iF
Od O O O
lL
w
.55
z o�¢o .. CO2f >^ w low r c,� 4y Z W Z
�� O o tl�lllllu 4�T g V',20�1 W H O N
C) O o� M1 woo
- z o a hl "N - ° 2 W co
W s o p`' k �IIIIIIIIG m '` 3
0
LU
G Q a ® ¢ 5 W coW
a o�a LL�o a H HTw
`W z
f z
m
—
y O Q N Q Q
E ym°r's �o c ......... .._ o W
N
o <0 _ Q
6L3 w <o 0
6L, Ozw w
C di
Z
Q D e_ne.n. N —
/r
— WK
M
4 CC
TO
y
1
i
u
I"1{1
A �
f_1 "
y ) _
)
r
p
� y
I U
A, >>
M
C, z
Qz ~ �f 1)
o� 2
w (•J
m c,
v z
ry 0 7
r ffi ao 0
�,�: _r fill re. w )
( r f�.�al•T
LL 4IO?.
J
W �
C
o O
O¢ O O wo
> o-w
W
O
� O o
o J W � M
Up LU
o d o ws�o3� 1 0, 3 LU
j ju
z W o o¢
¢ _ To
oww
oaLL� N N
�W
v O N .. Q �S K
wn
�Omrvmo Q O aN 4 U Q
w �EOV'd'd O Zk �. N O O
a z Z
Gw c�a w g0 O 'm N z K
o ""� ° ° r m r o W W
w [If 6ia o S N < z ° a a w
y € Vf - o csi o '.. - y
N.. N..
UA
W 3a<<a<aaaa e�y NO
��ammm°°mom �mZLu
LU
a < cc�w
U Ny� �$3o
e
-- M
s"a
o
zz �F
a°=
.
I1 oaz �+ I1
............. .... ...... FJ
+
11 I
MI os 1 Na �-- � ,�E
m
1 .f
J
{.L....
F- fi
m
-
o - -
U
p rtow r o a
o m r
H lbw w w
rc.
w�K -
N m po
a721 8l/� s a _ m _
33
>n9 8l .. �30 _ a p a -� -
W � a
m w- 3 3ui _
d o�2
W
O
¢ �o W
LU
lo
� 0 o mlllllu
UQ oz
wow w o U_ W 2
0 3 �o h101 NNW- o ,m o J2 �. w = (n
am ;
LJJ o o d d E � 3 V
�� w � �IIIIIIImII mN
¢ LU
aTw
o ao— 5 N Tw W N
W 3
a 2 z w
m
0 w w
o 0 G
�omNm„ a O t N A U
ti o
� d � z x a O
o rya LLi w o Nz
w Nz� o z z > zo w a
w a. ~ S z N a zwLJJ
o
I)
jU
OJT
a
K�
N �K
ow,
# 4
o
N� CC CC
J ow w
`a w
w <<
s =a
a
cl
z — —
ul
.... ..... 08
FN
NOISS3dddflS
w J Q Q O O O O
u
wU �N
0 0
cl z z
U zo
a c�
U U
p oz
wo �m m
m z �
�o
m�
0 0
m w
wo xa
w�
wcl
—
o m
ono
W
0
0
¢ �o osgi Q
00
oy
_ O =�
w z
0 W O o �IIIIIIIII m qq `u„k
M o 3 01 .. '. W '
00
_��� � � ��IIIIII� rNq✓, C..� �
,�i zwz
w a,
�IT! -
lip. ,ram l
JJ p P
/4 /�� 3////i��i�%/lll%%/✓l/%%Illlllrr i �,
� ii.11lai,li�
IIr1I; I i
OIL
i
19 ajig
M j li
ax o� z was
f _ 00 eQ
0
. . ,�� Z � �� w _
...>/ W
O
o z wlNb c Y ova .. �,..✓�� J N
Lb
0
r� o O W o o o �IIIIIIIIG m r `u„p� O 0 a
��� q
a o o s N NTw
N
o
a a
9 n hx as 8li 5 s ,„
y
xx
1 4
w
'� x
OD
k
w �m
-- ---- o
Ld
1v se z w
o q
u
W W
\\
+ C �q "�4� dy1F -11 lfi li Jk
b
k
per
I �
I
\� ,q
z
U
m
C,
U
� Q
<
Q W
0 J
W
Z W
J =
LU U
Z CO
O J
W
w z z
a
o
W
o W ~
J
> W
Z 2
W � CO
CO
W
W Z
o
C,
4?4 4'*7 4N .'49W&
WboibBURN
Inc orpornreA 1889
January 12, 2026
TO: Honorable Mayor and City Council through City Manager
FROM: Chris Kerr, Community Development Director
Dan Handel, Senior Planner
SUBJECT: Annexation of Approximately 72.67 Acres of Territory at 1505 Boones
Ferry Rd NE and Approval of a Large Lot Subdivision (ANX 25-01, SUB
25-03, ZMC 25-01)
RECOMMENDATION:
Conduct a public hearing and make a motion to tentatively approve the land
use applications, directing staff to prepare and submit ordinances and a final
land use decision for consideration at the next City Council meeting.
EXECUTIVE SUMMARY:
The item before the Council is an annexation application by Icon Construction &
Development LLC and Emerio Design, LLC for four properties totaling
approximately 72.67 gross acres, as well as a remnant segment of Boones Ferry
Rd right-of-way that is not currently within City limits.
The territory proposed for annexation is undeveloped farmland in the southwest
corner of the city, south of Parr Road and west of Boones Ferry Road. The territory
is eligible for annexation because it is within the City urban growth boundary
(UGB) and shares a boundary with the current City limits.
Upon annexation, the City would need to designate the properties with City
zoning. The Comprehensive Plan land use map designates the westernmost
property as Medium Density Residential and the remaining three properties as
Low Density Residential. The two properties west of the railroad tracks are within
the Nodal Development Overlay. Per Comprehensive Plan Policy Table 1, the
default compatible base zoning districts are Nodal Medium Density Residential
(RMN), Nodal Single-Family Residential (RSN), and Single-Family Residential (IRS).
The applicant accepts these default zoning districts.
Agenda Item Review: City Manager x_ City Attorney_x Finance_x
39
Honorable Mayor and City Council
January 12, 2026 (ANX 25-01 Mill Creek III)
Page 2
Alongside the annexation request, the applicant is proposing a "large lot"
subdivision for the two properties west of the railroad tracks. These large lots range
in size from over 2 acres to nearly 14 acres and are intended to serve as phases
of a future residential development proposal (similar to what was done for the
Smith Creek subdivision to the north, which was built out over nine phases).
No development is proposed at this time.
f dq0 IIII I
I �u luv uYtlN ���IIII
vr�'/�CJIwI damn +^ul r 0 yr'. i I
r/I ipy r�If-,��t� /Ya''✓ti4%f%1 �'�y�j
i
„
t /il¢J�r o
Aerial photo of the site (outlined in red).
PARR RDAU
I
'£FACT:k'
I ru.,rw.u.n
I /
LOTI f.O'1'1 L(YI"! LQ 4
1
— _ _...
,,,, L-I LOTS LOTT
_. W TRAVERSE RD
� n a,scrw•c,I/
Proposed large lot subdivision (does not include territory east of the railroad).
40
Honorable Mayor and City Council
January 12, 2026 (ANX 25-01 Mill Creek III)
Page 3
BACKGROUND:
The applicant originally proposed annexing only the two properties west of the
railroad but in working with staff, agreed to include the two triangle properties
and the Boones Ferry Rd right-of-way as part of the annexation. Because there is
no development currently proposed and given the state legislature's recent
actions limiting what local jurisdictions can require of housing developers, staff
worked with the applicant to create an annexation agreement which addresses
some of these uncertainties.
The annexation agreement includes the following provisions:
• The annexation will include the two triangle properties east of the railroad
tracks;
• The applicant will dedicate right-of-way for arterial roads as part of this
annexation and subdivision;
• The timing and standards for future arterial street improvements have been
specifically spelled out and will not be a point of contention for future
developers; and
• A transportation impact analysis will be provided for any future
development within the large lot subdivision.
The agreement also provides for the continued agricultural use of the land until
development is proposed and acknowledges that the City will not require the
applicant to construct the south arterial railroad crossing improvement.
PLANNING COMMISSION RECOMMENDATION
On December 11 , 2025, the Planning Commission held the initial public hearing.
No testimony was received in opposition. Commissioners appreciated the
collaboration that occurred between staff and the applicant in drafting the
annexation agreement, and were pleased that the agreement provides
specification of arterial street improvement requirements for future development
of the territory. After deliberating, the Commission voted unanimously to
recommend approval of the consolidated applications package.
41
Honorable Mayor and City Council
January 12, 2026 (ANX 25-01 Mill Creek III)
Page 4
DISCUSSION:
The decision to annex territory is a policy decision by the Council. Decision-making
criteria for annexation are outlined in Woodburn Development Ordinance (WDO)
5.04.01 C.
The attached staff report addresses the applicable criteria for the application
package and includes analyses and findings for each.
FINANCIAL IMPACT:
Annexing the territory into city limits would subject it to City taxing authority,
including property tax which generates the largest source of funding for general
fund services such as the library, policing, and parks and recreation.
The City permanent tax rate is $6.0534 per thousand dollars - equal to a millage
rate of 6.0534 mils-as set by Oregon Ballot Measure 50 in 1997-98. The table below
simplifies and grossly estimates tax revenue, not accounting for any increase
resulting from future development:
Address Tax Lot Marion County Gross Estimate of City
Assessed Value (AV) Property Tax (6.0534 mils)
1505 Boones 052W 130001200 $61,737 $373.72
Ferry Rd NE
n/a 052W 130001201 $14,997 $90.78
n/a 052W 130001202 1 $7,392 1 $44.75
n/a 052W 130001203 1 $15,733 1 $95.24
The estimate neither accounts for how the City might assess property value
differently than Marion County nor excludes the unknown cost of providing basic
utility services to the properties that the City does not already provide. Crucially,
future site development would increase both the number of residences and
assessed valuation (AV) while also increasing City utility and other service costs.
ATTACHMENTS:
1 . Planning Commission Staff Report and its attachments:
101 . Recommended Conditions of Approval
102. Notes to the Applicant
103. Analyses & Findings
42
Honorable Mayor and City Council
January 12, 2026 (ANX 25-01 Mill Creek III)
Page 5
104. Annexation Service Provider Letters
105. Tax Map, Marked
106. Annexation Plans
107. Subdivision Plans
43
its
DBURN
rR-q-,
Incorporated 1889
Staff Report
Project Title: Mill Creek III
Project Location: Tax Lots 052W130001200, 1201, 1202, & 1203
(1505 Boones Ferry Rd NE)
File Numbers: Annexation (ANX) 25-01
Preliminary Subdivision (SUB) 25-03
Zoning Map Change (ZMC) 25-01
Property Owner: Burlingham Farms, Inc.
Applicant: Icon Construction & Development LLC
Initial Hearing Date: December 11, 2025
Date of Report: December 4, 2025
Staff Reviewer: Dan Handel, Senior Planner
Staff Recommendation: Approval with Conditions
Executive Summary
The subject properties encompass approximately 72.67 acres of undeveloped farmland within
the Woodburn urban growth boundary. The applicant seeks to annex the properties into City
limits, assign City zoning to them, and subdivide Tax Lots 1200 & 1203 (the two properties west
of the railroad tracks) into eight large lots. No development is proposed with this application
package. The applicant anticipates submitting a subsequent land use application package for
residential development of the eight large lots after completing this annexation and large lot
subdivision.
44
The Comprehensive Plan land use map designates Tax Lot 1203 to be Medium Density Residential
and within the Nodal Overlay District, Tax Lot 1200 to be Low Density Residential and within the
Nodal Development Overlay, and Tax Lots 1201 & 1202 to be Low Density Residential. Per
Comprehensive Plan Policy Table 1, the default zoning districts that correspond are Nodal
Medium Density Residential (RMN), Nodal Single-Family Residential (RSN), and Single-Family
Residential (RS), respectively.
u, u
���� �Sy�/iia�lgw�plpi IOmN➢I�II� f � I
�/k l iili��i i�i�� rrr�d✓�/���/✓i �"f ��ili�r j � �{
Aerial view of the subject properties to be annexed(outlined in red)
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
I
4
w
PAPR ROAD..
7RACTA....
LOTt LOT2 GOl"3 4OTI A+4
COTS LOT4
LpT7ERD
Proposed large lot subdivision plan for Tax Lots 1200& 1203
ANX 25-01,SUB 25-03,&ZMC 25-01
Staff Report
Page 2 of 3
45
The Planning Commission is tasked with issuing a recommendation on this Type IV land use
application package based on the applicable development standards in the Woodburn
Development Ordinance (WDO), the applicable goals and policies in the Woodburn
Comprehensive Plan, and a review of the evidence submitted into the record. The applicable
standards, goals, and policies are specifically cited in the Analyses & Findings (Attachment 103).
Staff Recommendation
Approval with conditions: Staff recommends that the Planning Commission consider the staff
report and its attachments and recommend approval to the City Council with the conditions
recommended by staff in Attachment 101.
Actions
The Planning Commission may act on the land use application to recommend to:
1. Approve per staff recommendations,
2. Approve with modified conditions, or
3. Deny, based on WDO criteria or other City provisions.
After the Planning Commission acts upon the application, staff would proceed to a City Council
public hearing,tentatively scheduled forJanuary 8, 2026,with the Commission recommendation.
Attachment List
101. Recommended Conditions of Approval
102. Notes to the Applicant
103. Analyses & Findings
104. Annexation Service Provider Letters
105. Tax Map, Marked
106. Annexation Plans
107. Subdivision Plans
ANX 25-01,SUB 25-03,&ZMC 25-01
Staff Report
Page 3 of 3
46
Recommended Conditions of Approval
Section references throughout the conditions are to the Woodburn Development Ordinance
(WDO).
Annexation ANX 25-01
1. Annexation agreement: The applicant shall enter into an annexation agreement with the
City, made concurrent with and incorporated into the final decision by the City Council
that approves the annexation of the subject territory. The agreement shall be subject to
Council approval and have provisions addressing the following:
a. It shall run with the land and shall be contractually binding on the applicant, heirs,
successors, and assigns. It shall have the same effective date as the annexation
and zoning assignment ordinances. A duly executed copy shall be recorded with
Marion County.
b. It shall provide for the continuation of pre-existing nonconforming use of the
properties (per 1.04.02A).
c. It shall provide for right-of-way dedications as well as the timing and standards for
future street improvements (per 3.01).
d. It shall provide an access easement to serve the large lot subdivision (per
3.04.01A.2.).
e. It shall require a Transportation Impact Analysis(TIA) be submitted with any future
land use application involving the lots created by SUB 25-03. The TIA shall be a
basis for requiring off-site improvements or proportionate share contributions
(per 3.04.05).
Preliminary Subdivision SUB 25-03
2. Recordation: After obtaining Subdivision Final Plat approval from the City, record the
subdivision with Marion County in a manner acceptable to the County Surveyor.
ANX 25-01,SUB 25-03,ZMC 25-01
Mill Creek III
Staff Report Attachment 101
Page 1 of 1
47
Notes to the Applicant
The following are not land use conditions of approval, they are standard notes for the applicant
to be aware of and follow:
1. Records: Staff recommends that the applicant retain a copy of this final decision document.
2. Mylar signature:The Community Development Director is the authoritythat signs plat Mylars
(not the mayor, City Administrator, Public Works Director, or City Engineer). Only one City
signature title block is necessary.
3. Plat Tracker: Marion County maintains a plat tracking tool at
<I)ttl ://ai l s.co -narior-i,or,..As/Iplattrac:ker/>. Use it to check on the status of a recordation
request to the County. City staff does not track County plat recordation.
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Attachment 102
Page 1 of 1
48
Analyses & Findings
This attachment to the staff report analyzes the application materials and finds through
statements how the application materials relate to and meet applicable provisions such as
criteria, requirements, and standards. They confirm that a given standard is met or if not met,
they call attention to it, suggest a remedy, and have a corresponding recommended condition of
approval. Symbols aid locating and understanding categories of findings:
Symbol Category Indication
Requirement (or guideline) met No action needed
Requirement (or guideline) not met Correction needed
1'{�11 Requirement (or guideline) not applicable No action needed
• Requirement (or guideline) met with condition of
approval Modification or
condition of
• Other special circumstance benefitting from approval required
attention
Location
Address 1505 Boones Ferry Road NE
Tax Lots 052W130001200, 1201, 1202, & 1203
Nearest intersections S Boones Ferry Rd & Iris St; Parr Rd & Meadowlark Ave
Land Use & Zoning
Comprehensive Plan Land Low Density Residential, Medium Density Residential, Nodal
Use Designations Development Overlay
Zoning Districts Single-Family Residential (IRS), Nodal Single-Family Residential (RSN), and
Nodal Medium Density Residential (RMN) upon annexation
Overlay Districts Nodal Overlay District
Existing Use n/a; undeveloped farmland
For context, the comprehensive plan land use map designations and zoning are illustrated, and
adjacent zoning is tabulated, on the following page.
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 1 of 17
49
� I
Comprehensive Plan land use map excerpt Zoning map excerpt
Cardinal Direction Adjacent Zoning
North RMN, RSN, Public/Semi-Public (P/SP), and IRS
East IRS
South No City zoning because territory is not within City limits
West No City zoning because territory is not within City limits
Section references throughout this staff report are to the Woodburn Development Ordinance
(WDO).
Statutory Dates
The application was submitted on August 14, 2025 and deemed complete as of November 25,
2025, making the 120-day decision deadline March 25, 2026.
Applicable Provisions
1.04 Nonconforming Uses and Development
1.04.02 Nonconforming Use
A. Multiple-family dwelling and non-residential uses:
2. The Director may allow nonconforming use to expand outdoors where the application of this
section to a proposal is unclear.
Staff Finding:
The subject properties are currently outside City limits and are undeveloped farmland. The
applicant seeks to annex the properties and accomplish a large lot subdivision of Tax Lots 1200
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 2 of 17
50
& 1203 to create eight large lots for future residential development. Looking at the
Comprehensive Plan Map, Policy Table 1 within the Comprehensive Plan, and the current Zoning
Map, default zoning districts to apply upon annexation include:
• Lots 1 and 5 of the large lot subdivision (currently Tax Lot 1203) would be assigned the
Nodal Multi-Family Residential (RMN) zoning district.
• The remaining six lots within the large lot subdivision (currently Tax Lot 1200) would be
assigned the Nodal Single Family Residential (RSN) zoning district.
• Tax Lots 1201 and 1202 would be assigned the Single-Family Residential (RS) zoning
district.
There is no development proposed with this application package.The applicant has requested to
maintain the agricultural use of the land until development proposals are approved by the City.
Technically, the agricultural use would be nonconforming for the RMN, RSN, and RS zones
because it is not listed as a permitted use within Table 2.02A, however it is common for
undeveloped land to be annexed and farming to continue while development plans are being
created and finalized. Additionally, the provisions within 1.04.02A. are intended for developed
property with nonconforming uses, not for undeveloped farmland, and subsection A.2. provides
a method for the Director to allow the agricultural use to continue. Staff recommends Condition
of Approval 1 to have the applicant enter into an annexation agreement with the City to provide
for the continuation of the nonconforming use.
A The provisions are met with Condition 1.
2.02 Residential Zones
A.The City of Woodburn is divided into the following residential zones:
1. The Residential Single Family (RS) zone is intended to establish standard density single-family
residential developments(typically 6,000 square foot lots).
2.The Nodal Single Family Residential (RSN) zone provides for row houses (attached single-family
homes)and detached single-family homes on smaller lots(typically 4,000 square foot lots).
5.The Nodal Multi-Family Residential (RMN) zone provides for row houses, multi-family dwellings
and care facilities at higher densities than non-nodal zones.
Staff Finding:
The proposed annexation involves approximately 72.67 acres of undeveloped farmland within
the Woodburn urban growth boundary. The applicant also seeks to accomplish a large lot
subdivision of approximately 56.89 acres of the land (Tax Lots 1200 and 1203) to create eight
large lots for future residential development. Looking at the Comprehensive Plan Map, Policy
Table 1 within the Comprehensive Plan, and the current Zoning Map, default zoning districts to
apply upon annexation include:
• Lots 1 and 5 of the large lot subdivision (currently Tax Lot 1203) would be assigned the
Nodal Multi-Family Residential (RMN) zoning district.
• The remaining six lots within the large lot subdivision (currently Tax Lot 1200) would be
assigned the Nodal Single Family Residential (RSN) zoning district.
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 3 of 17
51
• Tax Lots 1201 and 1202 would be assigned the Single-Family Residential (RS) zoning
district.
There is no development proposed with this application package. Future development of the
eight large lots or of Tax Lots 1201 and 1202 would be reviewed for compliance with lot area &
dimension requirements and minimum density requirements through a subsequent land use
application. Similarly, site development standards like setbacks, lot coverage, and building height
standards are analyzed as part of the review of a building permit application. To ensure future
development is consistent with these standards, staff recommends Condition of Approval 1 to
have the applicant enter into an annexation agreement with the City to ensure any future
residential development of the eight large lots meets minimum density requirements outlined in
Comprehensive Plan Policy Table 1.
A The provisions are met with Condition 1.
2.05 Overlay Districts
2.05.04 Nodal Overlay Districts
A. Purpose
Development within the Nodal Overlay Districts includes several residential building types, with
limited commercial development and accessible parks.The intent of the overlay districts is to provide
community identity to higher density residential developments within walking distance (generally
one-half mile or less) of the neighborhood commercial center. Nodal development will be designed
with a pedestrian focus,with interconnected streets and pedestrian walkways,alleys serving garages
located at the rear of lots,and with limited on-street parking.
Nodal Overlay Districts are shown on the Comprehensive Plan Map with zoning applied at the time
of annexation. To ensure that land is efficiently used within the Urban Growth Boundary (UGB),
master plans shall be required for land within Nodal districts.
Staff Finding:
The proposed annexation includes approximately 56.89 acres of land (Tax Lots 1200 and 1203)
that are within the Nodal Overlay District shown on the Comprhensive Plan Map. The applicant
also seeks to accomplish a large lot subdivision of this land within the Nodal Overlay District to
create eight large lots for future residential development. Looking at the Comprehensive Plan
Map, Policy Table 1 within the Comprehensive Plan, and the current Zoning Map, default zoning
districts to apply upon annexation include:
• Lots 1 and 5 of the large lot subdivision (currently Tax Lot 1203) would be assigned the
Nodal Multi-Family Residential (RMN) zoning district.
• The remaining six lots within the large lot subdivision (currently Tax Lot 1200) would be
assigned the Nodal Single Family Residential (RSN) zoning district.
The Nodal Overlay Districts provisions of 2.05.04 apply however there is no development
proposed with this application package.Site planning elements like residential density,street and
pedestrian connectivity, and access management would be reviewed through a subsequent land
use application.
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 4 of 17
52
The provisions are met.
D. Master Planning Requirement
1.A master development plan shall be approved by the City Council for the entire area designated
as Nodal Overlay on the Comprehensive Plan Map, prior to annexation of any property within the
Nodal Development Overlay Comprehensive Land Use Plan map designation.The master plan shall
be conceptual and non-binding in nature, but may be used as a general guide for development
within the Nodal Overlay Districts.
2.The required master plan shall show:
a. The location and rights-of-way for existing and planned streets. These streets shall provide
access to all existing and proposed parcels,consistent with the Transportation System Plan(TSP);
b.The location and size of existing and planned sanitary sewer,storm water and water facilities,
at adequate levels to serve existing and proposed development;
c.The location and area of the Riparian Corridor and Wetlands Overlay District(RCWOD).Planned
streets and public facilities that cannot reasonably avoid the RCWOD shall be indicated;
d.A development plan for the Nodal Neighborhood Commercial center, neighboring multi-family
areas,and potential parks,including planned pedestrian and bicycle connections within the Nodal
Overlay District as shown on the Transportation System Plan, and pedestrian and bicycle
connections to Southwest Industrial Reserve areas;
e.A development plan for all residential areas,demonstrating consistency with applicable nodal
design standards.
Staff Finding:
A Nodal Master Plan in conformance with the requirements of subsection D. was approved by
City Council via Resolution No. 2124 in November 2018 as part of the Smith Creek Development
project.
The applicant has provided a shadow plat of the eight large lots created via this subdivision.This
shadow plat serves as an update to the Nodal Master Plan that illustrates potential residential
development and how it would connect with the previously approved and built developments in
the Nodal Overlay District.
The provisions are met.
2.05.05 Riparian Corridor and Wetlands Overlay District
A. Purpose
The Riparian Corridor and Wetlands Overlay District (RCWOD) is intended to conserve, protect and
enhance significant riparian corridors, wetlands, and undeveloped floodplains in keeping with the
goals and policies of the Comprehensive Plan.The RCWOD is further intended to protect and enhance
water quality, prevent property damage during floods and storms, limit development activity in
designated areas, protect native plant species, maintain and enhance fish and wildlife habitats, and
conserve scenic and recreational values.
B. Boundaries of the RCWOD
1.The RCWOD includes:
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 5 of 17
53
a. Riparian corridors extending upland 50 feet from the top of the bank of the main stem of
Senecal Creek and Mill Creek and those reaches of their tributaries identified as fish-bearing
perennial streams on the Woodburn Wetlands Inventory Map; and
b. Significant wetlands identified on the Woodburn Wetlands Inventory Map. Where significant
wetlands are located fully or partially within a riparian corridor,the RCWOD shall extend 50 feet
from the edge of the wetland; and
c. The 100-year floodplain on properties identified as vacant or partly vacant on the 2005
Woodburn Buildable Lands Inventory.
2. The approximate boundaries of the RCWOD are shown on the Zoning Map. The precise
boundaries for any particular lot should be verified by the property owner when making a land use
application. Map errors may be corrected as provided in this Ordinance (Section 1.02.04).
Staff Finding:
There are no apparent riparian corridors, wetlands, or floodplains within the territory to be
annexed.Aerial imagery of Tax Lot 1202 appears to show a drainage ditch running east/west near
the northern tip of the lot however no development is proposed for this lot with this application
package. If applicable, the RCWOD provisions would be reviewed through a subsequent land use
application for future development.
The provisions are not applicable.
2.06 Accessory Structures
1«</ None apply.
2.07 Special Uses
fi None apply.
2.08 Specific Conditional Uses
None apply.
3.01 Streets
3.01.01 Applicability
A. Right-of-way standards apply to all public streets.
B. Improvement standards apply to all public and private streets,sidewalks and bikeways.
C. Functional standards are identified in the Woodburn TSP.
D. This applies to all development, and is not limited to partitions, subdivisions, multi-family,
commercial or industrial construction, or establishment of a manufactured dwelling or recreational
vehicle park. Construction of a single-family dwelling or placement of a manufactured dwelling does
not, for the purposes of this Section, constitute development, however, in no case can this type of
development occur without minimal access as determined by the Director.
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 6 of 17
54
...........................................................................................................................................................................................................................................................................................................................................................................
t tm�
w,
1 AN flu .J'1I
m, [d,""�' � '.N/ " ,� fi' � r,� .. y ._ �'N, yff ....id ,yy.'..n ,�"> y. �• i �e>rf' ,,,h t_>
Figure 3.01C—Minor Arterial
Staff Finding:
The proposal involves an annexation and large lot subdivision, but no development. Considering
TSP Figure 2 "Functional Roadway Classification", Evergreen Road is expected to continue along
the western boundary of the site and the south arterial is expected to run along the southern
boundary of the site. Both streets are classified as Minor Arterials and the applicable cross-
section is Figure 3.01C. The site also has frontage along S Boones Ferry Road, a Minor Arterial.
As analyzed under the Annexation provisions in 5.04.01, staff recommends Condition of Approval
1 to have the applicant enter into an annexation agreement with the City to provide for abutting
Minor Arterial right-of-way dedications with this annexation approval and to outline timing and
standards for future street improvements.
The provisions are met with Condition 1.
3.02 Utilities and Easements
The proposal involves an annexation and large lot subdivision, but no development. Utilities,
easements, and street lights would be reviewed through a subsequent land use application for
future development.
The standards do not apply at this time.
3.03 Setbacks and Open Space
The proposal involves an annexation and large lot subdivision, but no development. Setbacks and
vision clearance areas would be reviewed through a subsequent land use application and/or
building permit for future development.
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 7 of 17
55
U«« The standards do not apply at this time.
3.04 Vehicular Access
3.04.01 Applicability and Permit
A.Street Access
Every lot shall have:
1. Direct access to an abutting public street,or
2. Access to a public street by means of an access easement and maintenance agreement to the
satisfaction of the Director,and revocable only with the concurrence of the Director.
C.Access to County Roads
Access to a road under the jurisdiction of Marion County shall be subject to County requirements.The
Director may incorporate County requirements into the conditions of approval for any application.
The proposal involves an annexation and large lot subdivision, but no development.The large lot
subdivision plans show a 20-foot-wide private access easement benefiting all eight lots and
connecting to Evergreen Road right-of-way. Staff recommends Condition of Approval 1 to have
the applicant enter into an annexation agreement with the City to ensure this access easement
is granted.
A The provisions are met with Condition 1.
3.04.05 Traffic Impact Analysis
Staff Finding:
The proposal involves an annexation and large lot subdivision, but no development. To ensure
that transportation impacts created by future development of the large lot subdivision are
properly measured and mitigated, staff recommends Condition of Approval 1 to have the
applicant enter into an annexation agreement with the City to ensure a transportation impact
analysis(TIA) report is submitted alongside any subsequent land use application for development
of the lots created by SUB 25-03.
A The provisions are met with Condition 1.
3.05 Off-Street Parking and Loading
Staff Finding:
The proposal involves an annexation and large lot subdivision, but no development. Parking
requirements would be reviewed through a subsequent land use application for future
development or through building permit applications.
'n The standards do not apply at this time.
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 8 of 17
56
3.06 Landscaping
Staff Finding:
The proposal involves an annexation and large lot subdivision, but no development. Landscaping
requirements would be reviewed through a subsequent land use application for future
development or through building permit applications.
'n The standards do not apply at this time.
3.07 Architectural Design
Staff Finding:
The proposal involves an annexation and large lot subdivision, but no development.Architectural
design requirements would be reviewed through a subsequent land use application for future
development or through building permit applications.
The standards do not apply at this time.
3.08 Partitions and Subdivisions
3.08.01 Requirements
All partitions and subdivisions shall comply with the standards of ORS Chapter 92 and the Woodburn
Development Ordinance.
Staff Finding:
This staff report serves to ensure compliance with applicable standards of the Woodburn
Development Ordinance whether they are met by the applicant's proposal or via conditions of
approval. The Marion County Surveyor's Office will ensure compliance with applicable ORS
standards during their review of the subdivision plat.
It is worth noting that ORS 92.040(3) allows local governments to establish a time period not to
exceed 10 years for which the Preliminary Subdivision approval applies. Staff adds Condition of
Approval to record the subdivision plat in a manner acceptable to the County Surveyor.
A The provisions are met with Condition 2.
3.09 Planned Unit Developments
The proposal does not include a Planned Unit Development.
3.10 Signs
Signage is reviewed separately through Sign Permit applications. These provisions are not
applicable here.
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 9 of 17
57
4.01 Decision-Making Procedures
4.01.07 Consolidated Applications
An applicant may request, in writing, to consolidate applications needed for a single development
project. Under a consolidated review, all applications shall be processed following the procedures
applicable for the highest type decision requested. It is the express policy of the City that development
review not be segmented into discrete parts in a manner that precludes a comprehensive review of the
entire development and its cumulative impacts.
Staff Finding:
The application package consists of Type IV Annexation and Zoning Map Change and Type III
Preliminary Subdivision. Per 4.01.07, the applications are consolidated and reviewed at the Type
IV level.
The provision is met.
5.03.10 Subdivision Preliminary Approval
A. Purpose:The purpose of a Type III Subdivision decision is to ensure that the division of properties
into 4 or more lots complies with the standards of this Ordinance(Sections 2 and 3). Subdivisions are
allowed in all zones, provided the proposal meets applicable standards.
B.Criteria: Preliminary approval of a Subdivision shall require compliance with the following:
1.That approval does not impede the future best use of the remainder of the property under the
same ownership or adversely affect the safe and efficient development of the remainder of any
adjoining land or access thereto.
2. That the proposed development shall be served with city streets, water, sewer and storm
drainage facilities with adequate capacity.
3.That the plan for the development takes into account topography,vegetation and other natural
features of the site.
4. That adequate measures have been planned to alleviate identified hazards and limitations to
development:
a.For wetlands these shall be the measures required by the Division of State Lands for regulatory
wetlands.
b. For unstable areas,demonstration that streets and building sites are on geologically stable soil
considering the stress and loads.
5.The preliminary plat complies with all applicable provisions of this Ordinance(Sections 2 and 3),
except where waived by variance.
Staff Finding:
The proposal involves an annexation and large lot subdivision, but no development. The
applicant's narrative states on page 3:
"The proposed large-lot subdivision will divide these two parcels into eight lots for
future development; however, no development is proposed by this application."
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 10 of 17
58
And on page 4:
"Although development is not proposed by this application,the newly created lots
have been designed to accommodate the eventual construction of residential uses
permitted in these zoning districts."
Regarding Criterion 1, the proposed large lot subdivision (involving Tax Lots 1200 & 1203) is
intended as a preparation stage for future residential development of the land, therefore future
best use of the property is not impeded. In fact, this subdivision may expedite the development
of the property. The remaining Tax Lots 1201 & 1202 are not adversely impacted by this
subdivision.
Regarding Criterion 2, staff recommends Condition ofApproval1 to have the applicant enter into
an annexation agreement with the City to provide for abutting Minor Arterial right-of-way
dedications with this annexation approval and to outline timing and standards for future street
improvements. Water, sanitary sewer, and stormwater facilities would be reviewed as part of
the land use application(s) for future development of the large lots.
Similarly for Criterions 3 and 4, topography, vegetation, wetlands, soils, and other natural
features would reviewed as part of the land use application(s) for future development of the
large lots.
As noted throughout this staff report, the proposal complies with all applicable provisions of the
WDO, or can via conditions of approval.
A The provisions are met with Condition 1.
5.04 Type IV(Quasi-Judicial) Decisions
5.04.01 Annexation
A. Purpose: The purpose of this Type IV review is to provide a procedure to incorporate contiguous
territory into the City in compliance with state requirements, Woodburn Comprehensive Plan, and
Woodburn Development Ordinance.
Staff Finding:
The applicant proposes to annex Tax Lots 1200, 1201, 1202, and 1203, as well as a remnant
segment of S Boones Ferry Rd right-of-way.The subject properties are contiguous with City limits.
The Comprehensive Plan Map categorizes Tax Lot 1200 as Low Density Residential and within the
Nodal Development Overlay,Tax Lots 1201 & 1202 as Low Density Residential, and Tax Lot 1203
as Medium Density Residential and within the Nodal Development Overlay. This staff report
reviews the proposal for compliance with the Woodburn Comprehensive Plan and WDO, both of
which were acknowledged by the state to be in compliance with statewide planning goals.
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 11 of 17
59
The provision is met.
B. Mandatory Pre-Application Conference: Prior to requesting annexation to the City, a Pre-
Application Conference (Section 4.01.04) is required. This provides the city an opportunity to
understand the proposed annexation and an opportunity to provide information on the likely
impacts, limitations, requirements, approval standards, and other information that may affect the
proposal.
Staff Finding:
A pre-application meeting for the proposal was held on September 17, 2024 (PRE 24-15).
The provision is met.
C. Criteria:
1. Compliance with applicable Woodburn Comprehensive Plan goals and policies regarding
annexation.
2.Territory to be annexed shall be contiguous to the City and shall either:
a. Link to planned public facilities with adequate capacity to serve existing and future
development of the property as indicated by the Woodburn Comprehensive Plan; or
b. Guarantee that public facilities have adequate capacity to serve existing and future
development of the property.
3. Annexations shall show a demonstrated community need for additional territory and
development based on the following considerations:
a. Lands designated for residential and community uses should demonstrate substantial
conformance to the following:
1)The territory to be annexed should be contiguous to the City on two or more sides;
2)The territory to be annexed should not increase the inventory of buildable land designated
on the Comprehensive Plan as Low or Medium Density Residential within the City to more than
a 5-year supply;
3)The territory proposed for annexation should reflect the City's goals for directing growth by
using public facility capacity that has been funded by the City's capital improvement program;
4)The site is feasible for development and provides either:
a) Completion or extension of the arterial/collector street pattern as depicted on the
Woodburn Transportation System Plan; or
b) Connects existing stub streets,or other discontinuous streets,with another public street.
5) Annexed fulfills a substantial unmet community need, that has been identified by the City
Council after a public hearing. Examples of community needs include park space and
conservation of significant natural or historic resources.
Staff Finding for Criterion 1:
Section G. "Growth Management and Annexation" of the Woodburn Comprehensive Plan
includes Growth Management Goals G-1.1 and G-1.2 and Policies G-1.1 through G-1.28. The
applicant's narrative provides the following response (page 11) regarding the goals:
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 12 of 17
60
"The City of Woodburn implements these goals by establishing city limits, an
urban growth boundary, and development ordinance. The standards and criteria
governing annexation, which are addressed in this narrative, ensure all property
is annexed and developed in orderly and efficient manner. Compliance with these
requirements results in a project that accomplishes these goals. While some
future improvements might qualify for reimbursement in the form of system
development charge credits, any construction would need to dedicate right-of-
way and construct the improvements necessary to serve its uses."
The applicant's narrative provides the following response (page 15) regarding the policies:
"These policies are intended to guide and influence the long-range planning
decisions made by the City of Woodburn. The results of these decisions have a
direct impact on annexation standards, criteria, and procedures. This application
proposes to annex a property located within the urban growth boundary and
abutting city limits. The proposed annexation can be accomplished without
amending the existing urban growth boundary or Comprehensive Plan Map as the
applicant proposes zoning consistent with the Comprehensive Plan. Therefore,
the proposed project is consistent with these goals and policies"
Section G. "Growth Management and Annexation" of the Woodburn Comprehensive Plan also
includes Annexation Goal G-2 and Policies G-2.1 through G-2.3.The applicant's narrative provides
the following response (page 15-16) regarding the goal and policies:
"The proposed annexation does not include any amendments or alterations to the
Comprehensive Plan Map designations applied to these properties, so the future
zoning will reflect the City's plans for this property. Additionally, the service
provider letters state that the public utilities extended to the subject property by
adjacent development have adequate capacity to serve future development that
could result from this annexation. Inclusion in the Comprehensive Plan Map,
adjacent development, and easily accessible utilities indicate to the applicant that
this is the intended direction and shape of urban development. Additionally, the
attached shadow plat demonstrates that future development would be
compatible with and reflect the pattern and style of nearby residential
development. Therefore, the proposed project is consistent with these goals and
policies."
Staff generally concurs with the applicant. The annexation goals and policies are effectuated by
the annexation review criteria within the Woodburn Development Ordinance.The Nodal Master
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 13 of 17
61
Plan,which was approved via Resolution 2124 in 2018, illustrates the conceptual layout of private
development and public facilities throughout the Nodal overlay district area. The applicant also
submitted a shadow plat showing already approved development within the Nodal overlay
district and how future development of Tax Lots 1200 & 1203 could occur in an orderly and
efficient manner. Additionally, the applicant provided Service Provider Letters indicating the
Woodburn School District, Woodburn Fire District, and Public Works Department can
accommodate future development of the territory proposed for annexation. Staff recommends
Condition of Approval 1 to have the applicant enter into an annexation agreement with the City
to provide for abutting Minor Arterial right-of-way dedications with this annexation approval and
to outline timing and standards for future street improvements. Water, sanitary sewer, and
stormwater facilities would be reviewed as part of the land use application(s) for future
development.
A The criterion is met with Condition 1.
Staff Finding for Criterion 2:
The territory proposed for annexation abuts the current City limits boundary on its north and
east sides. The application materials include service provider letters from the City Engineer, the
Woodburn Fire District, and the Woodburn School District certifying there is capacity to serve
future development within these properties. Staff recommends Condition of Approval 1 to have
the applicant enter into an annexation agreement with the City to provide for abutting Minor
Arterial right-of-way dedications with this annexation approval and to outline timing and
standards for future street improvements. Water, sanitary sewer, and stormwater facilities
would be reviewed as part of the land use application(s) for future development.
A The criterion is met with Condition 1.
Staff Finding for Criterion 3:
The applicant's narrative provides the following response (pages 16-17):
"The subject property's northern boundary line is the current city limit line, and
properties north of this site have already been annexed into the City, some fairly
recently.Along with the proposed annexation,the applicant also proposes a large-
lot subdivision to divide the property into eight lots for future development and
further division.
The property is within the urban growth boundary and is identified by the
Comprehensive Plan as residential with a Nodal overlay; so, upon annexation, the
property will be split zoned between the Nodal Single-Family Residential and
Nodal Medium Density Residential zoning designations.The proposal is consistent
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 14 of 17
62
with the future zoning and current Comprehensive Plan requirements.
Confirmation of adequate public facilities has been included with this application.
Based on conversation with City Staff and the pre-application conference
feedback, the applicant believes that the proposal reflects the city's goals for
growth. Many of the properties immediately north of this site are newly
developed. This development stubbed streets to the subject property's
boundaries. As illustrated by the attached shadow plat, these streets could be
easily extended to serve future development.
The applicant finds that the potential pedestrian pathways (illustrated on the
shadow plat) continued from nearby development demonstrate the intent of the
Nodal Master Plan. The shadow plat shows a mix of single-family attached and
detached homes which the applicant believes is meeting an unmet community
housing need as illustrated by the Housing Needs Analysis by providing housing at
a range of price points.The subject property is only contiguous with the city limits
on one side.
It should be emphasized that the above criteria states that the application
"should" demonstrate substantial conformance with the standards rather than
stating the application "shall" conform to the standards. The applicant has met
the burden of proof that substantial conformance with all criteria is met."
Staff generally concurs and recommends Condition ofApproval1 to have the applicant enter into
an annexation agreement with the City to provide for abutting Minor Arterial right-of-way
dedications with this annexation approval and to outline timing and standards for future street
improvements. Water, sanitary sewer, and stormwater facilities would be reviewed as part of
the land use application(s) for future development.
The criterion is met with Condition 1.
D. Procedures:
1.An annexation may be initiated by petition based on the written consent of:
a.The owners of more than half of the territory proposed for annexation and more than half of
the resident electors within the territory proposed to be annexed; or
b. One hundred percent of the owners and fifty percent of the electors within the territory
proposed to be annexed; or
c.A lesser number of property owners.
2. If an annexation is initiated by property owners of less than half of property to be annexed,after
holding a public hearing and if the City Council approves the proposed annexation,the City Council
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 15 of 17
63
shall call for an election within the territory to be annexed. Otherwise no election on a proposed
annexation is required.
Staff Finding:
The proposed annexation has been initiated by the property owner, Burlingham Farms Inc.
The provisions are met.
E. Zoning Designation for Annexed Property: All land annexed to the City shall be designated
consistent with the Woodburn Comprehensive Plan, unless an application to re-designate the
property is approved as part of the annexation process.
Staff Finding:
The applicant proposes to annex Tax Lots 1200, 1201, 1202, and 1203, as well as a remnant
segment of S Boones Ferry Rd right-of-way. The Comprehensive Plan Map designates Tax Lot
1200 as Low Density Residential and within the Nodal Development Overlay, Tax Lots 1201 &
1202 as Low Density Residential, and Tax Lot 1203 as Medium Density Residential and within the
Nodal Development Overlay. In compliance with Comprehensive Plan Policy Table 1,the territory
will be assigned to the RSN, RS, and RMN zoning districts upon annexation.
The provisions are met.
F.The timing of public improvements is as follows:
1. Street dedication is required upon annexation.
2. Dedication of public utility easements(PUE)is required upon annexation.
3. Street improvements are required upon development.
4. Connection to the sanitary sewer system is required upon development or septic failure.
5. Connection to the public water system is required upon development or well failure.
6. Connection to the public storm drain system is required upon development.
Staff Finding:
As required by subsection F, staff recommends Condition of Approval 1 to have the applicant
enter into an annexation agreement with the City to provide for abutting Minor Arterial right-of-
way dedications with this annexation approval and to outline timing and standards for future
street improvements. Water,sanitary sewer,and stormwater facilities would be reviewed as part
of the land use application(s) for future development.
A The criterion is met with Condition 1.
5.04.04 Official Zoning Map Change,Owner Initiated
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 16 of 17
64
A. Purpose:The purpose of an Owner Initiated Official Zoning Map Change is to provide a procedure
to change the Official Zoning Map,in a manner consistent with the Woodburn Comprehensive Plan.
B.Criteria:The following criteria shall be considered in evaluating an Official Zoning Map Change;
1. Demonstrated need for the proposed use and the other permitted uses within the proposed
zoning designation.
2. Demonstrated need that the subject property best meets the need relative to other properties in
the existing developable land inventory already designated with the same zone considering size,
location,configuration,visibility and other significant attributes of the subject property.
3. Demonstration that amendments which significantly affect transportation facilities ensure that
allowed land uses are consistent with the function, capacity, and level of service of the facility
identified in the Transportation System Plan.This shall be accomplished by one of the following:
a. Limiting allowed land uses to be consistent with the planned function of the transportation
facility; or
b. Amending the Transportation System Plan to ensure that existing, improved, or new
transportation facilities are adequate to support the proposed land uses consistent with the
requirement of the Transportation Planning Rule; or,
c. Altering land use designations, densities, or design requirements to reduce demand for
automobile travel and meet travel needs through other modes of transportation.
C. Delineation: Upon approval, a zone change shall be delineated on the Official Zoning Map by the
Director. A zone change subject to specific conditions shall be annotated on the Official Zoning Map
to indicate that such conditions are attached to the designation.
The applicant proposes to annex Tax Lots 1200, 1201, 1202, and 1203, as well as a remnant
segment of S Boones Ferry Rd right-of-way. By its very nature, annexation of territory results in
a change to the City limits boundary and the territory being annexed must be assigned to one or
more zoning districts. The Comprehensive Plan Map designates Tax Lot 1200 as Low Density
Residential and within the Nodal Development Overlay, Tax Lots 1201 & 1202 as Low Density
Residential, and Tax Lot 1203 as Medium Density Residential and within the Nodal Development
Overlay. In compliance with Comprehensive Plan Policy Table 1, the territory will be assigned to
the RSN, RS, and RMN zoning districts upon annexation and the Zoning Map will be updated to
reflect this.
The provisions are met.
ANX 25-01,SUB 25-03,&ZMC 25-01
Mill Creek III
Staff Report Attachment 103
Page 17 of 17
65
ELL PUBLIC WORKS DEPARTMENT
190 GARFIELD STREET
WOODB WOODBURN, OR 97071
1' ncvrparated 188
August 14, 2025
Harlan Borow
Land Development and Acquisitions Manager
ICON Construction & Development, LLC
1969 Willamette Falls Drive, Suite 260
West Linn, OR 97068
Re: Annexation Certification
Subject Property: Burlingham Farms Annexation (Mill Creek 3)
Primary Situs Address: 1505 Boones Ferry Road, NE Woodburn OR 97071
Map Tax Lot: 052W130001200
Please accept this letter as written documentation that I have reviewed the site in
question. The city has no capacity issue with the public wastewater treatment facility or
public water, water treatment facility. The subject property is, however, not adjacent to
an existing collection system for wastewater, adequate distribution system for water or a
public storm sewer collection system. The requirements for those facilities would yet
need to be determined. The capacity analysis, design and installation would be the
responsibility of the applicant/property owner.
I hope this letter fulfills the requirements in accordance with Section 5.104.01 of
Woodburn Development Ordinance. If you have any questions, please contact me at
503.982.5248.
Sincerely,
T�� ?�24�
Dago Garcia, P.E.
City Engineer
City of Woodburn
66
1776 Newberg Hwy
Woodburn,OR 97071
Bus.Office 503-982-2360
Fax 503-981-5004
July 24, 2025
Hayden Wooton
Senior Land Use Planner
Emerio Design
1500 Valley River Dr, Ste 100
Eugene, OR 97401
Cell: (541) 990-7689
Re: Adequate Service Provision
Hayden Wooton:
I have reviewed the property located immediately south of Centennial Park described as
tax lots 1200 & 1203 of Marion County Assessor's Map 052W13. Woodburn Fire District
(WFD) evaluated the proposed project and has determined that adequate service can be
provided by WFD. We will continue to review, evaluate, and comment on other
submitted plans as they become available.
If you have any questions or need additional information, please contact me.
Sincerely:
A r r
Fire Marshal
Woodburn Fire District
(503) 982-2360
omar.ortiz@woodburnfire.com
67
12/4/25, 11:52 AM Re:Mill Creek 3 annexation-Dan Handel-Outlook
Outlook
.....____ .....____ .....____ .....____ .....___.. .....____ .....____ .....____ .....____ .....____ .....____
Re: Mill Creek 3 annexation
.....____ .....____ .....____ .....____ .....___.. .....____ .....____ .....____ .....____ .....____ .....____ .......................................................
From Omar Ortiz <Omar.Ortiz@woodburnfire.com>
Date Tue 11/25/2025 10:59 AM
To Dan Handel <Dan.Handel@ci.woodburn.or.us>
"➢f"Ms eina:ill is firmn an EXIIZIRNAL send.er, III, em°6se camm:don when mmpe hig alla�chin nts or chick finks firmmmn mmm�mlk:nom m
Dan,
The Woodburn Fire District has no concerns with the additional properties.
-Omar
Get Outlook for i
.....____ .....____ .....____ .....____ .....____ .....____ .....____ .....____ .....____ .....____ .....____ .....____ .....____ .....____ .....____ .....____.
From: Dan Handel<Dan.Handel@ci.woodburn.or.us>
Sent:Tuesday, November 25, 2025 8:58:17 AM
To: Omar Ortiz<Omar.Ortiz@woodburnfire.com>
Subject: Mill Creek 3 annexation
"➢f:Ms eina:ill is firmn an EXIIZIRNAL send.er, Ill, em°6se camm:don when mmpe hig alla�chin nts or chick finks firmmmn mmm�mlk:nom m
Good morning Omar:
You provided the attached letter to the developer who is looking to annex property south of Centennial
Park. After receiving their application, we asked them to include additional property with their
annexation request (the two triangle properties east of the railroad). As an update to your letter, can you
reply and let me know if there are any service concerns with the additional two properties?
Thanks,
HandelDan
Senior Planner
(503) 980-2431
[www.woodburn-or.gov]City Websiteunity Developn n
270 Montgomery St, Woodburn, OR 97071
PUBLIC RECORDS LAW DISCLOSURE This e-mail is a public record of the City of Woodburn and is
subject to public disclosure unless exempt from disclosure under Oregon Public Records Law. This e-
about:blank?windowld=SecondaryReadingPanel 1/2
68
12/4/25, 11:52 AM Re:Mill Creek 3 annexation-Dan Handel-Outlook
mail is subject to the State Retention Schedule
about:blank?windowld=SecondaryReadingPanel 2/2
69
1390 Meridian Drive,Woodburn, OR 97071
®°VIII J �u �s�'�Q0`�/ Phone: 503-981-9555
Fax: 971-983-3611
August 18, 2025
Re: annexation of the property identified as No. 05-2w-13, Lots 1200 & 1203 on Marion County
Assessor's Map.
Dear Mr. Wooton,
In response to your request, Woodburn School District has determined that your requested
annexation will impact our schools. Whereas, we do feel we have capacity to handle potential
increase in attendance, we will defer to the city's traffic and pedestrian analysis to determine if
the current infrastructure is sufficient and will not affect the safety of our students and families as
they access our sites.
We do ask that the city pay close attention to bus access and street width when looking at
renderings. We also ask that the developers and the city look at safety barriers that could be
placed to decrease foot traffic and access to the back side of our school property. Our school
sites have traditionally been very isolated and with this new construction, they will suddenly be
very exposed. We will limiting access, and having very directed pathways would help with
safety and security.
Sincerely,
Casey Woolley
Director of Safety, Operations, and Communications
Woodburn School District
P'aPcc 1 1
70
12/4/25 11:5nmw Re:pCouuon:/wtaohmont/unkg Mill Creek o annexation'Dan Handel'Ouuoox
to Outlook
Re: [Caution:Attach nnmnt/LnW] Mill Creek 3 annexation
From Casey Woolley^cwoo||ey@woodbumad.o,g^
Date Mon 12/1/20258:41 Am
To Dan Handel ^oon.Handel @d.woodbum.ocus^
****7b�s croo�l �s f1rmonaoEX7E0NALaenobc.r.Fxcr6scnazdmowhmoopendog,at*ybnncritsmcnOn1k hmks f1rmmoolkno»woacrobcramcoocxpcntcd
mfln0.****
Oon'
My real concern with this development is limiting access to our property from the backside. As | mentioned,me
haven't had to worry about access in the noor of this property in the post. With this development,we now have to be
aware and ask that some sort of bonier be required to limit access tothe property for safety reasons.
Otherwise,our standard response regarding traffic patterns and street width so that buses can navigate.
Casey
OnTue, Nov3S, 3035 ot9:O4AM Don Handel < > wrote:
Good morning Casey:
You provided the attached letter to the developer who is looking to annex property south of Heritage&Valor.After receiving
their application,we asked them to include additional property with their annexation request(the two properdes east of the
railroad shown be|ovv).Asan update to your letter,can you reply and let me know if there are any service concerns with the
additional two pmperdes?Thank you!
oumut:monxvwmumwm~0000nuorynooumgPonoo 1/3
71
12/4/25, 11:53 AM Re:[Caution:Attachment/Link!]Mill Creek 3 annexation-Dan Handel-Outlook
n
Jid
riU�i�'�r�i��� VLrV0u�9M o FI r f /
i
Illlpum i eri ,. ,.,
i
il�r � r i rr1
r ✓� r r�� � r/r /`�IY"% �� r 9 % r v
V
f�l��✓..' e uu A
Dan Handel
Senior Planner
(503)980-2431
it it I Community Dev -meelop rtme
nt
270 Montgomery St, Woodburn, OR 97071
PUBLIC RECORDS LAW DISCLOSURE This e-mail is a public record of the City of Woodburn and is subject to public
disclosure unless exempt from disclosure under Oregon Public Records Law.This e-mail is subject to the State
Retention Schedule
Casey Woolley
Director of Safety, Operations,and Communication
503-981-2702
The information transmitted by this email is intended only for the person or entity to which it is addressed. This email
may contain proprietary, business-confidential and/or privileged material. If you are not the intended recipient of this
message, be aware that any use, review, re-transmission, distribution, reproduction or any action taken in reliance
upon this message is strictly prohibited. If you received this in error,please contact the sender and delete the material
from all computers.
I he W(.)odburn School oo .'Nstrict rexx.:)c;I izes the divc.vsity any m.)it ofall individuals and c;ln.)u s. It is the (.) (..'Y o I e
VK)odbui ch(.x)1 L.Nstrict h)ax.)mply with state and I'a,deral laws d prt)m tea ondiscri math d an envin.:mme I
free ofhar ss e t ofI dividuals(.)r ;ln.)ups based on mare, c(.A.m ��;»f�cl��:� , c;ende , sexual ofientatk) , national or�gfl ,.
marital status, age, (.)r disability in any educath al n.)g a s, activifies or e pk)y e t
dditk:mally the VK)odburn School L.Nstrict 103 ax.)mpfies with prtwiskms of the vark:xis civil rl(.-I is laws, such as the I::::air
F„Jiactices Act, the Americans with L.Nsabiffies Act, ,i„tle IX Regulatk) s and secthm 04 of I„"I...93.112 i
about:blank?windowld=SecondaryReadingPane3 2/3
72
12/4/25, 11:53 AM Re:[Caution:Attachment/Link!]Mill Creek 3 annexation-Dan Handel-Outlook
empk)yment, &Yucatkmal pn.)grams and activities.
about:blank?windowld=SecondaryReadingPane3 3/3
73
� 0 a T
z � � �� z �z m z
M DC O o w o DC M
r � o of °I
ca
Co
Z � w >� w
N O f 0 ' a E � ¢ O N
Ln
O J,. ,.J' Z V ". e O Q ° 0 O
O vw O ____________ m_ a a
0 0
r _ n o rc O o f a
OC °
M
> 0
0
� s
c v ,
w � ° IJ_I LIJJ
� a
w ® m
N
� ^w
Ls oho \
s Em s
_ o
\ o V
CD
41
� Ad
CD
oa
a
O
a°ate �
oe
z.nas�
oaz
4 3
t�
O w N
O w
r" (.0
O
U
CD
CD
ye(.0
wo
an CD
se o mm o
o$z
z c z ea S
q x
m � ezes
nr,H i `. 3' z °s susus sse� eze«
S ooru�-
db�S��
°
°
M M
N N
O O
so as
,o EIN o'er 2a o 04
umo NOINVIAI » §
cu,z pi,oz i,kz,
`III aw 133HSN3Aoo ® 0��22 \ CD
\
§
-
% |
° ( - -
2\? k -
2
-::
, > = I ■2
_ \
k
2 E
LLJ
E j &
0
LU 0 o ■ 7 >
x \w
Z ^~J � 0 . . . . . . . . . :
k LL a
W)
} �-
a L �\
« o L2
a /
2 ^ § § ^
R . . . . . . . . . . . \ �
� §
) f
- -aVOLH2
\
ƒ
nbso�aua�iy 1,'Nd£F b SdOL/%d[aJ�O l�ld'SUJ]%35V3 V SNJILVJIO]0 AYM JO-1NJIN d0 I�M�)'I��dO .........�°lelb^'�1£�'aaq II,�N-swioj woybu�mg 6[0-L8001'd�3]IJ
NODEINO'Nansa00M w
AlNnOO NOiavw S1N3W3St/3 l3^�aaa3^�a ^O�l CD
ZOZ6`60Z6`OOZ6ll
£LMZSO dVW Xtll V SNOIlt/Ola3a
����sNolslnaa
OI MN3 w "
III�aaaO nniw AVM-�O-IHORI SN N CD
�m
8 0 03
o mLLa
o \
x
w w �
o
J
m c \3ys�
8
�e
�Q, J
U �JQ�,�js 13
=
o �an I
U�II e
0 0
r
q
I
III I�m
e II Iti
I I
I
I I
I I
II I
II
�y sc erc M.cc�a.vs
o
14
a",3 oz-IN -
9,� ,91Yt5 M,fS,16.OS --
0 0
n z n m
/V�a'NV ei O<5Z0%,/Z<�10 lod'[33N5 dPIN t0:/nMo HotO 6t0—ZP00��sNPanS�o,o�6mP�C haaq,Pry—swioj wovbunng bt0—Z800�'d3]lJ
NODEINO`NunsaoOM o
0
AlNnOO NORItlW 00`3.111 a1--1-0011
£OZI,T OOZ6ll-£6MZSO dVW Xtll ,I- DNw
III)433HO TIM 133HS 213A0O OI?I3r11t3 CD����'1'°sNoisinaa
Z e U
o z 0 m w a
> z
o z
N _ ---
Y
� U -
- w a
z 0
_ s
> >o
�o Jpo 00 m z
NJ o o Yo 3 06
CL
e �
0
C N
N w
Z J
o � �
J �m
z \__
� NZ°
0 0Lu '
cn o
W N
W > Jz_
li Q " r
zoo
H04O
o ? m \ a
J F
z d LLo �
oa
U) z
> xi-
co
y �
CO
o
co y 3
m
N y ,
o Q
nb:�aoaliV 11'IV 8F11 Sdod/!/Li also laid SNJrOONOJ Ow[SM]do:�nM�1'�='Zo Dto-d 0—,AP nsl°viol b^'v1t daa9"try-rm of wo46—Dto-La 'd,,
N003HO`Nunsciom o
0
AlNnOO NOIUVW
£OZI,T OOZ6ll-£6MZSO dVW Xtll w�
III>133HOTIM SNowaNO3ONUSIX3 ORI3W3 0
H oao
a
Ul
_IT111�T _
-
'
__js AC 6ECM(S,c6.15 �
Im
m
EL'lCS 3,11 Bl AN
,9lYlS M,£S,t6.QS -
�, z y
yes n a�airo�a rve asar szoa/r/zi a��o��id'uron n poi oas000ae so:m��i'��ro—rro—aeool�srwa�sl��iol�vlr+aa�itry—_�•��w�rb�p.^e rro—aaool'd=3n�
NODEINO`Nunsa00M o
0
AlNnOO NORItlW 00`3.111 a1--1-0011
£OZI,T OOZ6ll-£6MZSO dVW Xtll , w ag
III J133 o
210IIIW ino.kvi lol a3SOdOUd I2I3r11t3 CDUd1aJ530 111 O�3a
g
0 oso
C - 4
_ =pow
a
�o=
o � 3
��
e N �
=Ig
0
m 1 �
�sy
s
i
r w
H P
I
4
ro
w I
a
�JI e
I r
osss3 >.oN --
ovou a —
__ -
,9i5t5 M,£S i6 AS
ne+orl auaVy 11'IV 95Y[SZod/!/zi also laid IV1d--bo:11-1�11 5o Dto-deool°°sN.w9^sl°viol b^'v1t d'a9"m —46°p."e"'-La 'd,,
NODEINO`NunsaoOM o
0
AlNnOO NORItlW
£OZI,T OOZ6ll-£6MZSO dVW Xtll OI?I3r11t3
III>133HOTIM iVld MOaVHS ouaia 3a a oN , o
g
g o
n r
CZ 8
\ 43'"
e
oOls
cwa�a
J
� lav
g
J
os
--
NT
FF-
4
U
a
I,...
la,,
�asn a�ar,y xg'we rra saoa/r/u ar�o raid Nv�d eunm 3ar�m��r�,r�i vo�so rro-aeool�srwa�sl��iol�vlr+aa�iery-s�•��wwb�p•^e rro-aaool'd=3n�
NODEINO`NunsaoOM CID
0
AlNnOO NORItlW
£OZI,T OOZ6ll-£6MZSO dVW Xtll
III>133HOTIM NVId Jllnin 321nin=i daJ530 ORMN3 0
r
030
mLLa g �o=
o=�
o
N
J
w ri-
- C3 ,
uQ
oa
wj \
I
_ —
Lit
m
�i Sri
\ I 33
— — s
w �
= I�
0
o
7ga w w
g IIIII -- �� �� ► 3�
w
-_l ll -
N��N`J
ICI �o
>z
Q
z�
Q�
>v�
v
o
oIz
zo
,y.To'pd tf6 SZO%6�/tt.a! :InMo]%oPou90 6t0—ZPOO��s,�,PanS��oio�6mP�C haaq iPry—sw,oj wovbunng bt0—Z800�'d3]lJ
NODMO`Nunsao0M o
0
AlNnOO NOIatlW 00`3.1131as 11-1—oo11
OOZ6ll-£LMZSO dVW Xtll NVId 1d3ONOO AVlM3A0
DN CD
OI?I3LS... w `°
III>133aO TIIw 1N3WdOl3A3a lVaON SN N
����sNolslnaa
/,'✓ 'rA,✓ ""O"� lY�l�:`/a"X,�/y y r "s"v,;,,,P/ F3p
4'
f
w
of ` U
�y o
I� z
7-7 119 .
W
Hill
l�
� � m
�e cl1 ° F
1 I(
O
W
>
JOE] w
�U F,
o
II
1 I
a
��r I
R
�o
r
r~�
W
_ m
4 7 mm'
Ag4--4
�TOODBURN
Inc orpornreA 1889
January 12, 2026
To: Honorable Mayor and City Council through City Manager
From: Chris Kerr, Community Development Director C 'r
Subject: Ordinance adopting a revised Transportation System Plan (TSP) and
amending the Woodburn Development Ordinance (WDO).
RECOMMENDATION:
Adopt an ordinance revising the Transportation System Plan, a component of the
Woodburn Comprehensive Plan, and making associated amendments to the
Woodburn Development Ordinance.
BACKGROUND:
In July 2023, the City Council directed staff to initiate the hiring of a consultant
(Kittleson &Associates) to update the 2019 TSP and WDO to address development
in this area. Specifically, the revisions were intended to account for recently
completed developments and their associated improvements; and identify the
necessary future transportation improvements needed to serve the recent Urban
Growth Boundary (UGB) expansion area. Associated updates to the WDO were
also proposed through this process that would sunset the Interchange
Management Area (IMA) district area trip budget as its 20-year planning horizon
has expired.
The Planning Commission held a work session on August 14, 2025, to review the
proposed amendments. At their October 23, 2025, meeting, the Planning
Commission held a public hearing and unanimously recommended that the City
Council approve the TSP and WDO amendment package as presented.
The City Council held a public hearing on December 8, 2025. At the public
hearing ODOT representatives testified in opposition to the amendment that
removes the district trip budget from the IMA. Councilors asked ODOT and City
Agenda Item Review: City Manager_x_ City Attorney_x
83
staff to clarify questions and expressed support for the amendments as they
reflect Woodburn's economic goals.
DISCUSSION:
Based on City Council direction, staff has prepared the attached ordinance for
consideration, which incorporates the TSP and WDO amendments presented at
the Council hearing on December 8th. Associated findings supporting adoption
of the amendment package are also included as an attachment to the
ordinance and provide, in-part, a response to the objections raised by ODOT
during the public hearing process.
FINANCIAL IMPACT:
Modifying the TSP to include needed roadway projects to address the recent and
expected development activity in the southwest area of the City is critical to
ensure that future development is providing transportation facilities that are both
appropriate and predictable. The list of projects in the TSP is used to formulate
the City's capital improvement plan as well as determining the SDC schedule.
Additionally, these projects allow the city and developers to more accurately
confirm the individual proportionate share costs required for an individual
development project. Determining these proportionate share costs assures that
development costs are borne by applicants rather than the public to the greatest
extent legally possible.
The proposed WDO amendment to the IMA district is vitally important and
imperative because if no action is taken and the `cap' were to be reached,
hundreds of acres of vacant land in the IMA would be essentially unbuildable -
putting the city at a significant risk under the takings clause of the US Constitution.
84
COUNCIL BILL NO. 3293
ORDINANCE NO. 2643
AN ORDINANCE REVISING THE TRANSPORTATION SYSTEM PLAN ("TSP") TO
ACCOUNT FOR THE RECENT URBAN GROWTH BOUNDARY ("UGB") EXPANSION
AND AMENDING THE WOODBURN DEVELOPMENT ORDINANCE ("WDO") RELATED
TO THE INTERCHANGE MANAGEMENT AREA (IMA) (LA 23-01)
WHEREAS, ORS 197.175 requires cities to prepare, adopt, and implement
Comprehensive Plans consistent with statewide planning goals adopted by
the Land Conservation and Development Commission; and
WHEREAS, Oregon Statewide Planning Goal 12 requires cities, counties
and the state to create a transportation system plan that takes into account
all relevant modes of transportation: mass transit, air, water, rail, highway,
bicycle and pedestrian; and
WHEREAS, the Woodburn Transportation System Plan (TSP) was last updated
in 2019 to guide the management of the appropriate transportation facilities; and
WHEREAS, periodic revisions and updates to the TSP are necessary and
expected to comply with statutes and administrative rules, administer new and
revised long-range plans, and address current issues; and
WHEREAS, there has been unprecedented commercial and residential
development in the southwest area of the city; and
WHEREAS, the City recently completed a UGB expansion, adding 237 acres
of new industrial land in the southwest area; and
WHEREAS, the current 2019 TSP does not account for the recent
development or the recent UGB expansion; and
WHEREAS, In July 2023, the City Council directed staff to initiate the hiring of
a consultant (Kittleson & Associates) to update the 2019 TSP to address recent
developments; and
WHEREAS, the City received grant support from Business Oregon to assist with
the development of the revised TSP; and
Page - 1 - Council Bill No. 3293
Ordinance No. 2643
85
WHEREAS, the process was led by a professional consultant with input from a
Technical Advisory Committee which included representatives from DLCD, Marion
County, ODOT, and technical staff from the city; and
WHEREAS, within the study area for the TSP revisions, the City also has an
Interchange Management Area (IMA) overlay zoning district, which is intended to
guide development around the I-5/OR 214 interchange, focusing on managing
traffic, promoting planned industrial growth (part of the Southwest Industrial
Reserve - SWIR), and ensuring high-quality development; and
WHEREAS, in 2005 the City entered into an Interchange Management Area
(IMA) agreement with Oregon Department of Transportation (ODOT); and
WHEREAS, as part of the IMA agreement, a 20-year budget cap on peak
hour trips within the IMA Overlay District was incorporated into the City's WDO;
and
WHEREAS, the 20-year peak hour trip budget for the District sunsets at the
end of 2025 and the City desires that change to be reflected in revisions to the
City's WDO; and
WHEREAS, the Woodburn Planning Commission held a public hearing on
October 23, 2025 and unanimously recommended approval of the TSP and WDO
amendments to the City Council; and
WHEREAS, the Woodburn City Council held a public hearing on December
8, 2025, and tentatively approved the legislative amendments on a unanimous
vote; NOW, THEREFORE,
THE CITY OF WOODBURN ORDAINS AS FOLLOWS:
Section 1. For purposes of this ordinance amendment, all new text is shown
as underlined (i.e. new text) and all deleted text is shown as stricken (i.e. ro' Q
After this ordinance amendment is adopted, the Community Development
Director shall correct the TSP and WDO to incorporate all revisions contained
herein.
Section 2. The revised Transportation System Plan (Exhibit A), attached
hereto and incorporated herein, is hereby adopted as an element of Volume II of
the Woodburn Comprehensive Plan.
Section 3. The Woodburn Development Ordinance is amended as
specified in Exhibit B, which is attached hereto and incorporated herein.
Page - 2 - Council Bill No. 3293
Ordinance No. 2643
86
Section 4. The legislative action taken by this Ordinance is explained
and justified by the Analyses & Findings document attached hereto and
incorporated herein as Exhibit C.
Approved as to form:
City Attorney Date
Approved:
Frank Lonergan, Mayor
Passed by the Council
Submitted to the Mayor
Approved by the Mayor
Filed in the Office of the Recorder
ATTEST:
Heather Pierson, City Recorder
City of Woodburn, Oregon
Page - 3 - Council Bill No. 3293
Ordinance No. 2643
87
Exhibit A
WOODBURN
TRANSPORTATION SYSTEM
PLAN
Prepared For:
City of Woodburn
270 Montgomery Street
Woodburn, Oregon 97071
(503) 982-5246
Prepared By:
Kitt elson&Associates, Inc.
851 SW 6'h Avenue, Suite 600
Portland, OR 97204
(503) 228-5230
FINAL
September 2019
This Project is partially funded by a grant from the Transportation and Growth Management
("TGM") Program, a joint program of the Oregon Department of Transportation and the Oregon
Department of Land Conservation and Development.This TGM grant is financed, in part, by
federal Fixing America's Surface Transportation Act ("FAST Act"), local government, and the State
of Oregon funds.
The contents of this document do not necessarily reflect views or policies of the State of Oregon.
88
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOODBURN 0 TRANSPORTATION SYSTEM LAI
Acknowledgeis
The development of the Woodburn Transportation System Plan was guided by the Project
Management Team (PMT) a Technical Advisory Committee, and a volunteer Citizen Advisory
Committee (CAC). The City of Woodburn would like to thank each of these individuals who
devoted their time, expertise, and insight into the development of the plan.
Project Management Team (P T)
• Chris Kerr, City of Woodburn
• Eric Liljequist, P.E., City of Woodburn
• Michael Duncan, ODOT
Citizens Advisory Committee (CAC)
• Dawn Cole- Estates Officer
• Mark Hester- Business Representative
• Kari Pankey- Parks Board
• Charlie Piper- Planning Commission Chairperson
• Sharon Schaub-City Councilor
• Peter Skei- Industrial Property Representative
• Sheryl Southwell- Industrial Property Representative
• Elias Villegas-Chemeketa College
• John Zobrist-Citizen
Consultant Team Members
• Matt Hughart, AICP, Kittelson & Associates, Inc.
• Molly McCormick, Kittelson &Associates, Inc.
• Julia Kuhn, P.E., Kittelson &Associates, Inc.
• Adrienne DeDona, JLA Public Involvement
• Clinton "CJ" Doxsee, Angelo Planning Group
• Darci Rudzinski, AICP, Angelo Planning Group
-Page 2-
89
Exhibit A
�Vnnxa�vx�T
Table of Contents
INTRODUCTION...................................................................................................................................................9
WHY CREATE A TRANSPORTATION SYSTEM PLAN?.......................................................................................................9
WOODBURN2019 .....................................................................................................................................................9
TSPUPDATE PROCESS...............................................................................................................................................13
TSPORGANIZATION .................................................................................................................................................14
SETTING THE VISION FOR WOODBURN'S TRANSPORTATION SYSTEM .......................................................17
GOALS AND OBJECTIVES...........................................................................................................................................17
MOTOR VEHICLE SYSTEM ................................................................................................................................23
FUNCTIONAL CLASSIFICATION SYSTEM.......................................................................................................................23
ROADWAYPLAN ......................................................................................................................................................29
FREIGHTPLAN.........................................................................................................................................../p040.4Qd4Qd,3.,7,
TRAFFICSAFETY PLAN................................................................................................................................/p44444444p 4
LOCAL STREET CONNECTIVITY PLAN..........................................................................................................4.77-77-7.4442.
TRANSITSYSTEM.................................................................................................................................525252614:
EXISTING TRANSIT SERVICE.........................................................................................................................57&7&2&4.47
TRANSIT PLAN PROJECTS AND PROGRAMS................................................................................................56&65
PEDESTRIAN SYSTEM..........................................................................................................................1 . .141::1
PEDESTRIAN FACILITIES...............................................................................................................................676•7,.6.7,.6.4,,,.9:7p
PEDESTRIAN PLAN PROJECTS.....................................................................................................................646444-63 5-9
BICYCLESYSTEM................................................................................................................................76,7676'1.11•1,
BICYCLEFACILITIES....................................................................................................................................76:,p.6:,p.6:7.5:7.:4,
BICYCLE PLAN PROJECTS..........................................................................................................................78:7.97.97:77.4
OTHER TRAVEL MODES......................................................................................................................17,9797 1, 1
TRANSPORTATION SYSTEM MANAGEMENT AND OPERATIONS (TSMO) PLAN................................. ......879 z8;z8&.84
RAILPLAN.................................................................................................................................................7D7..9.7:,.9.7:.8.98&
AIR TRANSPORTATION...............................................................................................................................7D7..9.7:,.9.7:.8.98&
MARINE TRANSPORTATION........................................................................................................................7D7.97.97,89.8!'
PIPELINE....................................................................................................................................................7D7.97.97,89.8!'
FUNDING........................................................................................................................................... .95,96,97,.97 9
FUNDING PROGRAMS AND REVENUE........................................................................................................7D5.9.9.9.9.9,9w'9.
PLANNED TRANSPORTATION SYSTEM COST SUMMARY...............................................................................7D79;zw9pi
GLOSSARY OF TERMS..................................................................................................................1.11..1011 1 91
—Page 3-
90
���.�.+ ��
�-�/ U`�|� ��
WOODBURN
0TY OF WOODBURN | TRANSPORTA'MN SYSTEM PLAN UPDATE
List of Tables
TABLE l: FUNCTIONAL CLASSIFICATION COMPARISON eY JURISDICTION.......................................................................27
TABLE 2: ROADWAY PLAN PROJECTS-----------------------------------------31
TABLE 3:TRAFFIC SAFETY PROJECTS------------------------------------.4444444444:
TABLE4:TRANSIT PLAN.................................................................................................................................. 69694699 9 4,
TABLE 5: PEDESTRIAN PLAN PROJECTS-----------------------------------.656965644�iA
TABLE 6: BICYCLE PLAN PROJECTS-------------------------------------.78797977.73
TABLE 7:TRANSPORTATION DEMAND MANAGEMENT PROGRAM STRATEGIES...............................................88&3&.03(-,.82
TABLE 8: LAND USE PROJECTS.......................................................................................................................8999999784�
TABLE 9:ACCESS MANAGEMENT PROJECTS.................................................................................................909GPQ99�94
TA BILE lU: RA|LPROJECT .............................................................................................................................919 19 f����
TABLE ll:CITY()FVVOODBURN REVENUE HISTORY.......................................................................................9595-98&93.89
TABLE l2: POTENTIAL GRANT SOURCES AND PARTNERING OPPORTUNITIES...................................................969694694�9A
TABLE l3: POTENTIAL NEW FUNDING SOURCES FOR CONSIDERATION eY THE CITY oFVV000aunm..............969696949A
| TABLE l4: PLANNED TRANSPORTATION SYSTEM COST SUMMARY----------------------.9797979&.94
List of Figures
FIGUREl: REGIONAL MAP............................................................................................................................................11
FIGURE 2: FUNCTIONAL ROADWAY CLASSIFICATION---------------------------------'24
FIGURE 3: ROADWAY PLAN PROJECTS-----------------------------------.38999999g&
FIGURE 4: FREIGHT ROUTES........................................................................................................................... 2424-24-2,99
FIGURE 5:TRAFFIC SAFETY PROJECTS-----------------------------------'484g4,g4'74,3
FIGURE 6: LOCAL STREET C()NNECTNITY----------------------------------494,94,94S.44
FIGURE 7: EXiST|N0 TRANSIT FACILITIES.......................................................................................................... 454�.'P44'449�
FIGURE 8: PEDESTRIAN PLAN PROJECTS----------------------------------.72727274�67�
| FIGURE 9: BICYCLE PLAN PROJECTS ------------------------------------.83939381.77
-Page 4-
g1
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
.............................................................................................................................................................................................................................
wcxxT Uuu:::p s Scm.j.II,Ihvvesl:.. a n(3us:ll kio� l Il e eiv ...; 3 rlllh tl.,,ll „ u.�u n,.33� a :3 :.p:n�'�og:::dflc ciu p:ll:cdI-xiii gg �oo;n e Illhe
gd2V">Noini of hlhE 2019 I al', INc lhlugt)hg: j Ly±g coinshruc hioini c ind re c inih ol,p iD ing 2f hlhE Airruazoin.,
iuliullurrue ins ew !ije:,'[gigiig 53 :�jje y lle IlRoad and hlhuE coin, her be opeinEKJ ew,.xhe inisuc?iD c?i...l ve, 2e.,.e ini IlRocic
h0 I'c rr IlROCI . I Ihuic re c,lhu�ainDgg r care., gu-ruocj rh hlhuE coin g ??ing b:JICJCXJh Of hlhuE aurruohlh l:,`rew,.ew,.11: and.
3uogJ k)in, I'cAinn e:,; ue,.rude injcil in�em„iic t)bcxhood ...and vallou r ohlh hem Ye`,.rude injal EXOc e h tea.."`Mgr ugc,c,,iDhy. .
hlh)g l:'y of "v 'oodbu nn, fon- ally e2g)aindew d li r u baini g[gc vhlh) becjinc3gy vwlh)uch added.
g3>pugAiMghc,,l 23Z c�g[u r � r .� u� e:,; oincju�r Ncil de ye lc?lpiie:,inn
� w
c�i Ic�in�c3 hc� hlhu�;,w w�a�llll�, c.uc;;�c�huin�c uc in�uiuc.c�in�h iu�k
c),'>,pgc a in,oh,ES h0 hhuE geao,.
� V" �� n�
i.....
I.c� c�,ccc�urr,�.p,rruc�c ci...e u�E se c�in�c...use c�„g iic�inlr.,..."v"�"c�c�c... u.�rin, ..:.e c..�c�in�...c�in� u.�.::. care c�....1:>c�in�in�,j,in�c >rcr.�e u
2024 ho ode,,inff r c Dij c3e::!. e lc lr>....g uTucxe`: c3e" ha„lile c3 lus..h of hm„inspgh,alloini iiiin .�c, u� e r n�irc��hru.... I>r2,�2c...h icX h,lhE''.
h„Ihme I>g hiicr,ini of hlh,
.3 l u 3r�...1 )E 2.025 I al:;'..Updgj2 uS HhE [XQCJUC Of Ns ru.r... care a....Ye uin�&rrue ins....
p..La.,in....
—Page 5—
92
Exhibit A
This page intentionally left blank
-Page b-
93
1
11
J
r
i
r ,
i �
r/
� �
/ i /
� /
/
� / ,
/
''
/ /
r
i /
i
/ �,
/
i � � i
r
/
i / i
, , � / i
i i
, . �
� r � �
/ /
� , � �
� /
� / i
�, � , ,
� ,
, �
/ � /
r � , r
, .
r /
/ f
r i ,���
/ ��
;�
� �
��
�� ,
J � „ �
/ / � ,
/,
,/ / i
f
�/ � �
� ,y
i
, �
i� ////
� .� f /.
, / i
/
t f
. � �/ , � � � / �i
��
a , �
� r , ..
��� � , � �,
� � � �,
i � , /
, �
i
f
�, /
,� � / r //
. ��� � � �
. i ,� � %
„ � � / ,,.,,r /
,, �, ,, u,, ,„
,,/
i � � , .
., / �� ,,, i ,,,evil%/�i/, ., / � r rii„ / /
./.��,,, rill i r .,, ... .. � � ,....... .... r%/ .._
/ 1 //� ,,,
/ // r %%% / % %%%%
�y ,� rrrrrr/,
,� ,
//iii� it N ,,,, /
�� a ,,, r�< /, ,, / ,
/ ri /r f
�///// i rrr /
J � ra/ d/ rr
/ ri% rr � r ii/ //
r, / r r /�%%,, � r .... . /%
/ %r r ��,. � / rrc
%% r / %%/
�r.,,,rrr % r �, /
i rr
/ „ia
/ ,i
///// /,
/ / / % /
, /// / r /, „// /ice,
i%/ / r� ,,/ ,,,,
/ /� / ,
/i /% r
/ /�i��� r
rs/>� / / ii _,,,,
r/ / ,,,,,,,,, iii / -„
r/,,.... /.. ,,,,/ ,,,, ,
/ j r ryl �/ .,,,
r ,,, ,e,//rr /. / �/ „, // ri /e/ ;,;;, ,,,
r /%///%/////%// «�� �rr�/ii/fir � r ,,,,, ,,,. ,..,;,., Nl�< t'�i'� '4 r //o�
r /////// ��"''�
,,
� /j
/ r ,. r, ,,,�„ 'a f
��gq ��ryry � ,,,,,,,,,r, � ,,,,,,, �„ .».,.�.., -i�
�� MMMW^� „r "
4� �, r „'� � r � r
��y, ,
r:
�m��wmm�w� mm, o � � � r rid riiiii ii / iiiij
r >, r
,: ,,. ,,,: "rill
�� �� .�N,� �/ � ',
/ ./�r ,,;� r it ;e
..,��. ,,,, �.a� ,
��
�,.�
�' - u, ��
tl.� r„�„,' ,. ,� � �,
��� ��� � .��wflv�h�1 s myB � � r���
����
��p ,
�f�� �. 1�\\111ti� 1� � h � l�� ���o ,k
IOIp1P11��"'�"�� ��
�x �� �,,;i�,;��jy ,/��/. �/////ii ���,�
�� �� �
OI�Jf�f� t
�� � „„ pi�Y � � ��
i �� � ,
� �r � ��� ,, � ��w�m.
f
r// ;/���/'yr ,��� � � ,d
'' �r �y it
,�1 ,' ��,-,���
� ,
� � �,J �;
�� �r
�.
> � ���
� h���o�dl o�1����„�„
�r o
�,.,
�1iii� ,�1�� ll��;�������' �`
1f ��/�r� ��� ��� ,r m
I�1���/��� � � �1,
, / !�/�i /���l�j�/�/��j�/��///�it l�l�� �.. iili�� �� �d / F k�M ,, r,�,
/ r1�!�/ /� / �,r� �x! �i= � I
/�
r�r r,/;i��%�/�i� /�� r ,� � ;,�
f���%��%�� /��i������ � ,� �� i pig w �',� ,�,r�, �,°
,,.
��1 rii���v/���������� � t ✓
�it
�� � �� � e u �m h'uVV��4
//l �0�� l�l � �, ,
�;�
I �:�� w, r r", �„ ", �" a�
°� ,�
n
��rl, � �� � .� � ��,. � 'oe�,. ,�� ,
r
'� i�� ,
r�i ,,
h
�. ,
..,
r 1^Ym,. �/° � �a ��
i �,. spa � s i mtt fi
�°"" �
i o �
,�,.; 1"
� • r •
. . . .
. . . — —
. .
Exhibit A
This page intentionally left blank
-Page 8-
95
Exhibit A
WOODB�pR.N ("IT.Y OF WOOS:;BURN p TRANSPORTATION SYSTEM LA
INTRODUCTION
IL.....II Y CR II:::::: l..I[::::: A TR INS II:::'0 IR.F .T]O IN SYS.T1:..:::: II::.)IL....
The Woodburn Transportation System Plan (TSP) is a long-range plan that sets the vision for the
city's transportation system, facilities and services to meet state, regional, and local needs for
the next 20 years. The TSP was developed through community and stakeholder input and is
based on the system's existing needs, opportunities, and anticipated available funding. The plan
also serves as the Transportation Element of the Woodburn Comprehensive Plan. The purpose of
the 2019 TSP update is to address regulatory changes that have occurred in the region since the
previous 2005 TSP, as well as to provide an updated list of projects to address local transportation
needs and deficiencies.
� I
Pedestrians in Downtown Woodburn Playground Located Along the Existing
Section of Mill Creek Greenway
The TSP addresses compliance with new or amended Federal, State, and local plans policies,
and regulations including the Oregon Transportation Plan (OTP), the State's Transportation
Planning Rule (TPR), the Oregon Highway Plan (OHP), and presents the investments and priorities
for the Pedestrian, Bicycle, Transit, and Motor Vehicle System.
O I I LYR IN 2019
As shown in Figure 1, the City of Woodburn lies in the Willamette Valley in Marion County,
approximately 30 miles south of Portland and approximately 20 miles north of Salem. Initially
starting as land purchased for a tree nursery, construction of the railroad led to rapid
development and incorporation as a city in 1889. Further growth occurred as additional tracks
and 1-5 were constructed. Based on information from the Portland State University Population
Research Center (PRC), Woodburn has an estimated 2016 population of 24,795 people,
comprising 7.4%of Marion County's 333,950 residents. The community is known for its tourism,
local events, and young and diverse population. Big attractions include the Woodburn Premium
Outlets, several golf courses, Tulip Festival, Fiesta Mexicana, and the Woodburn Dragstrip with
over 4.5 million visitors to the area each year.
-Page 9-
96
Exhibit A
This page intentionally left blank
-Page 10-
97
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Figure 1: Regional Map
-Page 11 -
98
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Blank l 1x17 page
-Page 12-
99
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOODBURN 0 TRANSPORTATION SYSTEM L
The TSP update process began with a review of local, regional, and statewide plans and policies
that guide land use and transportation planning in the city. Goals and objectives were then
developed collaboratively with the project's Citizens Advisory Committee (CAC) to guide the
evaluation of the existing and future transportation system conditions as well as the
development of planned improvements. An inventory of the multimodal transportation system
was conducted to serve as the basis for the existing and future conditions analyses. The existing
and future condition analyses focused on identifying gaps and deficiencies in the multimodal
transportation system based on current and forecast future performances. For each gap and
deficiency, a solution, or set of potential solutions, was identified to address the system needs.
The solutions were then evaluated to determine the preferred solutions, which were prioritized
through the public involvement process and organized into planned project lists. The
culmination of the TSP update process is this document, which presents the plans and solutions
identified to address the existing and future gaps and deficiencies in the city's transportation
system.
Committees
The project team developed the TSP update in close coordination with city staff, along with
representatives from the local community. One formal committee, referred to as the Citizens
Advisory Committee (CAC), had a significant role in the TSP update process. The CAC consisted
of local residents with an interest in transportation. The CAC provided technical guidance and
coordination throughout the project. CAC members reviewed and commented on technical
memorandums and participated in committee meetings and community meetings. The CAC
served as the voice of the community and the caretakers of the goals and objectives of the TSP
update.
Public Involvement
The Woodburn TSP is the result of a collaboration among various public agencies, the
community, and the project team of city staff, Oregon Department of Transportation (ODOT),
and consultants. The public involvement process consisted of continuous face-to-face
interactions at multiple events. These events included three drop-in style and three on-line open
houses spaced over the course of key project milestones. A detailed summary of the open
house outreach methods and feedback is provided in the technical companion document to
the TSP. At the deliverable level, the project was supported by Citizens Advisory Committee
(CAC) made up of interested citizens, business representatives, and Planning Commission
members.
-Page 13-
100
Exhibit A
WOODB�pR.N ("IT.Y. OF WOODBURN p TRANSPORTATION SYSTEM L
an
ml
I'
r
i
j
Open House #1 Open House #1
°•�mn)J�9H)I iv� -� oumi
1 r.
,ww
war.w,irra I
�l
Open House #3 Open House #3
The Woodburn TSP is comprised of the main TSP summary document (Volume 1) and a volume of
supporting technical appendices and other supporting documentation (Volume 11). Volume I
(this document) is organized into the following sections:
• Chapter 1 - Introduction
• Chapter 2-Setting The Vision for Woodburn's Transportation System
• Chapter 3-Motor Vehicle System
• Chapter 4-Transit System
• Chapter 5 - Pedestrian System
• Chapter 6- Bicycle System
• Chapter 7- Other Travel Modes
• Chapter 8- Funding and Implementation Outline
• Chapter 9-Glossary of Terms
Volume 11 (under separate cover) contains the technical memorandums prepared during the
development of the TSP including the detailed data and technical analyses that informed the
plan.
-Page 14-
101
Exhibit A
.pr
Aa
I
�s
W
m au
Y
r � e
Exhibit A
This page intentionally left blank
-Page 16-
103
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOODBURN 0 TRANSPORTATION SYSTEM L
SETTING THE VISION FOR W U '
TRANSPORTATION SYSTEM
Setting a vision for a city's transportation system is an essential first step in maintaining the existing
system and establishing the framework to accommodate potential growth. The public
involvement process for the TSP provided a forum for the community to express their vision for
the future of Woodburn's transportation network. The community advisory committee and other
community members expressed a desire for a transportation system that maintains community
livability, enhances existing transportation infrastructure, increases safety for all users, and
provides a framework for potential growth.
'BOA II....S A I I
The project team developed goals and objectives for the TSP update to help guide the review
and documentation of the preferred future Woodburn transportation system. As described in
Technical Memorandum #6: Preferred Alternatives, the goals and objectives through a range of
evaluation criteria that were applied to select preferred alternatives and priority rankings among
the identified projects. In compliance with state, regional, and local planning requirements, the
goals and objective below emphasize a multimodal system that supports all modes and users.
Goal 1 - Multimodal Mobility
Provide a multimodal transportation system that avoids or reduces a reliance on one form of
transportation and minimizes energy consumption and air quality impacts.
Objective 1
Develop an expanded intrcity bus transit system that provides added service and route
coverage to improve the mobility and accessibility of the transportation disadvantaged
and to attract traditional auto users to use the system.
Objective 1
Develop a plan for providing travel options between Woodburn and Portland or Salem,
including intercity bus service and potential bus/carpool park-and-ride facilities.
Objective 1
Develop a comprehensive low stress network of bicycle lanes and routes that link major
activity centers such as residential neighborhoods, schools, parks, commercial areas,
and employment centers.
-Page 17-
104
Exhibit A
WOODB�pR.N ( I..I,.Y OF WOODBURN 0 TRANSPORTATION SYSTEM LAI
Objective 1
Develop a comprehensive network of sidewalks and off-street pathways that improve
pedestrian mobility within neighborhoods and link residential areas to schools, parks,
commercial areas, and employment centers.
Objective 1 E
Maintain adequate intersection and roadway capacity on the key east-west and north-
south arterials.
Goal 2 - Connectivity
Provide an interconnected street system that is adequately sized to accommodate existing and
projected traffic demands in the Woodburn area.
Objective 2
Verify and Incorporate the relevant strategies and infrastructure projects from the existing
TSP, I-5/OR 214 IAMP, and 99E Refinement Plan
Objective 2
Identify new east-west and north-south collector/minor arterial streets within the City to
relieve traffic demands on Oregon 219/214, 211, and 99E, and coordinate with Marion
County to construct the street connections needed outside of the urban growth
boundary (UGB).
Objective 2
Develop updated street design standards for arterials, collectors, and local streets.
Goal 3 - Safety
Provide a transportation system that enhances the safety and security of all transportation
modes in the Woodburn area.
Objective
Address existing and potential future safety issues by identifying high collision locations
and locations near schools or with a history of fatal, severe injury, and/or
pedestrian/bicycle-related crashes and developing strategies to address those issues.
-Page 18-
105
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOODBURN 0 TRANSPORTATION SYSTEM L
Objective
Identify street and railroad crossings in need of improvement, as well as those that should
be closed or relocated.
Objective
Develop a plan for designated truck routes through the City, and a plan to handle truck
and rail hazardous cargoes
Goal 4 - Strategic Investment
Provide a financially sustainable transportation system through responsible stewardship of assets
and financial resources.
Objective
Identify new and innovative funding sources for transportation improvements
Objective 4B
Preserve and maintain the existing transportation system assets to extend their useful life.
Goal Land Uses t ti Integration
Review and update land use standards and ordinances to create a balanced built environment
where existing and planned land uses are supported by an efficient multi-modal transportation
system.
Objective
Identify a range of potential Transportation Demand Management (TDM) strategies that
can be used to improve the efficiency of the transportation system by shifting single-
occupant vehicle trips to other modes and reducing automobile reliance at times of
peak traffic volumes.
Objective 5B
Identify revisions to the Woodburn Zoning Ordinance for compliance with the
Transportation Planning Rule
-Page 19-
106
Exhibit A
This page intentionally left blank
-Page 20-
107
pit A
uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu� IIIIII I �
f
..:.. .. .....
Nl .... .....
i ;07
m uuuum�W"
f
,
/
/
/
/
i1
/
• • •
• • - - • - •
Exhibit A
This page intentionally left blank
-Page 22-
109
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN 0 TRANSPORTATION SYSTEM L
MOTOR VEHICLE SYSTEM
Streets serve a majority of all trips within Woodburn across all travel modes. In addition to
motorists in private vehicles, pedestrians, bicyclists, and public transit riders use streets to access
areas locally and regionally. This section summarizes the updated functional classification
system, roadway plan, freight plan, safety plan, and local street connectivity plan that make up
Woodburn's motor vehicle system.
IF LJ IN C T'10 IN A II..... CII..... S III IIr A"T]OI SY ...]:::::.M
A street's functional classification defines its role in the transportation system and reflects desired
operational and design characteristics such as right-of-way requirements, pavement widths,
pedestrian and bicycle features, and driveway (access) spacing standards.
Figure 2 illustrates the functional classification of streets within Woodburn, which includes the
following designations as defined by the current Woodburn TSP:
• Freeways-The primary function of the interstate is mobility, because freeways connect
major cities, regions within Oregon, and other states, and serve as major freight routes.
The freeway should provide "safe and efficient high-speed continuous flow." The
freeway has full access control with access limited to the interchange. Only motorized
vehicle traffic is served.
• Major Arterials- Primary functions are to serve local and through traffic as it enters and
leaves the urban area, connect Woodburn with other urban centers and regions, and
provide connections to major activity centers within the UGB. Emphasis should be on
traffic flow, pedestrian and bicycle movements. On-street bicycle lanes and sidewalks
should be provided.
• Minor Arterials - Primary functions are to connection major activity centers and
neighborhoods within the UGB and to support the major arterial system. Minor arterials
should have a higher degree of access, shorter trip lengths, lesser traffic volumes, and
lower travel speeds than major arterials. Like major arterials, emphasis should be on
traffic flow, pedestrian and bicycle movements. On-street bicycle lanes and sidewalks
should be provided.
• Service Collector- Primary function is to provide connections between neighborhoods
and major activity centers and the arterial street system. Some degree of access is
provided to adjacent properties,while maintaining circulation and mobility for all users.
Service collectors carry lower traffic volumes at slower speeds than major and minor
arterials. On-street bicycle lanes and sidewalks should be provided.
-Page 23-
110
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN 0 TRANSPORTATION SYSTEM LA
• Access Streets- Primary function is to connect residential neighborhoods with service
collectors or arterials. On-street parking and access to adjacent properties is prevalent.
Slower speeds should be provided to ensure community livability and safety for
pedestrians and cyclists. In many cases, cyclists can "Share the road" with motor
vehicles because of low traffic volumes and speeds.Sidewalks or pathways should be
provided for pedestrians.
• Local Streets- Primary function is to provide direct access to adjacent land uses.Short
roadway distances, slow speeds, and low traffic volumes characterize local streets.
Cyclists can share the road with motor vehicles. Sidewalks or pathways should be
provided for pedestrians. oca.l..2h eh sigincih oin r uinclude re side injci,llocal r e Q hsancj,,,
oindu r 6cil kcal rh e:le: s.
r9
f
�AA
School Bus Woodburn Public Library
Table 1 summarizes the functional classifications of the major arterial, minor arterial, and service
collector streets within Woodburn and identifies the overlapping ownership/maintenance and
jurisdictional relationships that exist.
The functional classifications used in local TSPs should be consistent with other regional planning
efforts. As shown in Table 1, there are several streets that currently have conflicting
classifications.
-Page 24-
111
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Figure 2: Functional Roadway Classification
-Page 25-
112
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Blank l 1x17 page
-Page 26-
113
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Table 1: Functional Classification Comparison by Jurisdiction
WIN
Buttevilled Major Major
(north of OR 219 and south of OR 219) County/C`,ty Minor Arterial Collector Collector No
Butteville Road
ODOT Minor Arterial Minor Arterial Yes
(segment where aligned with OR 219)
OR 219(Butteville Road to Woodland ODOT Major Arterial Minor Arterial No
Avenue)
OR 219(Woodland Avenue to 1-5) ODOT Major Arterial Principal No
Arterial
Woodland Avenue City Access Street Major No
Collector
Arney Road City/Private Service Major No
Collector Collector
1-5 ODOT Freeway Interstate Yes
OR 214(1-5 to OR 99E) ODOT Major Arterial Principal Yes
Arterial
OR 214(OR 99E to UGB east limits) ODOT Major Arterial Minor Arterial No
Stacy Allison Way City Service Local No
Collector
Center Street City ServiceLocal No
Collector
Evergreen Road (OR 219 to Boean Major
City Minor Arterial No
Lane) Collector
Evergreen Road (Boean Lane to end City Minor Arterial Local No
of road)
Harvard Drive City Access Street Local No
Stubb Road C,` +rC,`ity, Access Street No Local No
Designation
Parr Road ' r /City Service Major Major No
Collector Collector Collector
Hayes Street City Service Major No
Collector Collector
Oregon Way City Access Street Major No
Collector
Astor Way City Access Street Major
No
Collector
Country Club Road City Access Street Major
No
Collector
Boones Ferry Road/Settlemier Avenue County/City Minor Arterial Arterial Minor Arterial Yes
(north of Parr Road)
Boones Ferry Road/Settlemier Avenue County/City Minor Arterial Major Minor Arterial Yes
(south of Parr Road) Collector
-Page 27-
114
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN p TRANSPORTATION SYSTEM PLAN
MIN
Tukwila Drive City Access Street Major No
Collector
Hazelnut Drive City Access Street Major No
Collector
5rh Street City Access Street Major No
Collector
Harrison Street City Service Major No
Collector Collector
Lincoln Street County/City Service Local Major No
Collector Collector
Garfield Street City Minor Arterial Minor Arterial Yes
Young Street City Minor Arterial Minor Arterial Yes
Cleveland Street City Service Major No
Collector Collector
Front Street City Minor Arterial Minor Arterial Yes
Industrial Avenue City Service Major No
Collector Collector
Progress Way City Service Major No
Collector Collector
OR 211 ODOT Major Arterial Minor Arterial Yes
Park Avenue City Access Street Major No
Collector
Hardcastle Avenue County/City Service No Major No
Collector Designation Collector
Gatch Street City Access Street Major No
Collector
Brown Street City Service Major No
Collector Collector
OR 99E
(north of OR 214 and south of Young ODOT Major Arterial Minor Arterial No
Street)
OR 99E(segment where aligned with Principal
OR 214) ODOT Major Arterial Arterial No
Service Major
Cooley Road C,«E:kF kyC,itY. Collector Local Collector No
Roadway Cross-section Standards
A functional classification system as shown in Figure 2 has to work together with roadway cross-
section standards to allow for standardization of key characteristics within roadway
classifications while also providing some flexibility based on context. A roadway's cross-section
and design will vary between streets and between segments based on adjacent land uses and
demands, but the overall street network should also be considered. The Woodburn
-Page 28-
115
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOODBU N 0 TRANSPORTATION SYSTEM L
Development Ordinance Section 3.01.041 contains the current roadway cross-sections standards
for the city that work together with the identified functional classification system shown in Figure
2.
Y II...'II.....A IN
Roadway Facilities
The roadway facility types that are currently utilized or that are recommended through the
roadway plan projects are described below.
Turn Lanes
Separate left-and right-turn lanes, as well as two-way left-turn lanes (TWLTL) can provide
separation between slowed or stopped vehicles waiting to turn and through vehicles. The design
of turn lanes is largely determined based on a traffic study that identifies the storage length
needed to accommodate vehicle queues. Turn lanes are commonly used at intersections where
the turning volumes warrant the need for separation.
Traffic Signals
Traffic signals allow opposing streams of traffic to proceed in an alternating pattern. National
and state guidance indicates when it is appropriate to install traffic signals at intersections. When
used, traffic signals can effectively manage high traffic volumes and provide dedicated times in
which pedestrians and cyclists can cross roadways. Because they continuously draw from a
power source and must be periodically re-timed, signals typically have higher maintenance
costs than other types of intersection control. Signals can improve safety at intersections where
signal warrants are met, however, they may result in an increase in rear-end crashes compared
to other solutions. Signals have a significant range in costs depending on the number of
approaches, how many through and turn lanes each approach has, and if it is located in an
urban or rural area. The cost of a new traffic signal ranges from approximately$250,000 in rural
areas to $500,000 in urban areas.
Signal Timing/Phasing Modifications
Signal retiming and optimization offers a relatively low-cost option to increase system efficiency.
Retiming and optimization refers to updating timing plans to better match prevailing traffic
conditions and coordinating signals. Timing optimization can be applied to existing systems or
may include upgrading signal technology, such as signal communication infrastructure, signal
controllers, or cabinets. Signal retiming can reduce travel times and be especially beneficial to
improving travel time reliability. In high pedestrian or desired pedestrian areas, signal retiming
can facilitate pedestrian movements through intersections by increasing minimum green times
to give pedestrians time to cross during each cycle, which may create additional delay for other
https://www.woodburn-or.00v/dev-planning/paae/woodburn-development-ordinance-wdo
-Page 29-
116
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN 0 TRANSPORTATION SYSTEM LA
intersection users. Signals can also facilitate bicycle movements with the inclusion of bicycle
detectors.
Signal upgrades often come at a higher cost than signal timing and phasing modifications and
usually require further coordination between jurisdictions. However, upgrading signals provides
the opportunity to incorporate advanced signal systems to further improve the efficiency of a
transportation network. Strategies include coordinated signal operations across jurisdictions,
centralized control of traffic signals, adaptive or active signal control, and transit or freight signal
priority as further described in the Transportation System Management and Operations (TSMO)
section. These advanced signal systems can reduce delay, travel time, and the number of stops
for transit, freight, and other vehicles. In addition, these systems may help reduce vehicle
emissions and improve travel time reliability.
Roundabouts
Roundabouts are circular intersections where entering vehicles yield to vehicles already in the
circle. They are designed to slow vehicle speeds to 20 to 30 mph or less before they enter the
intersection, which promotes a more comfortable environment for pedestrians, bicyclists, and
other non-motorized users. Roundabouts have fewer conflict-points and have been shown to
reduce the severity of crashes, as compared to signalized intersections. Roundabouts can be
more costly to design and install when compared to other intersection control types, but they
have a lower operating and maintenance cost than traffic signals. Topography must be
carefully evaluated in considering a roundabout, given that slope characteristics at an
intersection may render a roundabout infeasible. The cost of a new roundabouts ranges from
approximately$2 million to$4 million depending upon the number of lanes and the slope
conditions.
i
n
I�Ifl�bl
� ��lr/ti ��rria
/
end r,iri is i%ii "U '
Traffic Signal Roundabout
Through Lanes
When the demand per lane on a roadway segment has reached saturation, a potential solution
is to construct additional through lanes. Although this theoretically adds capacity to the corridor,
-Page 30-
117
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOODBURN 0 TRANSPORTATION SYSTEM L
added lanes can allow latent demand from the system to show an increase in demand. Added
lanes may also create induced demand where drivers see that roadway as less of a barrier with
its increased capacity, drawing in additional new demand and potentially maintaining or
worsening the rate of congestion.
When a roadway does not have a consistent number of travel lanes per direction along a
corridor, an added through lane may provide a consistent cross-section allowing for less
weaving by vehicles traveling the corridor.
Roadway Plan Projects
The projects developed for the roadway plan are summarized in Table 2 and shown in Figure 3.
These projects are intended to address existing and projected future transportation system
needs for motor vehicles as well as all other modes of transportation that depend on the
roadway system for travel, such as pedestrians, bicyclists, transit users, and truck freight.
Table 2: Roadway Plan Projects
EN Noll,11111111
Ib-
SPI ithern(117(117
m= M t,G�Gtl;@� 4414 $'77 �
11-4444,+�..R FAh(4A(;6;d#OffiG 1-4GI (#GIffiG !.I
QR 919 f...w, G&R-.,+iGIA GIAGI G tNNG ,loft t rR'GRe (iR
Street de&igR GtiGR NNith 1-.01-e&#i GIR!.1-d @!G, 'Glo
TTTgr' .,I !-IoRI
GRd PI)
9B8T
Widen roadway to include two lanes in each
direction and a two-way left-turn lane,
OR 214 from including changes to signal timing as $20,300,000
R3 Cascade Drive State Street design Medium
to OR 99E appropriate,in coordination with ODOT (and (Cost
in conjunction with bicycle facility includes 32)
improvements)
As identified in the Highway 99E Corridor
Plan,widen roadway to provide a
0,000
OR 99E from continuous two-way left-turn lane and wider $12,30(Cost
(Cost
R4 Lincoln Street to State Street design shoulders,including changes to signal timing Medium includes 33,
south UGB as appropriate,in coordination with ODOT
B4
(and in conjunction with pedestrian and ,P3,and
bicycle facility improvements) P4)
-Page 31 -
118
Exhibit A
WOODB�pRN ("VTY OF WOODBURN TRANSPORTATION SYSTEM L
III,R111 111,11111111
6k ooc:l r<rwrr
vk kww h x;#yc,
144 FF hk4EA yc $O
clrrwrwe =W°
4o«n Pt Rr Rood Upgrade to Service Collector urban (Project
R5 te):,odktii A+teev k)( Coon YCJty, Street design standards including bicycle and pedestrian Low includes
and P Rr Rood. enhancements B21 and
ket rh to y i ty, :)
Poi i IE'ood fi,orn
Stralblo IEood to.
I Ve"!cgie"o 7 lEe gd.
Butteville Road
from r.mi,o It Upgrade to Minor Arterial urban standards $0
i�i ki e,ve;c1 (Project
R6 C,"-wrHww::rt�yC,`ity Street design including bicycle and pedestrian Low
oxte i7t Lek 1'4on. includes B7
R o�I c,at�2 i9 to enhancements c,r7.:tl ie;e;c ,t.,,ic1e,,
and t'6I">)
southern UGB
Brown Street $01
from Comstock g pg rof.to Service Collector Upgrade e lyi�c,vvr7 x i e e
R7 Avenue to Vine CityStreet design urban standards including bicycle and Low
(Project
Vve ivae;ererrx ° includes
pedestrian enhancements
<rk.�k.le�vc.y. '"x'1)1'1 9.)
OR 214/ Investigate corridor signal timing and
-5 Southbound Traffic signal
R8 Ram State timing coordination adjustments in coordination Medium $15,000
p g with ODOT
Intersection
OR 214/ Investigate corridor signal timing and
-5 Northbound Traffic signal
R9 Ram State timing coordination adjustments in coordination Medium $15,000
p g with ODOT
Intersection
OR 214/ Traffic signal Investigate corridor signal timing and
R10 Evergreen Road State timing coordination adjustments in coordination Medium $15,000
Intersection with ODOT
OR 214/
Oregon Way/ Traffic signal Investigate corridor signal timing and
R1 1 Country Club State timing coordination adjustments in coordination Medium $15,000
Road with ODOT
Intersection
OR 214/ Install intersection capacity improvement
Front Street such as traffic signal (if warranted),turn
R12 State Traffic control Medium $1,000,000
Ramp lanes,or roundabout in coordination with
Intersection ODOT
Install intersection capacity improvement
OR 214/ such as traffic signal (if warranted),turn
R13 Park Street State Traffic control Medium $1,000,000
Intersection lanes,or roundabout in coordination with
ODOT
Install a second left-turn lane on the
OR 214/ southbound approach,install a second
Intersection receivinglane on the east le u 7 fell cT
. 4}
R14 OR 211/ State geometric g Medium $I„,900,000
Ie'wnt �nn Iorlo,,and
OR rse considerations us date signal timing Intersection p g g' coordination with
ODOT
—Page 32—
119
Exhibit A
WOODB�pRN `w"VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Ib-
Parr Road/ Install intersection capacity improvement
Settlemier $500,000 tct
R15 rityTraffic control such as traffic signal (if warranted),turn Low1s C)C)C)C)C)C)Avenue
Intersection lanes,or roundabout
OR 99E/ Intersection- Reconfigure the westbound approach to
R16 Hardcastle State geometric incorporate one left-turn lane and one thru- Medium $50,000
Avenue
Intersection considerations right turn lane in coordination with ODOT
OR 99E/ Intersection-
Install a shared through-right turn lane on the
eastbound approach and reconfigure the
R17 Lincoln Street State geometric existing approach lane as a separate left- Medium $500,000
Intersection considerations
turn lane in coordination with ODOT
As identified in the Highway 99E Corridor
Plan,install a third westbound lane to
OR 99E/ Intersection- provide separate left,thru,and right turn
R18 Young Street State geometric lanes in coordination with ODOT.Implement Medium $550,000
Intersection considerations protected-permissive left-turn phasing on the
eastbound and westbound approaches.
Install intersection r rof)rrr#y f cgffic r of fi, 1.
improvement such as traffic signal (if
OR 99E/ warranted),turn lanes,or roundabout in
Cleveland Medium
R19 Street State Traffic control coordination with ODOT.Consideration $1,000,000
Intersection should be given to railroad preemption and
the proximity to the signalized intersection at
OR 99E and Young Street.
Ben Brown Lane Extend Ben Brown Lane frorn I Iar a[d [Y vr,
c rn 1 Ic Yc21 c
R20 L rivr to City New roadway to Evergreen Road at�s tl Ir:c�rs Access Street Medium $5,100,000
Coo „
} G..or(.roor,Pr.l.!-I -+h tp P(4rr RP(4-I -I�(.h
Stacy Allison �'
Way ficrri Extend Stacy ill sc2i7 Woy south to
R22 rire;i Sfi'o Y y '' d(it t le...� oi, Medium $7,300,000
t City New roadway li lc�,l,a�stricsl�tF,y,r,tlEc,c�... "�e;ivir.e;...C,'c,lle;r.t,.,..
tcfli sclush ic ... .
Cool
.:....................
Brown Street
urn Vino. Extend ui,o.South
R23 s ae, to. City New roadway Arterial (it th ,"�o k.south to the F jai Medium $800,000
Rifuio Sc'u.rtl.l
W wooct4c)rsct C.'C NE4w e<° t v Y t!,e t vv °1', vi l"'oo 1 ME4( 4-�r
-(-)4weo4 1 Xf nd liscl�,a,sticil ICood to(I,Ritmt,C;'on'4oc;
C,'onne-" .ti<)n 4+ cr.new 4 o�c!,rl kndt ks4-ikrf S4e e't tl��e
R25 S«srthwe'4 City New roadway southern extensions of Stacy Allison Way crnd Medium $1,800,000
woodbf krV-khnclus Roca t crt..fl Ir,1 or,ol hkdustlicl,l.
h i.,
it 1Eo(7d s'fondoi' t
�yar � Street r+l.r,!-I1.rl-Ir(_4n I extol d Apr+h+.. gediijm Q� pQQ'QQQ
—Page 33-
120
Exhibit A
WOODB�pRN `w"VTY OF WOODBURN TRANSPORTATION SYSTEM L
im Noll,i�
r o + r +r +, ARIA, n Co c+roo+ o +
Z lJ l..,or C+roo++..C+� hh C+roo+
Evaluate the need for intersection
OR 99E/ Intersection- rlrgcjif r.citic ins incfiacfirsg traffic control,
Industrial
R28 State/City geometric ill�ar�irsc�tic,r7 signing,and striping,including Medium $100,000
Avenue
Intersection considerations any sight distance constraints in coordination
with ODOT
Construct the Southern Arterial from
attr vlllr.Rood.to RjfuI(.
Southr:l r7
R29A City New roadway I ve°,idle e;1�7IEc,c�cl e;xte,l7,lc,l�7r�4�c?c?d- (2lanes),,, Medium $d�=���`,(?-4?W)
Arterial 61/02000
C;:<°n stl uct tlho,S u.a tlhoi rs ill toi kil fi,orn
sou fl,ie:l n I voi clle on Rood e.rte n on to 6e.ttlornie.l /eve,
Me,jurn,. ,,
:'c I't ;CI„te i,kil C,'„!,,y. ;Wv Ic;rc clWvc y ( Ic 17t.,1 IIncl-lilnu r.ol7slcioi'('Uon k) c
c lc te:c1,.< c ;,irscl,,,,.crf tl " UPIEIE (111 1Ino..
tl ie:l r C Y, n7 t uct t 111
,7c Irk. ..7 .� . I`de;vvl.� .. .. 'le:lrsAl e,llci Icrrri,. �` )
IE:,rC, �� M„t;rli�arn„ >,r,1C)C,,,.
C;,% c�c�clvvc�
illfoikil. ",oflorlrk,,i vertoO t"'Irlser�ii.?
Woodland Intersection- Modify the intersection layout to address
R30 Avenue Curve City geometric truck turning movement constraints Medium $100,000
Modification considerations
George As identified in the Highway 99E Corridor
Street/Hillsboro Intersection- Plan,close vehicular access to George
R31 Silverton State/City geometric Street from Hillsboro Silverton Highway when Medium $60,000
Highway considerations future local street access is provided to the
Intersection east
d �i,oriq
rn I'c�ll IEc�c�c1 C,,ty IVe.uvl�,c�cscluvcTy I c�Is�lEcrc�cl totl�e; f�ahare;ma's-+��+��Ic��atl i�WrYte,,Yicsl IVIr:cliuriW„ C)C)
I«s c1 Vc fi,orlW cr `il R { d to tl o Rit( o, y ,cr�aA oikl7
sdu st kil I�;'c,r�r1 We,l vlr.e,C,clle,r�tc!i�r���WVV �
..:..Y tl1erra tncsl Inc.
I de:vv I,,,,, �
C e ri„
. �Y rl �;tc�l"sc�c�lc1: :. � �t Mj:,:cll�ar„ 4>/s,J`>�)C)C)C;'.,
I�t3E3 C;i( �'«rsrlvvr,,,, I ir1� `�«�at i�rte:rlrs r
to South AI foi,ril
ICilllrsl i Irarirac�1. �'%'r'�f>� I EsC)C)
°ve fi,orn I Xto ost to I ve IcCji'o n
Wk3 strlalblo Rood tcr, C,`,,ty Ve.uv I c cscluvcTy IEcrcf c1 �I �� vt:Wy :cli ari,'1„ 00.
i `� arlric
ve"Iule'on Rood
d+�����rdd le�tsrrr4rr.�icrr�r;�rHr�r�.ioW',:eralrrdcr�r;trrrcre�t!k,
sclle .r tcsr,`.,. he ffir. r.crr7hcrl 1 r1]c strvr1 rM
/ Y C,It W+ °e WW „ I.e;r.c,r7f6 er rtho, i; f>`>C)C),C)C)C)tct,
I ite r;e,r tic�l"i
I ., W:cllsrrF:i: C)C)C)C)^
I cal i
Y r,cg�,,rrn trlr,
rr(e[so(.'tion. 4 Y � c e r„(,e'mcs c n'i.. he Fflr ,iclrsc l c,l Ic a scic l:]el,utl uvl1e;l7ti,c,l
ve.rl7r.rit, 1 .... n f n
uvc�l'I'c�r7tec1.
d+�����rdd le�tsrrr4rr.�icrr�r;�rHr�r�.ioW',:eralrrdcr�r;trrrcre�t!k,
Cee:r„ C`it hr("[sIrc,lshcrl c° s'+ r rW�lr ice" rdfWwree y II ite r e„r tl«ri 1 $>E3CJCJ„CJ CJCJCJ
k3Fk, 1IE'e;]r c et r yr $ (
�o+r ie, Irste;lr,e"r.hc,rs r w rr7e.trir� � sflc pare; tl � �,I lic I��. ,
1 /
c nslr hc,l Le,.c1. hr ff,% ,Iclrsr l � Y. 1
e.rrsti«ri�s tl 1er... � � r �" c,i,rlif
.;. hc�ffir. r
II .,arc�ve:rr7l i
`s
e�d.iisrlr l:rce�i,;(t vvl ie;r7,wol'I orsT,od..
—Page 34—
121
Exhibit A
WOODB�pRN `w"VTY OF WOODBURN TRANSPORTATION SYSTEM L
11111111 Holl,1111 Mill I Ili
s sri e rrl. o r eeconfi«I. «ssisrt< .>«sf�t r f I VCecye;e,rs I«s st. c tetvbs Fes e"feestt 1,'))C),000 to
Rk . l ite.r,e[r�fI)[i Ve' C,',!t° ��rclo rne:frir ViyCelE'e"r.�cni7,ficiaare:tho,irrfea�se"r.firrrr/rn«iify fl�i,e: yC li yl i a:�i:
,;, r,c�l
Iri�7Gsrc�Ve:rr7r:rif< r.c�ri�sice:res ic�ris, c� ir. r.cri"s,..
«ad.l:rrir l:r«a,l,;tt v ie:r7,,W(11 (In:tf.d.
Intoi�se,r Hon fc7(III woy„sLu)., M;ei t elr ;;
,e,r.ficrrs , 14f): 200�
l Rood. C ,ty ti,ofcrcih cl crti,ol When wol'ionted.Ln ric,Ve;riConts
+ar s�11 ie e re re.sic�r -i� l rr �v� �r ere"s�-4�
Intersection
OR99E /Southc°rrkc°Ms+Cri ce"r .sic°e".
hoffir. r.cri"shcsl
Intersection ? eometric liric)Iric fe irfe e;r.ficri"s lc yc)aat,, Medium $50,000
R3yi Arterial State/City I Vol
Y 9 r.00i'(iiisgHo
r r onti„ol, is 1Jn , g sci r h it 2iDg,..,.iD.
considerations
rr vvifl i 01001.
+a,44 ie rr r .sic r lrr v ere"s 4�
R C)i Road So Intersection
��rffleerni�er S.
ArteriBoonoal I ee��uth City g .... ..
Ar " Y� � � $3,000 OOOs';
/ y ?� .gfeometric Voluote c�ndc I7 fall fl ies, Medium
�n.
Intersection considerations
Iric,l lkltt hc�ff c c onti crl
.tc ;,aarne ct
i cr(a,ii,sciol:rcr.f.a:tt..,,
Fsrrfr l nn eose,e.�on imr)aov rr�neenf, to
occornrncrsstr4ee Soso a A4eokIt<.«Fa+-aeee.fic+-s
Evergreen Intersection- vvi4a fiaee of I e�eacsa�ee�r+-s
R4i() Arterial South City ,�I geometric) ono, is tho,,iiSouthAife{inol lPi,ovicie s.r irc is feY,"s Medium $480,OOO,n?.
?
n.
Intersection considerations south bound and le:ff o!nd i iu if t�aa]Igrse s on fl ier.
I Ve,iciie:e:i"s IEcrc ci c l's,Cricrc r.l1...,11IcrZd ,sfcrrr::,
r,� r ti' I on aI ie: Vea;, iie:e:rr IE'<',rgrr gieiri«gr.j?.,,,.
VVice:i"s liaa s;wVi e:IEcs„c,
d to i21;rVicie'(I...sor2' !!Igt."..
Intersection OUt il.]c and le:ff tarn lane:. Pi,ovicie:s,t.l'rc is fei,.
hciffir. r ontiol on fl iy
,South Arterial City ? geometric So e 2u r.o ti,ol fl ee:
R4:-f- ,� VV e:afl i Ai,fec i Medium $476,000 ,,
Butteville Road,/,
i
y cal c� r'ricrc�r l i.Cfc
Intersection considerations ",ouH i Ai toi,kil IRood1. 4,k)li
irgpr v erneenfs:k,
So 4la Aafeoir .crFa+-a ee..fi«Fse.
Vict F lJl'rciic cie:roadway to bof of
Stacy Allison Vo+1VVVcs $7,1 OO,000r';
R4isy? y City Street Design r�r��r���r'r'�rnr'rke,designated fTruck Ways Medium nn
Widen i«odvvV pyl lice Il; vm,to include«new,lane
in each direction and a two-way left-turn
OR 219 west of $4,680,0004;
R44:,i Butteville Road State Street Design lane (in conjunction with pedestrian and Low
�
bicycle facility improvements) in
coordination with ODOT
Gatch Street
fi orn 1',lo nr, Upgrade Gotch Ch r,of to Service Collector
R4`>4 Ch,,,e:e:f to. City Street Design urban standards including bicycle and Low $1,870,OOO ;
1 k1icicosflf'«<, pedestrian enhancements
Avenue
—Page 35—
122
Exhibit A
WOODB�pRN `w"VTY OF WOODBURN TRANSPORTATION SYSTEM L
mill RIIII ,ill,,11111 ill ill
Brown Street
fi< rn C,'lovt, j„ yrStreetDesign
ofto Service CollectorI,�rs,m c,vvrs f,i e�e 7$2,8100,000�2R4F f ,t tc, Cit ards including bicycle and Low
Comstock. pedestrian enhancements
t c,f I�f„ce te,rs ti,.l..lul cel",e,i T,y
1 r cj
i e,c1 is rs l'c�i i,lEc,c�c c;�, ii s e,i use+.,.. Itsa evi e,IEc,c1,..
BuffoAl "1l 0(10/. lnfoi'socfion �artl, of f�) fl i,e oufl i„fc) I21l2yk l it rli�stF i7r e..,,
1 hc,is ;i f yc,satl ,
_ c�r7c1 ii ste,i�;e yi te,i ic11 )
,r,r�liclr7r:r.j.I'r�il:: C��.�:�Y. clr«rnr tilt 1
E 7
I;;I i c1f,',i,
Eoo(,i r.c,rsskioiofho s„l,, ". ve is ie,e !7tc�og( c,'.
,vvirsc irn ,le rne,r
s IEC�(7( e,r e,rs�sic,,,,,, ..
cic,,l,,e, fl ie,iec liclrse,cju7foi's ,c,,fion of c onvol tt,
to i g firs/i c11 it cLs f.,.c,r71,.y.,.
C46M <f fix l nve tic Lc 'c2L]d iIns 111 I,c,te"Infkll
vllle, c,f c / ,i,er.tic,rs
�;c�fe,ty r.c,sar7te erne c�,l,sare to gciclie `}..`,ic11 it
UM .i�,rl "r�<� � y'jll
CFj C isc1 �,i �Y. �,is;ieje ij tic,rs.l=.
TOTAL High Priority Costs 972007000
TOTAL Medium Priority Costs 74,670,000
TOTAL Low Priority Costs 00,0(K)
TOTAL Program Costs(20 years) '84T 370a000
1.Project to be funded by others
2.The cost estimates presented to not include costs associated with right-of-way acquisition due to its high variability
depending on location, parcel sizes,and other characteristics.
n„ ,rst"s c,rsly c,rs 1 the e,,�"st"si,1e,of Buf ,� „�, , , sae': ce:C)Y,e„�i I x ,e�is�i„rs i,rni ,� i«i�lsars i ,I,�i;fsa,�i
ify C,'c,salsr.il on C, nco'I Jo 2 c ;r y ;f,
C„,'° �r.�tc,l:,e,r,1s I, :C)C)�;�
'... `1�C)i,1u�s, �� .1s,r i�r�����rs,1,�r.�lt„s,)vvle„1.�i�1e„1 I:, t,J ie,yt,�te". «.
C)re.c c,rs c,rs 17e,r.e,rnl:,c,,i 2Z :'C)L
v 'o[ cs do'J y I , tl ie,cal.' f l,.�1.!e cost e,�s r;i 7cs e,rc�i,ic1e,is I',Y„c,vic e,c c,c� c,v...., c i i ",rct..., e,r. c,c:,e, e,rrr7iri, , ,rc, ,ricT,e iri e,rl�c r ic,ri
cscicl�c,ricsl c1gtcI, ssac.J.
,i css[i01lii f wvT c, iy inl`oYrnglto cs n ri,d ssarYc,sa,ii,,do I,ig e,inviionrnc',nkil coi'ijli kxls.,,,.tf>/`,`>flC),,,.022 ins tl,?,t,l ,v,lr«st ,"tirrste ifs tsfr ic sl ifl ,t,rrr„ , 1, cs;l1 > , ))2,0Q0 i" . l ,vfl r ,�t e,ltirr �te...%f �r ,sr.l �,,s .t..."s.i i i cle,terr7irie,cl. it ie,I iicyl;ie,r cost f,��hrr7cstc' vvcs�s ric,;.l�acle,cl i,.i call tc,tcllf,.
—Page 36—
123
Exhibit A
This page intentionally left blank
-Page 37-
124
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Figure 3: Roadway Plan Projects
-Page 38-
125
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Blank l 1x17 page
-Page 39-
126
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOOS:;BURN I TRANSPORTATION SYSTEM L
IR II::.::.:IIG IL...ILT' 11='IL....A IN
Efficient truck movement plays a vital role in the economical movement of raw materials and
finished products. The designation of freight routes provides for this efficient movement while at
the same time maintaining neighborhood livability, public safety, and minimizing maintenance
costs of the roadway system. Per the Oregon Highway Plan (OHP), the only designated freight
route in Woodburn is 1-5. In addition, OR 214 is designated a National Network Truck Route per
ODOT TransGIS information online. Freight routes are shown on Figure 4, identifying freight routes
and freight ways throughout Woodburn that facilitate the movement of freight in the city.
National Highway System Routes
The National Highway System (NHS)is designated by the US Department of Transportation
Federal Highway Administration and includes roadways that are "important to the nation's
economy, defense, and mobility."2Within Woodburn, 1-5 is part of the Eisenhower Interstate
System and OR 219, OR 214, and OR 99E are classified as MAP-21 NHS Principal Arterials.
2 https://www.fhwa.dot.00v/planning/national hiahwav system/
-Page 40-
127
Exhibit A
This page intentionally left blank
-Page 41 -
128
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Figure 4: Freight Routes
-Page 42-
129
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Blank l 1x17 page
-Page 43-
130
Exhibit A
WOODB�pR.N `wlT.Y OF WOODBURN I TRANSPORTATION SYSTEM LA
TIAAI I IIC SAI II::::::1Y 11:='II.....A IN
Traffic safety has a significant impact on how people use the transportation system within
Woodburn, particularly in areas where real or perceived safety risks prevent people from using
more active travel modes, such as walking, biking, and taking transit. Table 3 identifies the traffic
safety projects that will be included in the Woodburn TSP update. Additional safety projects and
improvements are identified as part of the pedestrian, bicycle, and transit plans later in the
document, in addition to the safety-related projects already discussed in the roadway plan
previously in this section. Figure 5 illustrates the traffic safety plan projects.
Table 3:Traffic Safety Projects
Ib-
in III,,,Mill.
(#GffiG GI
$ 249/� ytteyillle State Gte ge etriG 44
(`r. +ir.�l ir-1 or-I ire f�l
hG A,P.M.o Rt&) if/1.,heR ^TT r,
01 O anced traffic
control (traffic signal,
roundabout,or other
appropriate geometric
Northern OR enhancements) if/when
214/ Intersection
warranted cnnd in
S2 Butteville State/County geometric Medium $/5))0,000 to$1s2,000,0001
Road considerations "''d`€')ir++ tic,+-s vaitk+
Intersection c4 X—A) end sr) "fy,
rnr2jovorne,infs to gcldi,os<
)I it..dl stgnc,lirnitgticrns
6<;;'
rn* ,c1
Enhanced signs and
Front Street/ pavement markings(e.g.
S3 Lincoln Street City Intersection Medium $50,000
Intersection stop signs,warning signs,
and/or beacons)
Evaluate the intersection
layout,signing,and
Front Street/ Intersection-
striping in correlation to
Young Street/ the railroad tracks.
S4 City geometric High $100,000
Garfield Street Provide clarification for
Intersection considerations
westbound drivers trying
to proceed through the
intersection
—Page 44—
131
Exhibit A
WOODB�pRN ("VTY OF WOODBURN TRANSPORTATION SYSTEM L
all III,.miin III,,,mlis
As identified in the
Highway 99E Corridor
OR 99E/CCE Plan,update roadway
S5 }i 4 City Lighting lighting to meet ODOT Medium $2,150,000
roadway lighting
standards in
coordination with ODOT
As identified in the
Highway 99E Corridor
Plan and in coordination
with ODOT:
Restrict left-turn
movements and
eventually close the
Silverton Avenue
intersection on OR 99E
and vacate the segment
of Silverton Avenue
OR 99E access between OR 99E and
between Birds Eye Avenue
S6 Yaouung Street State Intersection Medium $60,000
Cleveland Restrict left-turn
Street movements onto Birds
Eye Avenue from
Hillsboro Silverton
Highway and eventually
close the Birds Eye
Avenue intersection on
Hillsboro Silverton
Highway and vacate the
segment of Birds Eye
Avenue between
Hillsboro Silverton
Highway and Silverton
Avenue
Evaluate the intersection
layout,signing,and
striping in coordination
OR Intersection- with ODOT,including any
S7 Tomlin Avenue State geometric sight distance High $100,000
To
considerations constraints.Consider
restricting the
southbound left-turn
movement
-Page 45-
132
Exhibit A
WOODB�pRN ("VTY OF WOODBURN TRANSPORTATION SYSTEM L
all III,.miin III,,,mlis
Ib
kFske,vrks-1>uh«k�i-fy
enkeos,-,s.ki«n to
:,x i<s ki ncl'x tjl'{:k.d's kk sns e.
lirksikkskickrss t�elklF� xis �c�lik
d;skk ns ,i's1ke -vvkR n
klai?k�krrveikls .... ....
�' yr hcicskt,„'.and iInsfoll
u.ar7kr:irnr:c:ssaarrs to
rnikic,;kve;c,ve.f:rs.V.
nfoi<kxr.kickn f,gs ofy.As
Butteville Intersection-
will c2f i�k f, "I fkll
lkc:i 1y ir:cic,:vr:lckikri e;rst,,,, `[>i;fJoo'of)C)C."ost ii Icliid("l ii I
S8 Road/ �l-��ska'rk��C,'ifv, geometric �h�rsTiti+r�w��klliclf;l„
Parr Road considerations r o 74kjo kl Ir,it glicli7ri ont, R4
I',uffo illo,Rood fail kl of to
kl Io,soufll I k<k,�21i 2ykjo'
rnikickve;cl ;kcslklkirscl clrsc�.
rskr:i<l r.kickrs f,cll it
rsr.r:. I c~al,J,ckvvirl„c�l.rniklerne;rskcsrc,rs c,f Sccaakl i
Ai koijol LIE'22.1..rsi::7.f:t.
I voi'01oon IEclod
r.x <:.I::,s "�s,. , r.crsr,' Ir
kxks.l.-(Jno n k.;�,i,oc ion ol,
«rkvk,i k if k«.!:Jg Ik in/1„g It:
o a k<k^1 1 y�.
Evaluate traffic safety
along OR 99E,OR
State/ 219/OR214,Front Street,
S9 City-wide County/City Study Evergreen Road,and Low $100,000
other key corridors to
identify appropriate
countermeasures
Fnhl4nc_Rd tr(4fic- ntrPI
Y, Gte ge etriG
lJikklklke;ic,ksklvvksy licll;l,kirkc,1„
B affoAlr
S I..L. Rood c2y, I JQLDIku cll Iki,,kcl ;tJfy'si r dkLoy. c L
TOTAL High Priority Costs $2,2200,000
TOTAL Medium Priority Costs
TOTAL Low Priority Costs $Igoo,000
TOTAL Program Costs(20 years) $ ,22,, 007,56 ,0004, 1,2 ,, b„
1.A cost estimate range is provided to allow for a design project to determine the appropriate intersection control using
additional data,such as right-of-way information and surrounding environmental conditions.$500,000 is the planning-
level cost estimate if a traffic signal is determined,and$2,000,000 is the planning-level cost estimate if a roundabout is
determined.The higher cost estimate was included in all totals.
—Page 46—
133
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN 0 TRANSPORTATION SYSTEM LA
2.The cost estimates presented to not include costs associated with right-of-way acquisition due to its high variability
depending on location, parcel sizes,and other characteristics.
IL....( C IL.... ....III��::::::��::::::.... COIN I Il::::::r ..�.II V I�..�..Y II::.'IL....A IN
As indicated above, the street system within Woodburn is largely built-out. Therefore, there are
limited opportunities for new arterial, Service Collector, or Access Streets. However, there are
opportunities for new local streets in select areas throughout the city that could improve access
and circulation for all travel modes.
Figure 6 illustrates the general location of the local street connections identified for the
Woodburn TSP update. Roadway alignments for each connection are not provided as they are
anticipated to be determined as part of future development. Costs are not provided for these
projects as they are anticipated to be constructed by future development. Any local street
connectivity projects that are desired to be city-initiated projects should be identified as a high
priority and included in the cost-constrained plan.
—Page 47—
134
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Figure 5:Traffic Safety Projects
-Page 48-
135
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Figure 6: Local Street Connectivity
-Page 49-
136
rrrr/ rrrrr , %/
/,,,,,,,,,%%%%rrrrrrrrrrrrrrrrrrrrrrrrrr/rrr// /r
rr,
,rr
,oao�o00 � I 1
rr rrr rill, %;, I
i rr
/
r rrrr, r,/ r r r
t rrrrr/ i�rr
1 r„ rr
,rrrrr //�i
/
/
/
/
r,
rrr„rr
rr
/
/ rri r
I
I �
/ r
/r
/
rr„rr
rr �/
��Illlllliiiiu
/
r
rrr//
I
/
ail i
I
r /i
/
/
r/
/
r
r
/
, i/arrrrrii��
�r
i
i
r
r
uu�uu'u�i
�//�i�rs/ P it r, rr rr J,/�it r F/% r// rii ,r ,rrr��i�i// r✓1i�i//6rd r///%ij�%/.„ r�/��/�/%%/,;«u
r N//%„e„✓ r r/p rr/i r
� �'� l� � IP"�` /j ri� �r rr �✓G�0 y/ F
Exhibit A
This page intentionally left blank
-Page 51 -
138
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN 0 TRANSPORTATION SYSTEM PLAN
TRANSIT SYSTEM
Public transportation can provide important connections to destinations for people that do not
drive or bike and can provide an additional option for all transportation system users. Transit
complements walking, bicycling, or driving trips: users can walk to and from transit stops and
their homes, shopping or work places, people can drive to park-and-ride locations to access a
bus, or people can bring their bikes on transit vehicles and bicycle from a transit stop to their
final destination.
X IIS.T'IIN G T'�R A IN S II.T' S IR VIICII::::::
The transit system within Woodburn consists of fixed-route and paratransit services as well as
school and shuttle bus service.
Fixed-Rout Fixed-Route Service
Public transportation in Woodburn today is provided by Woodburn Transit Service, Cherriots
Regional, and Canby Area Transit, as described below. Figure 7 shows the existing transit
facilities.
Woodburn Transit Service
Woodburn Transit Service operates a fixed-route bus line in Woodburn, providing connections
throughout town as shown in Figure 7. As shown, fixed-route transit service is provided along the
major east-west corridors linking neighborhoods to all major retail and commercial areas. The
route also connects to the Woodburn Memorial Transit Facility located off of OR 214. Service is
provided from 7:00 AM to 7:00 PM at approximately 1-hour headways.
Cherriots Regional
Cherriots Regional operates the IOX Woodburn/Salem Express bus line that provides weekday
service between Salem and Woodburn along the 99E corridor. Stops are located along Front
Street, OR 214, Settlemier Avenue and Downtown Woodburn. Cherriots Regional also operates
the 20X N. Marion Co./Salem Express bus line that provides weekday services between Salem,
Silverton, and Woodburn. Stops are located along OR 214 and 99E. The service operates
Monday- Friday from 7:30 AM -7:00 PM with 2 to 2.5 hour headways.
Canby Area Transit
Canby Area Transit (CAT) operates the Route 99 bus line which provides daily bus service
between Woodburn and Canby along the 99E corridor. The Woodburn stop is located near the
99E/OR 214 intersection. The service operates Monday- Friday from 6:30 AM-8:00 PM with
headways that range from 1 to 2.5 hours.
-Page 52-
139
Exhibit A
WOODB�pR.N ("I..I,.Y OF W ODBU N 0 TRANSPORTATION SYSTEM L
Dial-A-Ride Service
Woodburn provides Dial-A-Ride service for people with disabilities and the elderly living within
Woodburn who are not able to utilize the fixed route bus. The service operates Monday- Friday
from 7:00 AM - 7:00 PM and utilizes a fully accessible van. The van provides door to door service
for any purpose to any location within the Woodburn City limits.
The Dial-A-Ride program also arranges for volunteer drivers to take elderly Woodburn residents
and those with disabilities to medical appointments in all areas between Portland and Salem.
Requests for service must be made at least one day in advance.
Otherrvi
Greyhound
The Greyhound bus service provides a regional transportation option, with buses to Portland
from Woodburn three times per day. The station is located on Front Street and is open from 9
a.m. to 8 p.m. everyday.
Park-and-Rides
The Woodburn Memorial Transit Facility (Park& Ride) is located off of Evergreen Road north of OR
214. Woodburn Transit Service regularly stops at the park & ride facility. The Cascades POINT bus
service, operated by MTR Western in partnership with ODOT, makes 2 daily northbound stops
and 2 daily southbound stops at the new transit facility. Riders can buy tickets to go as far as
Eugene to the south, and Portland to the north. Schedule and ticket information is available at
the website and the Amtrak Cascades site.
Jim.
Woodburn Memorial Transit Center Bus
-Page 53-
140
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Figure 7: Existing Transit Facilities
-Page 54-
141
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Blank l 1x17 page
-Page 55-
142
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN I TRANSPORTATION SYSTEM L
T.IIR A INSI.T. II::.'II..... II II::.T0J1� ::::.:rC"F I I II::.T( RAM
Public transit service within Woodburn is provided by Woodburn Transit Service, supplemented
by regional service provided by Cherriots Regional and Canby Area Transit. In addition to
coordinating as needed with local and regional transit agencies to help implement their
planned service enhancements, the City of Woodburn can support improved transit service by
providing easy and safe walking and bicycling connections between key roadways,
neighborhoods, and local destinations; by providing amenities, such as shelters and benches, at
transit stops; by encouraging an appropriate mix and density of uses that support public transit;
and by providing and planning for park-and-ride locations. Table 4 summarizes the transit plan
identified for Woodburn.
Table 4:Transit Plan
Coordinate with Woodburn Transit to deliver service
enhancements funded through the STIF:
Woodburn Woodburn
Tl Medium $5,000
Fleet Transit/City Purchase of Category B and C vehicles(1 each)for use in
the City's expanded transit services. (100%funding level
2020-21)
Coordinate with Woodburn Transit to deliver service
enhancements funded through the STIF:
Woodburn Woodburn
T2 Fleet Transit/City Purchase a Category B vehicle that will replace the second Medium $5,000
oldest full-size vehicle in the WTS fleet;will be used for the
City's existing local fixed route circulator. (130%funding level
2021)
Coordinate with Woodburn Transit to deliver service
enhancements funded through the STIF:
Woodburn Woodburn
T3 Fixed Route Transit/City Addition of weekend service for Woodburn Transit Service Medium $5,000
fixed route and paratransit services(Sat.9am-5pm,
Sun.9am-3pm) by up to 2,156 revenue hours(FY20-21).
(100%funding level 2020-21)
Coordinate with Woodburn Transit to deliver service
enhancements funded through the STIF:
Woodburn Woodburn Modify the existing 60-minute fixed route loop;add an
T4 Medium $5,000
Fixed Route Transit/City additional 30-minute route that will serve high frequency
stops on weekdays(7am-7pm)within the Woodburn city
limits.Total additional service will be up to 6,192 revenue
hours(FY20-21). (100%funding level 2020-21)
Coordinate with Woodburn Transit to deliver service
enhancements funded through the STIF:
Woodburn Woodburn Modify the existing 60-min.fixed route by adding a new 30
T5 Fixed Route Transit/City min.route that serves high frequency stops(up to 1,456 Medium $5,000
revenue hours);this service will operate Saturdays(9am-
5pm) and Sundays(9am-3pm).Also includes Dial-a-Ride
(DAR) service. (130%funding level 2020-21)
-Page 56-
143
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Woodburn Woodburn
T6 Fixed Route Transit Increase frequency of existing route to 30 minutes Medium $0
Woodburn Woodburn
T7 Fixed Route Transit Convert existing route to two-way operations Medium $0
Work with Woodburn Transit as growth occurs to provide
new or re-routed service to other areas of Woodburn
including:
• Parr Road via an extension of Evergreen Road
• Crosby Road
Woodburn Butteville Road
T8 City-wide Transit/City The employment center southwest of the I-5/0R Medium $5,000
214 interchange
• Woodburn Industrial Park along the Progress Way
and Industrial Avenue corridors
• Gateway subarea between Front Street and Mill
Creek
• Neighborhoods in southeast Woodburn
Coordinate with Woodburn Transit to establish a free shuttle
Woodburn Woodburn between the Woodburn Company Stores and Downtown
T9 Company Transit/City Woodburn,hourly during peak shopping and entertainment Medium $5,000
Stores hours
Woodburn Coordinate with Woodburn Transit and major employers to
T10 City-wide Transit/City establish a peak-only employer shuttle Medium $5,000
Coordinate with Cherriots to deliver service enhancements
funded through the STIF:
Urban and
Rural Cherriots Expand service for up to 7,557 revenue hours on urban&
T11 Cherriots/City Medium $5,000
Regional rural Regional services.Includes startup costs for hiring new
Services employees,and coordination of schedules with connecting
services.Also establishes a Youth fare category(ages 6-
18).(100%funding level 2020-21)
Coordinate with Cherriots to deliver service enhancements
funded through the STIF:
Keizer to Establish one new Regional route from Keizer to Wilsonville
T12 Cherriots/City Medium $5,000
Wilsonville with a stop at the Woodburn Memorial Park and Ride.
Increase service on weekdays by 30 percent on urban&
rural Regional services by up to 5,245 revenue hours. (130%
funding level 2020-21)
Coordinate with Cherriots to deliver service enhancements
Urban and funded through the STIF:
Rural Cherriots
T13 Regional Cherriots/City Add Saturday service to urban&rural Cherriots Regional Medium $5,000
services with up to 3,919 revenue hours of new service
Services
(FY20-21). Includes coordination of schedules with other
connecting services. (100%funding level 2020-21)
—Page 57—
144
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Coordinate with Cherriots to deliver service enhancements i7
funded through the STIF:
Urban and
Rural Cherriots Add 30 percent more Saturday service to urban&rural
Tl 4 Cherriots/City Regional Regional services by up to 215 revenue hours(FY20-21). In Medium $5,000
Services FY21,adds 6 holidays to the same routes.Includes
coordination of schedules with connecting services. (130%
funding level 2020-21)
Woodburn
Coordinate transfers between the different agency services
T15 City-wide Transit/ Medium $5,000
Cherriots/City in Woodburn
Coordinate with Cherriots to provide a stop in Woodburn for
T16 Woodburn Cherriots/City SMART Route 1X,providing service to WES station in Medium $5,000
Wilsonville and downtown Salem
Coordinate with Cherriots to consider further new service
connections for Woodburn including:
Woodburn to 0 Service to Portland-connect to TriMet via the
T17 Portland Cherriots/City Tualatin Park-and-Ride,directly into downtown Medium $5,000
Portland, or the MAX Orange Line light rail service.
• Demand-responsive service to Hubbard one day
per week
Woodburn Evaluate all bus stops to verify static bus route information
T18 City-wide Transit/ signage is visible and accessible and that bike racks are Medium $25,000
Cherriots available at major bus stops
T19 Stop 755016: Woodburn New shelter Low $5,000
Walmart Transit
T20 Stop 20419: Woodburn New shelter Low $5,000
Garfield Street Transit
Woodburn Investigate transferring the paratransit system to a local
T21 City-wide Low $5,000
Transit social service agency
TOTAL High Priority Costs $0
TOTAL Medium Priority Costs $100,000
TOTAL Low Priority Costs $15,000
TOTAL Program Costs(20 years) $115,000
1.Project to be funded by others.
—Page 58—
145
Exhibit A
This page intentionally left blank
-Page 59-
146
`h
I"
�, ry
U, M
�d 1
x I r
xw,
dl
/
I
I
r r
r ,
��%F/��j ! ���%//✓�/I��//%�%/i/��r/,:r /�f %�/ � './r/%%r r✓: /r°ri/ �/f %/ c"��✓,,,;"V r/ rF� a ",,,,,;,� ,.:,.,. , n„�r r"°:r„,
%!�%�/�%//r%/%,�/d/ri//rp�✓r�if�i�/?my�„_ ,,. �/r Frrrr�l r/�/r✓Jf r7 �/k/��(rrF x �� ,. '.
�,,�/m��l/��i �/✓ rn"ti7r�/ ^r^°ym'�a��)a,,,; »ny //a >irmfrr�ta'^r ��n�IL'�9;F�y.,..dLy��/��' r/fl HFi a!✓;v+...r ,, ":"y" r "'"'�'
rA / � M ,l � Irw dd /I Wpo-/ �"'� ud✓ ✓r,y lw krmleyr«d y N' � :,..
l ��iG,,f«yur�u« yy�� o,,A�t,✓Ir�1, r,,,i r4i,xu„rl�giiraw'�rJ��+a✓ay�i »rvj'�;Nr���" l?� I;h�s'r�// ;„�i�L�'/v4��✓UIO��U� G�r�h ilL�rrU«�r,' ' ,d
y �al� ,,.,��; �l%.���'��,�.i�rdr�,w I✓r� �✓iraiY+x�l�',G/r,`� /",�,f'rrN'�r�/ ,f/X,/ �"/frr/�i ��,rh+� IErm�r� rI�N.✓rir�r+ijry�"afx°�x'l�� a r.�l "rrN�T
t���r r' W'1N`r�i ° l�x� 6M ry.,/Y/�r�r�?Ar/i/7y �r,lt 4yrrx �6�r��,✓�d�,fzwrpl���fYY���yN (3r ��r✓i�r( f�! �f II
r � u Y ryll � ,, �, der U✓r�� „rr,; ,r rs F,I r r, y,'r,
° � r,'!',. , '�'/�,1�"' Y«r9 '�,�1 r ��Iyllru,N l„xi,f'r/,a� rr,kr,4 r✓J Ju ,-�r,J, !,;r� m ";.,� �',, r U7nA
!yi.yY, ,,;, �,l„/Y%�,r rY ��� ;,r , A✓a /.A. Y ud� r nMr�%� Ir�! � r��Yv I k;N r.:r !,r(f/rl'yil �l �.r, Y ;„ , ytaw rr,i;,N,
�, /" � I rb✓ti((/ �a�r�, �,lw, ,,6„ u f /f� s>Yl r0✓%!�e �,✓`r- � r.»$e r ,,�r,(IrWrr✓ v,sw,, «y� ,,"'�r,.
,� r ,,„, s f,^x „ rq ;..;,Y`r, r,w�.�N ��� .} Y✓, � �r ., ✓ 1G .,/ !r� N'Y+,r°',�I r�P -,r r Ar'." »,r, N
/ �- a d r, �,.:-r, �.r , ./l^r<, rr' r l {fi f�,�, ✓rr ,�...v"' � 4"!'"�nr,�+ lu, 9Na »�r�rew�,.r/�,u'� ,. l,, d +..✓',,.,. � .,r^,F r;c, .,a,, "
w .y ,�� Y �� ,hmruoi�J/ r ,./A Ir'r, / �rF o �✓r',� ��,, r. j/��;C,.rJ � 1 J Nr , 9i'", „ri,,r� n;,� �„rW
,:r .'%�1„, ,,.. '" r/4; �7�„YF�`J�. ,., r ,,r��� /` „1..,,,r'. i :I,r,,,'SR„ r,�w:'uu.- ✓ti ,�'e.., ,,.:J�u.«, ..tiaF W. « ,,.: n,,,,,.. , / r•,.:;d'�'f;..
l,I r ll,,;. �, 7�r;�,y�f, qr rr�,,;,d I,l✓,dn„1// �„ro.,7'a/r .J. eaArJY;.�(r ,w�r,.�,, �l,s uGr x.;p� r .;rx,. ..�,n( :,.r ;i'rm. ✓9 r', �� ",�„�»3.
r sA <, �,, f ra,✓ rr r rvra /,,r 9,r i ./ �/,,,,r N,� r,,r � r ,r. Y War { ,,M„», r a,
,;//(✓ � � � ,a/ ,., ,,...1/ „r/s':; r r,,.r✓/N�1 �,.�1� ,..,u � ,,. a !re :;fir»* ;-,� rr�,,r ,... rrw ,,.,,,
,, .f �r, �d✓ r .9N ,../41.0 Via/. » , u �w1',.. x,.... rJ�..a,. nr »r ;K.. )�..�.f r .„ /,.,.rt <,,,. ,, ,
/ .fdr' I�P r"".*wik<:.1±, reA✓ .r�, h'wir yr.a.?/ "i,n. ,d :w>'•,., r r„u /. i"., �,r vl r,r✓r„ „kN�,,
r/I r," /J r"r-, r /. �O rr9 h ,�r�f f >� i,, :,rv, /am,,..w✓c„ ✓a ,:,,,lr�, ,riw, ,,.,!„�r a„ /r,r:, k.l�.,. M,v »„ N' ",l�r
,r1i/� f2 w, p,ni�ru f� �l�dsF"/`�i /�%+,��°�%Jlrlr//%�rl�,rr ✓ „ . �ir�w,,.Jr r r. r�,7 ". 'y �^.,
! ,/✓/% ,,,...,,,, r� �. <..r % �d*.. � ,9r"r r: f^w;w rrr� �� ~rr 'IMIW W„"„o; rnAr.. xi.-i�^ „ a"F�,,.,",
�4. r J ,vr'y J r ! r°,r n » I t�� r . , Jl x�n � u�, C/1h, ✓,,r r 1`, Ar,,, Ari I, �»r✓U, ,,r; nd
�« � ,, r I�� �, ✓i zr, , ,e N~,,,r 8,u, ».� .vtll,l » r�rr„ Irv,;, r, ,yr, ,.
„r,..�� a ,rJl1 r. "i",B" !!' `�.,r „„ (,(:, ..�,,. r., „rr ,,rL'i r�"� w' :•2",r„N /!7^", rr, P r ,,, ✓ ..+� r 4 G.,. R6 1k` na
rou@A ,lw. ��� rr r!� Y !,! :,:, llir ,, p 1 4. �,� ,i,r.,. Y,P r'�r di RC „, y; .Y R ,,,,uoz °w.,_ ,r,N,"/ ✓., .Mmow ,,,..,hy'
„,w,, r s h v r,.. r M ,,fi r,,,7 ,,, r�y ,W l � r,r ,�r � .,"Lmg, �r ✓vU a ,,,,
r,, 0 r., ., �`'F P �U r �, ,,,s, V r ;, r� r „,, 5✓kli � s � r w, r,Ih d«r �?"»;"`r�" rf,
/ ! iid,� ,,,: ✓ ,✓';�`r,.". rl/r�. r rf>, .� ��,�. :,, ,ter ,�.9 a �W.rr :1y �,,,��r, ,.,: rMf, ''"N r r,,.<+u/n,
ly' �..:. r I. ✓u ,.. � l ,rr,v ,,r., .. � ,.r,.,.r in, ,,,,rr. sr% .NAM , r uy,".�a» r r ,.,, s�„. ,,•71 ¢a! u
r� r'•1, d Mw� wfr�-n;;: „�r„rv^.f;, rr Xr,,r ,^,�.. ✓r, ,.;, �' m,wrF/,a:✓dr. +3N .,r� ..,.,r;r � ;w h ,u,r;,"P.., r �h ,u,r ,,... .,., � ' .. !W
L,.
�,N�';; J y��. ¢ L .�.,n ,S Fl"r!' r u .l at �rir.,,,f r,,,,.�: 6 ,,..r, r�*'' 4 lµ,...7�� /r�.; r r ll',r,✓r r I Y"�'W,,r r�s m 9V:4d'�r„ rl� ,.,,�,>rt^.,,r�",,ij' ,,y ,r;r, � I ul �oNa M
fr.�, � � % �, �tr ✓ n.,, rr /G a N,,r „n �„ ,w` .,.,,,, «�,, r., j n«r€w�.r r �o « <s,d ;�; � , , I, w.,, n. "
> l.7lA✓1"w ra»rr,r<'1% Nf.,. r ,.M: ,,. ,. d,,,.,y .,,....r ,/ "r+ .� r d"j r.,� 1 d �: ,;, " „ � ...ar N7 w.,,".: FNa a�,f<. d''
nl n „ws✓r,,, J r., „rir ,, ,, ✓i ✓.. '�.w fiNw ,w a;»».,�a, r' I..u..,, ✓ ;Taal m L.. MI ✓
rosy✓i ,/ M „, Liww ,rw ,( ,. yam,. . ,,. hd#� .,J" y, M':!a�r M r.. M Y, .;,, .., wN�w: ,.,„M aM' _,., � N s., r r
r / �,rr hJd ,r r�"A„ o .;;/ ,Y lr ,,: �1Nr,, r ii �✓„/r e" dN v:,. N a m,r,,.r ,.m�.. � I>'.,w., r✓r . .:,r. .�n>r,swd...'n „n';Mr r :„ IIN�q n,l«;A-�, u(I N,l, r, ,
,' M a-,,rwJ all, ,, *Nr�:�r,JN�1[ r j D '" �„,w��f 'r,r�W �,,f„,M1 dk,;,,,r „,rp��w� 'vc„u„r M,d"vP r'✓fr✓y Id ��.,,p „� � a r�A4'�, I �i1w' rle 7rt NL,NIh . I '
„ ynY),,;w�lfk'„„fin, �,y/�y nnv�^"�',am�0 M��xNM�J1... w"'✓ da,,M„"f r w�'x r�,r�!n,',r h,N�`N� ,f1,ra�r� y","rl a�duM`7 'WW�N'Ni�«p dr r�,r,Ah,;'"rw dd''^Y :.Mw,m'gr �,N1L,"�� �/r",A ,M2.;,;rr,,r :,
r , a /r^�M' y�g r rm r✓ ✓,rl�"��"N�a „,!^ ?.,, ,,; r s„ M r 9v1 6. r'��/, f ,*gr , /r a;, r v"Lw,r, �
y ,:9`A ar",Na. t"ar ,,,rl.. a;:,; w va;<.e ,.,,�., ,,.. r, y I ,r.;ei;,�`. 1�., r,�„Aim u4 r �h nr- , ,; n fr, �:(. ✓" k1✓T�.
m „ „"..,,�"" N u y, �A ��u,�, ,«„..u, �a Ulf » U rv,,,bl�w� d,» .,, � ✓ ,I,�"n,oe .,, Ir y �, »~f,,U/�>�" "r s r ��,
),�ar rl �t"✓~7r ,y M'wMf,Ybr F...,,� r,.,w S""p d� M're r ¢� ;ay..� ,. � 7'hl�'JI''x, ;",,:A! "r�' �„ ';"��F !r ^kr y«r„ yy'yUy,;, ! d'�o�.r
„ ,,, ✓M,�/!7 r+ma:� ,g✓ u a r7ti,:^ ��';/" y rah i r �r vN„,r �W w 'w�"�A uJ��rr�'N"Wdk 'Mv d�.,,,�,�" �,^ r�',"�d^; f�»r r `�" ray /rr)r✓u! r,»,N r I
,m ru w�J;a ,.:!r,%i ✓r .. �"S"`,r^»°'��,,n,.r(✓r»av Aa;.",,;.,"y&hrr v ,, ., M r,,,t�d „,rl�:.,wyyt« �A, ',M ,,� 5* A"'"rw,.,,. lrr ��,� ��N,V. Wa V'` r„
��,a Iri/„it ,k", ,,� �o.ui /wm�wS���'' rr�a lr..:N,y �u r,5 rk r7",97�diwn � ,,� ✓�'d,^'-,r n,�,�.,; � ;;� T/ ^ rr, ¢,rr MiMW„h; ya .1 i
r �...". ,,,,dOp Y; ,r ,,,.. lN,., r,,,,+w ., !u ,..�. ,✓� �I� .,.?&'✓r ''"% w,. r ;mmr".;f b;. , 1+,', ,.,..d r � ,w, Mr�yl, V
,. ,,,,�"" ;r ar YI Y/ ,n - ml„ y. ,.. a r -.wv,r ,-,r �`"',,,.✓ %-, r,:..ra Y. ,,., „1�+:� �'m� M�:„h ,r. w(�.r,M�,/. ' � �A r
,.rd' Y ,v,�,w I, vA�^ y�, M" r ,A,,;,,,,! /f 1 91 «l+ 'W„ r Y?„r�,,��'f,+,w tur' ,W. '��t a I� �, ,M""A JI (��.d., a✓, I
A ! �'' 1 r,.Y,�".,I �, „1Yi:.: �+,,; ;,"^y Idf drllly rA� ok r" ;, �rM M' f�5' r ��GA.di"N� r" �w7•,,. f r� J�"�"x, r Nr „», ° ,�' .n�
of ."n,M r' � nui r�di �r< � N ,t r, `;r,(r,✓r, �r l a +,�;,�" ,✓ � �pU NON*^ ^� I ✓ r„�a ;a' My'' ;F" ,» mua�, N row»»
!�_r Y ,:',,r, !" ,,, ;r, - r a ✓/✓r niy`,,., �9I,,,,y� a �' :w,r'Ff,W J'M ",,rl,�� fw�,r ✓,r,.., ^I !,!m , } "a�;,. r �',' xr l0/'' (�'�pM'"...r; �° l;:'�ijl! "�4x rye,,+;I I f"`'^7>WY`.,,i,�;, ;r,
w ,� ,✓rr,. r,, ro'J„';,: r .d rr Ykldlm lrr,„ ,r ;d"NV t r C d;��ih N"d".t y '"„(UM y * a f M`r v re rw I���wA!apN vl Iuw r rl� (»,, �"' ,u'
ah u ; r" M, " I y row �`�� ,� �,�,.;� ��Y" ;,,, z ,Tyrr✓»�Y ,�«I��i' ,''", ,�`%'a «�1�r*�Y^ ' Urir 1>��„ ,;, ,�, �r
r
Exhibit A
This page intentionally left blank
-Page bl -
148
Exhibit A
WOODB�pR.N ("I..I,.Y OF W ODBU N 0 TRANSPORTATION SYSTEM LAI
PEDESTRIAN SYSTEM
Woodburn's pedestrian system consists of sidewalks, pedestrian crossings, and multi-use paths. A
majority of city streets currently have sidewalks on at least one side of the roadway. The
pedestrian plan includes several projects to construct new sidewalks where they are lacking and
to fill in the gaps in the existing sidewalks along the city's streets. Although many of the
pedestrian projects are located on Service Collector streets or higher, a few local street
pedestrian projects are included to provide access to essential destinations such as schools,
parks, churches, and other land uses. The pedestrian plan also includes several enhanced
pedestrian crossings, multi-use paths, and accessways that support the pedestrian system.
�J...) I S'TRAIN A C II IL....II II
This section summarizes the facility types integrated into the pedestrian plan, addressing gaps
and deficiencies identified in the existing system and forecast as part of future needs.
Sidewalks
Sidewalks are the fundamental building blocks of the pedestrian system. They enable people to
walk comfortably, conveniently, and safely from place to place. They also provide an important
means of mobility for people with disabilities, families with strollers, and others who may not be
able to travel on an unimproved roadside surface. Sidewalks are usually 6 to 8-feet wide and
constructed from concrete. They are also frequently separated from the roadway by a curb,
landscaping, and/or on-street parking. Sidewalks are widely used in urban and suburban
settings. Ideally, sidewalks could be provided along both sides of the roadway; however, some
areas with physical or right-of-way constraints may require that sidewalk be located on only one
side. Sidewalk solutions include:
• Fill in the gaps
• Install sidewalks on one-side of the roadway
• Install sidewalks on both sides of the roadway
• Re-construct existing sidewalks with appropriate width and buffer
• Improve existing sidewalks with appropriate lighting
Access ways
Non-vehicular connections between cul-de-sacs and adjacent roadways can significantly
reduce travel distances for pedestrians, thereby encouraging more people to walk. Woodburn
has a few existing accessways that create connections between neighborhoods and pedestrian
and bicycle routes. Potential new connections could use existing City right-of-way between cul-
de-sacs or unconnected roadways to provide a paved path, unpaved path, or trail for non-
motorized use.
-Page 62-
149
Exhibit A
WOODBURN ("ITY OF WOODBURN TRANSPORTATION SYSTEM PLAN
77
r'N
r
ri : ,' � iumpi III �VVii uui"i"'�VVi`uV
�� uuuf�uu
�V
r v
Sidewalk Gap Sidewalk Improvements
Multi-use t s and Trails
Multi-use paths are paved, bi-directional trails that can serve both pedestrians and bicyclists.
Multi-use paths and trails can be constructed adjacent to roadways where the topography,
right-of-way, or other issues don't allow for the construction of sidewalks and bike facilities. A
minimum width of 10 feet is recommended for low-pedestrian/bicycle-traffic contexts; 12 to 20
feet should be considered in areas with moderate to high levels of bicycle and pedestrian
traffic. Multi-use paths can be used to create longer-distance links within and between
communities. They play an integral role in recreation, commuting, and accessibility due to their
appeal to users of all ages and skill levels.
��✓��r t4���, �r' NPn
n V�
l �ry�✓drdGr9x erYf� i r�✓/, � 'i�o�n� '�� '9» I
J rW
�,, ,� V�(II�IiIInl011111111ih� <' llll�lllr�llflhl�I�ftlbfli�lf���/,r(' ,, ;.r,,✓.,ar, , I i „. `�" ��s�a� 7r�i� '.. .��.
Accessways
Multi-use Paths and Trails
—Page 63—
150
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN 0 TRANSPORTATION SYSTEM LAi
Enhanced Pedestrian Crossings
Pedestrian crossing facilities enable pedestrians to safely cross streets, railroad tracks, and other
transportation facilities. Planning for appropriate pedestrian crossings requires the community to
balance vehicular mobility needs with providing crossing locations for desired routes of walkers.
Enhanced pedestrian crossing treatments include:
• Median refuge islands Curb extensions
• High visibility pavement markings and Pedestrian signals
signs e Pedestrian countdown
• Rapid rectangular flashing beacons heads
(RRFB) e Leading Pedestrian
• Pedestrian Hybrid Beacons interval
Many of the treatments listed above can be applied together at one crossing location to further
alert drivers of the presence of pedestrians in the roadway. See Attachment "A" for a detailed
description of enhanced pedestrian crossing treatments.
_m
I
X
YI„
v
Enhanced Pedestrian Crossing with RRFBs Enhanced Pedestrian Crossing with Pedestrian
Signal
�J::.) ID :S T'IR II A IN II::.)IL....A IN II::.)
Table 5 identifies the pedestrian plan projects for the Woodburn TSP update. As shown, the
projects are separated into projects based on roadway classification, as well as projects at
intersections and in other locations throughout the city.The priorities shown in Table 5 are based
on the project evaluation criteria as well as input from the project team and the general public.
The cost estimates are based on average unit costs for roadway improvements. Table 8
illustrates the location of the pedestrian plan projects.
-Page 64-
151
Exhibit A
WOODB�pRN ("VTY OF WOODBURN TRANSPORTATION SYSTEM L
Table 5: Pedestrian Plan Projects
„wi m
Ib-
Major Arterials
R6++o o Re(.(J A qid R1A1l.Ikq it
#eT o ._Io(d iit
tp
OR 99E from Cost
Lincoln Street to Remove existing sidewalks and install new
P2 State New sidewalks Medium included in
southern City sidewalks in coordination with ODOT R42
Boundary
OR 99E from Cost
P3 southern City State New sidewalks Install new sidewalks in coordination with Low included in
Boundary to ODOT
southern UGB R42
Minor Arterials
Butteville
Road/OR 219 Install new sidewalks in coordination with
P4 from northern State/County New sidewalks ODOT Medium $1,500,000
UGB to OR 219
Butteville Road
from r mi,o f Cost
rl,i Install new sidewalks on tl to e osf Akio
P5 r e County New sidewalks ',uffoville,IEood Medium included in
R62
I=W�°o4t!,�4�'y?icy to
southern UGB
Evergreen Road
P6 from Stacy City Sidewalks-Fill Fill in the gaps High $200,000
Allison Way to in gaps
Boean Lane
Boones Ferry
P7 Road from County/City New sidewalks Install new sidewalks on one side Medium $150,000
northern UGB to
Hazelnut Drive
Install new sidewalks on one side.This
Settlemier project improves safe routes to school for
P8 Avenue from City New sidewalks Nellie Muir Elementary School,Heritage High $300,000
Oak Street to
Parr Road Elementary School,and Valor Middle
School
Boones Ferry Install new sidewalks.This project improves
Road from Parr safe routes to school for Heritage ctr+I e
P9 County/City New sidewalks $800,000
Road to Elementary School and Valor Middle clilari.
southern UGB School
Front Street from Install new sidewalks on one side.This
P10 northern UGB to City New sidewalks project improves safe routes to school for High $400,000
Hazelnut Drive Woodburn High School
P1 1 Young Street City Sidewalks-Fill Fill in the gaps Medium $200,000
in gaps
—Page 65—
152
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
„w� m
OR 211 from OR Install new sidewalks in coordination with
P12 99E to eastern State New sidewalks ODOT Medium $500,000
UGB
Service Collectors
Hayes Street Fill in the gaps.This project improves safe
from Harvard Sidewalks-Fill
P13 City routes to school for Nellie Muir Elementary High $600,000
Drive to in gaps
Cascade Drive School
I yr rclir:r:rl Road
f[orn Pa[[ Road
�o S E4kl Fkeo r)1
and Pa[[ Road Install new sidewalks.This project improves
Cost
safe routes to school for Heritage P14 � 1 r:-()��ar���C,'ij„v, New sidewalks High included in
c,ear x re Fa
}' dr Elementary School and Valor Middle R52
�w rar School
vwr kwa r I C I',k4
vw r k war C,;i y
Lincoln Street Sidewalks-Fill Fill in the gaps.This project improves safe
P15 from Cascade City routes to school for Washington High $450,000
Drive to OR 99E in gaps Elementary School
Industrial
P16 Avenue from City New sidewalks Install new sidewalks Medium $500,000
Progress Way to
OR 99E
Progress Way
P17 from Industrial City New sidewalks Install new sidewalks Medium $850,000
Avenue to OR
214
Hardcastle Fill in the gaps.This project improves safe
Avenue from Sidewalks-Fill
P18 Front Street to City in gaps routes to school for Washington High $450,000
Elementary School
Cooley Road
Brown Street Cost
from Cleveland Sidewalks-Fill
P19 City Fill in the gaps Medium included in
Street to end of in gaps
roadway R72
Cooley Road
from OR 211 to Sidewalks-Fill
P20 County Fill in the gaps Medium $650,000
Hardcastle in gaps
Avenue
Access Streets
Woodland
P21 Avenue from City New sidewalks Install new sidewalks on one side Medium $250,000
Jory Street to
Arney Road
Stubb Road Cost
from Harvard
P22 County New sidewalks Install new sidewalks c,r7 „fl, e;vve;s is <;<, Medium included in
Drive to Parr T,I ie;col i kiol;. R262
Road
—Page 66—
153
Exhibit A
WOODB�pRN ('VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
„w� m
Oregon Way
P23 from Country City New sidewalks Install new sidewalks Medium $250,000
Club Road to
OR 214
Hazelnut Drive Fill in the gaps.This project improves safe
from Graystone Sidewalks-Fill
P24 Drive to Front City in gaps routes to school for Woodburn High High $150,000
Street School
Gatch Street Fill in the gaps.This project improves safe
from Hardcastle Sidewalks-Fill
P25 Road to City in gaps routes to school for Washington High $350,000
g p Elementary School
Cleveland Street
Park Avenue Install new sidewalks on one side.This
P26 from Hardcastle City New sidewalks project improves safe routes to school for High $65,000
Avenue to
Lincoln Street Washington Elementary School
Local Streets
Willow Avenue
P27 from McNaught City New sidewalks Install new sidewalks on both sides Medium $350,000
Road to OR 219
Cascade Drive Install new sidewalks.This project improves
P28 from OR 214 to City New sidewalks safe routes to school for Nellie Muir High $400,000
Hayes Street Elementary School
Ben Brown Lane
from end of Sidewalks-Fill
P29 roadway to City in gaps Fill in the gaps Medium $200,000
Boones Ferry
Road
Oak Street from
P30 Boones Ferry City New sidewalks Install new sidewalks on one side Medium $150,000
Road to Front
Street
Ogle Street from
P31 Cleveland Street City New sidewalks Install new sidewalks on one side Medium $900,000
to Boones Ferry
Road
Pedestrian Crossing Enhancements
Front Enhanced Construct ADA-compliant ramps and
P32 Street/Young City sidewalks on the east leg of the Medium $15,000
Street crossing intersection
Construct ADA-compliant ramps and
Front Enhanced sidewalks on the east leg of the
P33 Street/Lincoln City crossing intersection.This project improves safe High $15,000
Street
routes to school for St Luke's School
Cascade Enhanced Install an enhanced pedestrian crossing.
P34 Drive/Hayes City This project improves safe routes to school High V141`,21000
Street crossing for Nellie Muir Elementary School
Park Enhanced Install an enhanced pedestrian crossing.
P35 Avenue/Legion City This project improves access to Legion Medium V141`,21000
Park Driveway crossing Park
—Page 67—
154
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
„w� m
Hazelnut Drive/ Install an enhanced pedestrian crossing.
Broadmoor Enhanced
P36 City This project improves safe routes to school High V14 I,,,.,,C),000
Place crossing
Accessway for Woodburn High School
As identified in the Woodburn OR 214/OR
99E Pedestrian Safety Study,update the
existing crossing to an enhanced
OR 214/N Enhanced pedestrian crossing with a pedestrian
P37 Bulldog Drive State/City crossing hybrid beacon coordinated with the High $150,000
surrounding traffic signals in coordination
with ODOT.This project improves safe
routes to school for Woodburn High
School
As identified in the Highway 99E Corridor
Plan,install countdown pedestrian timers
Enhanced and construct ADA enhancements at key
OR 99E from OR crossing_ signalized intersections along OR 99E in
P38 214 to Young State/City coordination with ODOT,including: Medium $605,000
Street Signalized g�
intersection OR 214/OR 211
• Hardcastle Avenue
• Lincoln Road
• Young Street
As identified in the Highway 99E Corridor
Plan,install curb extensions on minor street
legs of intersections(curb extensions to
shorten pedestrian crossing distances
parallel to OR 99E,not for crossing of OR
99E) between Arlington Street and
OR 99E from OR Enhanced Cleveland Street(up to 8 locations) in
P39 214 to Young State/City crossing coordination with ODOT.Potential Medium $950,000
Street locations include:
• Alexandria Avenue
• James Street
• Williams Street
• Blaine Street
• Aztec Drive
• Laurel Avenue
• Tomlin Avenue
As identified in the Woodburn OR 214/OR
99E Pedestrian Safety Study,install an
OR 99E, north of Enhanced
enhanced pedestrian crossing in
P40 Williams Street crossing State/City coordination with ODOT,that may include High $ `,1„`)21000
raised median refuge island,sidewalk infill,
supplemental street lighting,and a
potential RRFB (RRFB cost not included).
As identified in the Woodburn OR 214/OR
OR 99E, 99E Pedestrian Safety Study,install an
between NE Enhanced enhanced pedestrian crossing in
P41 Laurel Avenue State/City coordination with ODOT,that may include High $ `,1`)21000
and Tomlin crossing raised median refuge island,sidewalk infill,
Avenue supplemental street lighting,and a
potential RRFB (RRFB cost not included).
-Page 68-
155
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
„w� m
As identified in the Woodburn OR 214/OR
99E Pedestrian Safety Study,install an
OR 99E, enhanced pedestrian crossing in
between Blaine Enhanced
P42 Street and Aztec State/City crossing coordination with ODOT,that may include High $,�>IC), ,000
Drive raised median refuge island,sidewalk infill,
supplemental street lighting,and a
potential RRFB (RRFB cost not included).
As identified in the Woodburn OR 214/OR
99E Pedestrian Safety Study,install an
OR 99E, north of Enhanced enhanced pedestrian crossing in
P43 Mount Jefferson State/City crossing coordination with ODOT,that may include Medium $, `>1`)Q'000
Avenue raised median refuge island,sidewalk infill,
supplemental street lighting,and a
potential RRFB (RRFB cost not included).
As identified in the Woodburn OR 214/OR
99E Pedestrian Safety Study,install an
OR 99E, north of Enhanced
enhanced pedestrian crossing in
P44 James Street crossing State/City coordination with ODOT,that may include Medium $ `,1„`)0'000
raised median refuge island,sidewalk infill,
supplemental street lighting,and a
potential RRFB (RRFB cost not included).
Boones Ferry
Road/ Enhanced Install an enhanced pedestrian crossing.
P45 Constitution City This project improves safe routes to school High $F,�>I`21000
Avenue/Tukwila crossing for Woodburn High School
Drive
Multi-use Pathways
As identified in the Mill Creek Greenway
Master Plan,construct a multi-use path
including at-grade mid-block crossing
treatments at the following street
connections:
• Hazelnut Drive
• Bulldog Drive (east crossing)
Mill Creek Multi-use OR 214 state highway)
High $2,000,000
P46 Greenway City pathway 0 Hardcastle Avenue
• Lincoln Street
• Young Street
• Cleveland Street and railroad
tracks
This project improves safe routes to school
for Woodburn High School
—Page 69—
156
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
„w� m
Ib-
As identified in the Mill Creek Greenway
Master Plan,construct a multi-use path
including at-grade mid-block crossing
treatments at the following street
connections:
Mill Creek • Bulldog Drive (west crossing)
Greenway- Multi-use
P47 Northern City pathway Meridian Drive Medium $700,000
tributary Boones Ferry Road
This project improves safe routes to school
for Woodburn High School, Lincoln
Elementary School,and French Prairie
Middle School
As identified in the Mill Creek Greenway
Master Plan,construct a multi-use path
including at-grade mid-block crossing
treatments at the following street
Mill Creek connections:
Greenway- Multi-use 0Parr Road
P48 Western City pathway Ben Brown Lane Medium $900,000
tributary Settlemier Avenue
• Front Street and railroad tracks
This project improves safe routes to school
for Heritage Elementary School and Valor
Middle School
nA�it+i II Imo Pl.+hP 1.+h T
woo 00
As identified in the Mill Creek Greenway
Master Plan,construct a north-south multi-
Washington use path connection between Hardcastle
Elementary Multi-use
P50 School Multi-Use City pathway Avenue and Lincoln Street,west of Medium $90,000
Path Washington Elementary School.This
project improves safe routes to school for
Washington Elementary School
Mill Creek As identified in the Highway 99E Corridor
Greenway Multi-use Plan,construct extension of Mill Creek
P51 Southern City pathway Greenway multi-use path to Belle Passi Medium $90,000
extension Road
Construct a connection between the
Evergreen Road Multi-use Evergreen Road multi-use path and
P52 Pedestrian City pathway pedestrian facilities that are part of future Medium $20,000
Connection
development to the south
' e Q@At@AAil.I Pork.,-,64i 6 o r+h
n nd" .,, 9
�9i�B£tIAi3
S(gA#+9m Bri,F6 441 l4i I
-Page 70-
157
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
„w� m
As identified in the Highway 99E Corridor
Plan and in coordination with ODOT,install
June WayMulti-use a new accessway to OR 99E(near the
P55 Accessway State/City pathway Audrey Way intersection),may not Low $80,000
connect directly as it runs parallel to OR
99E
Johnson Street Multi-use
As identified in the Highway 99E Corridor
P56 Accessway State/City pathway Plan and in coordination with ODOT,install Low $45,000
a new accessway to OR 99E
As identified in the Highway 99E Corridor
Elm Street Multi-use
Plan and in coordination with ODOT,install
P57 Accessway State/City pathway a new accessway to OR 99E,may not Low $25,000
connect directly as it runs parallel to OR
99E
Wilson Street Multi-use
As identified in the Highway 99E Corridor
P58 Accessway State/City pathway Plan and in coordination with ODOT,install Low $55,000
a new accessway to OR 99E
As identified in the Highway 99E Corridor
Plan and in coordination with ODOT,install
Hawley Street Multi-use a new accessway to OR 99E(possibly part
P59 Accessway State/City pathway of future street extension),may not Low $55,000
connect directly as it runs parallel to OR
99E
A Street Multi-use Install a new accessway that connects A
P60 Accessway City pathway Street north to Cleveland Street and/or Low $25,000
Mill Creek Greenway(western tributary).
Greenview Drive Multi-use Construct a multi-use path extending from
P61 Multi-use Path City pathway Greenview Drive west to OR 99E Low $70,000
Provide wayfinding to bike routes,multi-
P621 City-wide City Wayfinding use paths, parks,schools,and other Medium $30,000
essential destinations
TOTAL High Priority Costs 1750,000602
1922
TOTAL Medium Priority Costs 10,300,0008
p: 1199
TOTAL Low Priority Costs $ k�5'0
5a000
$.1.,L.gj"2gg
TOTAL Program Costs(20 years) 4.:7a4007000„1,,,,
1.Project not shown on Pedestrian Plan Map
2.Cost estimates are not included for projects that would be completed as part of a roadway project,such as locations
where roadway widening will relocate the curb and require new sidewalks to be installed.The cost for these projects is
included in the corresponding roadway projects described later in the memo.
3.The cost estimates presented to not include costs associated with right-of-way acquisition due to its high variability
depending on location, parcel sizes,and other characteristics.
—Page 71 —
158
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Figure 8: Pedestrian Plan Projects
-Page 72-
159
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Blank l 1x17 page
-Page 73-
160
'„ri
IN
m„ W
�" nod"",, ✓ ,
"
e,
r
ro
r
�� (Pr(ldffflnuaarr") �J➢U I
f �f%r�lJl/fly I d d
.gym
o "
r�r;yu
6 I Mn
i II
r
i
r
rn
I
Exhibit A
This page intentionally left blank
-Page 75-
162
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOODBURN 0 TRANSPORTATION SYSTEM PLAN
BICYCLE SYSTEM
Woodburn's bicycle system consists of on-street bike lanes and other bicycle provided on a few
roadways within the city. The bicycle plan includes several projects along the city's Major and
Minor Arterial and Service Collector streets for connectivity throughout the city. The bicycle plan
also includes projects on access and local street that provide direct access to essential
destinations.
Alternative t
Designate an alternative route along a parallel street that provides a more comfortable
environment for cyclists with the same level of connectivity. The alternative route could be
identified by wayfinding signs, which could also be used to identify essential destinations that
can be reached by the route. The alternative route may provide shared-lane pavement
markings and signs, on-street bike lanes, or other bicycle facilities.
PavementShared Lane Markings and Signs
Shared-lane pavement markings (often called "sharrows") are not a bicycle facility, but a tool
designed to help accommodate bicyclists on roadways where bike lanes are desirable but
infeasible to construct. Sharrows indicate a shared roadway space for cyclists and motorists and
are typically centered in the travel lane or approximately four feet from the edge of the
travelway. Sharrows are suitable on roadways with relatively low travel speeds (<35 mph) and
low ADT (<3,000 ADT); however, they may also be used to transition between discontinuous
bicycle facilities. Sharrows could be applied along a variety of streets within Woodburn where
room for on-street bike lanes is limited.
On-Street i lanes
On-street bike lanes are striped lanes on the roadway dedicated for the exclusive use of cyclists.
Bike lanes are typically placed at the outer edge of pavement (but to the inside of right-turn
lanes and/or on-street parking). Bicycle lanes can improve safety and security of cyclists and (if
comprehensive) can provide direct connections between origins and destinations. On-street
bike lanes could be applied along a variety of streets within Woodburn where space allows.
Separatedi Facilities
Separated bike facilities include buffered bike lanes and separated bike lanes, or cycle tracks.
Buffered bike lanes are on-street bike lanes that include an additional striped buffer of typically
2-3 feet between the bicycle lane and the vehicle travel lane and/or between the bicycle lane
and the vehicle parking lane. They are typically located along streets that require a higher level
of separation to improve the comfort of bicycling.Separated bike lanes, also known as cycle
tracks, are bicycle facilities that are separated from motor vehicle traffic by a buffer and a
physical barrier, such as planters, flexible posts, parked cars, or a mountable curb. One-way
-Page 76-
163
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN 0 TRANSPORTATION SYSTEM LAi
separated bike lanes are typically found on each side of the street, like a standard bike lane,
while two-way separated bike lanes are typically found on one side of the street.
r � µ
1
On-street Bike Lanes Buffered Bike Lanes
CrossingsEnhanced
Enhanced bicycle crossing facilities enable cyclists to safely cross streets, railroad tracks, and
other transportation facilities. Planning for appropriate bicycle crossings requires the community
to balance vehicular mobility needs with providing crossing locations that the desired routes of
cyclists. Enhanced bicycle crossings include:
• Bike Boxes - designated space at an intersection that allows cyclists to wait in front of
motor vehicles while waiting to turn or continue through the intersection.
• Two-Stage Left-turn Boxes - designated space at a signalized intersection outside of the
travel lane that provides cyclists with a place to wait while making a two-stage left-turn.
• Pavement marking through intersections-pavement markings that extend and bike lane
through an intersection.
• Bike Only Signals-A traffic signal that is dedicated for cyclists
• Bicycle Detection-Vehicle detection for bicycles
Additional information on the enhanced bicycle crossing treatments is provided in Technical
Memorandum 5: Alternative Analysis and Funding.
Wayfinding i s
Wayfinding signs are signs located along roadways or at intersections that direct bicyclists
towards destinations in the area and/or to define a bicycle route. They typically include
distances and average walk/cycle times. Wayfinding signs are generally used on primary
bicycle routes and multi-use paths.
-Page 77-
164
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN I TRANSPORTATION SYSTEM L
BC Y C IL....I[::::: II::.)IL.... I II::.)IR J II::::::.C'T'
Table 6 identifies the bicycle plan projects for the Woodburn TSP update. As shown, the projects
are separated based on roadway classification. The priorities shown in Table 6 are based on the
project evaluation criteria as well as input from the project team and the general public. The
cost estimates are based on average unit costs for roadway improvements. Figure 9 illustrates
the location of the bicycle plan projects.
Table 6: Bicycle Plan Projects
Major Arterials
np�i�c.
# Ile Rec� Wiest
— C+ +o RiI.o�ncc-icr-,cl.1-,0q AAo il�w, .,I1 o!-I in
tp
,AfBFlFi6
OR 214 from Cost
B2 Progress Way State Bike lanes Widen roadway and install bike lanes in Medium included in
to OR 99E coordination with ODOT R3
z
OR 99E from Cost
B3 Lincoln Street State Bike lanes Widen roadway and install bike lanes in Medium included in
to southern coordination with ODOT
City Boundary R42
OR 99E from Cost
B4 southern City State Bike lanes Widen roadway and install buffered bike Medium included in
Boundary to lanes in coordination with ODOT R42
southern UGB
Minor Arterials
OR 219 from
western UGB State Bike lanes Widen roadway and install bike lanes in
B5 to Butteville coordination with ODOT Medium $1,000,000
Road
Butteville
Road/OR 219 Widen roadway and install bike lanes in
B6 from northern State/County Bike lanes coordination with ODOT Medium $3,200,000
UGB to OR 219
Butteville Road
from cmn,onf.
Luc,Ye"1, Cost
B7 ,,xte;r7ts1',e +ra County Bike lanes Widen roadway and install bike lanes Medium included in
...,a a1) R62
to southern
UGB
Evergreen
B8 Road from OR City Bike lanes Widen roadway and install bike lanes Medium $500,000
214 to Hayes
Street
Boones Ferry
Road from
B9 northern UGB County/City Bike lanes Widen roadway and install bike lanes Medium $500,000
to Hazelnut
Drive
-Page 78-
165
Exhibit A
WOODB�pRN ('I..T,.Y OF WOODBURN TRANSPORTATION SYSTEM L
Em
„wpm
R Em Hill 111111
Settlemier Install shared lane markings and signs.
Avenue from This project improves safe routes to
B10 Harrison Street City Shared street school for Nellie Muir Elementary School, Medium $25,000
to railroad Heritage Elementary School,Valor Middle
tracks School,and St. Luke's School
Boones Ferry
Road from
311 Dahlia Street County/City Bike lanes Widen roadway and install bike lanes Medium $1,500,000
to southern
UGB
Widen roadway and install bike lanes.
Front Street This project improves safe routes to
B12 from northern City Bike lanes school for Woodburn High School, High $8,050,000
UGB to Boones
Ferry Road Heritage Elementary School,Valor Middle
School,and St. Luke's School
Garfield Street
B13 from 3rd Street City Shared street Install shared lane markings and signs Low $10,000
to Front Street
Garfield Street
B14 from Smith City Shared street Install shared lane markings and signs Low $10,000
Drive to 3rd
Street
Perform a corridor evaluation that would
3151 Young Street City Study consider design treatments to improve Medium $15,000
bicycle comfort and safety such as
striping,signing,and wayfinding
OR 211 from Widen roadway and install bike lanes in
B16 OR 99E to State Bike lanes Medium $1,000,000
eastern UGB coordination with ODOT
Service Collectors
Arney Road
from Robin Install shared lane markings and signs in
B17 Avenue to OR State Shared street coordination with ODOT Low $5,000
219
Harvard Drive Enhance the parallel route of Harvard
from Stacy Drive from Stacy Allison Way to Evergreen
B18 Allison Way to City Bike lanes Road in place of Stacy Allison Way. Install Medium $15,000
Evergreen buffered bike lane striping on both sides
Road of the roadway
Hayes Street Install bike lane striping.This project
B19 from Harvard City Bike lanes improves safe routes to school for Nellie Medium $35,000
Drive to
Cascade Drive Muir Elementary School
Hayes Street
from Cascade Widen roadway and install bike lanes.
B20 Drive to City Bike lanes This project improves safe routes to Medium $3,000,000
Settlemier school for Nellie Muir Elementary School
Avenue
-Page 79-
166
Exhibit A
WOODB�pRN ("VTY OF WOODBURN TRANSPORTATION SYSTEM L
1. m „wpm
Ism
Im iiiiiii I didi I III
lye gc ,e,F1Pol,I,
Rood f[orn
Sfulbb Sf("of to
I v,i cli on
Rood f'-sae:,
Rood fr) �,odkfi{ Widen roadway and install bike lanes.
Cost
Fa4 o k)l ond This project improves safe routes to
B21 P he I d fr C„`'44H ::4yC„`ity Bike lanes school for Heritage Elementary School High included in
ev Cri Y. and Valor Middle School R52
I'iy°a-+r�K1K�e a71,.f'aaK:K:
1tif.'�F#k1 fKk'�Y'�h
o Ka vv�fK�- C„`#yc
Lincoln Street Install shared lane markings and signs.
B22 from Cascade City Shared street This project improves safe routes to Medium $20,000
Drive to Front
Street school for Washington Elementary School
Lincoln Street Install bike lane striping.This project
B23 from Front city Bike lanes improves safe routes to school for High $55,000
Street to OR
99E Washington Elementary School
Cleveland
B24 Street from City Shared street Install shared lane markings and signs Low $15,000
Front Street to
OR 99E
Hardcastle Install shared lane markings and signs.
B25 Avenue from City Shared street This project improves safe routes to High $15,000
Front Street to
OR 99E school for Washington Elementary School
Brown Street
from Install shared lane markings and signs
Cleveland frorn C„`loovolond frrxr:f fc2.. iariric.
B26 City Shared street Low $ts20,000
Street to end I'oulovoid. Iinsfoll k ko,Igi,i , f iainQ fiorin.
of K«<s,lvro�hr�yfl i,w. fa,i n,l Ifr,ulov(xd to fl o,`oufl i Mfo[ksl,.
Soufl Mfo[kil
Cooley Road
B27 from OR 211 to County Bike lanes Widen roadway and install bike lanes Medium $1,300,000
Aubrey Way
Cooley Road
from Aubrey
B28 Way to County Bike lanes Install bike lane striping Medium $15,000
Hardcastle
Avenue
Access Streets
Stubb Road Cost
B29 from Harvard County Shared street Install shared lane markings and signs Low included in
Drive to Parr
Road
R262
Astor Way
B30 from Country City Bike lanes Install bike lane striping Low $25,000
Club Road to
OR 214
Tukwila Drive
B31 from Boones City Shared street Install shared lane markings and signs Low $5,000
Ferry Road to
Hazelnut Drive
—Page 80-
167
Exhibit A
WOODB�pRN ('VTY OF WOODBURN TRANSPORTATION SYSTEM L
Em
„wpm
R Em Hill 111111
5th Street from Install shared lane markings and signs.
B32 OR 214 to City Shared street This project improves safe routes to Medium $20,000
Garfield Street school for St Luke's School
Gatch Street
from Install shared lane markings and signs.
B33 Hardcastle City Shared street This project improves safe routes to Medium $15,000
Road to
Cleveland school for Washington Elementary School
Street
Park Avenue Install shared lane markings and signs.
B34 from OR 214 to City Shared street This project improves safe routes to Medium $20,000
Lincoln Street school for Washington Elementary School
Evergreen
Road from
B35 Country Club City Shared street Install shared lane markings and signs Low $10,000
Court to OR
214
Local Streets
Country Club
Road from
B36 Evergreen City Bike lanes Install bike lane striping Medium $40,000
Road to Astor
Way
Cascade Drive Install shared lane markings and signs.
B37 from OR 214 to City Shared street This project improves safe routes to Medium $10,000
Hayes Street school for Nellie Muir Elementary School
Smith Drive Install shared lane markings and signs.
from Hayes
B38 Street to City Shared street This project improves safe routes to Medium $5,000
Garfield Street school for Nellie Muir Elementary School
Meridian Drive
B39 from Hazelnut City Shared street Install shared lane markings and signs Low $10,000
Drive to OR
214
1 st Street from
B40 Harrison Street City Shared street Install shared lane markings and signs Medium $15,000
to Cleveland
Street
Provide wayfinding to bike routes,multi-
B401 City-wide City Wayfinding use paths, parks,schools,and other Medium $30,000
essential destinations
TOTAL High Priority Costs $8,125,2,000
TOTAL Medium Priority Costs $12,280,000
TOTAL Low Priority Costs $1210,000
TOTAL Program Costs(20 years) $20,5,2115 ,,000
1.Project not shown on Bicycle Plan Map.
2.Cost estimates are not included for projects that would be completed as part of a roadway project,such as locations
where additional roadway width is needed to install bike lanes.The cost for these projects is included in the
corresponding roadway projects described later in the memo.
3.The cost estimates presented to not include costs associated with right-of-way acquisition due to its high variability
depending on location, parcel sizes,and other characteristics.
—Page 81 —
168
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
-Page 82-
169
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Figure 9: Bicycle Plan Projects
-Page 83-
170
Exhibit A
WOODB�pRN ("VTY OF WOODBURN 0 TRANSPORTATION SYSTEM L
Blank l 1x17 page
-Page 84-
171
!
i
1
1
/
1 ,
/
/
/
w' .
w
I
w �
i
/
I
I
i
r�
�rrrry
a r
um
� (� ����� � ���1>�y ➢ ���� mid ��iri0 ri��k III � �I II
l
larrr y Oy /irii i
r ,
r
I �{I ����//, �/, � r 7" r,i( � � „vi n�'fl%Gl�(��A 6�✓r�ol i ,/;� ;
u
iI
/� �/ ✓1f �l , //�/ i [v,w/�///ual�n N d ,,,. � A � �r
Fm
ri'
,.r ;,:,. ,,,
,l" ��, �1 a� rt� �� G �,.,.,,;� � m�,�*m�r, fir.,✓�; ,y �rti"�� w� ��, r,l v� ;�;;�" � TJ�r�r!����� w; y,
Exhibit A
This page intentionally left blank
-Page 86-
173
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN I TRANSPORTATION SYSTEM PLAN
OTHER TRAVEL MODES
This section summarizes the plans for other travel modes in Woodburn.
TRA INS 11:::'0 R"I..A..-II O I SYS.T.II::::M MA II A G II::::::M II::::::II .T. AINID (I II::.)II:::RA.T] IN
(..I.SMO) II:=)II.....AI
Transportation System Management and Operations (TSMO) is a set of integrated transportation
solutions intended to improve the performance of existing transportation infrastructure.
Transportation Demand Management (TDM) and Transportation System Management (TSM)
strategies are two complementary approaches to managing transportation and maximizing the
efficiency of the existing system. TDM addresses the demand on the system: the number of
vehicles traveling on the roadways each day. TDM measures include any method intended to
shift travel demand from single occupant vehicles to non-auto modes or carpooling, travel at
less congested times of the day, etc. TSM addresses the supply of the system: using strategies to
improve the system efficiency without increasing roadway widths or building new roads. TSM
measures are focused on improving operations by enhancing capacity during peak times,
typically with advanced technologies to improve traffic operations.
Transportation
Transportation System Management (TSM) focuses on low cost strategies that can be
implemented within the existing transportation infrastructure to enhance operational
performance. Finding ways to better manage transportation while maximizing urban mobility
and treating all modes of travel as a coordinated system is a priority. TSM strategies include
traffic signal timing and phasing, traffic signal coordination, traffic calming, access
management, local street connectivity and intelligent transportation systems (ITS). Traffic signal
coordination and ITS typically provide the most significant tangible benefits to the traveling
public. The primary focus of TSM measures are region-wide improvements, however there are a
number of TSM measures that could be used in a smaller-scale environment such as within the
City of Woodburn. TSM projects and programs that are recommended for the City of Woodburn
to explore include the following:
• Update signal timing plans and coordinate signals to better match prevailing traffic
conditions
o OR 99E from Hardcastle Avenue to Young Street (or to the potential future
Cleveland Street traffic signal) is one candidate corridor for coordination
• Implement truck signal priority at key signalized intersections along OR 214 and OR 99E.
Truck signal priority can reduce delay, travel time, and the number of stops for freight
vehicles, helping reduce vehicle emissions and improve travel time reliability.
• Work with ODOT to develop and implement a Traffic Management Plan for the OR 99E
corridor that responds to increased congestion resulting from incidents on 1-5 and
regional events
-Page 87-
174
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN 0 TRANSPORTATION SYSTEM L
Transportation
Transportation Demand Management (TDM) is a policy tool as well as a general term used to
describe any action that removes single occupant vehicle trips from the roadway during peak
travel demand periods. As growth in the City of Woodburn occurs, the number of vehicle trips
and travel demand in the area will also increase. The ability to change a user's travel behavior
and provide alternative mode choices will help accommodate this potential growth in trips.
Technical Memorandum 5: Alternative Analysis and Funding identifies several policies and
programs that may be effective for managing transportation demand in the City of Woodburn,
especially within the next 10 to 20 years. Table 7 summarizes the strategies that best meet the
goals and objectives of the TSP update. As with all new public and private investments, the
implementation of TDM strategies is sure to draw opposition from some. Given Woodburn's lack
of experience with TDM strategies, it is important that decision-makers understand their long-term
costs and benefits and are able evaluate these along-side arguments from opponents in
achieving outcomes that best reflect the City's vision and goals while effectively reducing travel
demand.
Table 7:Transportation Demand Management Program Strategies
..... ......M 11 M
Carpool/Vanpool Coordinate a rid eshare/carpool/vanpool program
TDMI Match Services County/City that regional commuters can use to find other High $5,000/year
commuters with similar routes to work
Carpool/Vanpool Coordinate with employers to designate
TDM2 Parking Program City carpool/vanpool preferential parking Low $5,000/year
Work with nearby cities,employers,transit service
TDM3 Collaborative County/Cit providers,and developers to collaborate on Medium
Marketing y marketing for transportation options that provide an $5,000/year
alternative to single-occupancy vehicles
Limited and/or Update the Woodburn Development Ordinance to
TDM4 Flexible Parking City include strategies that encourage multi-modal High $25,000
Requirements transportation
Parking Modify the City's current parking policy to allow for
TDMS Management City the potential to charge for parking Low $10,000
Transit Fare City/ Work with Woodburn Transit to provide transit fare
TDM6 Subsidies Woodburn subsidies Low $5,000
Transit
Work with employers to encourage TDM measures
Employer TDM such as allowing employees to work at home one day
TDM7 Measures City a week and scheduling shift changes to occur Low $5,000/year
outside of peak travel periods
TOTAL High Priority Costs $125,000
TOTAL Medium Priority Costs $100,000
TOTAL Low Priority Costs $215,000
TOTAL Program Costs(20 years) $440,000
-Page 88-
175
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN 0 TRANSPORTATION SYSTEM L
Other potential TDM projects include:
• Encourage the development of high-speed communication in all part of the city (fiber
optic,digital cable, DSL, etc).The objective would be to allow employers and residents
the maximum opportunity to rely upon other systems for conducting business and
activities than the transportation system during peak periods.
• Encourage developments that effectively mix land uses to reduce vehicle trip
generation. These plans may include development linkages (particularly non-auto)
that support greater use of alternative modes.
Land 5
The types and intensities of land uses are closely correlated with travel demand. Land use
patterns in many areas of the city are suburban in nature with low densities throughout the city
and more industrial and commercial uses in the eastern part of the city near OR 99E. In the
future the city will continue to have a mixture of housing and industrial densities, as well as areas
of mixed-use development (i.e., a mix of residential, retail, commercial and/or office uses).
Technical Memorandum 5: Alternative Analysis and Funding identifies several land use strategies
that could be implemented in Woodburn. Table 8 summarizes the strategies that best meet the
goals and objectives of the TSP update.
Table 8: Land Use Projects
..... ......M 11 ME
Commercial and Establish neighborhood commercial and mixed-use
LU 1 Mixed-use Nodes City nodes within the city Low $25,000
LU2 Alternative State/City Work with ODOT to develop alternative mobility Low $25,000
Mobility Targets targets at critical intersections along state highways.
Through development,right-of-way dedications
Right-of-way should be provided to facilitate the future planned
LU3 Dedications C�y transportation system in the vicinity of the proposed Low $0
development
Through development, half-street improvements
Half-street (sidewalks,curb and gutter,bicycle lanes/paths,
LU4 Improvements City and/or travel lanes) should be provided along all site High $01
frontages that do not have full buildout improvements
in place at the time of development
TOTAL High Priority Costs $0
TOTAL Medium Priority Costs $0
TOTAL Low Priority Costs $50,000
TOTAL Program Costs(20 years) $50,000
1.Project to be funded by others.
-Page 89-
176
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOODBURN 0 TRANSPORTATION SYSTEM L
Access Management Plan
Numerous driveways or street intersections increase the number of conflicts and potential for
collisions and decrease mobility and traffic flow. The City of Woodburn, as with every city, needs
a balance of streets that provide access with streets that serve mobility. Access management is
a set of measures regulating access to streets, roads, and highways, from public roads and
private driveways. It is a policy tool which seeks to balance mobility, the need to provide
efficient, safe and timely travel with the ability to allow access to individual properties. Proper
implementation of access management techniques should guarantee reduced congestion,
reduced collision rates, less need for roadway widening, conservation of energy, and reduced
air pollution. Measures may include but are not limited to restrictions on the type and amount of
access to roadways, and use of physical controls, such as signals and channelization including
raised medians, to reduce impacts of approach road traffic on the main facility.
City of Woodburn access spacing standards can be found in the Woodburn Development
Ordinance Section 3.04.02 and OAR Division 51, which specifies access management spacing
standards for ODOT facilities. In coordination with the access spacing standards presented in
these documents, Table 9 summarizes the access management projects identified to help
Woodburn balance access and mobility throughout the city.
Table 9:Access Management Projects
..... ......M 11 im
Develop access management standards that reflect
Access Spacing functional classification of the roadway and that
AMl Standard City coordinate with the ODOT standards that regulate Low $25,000
Modification
several major roadways in Woodburn
Investigate and implement opportunities to provide
Alternative alternative access to nonstate facilities when
AM2 Access City reasonable access can occur(consistent with the Low $25,000
State's Division 51 access management standards)
Access Variance Define a variance process for when the standard
AM3 Process City cannot be met Low $25,000
Establish an approach for access consolidation over
time to move in the direction of the standards at
Access each opportunity.Cross-over easements should be
AM4 Consolidation City provided on all compatible parcels(topography, Low $25,000
access,and land use) to facilitate future access
between adjacent parcels and inter-parcel
circulation.
Access Consider opportunities to restrict certain turning
AM5 Movement City movements at accesses(such as a right in-right out Low $25,000
Restrictions access)
TOTAL High Priority Costs $0
TOTAL Medium Priority Costs $0
TOTAL Low Priority Costs $125,000
TOTAL Program Costs(20 years) $125,000
—Page 90—
177
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN I TRANSPORTATION SYSTEM L
IAA II IL.... 11:='IL....A IN
The existing rail system in Woodburn includes freight rail, while there are currently no passenger
rail terminals. Union Pacific Railroad operates a Class I rail line through Woodburn. These tracks
parallel the east side of Front Street. A total of five at-grade crossings and one grade separated
crossing exist along the rail line. Willamette Valley Railway operates a Shortline Railroad track
that parallels the north side of Cleveland Street in the south side of town. A total of five public
at-grade crossings exist along this rail line. In addition to these crossings, the rail line serves
multiple local businesses along the corridor. Table 10 summarizes the rail system projects that
best meet the identified goals and objectives of this plan.
Table 10: Rail Projects
Ma' EM
Establish a downtown Amtrak passenger rail stop
along Front Street in downtown Woodburn, potentially
RA1 Front Street City as a public-private partnership at the''Y''property Low $10,000
adjacent to Locomotive Park
Front Street and Investigate the opportunity to remove private grade
RA2 Cleveland Street City railroad crossings by providing alternative access to Medium $10,000
parcels as development and redevelopment occurs
Butteville Road, State/County/ Explore a passenger rail stop if commuter rail is
RA3 north of OR 219 City extended between Wilsonville and Beaverton down Low $5,000
to Salem
TOTAL High Priority Costs $0
TOTAL Medium Priority Costs $10,000
TOTAL Low Priority Costs $15,000
TOTAL Program Costs(20 years) $25,000
I IR T.IIR A IN S 11:::'0 IR T'A T'10 I
There are no airports located within the city limits. The closest airports include the Aurora State
Airport (classified as an Urban General Aviation Airport) located approximately 8 miles to the
north via OR 99E and OR 551 and the Mulino Airport located approximately 14 miles to the
northeast via OR 211 and OR 213. No air projects or programs were identified as part of the TSP
process.
i IR II II::.: .T.IRA INS II:::' R'T'A'T]0 I
Marine transportation is not available within the City of Woodburn, and no marine projects or
programs were identified as part of the TSP process.
There are no major pipeline transport facilities within the Woodburn UGB, and no pipeline
projects or programs were identified as part of the TSP process.
-Page 91 -
178
Exhibit A
This page intentionally left blank
-Page 92-
179
a
/
o
J l
�v
i I
/
f i /i
i o�
Im A ,
Y I i
i
� a
6
min
I
i
ul
r I �
�I
i
/
/
u�
i
r
I ,t
�r
II
} � I
u, i i I
I I
I. I I i it„ail I i
� 4
I I
I I, I I�I I V� I � I I MI� I I�I I
III I
411��
I
� t
I
•
Exhibit A
This page intentionally left blank
-Page 94-
181
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOODBURN p TRANSPORTATION SYSTEM PLAN
FUNDING
F 9J I IIING 11:::TOGRAMS AINID
The City of Woodburn has historically relied upon multiple revenue sources to fund the
maintenance of its transportation network and make capital improvements. These local gas tax
revenue, inter-governmental (primarily state gas tax revenue), franchise fees, and other
miscellaneous revenue. Table 1 1 displays the total revenue by source used to fund
transportation projects within Woodburn over the most recent seven years that comprehensive
data was available.
Table 11: City of Woodburn Revenue History
I I
Taxes $129,412 $115,692 $102,517 $101,761 $106,537 $182,109 $121,1
Inter
Government $1,480,082 $1,454,076 $1,409,311 $1,384,277 $1,597,518 $1,312,024 $1,116, , ,Franchise $359,820 $357,983 $336,707 $360,046 $353,381 $326,713 $347,621 $348,896
Transportation
SDC Fees $33,396 $183,698 $440,595 $521,933 $411,527 $400,172 $153,268 $306,370
Other $69,856 $59,518 $49,532 $319,086 $49,457 $88,767 $27,147 $94,766
Revenue Total $2,072,566 $2,170,967 $2,338,662 $2,687,103 $2,518,420 $2,309,785 $1,765,243 $2,266,107
Taxes=Local Gas Tax revenue
Inter-Government=State Gas Tax,State Fund Exchange
Other=Misc.revenue,interest income
Based on the information shown in Table 11, the City of Woodburn has generated an average of
approximately$2,266,107 per year in total revenue for transportation-related
maintenance/projects.
Potential Funding Sources
The projected transportation funding analysis shows that the City of Woodburn will have a
limited source of funds that can solely dedicated to transportation-related capital improvement
projects over the next twenty years. As such, Woodburn will likely need to seek additional funds
via transportation improvement grants, partnerships with regional and state agencies, and other
funding sources to help implement future transportation-related improvements. Table 12
identifies a list of potential Grant sources and Partnering Opportunities to consider during the
course of the 20-year planning horizon. Following Table 12, Table 13 identifies a list of potential
new funding sources for Woodburn to consider in an effort to bolster funds for additional capital
improvement projects.
-Page 95-
182
Exhibit A
WOODB�pRN ('I..T,.Y OF WOODBURN 0 TRANSPORTATION SYSTEM L
Table 12: Potential Grant Sources and Partnering Opportunities
The Statewide Transportation Improvement The next STIP (2018-2021)will be
Statewide Program (STIP) is Oregon's 4-year capital Streets organized into two different
improvement program for major state and categories that focus on projects
Improvement Bike lanes
Transportation regional transportation facilities.This scheduling Sidewalks that will fix/preserve the existing
-
Program (STIP) and funding document is updated every two Trails transportation network and
years. Projects included on the STIP are enhance/improve the transportation
allocated into the five different ODOT regions. network.
Federal Funding Large trails or trail networks with a transportation Multi-Use Trails Projects in urban areas have
purpose can compete for TIGER grant awards. traditionally been funded at a
Additional significant federal funding sources minimum of$10,000,000 and rural
include TAP,STP and CMAQ.Depending upon trails of lower project costs are
the location and purpose,trails can also be considered for TIGER funding.
funded by HUD CDBG funds, USDA rural
development programs,or EPA funding.
Oregon Bicycle The Oregon Pedestrian and Bicycle Grant See STIP above See STIP above.
and Pedestrian program ended as a standalone solicitation
Program process in 2012.Grant monies are now
distributed through the "Enhance" process in the
STIP program noted above.
ATV Grant Operation and maintenance,law enforcement, Multi-Use Trails http://www.oregoru.gov/o[2rd/ATV/12
Program emergency medical services,land acquisition, ages/grants.aspx
leases,planning,development and safety
education in Oregon's OHV (off-highway vehicle
recreation areas).
Table 13: Potential New Funding Sources for Consideration by the City of Woodburn
�m
III
Fees tacked onto a monthly utility bill or tied to The cost of implementing such a
the annual registration of a vehicle to pay for system could be prohibitive given
improvements,expansion,and maintenance to the need to track the number of
the street system.This may be a more equitable Primarily Street
vehicle miles traveled in every
User Fees vehicle.Additionally,a user fee
assessment given the varying fuel efficiency of Improvements
vehicles.Regardless of fuel efficiency, specific to a single jurisdiction does
passenger vehicles do equal damage to the not account for the street use from
street system. vehicles registered in other
jurisdictions.
The fee is based on the number of trips a
Preservation,restoration,
particular land use generates and is usually
Street Utility collected through a regular utility bill.For the and reconstruction of Other cities have adopted street
Fees/Road communities in Oregon that have adopted this existing paved residential maintenance utility fees at varying
streets. Includes amounts charged to residential
Maintenance approach,it provides a stable source of
sidewalks,ramps,curbs meters.Woodburn could consider a
Fee revenue to pay for street maintenance allowing
for safe and efficient movement of people, and gutters,and utility similar program.
relocation.
goods,and services.
A tax that is paid at the option of the taxpayer
to fund improvements. Usually not alegislative -Streets The voluntary nature of the tax limits
Optional Tax requirement to pay the tax and paid at the time -Sidewalks the reliability and stableness of the
other taxes are collected,optional taxes are Bike lanes funding source.
-Page 96-
183
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN TRANSPORTATION SYSTEM LA
usually less controversial and easily collected Multi-Use Trails
since they require the taxpayer to decide Transit
whether or not to pay the additional tax.
Sponsorship has primarily been used
Financial backing of a project by a private by transit providers to help offset the
Sponsorship corporation or public interest group,as a means Multi-Use Trails cost of providing transit services and
of enhancing its corporate image. maintaining transit related
improvements.
Trails with a transportation purpose can Projects in urban areas have
compete for TIGER grant awards. Depending traditionally been funded at a
Federal Funding upon the location and purpose,trails can also Trails minimum of$10,000,000 and rural
be funded by HUD,CDBG funds,USDA rural trails of lower project costs are
development programs,or EPA funding. considered for TIGER funding.
��::. ��..... I I II::I "F III I , II::.'( IR..I.. ..I..II( IN 6 Y .T II : T. (WMAIR Y
Table 14 provides a summary of the full cost of the planned and financially constrained
transportation systems. As shown, the full cost of the planned system is approximately
74i ,
million over the 20- ear period, including $, ER6,4 million in high priority projects,
$122, ,„192,;z million in medium priority projects, and $1 ,105 million in low priority projects. Based
on the anticipated funds available for capital improvement projects, the financially constrained
plan includes all of the high priority projects. This leaves no forecasted funding for the City to
complete medium and low priority projects over the 20-year period without additional funding.
Table 14: Planned Transportation System Cost Summary
Planned Transportation System
Bicycle $8,I `r 120.1000 $12,280,000 $d-I C)l)().'000 $20,`,d`r` 0,,000
Pedestrian $h 1sC)C)C)C) ,1` )f)Ch) $10,'I()())/(),,000 $t `>1sF1)000 $17,4wW>`r R1),,000
Roadway l:,C,;,,,,,?�,C)C)C),r;�fh)C)C4) l,()1,rSC)rS,C,),C)C),✓mot r'�,C;)fh));) „1,., 3rSC),C)Cr)C},CX)f)C;h) 1:,�C)rSl,.,.
Safety V);200,000 $5,260,000 $r1;100,000 $h 2L C)C)C)/`>60 000
Transit $100,000 $15,000 $1 15,000
TDM I $125,000 $100,000 $215,000 $440,000
Land Use $50,000 $50,000
Access Management $125,000 $125,000
Rail $10,000 $15,000 $25,000
06,4ft5a00�00 ;46a400aTb 11 :p0Tf�p00.... OA�abba00,�" 00604 7,�k0a00 $�.,�4„4f511� ....
TDM:Transportation Demand Management
1:Includes annual costs occurred every year.
—Page 97—
184
Exhibit A
WOODB�pR.N ("IT.Y OF WOODBURN 0 TRANSPORTATION SYSTEM LA
The Transportation Planning Rule (TPR), as codified in Oregon Administrative Rules (OAR) 660-012-
0045, requires that local jurisdictions identify and adopt land use regulations and code
amendments needed to implement the TSP. The land use regulations and code amendments
are provided under separate cover.
-Page 98-
185
//
d
i
a
Exhibit A
This page intentionally left blank
-Page 100-
187
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOOS:;BURN 0 TRANSPORTATION SYSTEM L
GLOSSARY OF TERMS
The following terms are applicable only to the Woodburn Transportation System Plan and shall
be construed as defined herein.
Access t: Refers to measures regulating access to streets, roads and highways
from public roads and private driveways. Measures may include but are not limited to restrictions
on the type and amount of access to roadways and use of physical controls such as signals and
channelization including raised medians, to reduce impacts of approach road traffic on the
main facility.
Access (Street): A street designated in the functional classification system that's primary
purpose is to connect residential neighborhoods with service collectors or arterials. On-street
parking and access to adjacent properties is prevalent. Slower speeds should be provided to
ensure community livability and safety for pedestrians and cyclists.
Access way: Refers to a walkway that provides pedestrian and or bicycle passage either
between streets or from a street to a building or other destination such as a school, park, or
transit stop.
Alternative Mods: Transportation alternatives other than single-occupant automobiles such
as rail, transit, bicycles and walking.
Americans with Disabilities Act : A civil rights law that prohibits discrimination
against individuals with disabilities in all areas of public life, including jobs, schools, transportation,
and all public and private places that are open to the general public.
Average Annual Daily ffi : A measure used primarily in transportation planning
and traffic engineering that represents the total volume of vehicular traffic on a highway or
roadway for a year divided by 365 days.
Average Daily ffi : This is the measurement of the average number of vehicles
passing a certain point each day on a highway, road or street.
Bicycle Facility: Any facility provided for the benefit of bicycle travel, including bikeways and
parking facilities.
Bicycle Network: A system of connected bikeways that provide access to and from local
and regional destinations.
Bicycle Boulevard: Lower-order, lower-volume streets with various treatments to promote
safe and convenient bicycle travel. Usually accommodates bicyclists and motorists in the same
travel lanes, often with no specific vehicle or bike lane delineation. Assigns higher priority to
through bicyclists, with secondary priority assigned to motorists. Also includes treatments to slow
vehicle traffic to enhance the bicycling environment.
Lane:Bike Area within street right-of-way designated specifically for bicycle use.
-Page 101 -
188
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOODBURN 0 TRANSPORTATION SYSTEM LAN
Capital Improvement I I : A community planning and fiscal management tool used
to coordinate the location, timing and financing of capital improvements over a multi-year
period.
Capacity: The maximum number of vehicles or individuals that can traverse a given segment
of a transportation facility with prevailing roadway and traffic conditions.
Citizen AdvisoryCommittee : An advisory committee consisting of volunteer citizens
from the community they represent.
Congestion ifl fl / it Quality (CMAQ): A program within the federal ISTEA and TEA-
21 regulations that address congestion and transportation-related air pollution.
Crosswalk: Portion of a roadway designated for pedestrian crossing and can be either
marked or unmarked. Unmarked crosswalks are the national extension of the shoulder, curb line
or sidewalk.
Cycle Track: An exclusive bike facility that combines the user experience of a separated path
with the on-street infrastructure of a conventional bike lane. A cycle track is physically separated
from motor traffic and distinct from the sidewalk.
Management:Demand Refers to actions which are designed to change travel behavior in
order to improve performance of transportation facilities and to reduce need for additional
road capacity. Methods may include subsidizing transit for the journey to work trip, charging for
parking, starting a van or carpool system, or instituting flexible work hours.
Department of Environmental Quality (DEQ): A regulatory agency whose job is to
protect the quality of Oregon's environment.
Department of Land ConservationI t : A public agency that
helps communities and citizens plan for, protect and improve the built and natural systems that
provide a high quality of life.
Driveway : A short road leading from a public road to a private business or residence.
Eastbound : Leading or traveling toward the east.
Fiscal Year : A year as reckoned for taxing or accounting purposes.
Geographic Information Sysf s (GI : A system designed to capture, store, manipulate,
analyze, manage, and present all types of spatial or geographical data.
Grade: A measure of the steepness of a roadway, bikeway or walkway, usually expressed in a
percentage form of the ratio between vertical rise to horizontal distance, (e.g. a 5%grade
means that the facility rises 5 feet in height over 100 feet in length.)
Grade Separation: The vertical separation of conflicting travelways.
High Capacity r sit : A form of public transit distinguished from local service transit
such as bus lines by higher speeds, fewer stops, more passengers, and more frequent service.
-Page 102-
189
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOOS:;BURN 0 TRANSPORTATION SYSTEM PLAN
Highway Design I : A manual that provides uniform standards and
procedures for the design of new roadways and the major reconstruction, rehabilitation,
restoration, and resurfacing of existing roadways.
Intelligent r s rt tf sf s (ITS): the application of advanced technologies and
proven management techniques to relieve congestion, enhance safety, provide services to
travelers and assist transportation system operators in implementing suitable traffic management
strategies.
ServiceLevel of : A qualitative measure describing the perception of operation
conditions within a traffic steam by motorists and or passengers. An LOS rating of"A" to "F"
describes the traffic flow on streets and at intersections, ranging from LOS A, representing
virtually free flow conditions and no impedance to LOS F representing forced flow conditions
and congestion.
Local (Street): A street designated in the functional classification system that's primary
purpose is to provide direct access to adjacent land uses. Short roadway distances, slow speeds,
and low traffic volumes characterize local streets.
Major Arterial (Street): A street designated in the functional classification system that's
primary functions are to serve local and through traffic as it enters and leaves the urban area,
connect Woodburn with other urban centers and regions, and provide connections to major
activity centers within the UGB.
UniformManual on i Control Devices : A document issued by the
Federal Highway Administration (FHWA) of the United States Department of Transportation
(USDOT) to specify the standards by which traffic signs, road surface markings, and signals are
designed, installed, and used.
Minor Arterial (Street): A street designated in the functional classification system that's
primary functions are to connection major activity centers and neighborhoods within the UGB
and to support the major arterial system.
Multi-Modal: Involving several modes of transportation including bus, rail, bicycle, motor
vehicle etc.
Multi-Use Path: Off-street route (typically recreationally focused) that can be used by several
transportation modes, including bicycles, pedestrians and other non-motorized modes (i.e.
skateboards, roller blades, etc.)
National Highway System : The National Highway System is interconnected urban
and rural principal arterial and highways that serve major population centers, ports, airports and
other major travel destinations, meet national defense requirements and serve interstate and
interregional travel.
Northbound : Traveling or leading toward the north.
OregonI istr ti Rules : The official compilation of rules and regulations
having the force of law in the U.S. state of Oregon. It is the regulatory and administrative
corollary to Oregon Revised Statutes and is published pursuant to ORS 183.360 (3).
-Page 103-
190
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOODBURN 0 TRANSPORTATION SYSTEM LAN
Oregonrt t of Transportation : ODOT is a public agency that helps
provide a safe, efficient transportation system that supports economic opportunity and livable
communities throughout Oregon. ODOT owns and operates two roadways (OR 213 and OR 21 1)
that are located in Molalla or provide access to the city. There are street design and operational
standards for these roadways which supersede Molalla's street design and operational
standards.
OregonI I : The document that establishes long range policies and
investment strategies for the state highway system in Oregon.
Oregonvised Statutes : The codified body of statutory law governing the U.S. state
of Oregon, as enacted by the Oregon Legislative Assembly, and occasionally by citizen
initiative. The statutes are subordinate to the Oregon Constitution.
PeriodPeak : The period of the day with the highest number of travelers. This is
normally between 4:00 p.m. to 6:00 p.m. on weekdays.
Pedestrian Connection: A continuous, unobstructed, reasonability direct route between two
points that is intended and suitable for pedestrian use. These connections could include
sidewalks, walkways, accessways, stairways and pedestrian bridges.
Pedestrian Facility: A facility provided for the benefit of pedestrian travel, including
walkways, crosswalks, signs, signals and benches.
Pedestrian Scale: Site and building design elements that are oriented to the pedestrian and
are dimensionally less than those sites designed to accommodate automobile traffic.
Regional Transportation Functional Plan (RTFP): A planning document that contains
policies and guidelines to help local jurisdictions implement the policies in the Regional
Transportation Plan (RTP) and its modal plans, include those for active transportation, freight
movement, and high capacity transit.
Regional Transportation I : The transportation plan for the Portland Metro region.
Right-Of-Way r / : A general term denoting publicly owned land or property
upon which public facilities and infrastructure is placed.
Safetyrl rif Index SystemI : An indexing system used by Oregon Department of
Transportation to prioritize safety improvements based on crash frequency and severity on state
facilities.
Service Collector (Street): A street designated in the functional classification system that's
primary function is to provide connections between neighborhoods and major activity centers
and the arterial street system. Some degree of access is provided to adjacent properties, while
maintaining circulation and mobility for all users.
Shared : Roadways where bicyclists and autos share the same travel lane. May
include a wider outside lane and/or bicycle boulevard treatment (priority to through bikes on
local streets).
-Page 104-
191
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOODBURN 0 TRANSPORTATION SYSTEM LAN
Single-Occupancyi te or Single-Occupant Vehicle (SOV): A vehicle containing
only a single occupant, the driver.
Southbound : Traveling or leading toward the south.
Statewide Tras rt ti Improvement Plan (STIP): The capital improvement program
that identifies founding and schedule of statewide projects.
System Development Charge (SDC): Fees that are collected when new development
occurs in the city and are used to fund a portion of new streets, sanitary sewers, parks and
water.
Technical Advisory itt : An advisory committee consisting of state, county,
and city staff that review and provide feedback on technical memorandums.
MemorandumTechnical : A document that is specifically targeted to technically
capable persons, such as practicing engineers or engineering managers, who are interested in
the technical details of the project or task.
Traffictr I Devices: Signs, signals or other fixtures placed on or adjacent to a travelway
that regulates, warns or guides traffic. Can be either permanent or temporary.
Transportation AnI sis : A geographic sub-area used to assess travel demands
using a travel demand forecasting model. Often defined by the transportation network and US
Census blocks.
Transportation Demand Managemef : A policy tool as well as any action that
removes single-occupant vehicle trips from the roadway network during peak travel demand
periods.
Transportation and Growth t : A program of the Oregon Department
of Transportation (ODOT) that supports community efforts to expand transportation choices. By
linking land use and transportation planning, TGM works in partnership with local governments to
create vibrant, livable places in which people can walk, bike, take transit or drive where they
want to go.
Transportation Managemet Area (TMA): A Transportation Management Area is an area
designated by the Secretary of Transportation, having an urbanized area population of over
200,000, or upon special request from the Governor and the MPO designated for the area.
Transportation Planning I : A series of Oregon Administrative Rules intended to
coordinate land use and transportation planning efforts to ensure that the planned
transportation system supports a pattern of travel and land use in urban areas that will avoid the
air pollution, traffic and livability problems faced by other large urban areas of the country
through measures designed to increase transportation choices and make more efficient use of
the existing transportation system.
Transportation Ssf t : Management strategies such as signal
improvements, traffic signal coordination, traffic calming, access management, local street
connectivity, and intelligent transportation systems
-Page 105-
192
Exhibit A
WOODB�pR.N ("I..I,.Y OF WOODBURN 0 TRANSPORTATION SYSTEM LAN
Transportation Sst t and Operations : An integrated program
to optimize the performance of existing multimodal infrastructure through implementation of
systems, services, and projects to preserve capacity and improve the security, safety, and
reliability of our transportation system.
Transportation System I : Is a comprehensive plan that is developed to provide a
coordinated, seamless integration of continuity between modes at the local level as well as
integration with the regional transportation system.
Stop Control : An intersection, where one or more approaches is stop
controlled and must yield the right-of-way to one or more approaches that are not stop
controlled.
Area:Urban The area immediately surrounding an incorporated city or rural community that is
urban in character, regardless of size.
GrowthUrban : A regional boundary, set in an attempt to control urban
sprawl by mandating that the area inside the boundary be used for higher density urban
development and the area outside be used for lower density development.
Vehicle Miles Traveled (VMT): The cumulative distance a vehicle travels, regardless of
number of occupants.
Volume to Capacityl / : A measure that reflects mobility and quality of travel of a
roadway or a section of a roadway. It compares roadway demand (vehicle volumes) with
roadway supply (carrying capacity).
Westbound : Leading or traveling toward the west.
-Page 106-
193
Exhibit B
ATTACHMENT 103
PROPOSED WDO AMENDMENT
2.05.01 InterchanLye ManaLyement Area Overlay District
A. Purpose
The purpose of the Interchange Management Area Overlay District(IMA) is to preserve
the long-term capacity of the I-5/Highway 214 Interchange. Preserving the capacity of the
interchange is essential for the City's future. Continued access to I-5 is critical for existing
businesses and for attracting new businesses and development to the community.
The IMA complements the provisions of the Southwest Industrial Reserve (SWIR)
Zoning District by ensuring that industrial land is retained for the development envisioned
in the Woodburn Comprehensive Plan. The IMA also ensures that needed industrial,
commercial and residential lands within the IMA are protected from incompatible
development generating excessive vehicle trips.
The vehicle trip budget(Table 2.05A) identifies by parcel the maximum amount of peak
hour trips for each parcel within the IMA and is intended to be high enough to
accommodate peak hour trips anticipated by the Woodburn Comprehensive Plan and the
Transportation Systems Plan (TSP), but low enough to restrict unplanned vehicle trips that
could adversely affect the I-5/Hwy 214 Interchange.
B. Applicability
The provisions of this Section apply to all Type II—V land use applications that propose
to allow development that will generate more than 20 peak hour vehicle trips (based on the
latest Institute of Transportation Engineers Trip Generation Manual) on parcels identified
in Table 2.05A. The provisions of Section 2.05.02F apply to all properties within the
boundary of the IMA.
C. Vehicle Trip Budgets
This Section establishes a total peak hour trip generation budget for planned employment
(commercial and industrial) land uses within the IMA.
1. J he i 1:.A 4it-j,i)udt yet 0 I�)fYaeaflt eoffi .efeial afid ifidusl+ial pafeels idefI4 died 41 1,44e
105A is 2,500 peak..,.hd`uiF veliiele„..4ips. Ati es44.mated 1,500 addil4otia l peak houiF
fesidefI44a l 4 afe to flfled Wit io th e...IMA: The IMA vehicle trip budget is allocated
to parcels identified in Table 2.05A on a first-developed, first-served basis.
2. Parcel budgets are based on 11 peak hour trips per developed industrial acre, and 33
peak hour trips per developed commercial acre.
3. The parcel budget for each parcel will be reduced in proportion to actual peak hour
vehicle trips generated by new development on any portion of the parcel.
4. The City may allow development that exceeds the parcel budget for any parcel in
accordance with this Section.
Woodburn Development Ordinance Section 2.05 Page 1
194
Exhibit B
F
Figure 2.05B — Interchange Management Area Boundary and Subareas
Woodburn Development Ordinance Section 2.05 Page 2
195
Exhibit B
Vehicle Trip Budget by Parcel (Parcel Budget)
Table 2.05A
Subarea Assessor's Tax Lot Comprehensive Buildable Maximum Peak
Number Plan Designation Acres Hour Vehicle Trips
A 052W1100300 SWIR 88 968
052W 14 00200
B 052W14 00600 SWIR 22 242
C 052W1400700 SWIR Exempt Exempt
052W 14 00800
D 052W14 00900 SWIR 106 1,199
052W 14 01000
052W 14 01100
E 052W14 01200 SWIR 4 44
052W 13 01100
F 052W14 01500 SWIR 96 1,056
052W 14 01600
G 052W23 00100 SWIR 46 506
H 052W12AC 04301 Commercial 2 66
052W12C 00604 1 33
I Commercial
052W12C 00605 3 99
052W12C 02300 7 231
J Commercial
052W12C 02400 2 66
052W12C 02100 7 231
052W12C 02200 6 198
K Commercial
052W 13 01600 5 165
052W14 02300 6 198
052W 14 02000 8 264
L Commercial
052W 14 02100 5 165
052W13BD 00900
(westerly portion)
M 052W13BD 01500 Nodal Commercial 9 297
052W13BD 01600
052W13BD 01700
052W13BD 01800
D. Administration
This Section delineates responsibilities of the City and ODOT to monitor and evaluate
vehicle trip generation impacts on the I-5 interchange from development approved under
this Section.
Woodburn Development Ordinance Section 2.05 Page 3
196
Exhibit B
1. TIA: In addition to Section 3.04.05, the following applies: A Transportation Impact
Analysis (TIA) is required for all land use applications subject to the provisions of this
Section. The TIA must meet City and ODOT administrative rule (OAR Chapter 734,
Division 51)requirements and shall include an evaluation and recommendation of
feasible Transportation Demand Management(TDM) measures that will minimize peak
hour vehicle trips generated by the proposed development.
2. For a land use application subject to the provisions of this Section:
a. The City shall not deem the land use application complete unless it includes a TIA
prepared in accordance with TIA Requirements;
b. The City shall provide written notification to ODOT when the application is
deemed complete. This notice shall include an invitation to ODOT to participate in
the City's review process;
c. ODOT shall have at least 20 days to provide written comments to the City,
measured from the date the completion notice was mailed. If ODOT does not
provide written comments during this 20-day period, the City's decision may be
issued without consideration of ODOT comments.
3. The details of City and ODOT monitoring and coordination responsibilities are found in
the Woodburn—ODOT Intergovernmental Agreement(IGA).
a. The City shall be responsible for maintaining a current ledger documenting the
cumulative peak hour trip generation impact from development approved under this
Section, compared with the IMA trip budget.
b. The City may adjust the ledger based on actual development and employment data,
subject to review and concurrence by ODOT.
c. The City will provide written notification to ODOT when land use applications
approved under this Section, combined with approved building permits, result in
traffic generation estimates that exceed 33% and 67% of the IMA trip budget.
4. This Section recognizes that vehicle trip allocations may become scarce towards the end
of the planning period, as the I-5 Interchange nears capacity. The following rules apply
to allocations of vehicle trips against the IMA trip budget:
a. Vehicle trip allocations are vested at the time of design review approval.
b. Vehicle trips shall not be allocated based solely on approval of a comprehensive
plan amendment or zone change, unless consolidated with a subdivision or design
review application.
c. Vesting of vehicle trip allocations shall expire at the same time as the development
decision expires.
E. Allowed Uses
Uses allowed in the underlying zoning district are allowed, subject to other applicable
provisions of the Woodburn Development Ordinance and this Section.
F. Comprehensive Plan and Zoning Map Amendments
1. The provisions of this Section (2.05.02.17) apply to all Comprehensive Plan Map
amendments within the IMA. This Section does not apply to Zoning Map amendments
Woodburn Development Ordinance Section 2.05 Page 4
197
Exhibit B
that result in conformance with the applicable Comprehensive Plan Map designation,
such as Zoning Map amendments that occur when land is annexed to the City.
2. Applications for Comprehensive Plan Map amendments and for Zoning Map
amendments shall determine whether the proposed change will significantly affect a
collector or arterial transportation facility.
3. To ensure that the remaining capacity of the I-5 Interchange is reserved fortargeted
employment opportunities and needed housing, this section imposes the following
prohibitions on Comprehensive Plan Map amendments within the IMA:
a. Comprehensive Plan Map amendments that will increase the net commercial land
area within the IMA shall be prohibited.
b. Comprehensive Plan Map amendments that allow land uses that will generate
traffic in excess of the IMA trip budget shall be prohibited.
G. Interchange Capacity Preservation Standards
Land use applications subject to the provisions of this Section shall comply with the
following:
w4k 4kef a pt)Toved...devel°G°fflitifitS SHI) e t t��...$kis Spa„e 44ofT�;...�"�i(�"�*'�;'�'t���n'I'f'�4. ..
2-1.Peak hour vehicle trips generated by the proposed development shall not exceed the
maximum peak hour vehicle trips specified in Table 2.05A for the subject parcel,
except:
a. Development may be allowed to exceed the maximum, if the development will
contribute substantially to the economic objectives found in the Comprehensive
Plan.
b. Residential development on a parcel zoned Commercial shall be allowed to exceed
the maximum.
-3-22Transportation Demand Management(TDM) measures shall be required to minimize
peak hour vehicle trips and shall be subject to annual review by the City.
Woodburn Development Ordinance Section 2.05 Page 5
198
Exhibit C
Attachment 101
Analyses&Findings
A. Legislative Amendment Applicable Provisions of the Woodburn Development
Ordinance (WDO)
WDO 4.01 Decision-Making Procedures
4.01.02E. Type V Decisions (Legislative):Type V decisions involve legislative actions where the
City Council enacts or amends the City's land use regulations, comprehensive plan, Official
Zoning Map or some component of these documents. Type V decisions may only be initiated by
the City Council. The Planning Commission holds an initial public hearing on the proposal before
making a recommendation to the City Council. The City Council then holds a final public hearing
and renders a decision. Public notice is provided for all public hearings (Section 4.01.14). The
City Council's decision is the City's final decision and is appealable to LUBA within 21 days after
it becomes final.
This WDO amendment and modification to the TSP are considered a post-acknowledgement
plan amendment to the Comprehensive Plan and qualify as a Type V decision. Staff completed
all required public notices (originally noticed for October 9, 2025 and continued until October
23, 2025) pursuant to the WDO 4.01.14:
September 4, 2025: 35-day PAPA notice to DLCD
September 18, 2025: (WDO) notice requirements for legislative amendments mailed and
posted, including notice to Marion County, service providers and ODOT
October 23, 2025: The Woodburn Planning Commission held a public hearing unanimously
recommended approval of the TSP and WDO amendments to the City Council.
December 8, 2025: The Woodburn City Council held a public hearing and voted to tentatively
approve the Legislation.
Woodburn Comprehensive Plan Policies
H. Transportation
Goal 1.9 To ensure that growth is orderly and efficient, the City shall phase the needed public
services in accordance with the expected growth. Extensions of the existing public services
should be in accordance with the facility master plans and Public Facility Plan in this
Comprehensive Plan.
The proposed revisions provide updates for the continued orderly and efficient planning and
growth in current and new UGB areas. The update includes planning for transportation with
LA 23-01: Analyses& Findings Page 1 of 6
199
Exhibit C
estimated costs for each project in the subarea. Not modifying the WDO to remove the trip cap
in the IMA would prohibit any possibility of orderly growth and would prevent the opportunity
for extension of necessary infrastructure to serve the SWIR and UGB expansion properties, as
already approved by DLCD as part of our 2024 UGB expansion.
B-2. Woodburn shall coordinate with affected state agencies regarding proposed
comprehensive plan and land use regulation amendments, as required by state law.
This project was partially funded by a grant from Business Oregon. DLCD, ODOT, and Marion
County staff served on the Technical Advisory Group (TAG) that oversaw the project. All
required parties were notified of the proposed amendments pursuant to state law and Staff
made modifications to the WDO amendment to address written concerns raised by ODOT.
H-6.2 Woodburn will implement plans as provided in the Woodburn TSP.
(b) The TSP shall include a map depicting future street connections for areas to be urbanized.
This is especially important in Nodal Development Overlay and Southwest Industrial Reserve
overlay areas.
The TSP revisions were made to the roadway and local street connections maps, including street
connections to serve the most recently approved UGB which includes both overlay Districts.
B. Applicable Statewide Planning Goals
There are a total of 19 Statewide Planning Goals. Staff finds Goals 3- 10, 13, 15 and Goals 16-19
for Coastal Statewide Planning Goals are not applicable.
Staff finds that the Statewide Planning Goals applicable to this land use decision are as follows:
• Goal 1: Citizen Involvement
• Goal 2: Land Use Planning
• Goal 9: Economic Development
• Goal 11: Public Facilities and Services
• Goal 12:Transportation
• Goal 14: Urbanization
Goal 1: Citizen Involvement -OAR 660-015-0000(1)
The City and its consultants provided citizen involvement opportunities in a variety of ways as
part of the planning process.
- Technical Advisory Group. The City formed and conducted meetings with a technical
advisory group (TAG) that met over four times to review materials and provide direction
at key milestones.
LA 23-01: Analyses& Findings Page 2 of 6
200
Exhibit C
Planning Commission and City Council Meetings. Staff provided public workshops and
updates on the TSP update before the Planning Commission and City Council to present
information.
Staff provided notice to the Department of Land Conservation and Development (DLCD)
in compliance with OAR 660-018-0020 and notified affected government agencies in
conformance with WDO 4.01.14D as outlined above.
Goal 2: Land Use Planning-OAR 660-015-0000(2)
Goal 2 requires each local government in Oregon to establish a land use planning process and
policy framework as a basis for all decisions and actions related to use of land and to assure an
adequate factual base for such decisions and actions. Goal 2 also includes requirements for
coordination with other jurisdictions and government agencies, requires that plans include
implementation measures, and that plans be reviewed periodically and amended as needed.
The City last updated and adopted its Transportation System Plan (TSP) in 2019 and in order to
ensure that the City has an accurate plan for transportation needs and costs, most specifically
for the recently expanded and fast-growing Southwest Industrial Reserve (SWIR), the City
Council initiated this Type V legislative process and update with assistance from a transportation
consultant.
Goal 11: Public Facilities and Services -OAR 660-015-0000(11)
The City last updated and adopted its Transportation System Plan (TSP) in 2019 and in order to
ensure that the City has an accurate plan for transportation needs and costs, most specifically
for the recently expanded and fast-growing Southwest Industrial Reserve (SWIR), the City
Council initiated this Type V legislative process and update with assistance from a transportation
consultant.
Goal 12:Transportation -OAR 660-015-0000(12)
Compliance with Goal 12 is found under Oregon Administrative Rules 660-012 below.
Goal 14: Urbanization -OAR 660-015-0000(14)
The proposal furthers this goal by revising the TSP and WDO to ensure efficient and orderly
infrastructure to address growth within the city's UGB, including the recent UGB expansion of
237 acres.
LA 23-01: Analyses& Findings Page 3 of 6
201
Exhibit C
C. Applicable Oregon Administrative Rules:
660-012 Transportation Planning Rule ("TPR")
Local TSP's and amendments to Plans must comply with the provisions of this rule. The TPR
requires local governments to prepare a transportation systems plan (TSP) that meets the
requirements of OAR 660-012. The City's existing TSP complies with the requirements of Goal
12 and the proposed revisions do not render any elements out of compliance.
Woodburn's adopted 2019 TSP established a transportation system that is adequate to serve
lands within the UGB at that time and is consistent with the Marion County TSP, and in
coordination with ODOT and DLCD. The updated elements in the revised TSP include the new
UGB area and removal of one of the trip caps in the IMA that is no longer applicable. All other
requirements and protections of the IMA still apply. The IMA provisions envisioned by the City's
adopted targeted industries and Comprehensive Plan are preserved.
660-012-0010 Provides that transportation planning be divided into two phases,
transportation system planning and project development.
These revisions update the TSP consistent with all provisions of Division 012. The proposed
revisions do not render any elements out of compliance and staff finds the two phases are not
changed.
660-012-0015 Includes requirements for preparation and coordination of transportation
system plans.
The proposed revisions comply with all of the applicable requirements for preparation,
coordination and adoption of TSPs as is required under this section of the TPR. The TSP
amendments are incorporated as part of City's Comprehensive Plan. The preparation of the
Plan was closely coordinated with affected government agencies and service providers,
including a Technical Advisory Group (TAG) comprised of ODOT, Marion County, and DLCD staff.
The revisions also amend projects and cost summary basis under Chapter 3 of the TSP to
remove completed project and add new needs for expansion areas. The proposed revisions do
not render any elements out of compliance.
660-012-0020 This section of the TPR describes the elements that TSPs must contain.
Staff finds these amendments, together with the previously adopted and acknowledged TSP,
include all of the elements required by the TPR and are consistent with OAR-660-012-0020.
These minor amendments to the TSP include updates to Chapters 3 ("Motor Vehicle System")
and 8 ("Planned Transportation System Cost Summary"). The amendments do not alter
previously adopted policies, financial plans, TDM provisions, or non-vehicular plans. The
projects added to the project list include locations, descriptions, providers, and planning level
cost estimates per this Division. The proposed revisions do not render any elements out of
compliance.
LA 23-01: Analyses& Findings Page 4 of 6
202
Exhibit C
660-012-0030 The provisions of this section set forth how needs shall be identified in TSP's.
The amendments comply with these requirements as noted in Technical Memorandum #2,
dated May 31, 2024 which included an assessment of needs for Bicycle Facilities; Pedestrian
Facilities;Transit Service; Streets and Highways; Intersection Operations; and, Transportation
Safety within and directly adjacent to, the study area and incorporated into the revised TSP.
The proposed revisions do not render any elements out of compliance.
660-012-0035 This section concerns how the transportation system alternatives analysis was
performed.
The City has an acknowledged TSP consistent with the TPR provisions of 660- 012-0035.
Proposed amendments to the TSP account for the new UGB expansion area, address existing
development(s), and remove completed TSP projects for a more current cost basis. As
described in the Technical Memoranda prepared by the consultant and included in this
amendment, ODOT's Analysis Procedures Manual (APM versions 1 and 2) as well as guidance by
the TAG, provide the basis for transportation system alternatives. Three alternatives were
considered including a 'No-Build' option.
660-012-0040 This section of the TPR requires that a TSP include a transportation financing
program and sets forth what such a program is required to include.
The funding program in the TSP is reasonably assured and the proposed revisions did not
significantly modify the financing program. There are no changes to the fiscally constrained
dollar amounts. The TSP amendments include a list of planned transportation facilities
including the estimated timing and rough cost estimates. The proposed changes are de minimis
and are consistent with OAR 660-012- 0040.
660-012-0045 The provisions of this section concern how a TSP is implemented.
The City has an adopted and acknowledged TSP, an approved WDO, and Public Works
Standards that implement the TSP. The proposed revisions, together with previously adopted
and acknowledged ordinances, fully implement the applicable provisions of OAR 660-012-0045.
The WDO amendment to the IMA does not adversely impact the long-term capacity of the
interchange since the IMA parcel trip caps remain in place as well the transportation demand
management (TDM) measures. The only revision is to remove the 20-year planning cap for area
peak hour trips that has expired. All other IMA regulations remain in place on applicable
properties within the IMA. These amendments have been adopted pursuant to all local and
state requirements.
660-012-0060 This section sets forth requirements for plan and land use
regulation amendments.
These amendments, together with previously adopted and acknowledged ordinances, fully
implement the applicable provisions of OAR 660-012-0060. The revisions and WDO
amendment do not alter any of the mobility targets for the interchange. The IMA trip cap
LA 23-01: Analyses& Findings Page 5 of 6
203
Exhibit C
remains in place on applicable properties in the IMA; therefore, no re-evaluation is necessary at
the intersection at this time. The transportation facilities identified in the TSP amendments are
considered to be financially feasible and are included in the System Cost Summary.
LA 23-01: Analyses& Findings Page 6 of 6
204
.. '... �//?G��iO�%��'vWY
BU ! ��/•E/�/1'
�TOODRN
In orarn reA 188
January 12, 2026
TO: Honorable Mayor and City Council through the City Manager
FROM: McKenzie Granum, City Attorney
SUBJECT: Ordinance Vesting Administrative Authority of City in Newly Titled
City Manager Officer Position
RECOMMENDATION:
Adopt an ordinance affirming the vestiture of the prior City Administrator duties
and authorities in the newly titled City Manager position pursuant to the
enactment of the City of Woodburn Charter of 2026.
BACKGROUND:
In November 2025, the electors of the City passed a ballot measure to amend the
Woodburn Charter ("Charter"). That enactment went into effect on January 1 ,
2026. Part of the amendment that was made to the Charter included changing
the title of the office of the City Administrator to City Manager (See Section 21 ).
It was the intent of the City Council as part of the ballot referral for the Charter
Amendment that the general authorities and duties of the previously titled City
Administrator position would carry forward to the newly named City Manager
position and that Scott Derickson, the preceding City Administrator, would
assume the newly titled role of City Manager without interruption.
DISCUSSION:
The purpose of the proposed ordinance is to memorialize the effect of the
Charter's title change and ensure that all authority previously granted to the City
Administrator is now vested in the City Manager.
The ordinance also specifies that the provisions of all previously adopted
ordinances, resolutions, administrative orders, rules, or policies of the City that
reference the City Administrator will hereafter be construed to mean City
Manager and grant such authority to that officer in accordance with the
provisions of the Charter.
Agenda Item Review: City Manager_x City Attorney x_ Finance_x
205
Honorable Mayor and City Council
January 12, 2026
Page 2
Upon ordinance passage, the City Recorder will also then have authority to
undertake a process to update associated governing documents of the City and
change references of City Administrator to City Manager.
FINANCIAL IMPACT:
There are de minimis costs associated with updating official documents and
references around the City that will be assumed over time and in the regular
course of business.
206
COUNCIL BILL NO. 3294
ORDINANCE NO. 2644
AN ORDINANCE PROVIDING FOR ADMINISTRATIVE AUTHORITY OF THE CITY TO VEST IN THE
CITY MANAGER PURSUANT TO THE NEWLY ENACTED AMENDMENTS TO THE WOODBURN
CITY CHARTER; AND DECLARING AN EMERGENCY.
WHEREAS, following a vote of the electors of Woodburn in November 2025, on
January 1, 2026, the City enacted an amended charter, now referred to as the City of
Woodburn Charter of 2026 ("Charter"); and
WHEREAS, as part of the Charter amendment, the City modified and updated
the title of the office of the City Administrator to City Manager; and
WHEREAS, the powers and duties of the City Manager are intended to remain
unchanged from that of the previously titled City Administrator position and are
described and detailed under Section 21 of the Charter; and
WHEREAS, it is the intent of the City that the newly titled City Manager be vested
with all duties and authorities of the prior City Administrator position; and
WHEREAS, the purpose of this ordinance is to memorialize the effect of the
Charter's title change and ensure that all authority previously granted to the City
Administrator is now vested in the City Manager; NOW THEREFORE,
THE CITY ORDAINS AS FOLLOWS:
Section 1. City Manager Duties & Authority. Pursuant to Section 21 of the
amended Charter, the City Manager assumes all administrative duties and authorities
as described in the Charter and as previously held by the office of the City
Administrator.
Section 2. Effect on City Ordinances & Resolutions. The City Manager shall
hereafter assume and be granted all powers, duties, roles, responsibilities, and/or
authorities previously granted to the City Administrator officer under the adopted
ordinances, resolutions, administrative orders, rules, and other policies of the City.
The provisions of all previously adopted ordinances, resolutions, administrative orders,
rules, or policies of the City that reference the City Administrator will hereafter be
construed to mean City Manager and grant such authority to that officer in
accordance with the provisions of the Charter.
Section 3. Authority to Update City Administrator Title References. Following
this ordinance adoption, the City Recorder or their designee may update the title
references of the office of "City Administrator" to "City Manager" (and "Administrator"
Page 1 Council Bill No. 3294
Ordinance No. 2644
207
to "Manager' as those abbreviated terms are used) in all ordinances, resolutions,
administrative orders, rules, and other policy or governing documents of the City.
Failure of the City Recorder to update any singular title reference in an ordinance,
resolution, administrative order, rule, policy, or governing document of the City will not
be deemed to invalidate or limit the effect of Section 2 of this Ordinance.
Section 4. Emergency Clause. This Ordinance being necessary for the
immediate preservation of the public peace, health and safety, and so the City may
ensure clear designations of authority in the appropriate officer of the City, this
ordinance shall take effect immediately upon passage and approval by the Mayor.
Approved as to form:
City Attorney Date
Approved:
Frank Lonergan, Mayor
Passed by the Council
Submitted to the Mayor
Approved by the Mayor
Filed in the Office of the Recorder
ATTEST:
Heather Pierson, City Recorder
City of Woodburn, Oregon
Page 2 Council Bill No. 3294
Ordinance No. 2644
208
.. '... �//?G��iO�%��'vWY
B ! ��/•�E/�/1'
�TOODURN
Inc orpornreA 1889
January 12, 2026
TO: Honorable Mayor and City Council
FROM: Scott Derickson, City Manager
McKenzie Granum, City Attorney
SUBJECT: Committee, Commission, and Board Member Appointment
Procedures
RECOMMENDATION:
Receive report and advise staff on any desired future action.
BACKGROUND:
Per a request from the Mayor, this report is intended to serve as a general review
and summary of the City's procedures for the appointment of members to City
volunteer committees, commissions, and boards. The City currently supports and
has members on the following active committees, commissions, or boards: (1 )
Budget Committee; (2) Planning Commission; (3) Library Board; (4) Recreation
and Parks Board; and (5) Public Art & Mural Committee.
Per the powers vested through the City Charter, the Mayor has the following
authority:
"The mayor shall appoint the committees of the council as provided by the rules
of the council. The mayor shall appoint or remove the members of the boards,
committees, and commissions as provided by ordinance."
Woodburn Charter Section 20.
Per the Council Bylaws, the appointment procedure is further detailed as follows:
"Section 4. City Officers.
A. Mayor . . .
(2) Consistent with the Woodburn City Charter all appointments by the mayor are
subject to Council confirmation.
(3) The Mayor shall make a good faith effort to confer with the Council about
who he/she will appoint to a committee so that any comments, objections, etc. of
Agenda Item Review: City Manager_x_ City Attorney_x_ Finance_x_
209
Honorable Mayor and City Council
January 12, 2026
Page 2
individual councilors may be considered by the Mayor prior to the appointment.
Both the Mayor and Council shall make every possible effort to avoid
embarrassment to appointees.
(4) In the event that the Council does not confirm any appointment made by the
Mayor and submitted to the Council for consideration, the Mayor shall within 10
days make a new appointment and submit it to the Council."
Woodburn Ordinance No. 2182.
Though not a mandated process, often when an individual is interested in
serving on one of the City's Boards or Commissions, they usually first complete a
Committee/Board Application (attached hereto), and return the completed
form to the City Administrator's Office for consideration. When a position opens
up on a committee, the Mayor then often reviews the applications on file to
select an appropriate replacement. Mayors have also historically met with or
conducted informal interview-style meetings with interested and perspective
applicants before making their appointment decisions. No further standardized
background check procedure is otherwise used prior to appointment decisions
being made.
DISCUSSION:
Beyond the Charter authority and Council Bylaw rules described above, the
specific procedures governing membership and appointments for each of the
City's committees, commissions, and boards, include the following:
(1) Budget Committee
The budget committee shall consist of the members of the governing body and
a number, equal to the number of members of the governing body, of electors
of the municipal corporation appointed by the governing body; if there are
electors fewer than the number required, the governing body and the electors
who are willing to serve shall be the budget committee; and if there are no
electors willing to serve, the governing body shall be the budget committee.
Appointive members of the budget committee may not be officers, agents or
employees of the municipal corporation.
Appointive members of a budget committee that prepares an annual budget
shall be appointed for terms of three years. The terms shall be staggered so that,
as near as practicable, one-third of the terms of the appointive members end
each year.
210
Honorable Mayor and City Council
January 12, 2026
Page 3
(2) Planning Commission
The Commission shall consist of a total of seven members appointed by the
Mayor to a full or unexpired term, and confirmed by the City Council. Any
vacancy in the Commission shall be filled by appointment by the Mayor with the
consent of the City Council for the unexpired portion of the term.
All members of the Commission shall be legal residents of the City of Woodburn,
with the exception of one member, who may reside outside the City.
No more than one member shall be engaged principally in the buying, selling, or
developing of real estate for profit as an individual, or as a member of any
corporation that is engaged principally in the buying, selling or developing of
real estate for profit. No more than one member shall be engaged in the same
kind of business, trade or profession.
The terms of office of each Commissioner shall be four years, or until a successor
is appointed and qualified. The terms of the Commissioners shall be staggered
so that not more than three members' terms of office will expire in the same
year. The terms of office shall expire at midnight on December 31 .
The Council may remove a Commissioner, after hearing, for misconduct or
nonperformance of duty.
(3) Library Board
The Board shall consist of seven (7) members, appointed by the Mayor with the
approval of the City Council, and shall be responsible to the Mayor and City
Council. Six (6) members shall be appointed from resident voters of the City or of
the urban growth boundary. The seventh member shall be a high school student
residing within the City of Woodburn or within five (5) miles of the City's Urban
Growth Boundary. Members shall possess a background and interest in library
science and programs, library management and operations, or literacy.
Members shall serve without pay. Terms of office, excepting that of the student
member, shall be four (4) years from the date of appointment and staggered so
three positions will expire every two years. The term of office for the student
member shall commence on the date of appointment and shall extend to the
final day of the student member's Senior year of high school. All other
appointments shall be made annually, in December, or upon the expiration or
other termination of the member's term of office. Each member of the
Committee serves at the pleasure of the Mayor and City Council and may be
211
Honorable Mayor and City Council
January 12, 2026
Page 4
removed prior to expiration of their terms without cause or hearing. Members
may be removed by the Mayor pursuant to City resolution. In addition to the
appointed members, the Mayor or the Mayor's representative and the Director
will serve as ex-officio members.
(4) Recreation and Parks Board
The Board shall consist of seven (7) members, appointed by the Mayor with the
approval of the City Council, and shall be responsible to the Mayor and City
Council. Six (6) members shall be appointed from resident voters of the City or of
the Urban Growth Boundary. The seventh member shall be a high school student
residing within the City of Woodburn or within five (5) miles of the City's Urban
Growth Boundary. Members shall possess a background and interest in
recreation management, leisure services, parks management, or parks and
recreation operations. Members shall serve without pay. Terms of office,
excepting that of the student member, shall be four (4) years from the date of
appointment and staggered so three positions will expire every two years. The
term of office for the student member shall commence on the date of
appointment and shall extend to the final day of the student member's Senior
year of high school. All other appointments shall be made annually, in
December, or upon the expiration or other termination of the member's term of
office. Each member of the Committee serves at the pleasure of the Mayor and
City Council and may be removed prior to expiration of their terms without
cause or hearing. Members may be removed by the Mayor pursuant to City
resolution. In addition to the appointed members, the Mayor or the Mayor's
representative and the Director will serve as ex-officio members.
(5) Public Art & Mural Committee
The Woodburn Public Arts and Mural Committee shall consist of seven to nine
members appointed by the Mayor to a full or unexpired term, and confirmed by
the City Council. Any vacancy in the Committee shall be filled by appointment
by the Mayor with the consent of the City Council for the unexpired portion of
the term.
The Woodburn Public Arts and Mural Committee shall consist of two City
Council/Urban Renewal Agency members, two representative members from
the local art community, and one member from the City Planning Commission.
Additional committee members may include representatives from the Chamber
Board, Woodburn Downtown Association, Downtown Advisory Review
Subcommittee (DABS), the Woodburn Tourism Advisory Committee, a member
of a local-area educational institution (e.g. Woodburn School District), and at-
212
Honorable Mayor and City Council
January 12, 2026
Page 5
large community member(s) who have experience, training or expertise in the
visual arts, art history, art criticism, or art education.
All members of the Committee shall be legal residents of the City of Woodburn,
except those members representing the arts community, who may or may not
reside within the Woodburn City limits.
FINANCIAL IMPACT:
None.
213
CITY OF WOODBURN
APPLICATION FOR COMMISSION/COMMITTEE/BOARD MEMBER WOODBURN
Zn c n ..r a..3 1881
Name: Date:
Present Address:
City/State/Zip:
Phones: 11 Work. Home: Cell:
Email: Years Lived in Woodburn:
Occupation:
Education:
Address for Past 5 Years:
City/State/Zip:
Registered Voter: ❑Yes ❑ No Resident of Woodburn: []Yes ❑ No
Commission/Committee/Board Applying For (excluding City Council and Mayor position):
❑ Woodburn Budget Committee ❑ Woodburn Public Arts and Mural Committee
❑ Woodburn Library Board ❑ Woodburn Recreation and Parks Board
❑ Woodburn Planning Commission ❑ Other (Specify)
Why you want to apply:
What ex erience/ex ertise/interest do you have for this group?
When you apply, it is understood that you will be volunteering to attend all meetings and to actively
participate. Commissions/Committees/Boards generally meet once monthly during the evening hours.
Some groups may meet more often, if necessary. A resume may be attached to this application but is not
required.
Return completed applications to:
City of Woodburn -Office of the Mayor
270 Montgomery Street
Woodburn, OR 97071
For City Use Only Dated Received:
Mayor's Decision:
.. '... �//?G��iO�%��'vWY Item
B�TOODURN
I ncor porn te,/ 1889
January 12, 2026
TO: Honorable Mayor and City Council through City Manager
FROM: Chris Kerr, Community Development Director 6' ';
Heidi Hinshaw, Associate Planner
SUBJECT: Council Briefing of Planning Commission partial approval of a
Modification of Conditions application (MOC 25-02) from Marion
County Housing Authority for "Farmdale Apartments" at 1219 & 1233
W Lincoln Street; Associated with DR 25-02, PAR 24-03, VAR 25-03
Approved December 11, 2025
RECOMMENDATION:
Staff recommends that the City Council take no action on this item and provides
this summary pursuant to a:aaaa.:: bs...arro Q.eve. 11a::a.p ieroll ( ra.: iroa.:..roe:. e Section
...................................................................................................................................................... ...rr............................................................................................................................................................................................
4.02.02. The Council may call up this item if desired and, by majority vote, initiate
a review of the Planning Commission decision.
Public Hearing
On December 11 , 2025, the Planning Commission unanimously approved a
Modification of Conditions application to change two conditions of approval:
1 . To change the vehicular access between two new parcels to emergency
and maintenance vehicles only, and
2. A new condition which relocated the public Mid-Block Pedestrian Corridor
from Parcel 1 to Parcel 2, to be developed at a later date.
No testimony other than from the applicant team was received. The motion to
approve read: "revise[d] Condition 8b and [...] partially approve[d] VAR 25-03 by
replacing two Conditions with a new condition which moves the corridor onto
Parcel 2;" this is illustrated in Figure 1 below.
Additional application materials are found via the f��„f ,;;;;;02. �; 1%Ily Q�ra:a`ee��11
vve„I�va.�-�.��.d�1.��.•......................
Agenda Item Review: City Manager_x City Attorney_x_ Finance_x_
215
Honorable Mayor and City Council, January 12, 2026
Briefing of Planning Commission Approval of MOC 25-02 Farmdale Apartments
Page 2
10
Figure 1
W
r
u' Bey ° .a Lj
�
�r
f
jy
9 4'
PHASE 2�,
.1
"NOT IN
"
AX,,�
Parcel 1 ° Parcel 2
�y
It
I'ro �
w
,..
tiro
A9 SITE WEAN
Notes:Teal circle indicates original location of Mid-Block Corridor;Green circle indicates an example of a possible
new location. Red area shows where vehicular access will now be limited to emergency&maintenance vehicles
only.
DISCUSSION:
n/a
FINANCIAL IMPACT:
n/a
Attachment(s):
None.
216
7 !
WOODBURN
� Item
Incorporated 1889
January 12, 2026
TO: Honorable Mayor and City Council through City Administrator
FROM: Chris Kerr, Community Development Director
SUBJECT: Council Bill No. 3293: Oversized Figures for adoption into the
Transportation Systems Plan ("TSP")
The attached oversized Figures ("Figures 1-9") should have been included in the
printout of the TSP attached with Ordinance 2643. These were included in the TSP
that the Council reviewed and approved as part of the public hearing on
December 9, 2025; however, they were inadvertently left out of the TSP
attachment under consideration for adoption this evening.
No changes have been made to the Figures since the public hearing. Therefore,
adoption of Ordinance 2643 will include the attached nine Figures as part of the
TS P.
ATTACHMENTS:
1 . Oversized Figures for inclusion with the TSP
Agenda Item Review: City Administrator City Attorney Finance
q
H_
cm
i
O
LL
Z
r 0
Y
E
9 @
,,..
Z
RZ
U Vj
i
id.
A
U
i�i wu
O U
c
ru
m
o
q
cn
@
c
0 ''II
o P
CD
0
0
w zn
a�
A9 �
1
e
c
c �
N
� IL
4 c c
CO,
CZ m
�.Al
Ul
Of
Ix
t
m
o .
R
µ� w
e_
ti
,aonkt �_ rn ¢ ° !-i:. i�
6l_ n o 0
�. rc
Q�
DOQ
O
Q
0
C
m ca
«.. �. W
aw B
z
m B
t �
P �
0 0,
A
r
. a lip
r
Pe
� m
C7 c � ro
o ro o i r_
y '
m Z
�B d
0
i
....,. W �
o
f
M
C,
LL
C'V CR
D O
r S�
f4
� E �
J
e
" o
c
MI
71
r
i
71
� O
0
1 Cy
O
Z
v
v >U
a
o �
o _
rvi j
rr»•9s'.'. o
P�' o
a
0- .0
S
v�
r
I "
`w; myr fnlw' ry 3
v ''°'+.v aw remr mw mw nvr.umw rtti�------------
tons
i
_J Gl
C
f3 i `1
U
{im U T
� 4
N ^O
ti „ �B
0
LL
0
Q
0
N
® o
� Cd$
"f
p fl
0. 8
4 &
q
tt
oo
11-2
n^
P
9
� � �" „�, �➢ h� � afar ham+om� d
b
U
u
o F
ii
-
n
LL
00
JI
LL
g f 40o
Al, —
� n
F—
I q
a
a a
b
a
N
'11A4 -
n
µ r
w�
i N �
O
U7 d
y Y r
-tTi 6 LfJ
co c
V� c,
5
h
3 m Q>
T
s o 0
o I �
o fl iL
a
Q
N E(}
id
O
2 Q
o � �
CL -.
a 0
2.,
e
it
i
ti
„w
� b
{ � q
a
m E
I �
m C
_ 31
4 - LU Z Cll .T co Cn IL O w u e�
CD CY)
iL
E �
O
Q 20
an r
J
^`' ,way•w ..
II bw
w, w"myw
4 u
n
e'
�""^wwuww✓"
I(f,f
P
r �
b v
rdk �
{ ki
1P
Q)
r
fJ IX�
o
z�
? tl U o i C
20 TJ O i A
m r� c
W qyi l 8 , O
G
i
r
F� o